VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
United States
Closing Date7 Feb 2025
Tender AmountRefer Documents
Details: This Is Not A Request For Proposal. This Is A Request For Standard Form (sf) 330 Architect-engineer Qualifications Packages Only. All Information Needed To Submit Sf 330 Documents Is Contained Herein. No Solicitation Package, Technical Information, Or Bidder/plan Holder List Will Be Issued. The Government Will Not Pay, Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. general Information veterans Health Administration (vha) Regional Procurement Office West (rpow) Network Contracting Office 20 (nco20) Is Seeking Sources And Intends To Award A Firm Fixed Price Design Contract For Architect-engineering (a-e) Services For A Complete Design For Project # 663-22-105 Sea Building 1 Hood Control System At The Va Puget Sound Healthcare System In Seattle, Washington. The A-e Services Contract That Is Anticipated To Be Awarded Will Be Procured In Accordance With The Selection Of Architects And Engineers Statute [formerly Known As The Brooks Architect Engineer Act], Federal Acquisition Regulation (far) Subpart 36.6 Architectural And Engineering Services, Va Acquisition Regulation (vaar) 836.6, And Va Acquisition Manual (vaam) M836.6 Architect-engineer Services. In Accordance With Far 36.209, Construction Contracts With Architect-engineer Firms, No Contract For The Construction Of A Project Shall Be Awarded To The Firm That Designed The Project Or Its Subsidiaries Or Affiliates, Except With The Approval Of The Head Of The Agency Or Authorized Representative. project Information this Project Is A 100% Set-aside For Service-disabled Veteran-owned Small Business (sdvosb) Concerns. The Naics Code For This Procurement Is 541330 Engineering Services And The Annual Small Business Size Standard Is $26m. A Full Design Team Is Required To Complete This Project. The Va Expects To Award The Anticipated A-e Contract In Late March 2025. the Anticipated Period Of Performance For Completion Of Design Is 301 Calendar Days After Notice Of Award (noa). The Vaar Magnitude Of Construction Is Between $1,000,000 And $2,000,000. Please Note That The Period Of Performance For The Design Completion Begins With The Issuance Of The Noa And That A Notice To Proceed (ntp) Will Not Be Issued For The Completion Of A Design Project. submission Requirements: the Below Information Contains The Instructions And Format That Must Be Followed For The Submission Of The Sf 330 Statement Of Qualifications: submit One (1) Sf 330 Statement Of Qualifications To Contract Specialist Kaycee Benson At Kaycee.benson@va.gov And Contracting Officer Ty Draszt At Nco20aesf330@va.gov. This Must Include Parts I And Ii And Any Applicable Attachments. the Submission Must Include The Sf 330, Architect-engineer Qualifications Form Is Available Online At: Http://www.cfm.va.gov/contract/ae.asp Or Https://www.gsa.gov/system/files/sf330-21.pdf . the Sf 330 Submission Is Due By February 7, 2025 By 12pm Pacific Time. the Sf 330 Must Be Submitted In One Email And Have A File Size No Larger Than 5 Mb. No Hard Copies Will Be Accepted. the Subject Line Of The Email Must Read: Sf 330 Submission 36c26024r0100_2 Project 663-22-105 Sea Building 1 Hood Control System.
the Sf 330 Submission Must Not Exceed A Total Of 50 Pages. This Includes Title Page, Table Of Contents, And Any Other Relevant Information. Any Pages Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. Each Page Must Be In Arial Size 12 Font, Single Spaced. Part Ii Of The Sf 330 And Any Cpars Or Ppqs Will Not Count Toward The Page Limitation. a Ppq Obtained For Another Sf 330 Submission May Be Submitted For This Project. However, If Significant Portions Of The Project Have Been Completed Since The Ppq Was Filled Out, A New Ppq Should Be Submitted To Accurately Assess The Project. firms Must Include The Following Information In Section B Of The Sf 330 Submission: sam Unique Entity Identifier tax Id Number cage Code primary Point Of Contact S Email Address And Phone Number all Questions Must Be Submitted To Kaycee.benson@va.gov With A Courtesy Copy To Ty.draszt@va.gov With The Subject Line Sf 330 Questions - 36c26024r0100_2 Project 663-22-105 Sea Building 1 Hood Control System. The Cutoff For Question Submission Is January 17, 2025 By 10am Pacific Time. Questions Will Be Answered Through Amendment To The Notice Posted To Contract Opportunities At Sam.gov. this Procurement Is A 100% Set-aside For Sdvosb Concerns. Offers Received From Other Than Sdvosbs Will Not Be Considered. Offerors Must Be Certified As Sdvosbs By The U.s. Small Business Administration (sba) And Visible In The Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov/) At The Time Of Sf 330 Submission, Written Response Submission, And Award. Failure To Be Certified In The Vetcert Database At These Times Will Result In The Offeror Being Deemed Ineligible For Award. all Joint Ventures Must Be Sba Certified At The Time Of Sf 330 Submission And Award And Must Submit Agreements That Comply With 13 Cfr 128.402 Prior To Contract Award. all Prime Firms Must Meet The Naics Code Requirement Specified In This Notice. The Contracting Officer Will Verify The Naics Code In Vetcert. Failure To Meet The Naics Code Requirement May Result In The Rejection Of The Sf 330 Submission. sf 330 Submissions Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. firms Not Providing The Required Information May Not Be Evaluated. All Information Must Be Included In The Sf 330 Submission Package. it Is The Offeror S Responsibility To Check The Contract Opportunities Website At Sam.gov For Any Revisions To This Announcement Prior To Submitting Their Sf 330. a-e Selection Process firms Who Timely Submit Sf 330s In Response To This Announcement, And In Accordance With Submission Requirements, Will Be Considered For Evaluation. The Selection Will Be Made As Follows: sf 330s Will Be Evaluated In Accordance With The Primary Selection Criteria As Stated In This Notice. These Evaluations Will Determine The Most Highly Qualified Firms For This Particular Requirement. in Accordance With Far 36.602-3(c), At Least Three Of The Most Highly Qualified Firms Will Then Be Notified Of The Government S Intent To Hold Discussions. Firms That Were Not Selected For Discussions Will Be Notified At This Time. In Accordance With Far 36.607(b), Any Requested Debriefings Of Successful And Unsuccessful Firms Will Be Held After Final Selection Has Taken Place And Will Be Conducted, To The Extent Practicable, In Accordance With 15.503, 15.506(b) Through (f), And 15.507(c). Note That 15.506(d)(2) Through (d)(5) Do Not Apply To Architect-engineer Contracts. discussions Will Be Held With Top Three Firms In The Form Of Written Responses. The Firms Invited To Participate In Discussions Will Be Notified By Contract Specialist Or Contracting Officer By Email With Detailed Instructions That Will Include Questions Or Topics To Address. following The Completion Of Discussions, The Firms Will Be Evaluated And Ranked Based On The Primary And (if Necessary) Secondary Selection Criteria. The Final Evaluation And Ranking Will Consider The Sf 330 Submission For Each Firm, As Well As Additional Information Obtained Via Discussions. The Highest Rated Firm Will Be Selected To Receive The Solicitation And Engage In Negotiations. the Solicitation Will Be Issued To The Highest Rated Firm As A Request For Fee Proposal (rfp). All Sow Attachments And Site-specific Documentation Will Be Provided To The Highest Rated Firm With The Rfp. A Site Visit May Be Authorized During The Negotiation Process. an Award Will Then Be Made As Long As The Negotiation Of Rates And Hours Leads To A Fair, Balanced, And Reasonable Determination Of The Final Contract Price. If Negotiations With The Highest Rated Firm Are Unsuccessful, The Firm Will Be Notified That Negotiations Have Been Terminated. Negotiations Will Then Be Initiated With The Next Highest Rated Firm, And So On Until Award Can Be Made Or This Announcement Is Cancelled. primary Selection Criteria: firms Responding To This Notice Will Be Evaluated And Ranked Using The Primary And Secondary Selection Criteria Listed Below. The Factors Are Listed In Descending Order Of Importance. The Evaluation Will Consider How Each Factor Is Addressed And How It Is Formatted To Coincide With The Selection Criteria. selection Criteria 1, Professional Qualifications (sections C Through E): The Evaluation Will Consider The Professional Qualification Necessary For Satisfactory Performance Of Required Service. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. The A-e Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure.
a Resume For Each Of These Key Positions Must Be Provided Via Section E Of The Sf330. Key Positions And Disciplines Required For This Project May Include Among Others: cost Estimator cadd Technician
civil Engineer
fire Protection Engineer
industrial Hygienist
mechanical Engineer
physical Security Specialist
plumbing Engineer
project Manager
structural Engineer
environmental Engineer
offer Must Include The Following Statement Of Sdvosb Compliance On The Cover Page When Submitting The Personnel Proposed To Perform The Work Under This Requirement: I [signatory Authority] ___________________, [company Or Joint Venture] __________________, Certify That The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Certified Sdvosbs By The Small Business Association S Veteran Small Business Certification (vetcert) In Compliance Of Va Acquisition Regulation (vaar) 852.219-75. the Information Provided In Sections C Through E Of The Sf 330 Will Be Used To Evaluate This Evaluation Factor. Do Not Include This Information In Section H, Unless It Is Pertinent To Support The Information Listed In The Other Sections. selection Criteria 2, Specialized Experience And Technical Competence (sections F, G, And H):
the Evaluation Will Consider Specialized Experience And Technical Competence In Design And Construction Period Services For Expansion And Renovations In Research & Development (r&d) Laboratory Spaces Within Specialty Care Clinics. Provide Information For Example Projects Which Best Illustrate The Proposed Team S Experience And Competencies For This Contract. Submissions Shall Include Information Regarding Experience And Competence In: medical Center Additions And Renovations For R&d Laboratory Spaces, repair Existing Conditions And Issues In The Renovated And New Construction Space provide New Mechanical, Telecommunications, Electrical And Fire Protection, For The New And Renovated Spaces. phasing Of The New Construction And Renovation To Minimize Disruption To The Hospital Which Must Remain Operational Throughout Construction. other Specialized Experience Includes Experience In Critical Path Scheduling, Fire Protection, Seismic Design, Construction Infection Control Protocols, Energy Conservation, Transition, Pollution Prevention, Waste Reduction, Use Of Recovered Materials Sustainable Design Practices And Decommissioning And Coordination.
submissions Shall Include The Following Information For Example Projects: project Title, Location And Detailed Narrative Describing The Scope Of Services Provided Including The Type Of Work Performed By The Offeror And Its Role In The Project I.e., Prime Contract, Teaming Partner, Or Subcontractor project Owner, Owner S Point Of Contact Including Telephone Number And Email Address. services & Deliverables Provided Under The Contract Or Task Order period Of Performance, Including Start And Completion Dates total Dollar Value Of The Project contract Number Associated With The Project. submissions Shall Include No More Than 5 And No Less Than 3 Recent And Relevant, Government And Private Experience, Example Projects, Similar In Size, Scope, Construction Features And Complexity, Which Clearly Illustrate Experience And Competencies Listed Above And In Other Portions Of This Solicitation. Recent Is Defined As Services Provided In The Five (5) Years Prior To The Closing Date Of This Solicitation. Relevant Is Defined As Projects, Within The United States, Its Territories, Or Possessions, Requiring Tasks Identified In This Solicitation. Similar Complexity Is Considered Projects Of An Operational, Construction, Or Design Likeness To The Work Covered In This Solicitation. three (3) Of The Five (5) Example Projects Must Have Construction Completed Or Construction Substantially (50%+) Complete. submit Example Project Information In Section F Of The Sf 330. section G Of The Sf 330 Will Be Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On The Provided Example Projects. the Evaluation Will Also Consider Narratives Addressing The Following Topics For The Offeror, And Key Consultants, In Section H Of The Sf 330: the Management S Approach the Coordination Of Disciplines And Subcontractors quality Control Procedures, And familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. the Narratives Should Clearly Illustrate How Each Of The Topics Were Addressed. Re-stating Or Reiterating This List Or The Scope Of Work In Section H Will Not Be Sufficient.
narratives Submitted In Section H Of The 330, Shall Not Exceed One (1) Page In Length For The Offeror And Each Key Consultant. The Narrative Submissions Shall Not Exceed Ten (10) Pages Total For This Criterion. selection Criteria 3, Capacity (section H) the Evaluation Will Consider The Team S Plan And The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded During The Previous 12 Months And The Full Potential Value Of Any Current Indefinite Delivery Contracts. offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Completion Percentages And Expected Completion Date For Projects Awarded In The Previous 12 Months. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Team/personnel Provided In The Sf 330. selection Criteria 4, Past Performance (section H) the Evaluation Will Consider The Firm S Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Rating System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Cpars Entry. Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted With Each Project In Section F So Cpars Can Be Reviewed In The Database. for Any Project That Does Not Have Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Requested Complete Ppq From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. evaluations May Also Include Additional Performance Related From The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers May Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf 330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. for Ppqs, Please Utilize The Attached Ppq Document Only. Completed Ppqs Should Be Incorporated Into The Sf 330 Directly. Ppqs Should Not Be Submitted Separately To Nco20 Directly. Any Ppqs Will Not Be Counted Towards The Page Limitations For This Submission. However, Any Narratives Provided For Past Performance In Section H Shall Not Exceed Two (2) Pages In Length And Will Be Counted Toward The Total Submission Page Limit. selection Criteria 5, Knowledge Of The Locality (section H), the Evaluation Will Consider The Knowledge Of The Locality, Including Specific Knowledge Of Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations Of The Area Of Seattle, Washington. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Project Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. Information Related To The Firm S Location Shall Be Provided In Section H Under Secondary Selection Criterion Factor 1, Geographic Location. See Below. selection Criteria 6, Experience In Construction Period Services, (section H) the Evaluation Will Consider Experience In Construction Period Services (cps) Necessary For Performance Of This Contract. Submissions Shall Provide Information Which Clearly Illustrates Cps Experience In The Following: solicitation Support Services professional Field Inspections During The Construction Period, Both Scheduled And Emergent coordination With Commissioning Requirements/commissioning Services review Of Construction Submittals For Design Conformance, Variance, And Applicable Code/standard Compliance support In Answering Requests For Information (rfi) During The Construction Period support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates maintaining A Comprehensive Submittal Log Inclusive Of Material Data, Shop Drawings, Certifications, Etc. providing Timely And Complete Responses To Requests For Information providing Supporting Documentation (statements Of Work, Cost Estimates, Technical Reports, Etc.) For Construction Modifications providing Record Drawing Documentation process For Correcting Design Errors/omissions Identified During Construction attendance At Pre-bid, Post-award, And Commissioning Kick Off Construction Project Conferences providing Minutes Of Weekly Construction Meetings Throughout The Duration Of Construction site Visits During Construction Both Scheduled And Emergent ensuring Compliance With The Design Drawings And Specifications preparation Of Site Visit Reports generation Of Punch-list Reports review Of Construction Project Modifications For Cost And Technical Acceptability attendance And Participation During The Final Acceptance Inspection preparation Of Record Drawings Of The Completed Construction Project Based On The Construction Contactor S As-built Drawings maintenance Of Rfi Logs attendance At Weekly Conference Calls providing Minutes Of Meetings Between The Ae, Va, And Contractors pre-final Inspection Site Visits production Of As-built Documentation the Information For This Factor Shall Be Provided In Section H Of The Sf 330. secondary Selection Criterion*: Geographic Location. location Of The Firm, As Measured By The Driving Distance (miles) Between The Offeror S Principal Business Location And The Va Puget Sound Healthcare System In Seattle, Washington. Determination Of The Mileage Will Be Based On Google Maps. (https://www.google.com/maps/dir/). *the Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Discussions. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf 330 Submission Highly Qualified Or Not Highly Qualified. attachments
Philippine Fiber Industry Development Authority Tender
Software and IT Solutions
Philippines
Closing Date21 Jan 2025
Tender AmountPHP 2.6 Million (USD 45.8 K)
Details: Description Invitation To Bid For The Supply And Delivery Of Information And Communication Technology (ict) Equipment – 2 Lots Rebidding Project Identification No. Pb-011-2024-r The Philippine Fiber Industry Development Authority Through The General Appropriations Act Fy 2024 Approved Annual Procurement Plan (pcaarrd Project 4) Intends To Apply The Sum Of Two Million Six Hundred Sixty Thousand Pesos (php2,660,000.00) Being The Abc To Payments Under The Contract For The “supply And Delivery Of Information And Communication Technology (ict) Equipment – 2 Lots Rebidding” With Project Identification No. Pb-011-2024-r. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Philippine Fiber Industry Development Authority Through The General Appropriations Act Fy 2024 Approved Annual Procurement Plan (pcaarrd Project 4) Intends To Apply The Sum Of Two Million Six Hundred Sixty Thousand Pesos (php2,660,000.00) Being The Abc To Payments Under The Contract For Each Lot. Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. Lot No. 1 Supply And Delivery Of Branded And Brand New Laptop Computer - Php160,000.00 Lot No. 2 Supply, Delivery, Installation And Setup Of High Processing Workstation Set For Generative A.i. Modelling And Bioinformatics Analysis - Php2,500,000.00 Total Abc: Php2,660,000.00 The Philippine Fiber Industry Development Authority Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By And Shall Be In Accordance With The Delivery Schedule Under Section Vi. Schedule Of Requirements. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. Prospective Bidders May Obtain Further Information From Philfida And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents Can Be Accessed Online Starting December 26, 2024 (thursday) And The Hard Copy Can Be Purchased By Interested Bidders Starting January 3, 2025 (friday) From The Given Address And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of: Lot No. 1 Supply And Delivery Of Branded And Brand New Laptop Computer - Php160.00 Lot No. 2 Supply, Delivery, Installation And Setup Of High Processing Workstation Set For Generative A.i. Modelling And Bioinformatics Analysis - Php2,500.00 Total Bid Doc Price: Php2,660.00 The Philfida Will Hold A Pre-bid Conference On January 7, 2025 (tuesday) At 9:30 A.m. Through Video Conferencing Via Microsoft Office 365 Teams Which Shall Be Open To Prospective Bidders. Bidder/s Should Submit A Valid Email Address One (1) Day Before The Pre-bid Conference. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At Philfida’s Fiber Processing And Utilization Laboratory, Bai Compound, Visayas Ave., Diliman, Quezon City On Or Before January 21, 2025 (tuesday) At 9:00 A.m. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. Bid Opening Shall Be On January 21, 2025 (tuesday) At 9:30 A.m. At Philfida’s Fiber Processing And Utilization Laboratory: Bai Compound, Visayas Avenue, Quezon City To Be Streamed Live Via Ms Office 365 Teams, The Link Of Which Is Available By Request. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. Bidders May Opt To Attend Virtually. The Bidders Shall Drop Three (3) Copies Of Their Duly Accomplished Eligibility Requirement, Technical And Financial Proposals In Two (2) Separate Sealed Envelopes In The Bid Box Located At Philfida’s Fiber Processing And Utilization Laboratory: Bai Compound, Visayas Avenue, Quezon City. Interested Bidders Are Requested To Contact The Bac Secretariat At Cellular Phone Nos.: 09189402419 And 09274003482 Before Submitting The Bidding Documents. Technical Specifications: Lot 1 Supply And Delivery Of Branded And Brand New Laptop Computer Technical Specifications: 1. 2 Units 2. 14-inch Fhd+ / Ips-level Display (at Least 1920 X 1200 Resolution) 3. Monitor Panel Refresh Rate Of At Least 144hz With At Least 100% Srgb Color Coverage 4. At Least 14 Total Cores And 18 Total Threads (combination Of Performance And Efficient Cores), With At Least 3.3ghz Performance Clock Base Speed 5. At Least 6gb Of Gddr6 Dedicated Graphical Unit, With Raytracing Capability 6. At Least 16 Gb Ddr5 Ram 7. With At Least 512gb M.2 Ssd 8. With Webcam 9. With Backlit Keyboard 10. With At Least Wifi7 Technology 11. With At Least 1x Thunderbolt™ 4 (displayport™/ Power Delivery 3.1); 1x Type-c (usb3.2 Gen2 / Displayport™/ Power Delivery 3.0); 1x Type-a Usb3.2 Gen2; 1x Hdmi™ 2.1 (8k @ 60hz / 4k @ 120hz); 1x Rj45 12. With At Least Windows 11 Pro/home Os Delivery Period: Forty-five (45) Calendar Days Upon Receipt Of Ntp Delivery Site: Immunology And Molecular Biology Laboratory, Visayas Ave., Quezon City Lot 2 Supply, Delivery, Installation And Orientation Of High Processing Workstation Set For Generative A.i. Modelling And Bioinformatics Analysis Technical Specifications: Workstation I: 1. Central Processing Unit: A. At Least 350w Thermal Design Power (tdp) With At Least 64 Core, 128 Threads, And 256mb Cache B. With A Base Clock Speed Of At Least 3.20ghz And A Turbo Speed Of At Least 5.10 Ghz C. Compatible With Wrx90 Socket D. With Compatible Heatsinks And Air Cooling Peripheral For Thermal Management 2. Graphical Processing Unit: A. Dual (2) Gpu Setup Connected Through 2-way Low Profile Bridges B. Each Gpu Should Have At Least 300w Max Power Consumption C. Each Gpu Should Have At Least 48 Gb Gddr6 D. With And Compatible With Pci Express Generation 4 X 16 Graphics Bus E. Vr/raytracing Compatible F. With At Least 4 Display Ports G. Ampere Architecture-based Gpu H. With At Least 10,700 Cuda Cores, And At Least 300 Tensor Cores For A.i Generation And Modelling 3. Memory: A. With A Total Memory Of At Least 256 Gb - Ddr5, Partitioned To 4 Channels B. Memory Should Have At Least 4,800 Mhz Speed 4. Storage: A. With At Least 2 Tb M.2 Nvme Ssd Boot Drive B. With At Least 24 Tb Total Hard-drive Storage, With A Speed Of At Least 7,200 Rpm 5. Chassis And Power Supply: A. Compatible Chassis To Contain Parts B. With At Least 1350w Power Supply 6. Operating System: A. With Windows 11 Pro (english) Operating System Workstation Ii: 1. Central Processing Unit: A. At Least 350w Thermal Design Power (tdp) With At Least 64 Core, 128 Threads, And 256mb Cache B. With A Base Clock Speed Of At Least 3.20ghz And A Turbo Speed Of At Least 5.10 Ghz C. Compatible With Wrx90 Socket D. With Compatible Heatsinks And Air Cooling Peripheral For Thermal Management 2. Graphical Processing Unit: A. With At Least 4 Gb Gddr6 Memory B. At Least 350 Cuda Cores C. With At Least Pci Express Gen 3 Bus D. Turing Gpu Architecture 3. Memory: A. With A Total Memory Of At Least 256 Gb - Ddr5, Partitioned To 4 Channels B. Memory Should Have At Least 4,800 Mhz Speed 4. Storage: A. With At Least 2 Tb M.2 Nvme Ssd Boot Drive B. With At Least 24 Tb Total Hard-drive Storage, With A Speed Of At Least 7,200 Rpm 5. Chassis And Power Supply: A. Compatible Chassis To Contain Parts B. With At Least 1350w Power Supply 6. Operating System: A. With Windows 11 Pro (english) Operating System Peripherals, Software And Warranty: 1. Monitors: A. Two (2) Ips Panel Monitors With At Least 27 Inch Diagonal Size B. Full Hd (1920x1080) Resolution C. Height, Tilt, Swivel And Pivot Adjustable D. Supports Hdmi, Usb 3.2, Rj45 Connection 2. Keyboard And Mouse: A. 2 Pairs Of Qwerty Full Keyboard, And 2 Optical Mouse For The Workstations 3. Four (4) Support Laptops: A. With At Least 16 Cores, 22 Threads And 24 Mb Cache B. With A Turbo Clockspeed Of At Least 4.8 Ghz C. With A Dedicated Graphical Processing Unit With At Least 4gb Gddr6 Memory, Ray-tracing Compatible D. With At Least 32 Gb Ddr5 Memory, With Speed Of At Least 5600 Mt/s E. With At Least 2 Tb M.2 Nvme Ssd Storage F. At Least 15.6" Display Screen With Resolution Of At Least 1920x1080 Fhd G. With Built-in Microphone, Camera, Backlit Keyboard, Wifi 6/6e H. Inclusion Of Wireless Optical Mouse And Backpack I. With Windows 11 Pro (english) Operating System 4. Services And Warranty: A. At Least 3 Years Warranty Support For All Equipment B. At Least 3 Years On-site Services For Workstations C. At Least 1 Year On-site Services For Laptops D. At Least 1 Year Warranty On Laptop Batteries Delivery Period: Forty-five (45) Calendar Days Upon Receipt Of Ntp Delivery Site: Immunology And Molecular Biology Laboratory, Visayas Ave., Quezon City
Bureau Of Corrections Muntinlupa City Metro Manila Tender
Civil And Construction...+1Building Construction
Philippines
Closing Date20 Jan 2025
Tender AmountPHP 300 Million (USD 5.1 Million)
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (procurement/contract No. 009) Sixth Edition July 2020 Bids And Awards Committee 202 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 59 Section Viii. Bill Of Quantities 60 Section Ix. Checklist Of Technical And Financial Documents 61 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) 1. The Bureau Of Corrections, Through The National Expenditure Program (nep) Of 2025 Capital Outlay, Intends To Apply The Sum Of Three Hundred Million Pesos Only (₱300,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) With Identification Number _epa-009__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections Super Maximum Security Facility, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _december 28, 2024 (08:00am To 05:00pm) To January 20, 2025 (01:29 Pm)_____ From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On _january 06, 2025 (01:30pm)__ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before __january 20, 2025 (01:30pm)_____. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)____ At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf), With Project Identification Number__________________. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Million Pesos Only (₱300,000,000.00). 2.2. The Source Of Funding Is: Nga, The National Expenditure Program 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is One Tenth Of One Percent Of The Total Contract Price. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Terms Of Reference Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Sablayan Prison And Penal Farm, Occidental Mindoro 1. Project Information 1.1 Project Description The Mission Of The Bucor Is To Protect Society By Confining Offenders In The Controlled Environments Of Prisons And Community-based Facilities That Are Safe, Humane, Cost-efficient, And Appropriately Secure, And That Provide Self-improvement Opportunities To Assist Offenders In Becoming Law-abiding Citizens. The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Shall Be Conducive To The Reformation And Rehabilitation Of Inmates That Will Bring Them Back Into The Mainstream Of Society As Useful Citizens Of The Country. The Contract Will Involve The Design And Build Scheme Leading To The Construction Of The Bureau Of Corrections Super Maximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm, Sablayan, Occidental Mindoro. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Bucor Planning And Design Division Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bureau Of Corrections Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Bucor Super Maximum Prison Facility (phase 2) Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. This Project Aims To Be Completed Within A Year, Aligning With Our Decongestion Program. This Expedited Timeline Underscores Our Commitment To Addressing Urgent Needs Within The Correctional System And Providing Timely Solutions For The High Risk Committed Pdl. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Division (pdd) Under. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Construction Of Super Maximum-security Facility Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdd. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Director Of Directorate For Engineering Services (des). B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdd Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: I. One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Oncomposed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. Ii. 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); Iii. Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); Iv. Road Networks And Culverts • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts." 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdd For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdd. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A. Render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical. All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdd Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate, When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdd Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The Engineering Services (es) Of The Sppf On Behalf Of The Bucor Pdd • Sppf-es To Impose To Contractor Testing Of All Items After Installation And/or Application. Es To Send Pdd Copy Of The Test Report/s. • Sppf-es To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Sppf- Es To Inform Pdd Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdd) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdd Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Sppf Es Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Ippf Es Will Be Reviewed And Approved By Pdd - Nhq Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdd. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdd And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply And Distribution System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Sewage Treatment Plant • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Electrical System Layout 4. Mechanical System Layout 5. Instrumentation And Control System Diagrams 6. Piping And Instrumentation Diagrams (p&ids) 7. Equipment Details And Specifications 8. Electrical Power Distribution 9. Emergency Power Systems 10. Grounding And Lightning Protection 11. Control And Monitoring Systems, If Applicable 12. Safety Systems 13. Miscellaneous Details B. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Backup Power Generator With Capacity Not Less Than Total Computed Kva Load Without Demand Factor. D. 3-phase Electrical Supply Shall Be Sourced From The Local Electrical Utility. E. Power Line Connection From Main Source To The Facility Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements Technical Specifications Boring Test Structural Design And Analysis And Computation Final Design And Construction Plans Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdd Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bureau Of Corrections. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184 V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 5. Minimum Heavy Equipment Requirement (as Needed) For Site Development Such As: No. Item Specification 1. Backhoe 0.8 Cu. M. 2. Backhoe Wheel Mounted With Breaker 0.90 Cu. M. 3. Cargo/service Truck 2-5 Mt., 160 Hp 4. Dump Truck 12 Cu. Yd. 5. Motorized Road Grader G710a, 140hp 6. Payloader 1.5 Cu. M. 7. Vibrator Roller 10 Mt 8. Bulldozer 170 Hp 9. Scraper 515 Hp 10. Truck Mounted Crane, Hydraulic Telescopic Bommer Capacity: 41 – 45 Mt. 11. Crawler Crane 41-45 Mt 12. Generator Set 300 Kw/375 Kva 13. Water Pump 100mm Suction Dia. 14. One Bagger Mixer 4-6 Ft3/min 15. Concrete Vibrator Ey20, 5hp, 32-70mm 16. Vibro Hammer 45000 Kg-m 17. Excavator 17.5 Kw Or Any Specify Types Of Heavy Equipment Needed For A Site Development Will Be Determined By The Winning Bidder. 6. Environmental Compliance 7. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 8. Billboard 9. Traffic Management (if Applicable). Vii. Building Construction 1 Lot One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Composed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. 1 Lot 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); 1 Lot Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); 1 Lot Road Networks And Culverts • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts. A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finished - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. (at Elevated Water Tank Area) J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Contractor Encouraged To Adapt: Lpf Flush Valve For Water Closet Or Stainless Toilet-lavatory Combination. Waterless Urinals N. Sprinkler System To All Prison Dormitories In Accordance With The Provisions Of Revised Plumbing Code Of The Philippines. O. Contractor To Provide A Water System To Supply The Facility 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 300,000,000. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php300,000,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D. Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criteria That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Safety And Security: Excellent (100%): The Design Features Robust Perimeter Walls, Guard Towers, And Security Features Ensuring Optimal Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Highly Reliable, With Comprehensive Safety Measures For Both Psdl And Staff. Good (80%): The Design Incorporates Effective Perimeter Walls, Guard Towers, And Security Features, With Minor Areas For Enhancement. Fire Protection And Detection Systems Are Reliable, With Adequate Safety Measures For Psdl And Staff. Acceptable (70%) The Design Includes Satisfactory Perimeter Walls, Guard Towers, And Security Features, Meeting Basic Requirements For Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Functional, With Sufficient Safety Measures For Psdl And Staff. Some Reservations (50%): The Design Features Partially Effective Perimeter Walls, Guard Towers, And Security Features, With Notable Deficiencies In Pdl Containment And Facility Security. Fire Protection And Detection Systems Lack Reliability, With Limited Safety Measures For Psdl And Staff. Serious Reservations (20%): The Design Lacks Effective Perimeter Walls, Guard Towers, And Security Features, Compromising Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Inadequate, Posing Significant Risks To Psdl And Staff Safety. Unacceptable (0%): The Design Neglects Perimeter Walls, Guard Towers, And Security Features, Failing To Ensure Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Absent Or Non-functional, Posing Severe Risks To Psdl And Staff Safety. D. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. E. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Ninety (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued Doc. No. _____ Page No. _____ Book No. _____ Series Of ____ Company Letterhead Omnibus Sworn Statement Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date7 Feb 2025
Tender AmountRefer Documents
Description: Contact Information|4|n743.49|wvb|7176052147|benjamin.t.spangler.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|||||||||
variation In Quantity (apr 1984)|3|0|5||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040|n50286|tbd|133.2|n/a|n/a|n39040|n/a|n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.
mil Benjamin.t.spangler.civ@us.navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|365 Days After Acceptance Of Material|365 Days After Acceptance Of Material|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|331221|1000||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286.
3. The Following Proposed Delivery Schedule Applies:
submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery. Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 365 Days After Effective Date Of The Resulting Contract.
4. Any Contract Awarded As A Result Of This Solicitation Will Be "do" Rated Order; "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
5. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000.
6. Far 52.232-25(a)(5), Entitled Prompt Payment, Constructive Acceptance Is Changed From 7 Days To 45 Days After Delivery Of The Supplies In Accordance With The Terms And Conditions Of The Contract.
7. This Order Is Issued Pursuant To Emergency Acquisition Flexibilities (eaf).
8. Viq 0+/5- Applies To This Order.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b666 | | | |201101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=sae Ams 2806 | | |c |080301|a| | |
document Ref Data=sae Ams 2807 | | |a |000901|a| | |
document Ref Data=sae Ams 2809 | | |a |070801|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=sae Ams-std-185 | | | |000901|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|2 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae-ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
3. Requirements
3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Sae-ams-qq-s-763 Except As Amplified Or Modified Herein. Sae-ams-qq-s-763 Ordering Data Information Is Provided Below:
(a) Steel Bars, Wire, Shapes, And Forgings, Corrosion Resisting Steel; Sae-ams-qq-s-763.
(b) Class - ;410 ; Condition - ;t; Form - ;bar, 2 Inches (round) ; Finish - Any Appropriate Finish Option Of Sae-ams-qq-763 Except Hot Finished, Scale Not Removed.
(c) Melting Practice - Electric Furnace, Electric Induction, Vacuum Furnace, Electroslag Remelt (esr), Or Argon Oxygen Decarburization (aod). Other Suitable Commercial Processes Must Be Submitted And Navy Approved Before They May Be Used.
(d) Special Cleaning Processes Are Not Applicable.
(e) Allowances For Machining Are Not Applicable.
(f) Major Stress Surface Areas Of The Finished Part Are Not Applicable.
(g) Low Magnetic Permeability Is Required For 300 Series Austenitic Corrosion Resistant Steels When Ordered In The Annealed Condition. The Relative Magnetic Permeability Must Be Determined And Must Not Exceed 2.0 (air - 1.0). Low Magnetic Permeability Is Not
required For Conditions B, H, Or T Unless Otherwise Specified.
(h) Length - Under 5" Dia. = 8 Feet Min / 12 Feet Max (plus Or Minus 10%) 5" Dia & Over = 5 Feet Min / 12 Feet Max (plus Or Minus 10%) Or As Specified Elsewhere In The Contract/purchase
(i) Forgings Are Not Applicable.
(j) Identification Marking Is Required In Accordance With Paragraph 3.10.1 Of Sae-ams-qq-s-763 And As Further Defined Elsewhere In This Contract/purchase Order.
(k) Lot Definitions Of Forgings Are Not Applicable.
(l) More Than The Usual Number Of Macrostructure Tests Is Not Required.
(m) Forging Prolongations For Testing Are Not Applicable.
(n) One Retest Is Permitted In Accordance With Paragraph 4.5.5 Of Sae-ams-qq-s-763.
(o) Packaging And Packing Requirements Must Be As Specified Elsewhere In The Contract/purchase Order.
(p) Special Marking For Shipment Must Be As Specified Elsewhere In The Contract/purchase Order.
3.2 Bar, Pipe, And Tube Quantities - When This Order Results In Supplying Fewer Than 5 Pieces As Defined In The "length" Paragraph Above, All Material Must Be From A Single Heat Of Material.
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;macrostructure ;
item - ;bar, Metal (see Specification For Sample Size) ;
performance - ;sae-ams-qq-s-763 ;
acceptance - ;sae-ams-qq-s-763 ;
3.4 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government Inelectronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.4.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. Requests Must Include The
information Listed Below.
a. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor.
b. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration.
c. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To Theoperational Use Of The Product.
d. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.4.2 Requests For Waivers/deviations For Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.4.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
a. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification.
b. A Complete Description Of The Change To Be Made And The Need For That Change.
c. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis.
d. Proposed Changes To Documents Controlled By The Government.
e. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration.
f. Recommendations About The Way A Retrofit Should Be Accomplished.
g. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of Theproduct.
h. Impacts To The Operational Use Of The Product.
i. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
j. Milestones Relating To The Processing And Implementation Of The Engineeringchange.
3.5 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.6 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.7 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.8 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.8.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government To Determine The System's Effectiveness In Meeting The Quality Requirements
established In The Contract/purchase Order.
3.8.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, Make His Facilities
available For Audit By The Contracting Officer Or His Authorized Representative.
3.8.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.8.4 This Contract Provides For The Performance Of Government Quality Assurance At Destination. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer.
3.8.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco.
3.9 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.9.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made Available For
operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.9.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By The
government.
3.10 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Any Purchasing Documents To A Subcontractor Must Cite The
applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility,
applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This Order, Promptly Notify The Prime Contractor Who Will Notify The Pco So That Appropriate
planning For Government Inspection Can Be Accomplished.
3.10.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.10.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.10.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.10.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.10.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.11 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.11.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.11.2 Inspection For Completeness And Proper Type.
3.11.3 Verification Of Material Quality Received.
3.11.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.11.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.11.6 Identification And Protection From Improper Use Or Disposition.
3.11.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.11.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.11.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.12 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other
required Objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within
paragraph 3, Section C Of This Contract/purchase Order.
3.12.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In The Contract/purchase Order.
3.13 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.14 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. In Addition To The Marking Requirements On Applicable Specifications, Marking For Traceability Is Required. Pipe, Tube, And Metal Bar Must Have
both Permanent Marking And Temporary Marking Applied As Specified Below.
3.14.1 Permanent Marking - Permanent Traceability Marking Must Be Marked On Each End Of Each Pipe, Tube, And Metal Bar. (monel And K-monel Bar: 3/4 Inch To 1 Inch Rods, And 7/8 Inch Hex Bar May Be Marked On The Surface Near The End Of Bar/rod, And Rod Less
than 3/4 Inch And Hex Bar Less Than 7/8 Inch May Be Bundled And Tagged Or Boxed With The Traceability Marking On The Tag Or Box.) All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792. An Alternate Marking Method Is Permissible
provided It Is An Available Option In The Contractually Invoked Specification, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order, And Differs From That Specified In The Specification. Electric Arc Marking Or Impression
marking Is Strictly Prohibited On Thin Wall Tubing. (wall Thickness Of Less Than 0.125 Inch).
3.14.2 Temporary Marking - Temporary Marking Must Consist Of:
name Or Trademark Of Manufacturer, Specification And Grade (as Applicable), Size, Contract Number, And The Traceability Marking. Pipe And Tube Marking Must Also Include Sml (for Seamless). Marking Must Be In Accordance With The Material Specification And
sae-ams-2806, Sae-ams-2807, Sae-ams-2809, Table I Of Sae-ams-std-185, Or Astm-b666 As Applicable. Application Must Be In Accordance With Mil-std-792, Type A (temporary Ink Stenciling). An Alternate Method Is Permissible For Monel And K-monel Bar Provided It
is An Available Option (temporary Marking Only) In The Applicable Material Specification, Except That Hot Finished Rod With Rough Ground Surface 3/4 Inch And Under May Be Bundled And Tagged Or Boxed With The Traceability Marking On The Bag Or Box.
contamination Levels For Ink Stenciling Must Be As Outlined In Paragraph 5.2 Of Mil-std-792.
3.15 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.15.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.15.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, The
original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number ______________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.15.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.15.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.15.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.16 Material Handling - The Written Material Control Process Must Include The Following:
3.16.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.16.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.16.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.16.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.16.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.17 Receiving Inspection -
3.17.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.17.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.18 Discrepancy Reporting -
3.18.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government.
3.19 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.19.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.19.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.19.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.19.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.20 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To The Contractor -
4.1.1 The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. The Departure Must Be
considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Record Of These Departures, Traceable To The Applicable Part Number And
contract Number Must Be Submitted To The Pco.
4.1.3 The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions, And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied
conforms To The Specified Requirements.
6.1.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.10 A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Nov 15 2011 - Combined 304/304l And 316/316l Niins Meeting Chem/mech Of Both - Dual Marking
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- May 16 2013 - Removed Gsi From This Material.
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section ; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon15 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n743.18|wvb|717-991-9570|karen.palm@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Sections C & E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
variation In Quantity (apr 1984)|3|10|0|total Quantity Of Item 0001|
general Information-fob-destination|1|b/a|
wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice & Receiving Report (combo), Certifications - Stand Alone Receiving Report|material - Inspection/acceptance At Source, Certifications - Inspection At Destination & Acceptance At Other|tbd|n001
04|tbd|n39040 - Certs, S4306a - Material|n50286|tbd|133.2|na|na|n39040 - Certs|na |na|see Dd1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|1 Year From Date Of Delviery|1 Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (feb2024))|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (feb 2024)|13|331221|500||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||dx|
the Closing Date Is Extended To 15 Jan 2025.
\
1. Dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mech.
2. Submit Certifications In Wawf At Least 20 Days Prior To The Required Delivery Date.
3. Any Contract Awarded As A Result Of This Solicitation Will Be "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
4. A Variation In Quantity Of +10%/-0% Of The Total Contract Quantity Is Allowed. See Far 52.211-16 For Further Details.
5. Far 52.232-25(a)(5) Entitled Prompt Payment, Contructive Acceptance Is Changed From 7 Days To 45 Days After Delivery Of The Supplies In Accordance With The Terms And Conditions Of The Contract.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
document Ref Data=ansi/asq-z1.4 | | | |080101|a| | |
document Ref Data=astm-b666 | | | |201101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=sae Ams 2806 | | |c |080301|a| | |
document Ref Data=sae Ams 2807 | | |a |000901|a| | |
document Ref Data=sae Ams 2809 | | |a |070801|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=sae-ams-std-183 | | | |000901|a| | |
document Ref Data=sae-ams-qq-s-763 | | |d |150301|a| | |
3. Requirements
3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Sae-ams-qq-s-763 Except As Amplified Or Modified Herein. Sae-ams-qq-s-763 Ordering Data Information Is Provided Below:
(a) Steel Bars, Wire, Shapes, And Forgings, Corrosion Resisting Steel; Sae-ams-qq-s-763.
(b) Class - ;316/316l Condition A (must Meet The Chemical And Mechanical Properties Of Both Classes); Condition - ;a; Form - ;bar, 4 3/4 Inches (round); Finish - Any Appropriate Finish Option Of Sae-ams-qq-763 Except Hot Finished, Scale Not Removed.
(c) Melting Practice - Electric Furnace, Electric Induction, Vacuum Furnace, Electroslag Remelt (esr), Or Argon Oxygen Decarburization (aod). Other Suitable Commercial Processes Must Be Submitted And Navy Approved Before They May Be Used.
(d) Special Cleaning Processes Are Not Applicable.
(e) Allowances For Machining Are Not Applicable.
(f) Major Stress Surface Areas Of The Finished Part Are Not Applicable.
(g) Low Magnetic Permeability Is Required For 300 Series Austenitic Corrosion Resistant Steels When Ordered In The Annealed Condition. The Relative Magnetic Permeability Must Be Determined And Must Not Exceed 2.0 (air - 1.0). Low Magnetic Permeability Is Not
required For Conditions B, H, Or T Unless Otherwise Specified.
(h) Length - Under 5" Dia. = 8 Feet Min / 12 Feet Max (plus Or Minus 10%) 5" Dia & Over = 5 Feet Min / 12 Feet Max (plus Or Minus 10%) Or As Specified Elsewhere In The Contract/purchase
(i) Forgings Are Not Applicable.
(j) Identification Marking Is Required In Accordance With Paragraph 3.10.1 Of Sae-ams-qq-s-763 And As Further Defined Elsewhere In This Contract/purchase Order.
(k) Lot Definitions Of Forgings Are Not Applicable.
(l) More Than The Usual Number Of Macrostructure Tests Is Not Required.
(m) Forging Prolongations For Testing Are Not Applicable.
(n) One Retest Is Permitted In Accordance With Paragraph 4.5.5 Of Sae-ams-qq-s-763.
(o) Packaging And Packing Requirements Must Be As Specified Elsewhere In The Contract/purchase Order.
(p) Special Marking For Shipment Must Be As Specified Elsewhere In The Contract/purchase Order.
3.2 Bar, Pipe, And Tube Quantities - When This Order Results In Supplying Fewer Than 5 Pieces As Defined In The "length" Paragraph Above, All Material Must Be From A Single Heat Of Material.
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below.
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;bar, Metal (one Sample From Each Lot);
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
3.4 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.5 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government Inelectronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.5.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. Requests Must Include The
information Listed Below.
a. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor.
b. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration.
c. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To Theoperational Use Of The Product.
d. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.5.2 Requests For Waivers/deviations For Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.5.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
a. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification.
b. A Complete Description Of The Change To Be Made And The Need For That Change.
c. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis.
d. Proposed Changes To Documents Controlled By The Government.
e. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration.
f. Recommendations About The Way A Retrofit Should Be Accomplished.
g. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of Theproduct.
h. Impacts To The Operational Use Of The Product.
i. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
j. Milestones Relating To The Processing And Implementation Of The Engineeringchange.
3.6 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.7 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.8 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.8.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government To Determine The System's Effectiveness In Meeting The Quality Requirements
established In The Contract/purchase Order.
3.8.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, Make His Facilities
available For Audit By The Contracting Officer Or His Authorized Representative.
3.8.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.8.4 This Contract Provides For The Performance Of Government Quality Assurance At Destination. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer.
3.8.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco.
3.9 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.9.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made Available For
operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.9.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By The
government.
3.10 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Any Purchasing Documents To A Subcontractor Must Cite The
applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility,
applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This Order, Promptly Notify The Prime Contractor Who Will Notify The Pco So That Appropriate
planning For Government Inspection Can Be Accomplished.
3.10.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.10.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.10.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.10.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.10.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.11 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.11.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.11.2 Inspection For Completeness And Proper Type.
3.11.3 Verification Of Material Quality Received.
3.11.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.11.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.11.6 Identification And Protection From Improper Use Or Disposition.
3.11.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.11.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.11.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.12 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other
required Objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within
paragraph 3, Section C Of This Contract/purchase Order.
3.12.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In The Contract/purchase Order.
3.13 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.14 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. In Addition To The Marking Requirements On Applicable Specifications, Marking For Traceability Is Required. Pipe, Tube, And Metal Bar Must Have
both Permanent Marking And Temporary Marking Applied As Specified Below.
3.14.1 Permanent Marking - Permanent Traceability Marking Must Be Marked On Each End Of Each Pipe, Tube, And Metal Bar. (monel And K-monel Bar: 3/4 Inch To 1 Inch Rods, And 7/8 Inch Hex Bar May Be Marked On The Surface Near The End Of Bar/rod, And Rod Less
than 3/4 Inch And Hex Bar Less Than 7/8 Inch May Be Bundled And Tagged Or Boxed With The Traceability Marking On The Tag Or Box.) All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792. An Alternate Marking Method Is Permissible
provided It Is An Available Option In The Contractually Invoked Specification, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order, And Differs From That Specified In The Specification. Electric Arc Marking Or Impression
marking Is Strictly Prohibited On Thin Wall Tubing. (wall Thickness Of Less Than 0.125 Inch).
3.14.2 Temporary Marking - Temporary Marking Must Consist Of:
name Or Trademark Of Manufacturer, Specification And Grade (as Applicable), Size, Contract Number, And The Traceability Marking. Pipe And Tube Marking Must Also Include Sml (for Seamless). Marking Must Be In Accordance With The Material Specification And
sae-ams-2806, Sae-ams-2807, Sae-ams-2809, Table I Of Sae-ams-std-185, Or Astm-b666 As Applicable. Application Must Be In Accordance With Mil-std-792, Type A (temporary Ink Stenciling). An Alternate Method Is Permissible For Monel And K-monel Bar Provided It
is An Available Option (temporary Marking Only) In The Applicable Material Specification, Except That Hot Finished Rod With Rough Ground Surface 3/4 Inch And Under May Be Bundled And Tagged Or Boxed With The Traceability Marking On The Bag Or Box.
contamination Levels For Ink Stenciling Must Be As Outlined In Paragraph 5.2 Of Mil-std-792.
3.15 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.15.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.15.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, The
original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number ______________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.15.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.15.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.15.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.16 Material Handling - The Written Material Control Process Must Include The Following:
3.16.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.16.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.16.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.16.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.16.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.17 Receiving Inspection -
3.17.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.17.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.18 Discrepancy Reporting -
3.18.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government.
3.19 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.19.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.19.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.19.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.19.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.20 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To The Contractor -
4.1.1 The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. The Departure Must Be
considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Record Of These Departures, Traceable To The Applicable Part Number And
contract Number Must Be Submitted To The Pco.
4.1.3 The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions, And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied
conforms To The Specified Requirements.
6.1.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.10 A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Nov 15 2011 - Combined 304/304l And 316/316l Niins Meeting Chem/mech Of Both - Dual Marking
- Feb 03 2011 - Clarified Intergranular Corrosion Test On Raw Stock
- Oct 22 2012 - Identified Intergranular Corrosion Test Material Classes
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- May 16 2013 - Removed Gsi From This Material.
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
DEPT OF THE AIR FORCE USA Tender
Electronics Equipment...+2Publishing and Printing, Electrical and Electronics
United States
Closing Date24 Jan 2025
Tender AmountRefer Documents
Details: Amendment 1 - 30 December 2024 the Following Changes Have Been Made Tofa8201-24-q-0007 Mylar Digitization Services For Aflcmc/lzp, Hill Afb Ut. 1. The Date To Request Mylar Originals From The Government Has Been Changed For Technical Subfactor 2 And Technical Subfactor 3. The Date To Request The Mylar Originals Is Nownlt 9 January 2024. 2. The Due Date Of Offers Has Changed. The Due Date For Offers Is Now Friday, 24 January 2025, 12:00 Pm Mountain Daylight Time. the Description Below And The Attached Document Entitledmylar Digitization Services Combination Synopsis Solicitation 30 December 2024 Have Been Edited To Reflect These Changes. fa8201-24-q-0007 Mylar Digitization Services For Aflcmc/lzp, Hill Afb Ut 30 December 2024 12.603streamlined Solicitation For Commercial Products Or Commercial Services Procedures Are Being Used, The Synopsis Required By 5.203 And Solicitation Is Being Issued As A Single Document. description: This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format Insubpart12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. solicitation Number Fa8201-24-q-0007 Mylar Digitization Services For Aflcmc/lzp, Hill Afb Ut Is The Solicitation Number And Solicitation Is Issued As Request For Quotation (rfq). fa8201-24-q-0007 Mylar Digitization Services For Aflcmc/lzp, Hill Afb Ut Sources Sought Published 02 May 2024 Is Related To This Solicitation. federal Acquisition Circular: The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular Number 2024-07 / Effective Date September 30, 2024. naics And Fsc: North American Industry Classification System (naics) 325992 Photographic Film, Paper, Plate And Chemical Manufacturing, Size Standard Number Of Employees 1,500 And Federal Supply Code 7670 Microfilm, Processed Are Applicable To This Effort. offerors Reps And Certifications 52.212-3(c)(1) Offerors Representations And Certifications - Commercial Items Is Applicable. Those Naics Codes For Which You Are Identified To Complete The Representation In 52.212-3(c)(1) Will Be Used To Verify If The Company Has A Current Registration In Sam.gov And If Registered Under Naics 325992 Photographic Film, Paper, Plate And Chemical Manufacturing, Size Standard Number Of Employees 1,500. to Be Eligible For Award, 52.212-3(c)(1), The Electronic Annual Representations And Certifications In Sam.gov Must Include Naics 325992 Photographic Film, Paper, Plate And Chemical Manufacturing, Size Standard Number Of Employees 1,500. dates Of Delivery/ordering Period: 1 Feb 2025 To 31 Jan 2028 place(s) Of Delivery: aflcmc/lzp 6032 Fir Ave Building 1237 hill Afb Ut 84056 acceptance And Fob Point: Destination estimated Date Of Award:29 January 2025 description Of Requirements For The Items To Be Acquired. blanket Purchase Agreement (bpa) For Hybrid Mylar Digitization Service, Mylar Precision Plotting Services And On-demand Mylar Restoration Services For The Air Force Life Cycle Management Center (aflcmc)/lzp Engineering Data Service, Hill Afb Ut 84056 Over A 3-year Ordering Period. for Description Of Requirement, See Attached Statement Of Work (sow) Mylar 1 Mar 2024, 4 Pages. 52.212-1, Instructions To Offerors-commercial Products And Commercial Services Applies To This Acquisition. The Following Addenda Replaces 52.212-1 In Its Entirety. list Of Contract Line Items (clins): offerors Shall Input Prices For All Clins. the Unit Prices Need To Include All Costs Including Labor, Materials, Shipping, And Delivery: clin 0001 mylar Digitization Servicein Accordance With Sow Paragraph 1.1 Through 1.1.2 For Price Call Period 1 Feb 2025 To 31 Jan 2026. ffp Quantity Unit Unit Price 1 Each $ clin 0001 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0002 mylar Precision Plotting Servicesin Accordance With Sow Paragraph 1.2 Through 1.2.3 For Price Call Period 1 Feb 2025 To 31 Jan 2026. ffp Quantity Unit Unit Price 1 Each $ clin 0002 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0003 on-demand Mylar Restoration Servicesin Accordance With Sow Paragraph 1.3 Through 1.3.1 For Price Call Period 1 Feb 2025 To 31 Jan 2026. ffp Quantity Unit Unit Price 1 Each $ clin 0003 Delivery Date:on Or Before 3 Business Days After Receipt Of Call clin 0004 mylar Digitization Servicein Accordance With Sow Paragraph 1.1 Through 1.1.2 For Price Call Period 1 Feb 2026 To 31 Jan 2027. ffp Quantity Unit Unit Price 1 Each $ clin 0004 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0005 mylar Precision Plotting Servicesin Accordance With Sow Paragraph 1.2 Through 1.2.3 For Price Call Period 1 Feb 2026 To 31 Jan 2027. ffp Quantity Unit Unit Price 1 Each $ clin 0005 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0006 on-demand Mylar Restoration Servicesin Accordance With Sow Paragraph 1.3 Through 1.3.1 For Price Call Period 1 Feb 2026 To 31 Jan 2027. ffp Quantity Unit Unit Price 1 Each $ clin 0006 Delivery Date:on Or Before 3 Business Days After Receipt Of Call clin 0007 mylar Digitization Servicein Accordance With Sow Paragraph 1.1 Through 1.1.2 For Price Call Period 1 Feb 2027 To 31 Jan 2028. ffp Quantity Unit Unit Price 1 Each $ clin 0007 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0008 mylar Precision Plotting Servicesin Accordance With Sow Paragraph 1.2 Through 1.2.3 For Price Call Period 1 Feb 2027 To 31 Jan 2028. ffp Quantity Unit Unit Price 1 Each $ clin 0008 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0009 on-demand Mylar Restoration Servicesin Accordance With Sow Paragraph 1.3 Through 1.3.1 For Price Call Period 1 Feb 2027 To 31 Jan 2028. ffp Quantity Unit Unit Price 1 Each $ clin 0009 Delivery Date: On Or Before 3 Business Days After Receipt Of Call technical Subfactors instructions technical Subfactor 1: offers Must Provide Documentation To Demonstrate How The Requirements Of The Sow Including The Delivery Dates On The Clins Will Be Met. To Be Technically Acceptable, The Documentation Provided Must Demonstrate How The Requirements Of The Sow Including The Delivery Dates On The Clins Will Be Met. Reference Sow Paragraph 1.4, Thresholds Items 1 Through 5. Offerors Must Provide Documentation For Each Item Listed In Paragraph 1.4, Items 1 Through 5. technical Subfactor 2: offerors Are Required To Request And Receive The Four Mylar Originals Nlt 9 January 2024. mylars Submitted For Evaluation Should Be Sent At No Cost To The Government Via Fedex To Aflcmc/lzpef 6032 Fir Ave, Bldg 1237 hill Afb, Ut 84056 mylars Must Be Received By The Government For Evaluation No Later Than 72 Hours After Receipt Of The Mylar Original. The Mylar Originals Will Be Returned. technical Subfactor 3: offerors Are Required To Request And Receive A Large Format Mylar To Convert To A Raster Image Iaw Sow 1.1 And Subparagraphs Nlt 9 January 2024. the Mylar Submitted For Evaluation Should Be Sent At No Cost To The Government Via Fedex To Aflcmc/lzpef 6032 Fir Ave, Bldg 1237 hill Afb, Ut 84056 the Mylar Must Be Received By The Government For Evaluation No Later Than 72 Hours After Receipt Of The Mylar Original. The Mylar Original Will Be Returned. discussions the Government Intends To Award Without Discussions, Based On The Initial Quotes Received, But Reserves The Right To Conduct Discussions If Determined Necessary. Any Discussions Will Be Conducted In Accordance With Far 15.306. (end Of Provision) 52.212-2, Evaluation-commercial Products And Commercial Services Applies To This Acquisition. The Following Addenda Replaces 52.212-2 In Its Entirety. unless The Requirement Is Cancelled, The Government Will Award A Contract Resulting From This Request For Quote To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers. factors price offerors Shall Input Prices For All Clins In Accordance With 52.212-1 Instructions. A No Bid Or An Omitted Price May Result In An Incomplete, Unacceptable Quote. a Price Evaluation Will Be Performed By The Contracting Officer To Determine The Cost To The Government Will Be Fair And Reasonable. cost Or Pricing Data. In Accordance With Far 15.403-1(b) And 15.403-3(a), Data Other Than Certified Cost Or Pricing Data May Be Required To Support A Determination Of Price Reasonableness. Data Shall Be Provided Iaw Far 15.403-5, Instructions For Submission Of Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data. If, After Receipt Of Quotes, The Pco Determines That There Is Insufficient Data Available To Determine Price Reasonableness And None Of The Exceptions In Far 15.403-1, Prohibition On Obtaining Certified Cost Or Pricing Data (10 U.s.c. 2306a And 41 U.s.c. 254b) Apply, The Offeror Shall Be Required To Submit Additional Cost Or Pricing Data. technical technical Subfactor 1: to Be Technically Acceptable, The Documentation Provided Must Demonstrate How The Requirements Of The Sow Including The Delivery Dates On The Clins Will Be Met. Reference Sow Paragraph 1.4 Thresholds Items 1 Through 5 technical Subfactor 2: to Be Technically Acceptable, The Four Produced Mylar Digitization’s Shall Be Provided Within 72 Hours After Receipt Of The Mylar Original And Meet The Technical Specification Of Sow Paragraph 1.2 And Subparagraphs. technical Subfactor 3: to Be Technically Acceptable, The Converted Large Format Mylar Drawing Shall Be Provided Within 72 Hours After Receipt Of The Mylar Original And Shall Meet The Technical Specification Of Sow Paragraph 1.1 And Subparagraphs. past Performance iaw Far 15.304(c)(3)(iii) The Contracting Officer Has Determined That Past Performance Is Not An Appropriate Factor For This Acquisition And The Past Performance Evaluation Is Waived. relative Order Of Importance Of Factors And Subfactors. Iaw 15.304(e)(3) All Evaluation Factors, Other Than Cost Or Price, When Combined, Are Equally Important To Cost Or Price. (b)options. This Effort Does Not Require Options. (c)a Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (end Of Provision) (x)offerors Are Advised They Are Required To Include A Completed Copy Of The Provision At52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services, With Its Offer. as Prescribed In12.301(b)(2), Insert The Following Provision: offeror Representations And Certifications—commercial Products And Commercial Services the Offeror Shall Complete Only Paragraph (b) Of This Provision If The Offeror Has Completed The Annual Representations And Certification Electronically In The System For Award Management (sam) Accessed Throughhttps://www.sam.gov. If The Offeror Has Not Completed The Annual Representations And Certifications Electronically, The Offeror Shall Complete Only Paragraphs (c) Through (v)) Of This Provision. to Be Eligible For Award, The Offeror Is Required To Have Completed The Annual Representations And Certification In Sam.gov And Have A Current Registration In Sam.gov At The Time Of Award. (end Of Provision) (xi)offerors Are Advised The Following Clauses And Provisions Are Incorporated Into The Solicitation: section B – Bpa Terms And Conditions bpa Terms And Conditions: description Of Agreement: blanket Purchase Agreement (bpa) For Hybrid Mylar Digitization Service, Mylar Precision Plotting Services And On-demand Mylar Restoration Services For The Air Force Life Cycle Management Center (aflcmc)/lzp Engineering Data Service, Hill Afb Ut Over A 3-year Ordering Period. the Contractor Will Abide By Firm Fixed Pricing Agreed Upon On This Date. The Contractor Shall provide All Personnel, Labor, Equipment, Tools, Materials, Supervision And Other Items Required To Supply And Maintain Requirements Defined In The Statement Of Work (sow) Dated 1 Mar 2024. the Terms And Conditions Below Will Be Met: 1. Minimum/maximum Order/not To Exceed Contract Value minimum Order: $100.00 maximum Order: $25,000.00 the Total Not To Exceed (nte) Price For The 3-year Contract Value Is $250,000.00 (current Simplified Acquisition Threshold). 2. Delivery Period And Ordering Period: 3 Years, 1 Feb 2025 To 31 Jan 2028. Calls Can Be Placed Any Time During The Delivery Period; No Delivery Is Required After 31 Jan 2028. 4. North American Industry Classification System (naics) Code And Federal Supply Code (fsc) To Be Used On Basic Bpa And Calls. naics: 325992 Photographic Film, Paper, Plate And Chemical Manufacturing, Size Standard Number Of Employees 1,500 fsc: 7670 Microfilm, Processed 5. The Bpa And Call Orders Will Be Written With The Following Contract Line Item (clin) Structure And Use The Price Call Period Unit Price Based On The Effective Date Of The Call. Prices On The Calls Will Not Be Prorated Using Different Price Call Periods. For Example, A Call With An Effective Date Of 15 Feb 2025, The Clin(s) 0001 Through 0003 For Price Call Period 1 Feb 2025 To 31 Jan 2026 Will Be Used To Price The Call. A Call With An Effective Date Of 26 March 2026, The Clin(s) 0004 Through 0006 For Price Call Period 1 Feb 2026 To 31 Jan 2027 Will Be Used To Price The Call. 6. Quantity Discounts: None 7. Prompt Payment Terms: Net 30 Days 8. Government Purchase Cards (both Gpc And Expanded Use) Are Accepted At Or Below The Simplified Acquisition Threshold (sat). Government Purchase Cards Are Not Accepted Above The Simplified Acquisition Threshold (sat). *please Note That The Most Common Form Of Payment Will Be The Government Purchase Card (gpc). Offerors Are Required To Accept The Gpc As A Form Of Payment. 9. Foreign Items (listed By Country Of Origin). None 10. Time Of Delivery: See Clins For Specified Delivery Dates. 11. Fob Point(s): Destination For All Clins 12. Government Furnished Materials/property: This Requirement Does Not Use Government Furnished Property. 13. Delivery Address: Aflcmc/lzp, 6032 Fir Ave Building 1237, Hill Afb Ut 84056 14. Ordering Address: Aflcmc/lzp, 6032 Fir Ave Building 1237, Hill Afb Ut 84056 15. Payment Address: Established Per Call 16. Warranty Provision: Standard Commercial Warranty 17. If Applicable, Indicate That Section 508 Compliance Information Is Available On Electronic And Information Technology (eit) Supplies And Services And Show Where Full Details Can Be Found (e.g. Contractor's Website Or Other Location). not Applicable. 18. Extent Of Obligation: The Government Is Obligated Only To The Extent Of The Calls/purchases Placed Against This Blanket Purchase Agreement (bpa) And Shall Not Be Liable In Any Manner In The Event No Calls Are Made. the Total Bpa Estimated Ceiling Is $250,000.00. 19. Call Limitation: No Individual Call Under This Agreement Shall Exceed $25,000.00. 20. Individual Authorized To Purchase Under The Bpa: This Is A Decentralized Bpa. Contracting Officers In Pzio And Authorized Gpc Cardholders At Hill Afb Ut Are Authorized To Purchase Under This Bpa. 21. Effective Period: This Bpa Is Effective For 3 Years, From 1 Feb 2025 To 31 Jan 2028. 22. Delivery Tickets: a Requirement That All Shipments Under The Agreement, Except Those For Newspapers, Magazines, Or Other Periodicals, Shall Be Accompanied By Delivery Tickets Or Sales Slips That Shall Contain The Following Minimum Information: (i) Name Of Supplier (ii) Bpa Number (iii) Date Of Purchase (iv) Purchase Number (v) Itemized List Of Supplies Or Services Furnished (vi) Quantity, Unit Price, And Extension Of Each Item, Less Applicable Discounts (unit Prices And Extensions Need Not Be Shown When Incompatible With The Use Of Automated Systems, Provided That The Invoice Is Itemized To Show This Information). (vii) Date Of Delivery Or Shipment 23. Invoices: an Itemized Invoice Shall Be Submitted At The Completion Of Each Call Or Upon Expiration Of This Bpa, Whichever Occurs First, For All Deliveries Made During A Billing Period And For Which Payment Has Not Been Received. These Invoices Need Not Be Supported By Copies Of Delivery Tickets. See Wawf Clauses In The Bpa (dfars 252.232-7003 And 252.232-7006). 24. Basis Of Call Award/issue: Calls Will Be Awarded For The Bpa For Three (3) Years, 1 Feb 2025 To 31 Jan 2028, Or Until The $250,000.00 Dollar Limit Has Been Reached. The Government Reserves The Right To Award The Calls On A Sole Source Basis In Accordance With Far 6.302-1 Only One Responsible Source And No Other Supplies Or Services Will Satisfy Agency Requirements. 25. Ordering Procedures: The Government Will Utilize The Following Procedures For Placing Orders. call Orders Issued Under This Agreement Will Be Placed By Contracting Officers In Pzio And Authorized Gpc Card Holders At Hill Afb Ut, The Bpa Issued Contractor Will Be Allowed A Maximum Of 48 Hours (2 Business Days) Response Time To The Call Order. the Government Will Review Paragraph 4, And The Bpa And Call Orders Will Be Written With The Contract Line Item (clin) Structure And Use The Delivery Dates And Price Call Period Unit Price Based On The Effective Date Of The Call, The Agreed Upon Pricing In Compliance With The Requirements Of The Individual Call Order And Issue An Order To The Contractor. allowed Per Call: minimum Order: $100.00 maximum Order: $25,000.00 contractor Obligation To Deliver: Estimated Maximum $250,000.00 Dollars, U.s. gpc Card Holders And Af Form 9 Certifiers Are Required To Track Calls Placed To Ensure The Total Bpa Estimated Ceiling Of $250,000.00 Is Not Exceeded. The Gpc Order Tracker Will Be Maintained By The Contract Specialist And Contracting Officer. section C - Description/specifications/statement Of Work requirements blanket Purchase Agreement (bpa) For Hybrid Mylar Digitization Service, Mylar Precision Plotting Services And On-demand Mylar Restoration Services For The Air Force Life Cycle Management Center (aflcmc)/lzp Engineering Data Service, Hill Afb Ut 84056 Over A 3-year Ordering Period. statement Of Work (sow) Dated 1 Mar 2024. section D – Packaging And Marking section E – Inspection And Acceptance supplies/services Will Be Inspected / Accepted At: inspect And Accept Is The Following For All Clins inspect At inspect By accept At accept By government government government government section F – Deliveries Or Performance see Delivery Requirements For Each Clin In List Of Contract Line Items (clins) Section Of This Document. section G – Contract Administration Data section H – Special Contract Requirements (xiv)this An Unrated Order, Without A Defense Priorities And Allocations System Assigned Rating. (xv)offers Are Required To Be Emailed To Both The Contract Specialist Colton Esplin At Email Colton.esplin@us.af.mil And The Contracting Officer Joseph Laing At Email Joseph.laing@us.af.mil. The Due Date For The Offers Is Friday, 24 January 2025, 12:00 Pm Mountain Daylight Time. (mdt). (xvi)for Information Regarding The Solicitation, Please Email Both The Contract Specialist Colton Esplin At Email Colton.esplin@us.af.mil And The Contracting Officer Joseph Laing At Email Joseph.laing@us.af.mil. The Contracting Office Address Is As Follows: Afsc Ol:h/pzioa, 6038 Aspen Ave, Bldg 1289 Ne, Hill Afb Ut 84056. section I – Contract Clauses please See Attachted Document Entiltedmylar Digitization Services Combination Synopsis Solicitation 10 December 2024 For A List Of Clauses (xvii) Attachments mylar Digitization Services Combination Synopsis Solicitation 10 December 2024 sow Mylar 1 March 2024 solicitation - Fa820125q0001 far 52.204-24 - Fill-in Provision
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+2Others, Building Construction
United States
Closing Date7 Feb 2025
Tender AmountRefer Documents
Details: This Is Not A Request For Proposal. This Is A Request For Standard Form (sf) 330 Architect-engineer Qualifications Packages Only. All Information Needed To Submit Sf 330 Documents Is Contained Herein. No Solicitation Package, Technical Information, Or Bidder/plan Holder List Will Be Issued. The Government Will Not Pay, Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. general Information veterans Health Administration (vha) Regional Procurement Office West (rpow) Network Contracting Office 20 (nco20) Is Seeking Sources And Intends To Award A Firm Fixed Price Design Contract For Architect-engineering (a-e) Services For The Development Of Complete Construction Documents, Which Include Working Drawings, Specifications, And Reports, And Construction Period Services For Project # 463-25-101 Generator Physical Security Upgrades At The Alaska Va Healthcare System Outpatient Clinic Located At 1201 N Muldoon Rd, Anchorage, Ak 99504-6104. The A-e Services Contract That Is Anticipated To Be Awarded Will Be Procured In Accordance With The Selection Of Architects And Engineers Statute [formerly Known As The Brooks Architect Engineer Act], Federal Acquisition Regulation (far) Subpart 36.6 Architectural And Engineering Services, Va Acquisition Regulation (vaar) 836.6, And Va Acquisition Manual (vaam) M836.6 Architect-engineer Services. In Accordance With Far 36.209, Construction Contracts With Architect-engineer Firms, No Contract For The Construction Of A Project Shall Be Awarded To The Firm That Designed The Project Or Its Subsidiaries Or Affiliates, Except With The Approval Of The Head Of The Agency Or Authorized Representative. project Information this Project Is A 100% Set-aside For Service-disabled Veteran-owned Small Business (sdvosb) Concerns. The Naics Code For This Procurement Is 541330 Engineering Services And The Annual Small Business Size Standard Is $25.5m. A Full Design Team Is Required To Complete This Project. The Va Expects To Award The Anticipated A-e Contract Approximately Early March 30, 2025. the Anticipated Period Of Performance For Completion Of Design Is 164 Calendar Days After Notice Of Award (noa). The Vaar Magnitude Of Construction Is Between $695,000.00 And $1,000,000.00. Please Note That The 164 Calendar-day Period Of Performance For The Design Completion Begins With The Issuance Of The Noa And That A Notice To Proceed (ntp) Will Not Be Issued For The Completion Of A Design Project. submission Requirements: the Below Information Contains The Instructions And Format That Must Be Followed For The Submission Of The Sf 330 Statement Of Qualifications: submit One (1) Sf 330 Statement Of Qualifications To Contract Specialist Melita Bernardo At Nco20aesf330@va.gov And Melita.bernardo@va.gov. This Must Include Parts I And Ii And Any Applicable Attachments. the Submission Must Include The Sf 330, Architect-engineer Qualifications Form Is Available Online At: Http://www.cfm.va.gov/contract/ae.asp Or Https://www.gsa.gov/system/files/sf330-21.pdf the Sf 330 Submission Is Due By February 7, 2025, 3:00pm (pst). the Sf 330 Must Be Submitted In One Email And Have A File Size No Larger Than 5 Mb. No Hard Copies Will Be Accepted. the Subject Line Of The Email Must Read: Sf 330 Submission 36c26025r0045 Project 463-25-101, General Physical Security Upgrades.
the Sf 330 Submission Must Not Exceed A Total Of 50 Pages. This Includes Title Page, Table Of Contents, And Any Other Relevant Information. Any Pages Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. Each Page Must Be In Arial Size 12 Font, Single Spaced. Part Ii Of The Sf 330 And Any Cpars Or Ppqs Will Not Count Toward The Page Limitation. a Ppq Obtained For Another Sf 330 Submission May Be Submitted For This Project. However, If Significant Portions Of The Project Have Been Completed Since The Ppq Was Filled Out, A New Ppq Should Be Submitted To Accurately Assess The Project. firms Must Include The Following Information In Section B Of The Sf 330 Submission: sam Unique Entity Identifier tax Id Number cage Code primary Point Of Contact S Email Address And Phone Number all Questions Must Be Submitted To Melita.bernardo@va.gov With The Subject Line Sf 330 Questions - 36c26025r0045 Project 463-25-101 Generator Physical Security Upgrades. The Cutoff For Question Submission Is January 17, 2025, 3:00pm Pst. Questions Will Be Answered Through Amendment To The Notice Posted To Contract Opportunities At Sam.gov. this Procurement Is A 100% Set-aside For Sdvosb Concerns. Offers Received From Other Than Sdvosbs Will Not Be Considered. Offerors Must Be Certified As Sdvosbs By The U.s. Small Business Administration (sba) And Visible In The Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov/) At The Time Of Sf 330 Submission, Written Response Submission, And Award. Failure To Be Certified In The Vetcert Database At These Times Will Result In The Offeror Being Deemed Ineligible For Award. all Joint Ventures Must Be Sba Certified At The Time Of Sf 330 Submission, Written Response Submission, And Award And Must Submit Agreements That Comply With 13 Cfr 128.402 Prior To Contract Award. all Prime Firms Must Meet The Naics Code Requirement Specified In This Notice. The Contracting Officer Will Verify The Naics Code In Vetcert. Failure To Meet The Naics Code Requirement May Result In The Rejection Of The Sf 330 Submission. sf 330 Submissions Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. firms Not Providing The Required Information May Not Be Evaluated. All Information Must Be Included In The Sf 330 Submission Package. it Is The Offeror S Responsibility To Check The Contract Opportunities Website At Sam.gov For Any Revisions To This Announcement Prior To Submitting Their Sf 330. a-e Selection Process firms Who Timely Submit Sf 330s In Response To This Announcement, And In Accordance With Submission Requirements, Will Be Considered For Evaluation. The Selection Will Be Made As Follows: sf 330s Will Be Evaluated In Accordance With The Primary Selection Criteria As Stated In This Notice. These Evaluations Will Determine The Most Highly Qualified Firms For This Particular Requirement. in Accordance With Far 36.602-3(c), At Least Three Of The Most Highly Qualified Firms Will Then Be Notified Of The Government S Intent To Hold Discussions. Firms That Were Not Selected For Discussions Will Be Notified At This Time. In Accordance With Far 36.607(b), Any Requested Debriefings Of Successful And Unsuccessful Firms Will Be Held After Final Selection Has Taken Place And Will Be Conducted, To The Extent Practicable, In Accordance With 15.503, 15.506(b) Through (f), And 15.507(c). Note That 15.506(d)(2) Through (d)(5) Do Not Apply To Architect-engineer Contracts. discussions Will Be Held With Top Three Firms In The Form Of Written Responses. The Firms Invited To Participate In Discussions Will Be Notified By Contract Specialist Or Contracting Officer By Email With Detailed Instructions That Will Include Questions Or Topics To Address. following The Completion Of Discussions, The Firms Will Be Evaluated And Ranked Based On The Primary And (if Necessary) Secondary Selection Criteria. The Final Evaluation And Ranking Will Consider The Sf 330 Submission For Each Firm, As Well As Additional Information Obtained Via Discussions. The Highest Rated Firm Will Be Selected To Receive The Solicitation And Engage In Negotiations. the Solicitation Will Be Issued To The Highest Rated Firm As A Request For Fee Proposal (rfp). All Sow Attachments And Site-specific Documentation Will Be Provided To The Highest Rated Firm With The Rfp. A Site Visit May Be Authorized During The Negotiation Process. an Award Will Then Be Made As Long As The Negotiation Of Rates And Hours Leads To A Fair, Balanced, And Reasonable Determination Of The Final Contract Price. If Negotiations With The Highest Rated Firm Are Unsuccessful, The Firm Will Be Notified That Negotiations Have Been Terminated. Negotiations Will Then Be Initiated With The Next Highest Rated Firm, And So On Until Award Can Be Made Or This Announcement Is Cancelled. primary Selection Criteria: firms Responding To This Notice Will Be Evaluated And Ranked Using The Primary And Secondary Selection Criteria Listed Below. The Factors Are Listed In Descending Order Of Importance. The Evaluation Will Consider How Each Factor Is Addressed And How It Is Formatted To Coincide With The Selection Criteria. selection Criteria 1, Professional Qualifications (sections C Through E): The Evaluation Will Consider The Professional Qualification Necessary For Satisfactory Performance Of Required Service. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. The A-e Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure.
a Resume For Each Of These Key Positions Must Be Provided Via Section E Of The Sf330. Key Positions And Disciplines Required For This Project May Include Among Others:
architect (leed Certified) cadd Technician civil Engineer cost Estimator electrical Engineer environmental Engineer fire Protection Engineer geotechnical Engineer industrial Hygienist life Safety Engineer mechanical Engineer physical Security Specialists plumbing Engineer project Manager quality Assurance structural Engineer offer Must Include The Following Statement Of Sdvosb Compliance On The Cover Page When Submitting The Personnel Proposed To Perform The Work Under This Requirement: I [signatory Authority] ___________________, [company Or Joint Venture] __________________, Certify That The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Certified Sdvosbs By The Small Business Association S Veteran Small Business Certification (vetcert) In Compliance Of Va Acquisition Regulation (vaar) 852.219-75. the Information Provided In Sections C Through E Of The Sf 330 Will Be Used To Evaluate This Evaluation Factor. Do Not Include This Information In Section H, Unless It Is Pertinent To Support The Information Listed In The Other Sections. selection Criteria 2, Specialized Experience And Technical Competence (sections F, G, And H):
the Evaluation Will Consider Specialized Experience And Technical Competence In Design And Construction Period Services For Demolishing And Regrading Corridor. Provide Information For Example Projects Which Best Illustrate The Proposed Team S Experience And Competencies For This Contract. Submissions Shall Include Information Regarding Experience And Competence In: identify All Existing Utilities Located Within And Beneath The Existing Walkway.
reroute Active Utilities Below Ground.
demolish All Unused Utilities Back To The Source And To The Destination As Far As Practicable.
abate All Asbestos And Lead As Necessary.
remove Walkway In Its Entirety.
ensure All Affected Buildings Have Abaas Compliant Access Throughout And At The Conclusion Of The Project.
provide Necessary Site Or Building Modifications And Equivalencies To Address Any Life Safety Violations Created By The Removal Of The Corridor.
where Practicable, Expose And Restore Original Decorative Railings Concealed Within The Corridor Walls.
provide Improvements To The Site Vacated By The Corridor, Such As Landscaping And Irrigation, Site Lighting, Sidewalks, Or Other Solutions As Determined By The Project Team. coordinate Final Design Conditions With The Future Site Plan, By Others, To Minimize Work Installed Under This Project That Would Interfere With Or Be Destroyed In The Implementation Of The Site Plan. other Specialized Experience Includes Experience In Critical Path Scheduling, Fire Protection, Seismic Design, Construction Infection Control Protocols, Energy Conservation, Transition, Pollution Prevention, Waste Reduction, Use Of Recovered Materials, And Sustainable Design Practices. submissions Shall Include The Following Information For Example Projects: project Title, Location And Detailed Narrative Describing The Scope Of Services Provided Including The Type Of Work Performed By The Offeror And Its Role In The Project I.e., Prime Contract, Teaming Partner, Or Subcontractor. project Owner, Owner S Point Of Contact Including Telephone Number And Email Address. services & Deliverables Provided Under The Contract Or Task Order. period Of Performance, Including Start And Completion Dates total Dollar Value Of The Project contract Number Associated With The Project. submissions Shall Include No More Than Five (5) And No Less Than Three (3) Recent And Relevant, Government And Private Experience, Example Projects, Similar In Size, Scope, Construction Features And Complexity, Which Clearly Illustrate Experience And Competencies Listed Above And In Other Portions Of This Solicitation. Recent Is Defined As Services Provided In The Five (5) Years Prior To The Closing Date Of This Solicitation. Relevant Is Defined As Projects, Within The United States, Its Territories, Or Possessions, Requiring Tasks Identified In This Solicitation. Similar Complexity Is Considered Projects Of An Operational, Construction, Or Design Likeness To The Work Covered In This Solicitation. two (2) Of The Example Projects Must Have Construction Completed Or Construction Substantially (50%+) Complete. submit Example Project Information In Section F Of The Sf 330. section G Of The Sf 330 Will Be Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On The Provided Example Projects. the Evaluation Will Also Consider Narratives Addressing The Following Topics For The Offeror, And Key Consultants, In Section H Of The Sf 330: the Management S Approach. the Coordination Of Disciplines And Subcontractors quality Control Procedures, And familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. the Narratives Should Clearly Illustrate How Each Of The Topics Were Addressed. Re-stating Or Reiterating This List Or The Scope Of Work In Section H Will Not Be Sufficient.
narratives Submitted In Section H Of The 330, Shall Not Exceed One (1) Page In Length For The Offeror And Each Key Consultant. The Narrative Submissions Shall Not Exceed Ten (10) Pages Total For This Criterion. selection Criteria 3, Capacity (section H) the Evaluation Will Consider The Team S Plan And The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded During The Previous 12 Months And The Full Potential Value Of Any Current Indefinite Delivery Contracts. offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Completion Percentages And Expected Completion Date For Projects Awarded In The Previous 12 Months. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Team/personnel Provided In The Sf 330. selection Criteria 4, Past Performance (section H) the Evaluation Will Consider The Firm S Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Rating System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Cpars Entry. Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted With Each Project In Section F So Cpars Can Be Reviewed In The Database. for Any Project That Does Not Have Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Requested Complete Ppq From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. evaluations May Also Include Additional Performance Related From The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers May Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf 330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. for Ppqs, Please Utilize The Attached Ppq Document Only. Completed Ppqs Should Be Incorporated Into The Sf 330 Directly. Ppqs Should Not Be Submitted Separately To Nco20 Directly. Any Ppqs Will Not Be Counted Towards The Page Limitations For This Submission. However, Any Narratives Provided For Past Performance In Section H Shall Not Exceed Two (2) Pages In Length And Will Be Counted Toward The Total Submission Page Limit. selection Criteria 5, Knowledge Of The Locality (section H), the Evaluation Will Consider The Knowledge Of The Locality, Including Specific Knowledge Of Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations Of The Area Of Anchorage, Ak. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Project Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. Information Related To The Firm S Location Shall Be Provided In Section H Under Secondary Selection Criterion Factor 1, Geographic Location. See Below. selection Criteria 6, Experience In Construction Period Services, (section H) the Evaluation Will Consider Experience In Construction Period Services (cps) Necessary For Performance Of This Contract. Submissions Shall Provide Information Which Clearly Illustrates Cps Experience In The Following: solicitation Support Services professional Field Inspections During The Construction Period, Both Scheduled And Emergent coordination With Commissioning Requirements/commissioning Services review Of Construction Submittals For Design Conformance, Variance, And Applicable Code/standard Compliance support In Answering Requests For Information (rfi) During The Construction Period support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates maintaining A Comprehensive Submittal Log Inclusive Of Material Data, Shop Drawings, Certifications, Etc. providing Timely And Complete Responses To Requests For Information providing Supporting Documentation (statements Of Work, Cost Estimates, Technical Reports, Etc.) For Construction Modifications providing Record Drawing Documentation process For Correcting Design Errors/omissions Identified During Construction attendance At Pre-bid, Post-award, And Commissioning Kick Off Construction Project Conferences providing Minutes Of Weekly Construction Meetings Throughout The Duration Of Construction site Visits During Construction Both Scheduled And Emergent ensuring Compliance With The Design Drawings And Specifications preparation Of Site Visit Reports generation Of Punch-list Reports review Of Construction Project Modifications For Cost And Technical Acceptability attendance And Participation During The Final Acceptance Inspection preparation Of Record Drawings Of The Completed Construction Project Based On The Construction Contactor S As-built Drawings maintenance Of Rfi Logs attendance At Weekly Conference Calls providing Minutes Of Meetings Between The Ae, Va, And Contractors pre-final Inspection Site Visits production Of As-built Documentation the Information For This Factor Shall Be Provided In Section H Of The Sf 330. secondary Selection Criterion: Geographic Location. location Of The Firm, As Measured By The Driving Distance (miles) Between The Offeror S Principal Business Location And The Alaska Va Healthcare System At 1201 N Muldoon Rd, Anchorage, Ak. Determination Of The Mileage Will Be Based On Google Maps. (https://www.google.com/maps/dir/). *the Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Discussions. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf 330 Submission Highly Qualified Or Not Highly Qualified.
Western Visayas Sanitarium Doh Tender
Healthcare and Medicine
Philippines
Closing Soon17 Jan 2025
Tender AmountPHP 36.6 Million (USD 631.7 K)
Details: Description Republic Of The Philippines Department Of Health Western Visayas Sanitarium And General Hospital Santa Barbara, Iloilo Invitation To Bid For Supply, Delivery And Installation Of Various Hospital Equipment Ib No. 2024-12-018-g The Western Visayas Sanitarium, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors To Apply For Eligibility And To Bid For The Hereunder Project: Name Of Project : Supply, Delivery And Installation Of Various Hospital Equipment Location : Western Visayas Sanitarium And General Hospital, Inangayan, Santa Barbara, Iloilo Approved Budget For : Php 34,665,000.00 The Contract (abc) Fund Source : Caf No. 2024-133-gf Delivery Period : Within Ninety (90) Working Days After Receipt Of The Notice To Proceed Line Items Abc: Php 34,665,000.00 Lot 1 No. Description Unit Of Measure Quantity Approved Budget Cost (php) 1 Electrical Machine. Brand New. Product Specifications: Combination Of Electrotherapy And Ultrasound; With 3 Independent Channels And Body Diagram Installed; Power Supply: Ac 100- 240 V, Number Of Channels: 3 Independent (2 For Electrotherapy, 1 For Ultrasound) Electrotherapy; Ten& Ems, Ultrasound Functions; Electrode Pads For Tens & Ems; Us Probe Head: Large And Small. Warranty -1 Year From Delivery And Installation. Unit 1 290,000.00 2 Hand Dynanometer. Brand New. Product Specifications: Hydraulic Adjustable Handle. Strength Can Be Viewed In Pounds Or Kilogram. Can Measure Up To 90kg (200lbs.). Durable Metal Gauge. Warranty –at Least 6 Months Upon Delivery And Installation. Unit 1 55,000.00 3 Parallel Bars. Brand New. Product Specifications: Adjustable And Foldable. Stainless Steel Bars And Steel Base. Height Adjust Within 26''-40''. Width -24''-36". Length Ranges: 7-10 Feet. Warranty -at Least 6 Months Upon Delivery And Installation Unit 1 50,000.00 4 Pulley System. Brand New. Product Specifications: Single Handle/dual Tower. Chest And Floor Height Mounted Handle. Easily Adjustable Handles. Wheelchair Accessible. Warranty –at Least 1 Year Upon Delivery And Installation. Unit 1 150,000.00 5 Pbx, Smart Hybrid. Brand New. Product Specifications: Designed For Telemedicine Use. Genuine And High Quality Brand. Pabx Built-in Extensions 16 Analog. At Least 2 Card Slots And 2 Slots Trunk Extension Card Switch System. Ability To Equip Sub-frame Ns-320; 12-32 Trunk Extensions. Sub-frame To Extend Pbx Ns300. Port Connected To The Main Frame. Dimensions: 40-45 X 35-36 X 86-90 Cms. Warranty –at Least 6 Months From Delivery And Installation * Unit 1 100,000.00 6 Uninterrupted Power Supply. Brand New. Products Specifications: Designed For Telemedicine Operation. 3000va. Output Power Capacity-3000va, Mount: 3u Rack Mountable. Nominal Output Voltage -230v. Dimensions: 20-22 X 19-20 X 5-6 Inches. Warranty –at Least 6 Months Upon Delivery And Installation. * Unit 1 400,000.00 7 Medical Waste Shredder. Brand New. Product Specifications: 20hp Motor Slow-speed And High Torque Dual Shaft Shredders, 5/16″ Wide Cutters, With Bearing Protection And Cleaning Fitters. Features: Efficiently Shred Syringes, Face Masks, Boxed Medical Waste, Pill Bottles, Etc., Available With A Split Cutting Chamber That Allows For Two Different Shred Widths Within One Shredder, The Manner Of In Feed And Output Are Also Divided. Includes Training And Certification, Warranty 1 Year Upon Installation Unit 1 350,000.00 8 Portable Multi-parameter Analyzer Flow Water Quality Testing. Brand New. Product Specifications: Measures Water Quality Parameter For Ph/ec/ise/do/temp. Mv/orp/px/resistivity/tds/sal./do Saturation. Features: Portable Device, Color High Contrast Lcd Touchscreen, Data Storage1000 Sets For Each Parameter, Support For Usb Communication, Ip65 Waterproof, Includes All Necessary Accessories And Consumables, Includes Training And Certification For Use, Warranty For 1 Year Upon Installation Unit 1 200,000.00 9 Water Purification System. Brand New. Product Specifications: 6000 Gdp Reverse Osmosis Machine. Up To 1200 Containers Per Day. Double U.s. Membrane. 2 Tanks 1000ltrs. For Raw & Product Water. At Least 28 Stages Of Water Filtration. To Include Piping Line From Water Station To Specified Areas Within The Health Facility. To Include Necessary. Building/structure For The Water Station. Service Warranty 1 Year After Delivery And Installation. To Include Service And User Training. Including Consumables: 50 Gallons Round Containers, 50 Gallons Slim Containers, 1 Sack Industrial Salt. * Unit 1 350,000.00 10 Anesthesia Machine With Cardiac Monitor. Brand New. Product Specifications: Main Gas Supply -oxygen, Air. Pin Index Supply System: Oxygen, Air. Ventilatior: With At Least Six (6) Ventilation Modes. Machine Must Be Able To Ventilate Patient Using The Preset Settings Provided By The End-user Even Presence Of Driving Gas Is Temporarily Unavailable. Ventilator Must Be Enclosed With Metal Casing To Prevent Entry Of Foreign Items Including Fluid. Ceramic Type Of Inspiratory And Expiratory Valve. Ventilator Must Have High Pressure Valve That Ensures Release Of Excess Pressure When Required. Ventilator Must Be Functional When Machine Is Connected Either Through Direct Power Supply Or Back Up Battery. Breathing System: The Volume Of The Compact Breathing System And Co2 Absorber Must Be 1.7l Excluding Hoses And Breathing Bag. Volume Of Co2 Absorber Reusable Canister Must Be 1.5l. With Bypass Valve Located In Breathing System Allowing Continuous Machine Operation While Changing Co2 Absorber. With Fresh-gas Decoupling Valve That Prevents Direct Entry Of Pressure In The Patient Airway When Pressing The O2 Flush Button, Peep And Pressure Limitation. With Breathing System That Can Be Detached From The Main Unit Without Tools Required. Breathing System Should Be Separated From The Main Unit With Mounting That Can Be Positioned From Any Direction Without Moving The Entire Anesthesia Machine. With Ceramic Type Of Inspiratory And Expiratory Valve. With Sample Gas Return Port. With Pup Off Pressure Release Valve Located At The Apl Valve. With Moisture Reduction System. Hot Steam Sterilization Can Be Carried Out At 134 ° C (273.2 ° F). With Heated Breathing System. Anesthesia Gas Supply Module: Range Of Fresh Gas Flow Indicators: 0.0 To 12.0 L/min. O2 Flush (bypass): At 87 Psi (6 Kpa X 100): Max. 75 L/min At 41 Psi (2.8 Kpa X 100): Min. 25 L/min. With Metering Valve And Dual Flow Tubes For Fresh-gas. With Integrated O2 Monitoring Located In The Screen. Vaporizer: With Two (2) Selectatec Vaporizer Mounting. With One (1) Unit Sevoflurane And One (1) Unit Isoflurane Vaporizer. Vaporizer Must Have No Cloth Component Which Allows Item To Be Functional Immediately Even Transporting It In An Upside Down Position. Oxygen Sensor: With Oxygen Sensor That Measures Percentage Of Oxygen. Flow Sensor: With Constant Temperature Hot-wire Anemometer Flow Sensor. Must Be Located Within The Anesthesia Unit Distal To The Patient Area. Flow Sensor Must Be Reusable. Auxillary Low Flow Oxygen: With Integrated Low Flow Oxygen Supply For Mask And Nasal Cannula Application. Writing Table/drawers/mounting: With At Least 3 Drawers As Storage For Other Accessories. With A Retractable Writing Table That Can Hold At Least 10kgs. Advanced And Safety Features: Functional Even The Battery Is Completely Discharged, All Pneumatic Functions Continue To Be Available (apl Valve, Breathing Pressure Gauge, Cylinder And Pipeline Gauges, Fresh Gas And Agent Delivery, And O2, Air, Flow Meters).manual Or Spontaneous Ventilation Can Be Maintained During Power Failure And Discharged Of Battery. In Case Of No Power And Totally Discharged Battery, Machine Must Be Shifted Automatically From Ventilator Mode To Manual Mode Without Any Switch Or Button Required. Start-up Time Must Be Less Than 15 Seconds. Power Input Data: Power Supply: Rating Non-configurable 100 To 240 Vac, 50/60 Hz, 145 Va. Battery Operation Time: Up To 2 Hours, Minimum Of 45 Minutes. Parameters: Minimum Tidal Volume (vt) Required: 20 Ml. Breathing Frequency (rate): 4 To 60 Bpm (1/min). Inspiratory Pressure: Peep + 5 To 65 Cmh2o. Inspiratory Flow (inspflow): 10 To 75 L/min In Volume And Pressure Control Modes, 10 To 85 L/min In Pressure Support And Simv/ps Modes. Inspiration Pause: 0 To 50 %. Simv Inspiratory Time: 0.3 - 4.0 Sec. Positive End Expiratory Pressure: (peep) 0 To 20 Cmh2o. Inspiration/expiration Ratio: (ti:te) 4:1 To 1:4. Pressure Limiting: 70 Cmh2o. Range Of Fresh Gas Flow Indicators: 0.0 To 12.0 L/min. Pressure Support Level: Peep + 3 To 20 Cmh2o. Min. Frequency For Apnoe-ventilation: (freq. Min.) 3 To 20 Bpm And “off”. Trigger Level: 2 To 15 L/min. Standard Accessories: One (1) Unit O2 Regulator, One (1) Unit Air Regulator, O2, Air Fittings And Hose Clamps, One (1) Unit Adult Anesthesia Circuit With 2l Bag. Biolight M12 Patient Monitor (basic Configuration). Technical Specification: Display/waveforms: Screen Size Display: Not Less Than 12" Color Tft Screen. Screen Navigation: Touch Screen With Quick Volume And Brightness Adjustment. Support Quick Key, Able To Access Specific Functions Or Perform Operations Easily And Quickly. No. Of Waveforms: At Least 7 Waveforms (using Standard Screen Display). Battery: Internal Battery Duration Must Be: ≥ At Least 240 (built In Battery). Can Upgrade Lithium Battery, Battery Power Supply ≥480 Min. Ecg: Ecg Leads: 3/5 Leads, Display Sensitivity: ×0.25, ×0.5, ×1, ×2, ×4,auto Gain, Must Have A Smart Lead Off Feature, Must Have An Ecg Calibration Feature, Must Have An St Segment Analysis And Monitoring. Heart Rate Range Must Be: Adu: 10 To 300 Bpm, Ped/neo: 10 To 350 Bpm, Must Have Two (2) Hr Averaging Method. With Ecg Multi-lead Synchronous Analysis Function, Analysis Of Multiple Cardiac Leads At The Same Time, Can Be Accurately Monitored In The Case Of Individual Lead Interference, With Intelligent Lead Fall Monitoring Function. St-segment Analysis Can Show The St Graphic, Which Help Indicates The St Alarm Status More Faster. Nibp: Nibp Measurements Must Comply With The American National Standard For Electronic Or Automated Sphygmomanometers: - (ansi/aami/iso 81060-2:2009, Ansi/aami Sp10:2002) In Relation To Mean Error And Standard Deviation. Measurement Mode: Manual, Auto, Stat, And Sequence. Sequence Mode Could Support 5 Different Modes. Maximum Measuring Interval In Auto Mode Must. Must Have An Overpressure Protection For Nibp. Temperature: Must Have Dual-channel Body Temperature Monitoring With Difference Display Measurements. Must Support Skin And/or Oral/rectal. If More Than One Temperature Probe Is Used, The Monitor Will Be Capable Of Calculating And Displaying A Delta Reading. Measuring Range: 0~50 ℃. Spo2: Must Be Used In Low Pi (perfusion Index). Resp: Detection Method: Respiratory Rate And Respiratory Waveform Must Be Monitored By Pulse Wave. Trends: Trend Data For All Parameters In Tabular And Graphic Formats Must Be: 180h. Stored Nibp Measurements Must Be: Up To 2400 Groups. Stored Alarm Events Must Be: 3000 Groups And Associated Waveform. Holographic Waveform Must Be 72 Hours. Printer/recorder: Must Support 3-channel Recorder To Realize Thermal Printing; Support Network Printing Function. Network Capability: The Ip Address Of Each Patient Monitor Shall Be User Configurable. Features: -the Monitor Must Provide Electronic Early Warning Scor (ews, Glasgow Coma Scale (gcs), And Oxycrg Screen. -oxycrg Screen Shows Two Trend Curves And A Compression Waveform, Support To Review 48 Hours Trend Curve And Compression Waveform On The Oxycrg Review Screen. -accessories Storage Box, Help Manage Accessories And Prevent Accessories Missing Or Broken Problem. -user Shall Be Able To Freeze The Waveforms On The Screen And Then Review It To Carefully Observe The Patient During This Time. -up To 4 Timers Shall Be Able To Be Configured On Monitor Display To Count Up Or Down The Required Time In Minute And Second With Audio Alarm To Alert User. - The Monitor Shall Provide Following Specific Working Modes: Standby, Intubation, Night, Privacy, And Demo Modes. Accessories Included: 3/5 Lead Ecg Cable, 3/5 Lead Ecg Lead Wires, Adult Spo2 Sensor, Pediatric Spo2 Sensor, Temperature Probe Skin, Temperature Probe Oral/rectal, Nibp Cuff Adult, Nibp Cuff Pedia, Wall Mount / Trolley, One (1) Unit Pediatric Anesthesia Circuit With 1l Bag, Two (2) Units Power Adapter. Includes Avr Machine For Anesthesia Machine. Warranty -2 Years From Delivery, Installation, And Training/orientation. Unit 1 3,300,000.00 11 Cardiac Monitor With Capnograph. Brand New. Product Specifications: Display/waveforms: Screen Size Display: Not Less Than 12" Color Tft Screen. Screen Navigation: Touch Screen With Quickly Volume And Brightness Adjustment By Gestures Operate. Support Quick Key, Can Easily And Quickly Access Some Functions Or Perform Operations. No. Of Waveforms: At Least 7 Waveforms (using Standard Screen Display). Size Must Be: At Least 175mm X 320mm X262mm. With Auto Speech Recognition Module Implements The Voice Interaction With The Patient Monitor. Battery: Internal Battery Duration Must Be: ≥ At Least 240 (built In Battery). Can Up-grade Lithium Battery Power Supply ≥480min. Ecg: 5 Leads Display Sensitivity: ×0.25, ×0.5, ×1, ×2, ×4, Auto Gain. Must Have A Smart Lead Off Feature, Must Have An Ecg Calibration Feature, Must Have An St Segment Analysis And Monitoring. Heart Rate Range Must Be: Adu: 15 To 300 Bpm, Ped/neo: 10 To 350 Bpm. Must Have Two (2) Hr Averaging Method. With Ecg Multi-lead Synchronous Analysis Function, Analysis Of Multiple Cardiac Leads At The Same Time, Can Be Accurately Monitored In The Case Of Individual Lead Interference, With Intelligent Lead Fall Monitoring Function. St-segment Analysis Can Show The St Graphic, Which Help Indicates The St Alarm Status More Faster. Nibp: Nibp Measurements Must Comply With The American. National Standard For Electronic Or Automated. Sphygmomanometers: - (ansi/aami/iso 81060-2:2009, Ansi/aami. Sp10:2002) In Relation To Mean Error And Standard Deviation. Measurement Mode: Manual,auto, Stat, And Sequence,sequence Mode Could Support 5 Different Modes. Maximum Measuring Interval In Auto Mode Must. Must Have A Dual Overpressure Protection For Nibp. Temperature: Must Have Dual-channel Body Temperature Monitoring With Difference Display Measurements. Must Support Skin Or Oral If More Than One Temperature Probe Is Used, The Monitor Will Be Capable Of Calculating And Displaying A Delta Reading. Measuring Range: 0~50 ℃. Spo2: Must Be Used In Low Pi (perfusion Index). Resp: Detection Method: Respiratory Rate And Respiratory Waveform Must Be Monitored By Pulse Wave. Ibp: Support 2-channel Ibp Measurement Range: -50mmhg~+350mmhg. Types Of Measuring Blood Vessels: Arterial Pressure (art), Pulmonary Artery Pressure (pa), Central Venous Pressure (cvp), Right Atrial Pressure (rap), Left Atrial Pressure (lap), Intracranial Pressure (icp); Pulmonary Artery Wedge Pressure (pawp); Cerebral Perfusion Pressure (cpp). The Monitor Will Calculate The Ppv Based On Any Arterial Pressure Value Between Heartbeats. Etco2: Measuring Range: Etco 2 0 To 150 Mmhg. Fico: 3 To 50 Mmhg. Awrr: 0 To 150 Rpm (mainstream). Trends: Trend Data For All Parameters In Tabular And Graphic Formats Must Be: 180h. Stored Nibp Measurements Must Be: Up To 2400 Groups. Stored Alarm Events Must Be: 3000 Groups And Associated Waveform. Holographic Waveform Must Be 72 Hours Printer/recorder: Must Support 3-channel Recorder To Realize Thermal Printing; Support Network Printing Function Network Capability: The Ip Address Of Each Patient Monitor Shall Be User Configurable. The Upper/lower Limits Of Alarms Can Be Configured Via Networking From The Central. The Alarms At Bedside Can Be Paused Or Muted Via Networking From The Central. Features: -the Monitor Must Provide Electronic Early Warning Scor (ews), Glasgow Coma Scale (gcs ), And Oxycrg Screen. -oxycrg Screen Shows Two Trend Curves And A Compression Waveform, Support To Review 48 Hours Trend Curve And Compression Waveform On The Oxycrg Review Screen -accessories Storage Box, Help Manage Accessories And Prevent Accessories Missing Or Broken Problem -all-in-one Monitoring Adult, Children, And Newborn Patients. -user Shall Be Able To Freeze The Waveforms On The Screen And Then Review It To Carefully Observe The Patient During This Time. -up To 4 Timers Shall Be Able To Be Configured On Monitor Display To Count Up Or Down The Required Time In Minute And Second With Audio Alarm To Alert User. - The Monitor Shall Provide Following Specific Working Modes: Standby, Intubation, Night, Privacy, And Demo Modes. Warranty -1 Year From Delivery And Installation. Unit 2 500,000.00 12 Ceasarian Instrument Set. Brand New. Product Specifications: Made Of Heavy Duty Stainless Steel. Includes The Following Items: 1 Pc. Scalpel Handle #3 With Measure 125mm, 1 Pc. Scalpel Handle #4 135mm, 1 Pc. Tc Metzenbaum Scissors Cvd 180mm, 1 Pc. Lexer Scissors Narr Str 165mm, 1 Pc. Mayo-lexer Scissors Cvd 165mm, 1 Pc. Lister Bandage Scissors Hvy 180mm, 1 Pc. Standard Forceps Serr 160mm, 1 Pc. Standard Tissue Forceps 1x2 160mm, 5 Pcs. Lorna Towel Clamp Non-perf 130mm, 6 Pcs. Halsted-mosquito Forceps Delstr125mm, 6 Pcs. Halsted-mosquito Forceps Del Cvd125mm, 2 Pcs. Kelly Forceps Del Str 140mm, 6 Pcs Moynihan Hemostatic Forceps, Crv, 150mm, 1 Pc. Tc Mayo-hegar Ndlholderhvyserr150mm, 1 Pc. Tc Hegar Needle Holder Hvy-serr 205mm, 1 Pc. Us-army Retrac.26x15/43x15-23x15/40x15, 1 Pc. Richardson-eastman Bt471rbt472r, 6 Pcs. Boys-allis Forceps 5x6 155mm, 2 Pcs. Kidney Tray Stainless Steel 250mm, 1 Pc. Bottom For 3/4 Container Height:135 Mm, 1 Pc. Primeline Pro 3/4 Lid Red, 1 Pc. 3/4 Size Perf Basket 406x253x76mm, 1 Pc. Silicone Basket Liner 3/4 Size, 1 Pc.mayo Safety Pin F/ring-hdl Inst 140mm, 1 Pc. Ident. Label Up To 13 Letters Red. Warranty –at Least Eat 1 Year From Delivery. Set 2 1,520,000.00 13 Chemical Analyzer. Brand New. Product Specifications: Combined Instrument With Two Complementary Technologies: Raman Spectroscopy And Colorimetric Detection Confirmatory Testing: One Instrument Capable Of Confirmatory Testing Using Two Technologies Including 1) Swgdrug Category A Technique For Presumptive Testing, And 2) Swgdrug Category C Technique For Confirmatory Testing Safety Of Features For Measuring Energetic Samples: Trace Detection Testing For Energetics Without Need For Opening The Container Nor Inducing Laser Light To The Sample, Scan Delay Timer: 15 Sec – 10 Min Sample Size: Able To Detect / Identify Samples From 1 Microgram Traces To Large Bulk Samples Materials Covered: Common Raman Substances, Explosives, Narcotics, Cwas, Tics, Tims, Precursors, Common Chemicals, Fluorescent Materials Not Covered By 785nm Raman: E.g. Colored Materials, Heroin, Colored Mdma Pills, Oils, Npss, Etc., Low Concentration Materials Not Covered By Any Raman Instruments: Lsd, Thc, Magic Mushrooms, Gunpowder, Etc. Raman Excitation Wavelength: 1064nm Minimizes Fluorescence Effects: Allows For Direct Analysis Of Colored/impure Chemicals Through Colored Packaging. Spectral Wavelength Range 200 – 2500 Cm-1 Portability Power: Small Handheld Device, Optimized For One Handed Operation. , 18.5cm-20cm (l) X 15cm-20cm (w) X 7.9cm-10cm (h), 3.65lbs-5lbs (1.65 Kg-2.27kg)., Quantity 2 Lithium Ion Rechargeable Batteries With Battery Life Of More Than 6 Hours Per Charge Per Battery. Cr123a Rechargable Batteries Can Be Used. Including Spare 2 Lithium-ion Battery. Ruggedness Decontamination: Us Mil-std 810g Designed Rugged., Ip 68 Rated For Use In Varying Environmental Conditions And For Complete Decontamination. Operational Temperature Range: Unit Can Be Operated In -20°c To +50°c Temperatures., Withstands Temperature Fluctuations And Humidity Fluctuations. Rapid Start-up Rapid Results: 60 Seconds From Power On To Analysis., Analysis Results In Less Than One Minute. Operational Mode Options: Raman Analysis And Colorimetric Analysis Oraman: • Auto-collect Adjusts Raman Settings Automatically Optimizes Use For Routine Operations • Advanced User Adjustable Raman Settings For Advanced Operators And Custom Library Build: • Laser Power Level 30-490 Mw Adjustable In 5 Mw Increments Exposure Time 5ms To 30s In Increments • Custom Applications Optimize Raman Analysis Parameters Specific To Material Type Ocolorimetrics: • Pouches Including Both Swipes And Colorimetric Chemicals In One Pouch • Pouches For Explosives And Narcotics • General Pouches For Detecting A Wide Range Of Explosives Or Narcotics • Specific Pouches For One Explosive/narcotic Substance Or Substance Group Easy Raman Operation: • Scans In Direct Contact And Through Translucent Plastic Or Glass Containers. • Universal Sample Holder For Analysis Of Samples In Varying Forms And Packaging. • Smartphone Like Touch-screen Interface Or Large Button Activation. • User Prompted Step-by-step Onscreen Analysis Activation. • Typically, 4 Button Presses To Receive Analysis Result. • Onboard System Status Monitoring And Calibration. Reduces Down-time And Necessity For Re-calibration At A Service Depot Analytical Performance: • Liquids, Solids, Powders, Pastes, Gels, Invisible Traces. • Colored Substances And Substances Found In Colored Translucent Packaging. These Types Of Substances Are Most Often Encountered In Real-world Samples. • Comparative Spectral Analysis Overlay Easily Performed Onboard. • User Adjustable Focus Ensures Analysis Of Material And Not The Packaging. • 4c Software Automatically Monitors Results For Combinations Of Precursors Used In Threat, Drug Manufacturing, And Other Recipes. Users Receive Onscreen Alert To Potential Threat Or Clandestine Drug Manufacturing Activity. Library: Raman: • Over 12,000 Substances. • Resq Library Includes The Latest Explosives, Precursors, Cwas, Tics/tims, Narcotics And Psychotropic Drugs, Steroids, Cutting Agents, Pharmaceuticals, Diluents And Pesticides. • Easily Expandable To Add Emerging Threats And Other Substances. • Fleet Management And Library Transfer To Units In The Field. • 4c Library With Explosive, Drug Manufacturing And Other Types Of Threat Manufacturing Recipes. • Library Updates Provided More Than Once A Year Colorimetrics: • General Narcotics Pouches: Multi Drug Test Incl. Fentanyl, Special Opiate Pouch, Cannabinoids • General Explosives Pouches: Chlorates/perchlorates, General Explosives • Specific Pouches: Cocaine, Ephedrine, Heroin, Ketamine, Lsd, Meth/mdma, Mushrooms, Opiates, Pcp, Thc, Ghb Evidence Documentation Traceability: • Onboard 5mp Camera Captures Image Of Sample And Surroundings, As Well As Colorimetric Swab. • Image(s) Stored Along With Analysis Results In Tamper-resistant File. All Analysis Results Are Traceable And Include Unique Date, Time And Serial Number Stamp. • Ability To Activate Password Protect Operator Log-in. Record Of User Associated Activity Stored Onboard And Cannot Be Deleted. Data Access And Transfer Reporting: • View Results In Real Time On Cell Phone Or Tablet, Computer Or Laptop (pc, Ios, Android, Linux) Via Wifi (can Be Disabled). • Exportable Data In Numerous File Formats. • Data Access And Transfer On Computer Or Laptop Via Usb And Wifi (can Be Disabled). • Easy Report Generation. Customer Support Package: • 24/7/ 365 Days Reachback Service For The Life Of The Unit. • Library Updates Provided For The Life Of The Unit. • Software Updates Provided For The Life Of The Unit. • Support: Online, Phone, Email, And In Some Cases Text Message For The Life Of The Unit Cql Complete Package: • Rugged Shipping Case With Custom Foam Insert. • Qty 2 Rechargeable Lithium-ion Batteries. • Cr123a Battery Cartridge (does Not Include Cr123a Batteries). • External Battery Charger. • Ac Power Supply. • Adjustable Base Adaptor. • Universal Sample Holder. • Certified Benzonitrile Performance Verification And Calibration Standard. • Flash Drive Containing User Manual And Supporting Documentation. • Quick Start Guide. • Usb-c To Usb-a Data Transfer Cable. • 1064nm Laser Test Card. • Including Hand Strap And Wrist Strap. . Training: • Comprehensive Onsite Training For An Unlimited Number Of Users. Add-on Accessories And Software: • Periscope Adaptor. • Vial Holder. • Bottle Adaptor. • Integrated Quickdetect Automated Colorimetrics • Detect Trace Quantities Of Non-visible Residues Left On Surfaces: • Explosives And Explosive Precursors • Narcotics Standard Requirements: • Bidder’s Certificate That Will Provide Manual In English Language (2 Copies Of Operator's/user's Manual And 2 Copies Of Service/technical And Maintenance Manual) Upon Delivery. • Brochure/sales Literature. Training Requirements: • Bidder’s Certificate That Will Conduct Free Technical Training And Product Demo For The End-user/s And In-house Biomed On Equipment Operation And On Maintenance Of Equipment. • After Sales Service: Bidder’s Certificate That Parts Shall Be Available At The Authorized Philippine Service Center/s For A Period Of Five (5) Years After The Warranty Period. • Certification From Local Distributor On The Availability Of Service Technicians And/or Biomedical Engineers In Case Of Equipment Breakdown. Preventive Maintenance - • Bidder’s Certificate Free Quarterly Preventive Maintenance During The Warranty Period With Preventive Maintenance Plan. Warranty Certificate: • Warranty Certificate Minimum Of Five (5) Years For Service And Three (3) Years For Parts. The Warranty Period Shall Commence From The Date Of Acceptance By The End-user After Testing And Commissioning. • Calibration: With Certificate Of Calibration Upon Delivery. The Bidder Must Be Iso 9001 And The Manufacturer Should Be Iso 13485 Certified Unit 1 6,900,000.00 14 Common Bile Duct Exploration Supplement Set. Brand New. Product Specifications: Made Of Heavy Duty Stainless Steel. Includes The Following Items: 1 Pc. Randall Kidney-stone Frcpsslt-cvd225mm, 1 Pc. Randall Kidney-stone Forceps Cvd225mm, 1 Pc. Randall Kidney-stone Frcpshvy-cvd225mm, 1 Pc. Randall Kidney-stone Frcps U-cvd225mm, 1 Pc. Bakes Bile-duct Dilator 1mm, Bakes Bile-duct Dilator 2mm, 1 Pc. Bakes Bile-duct Dilator 3mm, 1 Pc. Bakes Bile-duct Dilator 4mm, 1 Pc. Bakes Bile-duct Dilator 5mm, 1 Pc. Bakes Bile-duct Dilator 6mm, 1 Pc. Bakes Bile-duct Dilator 7mm, 1 Pc. Bakes Bile-duct Dilator 8mm, 1 Pc. Bakes Bile-duct Dilator 9mm, 1 Pc. Bakes Bile-duct Dilator 1mm, 1 Pc. Randall Kidney-stone Forcepscvd190mm, 1 Pc. Randall Kidney-stone Fcpshvy-cvd190mm, 1 Pc. Bottom For 1/2 Container Height:135mm, 1 Pc. Prime Line Pro 1/2 Lid Green, 1 Pc. 1/2 Size Perf Basket 243x253x76mm, 1 Pc. Identification Label Green. Set 1 590,000.00 15 Defibrillator. Brand New. Product Specifications: General Features: 7-10 Inch Lcd Display, Maximum Of 3 Waveforms. High Contrast Display Mode For Bright Environments. Ambulance-ready, Rugged Casting: Ip44, Impact Test Of 0.75m. Output Energy: 1-360j. Charge Times Of <3s T O200j, <7s To 360j. Auto-volt With Smart Charging. Lithium-ion Battery Supports To 6 Hours Monitoring/200 Shocks @360j/ 4.5 Hours Pacing, With Built-in Led Power Level Indicator. Lightweight At 4-5kg., Full Configuration, Main Unit. Automatically Switch Defibrillator Energy, Cpr Prompts, And Alarm Limits Depending On Patient Type. Display Ecg During Aed Mode. Ecg Recovery Within 2.5s Or Less. Contact Status Can Be Checked Through Paddle And Monitor, Impedance Value Can Be Checked In Monitor. Auto-testing Includes Maximum Energy Discharge Test. Parameters: 3/5 Lead Ecg, Pacer. Includes: Thermal Recorder, External Paddle Kits, Ecg Cable And Lead Wires, Ecg Electrode, Multifunction Electrode Pad. Printer Paper, Electrode Gel, Power Cord, Lithium-ion Battery. Unit 5 1,500,000.00 16 Dish Sterilizer. Brand New. Product Specifications: − High Light Led Display, − With Special Boiler Temperature Drainage Settings, − Washing (non-recycling) Parameters Can Be Set Free And With Control Memory Function, − Can Meet Different Washing Demand, − Self - Research Internal Water Softener, − Double Construction Design For Top Cover, − Power: 380v/50hz, − Basket Dimension : 500x500mm, − Washing Ability : At Least 60 Basket / H, − Rinse Water Quantity : 3 L/h, − Inlet Height :400-430mm, − Machine Dimension : 800-850x800-820x1450-1500mm, − Rated Power : 14.75kw, − Gross Weight : 140-150, − Net Weight : 100-110, − Packing Size : 890-900x900-910x1630-1700mm. Warranty Period- Within 1 Year Upon Delivery And Installation To Cover Parts (excluding Wearable Parts) And Service With Preventive Maintenance Every 6 Months Within 2 Years Period. Provides Orientation And Training To End-user Representative.* Unit 1 500,000.00 17 Electrocardiography Machine (ecg) Brand New. Product Specifications. High Resolution Lcd Touch Screen, 320-330x240-250vivid Waveform Display. 12 Leads Ecg Resolution Thermal Printer. Built-in Rechargeable Li-ion Battery, Ac/dc Power Supply. Anti-defibrillator And Pace Maker Detection. Complete Digital Filtering, Resisting Baseline Drift, Automatic Baseline Adjustment. Automatic Ecg Measurement And Interpretation. Large Patient Data Storage; 150 Cases, Equipped With Usb Port For Data Transfer. Three (30 Printing Formats (auto, Manual And Rhythm) Selectable. 1/2/3 Channel Ecg Waveform And Rhythm Leads Record Out. Lead Status Diagram Display. Unit 4 200,000.00 18 Electrosurgical Dessicator Machine. Brand New. Product Specifications: Use For Removal Of Lesions, Warts, Skin Tags, And Other Blemishes Easily With Minimally-invasive Treatment. For Superficial Treatments, Safe To Use Around The Eye And Nose Area. Includes Re-usable Pen And Tips. Unit Specifications: Depth:4-5 Inches, Width:8-9 Inches, Height:7-8 Inches, Weight:6-8 Pounds, Output Power -low At 0-20watts (1/10 Watt Increments Up To 10 Watts), High At 0-35 Watts, Bipolar: 0-35 Watts. Offers Hand-or-foot Activated Operation. Autoclavable, Reusable Hand Control Pencil With Power Adjustment Buttons. Pencils Are Designed With Non-spinning Hex Collar For Multi-positional Fall-safe Blade Locking. Equipped With Mobile Stand. Includes Consumables.warranty-6 Months From Delivery And Installation. Set 1 100,000.00 19 Fetal Maternal Monitoring System: Brand New. Product Specifications: Foldable Screen. Probe Rack And Wall Mounting Rack. Handle For Easy Carrying. User-friendly Gui With 3 Display Modes. Four (4) Optional Color Background. Capable Of 24 Hours Ctg Storage. Fast Print For Store Traces. "smart Notes" Annotation. Signals Overlap Verification. Real-time And Offline Data Transmission To Pc. 10-12 Inch Color Touch Screen. Excellent Algorithm. 12-crystal And 1 Mhz Water-proof Transducer For Accurate Detection. Configuration: Dual-fhr, Toco, Fm, Afm, Mecg, Nibp, Mspo2, Temp. Includes: 3 Each Belt, 1 Each Event Marker, 1 Bottle Ultrasound Gel, 1 Ea. Fhr Transducer, Purple, 1 Each Transducer, Yellow, 1 Each Spo2 Sensor, Adult, 1 Each Temperature Probe, Skin, 1 Each Toco Probe, 1 Each Nibp Cuff, Adult, 1 Each Nibp Tube, Adult. Unit 3 1,110,000.00 20 Infusion Pump. Brand New. Product Specifications: Mechanism: Peristaltic Pump, Operating Mode: Flow Rate Mode, Drip Rate Mode(optional), Preset Volume: 1-9999 Ml, Flow Rate Range: 1 – 600 Ml/h, Increment: 1, 10, 100 (ml/h), Accuracy: ± 5%, Kvo Rate: 1 Ml/h, Bolus Rate: 600 Ml/h, Drop Rate Range: 1 – 400 Drop/min With Optional Drip Sensor, Screen: 2.7 Inches B/w Lcd, Information: Flow Rate, Preset Volume, Accumulated Infusion Volume, Completion, Occlusion, Air Bubble, Bed No, Ac Power Indicator, Battery Capacity, Battery Charge Indicator, Iv Set, Etc., Status Indicator: Stop, Run, Bolus, Kvo, Alarm Type: Air Bubble, Finish, Occlusion, No Ac Power, Low Battery, Battery Empty, Reminder To Operate, Communication Error (err1), Operation Error (err2), Drops Error (err3), Handle Open (err4), Air Bubble Level: 1-3 Levels Adjustable, Universal Compatibility, Turn On/off, Occlusion Alarm Pressure Range: 3 Levels: 60kpa, 100kpa, 140kpa (±20kpa), Battery Type: Lithium Polymer, Battery Life: Up To 4 Hours Continuous Operation 25 Ml/h Flow Rate, With Delivery And Installation, Provision Of Trainings Of Staff With Certificates, And Manual. Unit 4 320,000.00 21 Laboratory Oven. Brand New. Product Specifications: Working Temperature Range At Least 5 Above Ambient Temperature To +300 °c; Setting Accuracy Temperature Up To 99.9 °c: 0.1 / From 100 °c: 0.5; Setting Temperature Range +20 To +300°c; Temperature Sensor 1 Pt100 Sensor Din Class A In 4-wire-circuit. Control Cockpit Single Display. Adaptive Multifunctional Digital Pid-microprocessor Controller With High-definition Tft-colour Display; Timer Digital Backwards Counter With Target Time Setting, Adjustable From 1 Minute To 99 Days; Adjustable Parameters: Temperature (celsius Or Fahrenheit), Air Flap Position, Programme Time; Ventilation: Natural Convection, Vent Connection With Restrictor Flap; Works Calibration Certificate : Calibration At +160°c; Door Fully Insulated Stainless Steel Door With 2-point Locking (compression Door Lock); Internals 1 Stainless Steel Grid(s), Electro Polished; Stainless Steel Interior; Interior Easy-to-clean Interior, Made Of Stainless Steel, Reinforced By Deep Drawn Ribbing With Integrated And Protected Large-area Heating On Four Sides; Volume 32 L; Dimensions W(a) X H(b) X D(c): 400 X 320 X 250 Mm; Max. Number Of Internals: 3; Max. Loading Of Chamber 60 Kg; Max. Loading Per Internal 20 Kg; With Free Power Back-up System, With Free Installation And Demonstration. Unit 1 130,000.00 22 Newborn Hearing Screening Test Equipment. Brand New. Product Specifications: • Capable Of Screening And Diagnostic Testing With Te And / Or Dpoae. • Fast Automatic Test With Pass / Refer And Graphical Test Result Display. • Direct Evaluation Via Value And Bar Diagram. • Up To 12 Frequencies Displayed Within The Device, Dp Up To 12 Khz. • 5 Dp / 2 Te Protocols With User Customizable Parameters (diagnostic Version). • High Noise Immunity For Operation In Normal Clinical Environment. • Lightweight, Small Ear Probe. • Environmentally Friendly Due To Long Life, Rechargeable Battery. • Bluetooth Communication To Optional Printer And Pc • Evaluation Of Results In Pc. Screener With At Least 4 Frequency Dpoae Testing Protocols. • Qualified Protocols Built Into The Device. • 4 Dpoae Test Frequencies Reported. • Integration To State Tracking Systems, Hi-track Or Oz. Diagnostic With Up To 12 Frequency Dpoae Testing Protocols. • 1.5 To 12 Khz Frequency Range With Up To 12 Test Frequencies Reported. • Customizable Test Protocols Teoae Available As An Upgradeable Option. Measurement Type: Distortion Product Otoacoustic Emissions (dpoae) Transient Evoked Otoacoustic Emissions (teoae). Frequency Range: Screener Version: Dpoae: 2.0 Khz To 5.0 Khz Teoae: 1.5 Khz To 4.0 Khz. Diagnostic Version: Dpoae: 1.5 Khz To 12.0 Khz Teoae: 0.7 Khz To 4.0 Khz. Stimulus Intensity Range: Dpoae: 40 Db Spl To 70 Db Spl Teoae: 83 Db Spl Peak Equivalent (±3 Db). Microphone System Noise: -20 Db Spl @ 2 Khz (1 Hz Bandwidth)/ -13 Db Spl @ 1 Khz (1 Hz Bandwidth). Dimensions And Weight (unit): 2.5 To 3” W X 1.2 To 1.8” D X 5.5 To 6.5” H 6.2 To 6.8 Oz. Power Supply: Lithium-ion Rechargeable. Battery Life: 1000 Tests Per Charge, Minimum 15 Hours On-time. Connectors/ Communications: Integrated Usb Communication Capability For Battery Charging And Communication With Pc-based Database Programs Or An Optional Printer. Hdmi Connector For Connection To The Micro-probe. Integrated Bluetooth Class 2 + Edr With Spp. Protocol For Communication With Optional Printer. Standard Accessories: Micro-probe, Box Of Single Use Ear Tip And Ear Tip Remover, Package Of Probe Tubes, Micro-usb Power Supply For Charging Lithium Ion-battery, Pc Database Software With Manual, Micro B To A Usb Cable For Pc Communicator/charging, Protective Carrying Case, Data Management Tool That Provides The Ability To Transfer Patient. Oae Test Data From The Testing Device To A Pc For The Purposes Of Viewing, Archiving, Managing And Printing Oae Reports. Using The Database Also Gives You The Means To Create Letter Sized, Detailed Reports That Can Be Easily Filed Or Faxed. You Can Also Create A “paperless” Office By Saving The Test Results As A Pdf For Electronic Filing Or Email. Dpoae: 40 Db Spl To 70 Db Spl Teoae: 83 Db Spl Peak Equivalent (±3 Db). Includes Ups. Warranty –at Least 1 Year After Delivery And Installation. Unit 1 1,000,000.00 23 Operating Room Lights. Brand New. Product Specifications: Dual Head- Ceiling Type. Major Operating Room Light Multi-color. Merging Of Light Fields, Light Intensity Control. Comfortable Display Of Key-pad On Major Lighting Head. Back Light Key Pad Display. Depth And Merging Light Field Should Be Operated At The Sterilizable Handle. Cool Light Temperature Increasing In Head Area: 0.5 ºc. 360° Continuous Rotation Around All Major Joints. Anti-bacterial Coating Head. - Light Head Diameter: 66cm. Ideal Laminar Flow Ceiling System. With Endo Mode: Must Be Color Green Light. Main Light Head. Electronic Light Intensity Control At Lamp Head. - Light Intensity At 1 Meter Distance: 160,000 Lux. Colour Rendering Index Ra At Kelvin: 98 (for Better Quality Image Of Skin, Blood And Tissues). Colour Rendering Index R9 At Kelvin: 99 (for Better Quality Image Of Skin, Blood And Tissues). Focusable Light Field Size: 19-30 Cm. Colour Temperature: 3,750, 4,000, 4,250, 4,500, 4,750 K. - Adjusting The Shadow Activating Via The Touch Panel. - Maximum Of Four Groups Of Lenses Are Dimmed Simultaneously. Shadow Management System. Number Of Led’s: 99 On Lamp Head. Life Span Of Leds: > 60,000 H. Working Distance: 70-160 Cm. Light Intensity Control (standard): 5% - 100%. Outstanding Depth Illumination: 70, 100, 130 Cm. Laser Pointer On Head (main Light Head Only). Lf-index Leenemann: 26. Lf-index Oostlander: 28. Input Voltage: Single Phase 110 ~ 230 Vac Free Volt. Total Power Consumption: 82 - 92watts. Adjustable Brakes At The Horizontal Arm. Light Head Weights: 18.5 Kg. Protection Type Lamp Head: Iec60529. - Aluminum Housing. Satellite Head. Electronic Light Intensity Control At Lamp Head. - Light Intensity At 1 Meter Distance: 140,000 Lux. Colour Rendering Index Ra At Kelvin: 98 (for Better Quality Image Of Skin, Blood And Tissues). Colour Rendering Index R9 At Kelvin: 99 (for Better Quality Image Of Skin, Blood And Tissues). Focusable Light Field Size: 18-30 Cm. Colour Temperature: 3,750, 4,000, 4,250, 4,500, 4,750 K. Number Of Led’s: 69 On Lamp Head. Life Span Of Leds: > 60,000 H. Working Distance: 70-160 Cm. Light Intensity Control (standard): 5% - 100%. Outstanding Depth Illumination: 70, 100, 130 Cm. Input Voltage: Single Phase 110 ~ 230 Vac Free Volt. Total Power Consumption: 82-92 Watts. Adjustable Brakes At The Horizontal Arm. Light Head Weights: 17.9 Kg Minimum. - Aluminum Housing. Protection Type Lamp Head: Iec60529. Standard Accessories: - Sterilized Handle: 2 Pcs/ Lamp Head, - Ceiling Anchorage Ring With Screws, - Spring Arm, - Ceiling Cover, Including Installation Of Brackets To Embed Overhead Ceiling- User Manual, - Ups. Warranty Of Two (2) Years For Parts And Labor With Free Preventive Maintenance Every Quarter Within Warranty Period Five (5) Years Warranty For Led Bulb Only. Unit 1 2,500,000.00 24 Operating Room Table (motorized). Brand New. Product Specifications: Total Length: 2000-2100 Mm. Width Including Side Rails: 600-630 Mm. Mattress Width: 550-570 Mm. Total Weight: 200-210 Kg. Safe Working Load (swl): Up To 250 Kg. Height Adjustment Range: From 595 Up To 1005 Mm. Castors: Four Ø 120-125 Mm Central Locking Twin Castors. Head Section: -58° ... +37°, 135 Mm. Back Section: -10° ... +70°. Leg Section: -80° ... +10°. Lateral Tilt: 20° / 20°. Trendelenburg/anti-trendelenburg: 30° / 20°. Sliding Tabletop For C-arm Function: 300-320 Mm. Flex / Reflex: 220° / 120°. Electrical System: 24 Vdc, Battery Operated, 100 - 240 Vac, 50/60 Hz. Controls: Hand Control And Integrated Control Panel On The Column. Memory Positions: Four Programmable Positions. Visco-elastic Mattresses. Radio Lucent Tabletop For X-ray. Accessories For General Surgery: 1. Arm Rest, 2. Anesthesia Frame With Clamp And, 3. Attachment Clamp. Transport And Storage Conditions: Temperature 7 10° C + 50° C. Relative Humidity 10 %, 85 %. Air Pressure 700 Hpa, 1060 Hpa. Operating Condition: Temperature +10° C, + 40° C. Relative Humidity 30 %, 75 %. Air Pressure 700 Hpa 1060 Hpa. Side Rail Accessories: 25 X 10mm. Warranty-1 Year From Delivery And Installation. Certificate Of Parts Available In The Next 5 Years. Includes Training To End-user. Includes Product Manual. Unit 2 5,500,000.00 25 Radiant Warmer With Phototherapy Units. Brand New. Product Specifications: Fixed Height Radiant Warmer, Mounted On A Column. The Unit Is Supported By A T-shaped Sturdy And Stable Wheeled Base. Bases Is Provided With A Minimum Three (3) Anti-static Swivel Casters. At Least Two (2) Of The Casters Are Equipped With Brakes. The Base Is Equipped With A Side Handle/rail For Easy Positioning. The Design Of The Base Is Suitable To Be Fitted Over Standard Cradles, Cribs, And Bassinets. Overhead Radiant Heater At A Fixed Height Of 1.80-2.0m. Radiant Heating Is Achieved By Quartz/ceramic Elements, Placed In A Parabolic Reflector. The Radiator Is Equipped With A Safety Grid. The Unit Support Three (3) Modes: Pre-heating, Manual And Servo Mode. The Unit Allows For Instant Switching Been The Different Operating Modes. The Minimum Skin Temperature Setting Range Is 32°c To 37°c. The Resolution Of The Temperature Is: ± 0.5°c Or Better. In Manual And Pre-heating Modes Heating Settings Allow For A Range Of 0 – 100%. Led Spotlight(s) For Examination Are Integrated In The Overhead Radiant Heater, The Angle Of The Overhead Light Is Adjustable. Warm-up Time < 30 Min To 25°c. Power Requirements: 1 Ph, 100 - 240 Volts - 50/60 Hz 900 To 1300va (with Ups And Avr). Display Features: The Display Panel Is Integrated In The Column For Visualizing Working Parameters And Alarms. The Display Indicates: - The Current Active Mode: Pre-heating, Manual Or Servo, - The Current Heating Power In Percentages, - The Current Pre-set Temperature, - The Current Actual Skin Temperature, - The Current Air Temperature. The Unit Is Equipped With A Self-check Feature. Alarm And Safety Features: Alarms Are Audible And Visible. Alarms Indicating: - Sensor Disconnection Or Malfunction. - Power Failure. - Skin Temperature, After Stabilizing, Varying Beyond 0.5° To 1°c From Set-point. - 10 To 15 Minutes After Manual Mode Has Been Engaged An Audible Alarm Will Sound. In Addition, The Unit Will Either Reduce Or Cut The Power To The Heater. In Skin Mode, When The Temperature Exceeds 39°c, The Unit Will Cut The Power To The Heater. Supplied With: Instructions For Assembly, Use And Maintenance In English: 1 X Installed And 2 X Spare Reusable Skin Temperature Sensors, Including Connection Cable And Plug. 1 X Spare Quartz/ceramic Heating Element Or The Same With Installed Heating Element. 2 X Spare Examination Light Bulbs. 1 X Set Of Spare Fuses, If Applicable. Accessories: A Durable Light Weight Cradle/crib And Mattress. Oxygen Regulator Including A Pressure Gauge, Flow Meter, Humidifier Bottle And All Required Tubing. Integrated Weighing Scale. Electrically Operated, Slow Suction Unit Including A Vacuum Regulator, Vacuum Gauge And Autoclavable Collection Jar. Electrical Height Adjustment. T-piece Resuscitator. Integrated Phototherapy Unit. Led Phototherapy Unit 36cm: 620-2800μw/c㎡. Led Phototherapy Unit 50cm: 400-1620μw/c㎡. Estimated Life Span: Eight Years. Includes Avr. Unit 3 600,000.00 26 Refrigerator (biological). Brand New. Product Specifications: External Dimension: W = 700-750 Mm D = 730-750 Mm H = 2000-2100 Mm. Inside Dimension: Useful Space On Top W = 600-620 Mm D = 550-570 Mm H = 500-550 Mm. Useful Space At The Bottom W = 590-610 Mm D = 540-560 Mm H = 500-550 Mm. Capacity: 600 L Temperature Range: Top 2°c To 20°c Bottom 2°c To 20°c. Optional: Other Temperature Ranges. Housing Galvanized Sheet Steel With High Quality White Coating, Antibacterial Coated. With 4 Feet, Height Adjustable. Optional: Set Of 4 Casters, 2 With Brakes. Interior Space Inner Case Of Galvanized Sheet Steel With High Quality White Coating, Antibacterial Coated. Cleaning Friendly By Rounded Corners, Slippery Surface In The Interior, Meets Highest Hygiene Requirements Insulation High Density Foamed-in-place Polyurethane, With A Thickness Of 60 Mm. Cfc-free. Circulation Air Cooling For Rapid And Uniform Temperature Control, Reducing Temperature Gradients To A Minimum. When The Door Is ""open"" The Circulating Fan Is Switched Off Automatically By A Micro Switch In Order To Prevent Warmer Ambient Air Being Drawn In. Door 2 Pcs. Three-layer Thermally Insulating Glass Door (arranged On Above The Other), Supplied As Standard With Right Hand Hinge, Also Available With Left Hand Hinge At No Extra Cost. Grease Resistant Magnetic Seal. Optional: With Door Lock. Interior Fittings 4 Pcs. Grating-type Shelves (dim.: 530x550 Mm), White Coated. Interior Lighting With Automatic On/off Micro Switch. Optional: Stainless Steel Shelves Or Stainless-steel Drawer Compartments, With 3 Lengthwise Dividers With Telescopic-type Guides On Rollers With Stops, Drawer Dimensions: 500x480x77 Mm (wxdxh) Usable With Between The Lengthwise Dividers: 106 Mm (lengthwise Dividers Easily Removable). Working Range 1 From 2°c To 20°c (assuming The Ambient Temperature Is Approximately 4°c Above The Set Point). Temperature Accuracy +/- 1,8°c After Stabilization (with 50% Of Loading). Acoustics Signal When The Set Value Is Undercut Or Exceeded Potential-free Connection Socket For Extern Alarm Refrigerating Unit 2 Pcs. Fully Hermetically Sealed, Forced Ventilation, Fitted On Vibration – Absorbing Mounts (ambient Temperature Max. 32°c), Low Noise (48dba/1m), Energy Saving Compressor With High Quality Vaporization System. Refrigerant: R 290 Or Equivalent Defrost Automatically With Thermal And Time Limit. Condensate Evaporation In Heated Tray. During The Defrost Period, The Temperature Inside The Cabinet (only The Air Temperature – Not The Stored Goods) Will Arise For A Short Time. Electrical Date: Power Supply220-230 V/50 Hz/single Phase Optional: 60 Hz. Power Input 2x 0,20 Kw. Fuse 16a. Power Cable: 2x 1,5 M. Packing Details (palletized) Dimensions: Approx. 85x98x224 Cm. Net Weight: 150-170 Kg. Gross Weight: 180-200 Kg. Include Avr. Unit 1 100,000.00 27 Rigid Video Procto-sigmoidoscope. Brand New. Product Specifications: Plastic Obturator. Video Camera. Stainless Steel Tube. Handle Of Polyacetal (delrin), Usb Male Connector. Analogue To Digital Converter Nozzle For Gas. Instrumentation Channel. Silicone Washer. Includes Universal Fiber Optic Light Source Machine And Tube Connector From The Proctoscope To The Light Source Machine. Warranty -6 Months From Delivery And Installation. Set 1 50,000.00 28 Stretcher, Transport Type. Brand New. Product Specifications: Hydraulic Stretcher. Numbers Of Function: Five-function. Certification: Ce, Fda, Iso13485. Size: 2000-2100 Mm (l)*770-800mm (w)*600-610/900-920mm (h). Height:600mm-930mm. Lowest Position-floor To Platform-580mm. Highest Position-floor To Platform-905mm. Side Rail Height Above Mattress Platform-340 To 360mm. Maximum Back Rest-0-80 Degrees. Maximum Knee Rest-0-30 Degrees. Maximum Trendelenburg Reverse Tr-0-16 Degrees. Mattress Size -1850-1880 X 650-670 X 80-90mm. Loading Capacity -up To 200 Kg. Side Rails: Collapsible Aluminum Alloy Side Rails. Bed Platform: X-ray Transparent. Specification: Ce, Fda, Iso. Other Features: 1. Central Brake System: Equipped With Four Brake Pedals On All Sides Of The Bed Make The Brakes At The Optimal Position Effectively. 2. Multi-function Instrument Support: The Instrument Support Can Put The Monitor And Can Also Be Used As A Headboard To Prevent Accidental Slippage Of The Patient. 3. Push Handle: Reducing The Workload And Preventing The Injuries. 4. High Quality Mattress: The European Standard Waterproof Cloth With The Smooth Surface Of The Mattress, Easy To Clean And Not Misplaced. 5. Large Diameter Wheel: Using The Imported 8-inch Silent Caster Make It Flexible And Durable. 6. The Fifth Wheel: The Fifth Wheel Can Provide A Smaller Radius Of Gyration. The Telescopic Collapse Design Can Slide Smoothly Even On The Rough Surface Or Obstacles Such As The Elevator Sill, Reducing Effectively The Damage Caused By Transport To Patients. 7. Plastic Coated Side Rails: The Side Rails With Stainless Steel Column Guardrail Covers Almost Entire Length Of Bed. 8. High-strength Carbon Steel Structure And Spray Procedure: The High Quality Carbon Steel And Robot Welding Guarantee The Mechanical Strength. The Spray Surface Treatment Is Easy To Clean And Guarantees A Longer Life. 9. Rapid Lifting Hydraulics: The Imported Dual-pressure Lifting System Can Be Used To Quickly Lift The Bed Or The Push Handle For 2 Seconds In An Emergency, And The Bed Will Automatically Locate The Height To Form A Special Body Position Of The Patient. 10. X-ray Imaging: Equipped With X-ray Material Bed Surface And X Ray Cassette Holder, The Whole Body Can Be X-rayed. 11. With Oxygen Cylinder Holder. Warranty -1 Year From Delivery And Installation. Unit 18 5,400,000.00 29 Suction Machine. (heavy Duty). Brand New. Product Specifications: Floor, Standing Type. Oil-less Piston Suction Motor. Double Anti-overflow Protection (mechanical Float And Electronic Sensor). Flow Rate: 40-50 Liter Per Minute. Water Displacement. Vacuum -700-800mmhg. Includes 2x3 Liters Polycarbonate Collection Jar. Attach/detach Abs Plastic Cover Jar. Anti-bacterial And Hydrophobic Filter. Patented Anti-vibration System. Dimensions: 300-400mm X 380-420mm X 800-850mm (lxwxh). Weight -15-25 Kg. Equipped With Foot Switch. Power -250w. Power Requirement -ac 200, 50-60hz. Silicone Hose. Operation And Service Manual Included. Warranty Of 6 Months From Delivery And Installation. Includes Orientation And Training Of End-user Staff. Unit 2 600,000.00 30 Syringe Pump. Brand New. Product Specifications: With Delivery And Installation, Provision Of Trainings Of Staff With Certificates, And Manual. Applicable Syringes (universal Compatibility To Various Brands): 10ml, 20ml, 30ml, 50ml/60ml, Accuracy: ±2% (mechanical ±1%). Flow Rate: 10ml: 0.1 Ml/h -300ml/h, 20ml: 0.1 Ml/h -600ml/h, 30ml: 0.1 Ml/h -900ml/h, 50ml: 0.1 Ml/h -1500ml/h. Bolus Rate: 10ml: 100-300ml/h (default 300ml), 20ml: 100-600ml/h (default 600ml), 30ml: 100-900ml/h (default 900ml), 50ml: 100-1500ml/h (default 1500ml). Purge Rate: 10ml: 300ml, 20ml: 600ml, 30ml: 900ml, 50 Ml: 1500ml. Volume To Be Infused: 0.1ml~1000ml. Injection Increment: 0.1ml. Infusion Mode: Rate Mode, Time Mode. Time Mode: Volume Limit: 0.1~999.9ml. Pre-set Time: 1min To 99h99min. Remaining Time: **h **min. Occlusion Pressure: 3 Adjustable Occlusion Pressure Settings: Low, Middle And High. Alarm Function: Infusion Completion, Near Completion, Empty, Occlusion, Low Battery, Syringe Disengaged, Incorrect Installation Of Syringe Plunger, No Ac Power Supply, Low Battery, Battery Exhausted, Malfunction Etc. Battery: Rechargeable Lithium Polymer Battery, 7.4v, 2100mah, Can Operate For More Than 3 Hours After Fully Charged At 25ml/h. Unit 5 300,000.00 Total 34,665,000.00 Note: Winning Bidder Shall Conduct Product Demonstration/end-user’s Training Of The Actual Unit And Issue Training Certificate To The End-user And Medical Equipment Technician Of Wvsgh. The Bidder’s Single Largest Completed Contract Similar To The Contract To Be Bid Should Have Been Completed Within 3 Years From The Date Of The Deadline Of Submission And Receipt Of Bids, Award For This Contract Should Have Been Awarded By A Hospital Or Health Facility And Not By Another Supplier, Except For Line Items With Asterisk (*) Which Have Been Awarded By A Non-health Facility. Likewise, The Contract Price Of The Slcc Should Be At Least 50% Of The Sum Of The Abc Of The Line Items Joined. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. The Complete Schedule Of Activities Is As Follows: Bac Activities Schedule Availability Of Bidding Documents December 12, 2024 At 8:00 Am To 4:00 Pm And Up To Before 9:00 Am Of January 7, 2025, At The Procurement/bac Office, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Pre Bid Conference December 20, 2024 (thursday), 9:00 Am At The 3rd Floor, Im Conference Room, New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Opening Of Bids January 7, 2025 (tuesday), 9:00 Am At The 3rd Floor, Im Conference Room, New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Bid Documents May Be Acquired By Interested Bidders On The Dates And Address Above And Upon Payment Of Applicable Fee For The Bidding Documents In The Amount Of: Php 25,000.00 Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac/procurement Office On Or Before 9:00 Am Of January 7, 2025. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Wvs.doh.gov.ph , Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Western Visayas Sanitarium And General Hospital Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Mr. Jasond Rex A. Huyaban/jessie H. Jarbadan Bac Secretariat Western Visayas Sanitarium And General Hospital Sta. Barbara, Iloilo Tel. No.: (033) 332-4778 Loc. 119 Email: Wvsbac.procurement@gmail.com Website: Wvs.doh.gov.ph Renia Grace G. Salapare, Md, Fpafp, Mpa Bac Chairperson
National Road and Highway Directorate Tender
Others
Poland
Closing Date23 Jan 2025
Tender AmountRefer Documents
Details: 1. The subject of the Order is the Supply of Consumables for Rail Buses Sa 105, Sa 108, Sa 132, Sa 134, Sa 139, 36wehd and Electric Traction Vehicles En 76, En 57al, En 57 Akw and 48we. 2. The Subject of the Order Was Divided into 2 Tasks with the following scope: 1) Task No. 1 - Miscellaneous Consumables - Appendix No. 2.1 to the Swz, 2) Task No. 2 - Adhesives, Contact Cleaner - Appendix No. 2.2 to the Swz. The detailed description and conditions of implementation are specified in Appendix No. 1 (Offer form), Appendix No. 2.1 and 2.2 (Price form for Selected Tasks), Appendix No. 3 (agreement template) to the Swz. 3. The Ordering Party provides for the possibility of exercising the Option Right during the execution of the Order. Significant provisions regarding the conditions of executing the Option Right have been specified in § 1 of the Agreement Template. 4. The Ordering Party informs that the Proceedings are conducted in two stages: A) Stage I - Bid submission, B) Stage II - Electronic Bidding - Bidding will start automatically after the end of Stage I It will last 15 minutes and Extra Time - Sub-stage of Stage II, the terms of which It is described in detail in the Procurement Platform's Proceedings Setting. Each Overtime Lasts 3 Minutes - Starts if Within the Last 3 Minutes of the Proceedings, Another Bid (proceeding) is submitted correctly. 5. Please direct any questions regarding the Procedure via the Purchasing Platform. 6. Technical assistance can be obtained at the following telephone number: +48 22 428 19 28. 7. The procedure is conducted in accordance with the provisions of the Regulations for the award of sub-threshold sectoral contracts, available for contractors on the website of the Employer: https://bip.kolejewielkopolskie.com.pl/ zamowienia - Public/contract-awarding-rules/.
Bureau Of Corrections Muntinlupa City Metro Manila Tender
Automobiles and Auto Parts
Philippines
Closing Date20 Jan 2025
Tender AmountPHP 17.3 Million (USD 298 K)
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Supply And Delivery Of Various Bucor Vehicles 2025 (procurement/contract No. 010) Sixth Edition July 2020 Bids And Awards Committee 2024 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 16 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 22 Section Vi. Schedule Of Requirements 27 Section Vii. Technical Specifications 29 Section Viii. Bidding Forms 34 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid For Supply And Delivery Of Various Bucor Vehicles 2025 1. The Bureau Of Corrections, Through The National Expenditure Program Fy 2025 (capital Outlay) Intends To Apply The Sum Of Seventeen Million Three Hundred Thousand Pesos Only (₱17,300,000.00) Being The Abc To Payments Under The Contract For Supply And Delivery Of Various Bucor Vehicles 2025 With Identification Number __epa-010__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Within Thirty (30) Calendar Days. Bidders Should Have Completed, Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below During Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On __december 29, 2024 (08:00am To 05:00pm) To January 20, 2025 (08:00am To 01:29pm)___ From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty-five (₱25,000.00) Thousand Pesos Only. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees And Presented In Person. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On __january 06, 2025 (01:30pm)____ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before __january 20, 2025 (01:29pm)__. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)__ At The Given Address Below Bac Conference Room Nbp Reservation Muntinlupa City, Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Schedule Of Bidding Activities Shall Be As Follows: Activites Date/time Venue 1. Sale And Issuance Of Bid Documents December 29, 2024 (08:00am To 05:00pm) To January 20, 2025 (08:00am To 01:29pm)_ Supply Division Bureau Of Corrections Muntinlupa City 2. Pre-bid Conference January 06, 2025 (01:30pm Bac Conference Room Bureau Of Corrections Muntinlupa City 3. Submission And Opening Of Bid Documents January 20, 2025 (01:30pm) Bac Conference Room Bureau Of Corrections Muntinlupa City 11. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Maria Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt. Celso S. Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Wishes To Receive Bids For The Supply And Delivery Of Various Bucor Vehicles 2025 {[insert, If Applicable:] Under A Framework Agreement}, With Identification Number [indicate Number]. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Supply And Delivery Of Various Bucor Vehicles 2025 Is Composed Of One (1) Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For National Expenditure Program Fy 2025 (capital Outlay) In The Amount Of Seventeen Million Three Hundred Thousand Pesos Only (₱17,300,000.00). 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. [select One, Delete Other/s] A. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I. When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii. Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv. When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. B. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.2. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.3. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.4. Subcontracting Of Any Portion Of The Project Does Not Relieve The Supplier Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Supplier’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address Bac Conference Room Nbp Reservation, Poblacion, Muntinlupa, City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within The Last Four (4) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.5. [include If Framework Agreement Will Be Used:] Financial Proposals For Single Or Multi-year Framework Agreement Shall Be Submitted Before The Deadline Of Submission Of Bids As Prescribed In The Ib. For Multi-year Framework Agreement, Evaluation Of The Financial Proposal During This Stage Is For Purposes Of Determining Eligibility And Whether Or Not Such Financial Proposal Is Within The Abc. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 12.2. [include If Framework Agreement Will Be Used:] For Framework Agreement, The Following Should Also Apply In Addition To Clause 12.1: A. For A Single Year Framework Agreement, The Prices Quoted By The Bidder Shall Be Fixed During The Bidder’s Performance Of The Contract And Not Subject To Variation Or Escalation On Any Account. Price Schedules Required Under Clause 12.1 Shall Be Submitted With The Bidding Documents. B. For A Multi-year Framework Agreement, The Prices Quoted By The Bidder During Submission Of Eligibility Documents Shall Be The Ceiling And The Price Quoted During Mini-competition Must Not Exceed The Initial Price Offer. The Price Quoted During Call For Mini-competition Shall Be Fixed During The Bidder’s Performance Of That Call-off And Not Subject To Variation Or Escalation On Any Account. Price Schedules Required Under Clause 12.1 Shall Be Submitted With The Bidding Documents. 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14.3. [include If Framework Agreement Will Be Used:] In The Case Of Framework Agreement, Other Than The Grounds For Forfeiture Under The 2016 Revised Irr, The Bid Security May Also Be Forfeited If The Successful Bidder Fails To Sign The Framework Agreement, Or Fails To Furnish The Performance Security Or Performance Securing Declaration. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Posting Of Performance Security Or Performance Securing Declaration, As The Case May Be, By The Winning Bidder Or Compliant Bidders And The Signing Of The Framework Agreement. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 16.2. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, The Submission Of Bids Shall Be For The Initial Evaluation Of Their Technical And Financial Eligibility. Thereafter, Those Declared Eligible During The Said Initial Eligibility Evaluation And Entered Into A Framework Agreement With The Procuring Entity Shall Submit Anew Their Best Financial Offer At The Address And On Or Before The Date And Time Indicated In The Call For Each Mini-competition. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, Determination Of Margin Of Preference Shall Be Conducted Every Call For Mini-competition. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. [include The Following Options If Framework Agreement Will Be Used:] A. In The Case Of Single-year Framework Agreement, The Lowest Calculated Bid Shall Be Determined Outright After The Detailed Evaluation; B. For Multi-year Framework Agreement, The Determination Of The Eligibility And The Compliance Of Bidders With The Technical And Financial Aspects Of The Projects Shall Be Initially Made By The Bac, In Accordance With Item 7.4.2 Of The Guidelines On The Use Of Framework Agreement. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Option 1 – One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.1. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, All Bidders Initially Determined To Be Eligible And Financially Compliant Shall Be Subject To Initial Post-qualification. The Bac Shall Then Recommend The Execution Of A Framework Agreement Among All Eligible, Technically And Financially Compliant Bidders And The Procuring Entity And Shall Be Issued By Hope A Notice To Execute Framework Agreement. The Determination Of The Lowest Calculated Bid (lcb) Shall Not Be Performed By The Bac Until A Mini-competition Is Conducted Among The Bidders Who Executed A Framework Agreement. When A Call For Mini-competition Is Made, The Bac Shall Allow The Bidders To Submit Their Best Financial Proposals On Such Pre-scheduled Date, Time And Place To Determine The Bidder With The Lcb. 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, {[include If Framework Agreement Will Be Used:] Or In The Case Of Multi-year Framework Agreement, That It Is One Of The Eligible Bidders Who Have Submitted Bids That Are Found To Be Technically And Financially Compliant,}the Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. {[include If Framework Agreement Will Be Used:] For Every Mini-competition In Framework Agreement, The Lcb Shall Likewise Submit The Required Documents For Final Post Qualification.} 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. [include The Following Clauses If Framework Agreement Will Be Used:] 21.2. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Framework Agreement Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 21.3. Within Ten (10) Calendar Days From Receipt Of The Notice To Execute Framework Agreement With The Procuring Entity, The Successful Bidder Or Its Duly Authorized Representative Shall Formally Enter Into A Framework Agreement With The Procuring Entity For An Amount Of One Peso To Be Paid To The Procuring Entity As A Consideration For The Option Granted By The Procuring Entity To Procure The Items In The Framework Agreement List When The Need Arises. 21.4. The Procuring Entity Shall Enter Into A Framework Agreement With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 21.5. The Following Documents Shall Form Part Of The Framework Agreement: A. Framework Agreement Form; B. Bidding Documents; C. Call-offs; D. Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; E. Performance Security Or Performance Securing Declaration, As The Case May Be; F. Notice To Execute Framework Agreement; And G. Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Motor Vehicle. B. Completed Within The Last Four (4) Years Equivalent To At Least Fifty Percent (50%) Of The Abc, Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 The Price Of The Goods Shall Be Quoted Ddp Bureau Of Corrections Iwahig Prison And Penal Farm (ippf) Puerto Prinsesa City, Palawan Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Two Percent (2%) Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 19.3 One Project Having Several Items That Shall Be Awarded As One Contract. 20.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (sales Invoice Or Official Receipt Or End-users Acceptance) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Audited Financial Statement 7. 2 Sets Photo Copy Of Eligibility And Financial Envelope Marked As “copy 1” And “copy 2” 21.2 No Additional Contract Documents. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. [include The Following Clauses If Framework Agreement Will Be Used:] 2.3. For A Single-year Framework Agreement, Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under A Call-off Shall Not Vary From The Prices Quoted By The Supplier In Its Bid. 2.4. For Multi-year Framework Agreement, Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under A Call-off Shall Not Vary From The Prices Quoted By The Supplier During Conduct Of Mini-competition. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184.{[include If Framework Agreement Will Be Used:] In The Case Of Framework Agreement, The Bidder May Opt To Furnish The Performance Security Or A Performance Securing Declaration As Defined Under The Guidelines On The Use Of Framework Agreement.} 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project {[include If Framework Agreement Will Be Used:] Or Framework Agreement} Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 1 [list Here Any Additional Requirements For The Completion Of This Contract. The Following Requirements And The Corresponding Provisions May Be Deleted, Amended, Or Retained Depending On Its Applicability To This Contract:] Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: The Delivery Terms Applicable To This Contract Are Delivered To Bureau Of Corrections Iwahig Prison And Penal Farm (ippf) Puerto Prinsesa City, Palawan. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is The Acting Director, Directorate For Engineering Services. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B. In The Event Of Termination Of Production Of The Spare Parts: I. Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii. Following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Are Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of [indicate Here The Time Period Specified. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 Not Applicable 4 The Inspections And Tests That Will Be Conducted Are: Partial/complete Goods Shall Be Inspected By The Tiac Technical Inspection And Acceptance Committee. Representative From Supply Division To Be Witnessed By: Coa Representative The Goods Shall Be Accepted By The End User After Passing The Inspection Of The Tiac (technical Inspection And Acceptance Committee). 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. Section Vi. Schedule Of Requirements Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Section Vi. Schedule Of Requirements Supply And Delivery Of Various Bucor Vehicles 2025 The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Delivered, Weeks/months 1 Prison Van 6 30 Calendar Days 2 Staff Car 2 30 Calendar Days 3 Staff Car 4 30 Calendar Days I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vii. Technical Specifications Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 1 Prison Van Overall Dimensions L X W X H (mm): 4,600 X 1,695 X 1,955 Wheelbase: 2400 Seating Capacity: 3 Engine Type Type: 4ja1 Direct Injection Common Rail Displacement (cc):2499 Maximum Output (ps/rpm): 78 Hp @3900 Rpm Maximum Torque (nm/rpm): 176.5 Nm @ 1800 Rpm Fuel Type: Diesel Fuel Tank Capacity: 50 Liters Transmission: 5-speed Manual Brakes: Front: Ventilated Discs Rear: Drum. Leading & Trailing Tires: 195r 14c 8pr Wheels (size): 14 X 5.5jj (6 Studs) Color: Camouflage Safety And Security Blinker And Siren Comm. Sys. Basic Tools, Jack And Manual Others: Bucor Logo Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 2 Staff Car Overall Dimensions L X W X H (mm): 4,735 X 1,830 X 1,795 Seating Capacity:8 Engine Type Type: 4-cylinder, In-line, 16-valve Double Overhead Camshaft (variable Nozzleturbo Charger W/ Intercooler) Engine Displacement (cc): 2755 Maximum Output (ps/rpm) 174 / 3,400 Maximum Torque (nm/rpm): 360 / 1,200 - 3,400 Fuel Type: Diesel 1 Gd - Ftv 6 - Speed At Multi - Reflector Halogen Black+silver Front Grille Function Fabric (black)* With Keyless Entry Eco+power Apple Carplay + Android Auto Safety And Security Driver + Front Passenger + Knee (d) With + Brake Assist + Ebd With Vehicle Stability Control ( Vsc) With Hill-start Assist Control (hsa) With Reverse Camera Other Modification: Color- Black Blinker And Siren Com. Sys. Basic Tools, Jack And Manual Others: Bucor Logo- Magnetic Type Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance _________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 3 Staff Car Overall Dimensions L X W X H (mm): 4,395 X 1,730 X 1,690 Wheelbase(mm): 2750 Seating Capacity: 7 Engine Type Type: 4-cylinder, In-line, 16-valve Dohc With Duel Vvt-idisplacement (cc):1329 Maximum Output (ps/rpm) 98/6000 Maximum Torque (nm/rpm): 122/4200 Fuel Type: Gasoline Fuel Tank Capacity: 43l Chassis Drivetrain: Front Wheel Drive Cvt Transmission 1nr-ve Brakes: Front: Disc Rear: Drum Tires: 185/ 65 R15 Alloy 15" Alloy Wheels __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 3 Continuation: Exterior Segment Lcd Mid Headlamps: Split Type Led Rear Combination: Led Lamp 2-tone Interior Function Key Start Digital Aircon Control Back Camera & Sensor 8" Audio Display With Apple Carplay And Android Auto Safety And Security Driver And Front Passenger Airbags Alarm+immobilizer+indicator Back Camera Color: Black Metallic 1 Blinker And Siren Comm. Sys. Basic Tools, Jack And Manual Others: Bucor Logo- Magnetic Type Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Viii. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Eligibility Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (f) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Bidders Should Have Completed, Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (g) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (h) Conformity With The Schedule Of Requirements; And ⬜ (i) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And A. Certificate Of Dealership B. List Of Service Centers Nationwide C. Certificate Of Availability Of Spare Parts D. Brochure And ⬜ (j) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate/board Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (k) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc; Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation At Least Equal To Ten Percent (10%) Of The Abc. Class “b” Documents ⬜ (l) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements Ii. Financial Component Envelope ⬜ (m) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (n) Original Of Duly Signed And Accomplished Price Schedule(s). Bidding Forms Company Letterhead Statement Of Ongoing Government & Private Contracts Supply And Delivery Of Various Bucor Vehicles 2025 Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Value Of Outstanding Contract Total Value Of Outstanding Contract: Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Supply And Delivery Of Various Bucor Vehicles 2025 Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Delivery Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Certificate Of Net Financial Contracting Capacity (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2025 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Ten (10) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1 Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: A) If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; B) If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting ; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The Supply And Delivery Of Various Bucor Vehicles 2025. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Bid Form Date: Invitation To Bid No: [insert Reference Number] To: Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply And Delivery Of Various Bucor Vehicles 2025 In Conformity With The Said Bidding Documents For The Sum Of ________________________________________₱_________________ Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. We Agree To Abide By This Bid For The Bid Validity Period Specified In Bds Provision For Itb Clause 17.1 And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period. Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Of Agent Amount And Currency Purpose Of Commission Or Gratuity (if None, State “none”) Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And You’re Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements As Per Itb Clause 5 Of The Bidding Documents. We Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections. [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract On The Latter’s Behalf For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 2025. [signature Over Printed Name] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of __________________________ Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Schedule Of Prices Supply And Delivery Of Various Bucor Vehicles 2025 Quantity Units Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat 6 Units Prison Van ₱8,700,000.00 2 Units Staff Car ₱3,600,000.00 4 Units Staff Car ₱5,000,000.00 Total: ₱17,300,000.00 Total Bid Price Inclusive Of Vat In Words [signature Over Printed Name] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of _______________________________ Sixth Edition July 2020 Bids And Awards Committee 2024
5971-5980 of 6047 active Tenders