Public Works Department Tender

View complete overview of Goa PWD Tender

Public Works Department - PWD Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date11 Feb 2025
Closing Date20 Feb 2025
Tender Amount₹ 12,02,021 
Notes
Download

Costs

  • EMD

    ₹ 24,040
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 2,404

Summary

Repairs To Pipeline Network Of Various Types In Curtorim Constituency Under Sd Iv Wd Ix Ws Borda Pwd

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; 160 mm

8

7596

60774.24

... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline (Outer Dia in mm); 80 mm

23

4134

95104.08

... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline 100 mm Nominal Dia

10

4574

45749.6

... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline (Outer Dia in mm); 150 mm

15

8945

134188.8

... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline 200 mm Nominal dia

10

10759

107599.2

... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline 250 mm Nominal dia

3

14005

42017.76

... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline 300 mm Nominal dia

3

16837

50513.76

... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to D.I / C.I pipeline 150 mm Nominal dia

3

10404

31214.76

... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.

6.72

2211

14857.92

... More
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : All works upto plinth level

3.36

6635

22293.6

... More
JCB excavator

100

1655

165500

... More
Pump for pumping water continuously

25

400

10000

... More
Hiring of electrical / diesel breaker for cutting bituminous roads, concrete and hard surface including operator for breaker, electrical wire etc. complete with all safety measures as directed by engineer in charge.

25

1000

25000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.