Electricity Department Tender
View complete overview of Goa Electricity Department Tender
Costs
EMD
₹ 13,302Document Cost
₹ 3,000Tender Fee
₹ 1,330
Summary
Construction Of 6.3mva Power Transformer Plinth, Vcb Foundation, Fire Safety Wall And Oil Collecting Tank For 33/11kv Sub-station At Pale Goa
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ED_22165_1Tender No
EE/XV/ED/ NOTICE-02(25-26)/187 dt 24/04/2025Tender Authority
Electricity Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
All kinds of soil
62.49
286
17872.14
... More
110 mm dia
8
295
2360
... More
(A) Lime, building rubbish, manure sludge, moorum excavated rock
-
-
-
... More
Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.
6.34
5186
32879.24
... More
Extra for laterite masonry in all sizes in super structure from floor I level up to floor V level.
6.34
929
5889.86
... More
Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
-
-
-
... More
Columns, Piers, Pillars, Aburments, Posts and struts (square rectangle polygon in plan)
24.28
598
14519.44
... More
TRANSPORTATION AND CARRIAGE OF MATERIALS
-
-
-
... More
Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth
35.15
412
14481.8
... More
Providing and fixing single tee of rigid PVC (approved make) for S.W.R. pipes including lubricating etc. complete, without door:
-
-
-
... More
Providing and fixing rigid PVC S.W.R. (soil, waste & rain water drainage pipes of approved including lubricant etc. complete (single/double) socketed:
-
-
-
... More
Painting three or more coats with acryllic exterior paint of approved brand and manufacture (Such as Dulex/ Asian Paints/ Sherwin Willians) including applying one coat of cement primer and one coat of surface treatment etc. complete.
104.64
208
21765.12
... More
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
27.26
245
6678.7
... More
All works upto plinth level
28.33
7178
203352.74
... More
( ii ) Earth (upto 10 km)
35.23
398
14050.08
... More
All works upto plinth level
4.05
6325
25616.25
... More
(A) By tipper truck including loading, unloading and stacking
-
-
-
... More
110 mm dia
5
445
2225
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
5.77
2211
12757.47
... More
Suspended floors,roofs landings,shelves & their supports
2.56
644
1648.64
... More
18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) and top layer 6mm thick with cement plaster 1: 3 (1 cement : 3 coarse sand) finished with sponge.
127.09
329
41812.61
... More
Foundations, Footings, Bases for columns
71.1
407
28937.7
... More
110 mm dia.
1
531
531
... More
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 min width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in :
-
-
-
... More
Providing and laying in position (1:11/2:3) Reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand: 3 graded stone agg 20mm nominal size)
-
-
-
... More
In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level
2.9
8109
23516.1
... More
Providing and fixing rigid PVC bend of required degree (of approved make) for S.W.R. drainage pipes of approved including lubricating.
-
-
-
... More
Centering & shuttering including Strutting, Propping & removal of forms for:
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%