Mormugao Port Trust Tender

View complete overview of Goa Mormugao Port Trust Tender

Mormugao Port Trust Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date10 Aug 2023
Closing Date4 Sep 2023
Tender Amount₹ 49,50,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Note 2: Idle time charges at Rs 12500/- per 1000 m3 TSHD capacity per hour are applicable.

-

-

-

... More
Note 3: The total accessed quantity is approximate i.e 15 Lakhs cubic metre but the quantity indicated in BOQ is for 3 years. However incase the exectued dredged quantity is less than 20% of the accessed quantity per year i.e (15 Lakhs cubic metre) than the quoted rate of the bidder will be increased by 5% on the total executed dredged quantity for the particular year. * incase the exectued dredged quantity is more than 20% of the accessed quantity per year i.e (15 Lakhs cubic metre) than the quoted rate of the bidder will be decreased by 5% on the total executed dredged quantity for the particular year.

-

-

-

... More
Note 4: The bidder has to quote as per the BOQ quantity assessed for 3 years however port reserves the rights to award the dredging work year wise. Port may or may not award the work for second and third year dredging. In such cases no claims will be entertained from the contractor.

-

-

-

... More
Note 5: Quoted Rate does nor include GST, however applicable will be payable to the Contarctor

-

-

-

... More
Note 6: The bids will be evaluated only on the quoted rate of item No.1

-

-

-

... More
Taking away the dredged material by the Contractor if found re-usable based on the soil data provided and paying to Port the cost of the retrieved materials. The dumping of dredged material, storing at yard, treatment of the dredged material and subsequent disposal to prospective users will be the responsibility of the Dredging Firm including taking EC for disposal of dredged material after taking due permission from the competent State Authorities, as required.

-

-

-

... More
Assessed approximate per year quantity is as follows: 1st year 2023-2024 = 1500000 M3 2nd year 2024-2025 =1500000 M3 3rd year 2025-2026 = 1500000 M3 Total quantity = 4500000 M3

4500000

-

-

... More
Note 1: If the dredged material is found to be re-usable to the bidder than bidder has to quote the rate for this item (item No. 2) otherwise quote the rate as ZERO

-

-

-

... More
Note 2: Quoted Rate does not include GST, however applicable will be payable to the Contarctor

-

-

-

... More
Note 3: MPA may or may not operate item No.2.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.