Tender AmountRefer Documents 
Notes
Download

Costs

  • EMD

    ₹ 6,25,000
  • Document Cost

    ₹ 20,000
  • Tender Fee

    ₹ 6,000

Summary

Appointment Of Vendor For The Work Of Availing Artistic Services For Ideation/ Conceptualization, Creation, Designing, Fabrication, Supply Erection/installation For Full Decor, Street Decor And Other Allied Activities On Rental Basis For 55th Iffi

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing 3Dimensional Art Decor for Old GMC Main Entry with 3D installations (4 Nos) with complete artistic lighting, frame, support as required complete for the entire Red Carpet Zone. Sound arrangement for announcement with minimum 05 nos of cordless/wireless microphones as per requirement including sound operator. The sound system shall be nicely placed at assigned location.

1

-

-

... More
Providing 3 Dimensional Art Décor at ESG Multiplex Car parking Entrance and Exit. 1. Peacock with complete installation etc., as required – 4 nos. (Left & Right Side) 2. Horizontal Beam on the entrance & exit gate with printing, lettering, logos in suitable colours including printing (double side) – 2 Nos. 3. Complete lighting of the entire Art Décor.

1

-

-

... More
Providing 3 Dimensional Art Décor at ESG Entrance. 1. Peacock with complete installation etc., as required – 2 nos (Left & Right Side) 2. Horizontal Beam on the entrance & exit gate with printing, lettering, logos in suitable colours including printing (double side) – 1 Nos. 3. Complete lighting of the entire Art Décor installations as required.

1

-

-

... More
Providing 3 Dimensional Art Décor at Maquinez Palace (ESG office). 1. Entrance Design complementing the façade of the building using two 3D Installations. 2. Red Carpet with 5 mm thickness from Maquinez Palace Art Décor installation to Auditorium No. 1 & 2. 3. Queue Managers on both the sides of Red Carpet – 60Nos. 4. Adequate lighting of the entire Art Décor installations and at Red Carpet as proposed by vendor.

1

-

-

... More
Providing 3 Dimensional Art Décor installations at Maquinez Lawns, ESG Entrance Gate Lawn, ESG Office Open Area, Festival Hotel or any other suitable location (on various themes (IFFI, India, Goa , Cinema etc,) with complete lighting of all the Art Décor Installations as required. The Art Installations should also serve as photo opp. The vendor will recommend suitable locations for installations in keeping with delegate density, photo opp, visibility of installations etc. (4 or More designs).

15

-

-

... More
Customized Podium with masking, printing and branding. (Art Work to proposed by vendor) The locations of the podium will be finalized by ESG.

12

-

-

... More
ESG Hoarding Mounting & Pasting

1

-

-

... More
DELEGATE REGISTRATION COUNTER: Installation of a temporary German aluminum clear spam marquee in size 10mts X 10mtrs X 6mtrs ht in the centre and 4 mtrs height on the sides will be placed at the ESG Main Gate from 09th Nov to 28th Nov 2024 (20 Days). The above said area should be divided into two parts. 1) The 7.31mts X 10mtrs area inside the gate should be used for creating a delegate registration/ merchandise store center with a total of 7counters for registration with three pin 5/15 amp plug points for computers, printers and lights with counter stools and the second section will be a merchandise store in size 5mtrs x 5mtrs. The complete area must have a locking facility and provided with 1.5 ton AC in the back office and a 3 ton tower AC at the delegate registration desk. 2. Providing a high counter top in MDF with printing on vinyl to cover facia of counter. Each counter will have an entry and exit ‘Q” and cue managers need to be arranged accordingly to achieve the same. Behind the counter a 12 feet wall need to be created including the sides of the tent on both sides for branding as per design approx. 36x 12 feet backdrop behind the counter. 3. The front of the delegate office will be covered using wooden frame and flex printed design with a glass door of 7 x 3 feet in the centre and sides covered. 4. A total of 2000 square feet will need to be flex printed on frame and accordingly placed to cover the sides of the tent on the top facia in front including panels as described as above. The peacock designs however will need to be created using foam with 1 inch raised embossed effect and stuck in flex as per concept design. The flex needs to be mounted on frame with full ply back for this purpose. Four 49 inch LED TVs to be wall mounted on front facia as per design and scale with provision for USB to play back multiple video formats including movie trailers and screen information. Content to be sourced from ESG. However, it is the responsibility of the production company to edit as directed by ESG and create one long loop that will have to be handled by the production company from 10.00 am to 10:00 pm. All power cabling and sockets to power the LED should be concealed. Note: • The Entire setup shall be through Silent DG Set from 8.am to 8 pm. No power connection will be provided by ESG. • The production agency will have to recce the venue to ensure site conditions & reconfirm all measurements before beginning fabrication. • All colours and their specifications need to be approved by ESG.

1

-

-

... More
Total 1

1

-

-

... More
INOX MULTIPLEX, MALL De’ GOA

-

-

-

... More
Providing 3 Dimensional Art Décor installations at Mall De’ Goa Entrance, Lobby Area and Multiplex entrance (on various themes (IFFI, India, Goa, Cinema etc,) with complete lighting of all the Art Décor Installations as required. The Art Installations should also serve as photo opp. The vendor will recommend suitable locations for installations in keeping with delegate density, photo opp, visibility of installations etc.(4 or More designs).

2

-

-

... More
Total 2

1

-

-

... More
LIGHTING

-

-

-

... More
Complete illumination of ESG Annex Building , Maquinez Palace and Old GMC Bulding with artistic lighting. The designer and light supplier will need to ensure that long sturdy cabling is provided in certain areas where the generator will be placed far away from the installations at a pre-determined locations as specified by ESG.

1

-

-

... More
Total 3

1

-

-

... More
Temporary Electricity Connections, Plug points & lights

-

-

-

... More
Providing temporary lighting arrangements and power plug points15Amps/5 Amps with 2 x 2.5 sq.mm wire for light points and 2 x 4 sq.mm wire for 15Amps/5Amps with earthing complete as required of finolex/RR cables/Anchor or equivalent make at stalls erected during 54th IFFI 2023 for 9 days from 20.11.2023 to 28.11.2023 a. Light point with holder with Bulb - 2 nos b. 15amps/5amp Plug points– 3 nos Including switches, switch boards and circuit wiring fixed at one location inside the stall.

80

-

-

... More
Obtaining temporary three phase connection from Electricity Department , Dept for the temporary connections required including all formalities such as submission of applications (Requisitions) Test Report and liaison with Electricity Department and providing temporary three phase Meter Box TP, MCB’s/MCCB’s/ELCB’S, Main Board Distribution system for the given load excluding temp connection charges Security deposits and energy charges complete as required for 09 days

15

-

-

... More
Supply installation testing and Commissioning on rental basis of electronic type three phase energy meter (KWD) 4 wire ISI marked in Polycarbonate or signet steel body (base mounting type) with ELT in class 1.0 50 HZ 240V Ac duty tested as required of following capacity of make L &T or equivalent 10 amp to 40amp

15

-

-

... More
Total 4

1

-

-

... More
KALA ACADEMY

-

-

-

... More
Providing 3 Dimensional Art Décor at Kala Academy. 1. Entrance Design complementing the façade of the building using two 3D Installations. 2. Red Carpet with 5 mm thickness from Kala Academy entrance Art Décor installation to Auditorium. 3. Queue Managers on both the sides of Red Carpet – 60Nos. 4. Adequate lighting of the entire Art Décor installations and at Red Carpet as proposed by vendor.

1

-

-

... More
Thematic Entrance Gates at Kala Academy Exit Providing 3Dimensional Art Décor at Kala Academy Exit Peacock with complete installation etc., as required – 2 nos (Left & Right Side) Horizontal Beam on the entrance & exit gate with printing, lettering, logos in suitable colours including printing (double side) – 1 Nos. Complete lighting of the entire Art Décor installations as required. Note: Item Shall be executed in close co-ordination with Kala Academy team.

1

-

-

... More
Providing 3 Dimensional Art Décor installations at Kala Academy, (on various themes (IFFI, India, Goa, Cinema etc,) with complete lighting of all the Art Décor Installations as required. The Art Installations should also serve as photo opp. The vendor will recommend suitable locations for installations in keeping with delegate density, photo opp, visibility of installations etc.(4 or More designs).

2

-

-

... More
Total 5

1

-

-

... More
Providing Street Décor from Divja Circle to Kala Academy.

-

-

-

... More
Description: A total of 03 types of pole pennants with different artistic concept of minimum size 6’ X 3’ with suitable frame/support as required to ensure stability to be placed on 96/poles/trees stretching from Divja Circle to Kala Academy. The bottom of every pole pennant must be of clear height of 16 feet from the ground to avoid inconvenience to high vehicles and firmly secured including lighting for each Pole Pennants.

1

-

-

... More
Providing Artistic, Conceptualized Self- standing sign boards, single sided to ensure stability and wind pressure of size 6’ x 3’ as per requirement of ESG (same will be retained by ESG). Note: If the Agency fails to hand over the items to be retained by ESG, the total amount of the job will be deducted from the final bill.

40

-

-

... More
Total 6

1

-

-

... More
Stage Set Up:

-

-

-

... More
Erecting of Stage with complete i. Stage Construct. ii. Set Designing, Platform and Construct iii. Side Wings iv. Stage props v. Trussing as per Requirement vi. Stage skirting masking vii. Side LED Screens with support structure 2 nos viii. Staircase on either side of the stage – 2 nos ix. Stage Décor with Light and sound requirement in accordance with the overall programme, cultural programme and design as prepared by ESG. x. Entire Lighting as per requirement including illumination of the entire Venue with intelligent lighting xi. Green Room for artists – 2 xii. Back stage arrangements including refreshment for artists Silent D.G Set for the entire set up and installations/lighting.

2

-

-

... More
Providing Housekeeping (6 Nos) and Security Services (4 Nos).1 Day

2

-

-

... More
Providing 2 Seater Sofa – 10 Nos, Teapoys – 10 Nos, 500 Banquet Chairs with cloth and bow, Tables – 75 Nos. with runner, cocktail tables – 10 Nos.

2

-

-

... More
Setting up of Kitchen, Food Counters (2 Nos.), Dessert Counters (2 Nos.) with artistic canopy as per the overall concept the EMA has proposed.

2

-

-

... More
Total 7

1

-

-

... More
Lighting

-

-

-

... More
Providing illumination scheme with different lighting, intelligent lighting effect as for various installation, for all The Art Décor installation proposed by the vendor, as per scope of the work. (From ESG Road to Health Department). The designer and light supplier will need to ensure that long sturdy cabling is provided in certain areas where the generator will be placed far away from the installations at a pre-determined locations as specified by ESG. The cost towards the lighting and all other charges must be included by the vender and no additional charges shall be paid as per the design proposed.

1

-

-

... More
Providing illumination scheme with different lighting, intelligent lighting ( From Health Department to DB Ground). The designer and light supplier will need to ensure that long sturdy cabling is provided in certain areas where the generator will be placed far away from the installations at a pre-determined locations as specified by ESG. The cost towards the lighting and all other charges must be included by the vender and no additional charges shall be paid as per the design proposed.

1

-

-

... More
Total 8

1

-

-

... More
Road Installations

-

-

-

... More
Providing Art Décor at various locations with 3 Dimensional installations (i) IFFI Logo with Decor – 1 No. (ii) ESG Logo with Décor – 1 No. (iii) Peacock with Décor – 2 Nos. with complete black masking on back side of the Art Installations and supports as required with complete lighting of the installations as required at the following locations: Each Circle/Junction should have different types of designs. Miramar Circle KTC Circle Divja Circle Anjuna Circle Calangute Circle

5

-

-

... More
Total 9

1

-

-

... More
Providing Stage, trussing, Sound &Lights as detailed below: Stage measuring 48 feet x 36 feet x 5 feet height, duly black masked on all three sides with grey carpeting. Box Truss admeasuring 52 feet x 36 feet with FOH of 10 feet to be placed over stage platform. 4 moving heads, 20 parcans& 40 LED pars will be required in addition to house lights. 4 Pa system with line array on both sides consisting of 8 subs and 4 line arrays on each side with a wattage of 40000. A 3 feet high riser will have to be created on stage in size 48 x 4 feet for LED screen of 48 x 12 feet. The LED screen of 48 x 12 feet will need to be minimum 4.8 pitch or finer. Complete lighting of the entire Art Décor installations as required from 21st to 28th November 2024.

1

-

-

... More
Fabrication & erection of Food Stalls / Handicraft Stalls. The stall size will be 10 feet depth and 10 feet height on left and right side duly flex on both sides of the frames which is the inner wall and the outer wall. The backwall will be 10 feet height x 10 feet width with one side flex and the back side black masked. The roof will need to be slanted from 10 feet high back wall to the front 10 feet wall with flex on both sides of frame. A table of 6x2 feet and 2.5 feet high will need to be provided and to be masked on front and one side in 6 feet width x 3 feet height. The stall will need to be carpeted with grey or blue colour. Each stall will have 2 chairs, 1 fire extinguisher, 1 dustbin, Pedestal Fan, One 15/5 amp power socket and one tube light The location will be finalized in consultation with ESG.

40

-

-

... More
Common Kitchen area with tin sheets covered on top and side with continues water arrangement for entire period.

1

-

-

... More
Cultural Programme from 21st to 28th November 2024 of 3hrs duration.and Mob Dances for alternate days i.e. 21st, 23rd, 25th, 27th November 2024

1

-

-

... More
Seating: 70 round tables with 4 feet diameter duly covered with frills having 6 plastic chairs also duly covered with white cloth and bows (500 chairs) to be placed on the ground.

1

-

-

... More
Providing Barricading as detailed below: Black cloth barricading will have to be provided on all three sides . A total of 1200 running feet of 10 feet high barricading using metal poles (not bamboo).

1

-

-

... More
LIGHTING INVENTORY FOR THE VENUE including complete Installations: Description: General lighting on Towers – Four towers at height of 28 feet to be placed on either side of venue with 40 halogens of 1000 watts and 10 metal halide lamps on each tower. Tower dimensions are 7 x 4 feet.

1

-

-

... More
Providing Green New Matting on entire Ground to be fixed tight with old matting underneath for a clean look. Total sq feet required is 40,000 sqft.

1

-

-

... More
Total 10

1

-

-

... More
Outdoor Branding

-

-

-

... More
Providing 100 Nos. Of pole pennants with artistic concept of minimum size 6'x3' with suitable frame/support as required to ensure stability. The bottom of every pole pennant must be of clear height of 16 feet from the ground to avoid inconvenience to high vehicles and firmly secured including lighting for each Pole Pennants

100

-

-

... More
Total 11

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.