Website Tenders
Website Tenders
Municipality Of Tuba, Benguet Tender
Healthcare and Medicine
Philippines
Details: Description Republic Of The Philippines Province Of Benguet Municipality Of Tuba Office Of The Municipal Mayor Bids And Awards Committee (bac) Invitation To Bid For Supply & Delivery Of Medical, Dental & Laboratory Supplies Project Id No. 2025-01-005 1. The Municipality Of Tuba, Through The Budget For The Contract Approved By The Sangguniang Bayan Under Annual Budget Cy 2025 Intends To Apply The Sum Of Nine Hundred Thirty-three Thousand Pesos (php933,000.00) For Supply & Delivery Of Medical, Dental & Laboratory Supplies Project Identification Number 2025-01-005 (goods) Being The Abc To Payments Under The Contract For One Lot. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. Specifications: Item No. Unit Description/specification Qty Unit Cost Total Cost Pr No. 2025-01-002: Family Health Program- Child Care 1 Pack Adhesive Bandages 100 Pcs/pack 30 100.00 3,000.00 2 Pack Cotton Balls, 300 Balls/pack 30 100.00 3,000.00 3 Pack Cotton Buds 30 50.00 1,500.00 4 Pc Digital Weighing Scale (3 Unit: Kg/lb/st; 0.1lb Accurate, 400lb Weight Capacity; Step-on Scale; Human Weighing Scale, Floor Scale, With Rechargeable Battery, 2*aaa Batteries Included: Auto-on/off, Long Battery Life, Large Lcd Display, With Curved Edges And Non-slip Pads; 5mm Tempered Glass 2 1,000.00 2,000.00 5 Box Medium Nitrile Gloves 10 250.00 2,500.00 6 Pack Non-woven Sponges 2x2 4-ply Gauze (2000 Pcs/pack) 30 100.00 3,000.00 7 Box Syringe, Disposable, 1ml, With Needle 23g 100 Pcs/pack 50 200.00 10,000.00 8 Box Syringe, Disposable, 3ml, With Needle 23g 100 Pcs/pack 50 200.00 10,000.00 9 Box Syringe, Disposable, 5ml, With Needle 23g 100 Pcs/pack 50 300.00 15,000.00 Please Ensure All Medications Are From Reputable Manufacturers And Meet All Relevant Quality Standards. All Items Must Have A Minimum Expiration Date Of 2-3 Years Upon Receipt, Properly Packed And Sealed. Must Be Fda Approved. Contact Mhso Staff For Queries Sub Total 50,000.00 Pr No. 2025-01-006: Communicable Disease Prevention & Control : Tuberculosis (tb) And Kilatis Kutis Caravan 1 Bot Alcohol, 70%, 500 Ml/plastic Bot 100 110.00 11,000.00 2 Box Hiv Kits, 30 Kits/box 10 1,800.00 18,000.00 3 Pack Cotton Balls Sterile 50’s/pack 50 100.00 5,000.00 4 Box Face Mask, Surgical, With Ear Loops, 50 Pcs/box 50 200.00 10,000.00 5 Pc Sputum Containers 200 10.00 2,000.00 6 Box Strips For Fasting Blood Glucose, 25s/box 30 1,400.00 42,000.00 7 Box Syphilis Kits, 50 Kits/box 8 1,500.00 12,000.00 All Item Description Must Be Strictly Followed. For Queries And Concerns Please Contact The End User Sub Total 100,000.00 Pr No. 2025-01-011: Communicable Disease Prevention & Control: Sexually Transmitted Infection (sti) Control Program 1 Pack Cotton Balls Sterile 50’s/pack 1 100.00 100.00 2 Box Hiv Kits, 30 Kits/box 2 1,800.00 3,600.00 3 Box Syphilis Kits, 30 Kits/box 2 1,500.00 3,000.00 4 Pc Urine Container Or Cup With Cover, Plastic, About 15 Ml Volume Capacity 60 5.00 300.00 5 Bot Urine Strips, Dipsticks, 100 Test Strips/bottle, 10 Sg Or Parameters 3 1,000.00 3,000.00 All Item Description Must Be Strictly Followed. For Queries And Concerns Please Contact The End User Sub Total 10,000.00 Pr No. 2025-01-016 ( Family Planning Health Promotion) 1 Bottle Alcohol, Ethyl, 70% Disinfectant 25 120.00 3,000.00 2 Vial Anesthesia, Lidocaine 2% 20mg/10mg/ml Solution For Injection, 50 Ml 6 125.00 750.00 3 Vial Depot Medroxyprogesterone Acetate (dmpa) Injectable Contraceptive 1141 105.00 119,805.00 4 Box Etonogestrel 68 Mg Implant Hormonal Contraceptive, 1 Applicator Containing 1 Implant/box 16 3,000.00 48,000.00 5 Box Gauze 4 X 4 100s/box 10 180.00 1,800.00 6 Box Male Condoms 1 Box/3s 637 30.00 19,110.00 7 Cycle Pills, 28 Days Cycle Contains 21 Pills With Ethinyl Estradiol 30mcg, Levonorgestrel 150 Mcg Plus 7 Tablets Ferrous Fumarate 785 55.00 43,175.00 8 Box Surgical Blade Size No. 11, 100s/box, Safe Aluminum Wrapper 1 260.00 260.00 9 Box Surgical Hypoallergenic Tape, 1 In, 10 Rolls/box 10 250.00 2,500.00 10 Box Syringe, 3 Ml, 100s/box 8 200.00 1,600.00 Should Be Fda Approved, Dosage Indicated Should Be Strictly Followed, Expiration Should Be 2 To 3 Years After Delivery And Please Contact End User For Any Queries Sub Total 240,000.00 Pr No. 2025-01-019: Maternal Care Services 1 Pc 4 In 1 Infrared Ear Thermometer For Baby Forehead Non-contact Digital Thermometer ˚c/˚f Mute, Measures Forehead (adult, Forehead, Children, Ear And Object, Can Save History Readings, Automatic Shut-off Function, With, Available Rechargeable Battery And Charger And With 6 Months Warranty Duration 2 1,200.00 2,400.00 2 Pc High-quality Fiber Filled Pillows, Pillow Size: 18x28 Inches, 100% Fiber-filled And Brushed Microfiber Fabric Cover, Dark Blue Color 4 350.00 1,400.00 3 Tube Lubricating Jelly, 150g 30 180.00 5,400.00 4 Set Pocket Fetal Doppler, With Built-in Speaker And Output For Headphones, Battery Status Indicator, Interchangeable Probes, Large Lcd Display, Auto-shut-off, With 2 Double Aa Rechargeable Batteries Plus Charger, With 3 Months Warranty Duration 3 2,600.00 7,800.00 5 Set Suction Machine Portable, Heavy -duty Motor, With 2years Warranty (1 Unit Suction Unit, Suction Connector, Air Filter, Fuse Tube, Suction Tube, Suction Cannister 1000 Ml, Instruction Manual) 2 4,300.00 8,600.00 Oil- Free Lubrication Pump -square Negative Pressure Dial -large Reservoir Bottle At 1000ml -low Noise -portable Power Supply: Ac 220v± 10% 50hz± 2% -input Power: 44va -power: ≤ 90va -max Negative Pressure Value: ≥ 0.075mpa -pumping Rate: ≥ 15l/min -reservoir Volume: 1000ml -noise: ≤ 65db (a) 6 Pc Stainless Steel Mayo Instrumental Table Medical Trolley Instrument U-shape Tubular Base To Ensure Stability; Raised Edges On All Sides Of The Tray To Prevent Falling Off Objects. Four Antistatic Castors With Two Brakes; Lift System With High Precision Hydraulic Pump, Pedal-operated. Height Adjustable From 770 Mm To 1170 Mm By Foot Pedal. Maximum Load Of 30 Kg 2 2,200.00 4,400.00 All Item Descriptions Must Be Strictly Followed. See Attached Pictures For Reference Sub Total 30,000.00 Pr No. 2025-01-020: Communicable Disease Prevention & Control : Rabies Control Program 1 Pc Alcohol, 70%, 500ml/plastic Bot 5 100.00 500.00 2 Box Adhesive Bandages/antiseptic Plastic Strips 100’s 4 25.00 100.00 3 Pack Cotton Balls, Sterile, 300 Balls/pack 2 100.00 200.00 4 Box Gauze, Sterile Swabs, White, 28x24 Mesh, 4in X 4in 8 Ply, 1 Pc Per Sterile Pack, 100 Pouches/box 2 180.00 360.00 5 Box Gloves, Surgical, Latex, Size 7.5, Large, 50 Pairs/box 2 520.00 1,040.00 6 Box Syringe, Sterile, Disposable, 3 Ml, W/ Needle 23g, 1 Inch, 100 Pcs Individually Packed/box 4 200.00 800.00 All Item Description Must Be Strictly Followed. For Queries And Concerns Please Contact The End User Sub Total 3,000.00 Pr No. 2025-01-021 - Management Of Common Illness 1 Set Blood Pressure Digital Monitor Rechargeable Electronic Blood Pressure Monitor Digital Bp Occur With, Pressure Gauge, Cuffs 22-32 Cm, Box, Rechargeable Battery, Product Manual, Data Cable & Charging Plug, Storage Bag, Rechargeable Battery * 4pcs + Original Charger. Can Automatically Measure Blood Pressure. Compact Body, Easy To Move. Weight Not Exceeding 250g (excluding Charcoal). Machine Ratio: 120x60x100mm. The Bandage Attached To The Machine Can Measure The Size Around The Arm From 22 To 32 Centimeters. Led Full-screen Display, Blood Pressure, And Pulse Are Clearly Visible. The Measured Blood Pressure Range Is 0-299 Mmhg. Measurement Accuracy: Blood Pressure – 3mm Mercury, Pulse – 5 9 3 750.00 2,250.00 2 Pcs Bulb Irrigation Syringe 60cc 5 86.00 430.00 3 Pack Cotton Balls, Sterile, 300 Balls/pack 100 100.00 10,000.00 4 Box Disposable Syringe 10ml With 22g/1.5-inch Needle, Individually Packed, 100pcs/box 25 700.00 17,500.00 5 Container Distilled Water 6l/container 23 100.00 2,300.00 6 Set Ear Clean Set (please See Attached Picture For Reference) 7 Pcs Ear Cleaner Earwax Removal Tool/earwax Remover Cleaning Tool With Case/ Earpick Curette Reusable Ear Cleaning Wax Remover/spoon Ear Pick Cleanser Care/ Removal Earpick Dirt Kit/reusable Earwax Cleanser Remover Dirt, Stainless Steel 1 1,200.00 1,200.00 7 Pcs Elastic Bandage Wrap With Clips Flexible Firm Soft Support 2 In X 5 Yd Stretch 30 75.00 2,250.00 8 Pcs Elastic Bandage Wrap With Clips Flexible Firm Soft Support 3 In X 5 Yd Stretch 30 75.00 2,250.00 9 Unit Emergency Cart (please See Attached Picture For Reference) * Heavy Duty With Functional Design *equipped With Compartments To Ensure Efficient Use* Ergonomic And Easy To Push And Maneuver Specs * Size: 75x48x93cm * Net Weight: 42kg * Material: Abs, Aluminum, And Steel *color: Blue And Gray Frame *mounted On Double Protected Noiseless Caster With Two Brakes * With Two (2) Small Drawers And Two (2) Mid-sized Drawers And Large Drawer With Centralized Locks, Includes Dividers For The Drawers * Standard Inclusion And Parts: Defibrillator Shelf, Iv Holders, Cpr Board, 02 Tank Holder, Extension Cord, Trash Bin And Sharp Container 1 35,000.00 35,000.00 10 Bottle Ethyl Alcohol, 70% 500ml/plastic Bot 150 110.00 16,500.00 11 Box Face Mask, 3 Ply With Ear Loop 50pcs/box 50 200.00 10,000.00 12 Pcs Fingertip Pulse Oximeter For Adult With High-quality Display Showing Value Of Spo2, Pulse Rate, And Battery Life. With Low Battery Alarm, Power Supply Of Alkaline Batteries, Automatic Turn Off Without Signal, Lamplight For Spo2 Status, And Silicone Buttons 2 1,000.00 2,000.00 13 Pcs Fingertip Pulse Oximeter For Pedia With High-quality Display Showing Value Of Spo2, Pulse Rate, And Battery Life. With Low Battery Alarm, Power Supply Of Alkaline Batteries, Automatic Turn Off Without Signal, Lamplight For Spo2 Status, And Silicone Buttons 2 1,000.00 2,000.00 14 Box Gauze Sponge, 12-ply Sterile 4x4 100pads/box 189 400.00 75,600.00 15 Gal Glutaraldehyde Soaking Solution 2% 1 Gal/container, With Alkaline Activating Solution 10 1,500.00 15,000.00 16 Pcs Hand Towels, White, Ultra-absorbent, 18” X 30” 15 60.00 900.00 17 Bottle Hydrogen Peroxide, 100ml/bottle 40 250.00 10,000.00 18 Pcs Instrument Cleaning Brush, Stainless Steel 2 150.00 300.00 19 Pcs Irrigating Solution Nss 1 Liter 80 170.00 13,600.00 20 Vial Lidocaine 2%, 50ml/vial 50 200.00 10,000.00 21 Box Micropore Tape 3m/1 Inch/hypoallergenic/12 Rolls Per Box 30 600.00 18,000.00 22 Pcs Nebulization Kit (adult) 50 65.00 3,250.00 23 Pcs Nebulization Kit (pedia) 50 65.00 3,250.00 24 Box Nitrile Examination Gloves 100pcs/box 80 200.00 16,000.00 25 O2 Tanks Refill 15 600.00 9,000.00 26 Pcs Oxygen Face Mask (adult) 100 65.00 6,500.00 27 Pcs Oxygen Face Mask (pedia) 70 65.00 4,550.00 28 Pcs Oxygen Nasal Cannula (adult) 100 65.00 6,500.00 29 Pcs Oxygen Nasal Cannula (pedia) 100 65.00 6,500.00 30 Pcs Oxygen Tank 20 Pounds With Regulator And Humidifier 3 4,800.00 14,400.00 31 Unit Portable Oxygen Concentrator (please See Attached Picture For Reference) With Ultra Silent Motor, Intelligent Surveillance Monitoring, Infrared Remote Control, High Reverse Display, Detachable Filter, Anion, And Safety System, Current Overload Or Loose Connection, Automatic Shutdown: Compressor With Abnormal High Temperature, Automatic Shutdown. Power Consumption: 220 Watts, Voltage; Ac230v+/10% 60 Hz., Flow Range 1-51/min, Oxygen Saturation 30% - 90% 2 20,000.00 40,000.00 32 Bottle Povidone Iodine, Antiseptic, 10% Solution 100ml/bottle 50 250.00 12,500.00 33 Box Scalpel Blade, Sterile, Disposable # 11, 100 Pcs/box 2 400.00 800.00 34 Pcs Skin Stapler Remover, Stainless Stee 2 250.00 500.00 35 Box Sterile Surgical Gloves, Size 7.5,50 Pairs/box 50 1,000.00 50,000.00 36 Pcs Sterile Water 50ml/plastic Container 40 50.00 2,000.00 37 Pcs Surgical Steel Blade Holder Handle # 3 2 1,000.00 2,000.00 38 Box Suture, Catgut With Cutting Needle, 12 Foil Packs/box, 2-0 25 400.00 10,000.00 39 Box Suture, Catgut With Cutting Needle, 12 Foil Packs/box, 4-0 100 400.00 40,000.00 40 Box Syringe, Disposable, 1ml, With Needle 23g 100 Pcs/box 20 200.00 4,000.00 41 Box Syringe, Disposable, 3ml, With Needle 23g 100 Pcs/box 20 200.00 4,000.00 42 Box Syringe, Disposable, 5ml, With Needle 23g 100pcs/box 20 300.00 6,000.00 43 Pack Toilette Tissue; 3 Ply, 1000 Sheets Green Tea Scented Bathroom Tissues That Are Made From Virgin Pulp. 10 Individually Packed Rolls/pack 25 400.00 10,000.00 44 Box Wooden Tongue Depressor, Sterile, Individually Wrapped 100 Pcs/box 9 130.00 1,170.00 Please Ensure All Medications Are Form Reputable Manufactrurers And Meet All Relevant Quality Standards. All Items Must Have A Minimum Expiration Date Of 2-3 Years Upon Receipt, Properly Packed And Sealed. Must Be Fda Approved. Dosage Indicated Should Be Strictly Followed. All Item Description Must Be Stricly Followed Please Contact End User For Any Queries/concerns Contact No. : Dr. Angeline F. Calatan -09088651484 Delivery: Should Be At Least 50% Within 15 Days & 100% Within 30 Days Sub Total 500,000.00 Grand Total 933,000.00 2. The Municipality Of Tuba Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Thirty (30) Working Days Upon Receipt Of The Notice To Proceed ( At Least 50% Within 15 Days & 100% Within 30 Days). Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Municipality Of Tuba And Inspect The Bidding Documents At The Address Given Below During Office Hours (8:00 Am To 5:00 Pm, Monday To Friday Except Holidays). 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 20, 2025, At The Bac Office, Municipal Hall, Poblacion, Tuba, Benguet From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of One Thousand Pesos (php 1,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees [official Receipt And Order Payment). 6. The Municipality Of Tuba Through Bac Will Hold A Pre-bid Conference On January 28, 2025 At The Bac Office, Municipal Hall, Poblacion, Tuba, Benguet. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before February 12, 2025 At 8:30 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On February 12, 2025 At 9:00 A.m. At The Bac Office, Municipal Hall, Poblacion, Tuba, Benguet. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. In Case There Will Be A Tie Between Bidders, All Those Who Have Passed Post-qualification And Offered The Same Financial Bid Price, A Tie-breaking Method Through “draw Lots” Will Be Used To Determine The Winning Bidder. 11. The Municipality Of Tuba Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Irr Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Failure To Sign Each Page Of The Bid Form, Including The Attached Schedule Of Prices Shall Be A Ground For The Rejection Of The Bid. 13. For Further Information, Please Refer To: Arlene D. Bangit, Edith G. Labbot, Venus P. Rimando, Jennylyn T. Wakat , Helen M. Kimpa-oy And Kevin B. Yaris At The Municipal Hall, Poblacion, Tuba, Benguet From 8:00 Am To 5:00 Pm Only, Mondays To Fridays At Tel No. (074) 442-1267 And E-mail At Bac_lgutuba2020@yahoo.com. However, Any Queries Relative To The Contents Of The Bid Documents And The Project Requirements Can Only Be Made By Bidders Who Purchased The Bid Documents Not Later Than Ten (10) Days Prior To The Submission And Opening Of Bids And Have Viewed And Ordered Through Our Posting At Philgeps. 14. You May Visit The Following Website For Downloading Of Bidding Documents: Tuba.gov.ph Date Of Posting: January 17, 2025 Janet V. Mariano Bac Chairperson
Closing Date12 Feb 2025
Tender AmountPHP 933 K (USD 15.9 K)
DEPT OF THE NAVY USA Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Corrigendum : Closing Date Modified
United States
Details: N44255-25-r-1501 Full And Open Indefinite Delivery/indefinite Quantity Contract For Architect-engineer Services For Marine Waterfront Architect-engineereing (wf A-e) Services At Various Locations Within Naval Facilities Engineering Systems Command (navfac) Northwest Area Of Responsibility (aor), Primarily Washington Statedescription: All Information Needed For Interested Parties To Submit A Standard Form Sf 330, Architect Engineer Qualifications Is Contained Herein. There Is No Separate Request For Proposals (rfp) Package To Download.this Procurement Will Result In One Indefinite Delivery/indefinite Quantity (idiq) Contract For Multi-discipline Architect-engineer (a-e) Services Primarily For Marine - Waterfront Projects At Locations In The Navfac Northwest Aor Including The States Of Washington, Oregon, Idaho, Montana, Alaska, North Dakota, South Dakota, Nebraska, Minnesota, Iowa, And Wyoming. These Services Will Be Procured In Accordance With 40 Usc Chapter 11, Selection Of Architects And Engineers, As Implemented By Far Subpart 36.6. The Idiq Period Of Performance Will Be For A Base Period Of (2) Two Years And One Three (3) Year Option Period For Maximum Duration Of 60 Months. The Total Fee For The Contract Term Shall Not Exceed $249m. The Guaranteed Minimum For The Contract Term (including Option Years) Is $5,000. Firm-fixed Price Task Orders Will Be Negotiated For This Contract. There Will Be No Dollar Limit Per Task Order And No Dollar Limit Per Year.this Proposed Contract Is Being Solicited On A Full And Open Basis. The North American Industrial Classification System (naics) Code Is 541330 ? Engineering Services And The Annual Small Business Size Standard Is $22.5m. The Government Seeks The Most Highly Qualified Firm To Perform The Required Services, Based On The Demonstrated Competence And Qualifications For The Type Of Professional Services Required And At Fair And Reasonable Prices, In Accordance With The Selection Criteria. The Market Research Study (sources Sought Number: N44255-24-r-1500) Conducted By Navfac Northwest Included An Assessment Of Relevant Qualifications And Capabilities Of Potentially Qualified Firms. As A Result Of The Market Research Analysis, A Determination Was Made To Solicit This Procurement On An Unrestricted Basis Inviting Full And Open Competition. The Navfac Northwest Deputy For Small Business Concurs With This Decision.the A-e Firm Is Expected To Provide An Interdisciplinary Team To Furnish Engineering And Design Services For Marine Waterfront Projects At Various Locations Predominantly Serviced By The Navfac Northwest Office. The Design And Engineering Services Will Require Expertise In Architectural, Mechanical, Electrical, Civil, Structural, Geotechnical, Corrosion Control, Coastal, Naval Architect, Fire Protection, Survey, Cost And Environmental Disciplines As It Pertains To Department Of Defense Waterfront/marine Facilities And Systems. Services May Include New Designs, Evaluations, Inspections And/or Studies For Maintenance, Construction, Equipment Installation, New Construction Repair And Replacement Of Piers, Wharves, Quay Walls, Dry Docks, Fendering Systems, Floating Metal Or Concrete Structures, Wave Attenuation Devices, Dredging, Etc., Including Utilities. The Work May Also Include Field Investigations, Technical Feasibility Assessments, Design Analysis, Structural/seismic Evaluation, Underwater Inspection, Geotechnical Evaluation, Cathodic Protection, Surveying, Cost Estimating, Technical Review Of Contract Documents Prepared By Government Employees, And Construction Support Consultation. At The Governments Discretion Up To 20% Of The Contract Value May Be Awarded For Non-waterfront Specific Designs Or Studies Including But Not Limited To New Construction Or Renovation Of Warehouses, Hangars, Administration Facilities, Barracks, Industrial Facilities, And/or Utilities.the Awarded Contract Will Be Subject To Specific Provisions Addressing The Avoidance Of Organizational Conflicts Of Interest. The Prime Firm For This Contract Will Be Required To Perform Throughout The Contract Term.interviews May Be Scheduled With Firms Slated As The Most Highly Qualified. Firms Slated For Interviews May Be Asked To Clarify Information Contained In The Sf330 Submittal. Elaborate Presentations Are Not Desired.selection Criteriafirms Responding To This Synopsis Will Be Evaluated To Determine The Most Highly Qualified Firms To Perform The Required Services In Accordance With The Published Selection Criteria. Failure To Comply With Instructions Or Provide Complete Information May Affect The Firms Evaluation Or Disqualify The Firm From Further Consideration. Criteria 1 And 2 Are Most Important And Equally Weighted. Criteria 3 Through 8 Are In Descending Order Of Importance. Specific Selection Criteria Include:1 - Specialized Experience And Sustainable Design2 - Professional Qualifications3 - Past Performance 4 - Quality Control 5 - Program Management And Capacity6 - Location7 - Commitment To Small Business8 - Volume Of Workcriterion 1 ?specialized Experience And Sustainable Design (sf330, Part I, Section F): Firms Will Be Evaluated On Specialized Experience In Performance Of Services Like Those Anticipated Under This Contract Through Evaluation Of Experience In: 1. design Of Waterfront Structures And Facilities (e.g. Piers, Wharves, Dry Docks).2. design Of Waterfront Utilities (e.g. Electrical, Compressed Air, Oily Waste)3. experience Using Department Of Defense Waterfront Unified Facilities Criteria4. experience Applying Sustainability Concepts Through An Integrated, Cost-effective Design Approach And Designing In Accordance With Recognized Sustainability Rating Systems Such As Green Globe, Leed, Etc.firms May Be Considered More Favorably By Demonstrating The Following: 1. projects Where Offeror Was The Prime Architect-engineer And Design Fees Were Above $4,000,000.submission Requirements: Provide A Maximum Of Five (5) Projects With The Design Complete Within The Past Ten (10) Years Immediately Preceding The Date Of Issuance Of This Notice That Best Demonstrate Specialized Experience Of The Proposed Team In The Areas Outlined Above. Sufficient Information To Determine The Date Of Completion Of The Project Must Be Included In The Project Description Or The Project Will Not Be Considered. If More Than The Maximum Number Of Projects Are Submitted, The Government Will Only Evaluate Projects Up To The Maximum Number Authorized In The Order Submitted.all Projects Provided In The Sf330 Must Be Completed By The Actual Office/branch/regional Office/individual Team Member Proposed To Manage And Perform Work Under This Contract. Projects Not Meeting This Requirement Will Be Excluded From Consideration In The Evaluation. To Enable Verification, Firms Should Include:1. the Unique Entity Identifier (uei) Number Along With Each Firms Name In The Sf330 Part 1, Section F, Block 25, Firm Name; 2. include A Contract Number Or Project Identification Number In Block 21;3. include An E-mail Address And Phone Number For The Point Of Contact In Block 23(c); 4. in Block 24, Include In The Project Description, The Contract Period Of Performance, Award Contract Value, Current Contract Value, And A Summary Of The Work Performed That Demonstrates Relevance To Specialized Experience As Outlined Above;5. for Projects Performed As A Subcontractor Or A Joint Venture Involving Different Partners, Specifically Indicate The Value Of The Work Performed As A Subcontractor Or By Those Firms Proposed For This Contract, And Identify The Specific Roles And Responsibilities Performed As A Subcontractor Or By Those Firms On The Project Rather Than The Work Performed On The Project As A Whole. If The Project Description Does Not Clearly Delineate The Work Performed By The Entity/entities Offering/teaming On This Contract, The Project Could Be Eliminated From Consideration.note: If The Firm Is A Joint Venture, Projects Performed By The Joint Venture Should Be Submitted; However, If There Are No Projects Performed By The Joint Venture, Projects Shall Be Submitted For Each Joint Venture Partner. Firms Failing To Provide Projects From All Joint Venture Partners Will Be Considered To Have Not Met The Requirements Of The Criterion. Projects Shall Be Submitted On The Sf-330 At Part I, Section F And Shall Be Completed Projects. Projects Not Complete Will Be Excluded From Evaluation Consideration. For Submittal Purposes, A Task Order On An Idiq Contract Is Considered A Project, As Is A Stand-alone Contract Award. Do Not Submit An Idiq Contract As An Example Project. Instead, List Relevant Task Orders Or Stand-alone Contract Awards As Individual Projects That Fit Within The Definition Above. The Government Will Not Evaluate Information Provided For An Idiq Contract. Examples Of Project Work Submitted That Do Not Conform To This Requirement Will Not Be Evaluated. All Information For Criterion 1 Should Be Submitted In The Sf330, Part I, Section F Of The Form. The Government Will Not Consider Information Submitted In Addition To Part 1, Section F In Evaluation Of Criterion 1.criterion 2 ? Professional Qualifications And Technical Competence (sf330, Part I, Sections E And G): Firms Will Be Evaluated On Professional Qualifications, Competence, And Experience Of The Proposed Key Personnel In Providing Services To Accomplish The Tasks Required Under This Contract, Including Participation In Example Projects In The Sf330, Part 1, Section G.key Personnel Are Individuals Who Will Have Major Contract Or Project Management Responsibilities And/or Will Provide Unusual Or Unique Expertise. All Key Personnel Must Be A Licensed Professional In Their Discipline And Have At Least Five (5) Years Of Demonstrated Experience On Waterfront Projects. Specific Disciplines That Shall Be Included In Key Personnel Are:� project Manager� design Quality Control Manager� senior Structural Engineer� senior Civil Engineer� senior Geotechnical Engineersubmission Requirements (sf330, Part I, Section E):provide Resumes For All Proposed Key Personnel That Illustrate Experience In The Work Proposed Under This Contract. Resumes Are Limited To 2 Pages And Should Indicate: Professional Registration, Certification, Licensure And/or Accreditation In Appropriate Disciplines; Cite Recent (within The Past Ten (10) Years) Project-specific Experience In Work Relevant To The Services Required Under This Contract; And Indicate Proposed Role In This Contract. Indicate Participation Of Key Personnel In Example Projects In The Sf330, Part 1, Section G.criterion 3 ? Past Performance (sf330, Part I, Section H):firms Will Be Evaluated On Past Performance With Government Agencies And Private Industry In Terms Of Work Quality, Compliance With Schedules, Cost Control, And Stakeholder/customer Satisfaction. Evaluating Past Performance And Experience Will Include Information Provided In Past Performance Questionnaires (ppqs) Or Cpars/acass For Criterion 1 Projects And May Include Customer Inquiries, Government Databases, And Other Information Available To The Government Including Contracts With Points Of Contact In Other Criteria. Note: Past Performance Information For Projects Listed Under Criterion 1 May Be Given Greater Weight.submission Requirements: Submit A Completed Cpars/acass Evaluation For Each Project Under Criterion 1. If A Completed Cpars/acass Evaluation Is Not Available, The Past Performance Questionnaire (ppq), Attachment (a), Included In This Notice, Is Provided For The Firm Or Its Team Members To Submit To The Client For Each Project Included Under Criterion 1, Specialized Experience. Do Not Submit A Ppq When A Completed Cpars/acass Is Available. If A Cpars/acass Evaluation Is Not Available, Completed Ppqs Should Be Submitted With Your Sf330. If The Firm Is Unable To Obtain A Completed Ppq From A Client For A Project(s) Before The Response Date Set Forth In This Notice, Firms Should Complete And Submit With Their Responses The First Page Of The Ppq, Attachment (a), Which Provides Contract And Client Information For The Respective Project(s). Firms May Submit A Ppq Previously Submitted Under A Different Notice/rfp (legible Copies Are Acceptable) If It Is On The Same Or Similar Form As Posted With This Synopsis. Firms Should Follow Up With Clients/references To Ensure Timely Submittal Of Questionnaires. If Requested By The Client, Questionnaires May Be Submitted Directly To The Governments Point Of Contact Via Email To:grace Montero: grace.e.montero.civ@us.navy.mil With A Copy Tonancy Coffee: nancy.m.coffee.civ@us.navy.mil Firms Shall Not Incorporate By Reference Into Their Response Ppqs Or Cpars Previously Submitted In Response To Other A/e Services Procurements. However, This Does Not Preclude The Government From Utilizing Previously Submitted Ppq Information In The Past Performance Evaluation. Firms Shall Provide Any Information On Problems Encountered And The Corrective Actions Taken On Projects Submitted Under Criterion 1 Specialized Experience And Sustainable Design. Firms Shall Also Address Any Adverse Past Performance Issues. Information Discussing Corrective Actions Or Adverse Past Performance Information Shall Not Exceed Two Double-sided Pages (or Four Single-sided Pages) In Total.awards, Letters Of Commendation, Certificates Of Appreciation, Etc. Shall Not Be Submitted And Will Not Be Considered In The Evaluation.criterion 4 ? Quality Control Program (sf330, Part I, Section H):firms Will Be Evaluated On The Strength Of The Quality Control Program Proposed By The Firm To Ensure Quality Products And Services Under This Contract And Means Of Ensuring Quality Services From Their Consultants/subcontractors.submission Requirements: Describe The Quality Control Program That Will Be Utilized For All Deliverables Of This Contract And The Management Approach For Quality Control Processes And Procedures. The Description Shall:1. explain The Quality Control Program Including An Example Of How The Plan Has Worked For One Of The Projects Submitted As Part Of Sf330, Section F Or How The Plan Will Work If It Has Not Been Used Previously. 2. provide A Quality Control Process Chart Showing The Inter-relationship Of The Management And Team Components.3. describe Specific Quality Control Processes And Procedures Proposed For This Contract Including Technical Accuracy Of And Assurance Of Overall Coordination Of Plans And Specifications, Field Verification Of Record Drawings And Existing Conditions Prior To Design, And Engineering And Design Services. 4. identify The Quality Control Manager And Any Other Key Personnel Responsible For The Quality Control Program And A Description Of Their Roles And Responsibilities.5. describe How The Firms Quality Control Program Extends To Management Of Subcontractors.criterion 5?program Management And Capacity (sf330, Part I, Section H): Firms Will Be Evaluated On The Firms Ability To Plan For And Manage Work Under The Contract And Demonstrated Capacity To Accomplish The Work In The Required Time. Submission Requirements: 1. provide An Organizational Chart For The Team And Discuss The Management Plan For This Contract And Personnel Roles In The Organization. 2. describe The Ability Of The Firm To Manage, Coordinate And Work Effectively With Team Members, Both Internal Staff And Consultants. Discuss The History Of Working Relationships With Team Members, Including Joint Venture Partners Where Applicable. 3. describe The Firms Present Workload And The Availability Of The Project Team (including Consultants) For The Specified Contract Performance Period. Describe The Workload/availability Of The Key Personnel During The Anticipated Contract Performance Period And The Ability Of The Firm To Provide Qualified Backup Staffing For Key Personnel To Ensure Continuity Of Services. General Statements Of Availability/capacity May Be Considered Less Favorably. Criterion 6? Location (sf330, Part I, Section H): Provide The Location Of The Office(s) That Will Be Performing The Work, Including Main Offices, Branch Offices, And Offices Of Team Members And The Locations Of Their Office(s) That Will Be Performing The Work Under This Contract With Demonstrated Knowledge Of The Primary Geographic Areas In Which Projects Could Be Located. Provide A Narrative Describing The Teams Knowledge Of The Primary Geographic Areas In Which Projects May Be Located And The Ability Of The Prime A-e To Respond To Urgent Site Visits Within 24 Hours Of Notification. The Individual(s) Responding Must Possess Authority To Negotiate And Bind The Prime Contractor. Evaluation Of Firms Will Include Consideration Of The Teams Knowledge Of The Primary Geographic Area Of The Anticipated Projects, Primarily The Navfac Northwest Aor.criterion 7?commitment To Small Business (sf330, Part I, Section H): Firms Will Be Evaluated In Terms Of The Extent To Which They Have Identified And Committed To Small Business (sb), Small Disadvantaged Business (sdb), Women-owned Small Business (wosb), Historically Underutilized Business Zone Small Business (hubzone Sb), Veteran-owned Small Business (vosb), Service Disabled Veteran Owned Small Business (sdvosb), And If Applicable, Historically Black Colleges Or Universities And Minority Institutions (hbcu/mi) In Performance Of This Contract, Whether As A Joint Venture, Teaming Arrangement, Or Subcontractor. The Government Will Evaluate Proposals Based On: (a) Past Performance In Utilization Of Small Business Concerns, And (b) Participation Of Small Business Concerns For This Requirement. In Support Of (a), All Firms Shall Provide Historical Data On Utilization Of Sb, Sdb, Wosb, Hubzone Sb, Vosb, Sdvosb And Hbcu/mi. Large Businesses Shall Submit Three Final Or Most Recent Individual Subcontracting Reports (isrs) For Similar Contracts Of Relative Size Which Show Compliance With Utilizing The Various Types Of Small Business Firms Noted Above. If Isrs Are Not Final Or Most Recent They Will Not Be Considered. If Subcontracting Goals Were Not Met, Provide An Explanation. If Individual Subcontracting Reports Were Not Applicable To The Similar Contracts Noted, Large Businesses Shall Submit Other Documentation Which Shows Their Utilization Of The Various Types Of Small Business Firms For The Contracts. Small Businesses Shall Also Submit Documentation Which Shows Their Utilization Of The Various Types Of Small Business Firms For Similar Contracts Of Relative Size. In Support Of (b), Large Businesses Shall Submit A Draft Small Business Subcontracting Plan, In Which They Will Be Evaluated On The Extent To Which They Identify And Commit To The Published Small Businesssubcontracting Program. The Secretary Of The Navy Has Assigned The Naval Facilities Engineering Command Goals For Fy2024 In Terms Of Percentages Of Total Planned Subcontracting Dollars For Utilization Of Small Businesses. Demonstrate The Plan To Meet These Goals:program fy24 Subcontracting Targetssmall Business (sb) 40%hubzone Small Business (hubzone Sb) 3%small Disadvantaged Business (sdb) 5%service-disabled Veteran-owned Small Business (sdvosb) 5%woman Owned Small Business (wosb) 5%veteran-owned Small Business (vosb) 5%if A Large Business Firm Is Selected For Award, A Small Business Subcontracting Plan, In Accordance With Far 19.7 And Dfar 219.7, Will Be Required And Incorporated Into The Contract Award. A Draft Small Business Subcontracting Plan Is Not Required From Small Businesses; However, Small Businesses Shall Submit Similar Information On The Extent To Which They Identify And Commit To Subcontracting To Large Business (lb), Sb, Sdb, Wosb, Hubzone Sb, Vosb, Sdvosb, And Hbcu/mi If Applicable In The Performance Of This Contract.the Small Business Size Standard Classification Is Naics 541330, Engineering Services, Size Standard $22.5m.the Attached Small Business Subcontracting Plan Template (attachment (b)) Shall Be Used By Large Businesses To Complete The Draft Subcontracting Plan. Firms Shall Submit Their Draft Small Business Subcontracting Plans Utilizing This Template, And Only This Template.criterion 8 ? Volume Of Work (sf330, Part 1, Section H) Firms Will Be Evaluated In Accordance With Dod Federal Acquisition Regulation Supplement (dfars) Procedures, Guidance And Information (pgi) 236.602-1, From Data Extracted From The Federal Procurement Data System (fpds). Firms Will Be Evaluated In Terms Of Work Previously Awarded To The Firm By Dod Within The Past Twelve Months With The Objective Of Effecting An Equitable Distribution Of Contracts Among Qualified A-e Firms Including Small, Disadvantaged Business Firms, And Firms That Have Not Had Prior Dod A-e Contracts.submission Requirements: Firms Do Not Submit Data For This Factor.sf330 Submission Requirements:architect-engineer Firms Desiring To Be Considered For This Contract Must Submit A Completed Sf-330 Package. The Sf-330 Shall Be Typed, One-sided, At Least 11-point Times New Roman Or Larger. Part I Shall Not Exceed 75 Single-sided 8.5 By 11 Inch Pages (the Page Limit Does Not Include Isrs, Certificates, Ppqs, Licenses, Or The Draft Subcontracting Plan, As Required By The Small Business Subcontracting Criterion, Nor Does The Page Limit Include Cover Sheets, Dividers, Or Other Requested Documentation (e.g., Joint Venture Agreement, Proof Of Ae Firm Registration) Provided That These Do Not Contain Any Substantive Information Submitted In Response To The Synopsis Or Intended To Demonstrate The Qualifications Of The Firm). Part I Pages Shall Be Numbered Sequentially. The Organizational Chart May Be One Page Single Sided 11 By 17 Foldout, Using 11-point Font Or Larger (font Limitations Do Not Apply To Graphics, Captions Or Tables). Please Include Your Unique Entity Identifier, Cage And Tin Numbers In Block 30 Of The Sf-330.in Accordance With The Far 36.601-4(b), Contracts For Architect-engineer Services May Only Be Awarded To Firms Permitted By Law To Practice The Professions Of Architecture Or Engineering. Firms Must Submit Proof That They Are Permitted By Law As Required By Far 36.601-4(b). If A Firm Is In A Jurisdiction That Requires Ae Firm Registration, The Firm Must Provide Proof Of Registration. If A Firm Is In A Jurisdiction That Does Not Require Ae Firm Registration, The Firm Must Provide Proof Eligibility To Practice (e.g., A Summary Explaining Eligibility Under The Laws Of That Jurisdiction. Failure To Submit The Required Proof Could Result In A Firms Elimination From Consideration.firms Who Are Offering As A Joint Venture Shall Include With Their Sf330 Submission A Copy Of The Joint Venture Agreement. Failure To Include The Joint Venture Agreement May Result In The Firms Elimination From Further Evaluation.interested Parties Must Be Registered In System Of Award Management (sam) At Time Of Offer Submission And Must Remain Valid Through Award. If Sam Registration Lapses During The Solicitation And Evaluation Period, The Offer Will No Longer Be Eligible For Award. For Instructions On Registering In Sam, The Sam Website At Https://www.sam.gov. *offer Submission Is Defined As The Selected Firms Submission Of Rates. If Sam Registration Is Not Complete By The Time The Government Requests Submission Rates, The Government May Proceed To The Next Slated Firm To Negotiate And Award A Contract.vets 4212 Federal Contract Reporting. The Selected Firm Must Be Current With Dol Vets 4212 Reporting Requirements If Current Awards Are $150,000 And Above. For Vets 4212 Requirements See Https://www.dol.gov/agencies/vets/programs/vets4212.the Selected Firm Must Be Determined To Be Responsible In Accordance With Far Part 9.104-1 And May Be Requested To Provide Additional Documentation In Support Of An Affirmative Determination Of Responsibility.architect-engineer Firms That Meet The Requirements Described In This Announcement Are Invited To Submit An Electronic Sf-330 To Naval Facilities Engineering Command Nw. This Is Not A Request For Proposal.if An Sf 254/sf 255 Is Submitted For This Solicitation, It Will Not Be Reviewed Or Considered. As Required Above, Provide Verifiable Evidence That Your Firm Is Permitted By Law To Practice The Professions Of Architecture Or Engineering (e.g., State Registration Number).hand-carried Or Mailed Sf-330s Will Not Be Accepted. Electronic Submissions Can Be No Larger Than 1.9 Gb Per File. Offerors Shall Ensure That The Government Has Received The Electronic Proposal Prior To The Date And Time Specified. Piee Solicitation Vendor Access Instructions Are Provided Via Enclosure 1. Emailed Submissions Will Not Be Accepted.submission Of Sf330s Will Be Via Solicitation Module Available Within Procurement Integrated Enterprise Environment (piee) At Https://wawf.eb.mil/piee-landing/. Instructions For Obtaining Access To And Using The Solicitation Module Will Be Provided In The A-e Synopsis.inquiries Concerning This Procurement Should Include Solicitation Number And Title And Be Forwarded Via Email: Grace Montero: grace.e.montero.civ@us.navy.mil With A Copy Tonancy Coffee: nancy.m.coffee.civ@us.navy.mil Submission Deadline Statements Of Qualifications Are Due No Later Than: 12:00 P.m. Pacific Standard Time (pst) On Monday, January 27, 2025.late Responses Will Be Handled In Accordance With Far 52.215-1 Instructions To Offerors-competitive Acquisition.this Is Not A Request For Proposal.
Closing Soon31 Jan 2025
Tender AmountRefer Documents
PKP INTERCITY REMTRAK SP Z O O Tender
Corrigendum : Closing Date Modified
Poland
Details: As a result of the recommendation of the Order of O Wartości of Szacunkowa Poniżości 1300,000 złotys.
Prowadzone is the foundation of the Art.2 Ust.1 Pkt. 1 Act of the 11th Września 2019 of the Year of Public Zamówień (Tj. U. Z 2019 Poz).
The executives, Których Oferty Zstaną Wybrane, Nie Mogą Zęszęszeń Względem Kwp W Olsztynie Z Titleu Otrzynia Niego Zapytaniaertnego Orazgotowanie I z Przygetowanie.
"Kwp Zastrzega Sobie Lawnieważnienie" (in Polish).
All the Prosecutions consisted of the Zakup Platform.
In Razie Problems Ze Złożem Oferty Prosecution, to Się Z Helpdesk Eb2b - Kontakt W Stopce website.
The Department for the Protection of the War of Poland Police of the Polish Police. In Olsz Firmy Zainteresed Realization of the Pole's Competition of Serwisowy I Wymianie Filtrów Station Uzdatnia Wody Millipore Natrzek Kwp W Olsztyn.
The choice of the most common Officers is not an Equalian.
"Wszelkie Pytania Prosza Kierć Na Adres Monika.dlugolecka@ol.policja.gov.pl Lub Tel". 47,731 43 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 43 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 43 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98
Closing Soon27 Jan 2025
Tender AmountRefer Documents
Association Of Municipalities For Sustainable Waste Management Of The Great Port LIPOR Tender
Agriculture or Forestry Works
Portugal
Details: The Eu Bioeconomy Strategy Envisions Cities To Become Circular Bioeconomy Hubs, Where Biowaste Is A Raw Material For Safe And Sustainable Bio-based Products. Lipor Has A Circular Economy Strategy Aligned With European And National Policies, Such As The European Circular Economy Action Plan, The Circular Economy Action Plan For Portugal And The 2030 Agenda For Sustainable Development. At Lipor, "waste" Is Managed As "resources", Transforming Them And Placing Them On The Market, Returning To The Value Chain. However, The Availability Of Suitable And Efficient Technology Is Still A Gap. Therefore, Lipor Intends To Optimize The Operation Of The Future Anaerobic Digestion Of Biowaste (food Waste From Selective Collection), And The Associated Wastewater Treatment Plant, Treating The Liquid Fraction Of The Digestate (liquid Effluent, After Phase Separation), Which Will Not Be Recirculated To The Digester, In Order To Comply With Wastewater Treatment Requirements And Recover Phosphorus And Ammonia Nitrogen, Producing Marketable Products. Both Nitrogen And Phosphorus Are Valuable Nutrients, Essential In The Composition Of Fertilizer Products And Of Interest For Agriculture. There Are Similar Anaerobic Digestion Plants With Wastewater Treatment Plants To Treat The Effluent. However, The Aforementioned Wwtp Removes, But Does Not Recover, Ammoniacal Nitrogen And Phosphorus. Lipor Intends To Investigate The State Of The Art And Find Out If There Is Technology Commercially Available, Or In Development, And What Is The Respective Level Of Coverage Of Functionalities And Performance. The Kpi And Relevant Requirements, As Well As Information On The Operational Framework Are Made Available In The Technical Sheet, Available On The Lipor Website: - Every Year, Lipor Treats Around 500 Thousand Tons Of Urban Waste (ru) Produced By Around 1 Million People. - The Future Anaerobic Digestion Plant Will Have An Annual Capacity Of 60,000 Tons Of Food Waste - The Anaerobic Digestion Plant Will Produce Biogas/biomethane And Digestate - The Digestate Produced Should Be About 160,000 Tons Per Year - The Digestate Will Be Separated Into Two Phases , Liquid And Solid. The Solid Phase Will Be Composted And Used As Organic Soil Corrector (compost). The Liquid Phase (effluent) Will Be Recirculated And/or Treated. - The Estimated Maximum Quantity Of The Liquid Phase (effluent) Is Approximately 150,000 M3/year (cubic Meters Per Year). The Market Consultation (omc) Concerns A Module With A Treatment Capacity Of 25,000 T/year (basic Solution That Only Refers To Surplus Effluent, After Recirculation) And/or A Module Of 150,000 T/year (secondary Objective That Refers To The Entire Flow Of The Liquid Phase). - Most Of The Nitrogen In The Effluent Is In The Form Of Ammonia Nitrogen (nh4-n). - It Is Planned To Recirculate A Large Part Of The Effluent To The Anaerobic Digester (estimate: 125,000 M3/year). - It Is Known That High Concentrations Of Ammonia Nitrogen Can Inhibit The Anaerobic Digestion Process. - Untreated Effluent Resulting From Similar Anaerobic Digestion Plants Has An Ammoniacal Nitrogen Content Of 3000 - 4500 Mg Nh4-n/l. - Untreated Effluent Resulting From Similar Anaerobic Digestion Plants Has A Total Phosphorus Content Of 50 - 250 Mg/l. - The Intended Solution Must Optimize The Balance Between A Nutrient Recovery System And Wastewater Treatment Compliance. - The Effluent After Nutrient Extraction Must Comply With The Usual Admission Criteria In A Wastewater Treatment Plant, As Set Out In The Technical Data Sheet Available On The Lipor Website. - The Effluent After Nutrient Extraction Must Have A Total Nitrogen Content Of Less Than 40 Mg/l. - The Effluent After Nutrient Extraction Must Have An Ammoniacal Nitrogen Content Of Less Than 30 Mg Nh4-n/l. - The Effluent After Nutrient Extraction Must Have A Total Phosphorus Content Of Less Than 20 Mg/l. - The Intended Solution Must Provide Marketable Products With Recovered Nutrients, Preferably One Or More Fertilizer Products, Which Must Comply With The Requirements Of Regulation (eu) 2019/1009 Relative To Fertilizer Products And Portuguese Legislation, Namely Decree-law No. 30 /2022 And Ordinance No. 185/2022. - The Solution Must Be Technologically Feasible And Economically Sustainable, Both In Terms Of Investment (capex) And In Terms Of Operating Costs (opex). - The Solution Must Provide For The Optimization Of Opex For Nutrient Recovery Throughout The Entire Life Cycle. - The Solution Should Recover At Least 40% Of The Ammonia Nitrogen And 15% Of The Phosphorus From The Effluent (liquid Digestate Phase) - Ideally, The Solution Should Not Create New Waste Streams. Pursuant To Article 40 Of Directive 2014/24/ue, Concerning Public Procurement, As Transposed Into National Legislation, Decree-law No. 18/2008, Technical Guidance No. 004/ccp/2019 Issued By Impic (dos
Closing Soon26 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n743.49|wvd|7176052147|benjamin.t.spangler.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a
|n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.t.spangler.civ@us.navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (jan 2025)|13|333998|700||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x||
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286.
3. The Following Proposed Delivery Schedule Applies:
submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery.
Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 365 Days After Effective Date Of The Resulting Contract.
4. Any Contract Awarded As A Result Of This Solicitation Will Be "dx" Rated Order; "dx" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
5. This Order Is Issued Pursuant To Emergency Acquisition Flexibilities (eaf).
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;236453 99657 G B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a582 | | | |211101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=sae Ams 5640 | | |v |160201|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;complete Indicator Assembly Must Be In Accordance With Marotta Drawing 236453 Item No. 1, Less Mounting Screws, Except As Amplified Or Modified Herein. Each Indicator Assembly May Be Shipped Either Unassembled Or Loose In The Packaging Ensuring The
parts Are Packaged Adequately To Prevent Damage And With A Label Reading, Assembly May Be Required Prior To Installation.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;delta Pressure Indicator Cover Part Of Item No. 1 And Delta Dyne Plug (indicator) Part Of Item No. 1;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams-5640 Or Astm-a582;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;delta Pressure Indicator Cover Part Of Item No. 1 And Delta Dyne Plug (indicator) Part Of Item No. 1;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
3.4 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.5 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.5.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.5.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.5.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.6 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be
submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.7 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.7.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.8 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.8.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.8.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.8.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.9 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.10 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.11 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.12 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met.
3.12.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.12.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.12.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.12.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.12.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.12.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.12.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.12.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.12.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.12.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.12.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified Thateach Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.12.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.13 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.13.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.13.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.13.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.13.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.13.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.14 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.14.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.14.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.15 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.15.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.15.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.15.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.15.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.15.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.16 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.16.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.16.2 Inspection For Completeness And Proper Type.
3.16.3 Verification Of Material Quality Received.
3.16.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.16.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.16.6 Identification And Protection From Improper Use Or Disposition.
3.16.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.16.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.16.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.17 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.17.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.18 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.18.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.18.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.18.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.18.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.19 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.19.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.19.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.19.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.19.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.19.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.20 Material Handling - The Written Material Control Process Must Include The Following:
3.20.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.20.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.20.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.20.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.20.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.20.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.21 Receiving Inspection -
3.21.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.21.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.22 Discrepancy Reporting -
3.22.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.23 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.23.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.23.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.23.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.23.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.24 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
; - 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Feb 03 2011 - Clarified Intergranular Corrosion Test On Raw Stock
- Oct 22 2012 - Identified Intergranular Corrosion Test Material Classes
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 17 2011 - Began Using Ecds For Submissions
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section.;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date24 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Machinery and Tools
United States
Description: Contact Information|4|n743.6|wvq|564-230-3066|francine.a.pommells.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
time Of Delivery (june 1997)|20|0001|3|365 Days||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd1
423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mech.
2. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000.
3. The Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls After Receipt
final Delivery Of Material (365 Days)
please Quote Actual Delivery Days
early And Incremental Delivery Is Acceptable At No Additional Cost To Thegovernment.
4. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
drawing Data=5001057 |53711| L| |d|0001 | L|49998|9999999
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a182 | | | |240301|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;the Complete Cap Assembly Must Be In Accordance With Naval Sea Systems Command Drawing 803-5001057, Part Number 803-5001057-sx-xxx-13, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;cap, Piece 14 Or Top Cap, Piece 15;
material - ;astm-a182, Grade F316;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - ;5x Visual Inspection;
item - ;weld Joint Piece 3 To Piece 9 & Piece 10;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - ;visual And Dye Penetrant Inspection (final Layer);
item - ;weld Joint Piece 11 To Piece 15 (if Applicable);
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.4 Heat Treat Requirements - Mechanical Properties (via Tension Testing And Hardness Testing If Hardness Is Required By The Applicable Material Specification) Are Required For Each Heat In Each Heat Treat Charge For Astm-a234, Astm-a403, Astm-a182, And
astm-a105 Material.
3.4.1 If Heat Treatment Is Performed In Continuous-type Furnaces With Suitable Temperature Control And Equipped With Recording Pyrometers So That Complete Heat-treatment Records Are Available, A Heat-treatment Charge Must Be Considered As Any Continuous Run
not Exceeding An 8-hr Duration. One Tension Test Must Be Taken From One Forging Per Heat In Each Heat Treatment Charge At A Minimum Of Every 8 Hours.
3.4.2 Certification Of Mechanical Properties (mechanical Analysis, Tension Testing) Must Include The Condition Furnished. The Contractor Must Maintain A Complete Record On File Of The Heat Treatment Given Each Piece, Including Stress Relief. The Contractor
must Provide Either The Record Of The Final Heat Treatment Or A Heat Treatment Certification Statement. The Certification Statement Must Be Signed By The Heat-treater And Include The Date Of Heat Treatment, Duration And Temperature Of Heat Treatment Operations
and Quenching Medium (if Required).
3.5 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be
submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.6 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.6.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.6.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.6.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.8 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.8.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.10 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.11 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met.
3.11.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.11.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.11.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.11.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.11.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.11.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.11.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.11.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.11.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.11.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.11.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.11.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.12 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.12.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.12.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.12.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.12.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.12.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.13 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.13.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.13.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.14 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.14.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.14.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.14.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.14.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.14.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.15 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.15.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.15.2 Inspection For Completeness And Proper Type.
3.15.3 Verification Of Material Quality Received.
3.15.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.15.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.15.6 Identification And Protection From Improper Use Or Disposition.
3.15.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.15.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.15.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.16 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.16.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.17 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.17.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.17.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.17.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.17.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.18 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.18.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.18.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.18.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.18.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.18.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.19 Material Handling - The Written Material Control Process Must Include The Following:
3.19.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.19.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.19.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.19.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.19.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.19.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.20 Receiving Inspection -
3.20.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.20.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.21 Discrepancy Reporting -
3.21.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.22 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.22.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.22.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.22.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.22.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.23 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Feb 09 2012 - Accepted Continuous Type Furnace Heat Treatment
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 22 2009 - Added Evidence Of Dcma Observing Test Plate Welding & Ndt
- Mar 18 2008 - Identify Applicable Weld Joints With Weld Procedures
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt.
date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Soon31 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Machinery and Tools
United States
Description: Contact Information|4|n743.6|wvx|564-230-3066|francine.a.pommells.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
time Of Delivery (june 1997)|20|0001|500|365 Days||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd1
423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (jan 2025)|13|332722|500||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x||
1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mech.
2. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000.
3. The Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls After Receipt
final Delivery Of Material (365 Days)
please Quote Actual Delivery Days
early And Incremental Delivery Is Acceptable At No Additional Cost To Thegovernment.
4. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
drawing Data=4384678 |80064| C| |d|0001 | C|49998|1136401
drawing Data=4385050 |80064| C| |d|0001 | C|49998|0451442
drawing Data=4385050 |80064| C| |d|0003 | C|49998|0767802
drawing Data=4385050 |80064| C| |d|0013 | C|49998|0430211
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b139 | | | |121001|a| | |
document Ref Data=astm-b505 | | | |180301|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.1 | | | |940727|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278(chg A) | | | |130214|a| | |
3. Requirements
3.1 ;nut, Stem Retaining, To Be In Accordance With Naval Ship Systems Command Drawing 803-4385050, Piece 12, And General Notes Of Naval Ship Systems Command Drawing 803-4384678, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;nut, Stem Retaining - Piece 12;
material - ;astm-b505, Alloy C90300, Type Iii Or, As An Alternate Material, Astm-b139, Alloy C51000, Temper H04 With The Following Minimum Mechanical Properties: 55 Ksi Tensile Strength, 22 Ksi Yield Strength, 18% Elongation.;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Visual Inspection
item - ;each Stem Retaining Nut Made From Astm B505 Alloy C90300, All Surfaces And Threads;
performance - T9074-as-gib-010/271
acceptance - S9074-ar-gib-010/278, Table Xv.1 Column B
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.4 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not Permitted On ;uns
c90300 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.5 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.5.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.5.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.5.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.6 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.7 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.7.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.9 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.9.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.9.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.9.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.10 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
^ Quality Assurance Requirements ^
3.11 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.12 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-4
3.12.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.12.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.12.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.12.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify
the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma)
office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.12.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.13 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.13.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.13.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.14 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.14.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.14.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.14.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.14.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.14.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.15 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.15.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.15.2 Inspection For Completeness And Proper Type.
3.15.3 Verification Of Material Quality Received.
3.15.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.15.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.15.6 Identification And Protection From Improper Use Or Disposition.
3.15.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.15.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.15.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.16 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.16.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.17 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.17.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.17.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.17.3 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area As Shown On Drawing 803-4385050.;
3.18 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.18.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.18.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, The
original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number ____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.18.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And
contract Requirements. Transcription Of Certification Data Is Prohibited.
3.18.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.18.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.19 Material Handling - The Written Material Control Process Must Include The Following:
3.19.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.19.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.19.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.19.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.19.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.19.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.20 Receiving Inspection -
3.20.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.20.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.21 Discrepancy Reporting -
3.21.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.22 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.22.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.22.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.22.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.22.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.23 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met.
3.23.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.23.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.23.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.23.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.23.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.23.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.23.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.23.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.23.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.23.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.23.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified Thateach Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.23.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.24 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date24 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n743.6|wvq|564-230-3066|francine.a.pommells.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
variation In Quantity (apr 1984)|3|0%|-5%|total Contract Quantity|
time Of Delivery (june 1997)|20|0001|125|365 Days||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd1
423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mech.
2. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000.
3. The Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls After Receipt
final Delivery Of Material (365 Days)
please Quote Actual Delivery Days
early And Incremental Delivery Is Acceptable At No Additional Cost To Thegovernment.
4. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities.
5. A Variation In Quantity Of -5% Of The Total Contract Quantity Is Allowed.see Far 52.211-16 For Further Details.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a240 | | |a |201115|a| | |
document Ref Data=astm-a262 | | | |150901|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=ms 18301 | | |b |920228|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;the 1 Inch Nps, 1500 Psi Restrictor Unit Must Be In Accordance With Ms18301, Ms18301-17 Style B And Ms18301-13, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;orifice Plate (note: Orifice Plate Only Is Considered Level 1);
material - ;astm-a240, Type 304;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - Intergranular Corrosion Testing
item - ;orifice Plate;
performance - Astm-a262, Practice E
acceptance - Astm-a262
3.4 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be
submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.5 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.6 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.6.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.6.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.6.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.8 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.8.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.9 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.10 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.10.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.10.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.10.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.10.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.10.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.11 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.11.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.11.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.12 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.12.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.12.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.12.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.12.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.12.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.13 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.13.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.13.2 Inspection For Completeness And Proper Type.
3.13.3 Verification Of Material Quality Received.
3.13.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.13.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.13.6 Identification And Protection From Improper Use Or Disposition.
3.13.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.13.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.13.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.14 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.14.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.15 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.15.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.15.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.15.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.15.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.16 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.16.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.16.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.16.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.16.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.16.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.17 Material Handling - The Written Material Control Process Must Include The Following:
3.17.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.17.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.17.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.17.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.17.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.17.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.18 Receiving Inspection -
3.18.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.18.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.19 Discrepancy Reporting -
3.19.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.20 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.20.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.20.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.20.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.20.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.21 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met.
3.21.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.21.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.21.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.21.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.21.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.21.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.21.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.21.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.21.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.21.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.21.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified Thateach Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.21.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.22 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Soon31 Jan 2025
Tender AmountRefer Documents
DEPT OF THE AIR FORCE USA Tender
Aerospace and Defence
United States
Details: Notice:
this Sources Sought Synopsis/request For Information (sss/rfi) Is Issued For Informational Purposes And Market Research Only. This Is Not A Request For A Quote, Request For Proposal, Or An Invitation To Bid, Nor Is This To Be Construed As A Commitment By The Government To Issue A Solicitation Or Ultimately Award A Contract. This Request Neither Constitutes A Solicitation For Proposals Nor The Authority To Enter Negotiations To Award A Contract. Additionally, This Sss Does Not Restrict The Government To A Particular Acquisition Approach. The Government Will Not Reimburse Any Company Or Individual For Any Expenses Associated With Preparing/submitting Information In Response To This Posting Or Any Follow-up Information Requests. Responders Are Advised That The Government Will Not Pay For Any Information Or Administrative Costs Incurred In Response To This Sss. All Costs Associated With Responding To This Sss Will Be Solely At The Responding Party’s Expense. No Funds Have Been Authorized, Appropriated, Or Received For This Effort. The Information Provided May Be Used By The Government In Developing Its Acquisition Strategy, Statement Of Work/statement Of Objectives, And Performance Specifications. Interested Parties Are Responsible For Adequately Marking Proprietary Or Competition Sensitive Information Contained Within Their Response As Instructed Later In This Sss/rfi. The Government Shall Not Be Liable For, Or Suffer Any Consequential Damages, For Any Proprietary Information Not Properly Identified. Please Be Advised That All Submissions Become Government Property And Will Not Be Returned.
overview:
the Air Force Life Cycle Management Center (aflcmc), Human Systems Division (hsd), Combat Ready Airman (cra) Branch, Wright-patterson Afb, Oh Is Conducting Market Research To Identify Possible Vendors And/or Manufacturers That Can Provide Aviator Helmets That Are Compatible With Fixed Wing Ejection And Non- Ejection Systems On Multiple Usaf Aircraft Weapon Systems.
background Information:
usaf Aircrew Require The Ability To Easily And Rapidly Transition Between Symbology Displays, Cueing, And Night Vision Or Use These Devices Simultaneously For Optimum Capability. Installing These Advanced Avionics On The Current 20+ Year Old Helmet Degrades The System's Operational Performance. If This Helmet Is Not Modified, Aircrew Will Continue To Have To Overcome Jitter, Loss Of Night Vision Image And Display Symbology, Neck Strain, And Increased Potential For Injury During Ejection. In Addition, Proprietary Helmets Designed To Optimize Specific Displays Will Be Introduced Into The Inventory, Increasing Logistical Footprint.
current Helmets Are Not Optimized For Use With Night Vision And Weapon Cueing/display Systems Required To Operate Modern Aircraft. Currently, Employing These Devices Require Extensive Modifications To Current Helmets That Were Not Designed To Accommodate Them. This Results In Poor Weight Distribution And Stability Which Contributes To Mission Degradation, Aircrew Fatigue, Neck Strain, And An Increased Potential For Injury. In Addition, Current Helmets Do Not Provide Adequate Noise And Impact Protection.
systems Requirements:
please Provide Information Regarding The Following Capabilities Of Your Helmet System Regarding The Following Categories And Provide Rationale How It Is Compliant:
key Performance Parameter (kpp)
1. Kpp #1: Stability
the Fwh Will Provide A Stable Fixed Reference To The User’s Eye Through The Full Range Of Aircraft Operations. When Used With Helmet Mounted Equipment, There Will Be No Vignetting (loss) Of Symbology Or Imagery Or Loss Of Resolution Of Optical Systems.
how Much Tension Load Can Your Helmet Withstand Over A 2.0-minute Exposure?
2. Kpp #2: Equipment Compatibility
the System And Its Components Will Be Compatible With And Not Degrade Aircrew Flight Equipment And Helmet Mounted Devices.
how Does Your Helmet System Integrate With Current Helmet Mounted Displays (hmds) (i.e. Joint Helmet Mounted Cueing System (jhmcs), Hybrid Optical-based Inertial Tracker (hobit), Night Vision Goggles (nvgs))?
are You Compatible With Any Other Hmds, Not Specifically Called Out?
what Capability Do You Have To Work With Other Companies To Understand Future Requirements/technologies For Helmet-related Systems To Include Hmds (ijhmcs, Etc.), Oxygen Masks, And Visors?
is Your Helmet System Compatible With The Equipment Listed In Attachment I?
3. Kpp# 3:weight, Center Of Gravity, And Principal Moments Of Inertia
the Weight, Center Of Gravity (cg), And Principal Moments Of Inertia (moi) Of The Fwh (in All Configurations) Will Decrease Neck Loads (compared To The Helmet(s) It Replaces) To The Aircrew During High-g Maneuvering, Bailout, 600 Knots Equivalent Air Speed (keas) Ejection, Parachute Opening, Ditching, And Crash-landing Scenarios.
what Data Can You Provide To Support Your Helmet Reduces Weight, Cg, And Moi To Decrease Neck Loads?
what Evidence Can You Provide To Show Your Helmet Decreases Neck Loads Against Mil-hdbk-516c, For Example: Multi-axial Neck Injury Criteria – Y Axis (manicy), Neck Moment Index (nmix), And Probability Of Concussion (poc)?
key System Attributes (ksa) Capability
4. Impact Protection
the System Will Protect The Crewmember’s Head From Impacts Associated With Basic Aircraft Maneuvers, Ejection, Bailout, Ditching, And Crash Landing Better Than The Helmet It Replaces
what Data Can You Provide To Show That Your Helmet Can Withstand A 600 Keas Ejection Sequence With Limited Physical Damage That Would Cause Injury To The Aircrew Or Impair The Ability Of The Helmet To Protect The Aircrew?
what Data Can You Provide To Show That No Part Of The Helmet System Will Become Foreign Object Debris In A 600 Keas Windblast?
5. Logistics
fwh Variants Will Use Common Components To Reduce The Logistical Footprint Compared To Existing Systems, And Be Organically Supportable By Defense Logistics Agency.
6. Anthropometric Accommodation
the Fwh Will Accommodate The Central 99% Of The Male And Central 99% Of The Female Aircrew Population (with 90% Confidence) In The Minimum Number Of Sizes, With The Remainder Being Fitted With Minor Modifications To Existing Sizes.
7. Acoustic Dose
the Fwh Will Ensure Wearers Experience Acceptable Noise Levels, Technically Defined As Less Than Or Equal To 100% Acoustic Dose (1.0 Total Daily Exposure (tde) @ Mean -2 Standard Deviations (sd) Performance For Fit) For Crew Positions In 90% Of Aircraft.
8. Speech Intelligibility
the Fwh Will Enable Helmeted Aircrew To Score Greater Than 80% On The Modified Rhyme Test (mrt) In The Laboratory With Talker And Listener Under Simulated Flight Noise Conditions.
9. Fit/wearability
the Fwh Fit, In All Configurations, Will Be Repeatable, Accommodate Missions Of Extended Duration, And Not Cause Hot Spots/pressure Points That Degrade Performance On 95% Of Aircrews.
10. Aircraft Compatibility
the Fwh Will Be Compatible With The Aircraft Without Requiring Aircraft Modifications.
11. In-flight Mission Reconfiguration
the Fwh Will Accommodate Safe And Rapid In-flight Reconfiguration Of Fielded And Post-milestone B Helmet Mounted Devices Without Removing The Helmet During All Mission Profiles No Worse Than Legacy.
additional Performance Attributes
12. Head Supported Weight.
the Mass Properties Of The System Will Not Decrease The Ability Of The Wearer To Perform Related Tasks Over The Duration Of The Mission.
what Is The Weight Of Your Helmet System As Operationally Worn For The Slick Configuration? Weight Reported Will Include Fully Assembled Base Helmet As Worn By The User, Excluding Interfacing Aircrew Flight Equipment (afe) (i.e. No Oxygen Mask, Or External Communication Cabling). Please Report The Weights For Each Size Of The Helmet System.
in Addition To Head Supported Weight Of Your Helmet System (described Above), Report Mass Properties Of Your Helmet System, In All Configurations, For Day And Night Operations, Using The Template And Guidance Found In Attachment Ii. Upon Reporting According To The Template, Describe Set-up And Methods Utilized For Collecting Measurements.
13. Eye Protection
the Fwh (in All Configurations) Will Shield The Eyes During All Flight And Ground Operations, From Adverse Effects Of Solar Radiation, Windblast, Airborne Debris, Bailout, Ditching, And 600 Keas Ejection.
tell Us How Your Helmet System Will Provide Eye Protection In All Phases Of Ejection (initiation Of Ejection To Ground Landing), During Day And Night Operations With Respect To Slick, Jhmcs, Hobit, And Nvgs.
what Data Can You Provide To Show That The Visor Of Your Slick Helmet System Remains In A Down And Locked Position During All Phases Of A 600 Keas Ejection (initiation Until Ground Landing), During Day And Night Operations?
what Data Can You Provide To Show That Your Helmet System In The Jhmcs And Hobit Configuration Provides Eye Protection To The User During All Phases Of A 450 Keas Ejection (initiation Until Ground Landing), During Day And Night Operations?
14. Visor/visual Compatibility
the Fwh Will Provide Aircrew The Ability To Rapidly Transition Between Two Visors Using One Gloved Hand During Flight Operations. The Visors’ Optical Distortion Qualities And Transmissivity Options Will Be Equal To Or Better Than The Visor Configurations They Replace.
does Your Visor Meet The Criteria In Mil-dtl-43511d? If Any Deviations Exist, Please Note Them.
15. Field Of View/regard
the Fwh Will Provide A Field Of View And Field Of Regard Equal To The Helmet Being Replaced.
16. Penetration Protection
the System Will Protect The Crewmember’s Head From Penetrations Associated With Basic Aircraft Maneuvers, Ejection, Bailout, Ditching, And Crash Landing To A Level Equivalent To The Helmet It Replaces.
what Data Can You Supply From Testing To Show That Your Helmet System Supplies Protection Against Impact And Penetration?
17. Retention
the Fwh And Visor Will Be Safely Retained And Remain In Its Worn Position When Exposed To A 600 Keas Ejection
tell Us How Your Helmet System Can Be Retained In All Phases Of Ejection (initiation Of Ejection To Ground Landing).
18. Bulk
the Helmet Shape And Cabling Will Not Interfere With Aircrew Mobility, Ingress/egress (including Emergency Egress) Requirements, Or The Operation Of The Ejection Seats In All Aircraft.
19. Spinal Alignment
the Helmet Shape Will Enable Proper Spinal Alignment During Flight When Interfacing With The Ejection Seat Head Pad.
20. Audio Compatibility
the Fwh Noise Attenuation System Will Be Compatible With All Aircraft Systems And Will Not Impede Recognition Of Audible Aircraft Warning/caution Systems, Night Vision Equipment, Weapons System Employment, Or Decrease Accuracy Of Helmet-mounted Cueing Devices.
21. Aircraft Cockpit Simulator Compatibility
the Fwh Will Be Compatible With All Existing Aircraft Cockpit Simulators. If New Adapters Are Required, They Must Be Provisioned For And Provided As Part Of The System.
22. Internal Communication Systems (ics)
the Fwh Noise Attenuation System Will Be Compatible With All Aircraft Icss.
23. Emergency Ground Egress
the Fwh Will Not Interfere With Emergency Ground Egress Procedures Or Require Any Additional Aircrew Action To Disconnect The Helmet System From The Aircraft Wiring (i.e. Disconnect Will Break Away During Aircrew Egress).
24. Fire Safety
the Fwh Will Provide Flame, Drip, And Melt Protection Equal To Or Better Than Current Fielded Helmets.
25. Don And Doff
aircrew Will Be Able To Don And Doff The Helmet Without Assistance. The Aircrew Will Be Able To Remove The Helmet During An Emergency With One Hand Using Either Hand.
26. Audio Performance
the System Will Provide Broadband Audio Output With Minimal Distortion And Ensure Overall Sound Pressure Level And Electrical Polarity Are Matched Across Both Ears.
what Data Can You Provide For Audio Performance Testing That You Have Conducted On Your Helmet System?
if Available Please Provide Specifics On: Broadband Frequency Response, Distortion, Sensitivity Balance, Volume Control, And Speech Intelligibility.
27. Volume Control
adjustment Of The Aircraft Ics Volume Control Will Result In A Corresponding Volume Change At The Ear.
28. Cockpit Illuminator
the Fwh Will Provide A Modular, Night Vision Compatible Light Source With An On/off Switch Selectable By The Aircrew During Flight.
29. 3-d Audio
the Fwh Will Be Capable Of Accepting 3-d Audio Cueing For Radio Communication And Threat/targeting Information.
what Data Can You Provide To Show Your Helmet Provides 3d Spatial Audio Support?
30. External Audio
fwh Will Be Capable Of Providing An External Audio Capability That Allows Dismounted Aircrew The Ability To Hear The External Environment While Wearing The Helmet.
31. Atmospheric Pressure Changes
the Fwh Will Not Increase The Risk Of Aircrew Injury Throughout The Range Of Atmospheric Pressure Changes Experienced During Flight.
32. Altitude Protection
the Fwh Will Allow Users To Safely Operate Aircraft At Altitudes Up To The Maximum Operational Cabin Altitude.
33. Emi/emc Compatibility
the Fwh Will Not Emit Electromagnetic Energy That Exceeds The Limits Of Mil-std-461 And Ads-37a-prf As It Applies To Mission Critical Equipmentor Be Degraded By Electronic Emissions In Its Operational Environment.
28. Cockpit Illuminator
the Fwh Will Provide A Modular, Night Vision Compatible Light Source With An On/off Switch Selectable By The Aircrew During Flight.
29. 3-d Audio
the Fwh Will Be Capable Of Accepting 3-d Audio Cueing For Radio Communication And Threat/targeting Information.
what Data Can You Provide To Show Your Helmet Provides 3d Spatial Audio Support?
30. External Audio
fwh Will Be Capable Of Providing An External Audio Capability That Allows Dismounted Aircrew The Ability To Hear The External Environment While Wearing The Helmet.
31. Atmospheric Pressure Changes
the Fwh Will Not Increase The Risk Of Aircrew Injury Throughout The Range Of Atmospheric Pressure Changes Experienced During Flight.
32. Altitude Protection
the Fwh Will Allow Users To Safely Operate Aircraft At Altitudes Up To The Maximum Operational Cabin Altitude.
33. Emi/emc Compatibility
the Fwh Will Not Emit Electromagnetic Energy That Exceeds The Limits Of Mil-std-461 And Ads-37a-prf As It Applies To Mission Critical Equipment Or Be Degraded By Electronic Emissions In Its Operational Environment.
34. Electrostatic Discharge (esd).
fwh Performance Will Not Be Affected By Esd Events.
35. Communication Devices
the System Will Be Compatible With Or Replace Current Communications Devices Designed For Use With Aircrew Helmets And Oxygen Masks.
36. Boom Microphones
the Fwh Will Be Compatible With A Boom Microphone.
37. Habitability
fwh Will Allow Aircrew The Unimpeded Ability To Eat, Hydrate, And One- Handed Valsalva.
38. Operability
direct Manipulation Of The Donned Fwh By The Aircrew Under Operational Conditions, Will Require Only One Gloved (standard Nomex Flight Glove) Hand To Easily Operate Any Mechanism.
39. Positive Pressure Breathing
the Fwh Will Allow For The Effective Use Of Positive Pressure Breathing For Altitude And G Systems.
40. Temperature And Moisture Control
the Fwh Will Incorporate A Washable Moisture-wicking And Anti-microbial Interface That Does Not Present A Burn Hazard In Extreme Thermal Survival Environments.
41. Reliability
the Minimum Acceptable Mean-time-between-critical Failure (mtbcf) Is Seven Years.
42. Maintainability
mean Repair Time (mrt) Will Not Exceed 0.5 Hours, With 95 Percent Of The Tasks Not Exceeding 3.0 Hours.
43. Durability
the Fwh And Its Components Will Be Shatter Proof, Non-reflective, And Have Abrasion/chip/stain/ Corrosion Resistance Equal To The Current System.
44. Materials And Helmet Shape
materials And Helmet Shape Will Not Damage Aircraft Canopies, Windscreens, Other Transparencies, And Structures.
45. Survival And Rescue Compatibility
the Fwh Will Not Interfere With Or Degrade The Performance Of Any Survival/rescue Equipment Or Procedures.
46. Support Equipment (se)
if New Tmde, Se, Or Tools Are Required, They Must Be Provisioned For And Provided As Part Of The System.
47. Maintenance Planning
maintenance, Repair, And Reconstitution Tasks Will Be Accomplished By Appropriately Qualified Organizational Level Aircrew Flight Equipment Specialist.
48. Maintenance Environment
system Design Will Allow Maintenance To Be Performed In Hostile Environmental Conditions (e.g. Arctic And Mopp-4) At Operating Bases/locations Worldwide To Include Mobile, Sea-based, And Bare-base Facilities.
49. Inspections
periodic Inspections And Preventive Maintenance Tasks Will Be Sufficient To Ensure System Integrity. Inspection Intervals Will Be Equal To The Helmet It Replaces.
50. Technical Data
technical Orders/manuals (to/tm) For Integration/operation And Repair Will Include Illustrated Parts Breakdowns, Parts Listings, Diagrams, Theory Of Operation, Maintenance, And Troubleshooting Guides. The Technical Data Will Be Formally Verified, Validated, And Approved By The Appropriate Agencies Prior To The Delivery Of The First System. Time And Cost To Fully Incorporate Technical Data Will Be Part Of The Program Cost And Schedule.
51. Manpower
manning Required For The System Should Meet Current Authorized Levels. Specifically, No Additional Logistics, Maintenance Or Aircrew Flight Equipment Authorizations Will Be Required To Support The New Helmet.
52. Human Factors Engineering
human Factors Engineering Principles Specified In Mil-std-1472 Should Be Employed To The Maximum Extent Possible In Each Fwh System Solution.
instructions To Potential Respondents:
1. Submit One (1) Electronic Copy To Ms. Samantha Mckee, Samantha.mckee.1@us.af.mil, No Later Than 6:00 Pm Est On 30 January 2025. Title E-mail Responses In The Subject Line Of The E-mail As Follows: “response To Next Generation Fixed Wing Helmet Rfi Rou-a044401.”
2. Respondents, Please Provide Data That Can Support These Questions As Well As Ejection Data That You Have. Respondents Shall Provide Capability Descriptions In The Same Format As The Above System Requirements Table, Attachment I – Equipment Compatibility, And Attachment Ii – Mass Properties And Should Include Technical And Descriptive Text To Provide Sufficient Detail On How The Proposed Solutions Will Benefit The Human Systems Division (hsd), As Outlined In The Systems Requirements Section Above. Submissions Shall Be Limited To No More Than 28 Pages Inclusive Of Answers To Requirement Specifications/questions Detailed In The Matrix Above; Any Necessary Product Sheets, Test Data, Graphs, And Charts Supporting Those Answers Shall Be Limited To No More Than 5 Pages As Well As A Rom (detailed Below) Of No More Than 3 Pages. Please Identify A Representative To Support Further Government Inquiries And Requests For Clarification Of The Information Provided, If Needed. Marketing Materials Are Considered An Insufficient Response To This Sources Sought Synopsis.
3. Please Provide A Rough Order Of Magnitude (rom) Cost Estimate. Rom Length Should Be No More Than 3 Pages. Provide Estimated Cost For The Following: This Section Of Your Response Should Provide Estimated Costs For Development, Non-recurring Engineering, Qualification Testing, And Future Production Costs. Specifically For Production, Include Helmet Unit Costs And Monthly Production Capacity For A Total 22,500 Production Units. The Government Is Interested In Obtaining Product Support Engineering Data Or A Technical Data Package (tdp) That Includes The Appropriate Level Of Data To Support An Organic Level Of Maintenance (that Could Include Up To Level 3 Drawings Iaw Mil-std-31000, Rev B, Sections 4.2 And 5.4.1.3). Furthermore, Please Provide An Estimate For Technical Manuals For The Helmets, Initial Provisioning Data And Any Required Updates Through Full Rate Production, And Training Costs To Include Training Evaluations And Fielding.
4. Please Provide A Program Schedule To Include Emd, Production, And Fielding Timelines.
5. Responses Shall Include The Following Information:
company/institute Name:
address:
point Of Contact (to Include Phone Number And Email Address):
cage Code:
unique Entity Id:
web Page Url:
state Whether The Company Is Domestically Or Foreign Owned (if Foreign, Indicate The Country Of Ownership).
state Whether The Company Is Interested In Being A Prime Contractor Or Subcontractor For This Requirement.
state The Company’s Manufacturing Readiness Level In Support Of Helmet Production And Provide A Manufacturing Readiness Assessment.
state The Business Readiness To Support Financial Capabilities To Support Government Testing And Production Of Helmets.
provide Data Supporting Design Is Stable And Meets Above Listed Capabilities And Requirements Outlined In Table Above.
provide Supply Chain Process And Capabilities To Support Helmet Production.
lead Time Projected For Vendors To Support Manufacturing Of First Article Delivery
provide An Assertion Your Helmet System Is Compliant With The Following Regulations:
far 52.225-1, Buy American-supplies
dfars 252.225-7012, Preference For Certain Domestic Commodities
provide Data Rights Assertions, Please Use The Table Below:
contractors Must Identify Any Noncommercial Data (data Is Technical Data And Computer Software) To Be Delivered Or Otherwise Provided Under The Contract To The Government With Data Rights Requirements More Restrictive That Unlimited Data Rights.
provide Assertions At The Lowest Practical Segregable Level:
software: Module Or Subroutine
technical Data: Subsystem, Component Or Sub-component.
refer To Dfars 252.227-7017 For Appropriate Language
data Rights Assertions | Technical Data/computer Software To Be Furnished With Restrictions |basis Of Assertion |asserted Rights Category |person Asserting Restrictions
6. All Prospective Contractors Must Be Registered In The System For Award Management (sam) Database To Be Awarded A Dod Contract. The North American Industry Classification System (naics) Code For This Requirement, If Applicable To The Company’s Capabilities, Should Be Included In The Company’s Naics Code Listing In Sam. To Learn More About This Sam Requirement And How To Register, Please Visit The Sam Website At Https://www.sam.gov/
7. The Naics Code For This Action Is 339113 – Helmets (except Athletic), Safety (e.g., Motorized Vehicle Crash Helmets, Space Helmets), Manufacturing With A Size Standard Of 800 Employees. Based On This Naics Code, Indicate Whether Your Company Qualifies As A:
self-certified Or Third Party Certified Small Business (yes / No)
self-certified Or Third Party Certified Women-owned Small Business (yes / No)
self-certified Or Third Party Certified Economically Disadvantaged Women- Owned Small Business (yes/no)
self-certified Or Third Party Certified Hubzone Certified (yes / No)
self-certified Or Third Party Certified Veteran-owned Small Business (yes / No)
self-certified Or Third Party Certified Service-disabled-veteran-owned Small Business (yes / No)
self-certified Or Third Party Certified 8(a) (yes / No)
self-certified Or Third Party Certified Sba
certification Date: ____________
sba Graduation Date: ______________
communication And Additional Considerations:
in Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The U.s. Government To Form A Binding Contract.
the Government Will Not Award A Contract On The Basis Of This Rfi. A Determination Not To Compete This Action Based On Responses Received Is Solely Within The Government’s Discretion.
the Acquisition Strategy Is Still Being Determined. Market Research Results Will Assist The Air Force In Determining Whether This Requirement Will Be A Full And Open Competition, A Small Business Set Aside, A Sole Source Acquisition, Or Utilization Of Dla Contract.
not Responding To This Sss Does Not Preclude Participation In Any Future Rfp, If Any Is Issued.
the Government May Contact Respondents To Obtain Additional Information Or Clarification In Order To Fully Understand A Response. This May Include Discussions, Site Visits, Demonstrations, Etc. To Further The Government’s Understanding Of A Proposed Effort, As Well As The Respondent’s Understanding Of The Government’s Requirements.
responses To Questions From Interested Parties Will Be Promptly Answered And Posted On Sam.gov Unless Some Release Of Proprietary Information Is Involved Or The Answer Addresses A Question Peculiar To A Company Or That Company’s Response. Post Submittal, One-on-one Information Sessions With Respondents Are Not Contemplated; However, They May Be Offered To Respondents To Clarify The Government’s Understanding Of Their Submittal, The Capability Ramifications, Or To Discuss Their Business Approach. Information Feedback Sessions May Be Offered To Respondents After The Sss Assessments Are Completed.
verbal Questions Will Not Be Accepted. All Questions Will Be Answered Through Postings To Sam.gov; Except As Provided Above. Additionally, Questions Must Not Contain Trade Secrets Or Classified Information. The Government Reserves The Right To Not Address Questions Received After 30january 2025.
respondents That Submit Proprietary Data Shall Clearly Mark The Data With Appropriate Markings On The Cover Sheet And On Each Applicable Page. Any Proprietary Data Submitted May Be Handled By Contract Support Services Personnel Who Have Signed An Nda. Any Proprietary Information Received In Response To This Request Will Be Properly Protected From Any Unauthorized Disclosure. The Government Will Not Use Proprietary Information Submitted From Any One Firm To Establish The Capability And Requirements For Any Future Systems Acquisitions, So As To Not Inadvertently Restrict Competition. Any Material That Is Not Marked Proprietary Will Be Considered Publicly Releasable
broad Industry Participation For This Sources Sought Is Encouraged. U.s. And Non-u.s. Firms Are Permitted To Respond To This Sss/rfi.
if A Company Is Capable Of Some, But Not The Entire Requirement Stated In This Sources Sought Synopsis, Please Provide A Response That Explains The Requirements For Which You Are Capable.
small Businesses Are Encouraged To Provide Responses To This Sss In Order To Assist The Program Office In Determining Potential Levels Of Competition Available In The Industry, As Well As Helping To Establish A Basis For Developing Any Subsequent Subcontracting Goals.
companies Responding To This Sss/rfi Are Encouraged To Provide Quotes For Existing Items. These Quotes Are For Planning Purposes Only.
indicate Whether The Company Is Currently Selling Proposed Solution To Department Of Defense Customers And Whether The Capability Can Be Obtained Under An Existing Government Contract. Provide The Contract Number(s) And Government Points Of Contact Accordingly.
this Notice May Be Updated As Additional Information Becomes Available. Please Check The Sam.gov For Updates To This Announcement And Register To Receive E-mail Notices Of Any Updates.
Closing Soon30 Jan 2025
Tender AmountRefer Documents
DEPT OF THE AIR FORCE USA Tender
Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Details: Fa8201-24-q-m001 - Amendment 1 - 21 January 2025
the Changes Made In Amendment 1 Are Outlined Below.
a Site Visit Is Now Being Offered. The Site Visit Will Take Place On Thursday, 30 January At 1:00 Pm Mountain Daylight Time. The Site Visit Will Take Place At The Hill Aerospace Museum, 7961 Cottonwood St Building 1955, Hill Afb, Ut 84056. If You Would Like To Attend The Site Visit, Please Email Both The Contract Specialist Colton Esplin Colton.esplin@us.af.mil And Contracting Officer Joseph Laing Joseph.laing@us.af.mil.
the Due Date Of Offers Has Changed. The Due Date For Offers Is Now Wednesday, 12 February 2025, At 12:00 Pm Mountain Daylight Time.
the Due Date For Questions Has Changed. All Questions Regarding This Acquisition Must Be Submitted By 5 February 2025 At12:00 Pm Mst To Allow For The Government To Assess The Inquiry And Provide A Response. Send All Questions To Contract Specialist Colton Esplin Colton.esplin@us.af.mil And Contracting Officer Joseph Laing Joseph.laing@us.af.mil.
request For Quote - Fa8201-24-q-m001 – Amendment 01
hill Aerospace Museum Static Aircraft Restoration - January 2025 Requirement
hill Air Force Base, Ut
this Is A Combined Synopsis/solicitation For Commercial Items And Services Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Proposals Are Being Requested And A Written Solicitation Will Not Be Issued.
solicitation Number Fa8201-24-q-m001 Is Issued As A Request For Proposal (rfq) And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition 2025-02, 03 January 2025. And Its Supplements.
this Is A Total Small Business Set Aside Announcement Filed Under Naics Code 238320 Painting And Wall Covering Contractors, Size Standard $19,000,000. Product Service Code (psc) J015 Maintenance, Repair, And Rebuild Of Equipment – Aircraft And Airframe Structural.
the Anticipated Clin Structure Of The Resulting Award Will Reflect:
clin 0001
description:c-130 Classroom Exterior Aircraft Restoration (outdoor Aircraft)
period Of Performance:1 July 2025 To 30 Jun 2026
qty:1 Ea
clin 0002
description:b-52 Exterior Aircraft Restoration (outdoor Aircraft)
period Of Performance:1 July 2025 To 30 Jun 2026
qty:1 Ea
clin 0003
description:c-124 Exterior Aircraft Restoration (outdoor Aircraft),
period Of Performance:1 July 2025 To 30 Jun 2026
qty: 1 Ea
all Clins Will Be Established On A Firm Fixed Price Basis.
all Proposals Will Be Evaluated On A Lowest Price Technically Acceptable (lpta) Basis. Award Will Be Made To The Offeror Who Submits The Lowest-priced Proposal That Meets The Minimum Technical Requirements Outlined In The Performance Work Statement (pws) And Other Solicitation Documents.
a Site Visit Is Being Offered. The Site Visit Will Take Place On Thursday, 30 January At 1:00 Pm Mountain Daylight Time. The Site Visit Will Take Place At The Hill Aerospace Museum, 7961 Cottonwood St Building 1955, Hill Afb, Ut 84056. If You Would Like To Attend The Site Visit, Please Email Both The Contract Specialist Colton Esplin Colton.esplin@us.af.mil And Contracting Officer Joseph Laing Joseph.laing@us.af.mil.
**the Due Date For All Proposals Is Wednesday, 12 February 2025, At 12:00 Pm Mst.**
all Questions Regarding This Acquisition Must Be Submitted By 5 February, 2025 At12:00 Pm Mst To Allow For The Government To Assess The Inquiry And Provide A Response Send All Questions And Quotes To Contract Specialist Colton Esplin Colton.esplin@us.af.mil And Contracting Officer Joseph Laing Joseph.laing@us.af.mil
quote Submission Information:
quotes Are Required To Be Submitted Via Email To Both The Contract Specialist Colton Esplin Colton.esplin@us.af.mil And Contracting Officer Joseph Laing Joseph.laing@us.af.mil
attachments:
pws Hill Static Aircraft Restoration - January 2025
static Aircraft Restoration Aircraft Pictures
wage Determination 2015-5483 Rev 25
period Of Performance: 1 July 2025 To 30 Jun 2026
the Following Provisions And Clauses Will Be Applicable To The Result Contract:
*note: Offerors Are Required To Fill In The Provision Below At Far 52.204-24
dfars 252.232-7006 Wide Area Workflow Payment Instructions
the Government Will Process Vendor Payment Requests And Receiving Reports Through The Wawf System Which Is The Electronic Method, As Authorized By Receiving Reports.
52.204-24 representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment.
as Prescribed In 4.2105(a), Insert The Following Provision:
representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (aug 2020)
the Offeror Shall Not Complete The Representation At Paragraph (d)(1) Of This Provision If The Offeror Has Represented That It “does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument” In The Provision At 52.204-26, Covered Telecommunications Equipment Or Services—representation, Or In Paragraph (v) Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Items.
(a) Definitions. As Used In This Provision-
backhaul, Covered Telecommunications Equipment Or Services, Critical Technology, Interconnection Arrangements, Reasonable Inquiry, Roaming, And Substantial Or Essential Component Have The Meanings Provided In The Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment.
(b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. Nothing In The Prohibition Shall Be Construed To—
(i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or
(ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles.
(2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. Nothing In The Prohibition Shall Be Construed To—
(i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or
(ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles.
(c) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For “covered Telecommunications Equipment Or Services.”
(d) Representations. The Offeror Represents That—
(1) It [] Will, [] Will Not Provide Covered Telecommunications Equipment Or Services To The Government In The Performance Of Any Contract, Subcontract Or Other Contractual Instrument Resulting From This Solicitation. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(1) Of This Section If The Offeror Responds “will” In Paragraph (d)(1) Of This Section; And
(2) After Conducting A Reasonable Inquiry, For Purposes Of This Representation, The Offeror Represents That—
it [] Does, [] Does Not Use Covered Telecommunications Equipment Or Services, Or Use Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(2) Of This Section If The Offeror Responds “does” In Paragraph (d)(2) Of This Section.
(e) Disclosures. (1) Disclosure For The Representation In Paragraph (d)(1) Of This Provision. If The Offeror Has Responded “will” In The Representation In Paragraph (d)(1) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer:
(i) For Covered Equipment—
(a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Original Equipment Manufacturer (oem) Or A Distributor, If Known);
(b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And
(c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision.
(ii) For Covered Services—
(a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or
(b) If Not Associated With Maintenance, The Product Service Code (psc) Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision.
(2) Disclosure For The Representation In Paragraph (d)(2) Of This Provision. If The Offeror Has Responded “does” In The Representation In Paragraph (d)(2) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer:
(i) For Covered Equipment—
(a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Oem Or A Distributor, If Known);
(b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And
(c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision.
(ii) For Covered Services—
(a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or
(b) If Not Associated With Maintenance, The Psc Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision.
(end Of Provision)
52.204-25 prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment.
prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment (aug 2020)
(a) Definitions. As Used In This Clause—
Backhaul Means Intermediate Links Between The Core Network, Or Backbone Network, And The Small Subnetworks At The Edge Of The Network (e.g., Connecting Cell Phones/towers To The Core Telephone Network). Backhaul Can Be Wireless (e.g., Microwave) Or Wired (e.g., Fiber Optic, Coaxial Cable, Ethernet).
covered Foreign Country Means The People’s Republic Of China.
covered Telecommunications Equipment Or Services Means–
(1) Telecommunications Equipment Produced By Huawei Technologies Company Or Zte Corporation (or Any Subsidiary Or Affiliate Of Such Entities);
(2) For The Purpose Of Public Safety, Security Of Government Facilities, Physical Security Surveillance Of Critical Infrastructure, And Other National Security Purposes, Video Surveillance And Telecommunications Equipment Produced By Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, Or Dahua Technology Company (or Any Subsidiary Or Affiliate Of Such Entities);
(3) Telecommunications Or Video Surveillance Services Provided By Such Entities Or Using Such Equipment; Or
(4) Telecommunications Or Video Surveillance Equipment Or Services Produced Or Provided By An Entity That The Secretary Of Defense, In Consultation With The Director Of National Intelligence Or The Director Of The Federal Bureau Of Investigation, Reasonably Believes To Be An Entity Owned Or Controlled By, Or Otherwise Connected To, The Government Of A Covered Foreign Country.
Critical Technology Means–
(1) Defense Articles Or Defense Services Included On The United States Munitions List Set Forth In The International Traffic In Arms Regulations Under Subchapter M Of Chapter I Of Title 22, Code Of Federal Regulations;
(2) Items Included On The Commerce Control List Set Forth In Supplement No. 1 To Part 774 Of The Export Administration Regulations Under Subchapter C Of Chapter Vii Of Title 15, Code Of Federal Regulations, And Controlled-
(i) Pursuant To Multilateral Regimes, Including For Reasons Relating To National Security, Chemical And Biological Weapons Proliferation, Nuclear Nonproliferation, Or Missile Technology; Or
(ii) For Reasons Relating To Regional Stability Or Surreptitious Listening;
(3) Specially Designed And Prepared Nuclear Equipment, Parts And Components, Materials, Software, And Technology Covered By Part 810 Of Title 10, Code Of Federal Regulations (relating To Assistance To Foreign Atomic Energy Activities);
(4) Nuclear Facilities, Equipment, And Material Covered By Part 110 Of Title 10, Code Of Federal Regulations (relating To Export And Import Of Nuclear Equipment And Material);
(5) Select Agents And Toxins Covered By Part 331 Of Title 7, Code Of Federal Regulations, Part 121 Of Title 9 Of Such Code, Or Part 73 Of Title 42 Of Such Code; Or
(6) Emerging And Foundational Technologies Controlled Pursuant To Section 1758 Of The Export Control Reform Act Of 2018 (50 U.s.c. 4817).
interconnection Arrangements Means Arrangements Governing The Physical Connection Of Two Or More Networks To Allow The Use Of Another's Network To Hand Off Traffic Where It Is Ultimately Delivered (e.g., Connection Of A Customer Of Telephone Provider A To A Customer Of Telephone Company B) Or Sharing Data And Other Information Resources.
Reasonable Inquiry Means An Inquiry Designed To Uncover Any Information In The Entity's Possession About The Identity Of The Producer Or Provider Of Covered Telecommunications Equipment Or Services Used By The Entity That Excludes The Need To Include An Internal Or Third-party Audit.
Roaming Means Cellular Communications Services (e.g., Voice, Video, Data) Received From A Visited Network When Unable To Connect To The Facilities Of The Home Network Either Because Signal Coverage Is Too Weak Or Because Traffic Is Too High.
Substantial Or Essential Component Means Any Component Necessary For The Proper Function Or Performance Of A Piece Of Equipment, System, Or Service.
(b) Prohibition.
(1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. The Contractor Is Prohibited From Providing To The Government Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far 4.2104.
(2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract, Or Extending Or Renewing A Contract, With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far 4.2104. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract.
(c) Exceptions. This Clause Does Not Prohibit Contractors From Providing—
(1) A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or
(2) Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles.
(d) Reporting Requirement.
(1) In The Event The Contractor Identifies Covered Telecommunications Equipment Or Services Used As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or By Any Other Source, The Contractor Shall Report The Information In Paragraph (d)(2) Of This Clause To The Contracting Officer, Unless Elsewhere In This Contract Are Established Procedures For Reporting The Information; In The Case Of The Department Of Defense, The Contractor Shall Report To The Website At Https://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractor Shall Report To The Contracting Officer For The Indefinite Delivery Contract And The Contracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided At Https://dibnet.dod.mil.
(2) The Contractor Shall Report The Following Information Pursuant To Paragraph (d)(1) Of This Clause
(i) Within One Business Day From The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Supplier Unique Entity Identifier (if Known); Supplier Commercial And Government Entity (cage) Code (if Known); Brand; Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended.
(ii) Within 10 Business Days Of Submitting The Information In Paragraph (d)(2)(i) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractor Shall Describe The Efforts It Undertook To Prevent Use Or Submission Of Covered Telecommunications Equipment Or Services, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Of Covered Telecommunications Equipment Or Services.
(e) Subcontracts. The Contractor Shall Insert The Substance Of This Clause, Including “this Paragraph (e) And Excluding Paragraph (b)(2)”, In All Subcontracts And Other Contractual Instruments, Including Subcontracts For The Acquisition Of Commercial Items.
(end Of Clause)
far 52.202-1 Definitions
far 52.203-3 Gratuities
far 52.203-17 Contractor Employee Whistleblower Rights And Requirement To Inform Employees Of Whistleblower Rights
far 52.203-19 Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements
far 52.204-9 Personal Identity Verification Of Contractor Personnel
far 52.204-10 Reporting Executive Compensation And First-tier Subcontract Awards
far 52.204-13 System For Award Management Maintenance
far 52.204-16 Commercial And Government Entity Code Reporting
far 52.204-18 Commercial And Government Entity Code Maintenance
far 52.204-19 Incorporation By Reference Of Representations And Certifications
far 52.204-23 Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (jul 2018)
far 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment
far 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment
far 52.209-6 Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment
far 52.209-7 Information Regarding Responsibility Matters
far 52.209-10 Prohibition On Contracting With Inverted Domestic Corporations
far 52.212-4 Contract Terms And Conditions-commercial Items
far 52.216-1 Type Of Contract
far 52.219-6 Notice Of Total Small Business Set-aside
far 52.219-28 Post-award Small Business Program Rerepresentation
far 52.222-3 Convict Labor
far 52.222-17 Nondisplacement Of Qualified Workers
far 52.222-19 Child Labor – Cooperation With Authorities And Remedies
far 52.222-21 Prohibition Of Segregated Facility
far 52.222-26 Equal Opportunity
far 52.222-36 Equal Opportunity For Workers With Disabilities
far 52.222-41 Service Contract Labor Standards
far 52.222-50 Combat Trafficking In Persons
far 52.222-55 Minimum Wages Under Executive Order 13658
far 52.222-56 Certification Regarding Trafficking In Persons Compliance Plan
far 52.222-62 Paid Sick Leave Under Executive Order 13706 (jan 2017)
far 52.223-5 Pollution Prevention And Right-to-know Information
far 52.223-12 Maintenance, Service, Repair Or Disposal Of Refrigeration Equipment And Air Conditioners
far 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
far 52.223-20 Aerosols
far 52.225-13 Restrictions On Certain Foreign Purchases
far 52.232-18 Availability Of Funds
far 52.232-33 Payment By Electronic Funds Transfer--system For Award Management
far 52.232-40 Providing Accelerated Payments To Small Business Subcontractors
far 52.233-1 Disputes
far 52.233-3 Protest After Award
far 52.233-4 Applicable Law For Breach Of Contract Claim
far 52.237-2 Protection Of Government Building, Equipment And Vegetation
far 52.242-15 Stop-work Order
far 52.249-4 Termination For Convenience Of The Government (services)(short Form)
dfars 252.203-7000 Requirements Relating To Compensation Of Former Dod Officials
dfars 252.203-7002 Requirement To Inform Employees Of Whistleblower Rights
dfars 252-232-7003 Electronic Submission Of Payment Requests;
dfars 252.204-7004 System For Award Management
dfars 252.204-7012 Safeguarding Covered Defense Information And Cyber Incident Reporting
dfars 252.204-7015 Notice Of Authorized Disclosure Of Information For Litigation Support
dfars 252.223-7008 Prohibition Of Hexavalent Chromium
dfars 252.225-7001 Buy American Act & Balance Of Payments
dfars 252.225-7002 Qualifying Country Sources As Subcontractors
dfars 252.225-7048 Export-controlled Items
dfars 252.232-7010 Levies On Contract Payments
dfars 252.244-7000 Subcontracts For Commercial Items
dfars 252.246-7008 Sources Of Electronic Parts
dfars 252.247-7023 Transportation Of Supplies By Sea
dfars 252.247-7024 Notification Of Transportation Of Supplies By Sea
clauses By Full Text
far 52.204-21 Basic Safeguarding Of Covered Contractor Information Systems
https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#id1669b0a0e67
far 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders – Commercial Items 52.222-50 (33)(i) X ; 33(ii) N/a
far 52.252-2 Clauses Incorporated By Reference
Https://www.acquisition.gov/content/regulations
far 52.252-6 Authorized Deviations In Clauses
(b) Defense Federal Acquisition Regulation Supplement (48 Cfr Chapter 2)
dfars 252.212-7001 Contract Terms And Conditions (deviation);
dfars 252.232-7006 Wide Area Workflow Instructions
affars 5352.223-9000 Elimination Of Use Of Class I Ozone Depleting Substance;
affars 5352.201-9101 Ombudsman Nov 2012
affars 5352.242-9000 Contractor Access To Air Force Installations
(b): When Reporting To The Registration Office, The Authorized Contractor Individual(s) Should Provide A Valid Driver’s License, Current Vehicle Registration And A Valid Vehicle Insurance Certificate To Obtain A Vehicle Pass. If The State Issued License Is Not Real Id Act Compliant, An Alternate Compliant Form Of Government-issued Photo Identification Is Required. Additional Information On Real Id Act Compliant States/identification Can Be Found At: Https://www.dhs.gov/current-statusstates-territories
(c): Afi 31-101, Integrated Defense, And Afi 31-501, Personnel Security Program Management
provisions By Reference
far 52.204-7 System For Award Management
far 52.204-16 Commercial And Government Entity Code Reporting
dfars 252.203-7005 Representation Relating To Compensation Of Former Dod Officials
dfars 252.204-7008 Compliance With Safeguarding Covered Defense Information Controls
provisions By Full Text
far 52.252-1 Solicitation Provisions Incorporated By Reference
Https://www.acquisition.gov/content/regulations
far 52.252-5 Authorized Deviations In Provisions
Closing Date12 Feb 2025
Tender AmountRefer Documents
8551-8560 of 8601 active Tenders