Public Works Department Tender
View complete overview of Goa PWD Tender
Costs
EMD
₹ 14,348Document Cost
₹ 5,000Tender Fee
₹ 1,435
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_20746_1Bid Award Id
ViewTender No
PWD/WDI/ASW-17/2024-2025/46/09Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of Septic tank and Soak pit for Female ward No.07 at IPHB Bambolim-Goa.
BOQ Items
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
9.8
2211
21667.8
... More
Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering shuttering and finishing in:;All works upto plinth level
5.53
6192
34241.76
... More
Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.
19.19
5186
99519.34
... More
Centering & shuttering including Strutting Propping & removal of forms for :;Vertical surfaces such as retaing walls return walls Partitions walls (any thickness) including attached Pilasters Buttresses Plinth and string courses Fillets and the like
5.28
479
2529.12
... More
Centering & shuttering including Strutting Propping & removal of forms for :;Suspended floors roofs landings shelves & their supports
36
644
23184
... More
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering shuttering finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size);All works upto plinth level
5.9
7178
42350.2
... More
Providing TMT steel reinforcement bars of (SAIL TATA. VIZAG JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
472
105
49560
... More
12mm cement plaster 1:4 (1 cement : 4 coarse sand)
211.92
223
47258.16
... More
Extra for providing and mixing water proofing material proportion recommended by the manufacturers.;12mm cement plaster 1: 4 (1 cement : 4 sand)
55.2
8
441.6
... More
Neat Cement punning
55.2
58
3201.6
... More
Making soak pit. 2.5 m dia 3 m deep with 45x45 cm dry brick honey comb shaft and S.W. drain pipe 100 mm diameter 1.8 m long complete filled with laterite stone aggregate 125 to 180 mm surrounded by laterite stone aggregate of 40 mm and down gauge as per standard design.
1
36210
36210
... More
Refilling the pipeline/foundation trenches plinth sides foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
50.61
245
12399.45
... More
Constructing brick masonry manhole or inspection chamber with second class bricks in cement mortar 1:5 (1 cement :5 fine sand) R.C.C. top slab with 1: 1 1/2:3 mix (1 cement: 1 1/2 coarse sand ;3 graded stone aggregate 20mm nominal size foundation concrete 1:1 1/2:3 mix (1 cemet ;1 1/2 coarse sand :8 graded stone agrregate 20mm nominal size) inside plastering 12 mm thick with cement mortar 1:3 (1 cement :3 coarse sand) finished with a floating coat of neat cement and making channels in cement concrete 1:2:4 mix (1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size) neatly finished complete as per standard design.;Inside size 60 x 60cm and 60cm deep including C.I. cover with frame (light duty) 455x610mm internal diameter total weight of cover and frame to be not less than 38 kg. (weight of cover 23 kg).
5
9297
46485
... More
Providing and fixing rigid PVC S.W.R. (soil waste & rain water drainage pipes of approved including lubricant etc. complete (single/double) socketed:;110 mm dia
50
295
14750
... More
Providing and laying cement concrete 1:5:10 (1 cement :5 fine sand :10 graded stone aggregate 40 mm nominal size upto haunches of s.w. pipes including bed concrete 15cm thick as per standard design :;100 mm diameter S.W. pipe.
50
678
33900
... More
Providing and fixing rigid PVC bend (approved make ) for S.W.R. pipes including lubricating etc complete bend with door :;100 mm dia
20
215
4300
... More
(B) By mechanical transport including loading unloading and stacking;(A) Limebuilding rubbish manure sludge moorum excavated rock;Excavated rock;1KM
136.4
581
79367.07