Mormugao Port Trust Tender
View complete overview of Goa Mormugao Port Trust Tender
Costs
EMD
₹ 2,00,100Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_mptgo_794293_1Bid Award Id
ViewTender No
CE/01/2024Tender Authority
Mormugao Port Trust ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Renewal of damaged wooden /P.S.C. sleepers by using new wooden/P.S.C. sleepers on straight or curved track within the siding, including removing the damaged wooden/P.S.C. sleepers, transporting and stacking within a lead of 5 kms, inserting the new sleepers fixing with available fittings, etc true to gauge level and alignment and retaining the original ballast profile, etc. as directed. All materials, equipments, tools & plant, labour, etc. complete. Note: 1. Wooden/PSC sleepers will be supplied by the department free of cost 2. Approval shall be taken from Executive Engineer (HR) before the execution of this item.
70
30520
436
... More
Renewal of damaged P.S.C. sleepers using new P.S.C. sleepers on level crossings or curved track fixed with check rail along with stock rail including removing the damaged P.S.C. sleepers by cutting the road on Level crossings, removing the debris etc, inserting the new sleepers under the tracks along with checkrails, fixing with fittings etc. in track true to gauge level and alignment including drilling holes in sleepers for fixing the brackets including retaining the original ballast profile, etc. and redoing the road with available loose material etc as directed. All materials, equipments, tools & plant, labour, etc. complete. Note: 1. PSC sleepers will be supplied by the department free of cost 2. Approval shall be taken from Executive Engineer (HR) before execution of this item.
70
35210
503
... More
Inserting of cut wooden sleeper of size 60x25x15 cm approx. and transporting and stacking within a lead of 5 kms, inserting the sleepers below the rails and fish plate joint, etc to true gauge level and alignment and retaining the original ballast profile, etc. as directed. All materials, equipments, tools & plant, labour, etc. complete.
80
15040
188
... More
Through packing on existing tracks on B.G. straight/ curved tracks with or without checkrails including points and crossings as indicated in Para 233 of IRPW manual with all operations such as opening of the road, examination of rail/sleepers and fastenings, squaring of sleepers, slewing of tracks to correct alignment if required, gauging packing of all types of sleepers, repacking of joint of sleepers, boxing of ballast section to standard parameters as detailed in Para 224 of IRPW manual of 52kg/90R / 60 kg rails of any lead and lift etc. Complete. Lifting sags up to a maximum of 75mm under traffic condition. Unit of Track Running Metre (TRM) will be considered as M. All materials, equipments, tools & plant, labour, etc. complete. (NOTE: Level, gauge & versine are to be taken every four months and reports submitted by contractor to the Department)
-
-
-
... More
Points & crossings (Turn out)
-
-
-
... More
Ist Round of Four Months
96
436224
4544
... More
Description as detailed in Item no. 7, but for IInd Round of Next Four Months
96
436224
4544
... More
Description as detailed in Item no. 7, but for IIIrd Round of Next Four Months
96
436224
4544
... More
In other Track Lines
-
-
-
... More
Description as detailed in Item no. 7, for Ist Round of Four Months
27792
3557376
128
... More
Description as detailed in Item no. 7, IInd Round of Next Four Months
27792
2973744
107
... More
Description as detailed in Item no. 7, IIIrd Round of Next Four Months
27792
2390112
86
... More
Note: 1. Approval shall be taken from Executive Engineer (HR) before the execution of above item. 2. Schedule shall have to be prepared of above item before execution.
-
-
-
... More
Description as detailed in Item No.7 above but for extra lift or sag/depression of more than 75mm and up to 150mm etc. including all labour, materials, equipments, tools and plant etc. complete. Unit of TRM will be considered as M. Note: 1. Approval shall be taken from Executive Engineer (HR) before the execution of above item.
3000
222000
74
... More
Deployment of skilled Keyman - 3 nos. for maintaining BG railway tracks, points and crossings perfect condition including tightening the loose fittings, replacing the missing damaged fittings such as fish bolts & nuts, elastic rail clips, rail screws, M.S. liners, fish plates, rubber pads, etc. and patrolling the tracks regularly for three shifts a day including Sundays and Public holidays (except for attendant) as instructed by the department, lubricating rail joints twice in a year, deploying 2nos. of skilled greaser for lubricating the switch assembly of turnouts using suitable lubricant such as grease. & deployment of 1 no of attendant for attending housekeeping/ stores. Note:1 )The work of lubricating of rail joints shall be taken up under caution order, to be issued by Engineer In charge. 2) All Permanent Way materials and consumables will be issued to the contractor by the department free of cost. 3) Work output generated by Keyman, Greaser and Attendants shall have to be reviewed by Executive Engineer (HR) every week.
-
-
-
... More
Deployment of skilled Keyman.
3 x 730 = 2190 nos.
2190
1600890
731
... More
Deployment of skilled Greaser
2 x 730 = 1460 nos.
1460
1067260
731
... More
Deployment of Attendant
1 x 640 = 640 nos.
640
467840
731
... More
Greasing of existing elastic rail clips and sleeve on sleepers protecting from corrosion. Elastic rail clip shall be removed and re-fixed on applying grease for elastic rail clip as well as sleeve. All materials, equipments, tools & plant, labour, etc. complete. This operation has to be carried out twice in a year (pre monsoon and after post monsoon). Grease will be issued by the department free of cost. Note: 1. Approval shall be taken from Executive Engineer (HR) before the execution of above item. 2. Schedule shall have to be prepared of above item before execution
200000
680000
3.4
... More
Replacing the fractured rail of the track (up to 13.00 m length) of section 52 kg / 90 R / 60 kg as and when required on straight or curved track including transporting the new rails to the site, cutting the rails to plumb by mechanical means with hacksaw to the required length, drilling of required holes of up to 32mm diameter in proper alignment to accommodate fish bolts, removing the fractured rail by unfastening all fittings and fixing the new rail, joining with fish plates as per standard procedure including leveling, gauging, rough packing aligning and making the tracks fit for traffic use, including transporting the retrieved fractured rail to the departmental railway stack yard, within siding. All labour, tools and plant etc. complete. Note: 1.Rails will be issued by the department free of cost. 2. Approval shall be taken from Executive Engineer (Railway/VSG) before the execution of above item. 3. Unit of Rail will be considered as EA
90
493560
5484
... More
Description as detailed in Item No.18 above but for replacing fractured check rails provided on curvatures including fixing of brackets etc. All labour, equipment, tools and plant complete. NOTE: 1. All the Permanent Way materials will be supplied by department free of cost. 2. Approval shall be taken from Executive Engineer (HR) before the execution of above item. 3. Unit of Rail will be considered as EA.
60
149880
2498
... More
Maintenance of points & crossings including replacing the damaged components ( 1 in 8 1/2 turnout) as per the items mentioned below including transporting the same to the site including, cutting & drilling, the required no. of holes of up to 32 mm diameter, including transporting and stacking the damaged components to the Railway Maintenance Office /AEN (Rly) stack yard as directed. All labour, equipment, tools and plant complete. NOTE: 1. All Permanent Way materials will be supplied by department free of cost. 2. Approval shall be taken from Executive Engineer (Railway/VSG) before the execution of above item.
-
-
-
... More
Tongue rail /Stock rail (52 kg / 60 kg)
40
130720
3268
... More
Description as detailed in item no.20 but for Built up Crossing/CMS crossing
8
27288
3411
... More
Description as detailed in item no.20 but for Stretcher bar
20
6160
308
... More
Description as detailed in item no.20 but for Check rail
50
107950
2159
... More
Description as detailed in item no.20 but for Rubber pads
10000
810000
81
... More
Supplying casual labour, skilled/ semi-skilled etc. during exigencies for maintenance of railway tracks to execute the unforeseen works involved which are not covered in the above items etc. All tools, plants, safety equipments etc. complete. NOTE: 1. Approval shall be taken from Executive Engineer (HR) before the execution of above item
-
-
-
... More
Skilled category (Blacksmith, Fitter, Painter, Carpenter)
30
29040
968
... More
Description as detailed in item no.25 but for Semi Skilled category (Asst. Fitter, Asst. Carpenter, Asst. Painter)
30
24750
825
... More
Description as detailed in item no.25 but for Mazdoor/Gangman
700
511700
731
... More
Description as detailed in item no.25 but for Trolley man
30
21930
731
... More
Screening of ballast after scooping out from the tracks (3.75 m width) mixed with coal/ coke / limestone / earth/ any other foreign material by using sieve /screen of required size including transporting & dumping good ballast in the tracks and transporting & dumping residual material outside the Port area as directed. All labour, equipment, tools and plant etc. complete. Unit of TRM will be considered as M. NOTE: 1. Approval shall be taken from Executive Engineer (HR) before the execution of above item.
5000
1310000
262
... More
Removal of jammed elastic rail clips of track by heating, without causing damage the studs of the sleeper including clearing of spillage and ballast around the clips etc. All Labour and Material, Tool and Plant, equipments, LGP, Oxygen cylinder, etc. complete. NOTE: 1. Approval shall be taken from Executive Engineer (HR) before the execution of above item.
200
12500
62.5
... More
Slewing of track laterally with 52 kg /90R / 60 kg rail on PSC sleepers including points and crossings on wooden/ concrete sleepers to a new alignment to an extent not more than 30 cms including disconnection if required with packing etc. All labour, tools and plant, equipment, etc. complete. NOTE: 1. Approval shall be taken from Executive Engineer (HR) before the execution of above item. 2. Unit of TRM will be considered as M
500
30675
61.35
... More
Reconditioning of the distorted rail head tops caused by wheel burns by welding Eutetic-680 S.S arc welding electrodes and grinding to build up the distorted section of the main rail of the track of section 52kg/90R/ 60 kg including transporting all necessary equipments and tools to the site, grinding and roughening of the wheel burn location, filling the wheel burn depressing on the rail with Eutetic-680 S.S arc welding electrodes, grinding to build up distorted section as directed including leveling, gauging, rough packing aligning and making the track fit for traffic use. ii. Reconditioning of 52kg / 60 kg CMS Crossing in situ of 1 in 81/2 turn by welding with approved quality of welding electrode Eutetic-680 Confirming to IRS M-28 as per the specification and instruction laid down in the manual of reconditioning of MM Steel points and crossings, 1996 issued by RDSO, Lucknow. Cleaning the foreign material by suitable means and grinding the rail surface before and after the welding to arrive at the rail profile keeping the CMS crossing in tank filled with water. iii Reconditioning of 52kg / 60 kg Tongue rail in situ of 1 in 81/2 turn by welding with approved quality of welding electrode Eutetic-680 Confirming to IRS M-28 as per the specification and instruction laid down in the manual of reconditioning of MM Steel points and crossings, SEJ’S 1996 issued by RDSO, Lucknow. Cleaning the foreign material by suitable means and grinding the rail surface before and after the welding to arrive the rail profile. All labour & Material, Tools & Plant, lead and lift etc complete Note: 1. Eutectic 680 welding rods will be supplied by the department free of cost. 2. Unit of Half day will be considered as Number. 3. Approval shall be taken from Executive Engineer (HR) before the execution of above item.
40
84440
2111
... More
Attending to the emergency rectification works of defects observed by patrolling party/ reported upon by user department, etc. during second and third shift. These rectifications include attending to lever and motorized points, rail fracture, barricades repairs, minor accidents, etc. on all days inclusive of Sundays and Public Holidays. NOTE: 1. Approval shall be taken from Executive Engineer (HR) for execution of above item within 24hrs, from informing to contractor. 2. Contractor shall have to mobilize labour within 30minutes on receipt of the telephonic call.
120
555960
4633
... More
Attending to the emergency rectification works carried out in case of derailments, breaches, accidents, etc. at any time during the 24 hrs of the day including Sundays and Public Holidays. NOTE: 1. Approval shall be taken from Executive Engineer (HR) for execution of above item within 24hrs, from informing to contractor. 2. Contractor shall have to mobilize labour within 30minutes on receipt of the telephonic call.
15
134685
8979
... More
Weeding of plants, creepers, small trees, grass, etc. by uprooting/ cutting as directed along tracks 2.5 mts. from centre of track on both sides and pruning of all overhead/overhanging tree branches, obstructions up to height of 8.0 mts. from top of rail including loading, unloading transporting & disposing off as directed. All labour & materials tools & plant, equipment, etc. complete. NOTE: 1.Weeding of the specified areas to be maintained throughout the maintenance period. 2. Approval shall be taken from Chief Engineer (HR) before the execution of above item. 3. Part payment will be released three (3) times in a year. 4. Measurements will be based on area where weeding is carried out.
30672
355795
11.6
... More
Repairs / replacing the lever box at the lever points…etc complete. All tools, plant, labour & material etc complete.
10
14070
1407
... More
Dismantling of heavy duty paver blocks at Level crossings for carrying out maintenance works of P. way track, including stacking of paver blocks, sand, etc complete and relaying of the paver blocks over sand cushion of 50mm to the required levels and slope, compacting, filling of dry sand in gaps, cleaning the surface, cutting the blocks, cutting of blocks using power operated tools, vibrating the surface with mechanical vibrator etc complete. All tools, plant, labour and material complete.
400
158800
397
... More
Removing of Burr formed on the rails, Points and Crossings due to continuously movement on rail by grinding and maintaining the required gauge
220
104060
473
... More
Shifting PSC Sleepers of lead approx 5km or as directed by the Chief Engineer or his representative including stacking the material as per standard Railway norms. All tools & plant, labour and material trailer, Crane etc. complete. The shifting of material to be carried out without disturbing rail traffic movement / damaging the PSC sleepers while shifting.
200
52600
263
... More
Shifting Rails of length up to 13m approx of lead approx 5km or as directed by the Chief Engineer or his representative including stacking the material as per standard Railway norms. All tools & plant, labour and material trailer, Crane etc. complete. The shifting of material to be carried out without disturbing rail traffic movement / damaging the Rails while shifting.
200
38000
190
... More
Shifting of CMS Crossings approx lead of 5km or as directed by the Chief Engineer or his representative including stacking the material as per standard Railway norms. All tools & plant, labour and material trailer, Crane etc. complete. The shifting of material to be carried out without disturbing rail traffic movement / damaging the CMS crossing while shifting.
10
18530
1853
... More
Replacing of slide chair screws at Motorized points and Lever Points including removal of existing sheared off bolts cased due to centrifugal force, heavy axle loads of rolling and other vagaries of the nature by using tag welding and without causing damage to the plastic dowel. Carrying out gauging and levels at the points etc. All labour & Materials, equipments, Tool, Plant, Welding machinery, etc. complete. (Note: Slide chair bolts will be supplied by the department free of cost).
200
35800
179
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements