Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_mptgo_799076_1Bid Award Id
ViewTender No
CE/17/2024Tender Authority
Mormugao Port Trust ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing & laying cement concrete ( 1:3;6) using 20 mm graded aggregate as coarse aggregate including mixing, depositing, consolidating , levelling, curing etc. All labour & material, tools & plant etc complete. Before laying the PCC , the soil has to be fully compacted and levelled by means of mechanical or manual rammer.
64
353152
5518
Constructing masonry in foundation and plinth using precast cement concrete solid blocks having a crushing strength not less then 35 kg/cm2 ( 28 days curing ) with a mix not leaner then (1:5:10) in cement mortar (1:6) including providing specially moulded blocks at junctions & corners, curing etc. All labour & material etc complete
160
1061440
6634
Supply of good quality soil for backfilling in the tree pits/beds free from any debris, laterite stones, bolders and wastes of any kind . All transportation, labour , tools & plant etc complete. soil shall be stored convienently at different plantation locations and no extra rate shall be given for retransporting the same. Rate shall include cost of retransporting of soil .
272
337008
1239
Transporation of saplings supplied from Forest Department/Panaji/ Saligao/Margao or any other nursery with similar distances to the Port AO bldg or as directed from above mentioned locations.Note: maximum lead distance of 40 kms. Goods carrying capacity of vehicle should be able to transport minimum of 500 plants minimum in a trip. Rate shall include cost of loading/unloading the tree saplings or any other incidentals.
4
16000
4000
Supply of dumper truck on hire basis as and when required of minimum 6.00 m3 capacity in good working condition for 8 hrs a day along with driver, fuel in Port area for transporting murrum, debris etc as directed within a lead of 6.00 kms. All fuel , driver, maintenance costs etc complete.
10
52500
5250
Planting of tree saplings supplied by the Department . . Planting will include trasporting of saplings at the Port designated areas, planting of saplings, backfilling the pits with garden earth,excavated earth as directed and immediately watering of saplings after plantation. All tools & plants etc complete
2000
24000
12
Supply of labour for carrying out misc works with necessary tools and plants.
25
21125
845
Deployment of Mechanical excavator with bucket on site on call basis for 8 hrs hire time. Note : The rates shall include the cost of fuel,driver, consumables etc. Payment shall commence once JCB is actually deployed on site.
20
168000
8400
PART B : Maintenance of of the tree saplings for 3 years
-
-
-
Maintenance of 2000 nos tree saplings after completion of plantation for a period of three years. Watering to be carried out on alternate days during winter season and every day during summer season (till on set of monsoons. monsoon period will be excluded for maintenance/watering.) . All tools & plants ,labour & materials etc complete. Rate shall include cost associated for maintaining /watering of plants , cost of water, tankers,labour, hoses for watering, temporary water tanks, weeding, etc required for watering, A minimum of 04 nos staff workers shall be deployed per day for carrying out watering of the plantation carried out at the different locations. The Contractor shall use sufficient quantity of water to ensure every plant is properly watered till the next schedule of watering.
468
2061072
4404
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements