Public Works Department Tender
View complete overview of Goa PWD Tender
Costs
EMD
₹ 24,040Document Cost
₹ 5,000Tender Fee
₹ 2,404
Summary
Repairs To Pipeline Network Of Various Types In Curtorim Constituency Under Sd Iv Wd Ix Ws Borda Pwd
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_19991_1Tender No
PWD IX /2062/17/2024-25 line07Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; 160 mm
8
7596
60774.24
... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline (Outer Dia in mm); 80 mm
23
4134
95104.08
... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline 100 mm Nominal Dia
10
4574
45749.6
... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline (Outer Dia in mm); 150 mm
15
8945
134188.8
... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline 200 mm Nominal dia
10
10759
107599.2
... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline 250 mm Nominal dia
3
14005
42017.76
... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to A.C pipeline 300 mm Nominal dia
3
16837
50513.76
... More
Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge; Repairs to D.I / C.I pipeline 150 mm Nominal dia
3
10404
31214.76
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
6.72
2211
14857.92
... More
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : All works upto plinth level
3.36
6635
22293.6
... More
JCB excavator
100
1655
165500
... More
Pump for pumping water continuously
25
400
10000
... More
Hiring of electrical / diesel breaker for cutting bituminous roads, concrete and hard surface including operator for breaker, electrical wire etc. complete with all safety measures as directed by engineer in charge.
25
1000
25000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements