Goa State Urban Development Agency Tender
View complete overview of Goa GSUDA Tender
Costs
EMD
₹ 99,963Document Cost
₹ 3,000Tender Fee
₹ 6,000
Summary
Supply And Installation Of Synthetic Football Turf Alongwith Fencing And Lighting For Futsal Ground In Ward No9 At Bordamargao
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_GSUDA_11473_1Bid Award Id
ViewTender No
43/3/GSUDA/E-TENDER/3/1158 Dt6/9/23Tender Authority
Goa State Urban Development Agency ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earthwork excavation by mechanical means for trench cutting( by hydraulic excavator ) in hard soil involving an average horizontal throw up to 2 meters and an average lift up to 0.5 m, excavated surface levelled and sides neatly dressed, the disposed earth to be levelled neatly after breaking of clods complete as per specifications. Complete for drainage facilities
14.18
-
350
Providing and spreading of high quality weedicide over the prepared surface to avoid the growth of the weeds in the top surface
600
-
400
GAP 40 -----Supplying, spreading and consolidating stone metal of specific size in requisite thickness in trenches for sub soil drainage. As necessarily spreading with manual means or hydraulic loaded or j.c.b. Laying the materials to fill up the interstices of coarse aggregates as directed, including lighting, guarding & barricading and making necessary earthen bundh on each side where necessary to protect edges and preparing including the cost of materials and hire and labour charges of all men and machineries with Grading OF 40MM Stone chips(75 mm)
45
-
500
GAP 20 -----Supplying, spreading and consolidating stone metal of specific size in hard crust to requisite thickness in layers including screening of metals stc. As necessary, spreading manually or with the help of motor grader sweeping, watering and rolling stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity of screening materials to fill up the interstices of coarse aggregates applying binding materials as directed, including lighting, guarding & barricading and making necessary earthen bundh of one meter width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of materials and hire and labour charges of all men and machineries with Grading of 20mm stone chips (50 m)
30
-
400
GAP 10 ---- Supplying, spreading and consolidating stone metal of specific size in hard crust to requisite thickness in layers including screening of metals stc. As necessary, spreading manually or with the help of motor grader sweeping, watering and rolling stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity of screening materials to fill up the interstices of coarse aggregates applying binding materials as directed, including lighting, guarding & barricading and making necessary earthen bundh of one meter width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of materials and hire and labour charges of all men and machineries with Grading of 10mm stone chips ( 25 mm Thick)
15
-
300
Stone Dust layer with levelling surface ----- Supplying, spreading and consolidating stone dust with screening materials of specific size in hard crust to requisite thickness in layers. As necessary, spreading manually or with the help of motor grader sweeping, watering and rolling stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity including guarding & barricading and making necessary earthen bundh of one meter width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of materials and hire and labour charges of all men and machineries with Grading of stone Dust
15
-
2500
Supplying laying and placing the sub soil drainage line with perforated slot including the bending, joining, fixing all necessary short pieces , including the application of solvent as required. 100 mm dia Pipes are considered with 4 kg Water Hammering Pressure ( for inside the field in Diagonal Placement)
298.3
-
1700
Supplying laying and placing the sub soil draingae line with solid UPVC including the bending, joining, fixing all necessary short pieces , including the application of solvent as required. 150 mm UPVC pipes to be laid along the longer side to channelize water outside the ground
76.3
-
2550
Providing and laying Geo Textile cloth on the drain pipes below the aggregates surface.
47.73
-
1450
Providing and constructing Drainage Sump to collect and dispose surface drainage water to main subsoil drainage line accordingly.
1
-
10000
Construction of Toe Wall with concrete blocks of Thickness 6 inches , Height as per the requirement of Sports Surface. Depth of Toe wall below the ground to be 150 mm. PCC of thickness 50 mm to be done below the toe wall. Plaster of Mix 1:4 to be done on Visible outer surface of Toe Wall .
122.23
-
2500
Fencing to create cage like structure - 100 x 100 mm poles of thickness 3.6 mm (56 nos), 40 x 40 mm poles of thickness 2.6 mm (18 nos) and 40 x 60 mm of thickness 2.6 mm (10 nos) - Supply, transport & installation
600
-
1500
Supply and Installation of Garware Net for Cage Structure (50 x 50 mm) of 2.5 mm thickness
13024.44
-
18
Lighting Solutions - (150 W LED) with requisite wiring
20
-
19000
Moveable Goal Posts with Nets
1
-
70000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements