Sewage And Infrastructure Development Corporation Of Goa Limited Tender

View complete overview of Goa SIDCGL Tender

Sewage And Infrastructure Development Corporation Of Goa Limited - SIDCGL Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date13 Jan 2024
Closing Date19 Jan 2024
Tender Amount₹ 1,76,13,182 
Notes
Download

Costs

  • EMD

    ₹ 3,52,265
  • Document Cost

    ₹ 8,000
  • Tender Fee

    ₹ 6,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Jointing of H.D.P.E pipe by heating to the end of pipes with the help of tefflon coated electric mirror /heater to the required tempreture & then pressing the ends together against each other to form a monolithic & leak proof joint by thermosetting process . the pressing may be required to be done with jacks/ Hydraulic jack/ Butt fusion machin etc. complete with all materials , labours as directed by engineer incharge. Class IV (6 kg/cm2)

-

-

-

... More
250 mm

128

21632

169

... More
355 mm

251

63252

252

... More
Excavation of Shafts for pipe jacking/ramming purpose in soil inclusive of all shuttering, strutting, and shoring and maiunttaining the shafts during construction operation and backfilling the same after the complition of work.

-

-

-

... More
All kinds of soil upto 5m depth

114

196650

1725

... More
All Types of Soil mixed with soft rock

105

627900

5980

... More
All Types of Soil mixed with hard rock

14

113190

8085

... More
Closed planking in trenches including strutting and shoring packing cavaties (wherever required) complete for sewerage works in saturated soil strata

-

-

-

... More
for works of depth of upto 3.0 m

363

303105

835

... More
Refilling the pipeline/foundation trenches plinth sides,foundation etc with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 m and all lifts and disposal of surplus earth directed by Engineer-in-charge.

233

57784

248

... More
Dewatering of pits or ground by dewatering pumps inclusive of all consumables, diesel, oil, petrol, & lubricants etc. and disposal of water. In All types of Soil

2400

792000

330

... More
Installation of HEPE product pipe by HOD method for on grade gravity sewer including preparing and setting up the plant and equipment, preparing new pipe-work material, making of entry & exit pits upto 3 meter depth, installing new pipe-work and commissioning system or making the system ready for commissioning by HOD operating including, all related civil and mechanical works like excavation, shoring/ strutting, etc. drilling, stringing, reaming, and pulling back the new pipe-work on the designed bore path alignment, proper disposal of drilling fluid and back fill of site after completion all inclusive as per lndSTT:101-2018: Code of Practice for Horizontal Directional Drilling Technique Suiting Indian Conditions. Mixed Strata

-

-

-

... More
250 mm

128

1365760

10670

... More
355 mm

251

5549610

22110

... More
Cutting the bituminous road for laying the pipeline in trenches for a width of 0.6m including labour , tools etc, and disposing the excavated excess material from the trench to a distance of 1000 meters, including making level the trench surface by utilising the serviciable material to the level of the top surface of road, by compacting, watering ramming with rolling with road roller after completion of laying of pipe and refilling the trenches etc. complete as per the direction of engineer incharge.

68.75

34787

506

... More
Construction of Composite type Manholes of various diameters and depth , as per the detailed specification of items of work annexed

-

-

-

... More
1200mm dia x 2000 to 2300mm depth

1

304761

304761

... More
1500mm dia x 2300 to 2500mm depth

1

425706

425706

... More
1500mm dia x 2500 to 3000mm depth

1

578394

578394

... More
1500mm dia x 3000 to 3500mm depth

7

4601149

657307

... More
Providing 2mm thick M.S clamp welded with ISA 50x50x6mm at ends including appliation of bonding solution such as SR solvent of fevicol or Dr fixit or any other equivalent product including fixing with necessary nut, bolt and applying a coat of red oxide etc. Complete as per directed by Engineer -in-charge.d

-

-

-

... More
250 mm

5

8175

1635

... More
355 mm

9

21267

2363

... More
Providing 2mm thick M.S clamp welded with ISA 50x50x6mm at ends including appliation of bonding solution such as SR solvent of fevicol or Dr fixit or any other equivalent product including fixing with necessary nut, bolt and applying a coat of red oxide etc. Complete as per directed by Engineer -in-charge.d

-

-

-

... More
250 mm

0.74

5036

6810

... More
355 mm

2.31

15720

6810

... More
supplying of laterite stone soling of size 150-200 mm and murum having P.I value not more than 6 and laying including packing with smaller stones and consolidation with power road roller including spreading, watering & consolidation of binding material etc (measurements shall be considered on finished item)

132

246444

1867

... More
providing and laying 50mm(consolidated thickness)full grout using granitic or basaltic stone of specified grading at 6.00 cu.m per 100 sq m grouting with hot bitumen straight run bitumenfor with such bituminous material of grade and type as specified by the Engineer-in-charge at 5.0 kg per sq.m binding with key aggregate of granitic or basaltic stone of specified grading at 1.5 cu.m per 100 sq.m including providing and laying seal coat sealing the voids in a bituminious surface laid with F.E loader with 1 cu.m bucket capacity to the specified levels,grade and cross fall using type A seal coat with 0.98 kg/sqm of bitumen of grade as per MoRT&H specifications clause 513.

297.44

187684

631

... More
providing and applying tack coat with bitumen grade of 80/100 or bitumen emulsion using pressure distributor on the prepared bituminous/granular surface cleaned with mechanical broom as per MoRT&H specifications clause 503

297.44

5056

17

... More
providing and laying bituminous macadam with 40-60 TPH hot mix plant producing an average output of 50 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder to the specified percentage of total mix,transported to site with all leads laid over a previously prepared surface with sensor paver finsiher to the required grade, level and alignment and rolled with smooth wheeled roller and vibratory roller to achieve the desired compaction including providing antistripping agent @ 0.5% of bitumen content , as per MoRT&H specifications clause 504. grade-I(40mm nominal size)@ 3.3% of bitumen-Mix

14.87

139945

9410

... More
providing and laying 25 mm thick bituminious/Asphaltic concrete with 40-60 batch type HMP producing an average output of 50 tonnes per hour using crushed aggregates of specified gradings premixed with bituminious binder at 6.5% by weight of total mix and filler incl.providing antistripping agent @ 0.50% of bitumen content of transpoting the hotmix to work site with all leads and applying a tack coat @ 3.75 kg/10sq.m with hot bitumen of 80/100 and laying with hydrostatic/hydraulic power finisher with sensor or control to the required grade ,level and alignment, rolling with smooth wheeled vibratory or tandem rollers to achieve the desired compaction as per MORT&H specifications clause 509 and 503.

297.44

146340

492

... More
Providing and laying in position ready mixed concrete (RMC) with usage of Ordinary Portland Cement manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C., from the transit mixer to the site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level. III)M-20 grade of concrete

44.62

366910

8223

... More
Providing and laying in position cement concrete below foundation M15(1:2:4) (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : For Repair of Damaged Drains

2

13620

6810

... More
Centering & shuttering including Strutting, Propping & removal of forms for Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like

15

7185

479



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.