Electricity Department Tender
View complete overview of Goa Electricity Department Tender
Costs
EMD
₹ 27,065Document Cost
₹ 500Tender Fee
₹ 2,706
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ED_14968_1Bid Award Id
ViewTender No
Tender-92/Div-V (2023-24)Tender Authority
Electricity Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of 11KV 3 phase indoor terminating kit to be used with cables - 185 sq.mm.
6
47238
7873
Supply of Earthing complete with 40mm GI Pipe, 2.5 mts long alongwith 20 kgs each salt, charcoal complete. (2*1RMU)
6
16380
2730
Civil Work for 11kV UG cable RMU foundation for 11kV Dabose feeder. 1) Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 min width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kind of soil...........14.50 Cum 2) Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete...............2.00 Cum 3)Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level...........1.00 Cum 4) Providing and laying in position (1:11/2:3) Reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand: 3 graded stone agg 20mm nominal size): All works upto plinth level.............3.68 Cum 5)Providing TMT steel reinforcement bars of (SAIL, TATA, VIZAG, JSW Steel Ltd.))(Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in allthe floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.................. 336.48Kg 6)Centering & shuttering including Strutting, Propping & removal of forms for: Foundations, Footings, Bases for columns............... 4.00 Sq.m. 7)Vertical surfaces such as retaining walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like................. 21.30Sq.m. 8) 12mm cement plaster 1:4 (1 cement : 4 fine sand)............ 15.27Sq.m. 9)Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge...........6.55 Cum. 10)Transportation by carriage of material (a) By tipper truck including loading unloading and stacking. (b) Lime, building rubbish, manure sludge, moorum excavated rock (ii) Earth (upto 10 Kms) .............7.95Cum.
1
96650
96650.64
Cost of Erection
-
-
-
Erection of 3 WAY RMU , 11KV , 630A ,21KA 3SEC, SF6 outdoor - 2LBS+1CB Extensible/Non-Extensible Two (2) Motor operated load break switches (LBSs) with Manual operated earthing switches in SF6 and One (1) vacuum circuit breaker with Electrical closing and tripping along with disconnector and earthing switches SCADA Compatible and base channel. Battery charger along with batteries required for Electrical operations of RMU is in the scope of the Bidder. Each module shall consist of VPIS, FPI in LBS Module (N-1) but not less than 1 no’s per RMU. Suitable arrangement for mounting FRTU, modem or Ethernet Switch/LIU along with battery, battery charger shall be provided in RMU.
2
19440
9720
Erection of 11KV 3 phase outdoor terminating kit to be used with cables - 185 sq.mm.
1
2648
2648
Erection of 11KV 3 phase indoor terminating kit to be used with cables - 185 sq.mm.
6
15288
2548
Erection of Earthing complete with 40mm GI Pipe, 2.5 mts long alongwith 20 kgs each salt, charcoal complete. (2*1RMU)
6
14664
2444