Electricity Department Tender
View complete overview of Goa Electricity Department Tender
Costs
EMD
₹ 28,078Document Cost
₹ 1,000Tender Fee
₹ 2,808
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ED_18583_1Bid Award Id
ViewTender No
Tender 11(24-25)/DIV-VI DT 22/11/24Tender Authority
Electricity Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Outdoor, LV Main Switchboard for 400KVA Transformer centre made of CRCA sheet with PU painted and complete with all accessories and HDGI mounting channels.
1
300950
300950
... More
415V straight through joint 3 ½ core from 185 to 300 Sq mm
3
2204
6612
... More
Earthing complete with 40 mm GI pipe, 2.5 mtrs long along with 20 kgs each salt, charcoal complete
2
2730
5460
... More
GI Flat 25 x 5 mm.6mt per earthing
36
116
4176
... More
providing and laying in position cemente concrete 1:2:4 ( 1 Cemete 2 coarses 4 graded grantic or basaltic stone aggregate 40 m nominal size ) excluiding cost of centering shuttering anf fininshing all work upto plinth level .FP(1.65*0.85*0.85)
1.19
6635
7895.65
... More
Centering and shuttering including struttings, propping etc and removal of form work for: Foundation, footing, bases for columns and mass concrete.FP(4*1.65*0.85)
5.61
407
2283.27
... More
12 mm cement plaster 1:4 (1-cement: 4 - fine sand) for foundations.FP(4*1.65*0.85)
5.61
223
1251.03
... More
AAC ANT conductor
0.48
60500
29040
... More
AAC Gnat conductor
0.16
31000
4960
... More
COST OF ERECTION
-
-
-
... More
400 KVA 11kv/.4kv Distribution Transformers level II losses, Copper Winding, with Bimetallic Terminal Connectors, Energy Efficiency Level-II as per IS: 1180 (Part-I): 2014
1
18357
18357
... More
Removal of 200kVA DTC
1
7819
7819
... More
Removal and refixing of 3 Core XLPE cable 11KV armoured cable 95 sq.mm
12
298
3582
... More
Outdoor, LV Main Switchboard for 400KVA Transformer centre made of CRCA sheet with PU painted and complete with all accessories and HDGI mounting channels.
1
12500
12500
... More
Removal of Outdoor, LV Main Switchboard for 200KVA Transformer centre made of CRCA sheet with PU painted and complete with all accsesories and HDGI mounting channels.
1
6250
6250
... More
Removal of 3 ½ Core XLPE Armoured cable, 1.1KV Grade 300 sq.mm
12
139
1674
... More
Single Core XLPE unarmoured, 1.1 KV grade cable Single Core 300 sq.mm.
80
218
17440
... More
3 ½ Core XLPE Armoured cable, 1.1KV Grade 185 sq.mm
20
228
4560
... More
Removal & Refixing of 3 ½ Core XLPE Armoured cable, 1.1KV Grade 185 sq.mm
36
342
12312
... More
415V straight through joint 3 ½ core from 185 to 300 Sq mm
3
2314
6942
... More
Earthing complete with 40 mm GI pipe, 2.5 mtrs long along with 20 kgs each salt, charcoal complete
2
2444
4888
... More
GI Flat 25 x 5 mm.6mt per earthing
36
48
1728
... More
Earth work excavation in foundation trenches or drain including opening of roads, chamber, pavements and soiling, ramming, leveling of bottoms, making bottom free from stones including removing out the excavated soil/ material as directed.All kinds of soil
1.2
468
561.6
... More
b) All types of Ordinary rock including all types of laterite rock, blasting prohibited
4
763
3052
... More
Back Filling of the available excavated earth (excluding rock) in trenches, plinth, sides, foundation etc. in layer work exceeding 0.2 mtr. depth consolidating each deposited layer by ramming and watering with deduction for RCC slab
3.7
120
444
... More
RCC pole 9.0 mtr long
2
5900
11800
... More
HDG LT 4 pin cross arm channel
10
261
2610
... More
HDG clamp for 9.0 mtr RCC pole
10
45
450
... More
GI nut bolts 100x16mm
4.4
30
132
... More
HDG LT 2 pin cross arm channel
5
232
1160
... More
HDG clamp for 9.0 mtr RCC pole
5
45
225
... More
GI nut bolts 100x16mm
2.2
30
66
... More
LT pin insulator with GI pin
27
99
2673
... More
GI pin for LT pin insulator
27
74
1998
... More
LT shackle insulator with Metal parts
25
104
2600
... More
Metal parts for LT shackle insulator
25
104
2600
... More
AAC ANT conductor
0.48
10300
4944
... More
AAC Gnat conductor
0.16
9100
1456
... More
Removal of RCC pole 7.5 mtr long
2
2600
5200
... More
Removal of HDG LT 4 pin cross arm channel
1
130
130.5
... More
Removal of HDG clamp for 7.5 mtr RCC pole
1
16
16
... More
Removal of GI nut bolts 100x16mm
0.44
15
6.6
... More
Removal of HDG LT 2 pin cross arm channel
1
116
116
... More
Removal of HDG clamp for 7.5 mtr RCC pole
1
16
16
... More
Removal of GI nut bolts 100x16mm
0.44
15
6.6
... More
Removal of LT pin insulator with GI pin
5
49
247.5
... More
Removal of GI pin for LT pin insulator
5
37
185
... More
Removal of LT shackle insulator with Metal parts
5
52
260
... More
Removal of Metal parts for LT shackle insulator
5
52
260
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements