Electricity Department Tender
View complete overview of Goa Electricity Department Tender
Costs
EMD
₹ 11,329Document Cost
₹ 500Tender Fee
₹ 1,133
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ED_8145_1Bid Award Id
ViewTender No
Tender-03/Div-V (2023-24)Tender Authority
Electricity Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of HDGI structure material. Each trasformer centre DP consist of HDGI structure material as follows: a) GI channel ISMC 75x40x7.3mm 2.75 mtrs long 2 pieces for incoming line & installation of disc insulators b) GI channel ISMC75x40x7.3mm 2.75mtrs long 2 pieces for GOAB switch c) GI channel ISMC 75x40x7.3mm 2.75 mtrs long 2 pieces for HG fuses d) GI channel ISMC 75x40x7.3mm 2.75 mtrs long 2 pieces for installation of lightening arrestor e) GI channel ISMC 100x50x7.3mm 2.75 mtrs long 2 pieces for installation of Trasformer f) GI channel ISMC 75x40x7.3mm 2.75 mtrs long 2 pieces for side support of trasformer g) GI channel ISMC 75x40x7.3mm 2.75 mtrs long 4 pieces for installation of any other items h) GI channel ISMC 100x40x7.3mm 0.52 mtrs long 2 pieces for installation of Transformer base channel
260
43940
169
Supply of GI Turn buckle with eye bolt 11KV
7
4739
677
Supply of break insulator 8KV (44KN)
7
1232
176
Supply of GI stay wire 7/10SWG
29.5
4159
141
Supply of X arm LA clamp for 9 mtr RCC pole
12
3192
266
Supply of Metal parts of Shackle insulator
59
12095
205
Supply of GI pin for LT pin insulator
9
1143
127
Supply of Earthing complete Sets
6
16380
2730
Supply of XPLE insulated single core unarmoured cable 50 mm2 for DP earthing.
55
4565
83
Supply of AA"ANT" conductor
1.29
61790
48086
Supply of AA"GNAT" conductor
0.78
19779
25293
Supply of AA"WEASEL" conductor
0.3
10022
33409
Supply of MS Distribution box as per drg No. CEE/E-689 Revision No. 3 along with MCCB 400 A, Bus bar made out of Aluminium strips 40 x 10 mm, kit kat fuses for 4 feeder arrangement
1
63140
63140
Supply of XLPE 1.1KV Armored single core unarmoured cable 185 mm²
48
11760
245
Supply of XLPE 1.1KV 3 & 1/2 XLPE Armoured cable 120 mm²
36
32868
913
Supply of Enamelled danger boards 11000 Volts ,250mm x 200mmm as per drg no. CEE/E-490
2
496
248
Supply of Aluminium crimping Lugs 50 Sq.mm.
45
990
22
Numbering/ painting of LT and HT network poles with non-washable / weatherproof Paints: Yellow colour (for background) & Black colour for numbering
7
730
104.33
Cost of Erection
-
-
-
Erection of RCC pole 11 mtr as per the drawing No.CEE/E-698 REV-3 as per annexure confirming to IS 785-1998 as amended upto date. The component used for pole shall conform to following IS amended up to date. 1) Ordinary Port land cement 53 grade IS 12269 2) Aggregate IS 383-1970 3) Torsteel IS 1786-7985 4) MS bar IS 432 p 1 & 2-1982
2
17200
8600
Erection of RCC pole 9 mtr as per the drawing No.CEE/E-724 REV-3 as per annexure confirming to IS 785-1998 as amended upto date. The component used for pole shall conform to following IS amended up to date. 1) Ordinary Port land cement 53 grade IS 12269 2) Aggregate IS 383-1970 3) Torsteel IS 1786-7985 4) MS bar IS 432 p 1 & 2-1982
3
13224
4408
Erection of 11 KV rated voltange GOAB switches tilting type, outdoor, manually operated, triple pole, single break, conforming to IS: 9921-Part 1 to V as amended up to date and detailed specification eclosed herewith. Each set shall comprise of six pedestal and three tilting post insulators. Insulator should be factory cemented by the manufacturer of the insulators and have minimum 320 mm creepage distance and AB switchs contacts shall be of copper/ copper alloy. The AB switch shall be of following current rating: 200 A
1
3971
3971
Erection of 11 KV , 200 A Horn gap fuse unit (Set of three) shall be as per enclosed drg No. CEE/E-786. Revision 3 and detailed specifications enclosed herewith.
1
3368
3368
Erection of 9 KV, 5 KA nominal discharge current metal oxide gapless distribution class Lightning arrestor conforming to IEC-600994-4 and IS: 3070 part 3 1993 as amended upto date suitable for 11 KV 50 HZ effectively earthed neutral system with necessary mounting arragements and connector suitable to connect ASCR conductor upto overall diameter 12.30 mm
3
522
174
Erection of HDGI structure material. Each trasformer centre DP consist of HDGI structure material as follows: a) GI channel ISMC 75x40x7.3mm 2.75 mtrs long 2 pieces for incoming line & installation of disc insulators b) GI channel ISMC75x40x7.3mm 2.75mtrs long 2 pieces for GOAB switch c) GI channel ISMC 75x40x7.3mm 2.75 mtrs long 2 pieces for HG fuses d) GI channel ISMC 75x40x7.3mm 2.75 mtrs long 2 pieces for installation of lightening arrestor e) GI channel ISMC 100x50x7.3mm 2.75 mtrs long 2 pieces for installation of Trasformer f) GI channel ISMC 75x40x7.3mm 2.75 mtrs long 2 pieces for side support of trasformer g) GI channel ISMC 75x40x7.3mm 2.75 mtrs long 4 pieces for installation of any other items h) GI channel ISMC 100x40x7.3mm 0.52 mtrs long 2 pieces for installation of Transformer base channel
260
12220
47
Erection of 200KVA 11KV/.4KV Distribution transformer level II Aluminium Winding with Bimetetllic terminal connectors energey effeiecny II as per IS 1180 ( Part-I):2014
1
15638
15638
Erection of GI stay rod & plate LT/11KV Line
7
12453
1779
Erection of GI Turn buckle with eye bolt 11KV
7
1869
267
Erection of break insulator 8KV (44KN)
7
679
97
Erection of GI stay wire 7/10SWG
29.5
1829
62
Erection of Stay SA clamp for 11 mtr RCC pole
4
392
98
Erection of Stay SA clamp for 9 mtr RCC pole
3
237
79
Erection of Nut bolts
2.8
84
30
Erection of 4 pin X arm Channel
14
3654
261
Erection of 2pin X arm Channel
7
1624
232
Erection of X arm LA clamp for 11 mtr RCC pole
9
585
65
Erection of X arm LA clamp for 9 mtr RCC pole
12
540
45
Erection of Nut bolts
8.4
252
30
Erection of LT Shackle insulator
59
6136
104
Erection of Metal parts of Shackle insulator
59
6136
104
Erection of LT pin insulator
9
891
99
Erection of GI pin for LT pin insulator
9
666
74
Erection Earthing complete Sets
6
14664
2444
Strining of XPLE insulated single core unarmoured cable 50 mm2 for DP earthing.
55
3080
56
Stringing of AA"ANT" conductor
1.29
8524
6634
Stringing of AA"GNAT" conductor
0.78
4835
6183
Stringing of AA"WEASEL" conductor
0.3
2133
7110
Erection of MS Distribution box as per drg No. CEE/E-689 Revision No. 3 along with MCCB 400 A, Bus bar made out of Aluminium strips 40 x 10 mm, kit kat fuses for 4 feeder arrangement
1
8795
8795
Stringing of XLPE 1.1KV Armored single core unarmoured cable 185 mm²
48
8832
184
Erection of XLPE 1.1KV 3 & 1/2 XLPE Armoured cable 120 mm²
36
6336
176
Erection of Enamelled danger boards 11000 Volts ,250mm x 200mmm as per drg no. CEE/E-490
2
114
57
Erection of Aluminium crimping Lugs 185 Sq.mm.
8
808
101
Erection of Aluminium crimping Lugs 120 Sq.mm.
6
528
88
Erection of Aluminium crimping Lugs 95 Sq.mm.
3
195
65
Erection of Aluminium crimping Lugs 50 Sq.mm.
45
2295
51
Cement concreting 1 : 2:4 for base of MS box & muffing of raile poles
2
11110
5555
Painting of Pole Numbers
7
-
-
Removing of 7.5 Mts long RCC pole
4
7378
1844.5
Removing of LT 4 pin cross arm of 75x40 channel with clamps & nut bolt for 7.5 mtr RCC pole
6
915
152.5
Removing of LT 2-pin cross arm of 75x40 channel with clamps & nut bolts for 7.5 mtr RCC pole
6
828
138
Removing of AA ANT Conductor
0.73
2411
3317
Removing of AA GNAT Conductor
0.74
2281
3091.5
Removing of FRP Box
1
1500
1500
Removing of 11KV GOAB switch 200 A, 3 Pole DP AB Switch
1
1985
1985.5
Removing of 11KV 200 A H.G Fuse unit
1
1684
1684
Removing of HDGI structural material
260
6110
23.5
Removing of 150KVA Transformer
1
7819
7819
Removing & Re-stringing of AA ANT Conductor
0.14
1413
9951
Removing & Re-Stringing of AA GNAT Conductor
0.14
1316
9274.5
Removing of XLPE 1.1KV 3 & 1/2 c cable 185 sq. mm²
12
1368
114
Removing of XLPE 1.1KV 3 & 1/2 c cable 120 sq. mm²
24
2112
88
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements