Goa Shipyard Limited Tender
View complete overview of Goa GSL Tender
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_GSL_89856_1Bid Award Id
ViewTender No
G22/PRS/PCV/221/185680 to 81/1267 to 68Tender Authority
Goa Shipyard Limited ViewPurchaser Address
-Website
http://https://goashipyard.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
CTC, Compliance Matrix, PBG, GST, Progress Report, Self declaration , Checklists formats
BOQ Items
... More
Additional items, if any, not indicated in the above stated scope of supply but required to achieve completeness of the system/configuration and satisfactory functioning/Installation/Commissioning of the system/equipment.
1
-
-
... More
On Board Spares -: The Manufacture's Recommended List of On Board Spares (MRL-OBS) for all Equipment required for servicing and maintenance including breakdown maintenance till two years after completion of warranty period of the vessel and shall be finalized based on equipment fit. This will also include tools and software as necessary (exact details of quantity of each items to be provided so as to indicate composition of 1 set ) as per GSL TA Sl. No. 4.2 to 4.2.4
1
-
-
... More
Additional items, if any, not indicated in the above stated scope of supply but required to achieve completeness of the system/configuration and satisfactory functioning/Installation/Commissioning of the system/equipment.
1
-
-
... More
Services of Engineers, Commissioning & proving Performance etc. including installation, Harbour Acceptance Trial, Sea Acceptance Trial etc. As per GSL TA Sl. No. 4.4 to 4.4.8
1
-
-
... More
Drawings and Documentation. As per GSL TA Sl. No.4.5 to 4.5.3.2
1
-
-
... More
The firm is to arrange supply of MRLS-B & D spares for five years of exploitation based on the likely consumption rate and exploitation pattern of the equipment. The firm should provide the comprehensive part identification list of spares alongwith manufactureres recommended B&D spares alongwith technical bid. The list would contain description, Pattern no and quality fitted on each equipment in respect of various parts/ componants. B&D should be as per the format attached as annuxure-1 as per GSL TA Sl. No. 4.3
1
-
-
... More
Additional charges for l Service engineer for per man day as per GSL TA
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements