Military Engineer Services Tender

View complete overview of Goa MES Tender

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date6 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 1,19,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(b) 50 HP

2

-

-

... More
(c ) 5 HP

2

-

-

... More
(d ) 2 to 3 HP

5

-

-

... More
(e) 0.5 to 1 HP

2

-

-

... More
M & L for Servicing of water pump split casing type set by removing & dismantling pump and connected pipes & electric connections etc and replacing of unserviceable parts with new gland packing set Gun metal bushes, bearing, water seal packing complete cleaning of impeller greasing etc reassembling and refixing in original position complete with packing and necessary nut & belt etc including testing for smooth functioning etcof following capacity all as specified and directed by EIC

-

-

-

... More
(a) 20 HP with discharge of 183.9 cum and head 20 mtrs make : GRUNDFOS

5

-

-

... More
(b) 50 HP with discharge of 183.9 cum and head 54 mtrs make : GRUNDFOS

4

-

-

... More
(c ) 0.62 HP with discharge of 3.1 cum and head 27.4 mtrs make : GRUNDFOS

10

-

-

... More
Supply & charge refrigerant (R - 134A) gas as per requirement

650

-

-

... More
Replacement of compressor oil BSE 170 with new compressor oil of Make :- Bitzer or equivalent all as specified and directed by EIC

80

-

-

... More
Replacement of compressor oil Grade DB 18 with new compressor oil of Make :- Dunham Bush , indsol, BPCL equivalent all as specified and directed by EIC

80

-

-

... More
S & F in repair of crank case heater 300 W all completed as specified and directed.

4

-

-

... More
Labour only for Routine maintenance of AHU with control panel incl. cleaning of blower fan and drain tap,cleaning & servicing of dampers linkages for free operation, adjustment of belt tension/replacement of same,if required cleaning of blower, oiling and greasing of blower motor testing functioning of thermostate and sensors of complete AHU, checking functioning of heater strips, cleaning of chilled water coil, replacement of broken/worn out connection cable lugs & connectors, replacement of unserviceable electrical accessories in panel complete.

11

-

-

... More
Labour only for routine check up & maintenance of electric power panel, of 1300 TR plant by tightening all incoming/outgoing connections incl. replacement of blown off electric fuses, defective contactors, indicating neon lamps assembly , indicating meters, checking earthing of panel making fresh connections, settings of overload relays and furnishing the report all as directed.

11

-

-

... More
Labour only for Routine check of electronic protection module and control panel for compressor, tighening of all loosened electrical connections testing functioning of thermostats, time delay setting and furnishing test report of the same in format approved by engr-in-charge.

11

-

-

... More
Supply laying and testing in cable PVC insulated screened PVC bedded galvanised steel strip or wire armoured electric power cable (heavy duty) with copper conductor 1100 volts grade cross sectional area 50 Sqmm 3.5 core lead on wall / ceiling / duct all as directed including taking down old cable

40

-

-

... More
do all as per Item No. 10 but 35 sq mm 3.5 core

40

-

-

... More
Supply & Fixing in rep Analogue type Voltmeter of 0 to 500 V range AC

1

-

-

... More
Supply & Fixing in rep ameter digital type 0 to 200 Amperes ,CT operated.

1

-

-

... More
Supply & Fixing only in repairs Water Flow Switch complete all as directed .

7

-

-

... More
Supply and Fix pressure gauge 0-150 PSI

6

-

-

... More
Supply and Fix pressure gauge 0-300 PSI

5

-

-

... More
Supply & Fixing in rep Filter drier core for 200 / 300 TR Central AC Plant

9

-

-

... More
Supply & Fixing V fan belt for AHU of any size

46

-

-

... More
Labour only for Non Comprehensive Routine maintenance checkup of SCADA system which includes inspection of controls & control panels , operational test of controls & control panels , full function tests of equipment incl. checking of Sensors,actuators,temperature/humidity duct sensor, immerson temperature sensors,differential pressure switches, room humidity sensors,electrical wiring ,connections for free operation, adjustment of relays ,sensors /replacement of same , checking functioning of sensors,actuators, cleaning of sensors,actuators , replacement of broken/worn out connection cable lugs & connectors, replacement of unserviceable electrical accessories in panel complete by authorised service engineer of OEM and furnish the report to Engineer-in-charge.

11

-

-

... More
Supply & Fix in repairs 3 way valve with actuator and power supply module of size 40mm dia completed all as directed by Engr-in charge.

2

-

-

... More
Supply & Fix in repairs 3 way valve with actuator and power supply module of size 50mm dia completed all as directed by Engr-in charge.

2

-

-

... More
Supply & Fix in repairs 3 way valve with actuator and power supply module of size 65mm dia completed all as directed by Engr-in charge.

2

-

-

... More
Supply & Fix in repairs 3 way valve with actuator and power supply module of size 80mm dia completed all as directed by Engr-in charge.

2

-

-

... More
Supply & Fix in repairs 2 way valve with actuator and power supply module of size 80mm dia completed all as directed by Engr-in charge.

3

-

-

... More
Supply & Fix in repairs 2 way valve with actuator and power supply module of size 40mm dia completed all as directed by Engr-in charge.

2

-

-

... More
Supply & Fix in repairs 2 way valve with actuator and power supply module of size 25mm dia completed all as directed by Engr-in charge.

2

-

-

... More
Supply & Fix in repairs 2 way valve with actuator and power supply module of size 50mm dia completed all as directed by Engr-in charge.

2

-

-

... More
Supply and fixing in repair PLC CPU unit for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair PLC 32 DO card for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair PLC 8 DO card for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair PLC 16 DI card for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

5

-

-

... More
Supply and fixing in repair PLC 8 DI card for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair PLC AI card for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair Relay 220V AC for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

320

-

-

... More
Supply and fixing in repair Relay 24 V DC for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

120

-

-

... More
Supply and fixing in repair Relay card 8 channel for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

35

-

-

... More
Supply and fixing in repair Relay card 4 channel for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair MCB SP 6 Amp for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

75

-

-

... More
Supply and fixing in repair MCB DP 10 Amp for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

26

-

-

... More
Supply and fixing in repair 5A SMPS unit for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair 5 port Ethernet switch for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair UVR Relay for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair 12A conrtoller for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair terminal block for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

1300

-

-

... More
Supply and fixing in repair Red illuminated pushbutton for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

120

-

-

... More
Supply and fixing in repair Green illuminated pushbutton for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

120

-

-

... More
Supply and fixing in repair Red 220V AC indicator for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair Red 24 V DC indicator for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair Green 24 V DC indicator for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

260

-

-

... More
Supply and fixing in repair Yellow 24 V DC indicator for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair Blue 24 V DC indicator for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair HMI 7 inches for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair multifunction meter for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair Buzzer for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair Yellow pushbutton for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair Cooling fan for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair MCB 32Amp TPN for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

13

-

-

... More
Supply and fixing in repair 16A SS combination box for controlling the SCADA system completed all as directed and specified by Engr-in- charge.

26

-

-

... More
Supply & Fixing in repair suction pressure translators of existing make complete all as specified and directed.

2

-

-

... More
Supply & Fixing in repair chilled water temperature sensor of existing make complete all as specified and directed.

2

-

-

... More
Supply & Fixing in repair discharge temperature sensor of existing make complete all as specified and directed.

2

-

-

... More
Supply & Fixing in repair load unload solenoid coil of existing make complete all as specified and directed.

2

-

-

... More
Supply & Fixing in repair controller keypad of existing make complete all as specified and directed.

2

-

-

... More
Supply & fix in repairs MCCB 250 Amps,3 pole,breaking capacity 55 KA, 415 V , all as specied & directed.

2

-

-

... More
M & L in repair of Thermostatic Expansion valve TGEN type suitable for 200/300 TR unit having refrigerant gas R134a complete all as specified and directed by EIC .

2

-

-

... More
S & F in repair of Electronic expansion valves ETS 250 suitable for 200/300 TR unit having refrigerant gas R134a complete all as specified and directed by EIC .

2

-

-

... More
Supply & Fix in repair Power contactor 2NO + 2 NC , 3TF54 of make siemens of 250 Amps current rating.

2

-

-

... More
Supply & Fix in repair Power contactor 2 NO + 2 NC , 3TS50 3 pole 440 volt ,105 Amps suitable for 55 KW motor of make siemens ,

2

-

-

... More
Pumping down the plant to preserve the existing refrigent gas & leak testing of 200/300 TR chiller package unit by charging of Nitregon gas in to entire plant & monitoring for 24 Hrs to find the leakages, rectification of leak by brazing and replacement of necessary gasket packing as when required including copper tubes of suitable size vacumizing of the plant by vaccum pump to the plant & topping of refrigent if required to maintain the standard pressure and testing the plant for smooth functioning complete all as specified and directed.

5

-

-

... More
Supply & Fixing in repairs UPS of capacity 1000VA/600Watts having back up of 45 minutes suitable for 230 Volts .Make APC Model No. APC BR1000G-IN

1

-

-

... More
Supply & Fixing in repairs UPS of capacity 700VA/420Watts having back up of 6-90 minutes suitable for 230 Volts .Make APC Model No. APC BE700Y-IN

1

-

-

... More
Removing old unserviceable insulation of chilled water pipe line and cleaning the surface & applying one coat of TPRA coat & M & L for wrapping on MS Chilled water pipe line with 50/40 mm thick fiber glass wool moulded to shape the thermal insulation in selection of 50 mm crown wrapped with chicken mesh wire netting 20 SWG and 20mm mesh & aluminium cladding with 24 SWG aluminum sheet on 150/100 mm dia MS chilled water pipe line complete all as specified & directed

36

-

-

... More
Supply & fixing in repair Nitrile insulation layers of size 25 mm thickness sticking on the chiller surface by using approved adhesive and ceiling joint by weather proof tape after removing unserviceable nitrile insulation from the chiller & cleaning complete all as directed by Engineer-in-charge.

20

-

-

... More
M&L for applying one coat of synthetic enamel paint as per colour code with spray machine on surfaces of 3X300+ 2x200 TR central AC plant comprising of chiller, compressor motor, Pump, water pipe lines etc by filling cavities if any with filler including preparation of surfaces & indication markings all as specified and directed.

1

-

-

... More
Supply & Fix in repair step controller display for hot water generator complete all as specified and directed by Engineer-in-charge.

5

-

-

... More
Supply & Fix in repair power supply 12 V for water generator complete all as specified and directed by Engineer-in-charge.

8

-

-

... More
Supply & Fix in repair step controller card for hot water generator complete all as specified and directed by Engineer-in-charge.

6

-

-

... More
Supply & Fix in repair sensor wire for water generator complete all as specified and directed by Engineer-in-charge.

8

-

-

... More
Supply & Fix in repair mini float switch for water generator complete all as specified and directed by Engineer-in-charge.

8

-

-

... More
Supply & Fix in repair adapter for hot water generator complete all as specified and directed by Engineer-in-charge.

8

-

-

... More
Supply & Fix in repair MNX 22 Contactor for hot water generator complete all as specified and directed by Engineer-in-charge.

5

-

-

... More
Supply & Fix in repair thermostat for hot water generator complete all as specified and directed by Engineer-in-charge.

5

-

-

... More
Supply & Fix in repair heater Cap 5 KW for hot water generator complete all as specified and directed by Engineer-in-charge.

5

-

-

... More
Supply & Fix in repair Auto manual switch for hot water generator complete all as specified and directed by Engineer-in-charge.

4

-

-

... More
Supply & Fix in repair Contactor BMS with no point for hot water generator complete all as specified and directed by Engineer-in-charge.

4

-

-

... More
Taking down old unserviceable CI butterfly valve of any make and size and Supplying, fixing, testing and commissioning of butterfly Valve(Manual) with C I body SS Disc, Nitrile rubber Seal & O- Ring PN 1.6 pressure rating for chilled water circulation, in the chilled water plumbing duly insulated to the same specifications as the connected piping and adequately complete all as specified and as directed

-

-

-

... More
(a) For size 200 mm

2

-

-

... More
(b). For size 150 mm

2

-

-

... More
(c). For size 125 mm

2

-

-

... More
M & L in repair for Insulation of M S Pipe with PUF slab 40 mm thick with and including applying bituminous compound and GI cladding with 26 gauge GI sheet complete of sizes as shown. as per specifications and as required complete all as specified and as directed

-

-

-

... More
(a) 150 mm dia

20

-

-

... More
Supplying, fixing, testing and commissioning in repair of Balancing Valve with built in measuring facility with C I body flanged construction with EPDM coated disc with long pitch with protected out pipe insulation & PN 16 pressure rating for chilled water circulation, in the chilled/hot water plumbing duly insulated to the same specifications as the connected piping and adequately supported as per specifications complete all as specified and as directed.

-

-

-

... More
(a) For 200 mm dia

1

-

-

... More
(b) For 150 mm dia

1

-

-

... More
Supply and fixing in repair 1.5sqmm x 6 core armd copper cable 1.1 KV FRLSH complete as specified and as directed.

1200

-

-

... More
Supply and fixing in repair 1.5sqmm x 2 core armd copper cable 1.1 KV FRLSH complete as specified and as directed.

600

-

-

... More
Supply and fixing in repair 1.5sqmm x 4 core armd copper cable 1.1 KV FRLSH complete as specified and as directed.

2200

-

-

... More
PART-II (ROUTINE MAINTENANCE OF VARIOUS SUMMER COOLING APPLIANCES

-

-

-

... More
Taking out split type ACs, of any capacity and make installed at various locations, checking the defects including replacement of defective/unserviceable parts except compressor and fan condenser motor/blower motor including refixing in its position/new position and making the equipment functional complete all as directed.

15

-

-

... More
M&L for periodical maintainance of split AC of 1.5 / 2 Ton capacity including cleaning of overhead ceiling supported indoor unit complete, blower, outdoor unit, wiring system, cool air vent, cleaing including oiling / greasing of movable parts of indoor unit such as motor bearing etc, fresh electrical connections, checking insulation of wiring etc complete, all as specified and directed.

32

-

-

... More
S&F in repairs reciprocating / rotary compressor single phase 230 V, 1.5 / 2 Ton capacity for split AC of exisiting make suitable for split AC factory tested including taking out old compressor, pumping down refrigerant, bracing and flaring, topping up of refrigerant (labour only) connecting, testing and commissioning the compressor all as specified and directed.

10

-

-

... More
Supply & fixed in repairs, fan motor single phase 240 Volts for in door unit of any capacity for split AC suitable for 1.5 ton existing make ,RPM & setting with remote unit all as directed.

6

-

-

... More
S&F in repair overload relay for 1.5 / 2 Ton compressor of Split AC complete all as specified & directed.

10

-

-

... More
S&F in repairs capacitor of 1.5-2 mfd,suitable for indoor unit of split AC plastic body complete all as specified & directed.

14

-

-

... More
Supply and fixing /lay PVC pipe of size 20 mm dia pipe fixing complete to wall for drain out condensing water of split AC including cutting of floor /openin g of hole in wall and making good surface after laying/fixing pipe etc to matching existing surface.

36

-

-

... More
Supply and fix in repairs PVC air filter for split AC of any capacity.

20

-

-

... More
M&L for gas charging with R-134A referigerant gas of required quantity including all allied work such as vaccumising the complete system, pressure test for detecting any leakage, replacement of flux, flare, nut, dead plug, dead cap, brazing etc including necessary welding work, testing and commissioning upto satisfactory performance for the following

18

-

-

... More
Supply and fix in repairs fan blade for split AC of any capacity.

8

-

-

... More
Supply and fix in repairs capacitor 45 mfd 230 Volt single phase.

14

-

-

... More
Supply & fix in repairs coil sensor of split AC or package type AC of any capacity all as specified & directed.

10

-

-

... More
Supply and fix in repairs remote control assembly and PC circuit for split type AC of any capacity.

9

-

-

... More
Supply and fix in repairs Voltage stablizer of 4 KVA suitable for 1.5 / 2.00 Ton split AC.

7

-

-

... More
SCHEDULE 'A' - PART I (M&O OF AC PLANT)

-

-

-

... More
Manning & operation of central AC plant of total 1300 TR capacity installed at MTP area with package chiller condensing unit for LR-SAM magazines of (Make :-DUNHAM BUSH , Model No. AFHX325-5CR of 900 TR capacity ) & BROHMAS magazines of (Make :- VOLTAS , Model No. EGADXR2302MZ of 400 TR capacity ) complete including SCADA system of Make : Honeywell with AHU & other accessories each for 24 hrs 3 shifts around the clock run daily

11

-

-

... More
a) Air cooled package chiller unit of (Make DUNHAM BUSH ,Model - AFHX325-5CR) -03Nos , for LR-SAM magazines.

-

-

-

... More
b) Air cooled package chiller unit of (Make VOLTAS ,Model -EGADXR2302MZ) - 02Nos , for BROHMAS magazines.

-

-

-

... More
c) Compressor of (Make: DUNHAM BUSH , Model - HX1816LA35AV1C2A) - 6 Nos for LR-SAM

-

-

-

... More
d) Compressor of (Make: BITZER KUHLMASCHINENVAU , Model - CSH9563-160Y-40D) - 4 Nos for BROHMAS

-

-

-

... More
e) Condensor fan motor of capacity 3 HP/2.2 KW - 48 Nos for LR-SAM

-

-

-

... More
f) Condensor fan motor of capacity 1.5 KW - 32 Nos for BROHMAS

-

-

-

... More
g) Primary water pump motor Model - MMG 160MB , capacity 15 KW, Make - CE GRUNDFOS -03Nos for LR-SAM

-

-

-

... More
h) Primary water pump motor Model - MMG 160MA , capacity 11 KW, Make - CE GRUNDFOS -02Nos for BROHMAS

-

-

-

... More
i) Primary water pump Model - NB 80-160 , discharge- 183.9 cum/hr, Head - 20 mtrs Make - CE GRUNDFOS -03Nos for LR-SAM

-

-

-

... More
j) Primary water pump Model - NB 80-160 , discharge- 183.9 cum/hr, Head - 20 mtrs Make - CE GRUNDFOS -02Nos for BROHMAS

-

-

-

... More
k) Secondary water pump motor Model - MMG 200LB , capacity 37 KW, Make - CE GRUNDFOS -03Nos for LR-SAM

-

-

-

... More
l) Secondary water pump motor Model - UD 1104 , capacity 37 KW/50 HP, Make - SIEMENS -02Nos for BROHMAS

-

-

-

... More
m) Secondary water pump Model - NB 80-200 , discharge- 183.9 cum/hr, Head - 54 mtrs Make - CE GRUNDFOS -03Nos for LR-SAM

-

-

-

... More
n) Secondary water pump Model - NB 80-200 , discharge- 183.9 cum/hr, Head - 54 mtrs Make - CE GRUNDFOS -02Nos for BROHMAS

-

-

-

... More
o) Air handling unit model ZDHRW-250 of capacity 25000 cmh with blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete -19 Nos. Make - Zeco for LR-SAM

-

-

-

... More
p) Air handling unit model ZDS-80 of capacity 8000 cmh with blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete -10 Nos. Make - Zeco. For BROHMAS

-

-

-

... More
q) Hot water generator 2 steps 415 volts of capacity- 30 KW , Model - RC/30 - 12 Nos of Make - Rapid Cool for LR-SAM

-

-

-

... More
r) Hot water generator 3 steps 415 volts of capacity- 15 KW , Model - RC/15 - 10 Nos of Make - Rapid Cool for BROHMAS

-

-

-

... More
s) SCADA system of make : Honeywell with connected accessories

-

-

-

... More
NOTES:-

-

-

-

... More
(a) Contractor has to employ minimum following staff for Manning and operation of the Main receiving Substation at Vajrakosh in all 3 shifts 8 hours each.

-

-

-

... More
(i) One No MCM / Supervisor having minimum qualification Diploma in Refrigeration & Air Conditioning Engineering from recognized institute with adequate experience in one shift of 8 hrs (Total - 01 Nos per day)

-

-

-

... More
(ii) One No operator having minimum ITI qualification in Ref Mech trade from Govt recognised institute with minimum 2 years experience in maintenance & operation of AC plants in each shift of 8 hrs (. The operator must be competent to caryout the routine maintenance & check of AC plant including maintenance/check/inspection of electrical panel board.. (Total 03 Nos Per day)

-

-

-

... More
(iii) One No Electrician highly skilled / operator having minimum qualification Diploma in Electrical Engineering from recognized institute with adequate experience in each shift of 8 hrs(Total 03 Nos Per day)

-

-

-

... More
(b) Contractor will maintain proper records of all kinds of daily, weekly , monthly, quarterly, half yearly, yearly or whatsoever maintenance is carried out during contract period in a binded book/register and will obtain the signature of Engineer-in-Charge

-

-

-

... More
(c ) The operator/helper will ensure general cleanliness and upkeep of the installation on daily basis.

-

-

-

... More
(d) Contractor shall maintain log sheet of installations,lodging of complaints if found defects in plants,monitoring of PLC including taking care of chiller plants,monitoring of make up water tanks , pilferage theft or damages etc.

-

-

-

... More
(e ) Defective parts of plants will be replaced and measured under respective item of this schedule.

-

-

-

... More
(f) Power supply for operating the installations will be made availiable by department free of cost.

-

-

-

... More
(g) If the Contractor fails of provide required man power for any of the shift, a panel recovery at the double of the quoted rate per shift shall be recovered from amount due to Contractor.

-

-

-

... More
(h) The Contractor shall not employ same tradesman continuously for more than 11 months

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.