Mormugao Port Trust Tender
View complete overview of Goa Mormugao Port Trust Tender
Costs
EMD
₹ 50,00,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_mptgo_766198_1Bid Award Id
ViewTender No
CE/07(R-1)/2023Tender Authority
Mormugao Port Trust ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Note 2: Idle time charges at Rs 12500/- per 1000 m3 TSHD capacity per hour are applicable.
-
-
-
Note 3: The total accessed quantity is approximate i.e 15 Lakhs cubic metre but the quantity indicated in BOQ is for 3 years.
However incase the exectued dredged quantity is less than 20% of the accessed quantity per year i.e (15 Lakhs cubic metre) than the quoted rate of the bidder will be increased by 5% on the total executed dredged quantity for the particular year.
* incase the exectued dredged quantity is more than 20% of the accessed quantity per year i.e (15 Lakhs cubic metre) than the quoted rate of the bidder will be decreased by 5% on the total executed dredged quantity for the particular year.
-
-
-
Note 4: The bidder has to quote as per the BOQ quantity assessed for 3 years however port reserves the rights to award the dredging work year wise. Port may or may not award the work for second and third year dredging. In such cases no claims will be entertained from the contractor.
-
-
-
Note 5: Quoted Rate does nor include GST, however applicable will be payable to the Contarctor
-
-
-
Note 6: The bids will be evaluated only on the quoted rate of item No.1
-
-
-
Taking away the dredged material by the Contractor if found re-usable based on the soil data provided and paying to Port the cost of the retrieved materials. The dumping of dredged material, storing at yard, treatment of the dredged material and subsequent disposal to prospective users will be the responsibility of the Dredging Firm including taking EC for disposal of dredged material after taking due permission from the competent State Authorities, as required.
-
-
-
Assessed approximate per year quantity is as follows:
1st year 2023-2024 = 1500000 M3
2nd year 2024-2025 =1500000 M3
3rd year 2025-2026 = 1500000 M3
Total quantity = 4500000 M3
4500000
-
-
Note 1: If the dredged material is found to be re-usable to the bidder than bidder has to quote the rate for this item (item No. 2) otherwise quote the rate as ZERO
-
-
-
Note 2: Quoted Rate does not include GST, however applicable will be payable to the Contarctor
-
-
-
Note 3: MPA may or may not operate item No.2.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements