Indian Oil Adani Gas Private Limited Tender
View complete overview of Goa IOAGPL Tender
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_AGPL_94323_1Bid Award Id
ViewTender No
IOAGPL/STLYNG/OPEN/2021-22/49Tender Authority
Indian Oil Adani Gas Private Limited ViewPurchaser Address
-Website
http://https://ioagpl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
SURVEY - Surveying of route and detours required at the time of execution including marking the same in topographical sheet, preparation of construction drawings showing survey details, and submit same to Owner for review/ approval.
-
-
-
... More
ROU - Clearing, Grubbing, Grading & Raking up of all kind of surface of any type including plants (excluding forest plants & trees which shall be under DFO/ Concerned Authority Instructions), shrubs, metal, concrete, bituminous, tiled, brick lined, soft rock etc. All tiles/ slabs/ curb stones etc. removed during excavation shall be placed properly. Any type of rake up surface to be restored to its original position. .
-
-
-
... More
TRENCHING - Trenching to all depths by excavation in all types of terrain/ strata including soft/ hard rock and various type of pavement/ footpath/ roads etc. including rock breaking, chiselling or otherwise cutting, excavation etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge & as per the relevant standard/ specification etc. The minimum depth of the trench for laying of Steel pipeline shall be 1.5 - 2 Mtrs. (as directed by Authority/E-I-C) measured from lowest available datum level adjacent to the trench or the periphery of the pipeline route. The depth may increase accordingly at places as per site condition or as per SCC/ OISD-141/ OISD- 226, PNGRB T4S, ASME Codes etc. whichever is higher. Clearing the bottom of trench by removing boulder, pebbles, etc. Undertaking proper safety measures, installing side plates/bracing etc. for protection of trench sides from collapsing.
Dewatering of trenches to be done properly and no extra soil to be left over on roads/site. Excavation required for preparation of Tie-In Pits is covered in this item. No extra/separate claims/payments under any clause/condition shall be made.
-
-
-
... More
WELDING & NDT – Checking, cleaning, aligning, bending, cutting and bevelling (if required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-ray for Mainline welding & Gamma-Ray for Tie-In Joints of lowered section (in trench) only and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re- radiography and other tests as required on repaired joints. All tieing-in, including the tie-in(s) of the pipeline with the adjacent sections of pipeline including cutting of test header, rebevelling as required, radiography and other NDT examination, joint coating as per specification.
-
-
-
... More
COATING - Coating of field weld joints, bends, elbows, buried fittings and valves etc. including supply of coating materials etc. (i.e. heat shrinkable sleeves and high build epoxy etc.) as per Technical Specification compatible with 3 layer PE coating material of the line pipe. Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation/ handling.
-
-
-
... More
LOWERING & BACKFILLING - Installation/ lowering the pipeline in trench to required depth, supply and placement of PE warning mat Anti-Rodent type as per approved specifications over the pipeline along the complete route, padding around pipeline with suitable approved soil including supply of padding material, backfilling with available & borrowed earth (if required), approved excavated material and/or other suitable soil by crowning. Supply and installation of slope breakers, wherever required or, as directed by Owner, Engineer–in–charge. Supply and installation of bank protection along with backfill materials duly approved by EIC for pipeline trench and banks falls under minor water body crossing as per technical specification & Std. Drg., wherever required or, as directed by Owner/ EIC. Training and diversions of streams in steep slope area, wherever required.
Supplying and filling coarse sand under floors, in foundations, floor, trenches, plinth etc. including cost-of sand, royalty, transportation, loading, unloading, spreading in layers not exceeding 20 cm., watering, ramming, compacting, dressing and levelling etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of E-I-C.
-
-
-
... More
RESTORATION - Supply and installation of construction markers (RCC Markers - to be installed at a distance of 50 mtr throughout the pipeline, Warning Marker- to be installed at a distance of 150 mtr throughout the pipeline), clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area. Shifting of all obstruction within the ROU/ Pipeline route alignment viz. electrical lines/ poles, telephone line/ poles, etc. coordination with concerned authorities and obtain permissions from these authorities. Final clean- up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / Or as directed by Engineer I/C. Restoration after completion of laying/crossing as per the direction of Statutory authority / Client / PMC and obtaining NOC.
-
-
-
... More
TESTING - Carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing of complete pipeline with required quantity of corrosion inhibiters, if necessary as per specification and approved by Engineer I/C to specified pressures indicated elsewhere and duration after stabilization as per specification, providing all equipment, pumps, fittings, instruments, dead weight tester, pressure recorder, thermocouples etc., and services, supervision, labour, consumables, water etc. as required and approved by Engineer I/C. Locating of leaks and rectification of defects attributable to Contractor (rectification of defects in line pipe material not attributable to contractor shall be paid separately as per other item of schedule of rate), re-testing after rectification, dewatering after successful completion of hydro testing of entire section and as approved by Engineer-in-charge.
-
-
-
... More
Carrying out GIS Data Collection & Entry for each Pipeline Assets / Cut Points / Jointers (Latitude / Longitude) With attributes as per satisfaction of Owner and / Or as directed by Engineer I/C.
Submission of Data in the GIs format of. Shp,. Kml. Accuracy of the collection of assets / Cut points/ Joints to be in accuracy to be maintained 30cm -60cm.
-
-
-
... More
AS-BUILT - Preparation of as-built drawings, pipe-books (3 hard copies of pipebook including as built drawings and 2 soft copies) All the works shall be executed in accordance with the provision of contract including carrying out all temporary/ ancillary/ auxiliary works required for the performance of the works and all other acts, deeds, matters and things necessary to make the pipeline ready for pre-commissioning activities.
-
-
-
... More
PIPELINE LAYING IN NORMAL/ MIXED STRATA ,ALL TERRAIN WITH NORMAL/ UNPREPARED SURFACE (KATCHA SURFACE)
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
3000
-
-
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
1800
-
-
... More
PIPELINE LAYING IN NORMAL/ MIXED STRATA ,ALL TERRAIN WITH BUILT-UP SURFACE/ HARD SURFACE (PUCCA SURFACE)
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
325
-
-
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
2000
-
-
... More
PIPELINE LAYING IN LATERITE STRATA ,ALL TERRAIN WITH NORMAL/ UNPREPARED SURFACE (KATCHA SURFACE)
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
455
-
-
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
700
-
-
... More
PIPELINE LAYING IN LATERITE STRATA ,ALL TERRAIN WITH BUILT-UP SURFACE/ HARD SURFACE (PUCCA SURFACE)
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
260
-
-
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
800
-
-
... More
PIPELINE LAYING IN HARD ROCK STRATA,ALL TERRAIN WITH NORMAL/ UNPREPARED SURFACE (KATCHA SURFACE)
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
520
-
-
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
200
-
-
... More
PIPELINE LAYING IN HARD ROCK STRATA,ALL TERRAIN WITH BUILT-UP SURFACE/ HARD SURFACE (PUCCA SURFACE)
-
-
-
... More
8" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
195
-
-
... More
4" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
300
-
-
... More
MDPE LAYING IN NORMAL/ MIXED STRATA TERRAIN WITH NORMAL/ UNPREPARED SURFACE IN SAME TRENCH WITH 8''/4'' STEEL PIPELINE
-
-
-
... More
Receiving, handling, loading, transportation and unloading of owner supplied MDPE Pipes, PE Fittings, TF, PE valve & Warning Mat & any other free issue items as mentioned elsewhere in tender from designated stock yards to contractor's own stock-yards/ work-sites. Supply of HDPE casing and any item items other then FIM shall be provided by contrcator. Proper storing, stacking, identification, providing security and insurance cover for the materials. Liaisoning with landowning agencies/ statutory authorities, preparation of detailed route plan, making trial pits to determine the underground utilities/ services etc., obtaining permission from landowning agencies (separately payable as per other SOR Item). Restoration of the abandoned excavation/ trial pits as per satisfaction of Engineer-in-charge (EIC)/ Site-in-charge (SIC) to original condition, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC/ SIC; uncoiling/ stringing of pipes, jointing of the pipe ends/ fittings/ valves by qualified personnel, using approved electro fusion techniques as per specification. Entire work shall be executed as per scope of work, specification, PNGRB T4S and/or any other specification as per requirement of statutory authorities.
-
-
-
... More
Laying using any method (open trench, moling and HDD) in all kind of soil (normal/ hard) with all kind of surface (kachha/ pacca) with or without casing pipe; it includes survey of the under ground utilities, submission of HDD profile for approval, execution of the work as per specification, PNGRB T4S and/or any other specification as per requirement of statutory authorities, including excavation of pits, moling with hole size not exceeding 20% of the the carrier/ casing pipe dia. jointing and insertion of the carrier pipe in casing pipe (on case to case basis) and subsequent backfilling, compaction, submission of as-built drawing, as graphs as per attached specification and instructions of ElC/ SIC of owner. Includes laying of pipeline in all type of surface including kutcha, metal, concrete (PCC/RCC), bituminous, tiled, bricklined etc. after raking up of hard surface of any type. Roads, pavement, footpaths etc. shall be made motorable once the pipeline is laid. Includes minimum 300 mm (150mm below the pipeline & 150 mm above the pipeline) loos soil/sand bedding & padding in all kind of soil (normal/ hard/ rocky), & laying of warning mat above pipeline. Trench shall be filled by normal/ soft soil and no sharp rock/ boulders to be used for backfilling.Restoration of road/footpath( metal, concrete (PCC/RCC), bituminous, tiled, bricklined etc) shall be done by separate line item of SOR if required).
-
-
-
... More
Flushing, cleaning, pneumatic testing, purging with nitrogen and commissioning as per scope of work, specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures during defect liability period.
-
-
-
... More
Handing over the completed works to owner for their operation/ use, returning of all surplus material to owner stores, reconciliation of free issue material area wise and obtaining no objection certificate.
-
-
-
... More
On completion of gas charging of pipelines, preparation and submission of as-built drawings, crossings details, termination, utility graphs and deviation statements. Submission of all documents required for contract closure in numbers as mentioned in contract.
-
-
-
... More
MDPE pipeline laying in all kind of terrain in normal soil with all type of surface by open trench methodology of laying by maintaining minimum clear cover of minimum 1.0 m from the top of lowest datum available in the vicinity of the pipeline.
-
-
-
... More
125/90/63 MM. MDPE PIPE LAYING
7530
-
-
... More
INSTALLATION OF CARRIER PIPE BY HDD METHOD - UNCASED CROSSING/ LAYING - ALL STRATA & ALL TERRAIN
-
-
-
... More
SCOPE - Complete work of installation of carrier pipe at crossings/ laying along route (between the limits as defined in approved drawings) or wherever required by HDD method for roads, nala, drain and canal wherever required in all types of soils/ murram/Laterite and terrains including scope covered in SOR Item 1 above but not limited to string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type of Heat Shrink Sleeve (Direx) and repair of pipeline coating with special repair patch materials as per Specification, pre-testing/ post testing etc. of complete string made for crossing, but not limited to, following works in accordance with specifications and instruction of Engineer-in-Charge and as per all provision of Contract Document. PRE-HYDROTEST IS REQUIRED FOR INSTALLATION/ LAYING OF PIPELINE THROUGH HDD ALONG THE ROAD/ ROUTE.
-
-
-
... More
SURVEY - Pre-Construction survey based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of crossing/ laying along route drawings for getting their approval from concerned Authority/ Engineer-in-Charge, getting work permit/ NOC for crossings as well as utility crossings (if any) encountered during crossings prior to start of the execution of work. Additional land required for placement of HDD equipments and/ or string preparation shall be in Contractors scope.
-
-
-
... More
DRILLING - Drilling to required depth including maintenance/ restoration of drill hole in all types of soils/ murram/ mixed strata, all depth to accommodate the pipeline at all conditions encountered during crossing/ laying along route by approved HDD methods procedure for providing minimum cover specified in code/ specification/ PNGRB regulations or as decided by concerned authority, whichever is more.
-
-
-
... More
RESTORATION - Backfilling of the ditch/ trench including restoration and clean-up of area and all other works including cleaning, gauging and final hydro testing etc. along with mainline works required as per specification, approved drawings, calculations, methods and to the satisfaction of Engineer-in-Charge and/ or as directed by concerned Authority.
-
-
-
... More
MEASUREMENT - The length of HDD mentioned is tentative and may vary to the considerable extent depending upon requirements as per site conditions. The length mentioned in SOR is indicative for all the crossing to be done by HDD, numbers and locations shall be decided by Engineer-in-Charge depending upon site condition.
-
-
-
... More
PAYMENT - Payment for the length of final tie-in carrier pipeline string with mainline laid by HDD are inclusive in this item rate. No separate payment shall be made under other clauses mentioned elsewhere. Payment shall be based on the actual length (i.e. length between tie-in joints) of pipeline laid by HDD. Exact location of tie-in shall be approved by Owner/ Owner's representative. Rate for this SOR item for steel pipeline laying is inclusive of carrier pipe string preparation (Welding, NDT, Pretesting, Coating, Hydro testing, Pre-commissioning etc.).
-
-
-
... More
INSTALLATION OF CARRIER PIPE BY HDD METHOD - UNCASED CROSSING/ LAYING - ALL STRATA & ALL TERRAIN
-
-
-
... More
8" NB/ 6.4 MM Thk. (0.252")/ API 5L GR.X-42 (ERW)
5200
-
-
... More
4" NB/ 6.4 MM Thk. (0.252")/ API 5L GR.X-42 (ERW)
2320
-
-
... More
MDPE pipeline laying by HDD method without casing pipe
-
-
-
... More
MDPE pipeline laying by HDD method without casing pipe in all kind of terrian & soil condition including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner.
-
-
-
... More
90MM
5400
-
-
... More
125MM
2700
-
-
... More
INSTALLATION OF CARRIER PIPE BY HDD METHOD-CASED CROSSING
-
-
-
... More
SCOPE - Complete work of installation of carrier pipe at crossings or wherever required by HDD method for roads, nala, drain and canal wherever required in all types of soils/ murram and terrains including scope covered in Item A above but not limited to string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type of Heat Shrink Sleeve (Dirax) and repair of pipeline coating with special repair patch materials as per Specification, pre- testing and post testing etc. of complete string made for crossing. Rate for this SOR item for steel pipeline laying is inclusive of carrier pipe string preparation (Welding, NDT, Pretesting, Coating, Hydro testing, Pre-commissioning etc.).Incl. Pre- testing and post testing shall be conducted as per EIC direction for critical crossings like Major Road Junction, NHAI, River & Canal, Railway and any other crossings considered critical by EIC and contractor shall abide by the EIC directions
Installation of Warning Marker at Entry and Exit Point.
-
-
-
... More
SURVEY - Pre-Construction survey based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of crossing/ laying along route drawings for getting their approval from concerned Authority/ Engineer-in-Charge, getting work permit/ NOC for crossings as well as utility crossings (if any) encountered during crossings prior to start of the execution of work. Additional land required for placement of HDD equipments and/ or string preparation shall be in Contractors scope. Bore hole inspection to identify soil strata shall be undertaken as per EIC directions for HDD in rocky strata
-
-
-
... More
TRENCHING/EXCAVATION FOR HDD WORKS - Trenching to all depths by excavation in all types of terrain/ strata including soft/ hard rock and various type of pavement/ footpath/ roads etc. including rock breaking, chiselling or otherwise cutting, excavation etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge & as per the relevant standard/ specification etc. The minimum depth of the trench for laying of Steel pipeline shall be 1.5 - 2 Mtrs. (as directed by Authority/E-I-C) measured from lowest available datum level adjacent to the trench or the periphery of the pipeline route. The depth may increase accordingly at places as per site condition or as per SCC/ OISD-141/ OISD- 226, PNGRB T4S, ASME Codes etc. whichever is higher. Clearing the bottom of trench by removing boulder, pebbles, etc. Undertaking proper safety measures, installing side plates/bracing etc. for protection of trench sides from collapsing.
Dewatering of trenches to be done properly and no extra soil to be left over on roads/site. Excavation required for preparation of Tie-In Pits is covered in this item. No extra/separate claims/payments under any clause/condition shall be made. No extra payment for excavation or breaking of soft/ hard rock and various type of pavement/ footpath/ roads, hard soil, etc required for laying
-
-
-
... More
DRILLING - Drilling to required depth including maintenance/ restoration of drill hole in all types of soils/ murram/ mixed strata, all depth to accommodate the pipeline at all conditions encountered during crossing/ laying along route by approved HDD methods procedure for providing minimum cover specified in code/ specification/ PNGRB regulations or as decided by concerned authority, whichever is more.
-
-
-
... More
RESTORATION - Backfilling of the ditch/ trench including restoration and clean-up of area and all other works including cleaning, gauging and final hydro testing etc. along with mainline works required as per specification, approved drawings, calculations, methods and to the satisfaction of Engineer I/C and/or as directed by concerned Authority.
-
-
-
... More
CASED CROSSING (WITH MDPE) USING 8" NB X 6.4 MM THK OF API 5L GRADE X-42, 3LPE COATED CARRIER PIPE & 125/90 MM MDPE PIPE IN 14"/16"•NB X 6.4/7.9 MM THK OF API 5L GR. B (ERW) CASING PIPE ALONG WITH 125/90 MM MDPE PIPE BETWEEN CASING & CARRIER PIPE AND ABOUT 1" THICK INSULATORS SO AS TO SUITABLY ACCOMMODATE THE MDPE TIED TO CARRIER PIPE INSIDE THE CASING PIPE- ALL STRATA & ALL TERRAIN
300
-
-
... More
CASED CROSSING (WITH MDPE) USING 4" NB X 6.4 MM THK OF API 5L GRADE X-42, 3LPE COATED CARRIER PIPE & 125/90 MM MDPE PIPE IN 12"/14"•NB X 6.4/7.9 MM THK OF API 5L GR. B (ERW) CASING PIPE ALONG WITH 125/90 MM MDPE PIPE BETWEEN CASING & CARRIER PIPE AND ABOUT 1" THICK INSULATORS SO AS TO SUITABLY ACCOMMODATE THE MDPE TIED TO CARRIER PIPE INSIDE THE CASING PIPE- ALL STRATA & ALL TERRAIN
520
-
-
... More
CASED CROSSING (WITHOUT MDPE) USING 4" NB X 6.4 MM THK OF API 5L GRADE X-42, 3LPE COATED CARRIER PIPE IN 12"/14"•NB X 6.4/7.9 MM THK OF API 5L GR. B (ERW) CASING PIPE- ALL STRATA & ALL TERRAIN
100
-
-
... More
SUBMERGED CROSSINGS WITH OR WITHOUT ANTI-BUOYANCY MEASURES
-
-
-
... More
Laying submerged crossings using pipes with or without concrete sheathing across major water course crossings and providing all works, labour, inputs and materials/ consumable necessary to perform and complete the work in all respects in accordance with the contract, including taking delivery and transportation of owner-supplied coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and with holiday detector for defects, arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position, arranging the required additional land for construction purpose, preparation of site, aligning, bending, lining up and welding the pipe, 100% radiographic inspection of weld joints, coating of field weld joints, holiday detection and repair of coating, hydro testing (both pre- & post-installation) and replacement of pipes/ defects, excavation of the trench to required depth, as per specifications, in all kinds of soil and conditions including rock trenching and maintenance of trench in all kinds of soil, mixed strata or rocky strata, if any, making bunds for stoppage of water flow, de-watering including installation of well-point system, and laying of the pipeline in approved trench, including de-watering, backfilling and final clean-up, stabilisation of the excavated banks by additional means, disposal of waste and surplus in accordance with the contract, and supply of materials (other than those specifically undertaken to be supplied by the Owner under the contract) necessary for or in the performance of the work or for temporary or permanent incorporation in the works and all other acts, matters and things necessary to complete the pipeline/ crossings in all respects according to the contract and as per directions of Site Engineer/ Engineer-in-Charge.
-
-
-
... More
Depending upon the site condition & location of each submerged crossing, the Engineer-in-Charge, in consultation with the Contractor, shall decide upon the precise operations necessary for the performance of the work to lay the pipeline across the canal/ drain/ rivers and the cost of all such operations necessary shall be deemed to have been included in the rate for this item.
-
-
-
... More
Profile of drain / canal bed, ground & top of laid pipe shall be established jointly in presence of Owner both before and after laying the crossing, by taking levels with reference to nearby permanent structure.
-
-
-
... More
The banks of the crossing shall be stabilised and suitable brick/ stone masonry bank protection works shall be carried out for the entire ROW width to prevent bank erosion leading to exposure of the pipeline. The procedure for such measures shall be submitted for Owner's approval prior to execution.
-
-
-
... More
Concrete sheathing work for submerged crossings shall be paid for separately under relevant item of Schedule of Rates.
-
-
-
... More
Continuous Concrete Coating - Supply of all consumables, materials and application of 25 mm-80 mm thk for various size of pipe, continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-20 and field joints thereof in all areas of work wherever required as per site condition and performing all works as per specification on the line pipe.
-
-
-
... More
Concrete Saddle Weights - Fabrication and installation of concrete saddle weights on pipeline including supply of all consumables and materials including supply of 3mm, HDPE sheets, and performing all works as per specifications, drawings, and instructions of Engineer-in-charge and other provisions of the Contract document.
-
-
-
... More
WITH CONCRETE CONTINUOUS COATING 8" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
800
-
-
... More
Liasioning Cost (if required) with various government / Semi government / Private land owner after receiving Principle permissions from IOAGPL. Prior approval from EIC shall be taken for any liasoning activities as per this line item
-
-
-
... More
LIAISONING AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES ALL KIND OF PERMISSIONS (STEEL/ MDPE/ SV/ CGS ETC)
14630
-
-
... More
Road/Surface restoration works shall be executed as per the specification of concerned authority and their directions. Specification provided below for restoration of Chipping Carpet road and BM&BC road are indicative only. Authority norms and directions shall be final and to ensured (in case of deviation between specification provided below and authority norms, authority norms shall be final). Contractor shall obtain NOC from respective authority after work completion. No separate payment shall be made for sub activities under each type of restoration item
-
-
-
... More
Chipping Carpet Road Restoration: Excavation – 1500mm thick (1.50m3); Sand Filling – 750mm thick (0.75m3); Granular Sub-Base (GSB) – 450mm thick (0.45m3); Wet Mix Macadam (WMM) – 300mm thick (0.30m3); Prime Coat – 1 m2; Premix Surfacing – 1m2
-
-
-
... More
BM&BC Road restoration: Excavation – 1500mm thick (1.50m3); Sand Filling – 750mm thick (0.75m3); Granular Sub-Base (GSB) – 450mm thick (0.45m3); Wet Mix Macadam (WMM) – 300mm thick (0.30m3); Prime Coat – 1 m2; Tack Coat – 1m2; Bituminous Macadam (BM) – 50mm thick (0.050m3); Bituminous Concrete (BC) – 40mm thick (0.04m3)
-
-
-
... More
RESTORATION OF ROADS RESTORATION OF ASPHALT ROAD UPTO 10 CM THICKNESS
100
-
-
... More
RESTORATION OF ROADS RESTORATION OF CONCRETE ROAD UPTO 10 CM THICKNESS
50
-
-
... More
RESTORATION OF ROADS RESTORATION OF RED STONE ROAD / FOOTPATH / PAVEMENT/ PAVER BLOCK UPTO 4 CM THICKNESS
400
-
-
... More
PERMANENT MARKERS : Permanent Markers supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint (powder coated), stencil letter cutting for numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner/Owner’s Representative
-
-
-
... More
PERMANENT MARKERS SV MARKER/DIRECTION MARKER
35
-
-
... More
PERMANENT MARKERS WARNING SIGN WITH POST
250
-
-
... More
PERMANENT MARKERS BOUNDARY PILLARS
210
-
-
... More
PIPING WORKS FOR SECTIONALIZING VALVE STATION/ VALVE-CUM-TAP-OFF POINT INSTALLATION
-
-
-
... More
All works for fabrication and installation of all piping above ground at all elevations and below ground at all depth for Sectionalising Valve Station along with preparation of construction drawings duly approved by EIC, in all type of terrains and soils including transportation and handling of all Owner supplied materials i.e. Ball valve, other types of valves, line pipes for mainline, 4" NB pipe for all branch line from Owner’s designated place(s) of issue to work site.
-
-
-
... More
Contractor shall supply all required size & type of piping material like pipes, fittings & flanges etc. along with 2" NB pipe for all branch line & vent line (wherever required) including supply of all consumables, manpower, machineries, materials etc. and carrying out all mechanical works of underground and above ground piping including fabrication, welding, non-destructive testing of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydro testing & hydrostatic testing, dewatering, functional testing, cutting of mainline and bevelling (if required).
-
-
-
... More
Assembly, including radiography of tie-in joints, corrosion, coating and external painting as required, installation of instruments like pressure/ temperature instruments/ gauges along with complete SS Tubing works including supply of SS Tube and their accessories etc., as required, obtaining all statutory clearances, approvals and permissions for the works (wherever required), making of valve pit (for detail refer relevant drawings) for SV Stations cum- tap-off points enclosed with tender filled with sand, excavation and filling in all types of soils including soft/ hard rock for installation of piping/ pipe supports providing pipe supports, area fencing and gate including all associated civil and structural works; painting, finishing, clean-up and restoration of site; preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge.
-
-
-
... More
All civil/ structural works including area fencing and gate, valve pits, piping support etc. is covered in this item. All coupling, nipples etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under this item rate.
-
-
-
... More
Work under this item is exclusive of all works associated with main pipeline covered under SOR Item No. 1.0 above.
-
-
-
... More
PIPING WORKS FOR SECTIONALISING VALVE STATION/ VALVE- CUM-TAP-OFF POINT INSTALLATION TYPE - I, SV INSTALLATION WITH BYE-PASS & VENT FACILITY
9
-
-
... More
PIPING WORKS FOR SECTIONALISING VALVE STATION/ VALVE- CUM-TAP-OFF POINT INSTALLATION TYPE - II, SV INSTALLATION WITH BYE-PASS, VENT FACILITY & 4" FUTURE TAP-OFF
4
-
-
... More
PIPING WORKS FOR SECTIONALISING VALVE STATION/ VALVE- CUM-TAP-OFF POINT INSTALLATION TYPE - III, SV INSTALLATION WITHOUT BYE-PASS & VENT FACILITY BUT WITH 4" FUTURE TAP- OFF
1
-
-
... More
PIPING WORKS FOR SECTIONALISING VALVE STATION/ VALVE- CUM-TAP-OFF POINT INSTALLATION TYPE - IV, INSTALLATION OF 4" FUTURE TAP-OFF
5
-
-
... More
Valve Chamber Construction
-
-
-
... More
SCOPE - All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local flooding of area, as per specification enclosed and instruction of Engineer-in-Charge. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.
-
-
-
... More
EXCAVATION - Earth work in excavation in all kinds of soil, mixed strata, hard rock upto any depth including trimming of sides of the trenches/ valve pits, dressing, ramming and levelling the bottom of the trenches correct to level, grade etc. including bailing out of water, if any, filling in sides of foundation trenches, plinth etc. with the excavated earth available and/ or depositing the excess earth within station area limits, in layers not exceeding 20 cms. thick, consolidating each deposited layer by ramming, watering, dressing to level and grade, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Engineer I/C.
-
-
-
... More
PLAIN CEMENT CONCRETE - Supplying and laying plain cement concrete of grade M 20 with stone aggregate 20mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, columns, pedestals, pedestal bases, pipe supports, floors, chambers, cable trench, under floors and any other locations, at all levels and locations as per drawings, specifications and directions of the Engineer I/C.
-
-
-
... More
SAND - Supplying and filling coarse sand under floors, in foundations, floor, trenches, plinth etc. including cost-of sand, royalty, transportation, loading, unloading, spreading in layers not exceeding 20 cm., watering, ramming, compacting, dressing and levelling etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Engineer I/C.
-
-
-
... More
REINFORCED CEMENT CONCRETE - Providing and laying RCC (reinforced cement concrete) of grade M-25 with 20mm and down grade crushed stone aggregate in all types of sub-structures like Beams, foundations, walls, columns, pedestals, pedestal bases, pipe supports, sleepers, cable trench, RCC retaining wall foundation for boundary wall including construction joints, bitumen painting on surfaces in contact with soil, shuttering, supplying and fixing MS inserts, finishes etc. at all depths and levels complete as per drawings, specifications and directions of the Engineer I/C.
-
-
-
... More
REINFORCEMENT - Supplying and providing reinforcement (for reinforced cement concrete works) Thermo-mechanically treated Fe-415 bars conforming to IS:1786 including initial straightening of coiled/uncoiled bars, removal of loose rust, cutting, bending to correct size & shape, binding with 18 gauge G.I. wire at each intersection and placing at any position, at any height and depth complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer.
-
-
-
... More
Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC cement including sulphate resistant cement for sub-structures, inserts, bolts, conduits, bitumen, excavation, PCC M-10 in mud mat, other minor construction materials, shuttering , staging, testing of concrete, curing etc. except reinforcement steel with all bye works and sundry works complete
-
-
-
... More
BRICK WORK - Providing brick work with brick class designation M-7.5 of IS:1077 in cm1:4 (1 cement : 4 sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with all lead, depths & height including curing, scaffolding, etc., as per specifications and drawings with all bye-works and direction of the Engineer-in-charge. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement bricks, finishes, bitumen, other minor construction materials, shuttering, staging, masonry work, plastering, painting etc. with all bye-works and sundry works).
-
-
-
... More
STRUCTURAL WORK - Supplying, fabricating and fixing M.S. structural steel work made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. for struts, chain link fencing posts as per drawing including gate, ladders, safety grills, walkways, collapsible gate, signboards, supports for cable trench, making slots for barbed line, wire hoisting, placing in position, embedding in concrete, applying two coats of epoxy paint "EPILUX 155 High Build Enamel over a coat of EPILUX 610 Primer of M/s Berger or any other approved equivalent make as per manufacturer’s recommendation, complete in all respect including cutting to required size welding of joints, fixing anchor plates, bolts, threading, nuts, washers, sleeves etc. and necessary lettering of approved pattern on main gate, signboards etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer. (excluding the cost of concrete work).
-
-
-
... More
CONSTRUCTION OF RCC VALVE CHAMBER VALVE PIT TYPE -I OF SIZE 2500 X 1500 X 1600 MM (APPROX.)
7
-
-
... More
CONSTRUCTION OF RCC VALVE CHAMBER VALVE PIT TYPE -II OF SIZE 1500 X 1500 X 1600 MM (APPROX.)
10
-
-
... More
PLANT PIPING (ONLY FOR ABOVEGROUND WORKS/ CNG STATION/ DRS & MRS LOCATIONS)
-
-
-
... More
Transportation of all piping items from Owner's and/ or Contractor's storage point to work at site/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes, flanges and fittings and making ready for further Commissioning/ Start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.
-
-
-
... More
Preparation of isometric and fabrication drawings. Preparation of final bill of material based on piping GADs. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven/different thickness wherever required, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of all Olets less than 2" NB size, all sizes of nipples and coupling etc. as required for completion of job. Weldolets, sockolets, flanges, vent and drain point connection etc., including providing stubbing connections, fabricated fittings and reinforcement pads etc., as required.
-
-
-
... More
Erection including prior cleaning, lifting, placing on pipe sleepers and supports, overhead on racks, skids and at all elevations including installation and carrying out connected activities for all types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever required for all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment, nozzles, strainers, tie- in with existing piping/facilities, etc. tapping for inline instruments like pressure gauges, thermo wells, sample connection, etc. Carrying out Non-destructive testing as required. All butt welded fittings & flanges end shall generally match with connecting pipe wall thickness. However, in case of misalignment, Contractor shall have to do end preparation without any extra cost.
-
-
-
... More
Surface preparation before application of primer by means of shot blasting including supply of approved quality of grits, manpower, machineries, tools & tackles to achieve required roughness as per specification and as per instruction of Engineer-in-charge.
-
-
-
... More
Painting of entire system (including aboveground all pipes fittings, flanges and accessories) as per specifications suitable for highly corrosive area environment including supply of approved paints and primers, application of primer and paints, identification lettering/ numbering, colour coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by COMPANY and providing scaffolding for all heights etc.
-
-
-
... More
Cleaning and flushing by water/ compressed air, testing of the systems including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/other methods approved by COMPANY.
-
-
-
... More
Precommissioning & making operational all piping system and equipments. Commissioning Contractor scope shall provide all necessary assistance in term of supply of man-power, equipment, tools and tackles required amount of nitrogen for purging of entire terminal piping system including equipments etc. to the company during commissioning activities.
-
-
-
... More
Completion of all such work in all respects as per scope of work and as per drawings, specifications and instructions of the COMPANY and keeping the system ready in all respects for further commissioning and start up.
-
-
-
... More
Complete Carbon Steel aboveground Piping Work with painting including all fittings, flanges and supply of all required gaskets, studs bolts & nuts etc. No separate payments shall be made for the supply of gaskets, studs, bolts & nuts as it is covered under this item rate.
-
-
-
... More
All pipes, fittings, valves, O-lets, less than 2" NB size, all sizes of coupling and nipples etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under erection rate.
-
-
-
... More
All civil/ structural works including area fencing and gate, piping support etc. is covered in this item.
-
-
-
... More
PLANT PIPING (ABOVEGROUND) PIPING 4", SCH 40, ASTM A 106 GR. B
300
-
-
... More
PLANT PIPING (ABOVEGROUND) PIPING 2", SCH XS, ASTM A 106 GR. B
250
-
-
... More
PLANT PIPING (ABOVEGROUND) INSTALLATION OF IJ 4"•, 300# (ASTM A 694 GR.F42) - PUP PIECE- API 5L GR.B
11
-
-
... More
PLANT PIPING (ABOVEGROUND) INSTALLATION OF BALL VALVE 4",300#, BW
9
-
-
... More
PLANT PIPING (ABOVEGROUND) INSTALLATION OF BALL VALVE 2"•, 300# ,FLANGED (BODY ASTM A 216 GR.WCB)
13
-
-
... More
PLANT PIPING (ABOVEGROUND) INSTALLATION OF GLOBE VALVE 2"•, 300# ,FLANGED (BODY ASTM A 216 GR.WCB)
7
-
-
... More
TEMPORARY CATHODIC PROTECTION
-
-
-
... More
Design, detailed engineering, supply, installation, testing and commissioning of the temporary Cathodic protection system using Mg/ Zn galvanic anodes to protect the external surface of 3 LPE coated entire length steel pipeline network against corrosion for design life of minimum 2 years or till commissioning of PCP system whichever is later as per standard specification for temporary cathodic protection system. Scope shall also include but not limited to the following for completion of jobs:
-
-
-
... More
Measurement of soil resistivity along the right of way of the main pipeline route as per specification for design & installation of anodes. Collection of additional data related to cathodic protection along the right of way of pipeline as per specifications.
-
-
-
... More
Supply, installation, testing & commissioning of one set of spark gap arrestor with 2 plate Zinc grounding cell of 20 kg net weight each across each insulating joint as per specification. Supply & installation of Zinc Ribbon Anodes at 4-8 O'clock position in the interval of 2 metre (max.) on carrier pipes at all cased crossings i.e. railways/ roads etc.
-
-
-
... More
Supply, installation, testing & commissioning one set of polarisation cell with zinc anode at all high tension (66KV or higher) electrical power transmission line/Equipment crossing or running parallel to the pipeline for grounding purpose as per specification. The rating shall depend upon anticipated fault current & ground bed resistance at the location of installation. However, the rating of polarisation cell (krick) shall not be less than 5 KA & number of 20 kg net weight zinc anode shall not be less than two.
-
-
-
... More
Monitoring of the protection system till commissioning of pipeline or till final handover, whichever is earliest..
-
-
-
... More
All civil/ structural works related to TCP system including supply of bricks, cement & steel etc. required for completion of the system.
-
-
-
... More
The quantities mentioned above are tentative and quantities for above including supply items shall be finalised & procured by Contractor only after due approval of EIC. Contractor supplied any surplus item during reconciliation shall not be accepted / taken by the Owner.
-
-
-
... More
For all the supply items mentioned above, procurement shall be made as per specification & Data Sheets, after due approval of Engineer-incharge.
-
-
-
... More
TEMPORARY CATHODIC PROTECTION 8"/4" NB/ 6.4 MM (0.252")/ API 5L GR.X-42 (ERW)
21730
-
-
... More
PLAIN CEMENT CONCRETE
(Supplying and laying plain cement concrete of grade M 20 with stone aggregate 20mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, columns, pedestals, pedestal bases, pipe supports,floors, chambers, cable trench, under floors and any other locations (which are not covered as part of composite items) , at all levels and locations as per drawings, specifications and directions of the Engineer I/C. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.)
-
-
-
... More
PCC- M 20 Providing and casting Plain Cement Concrete ( M20 ), including centering, form work, compacting, finishing and curing as per EIC's instructions.
130
-
-
... More
REINFORCED CEMENT CONCRETE IN SUB STRUCTURE WORKS (Providing and
laying RCC (reinforced cement concrete) of grade M-25 with 20mm and down grade crushed stone aggregate in all types of sub-structures like Beams, foundations, walls, columns, pedestals, pedestal bases, pipe supports, sleepers, cable trench, RCC retaining wall foundation for boundary wall including construction joints, bitumen painting on surfaces in contact with soil, shuttering, supplying and fixing MS inserts, finishes etc. at all depths and levels complete as per drawings, specifications and directions of the Engineer I/C.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC cement including sulphate resistant cement for sub-structures, inserts, bolts, conduits, bitumen, excavation, PCC M-10 in mud mat, other minor construction materials, shuttering , staging, testing of concrete, curing etc. except reinforcement steel with all works and sundry works complete).
-
-
-
... More
Supplying and providing reinforcement (for reinforced cement concrete works) Thermo-mechanically treated Fe-415 bars conforming to IS:1786 including initial straightening of coiled/uncoiled bars, removal of loose rust, cutting, bending to correct size & shape, binding with 18 gauge G.I. wire at each intersection and placing at any position, at any height and depth complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Engineer I/C.
-
-
-
... More
Sand bedding & Padding (Supplying and filling coarse sand under floors, in foundations, floor, trenches, plinth etc. including cost-of sand, royalty, transportation, loading, unloading, spreading in layers not exceeding 20 cm., watering, ramming, compacting, dressing and levelling etc complete in all respects inclusive of cost of all labourr, materials, tools, tackels, etc. as per drawings, specifications an direction of E-I-C)
-
-
-
... More
RCC-M20, Providing and casting steel reinforced cement concrete as per detailed drawings and designs or as directed by EIC including centering, form work, compacting, finishing and curing.
130
-
-
... More
Testing- Precommissioning -Commissioning of pipe already laid by other contractor
-
-
-
... More
Testing- Precommissioning -Commissioning of 8"NB CS pipe already laid by other contractor
7500
-
-
... More
Testing- Precommissioning -Commissioning of MDPE (125/90 /63 mm) pipe already laid by other contractor
7500
-
-