Public Works Department Tender

View complete overview of Goa PWD Tender

Public Works Department - PWD Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date5 Sep 2024
Closing Date16 Sep 2024
Tender Amount₹ 7,52,170 
Notes
Download

Costs

  • EMD

    ₹ 15,043
  • Document Cost

    ₹ 3,000
  • Tender Fee

    ₹ 1,504

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.

8

17688

2211

... More
Supplying at store or site of work including railway freight, carting, loading, unloading, stacking etc. unplasticised non-pressure PVC pipes for using underground drainage and sewerage system confirming to IS:15328 - 2003 stifness class SN-8 (8 KN/m2, SDR-34).Dia in mm

-

-

-

... More
c) 160

32

26400

825

... More
Conveying carefully from stack at site, 250m from both sides rolling and lowering in trenches, laying true to line and level and perfect linking for joints for P.V.C / H.D.P.E complete in all respects as per the direction of the engineer in-charge.

-

-

-

... More
f) 160mm OD

32

224

7

... More
Jointing of rigid / SEL FIT PVC pipes by cleaning the pipe with solvent cement including the cost of solvent cement and hydraulic testing of joints etc. complete as per IS:7634-1975 Part 3, including hydraulic testing of joints as directed by the Engineer in-charge.

-

-

-

... More
f) 160mm

5

365

73

... More
Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 grade granite or basaltic stone 20mm nominal size) including centering shuttering and form work for encasing around S.W. pipes including bed concrete as per standard design in I S:4127.

-

-

-

... More
b) 150mm dia S.W. pipes

30

51720

1724

... More
Construction of manhole rectangular in shape including cement concrete 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) foundation thickness of concrete 20cms and offset 10cms on both sides and first class brick work with bricks class designation 100kg/sq.cm (wire cut bricks) cement mortar 1:3 (1 cement : 3 coarse sand) 23cms thick including providing & fixing CI footrests confirming to IS 5445/69 or revised and whose weight shall not be less than 5.30kgs including fixing in man-hole at 30cm c / c in 20x 20x10cm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) and 12mm thick plaster inside and outside with cement mortar 1:3 (1 cement : 3 coarse sand) including adding waterproofing compound of approved brand in cement mortar with a floating coat of neat cement and making channel in cement concrete 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20m nominal size) neatly finished complete as per standard design.

-

-

-

... More
II) Inside size 0.45x 0.60m and 0.60m deep (with medium duty DI manhole cover & frame of size 0.45x 0.60m weighing 70kgs) including fixing with cement concrete 1:2:4 (1 cement :2 coarse sand: 4 graded stone aggregate 20mm nominal size and applying the frame & cover with coal tar.

1

22866

22866

... More
III) Inside size 0.60x0.60m and 0.60m deep (with medium duty DI manhole cover & frame of size 0.60x 0.60m weighing 90kgs) including fixing with cement concrete 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20mm nominal size and applying the frame & cover with coal tar).

4

93484

23371

... More
IV) Inside size 0.90 x 0.60m and 1.00m deep ( with medium duty DI manhole cover & frame of size 0.90x 0.60m weighing 105 kgs including fixing with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size and applying the frame & cover with coal tar).

10

354650

35465

... More
Extra/Additional depth of above square/ rectangular manholes at above item no.infractions with 100kg/sq.cm(wire cut bricks) brickwork in cement mortar 1:3 (1cement:3coarse sand) 23cm thick including providing and fixing CI footrests not weighing less than 5.30kgs incl. fixing in manholes @ 30cmc/c staggered in 20x20x10cm cement concrete blocks 1:3:6(1cement:3coarse sand :6graded stone aggregate 20mm nominal size) 12mm thick plaster inside and outside with cement mortar 1:3 (1cement :3coarse sand)including adding water proofing compound of approved brand with a floating coat of neat cement.

-

-

-

... More
III) 0.60 x 0.60m Manholes.

60

9300

155

... More
IV) 0.90 x 0.60m Manholes

125

22375

179

... More
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:

-

-

-

... More
A) All works upto plinth level

8

54480

6810

... More
Demolishing brick work in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead.

11

10538

958

... More
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.

47

11515

245

... More
Transportation and Carriage of materials

-

-

-

... More
A) By tipper truck including loading, unloading and stacking A) Lime, building rubbish, manure sludge, moorum excavated rock ii) Earth upto 5 Km.

183

28961

158.26



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.