Sewage And Infrastructure Development Corporation Of Goa Limited Tender

Calculate bid estimation of Goa SIDCGL Tender

Sewage And Infrastructure Development Corporation Of Goa Limited - SIDCGL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date2 Apr 2025
Closing Date17 Apr 2025
Tender Amount₹ 1,82,79,209 
Notes
Download

Costs

  • EMD

    ₹ 3,65,585
  • Document Cost

    ₹ 10,000
  • Tender Fee

    ₹ 6,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Jointing of HDPE pipes by heating the two ends of the pipe with electrically heated mirror, to the required temperature, including the hire charges of heating mirror and the generator set for the electricity for the heating mirror etc complete as per the direction of the engineer in- charge

-

-

-

... More
250 mm Dia HDPE (for By passof existing sewerline)

32

174

5568

... More
500 mm

32

356

11392

... More
Conveying carefully from stack at site, 250m from both sides rolling and lowering in trenches, laying true to line and level and perfect linking for joints for P.V.C / H.D.P.E complete in all respects as per the direction of the engineer in-charge

-

-

-

... More
250 mm Dia HDPE (for By passof existing sewerline)

190

10

1900

... More
500 mm

190

13

2470

... More
Cutting the bituminous road for laying the pipeline in trenches for a width of 0.6m including labour, tools, etc. and disposing the excavated excess material from the trench to a distance of 1000 metres, including making level the trench surface by utilising the serviceable material to the level of the top surface of road, by compacting, watering ramming with rolling with road roller after completion of laying of pipe and refilling the trenches etc. complete as per the direction of engineer in charge. Rural Roads

18

410

7380

... More
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in :Ordinary soil. 0 to 60 cm

91.2

323

29457.6

... More
Earthwork in excavation over areas in saturated soil (exceeding 0.30 m depth up to a depth of 0.60 m) including disposal of excavated earth,upto a lift of 1.5 m & within a lead of 50m to be neatly dressed leveled, as directed by the Departmental Officer. excluding planking, timbering in trenches and dewatering. Extra for earthwork excavated in saturated soil for every 0.30 m. depth or part thereof over 0.60 m. depth. Extra for additional depth of 1.5 m or part thereof in saturated soil . For Bypass of existing sewer line 250 mm dia

-

-

-

... More
0.60 to 0.90m

102.6

806

82695.6

... More
0.90m to 1.20m

102.6

923

94699.8

... More
1.2m to 1.50m

102.6

1040

106704

... More
1.50m to 1.80m

102.6

1218

124966.8

... More
1.80m to 2.10m

102.6

1335

136971

... More
2.10m to 2.40m

102.6

1452

148975.2

... More
2.40m to 2.70m

102.6

1569

160979.4

... More
2.70m to 3.00m

102.6

1686

172983.6

... More
Earthwork in excavation over areas in saturated soil (exceeding 0.30 m depth up to a depth of 0.60 m) including disposal of excavated earth,upto a lift of 1.5 m & within a lead of 50m to be neatly dressed leveled, as directed by the Departmental Officer. excluding planking, timbering in trenches and dewatering. Extra for earthwork excavated in saturated soil for every 0.30 m. depth or part thereof over 0.60 m. depth. Extra for additional depth of 1.5 m or part thereof in saturated soil . For Main sewer line 500 mm dia

-

-

-

... More
0.60 to 0.90m

57

806

45942

... More
0.90m to 1.20m

57

923

52611

... More
1.2m to 1.50m

57

1040

59280

... More
1.50m to 1.80m

57

1218

69426

... More
1.80m to 2.10m

57

1335

76095

... More
2.10m to 2.40m

57

1452

82764

... More
2.40m to 2.70m

57

1569

89433

... More
2.70m to 3.00m

57

1686

96102

... More
3.00m to 3.30m

57

1864

106248

... More
3.30m to 3.60m

57

1981

112917

... More
3.60m to 3.90m

57

2098

119586

... More
3.90m to 4.20m

57

2215

126255

... More
4.20m to 4.50m

57

2332

132924

... More
4.50m to 4.80m

57

2510

143070

... More
4.80m to 5.10m

57

2627

149739

... More
5.10m to 5.40 m

57

2744

156408

... More
5.40m to 5.70m

57

2861

163077

... More
5.70m to 6m

57

2978

169746

... More
6m to 6.30m

57

3156

179892

... More
Add extra for excavation in or under water and on liquid mud including cost of pumping and complete (extra rate per cu.m. of excavation qty. in saturated soil strata considering actual water table level during the construction as datum )

-

-

-

... More
Excavation work upto 3.00m. depth from datum (measured from saturated soil/ strata level).

513

781

400653

... More
Excavation work upto 4.50 m depth from datum (measured from saturated soil/ strata level).

285

1330

379050

... More
Excavation work upto 6.0 m & above depth from datum (measured from saturated soil/ strata level).

342

2473

845766

... More
Closed planking in trenches including strutting and shoring packing cavaties (wherever required) complete for sewerage works in saturated soil strata

-

-

-

... More
for works of depth of upto 3.0 m (for By passof existing sewerline)

1140

835

951900

... More
for works of depth of upto 6.0 m (For Excavation Pit)

2280

1276

2909280

... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.

60

2211

132660

... More
Refilling the pipeline/foundation trenches plinth sides,foundation etc with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 m and all lifts and disposal of surplus earth directed by Engineer-in-charge.

1314

245

321930

... More
Plugging of manhole both from upstream and pumping of Sewage from upstream or downstream sides while carrying out rectification of the Sewerlines /removing chokeup with sand bags and removing the same plugging after completion of the said work and making way for the smooth flow of sewage as directed by Engineer-in-charge.

2

14002

28004

... More
Construction of Composite type Manholes of various diameters and depth , as per the detailed specification of items of work annexed with

-

-

-

... More
i) 1500mm dia x 6500 to 7000mm depth

2

1004814

2009628

... More
ii) 1500mm dia x 7000 to 7500mm depth

3

1061119

3183357

... More
Providing 2mm thick M.S clamp welded with ISA 25x25x6mm at ends including appliation of bonding solution such as SR solvent of fevicol or Dr fixit or any other equivalent product including fixing with necessary nut, bolts and applying a coat of red oxide etc. complete as per directed by Engineer-in-charge. 500 mm Dia

10

1713

17130

... More
Providing and laying in position cement concrete below foundation M15(1:2:4) (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : 500 mm dia

34.56

6810

235353.6

... More
Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead.

2

1136

2272

... More
Laterite masonry in neatly dressed stones for 20 cms thick masonry walls in cm. 1 : 4 (1 cement : 4 coarse sand) in foundation upto plinth level

2

6453

12906

... More
As per Circular No.3-3-05/SSW-PWD/Vol-I/2022-23/391 Dt.13/03/2023 for Adoption of percentage increase in rates for working of sewerage works under unhygenic conditions - 10% (For item no. 1 to 37)

1

1661746

1661746.26



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.