Archaeological Survey Of India Tender
View complete overview of Goa ASI Tender
Costs
EMD
₹ 97,306Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Re Tender Minor Civil And Electric Work (conservation Of Ancient Monument) Conservation Of Church And Convent Of St Francis Of Assisi At Old Goa (repairs To The Wooden Members)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ASI_820010_1Bid Award Id
ViewTender No
20/2024-25/Goa Circle/Old GoaTender Authority
Archaeological Survey Of India ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying C. C. 1:3:6 (1 cement: 3 coarse sand: 6 basaltic or granitic aggregate) in foundation including carrying materials, mixing, compacting curing, etc. complete as directed by site incharge.
37.17
-
-
... More
Laying laterite stone flooring by using stone size: 0.35 x 0.25 x 0.20 m in CM 1:3 (1 cement: 3 sand) including laying, dressing, lifting, carrying materials, curing etc. complete as directed by site incharge.
743.48
-
-
... More
Pointing the joints of the laterite stone masonry in Lime mortar (1:1:1) including preparing lime mortar, mixing, carrying materials, curing, etc. complete as directed by site incharge.
743.48
-
-
... More
Providing and preparing railing of height 0.90 metre all along in Old Goa Church Complex by using vertical 20mm square bars @ 12 cm c/c and adjoining horizontally MS flat patti of size: 40 x 5 mm at upper and bottom side, preparing railing, fabrication, welding, carrying, lifting, including all charges, etc. complete as directed by site incharge.
18.53
-
-
... More
Fixing square bar railing all along in Old Goa Church Complex by using Cement concrete (1:3:6), inserting and fixing the railing, carrying, lifting, including all charges, etc. complete as directed by site incharge.
18.53
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements