Archaeological Survey Of India Tender

View complete overview of Goa ASI Tender

Archaeological Survey Of India - ASI Tender

Works
Civil And Construction
Eprocure
Opening Date21 Sep 2024
Closing Date28 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation including side cutting and bottom levelling for the foundation for laying laterite stone pavement including cutting, carrying earth etc. complete as directed by site incharge.

76.84

-

-

... More
Providing rubble soling in foundation by using hard laterite stone including watering, ramming and consolidating, including cost of material etc. complete as directed by site incharge.

49.11

-

-

... More
Providing and laying C. C. 1:3:6 (1 cement:3 coarse sand: 6 basaltic or granitic aggregate) in foundation including carrying materials, mixing, compacting curing, including cost of material etc. complete as directed by site incharge.

24.88

-

-

... More
Laying laterite stone flooring by using stone size: 0.35 x 0.25 x 0.20 m in CM 1:3 (1 cement: 3 sand) including laying, dressing, lifting, carrying materials, curing including cost of material etc. complete as directed by site incharge.

333.95

-

-

... More
Pointing the joints of the laterite stonemasonry in Lime mortar (1:1:1) including preparing lime mortar, mixing, carrying materials, curing including cost of material etc. complete as directed by site incharge.

712.8

-

-

... More
Providing and applying synthetic enamel painting of approved brand and shade in two coats (for Iron work like Railing, Grill) over a coat of primer to the mesh fencing including scraping the surface, preparing the surface including cost of material and all charges, etc. complete as directed by site incharge.

1280.89

-

-

... More
Constructing of retaining wall by using Laterite stone of size: 0.35 x 0.25 x 0.20m in CM 1:3 including dressing, carrying and lifting materials, curing, including cost of material etc. complete as directed by site incharge.

6.61

-

-

... More
Carefully dismantling of damaged laterite stone steps with suitable tools for re-use of the laterite stone including stacking, disposal of unserviceable material to a distance more than 4-5 km etc. complete as directed by site incharge.

67.53

-

-

... More
Construction of Retaining wall on southern back side of St. Catherine Chapel in laterite stonemasonry by using the 20% available stones (available stones are decayed/damaged and missing at many places) and80% new stones in cement mortar 1:3 – 1cement: 1river sand, providing weep holes at certain intervals including cost of material, dressing, to the stone carrying and lifting materials, curing, etc. complete as directed by site incharge.

8.66

-

-

... More
Construction and Re-setting of steps towards artifacts in laterite stone masonry with the 80%available stones (available stones are decayed/damaged and missing at many places) and 20% new stones of size: 0.60 x 0.40 x 0.20m in cement mortar 1:3 –1cement: 3river sand including cost of material and dressing to the stone carrying and lifting materials, curing, etc. complete as directed by site incharge.

9.92

-

-

... More
Construction and Re-setting of Pathway in laterite stone masonry by using the 20% available stones (available stones are decayed /damaged and missing at many places) and80% new stones of size: 0.35 x 0.25 x 0.20m in cement mortar 1:3 – 1cement: 3river sand including cost of material, dressing to the stone carrying and lifting materials, curing, etc. complete as directed by site incharge.

102.32

-

-

... More
Providing 12mm thick cement mortar plastering in cm 1:3 including cost of material and all charges, etc complete as directed by site incharge.

35.5

-

-

... More
Fixing the artifacts carefully by using chain pulley without damaging the artifacts including cleaning, carrying and lifting materials etc. complete as directed by site incharge.

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.