Waterproofing Tenders
Waterproofing Tenders
City Of Bayawan Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Invitation To Bid The City Of Bayawan, Through Its Bids And Awards Committee (bac), Invites Suppliers / Manufacturers / Distributors / Contractors To Bid For The Hereunder Projects: Lot No. I Tarpaulin Printing 1 4 Lot "labor And Materials ( Tarpaulin Printing ) 4 Sets - 2' X 4' (signage)" Lot No. Iii Sand & Gravel 4 7 Cu.m. Sand, Washed, Mixing/screened 5 8 Cu.m. Gravel, Mixing, Crushed, Screened & Washed, Max. Size 38mm Dia Lot No. V Construction Supplies/materials 16 72 Kg/s Tie Wire, # 16 17 3 Kg/s Nylon, #100 18 5 L.m. Mesh Wire, 3mm Eyehole X 0.90m Width (m) 19 15 Pc/s Blade, Hacksaw, 12mm X 300mm, 18tpi, (excellent Quality) 20 5 Kg/s Nails, Concrete, 75mm 21 6 Kilo/s Nails, Umbrella/roofing, 62mm 22 2 Box/es Nails, Common Wire, 100mm (25kgs/box) 23 1 Box/es Nails, Common Wire, 75mm (25kgs/bx) 24 1 Box/es Nails, Common Wire, 62mm (25kgs/box) 25 1 Box/es Nails, Common Wire, 38mm (25kgs/box) 26 3 Box/es Rod/electrode, Welding, E6013, 1/8" (bx)) (matchless Quality, Iso 9001, 2000 Certified, 20 Kg/box) 27 6 Pc/s Drill Bit, Masonry, 1/8" Dia 28 9 Pc/s Drill Bit, 1/8" Dia, For Steel 29 3 Pc/s Drill Bit, 3/16" Dia, For Steel 30 3 Pc/s Drill Bit, 1/4" Dia, For Steel 31 3 Pc/s Drill Bit, 3/8" Dia, For Steel 32 3 Pc/s Drill Bit, Masonry, 3/16" Dia 33 3 Pc/s Drill Bit, Masonry, 1/4" Dia 34 3 Pc/s Drill Bit, Masonry, 3/8" Dia 35 13 Pc/s Cutting Disc, Masonry/concrete, 100mm 36 10 Pc/s Cutting Disc, 100mm Dia, For Metal 38 5 Can/s Silicon Sealant, (300ml/can), For Polycarbonate 39 2 Can/s Sealant, Elastomeric/roof (1 Lit/can) 40 2 Can/s Solvent Cement, Pvc (500 Cc/can) 41 2 Roll/s Sack Cloth, 2.40m Width (100m/roll), Blue 42 10 Can/s Epoxy All Purpose (a And B), 1/4 Lit/can, Non Conductive, All Purpose Adhesive 43 50 Set/s Lag Screw, 6mm Dia. X 32mm With Expansion Shield 44 200 Set/s Bolt, Fine Threaded, 3.5mm X 25mm, With Nut And Washer 45 1 Sheet/s Steel Plate, G.i., Gauge # 16 X 1.2m X 2.4m 46 20 Pc/s Tiles, Granite, Polished, 0.60m X 0.60m, Color: Jet Black 47 65 Pc/s Tiles, Floor, Ceramic, 40cm X 40cm Non Skid 48 14 Pc/s Staircase Nosing, Brass Ochre (2m/length) 49 6 Pack/s Tile Grout (2kg/pk), Light Beige 50 1 Can/s Acrylic Spray Paint, Flat Black(400cc/can) 51 1 Lit/s Paint, Enamel, Quick Dry (lit), Red 52 10 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, Marking Yellow Or Equivalent 53 5 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, Black 54 12 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, White Or Equivalent 56 1 Gal/s Paint, Epoxy, Silver Finish With Aluminum With Catalyst 57 15 Gal/s Paint, Epoxy, Enamel, Black (gal) 58 4 Gal/s Enamel Paint, Silver Finish Aluminum (gal) 59 3 Can/s Thinner, Lacquer (3.75lit/can) 60 11 Gal/s Reducer/thinner, Epoxy Paint (gal) 61 8 Gal/s Adcoat Rust Converter And Primer 62 6 Gal/s Liquid Tile Paint, Primer White Acrylic Solvent-based Primer 63 6 Gal/s Liquid Tile, Topcoat Gloss White 64 4 Gal/s Liquid Tile, Top Coat Clear 65 5 Can/s Liquid Tile, Solvent Based-tinting Color Venetial Red, 1/4lit Per Can 66 5 Can/s Liquid Tile, Solvent Based-tinting Color Thalo Blue, 1/4lit Per Can 67 5 Can/s Liquid Tile, Solvent Based-tinting Color Thalo Green, 1/4lit Per Can 68 5 Can/s Liquid Tile, Solvent Based-tinting Color Hanza Yellow, 1/4lit Per Can 69 5 Can/s Liquid Tile, Solvent Based-tinting Color Lamp Black, 1/4lit Per Can 70 5 Gal/s Liquid Tile, Reducer Clear Liquid 71 10 Gal/s Plexibond, Cementitious Waterproofing System, Acrylic 72 10 Pc/s Sand Paper, #80, 225mm X 275mm 73 10 Pc/s Sand Paper, #100, 225mm X 275mm 74 10 Pc/s Sand Paper, #120, 225mm X 275mm 75 10 Pc/s Sand Paper, # 180, 225mm X 275mm 76 14 Pc/s Paint Roller W/ Handle, 100mm 77 150 Meter/s Service Drop Wire, # 4 Awg (m) 78 5 Pc/s Service Grip, # 2 79 4 Pc/s Service Grip, Dead End Performed Type, Size # 4awg 80 1 Length/s Pipe, Pvc, 40mm Dia X 3m, W/ Entrance Cap, Clip Type 81 70 Meter/s Thw Wire, # 4 (22mm2), Black (m) 82 70 Meter/s Thw Wire, # 4 (22mm2), White (m) 83 40 Meter/s Thw Wire, # 6 (14mm2), Stranded(m), Green 84 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), Black 85 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), White 86 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), Green 87 6 Roll/box Thw Wire, # 12 (3.5mm2), Stranded (150m/roll/bx), Black 90 1 Length/s Pipe, G.i. 65mm Ø X 6m, Wt=5.20mm , Outside Dia= 73.00, 8.694kg/m, Heavy Gauge 92 1 Pc/s Circuit Breaker, 100a, 2 Pole, Bolt-on, Single Phase W/ Casing, Outdoor Type 93 1 Pc/s Circuit Breaker, 30a, 2 Pole, Bolt-on 94 3 Pc/s Circuit Breaker, 20a, 2 Pole, Bolt-on, Single Phase W/ Casing, Outdoor Type 95 4 Roll/s Royal Cord, # 14 Awg, 2 Wire (75m/roll) 96 7 Length/s Pipe, Pvc, Electrical, 40mm Dia X 3m, Thickwall, Orange 97 200 Length/s Pipe, Pvc, Electrical, 25mm Dia X 3m, Thickwall, Orange 98 150 Length/s Pipe, Pvc, Electrical, 20mm Dia X 3m, Thickwall, Orange 99 3 Pack/s C-clamp/clip, Pvc, 20mm Dia, W/ Concrete Nails (100's/pk) 100 6 Pack/s C-clamp/clip, Pvc, 25mm Dia W/ Concrete Nails (100pcs/pk) 101 3 Pack/s Pipe Connector, Pvc, Electrical, 20mm Dia (100's/pk)) 102 3 Pack/s Pipe Connector, Pvc, Electrical, 25mm Dia (100pcs/pk) 103 10 Pc/s Connector, Split Bolt, # 6 (14mm2), Burndy 104 3 Set/s Magnetic Contactor, 40a 220-240vac Coil W/ Metal. Enclosure 105 2 Pc/s Photo Control (photo Switch), 220v, 6a, Operating Illumination: Turn-on At 31.5 Lux, Turn-off At 125 Lux 106 2 Unit/s Timer, Time Switch, 24hr Back Up 107 50 Roll/s Tape, Electrical, Vinyl, .177mm X 3/4"/19mm X 16m, Flame Retardant, 600v 108 5 Roll/s Tape, Electrical, Rubber, 18mm X 5m, Self Fusing Ethylene Propylene Rubber 109 5 Roll/s Tape, Electrical, Waterproof, 600v 111 29 Set/s Recessed Ground Lamps, Ip67 1w, Ac85-265v Dc 12v (1 Side), Natural White (4000k), 42mm X 70mm 113 8 Set/s Metal Hallide Flood Light Fixture 250w Set With Tubular Metal Hallide Bulb (firefly), Warm White, Model: Flh 121/s/250/fhimh 250dl/t 114 10 Set/s Solar Blinker Arrow Signage Warning Lights, Direction Signs, Size: Length:47"; Height:42", Arrow Sign, Size: Length: 47"; Height:16", Solar Panel Size: 10" X7", Led Color: Red, Ip Grade: Ip54 119 18 Set/s Lamp Post, Steel Tapered, Single Arm,t-6-30' Sb Bracket Type, W/ Base Plate, Anchor Bolt, Nut & Washer, Electroplated Silver Finish, Amco 120 6 Set/s Lamp Post, Steel Tapered, Double Arm, T-6-30' Db Double Arm, Bracket Type, W/ Base Plate, Anchor Bolt, Nut & Washer, Electroplated Silver Finish 122 32 Pc/s Led Fountain Lights, Rgb With Stainless Steel Toughed Glass Cover, Ac 220; Dc 12-24v Dmx 512 Built In Control With Decoder, 9x3w Led Rgb Color Changing 2700-6500k Ip68 Water Proof Grade Junction Box 124 5 Roll Cable Wire; 5c X 16 Twg/1.025mm Premium Multi-conductor Royal Cable Wire (75m/roll) 126 32 Set/s Fountain Nozzle, 1.0" Dn40 Female Thread Flower Column Style Fountain Nozzle Sprinkler Spray Head, Brass 127 1 Unit/s 37.5 Kva Ditribution Transformer, 7620/13200vy - 240/480 Volts Oisc, W/ 2-2½, Taps Above And N.v., Fuse Link, Fuse Cut-out And Accessories 128 2 Meter/s Fuse, Cut-out, 100a, 25kv, Ab Chance 129 1 Set/s Transformer Cluster Hanger, With Complete Accessories 130 1 Pc/s Clamp, Hot Line, #2 - #4/0 Acsr 131 3 Set/s Pull Box, Metal Enclosure, 900mm X 200mm X 150mm, With Cover 132 50 Pc/s Screw, Lag Screw, 10mm Dia X 50mm, W/ Plain Washer And Expansion Shield 133 200 Pc/s Bolt With Nut And Washer, (fine Thread) 3.5mm Dia X 25mm 134 200 Pc/s Bolt With Nut And Washer, (fine Thread) 4.5mm Dia X 25mm 135 5 Pack/s Ubolt Galvanized/ U Bolt With Nut And Washer Inches For Gi Pipe Screw Depot, 1/4 For 3", 1/4" Dia, 10 Pcs Per Pack 139 30 Gal/s Concrete Epoxy, With Low Viscosity For Construction 140 22 Length/s Pipe, Upvc, 20mm Outside Dia, Wt=1.8min, L=3.0m, Blue 141 12 Pc/s Tee, Upvc, 20mm Inside Dia, Blue 142 14 Pc/s Elbow, Upvc, 20mm Inside Dia X 90 Deg. Bend, Plain, Blue 143 4 Pc/s Tee Reducer, Upvc,32mm X 20mm Nominal Dia, Blue 144 3 Pc/s Tee, Upvc, 25mm Inside Dia, Plain, Blue 145 4 Pc/s Adaptor, Upvc, Male, 20mm Dia., Nominal Size, Blue 146 8 Pc/s Adaptor, Upvc, Female, 20mm Dia Nominal Size, Blue 147 4 Pc/s Ball Valve, Pvc, 20mm Outside Dia 148 10 Length/s Pipe, Upvc, 32mm Outside Dia, Wt=2.0min, L=3.0m, Blue 149 1 Pc/s Gate Valve, 25mm Dia, Brass/bronze 150 1 Pc/s Check Valve, 25mm Dia, Brass/bronze 151 2 Pc/s Adaptor, Upvc, Male, 25mm Dia., Nominal Size, Blue 152 8 Length/s Pipe, Upvc, 50mm Outside Dia, Wt=2.30min, L=3.0m, Blue 153 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 90 Deg. Bend, Plain, Blue 154 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 45 Deg. Bend, Plain, Blue 155 2 Pc/s Adaptor, Upvc, Female, 50mm Outside Dia., Blue 156 3 Pc/s Gate Valve, 40mm Dia, Brass/bronze 157 5 Pc/s Check Valve, Horizontal Swing 40mm Dia, Brass/bronze 158 6 Length/s Pipe, Upvc, 50mm Outside Dia, Wt=2.30min, L=3.0m, Blue 159 2 Pc/s Tee, Upvc, 32mm Inside Dia, Blue 160 2 Pc/s Adaptor, Upvc, Female, 50mm Outside Dia., Blue 161 4 Pc/s Elbow, Upvc, 50mm Outside Dia X 90 Deg. Bend, Plain, Blue 162 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 45 Deg. Bend, Plain, Blue 163 4 Length/s Pipe, Pvc, 57.15mm Outside Dia X T=2.54mm X L=3.0m, S-1000, Orange 164 2 Pc/s Elbow, Pvc, 57.15mm Inside Dia X 90 Deg. Bend, S-1000, Orange 165 2 Pc/s Elbow, Pvc, 57.15mm Inside Dia X 45deg Bend, S-1000, Orange 166 8 Length/s Pipe, Pvc, 82.55mm Outside Dia X T=3.75mm X L=3.0m, S-1000, Orange 167 2 Pc/s Pvc Tee, Inside Dia: 82.55mm, S-1000, Orange 168 2 Pc/s Floor Drain, 150mm X 150mm Dia, Stainless 169 8 Length/s Pipe, Pvc, 107.10mm Outside Dia X T=3.81mm X L=3.0m, S-1000, Orange 170 2 Pc/s Elbow, Pvc, 107.10mm Inside Dia X 90 Deg. Bend, S-1000, Orange 171 2 Pc/s Pvc Elbow, Inside Dia: 107.10mm X 45 Deg Bend, S-1000, Orange 172 1 Pc/s Gate Valve, 100mm Dia, Brass/bronze 173 1 Pc/s Gate Valve, 80mm Dia, Brass/bronze, Threaded Type 174 3322.536611 Sq.ft. Brass Metal Etching Engraved Marker 175 5 Pc/s Hat, Hard, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Brown 176 20 Pc/s Hat, Hard, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Yellow 177 20 Pc/s Vest, Reflectorized, Safety, Orange 178 20 Pair/s Raincoat, Jacket W/ Hood & Pants, Size: X-large With Reflectorized Strips 179 15 Pc/s Plastic Road Barriers 180 20 Pc/s Spectacles, Safety Goggles, Clear 181 8 Pair/s Gloves, Welding Leathear Long, 16', Ce Certified En 12477 182 5 Roll/s Caution Tape, Yellow, 3" X 50' 183 5 Roll/s Danger Tape, Red, 3" X 50' 184 15 Pc/s Traffic Cones 28" Tall, 14" X 14" Base With Reflective Collars Lot No. Vi Road Stud Installation 137 1 Set/s Solar Road Stud Installation Machine, Equipped With Running Wheel, Accurate Hole Position With Good Hole Forming Quality, 5.0hp, 220v With 3900w 50/60hz, 570rmp; Height: 800mm; Weight: 200kgs; Pure Copper Self-priming Pump, Manual Electric Starter, Free Adjustment Depth And Bearing Seat Assembly Complete With Coring Bit And Other Accessories ** ** ** Nothing Follows ** ** ** Bid Documents Shall Be Available At The Bac Office, New City Hall, Lgu Bayawan City Upon Payment Of Prescribed Non-refundable Fee In The Amount Of Php 5,000.00 Bidders Shall Drop Their Technical And Financial Proposals In The Bid Box At The Bac Office, Bayawan City On Or Before The Deadline Of Submission Of Bids As Shown Below. All Particulars Relative To Eligibility Process, Opening And Evaluation Of Bids, Postqualification And Award Of Contract Shall Be Governed By The Applicable Provisions Of Ra. 9184. The City Of Bayawan Reserves The Right To Reject Any Or All Bids, To Waive Any Defects Or Formality Therein And To Accept Bids Considered Responsive And Most Advantageous To The Government. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule Issuance Of Bid Documents December 17, 2024 To January 6, 2025 @ 5:00 Pm Pre-bid Conference December 26, 2024 @ 9:00 Am Deadline/opeing Of Bids January 7, 2025 @ 9:00 Am Post Qualification January 14, 2025 @ 9:00 Am Awarding Of Bids January 21, 2025 @ 9:00 Am Approved: (sgd)virginia D. Sadiasa City Civil Registrar Bac Chairman Received By: Name:___________________________ Date:___________________________ Geps Publication : Geps December 17, 2024 Newspaper : None
Closing Soon7 Jan 2025
Tender AmountPHP 2.1 Million (USD 37.8 K)
Municipality Of Bobon, Northern Samar Tender
Others
Philippines
Details: Description Republic Of The Philippines Municipality Of Bobon Province Of Northern Samar -oo0oo- Bids And Awards Committee Invitation To Apply For Eligibility And To Bid The Municipal Government Of Bobon, Northern Samar Through Its Bids And Awards Committee (bac) Invites Contractors/suppliers To Apply For Eligibility And To Bid For Purchased Of Office Equipment To Be Used In The Various Offices In Lgu-bobon, Bobon, Northern Samar; Item No. Quantity Unit Item/description 1 1 Set Desktop Co Mputer Pentium 2 2 Units Brother T720dw Printer 3 1 Unit Ups 1500va 4 1 Unit Avr 1000va 5 1 Unit 5kva Avr 6 1 Unit Dahua Interactive Whiteboard 65’’ 7 2 Unit Swivel Chair Js-131 8 5 Unit Steel Cabinet 4 Layers 9 2 Unit Desktop Computer Core I5 10 4 Unit External Hard Drive 1tb 11 10 Pcs Flash Drive 65gb 12 2 Unit Steel Cabinet 4 Drawer 13 6 Pcs Stand Fan 14 2 Unit Window Type 2hp Inverter 15 2 Unit Wavlink Wifi 6 Ax1800m Dual Band 16 1 Unit Haier Window Type 2hp 17 1 Unit Olympia Typewriter 18 1 Roll Isecure Stp Cable Cat6 19 1 Pc Crimpimg Tool 20 5 Pcs 1 To 2 Way Lan Rj45 Port 21 20 20 Pcs Rj45 Connector 22 1 Unit Acer Phn16-71-78y5 Laptop Predator 23 6 Unit Mgk Ups 650va 24 6 Pcs Gold Power Avr 500w 25 1 Set Kevler Speaker 15’’ 1000w Speaker Stand Kevler Amplifier Kevler Wireless Mic 30 Meter Speaker Wire 26 2 Sets Desktop Computer Core I3 W/ Printer 27 1 Unit Haier Aircon Window Type 1.5hp 28 2 Sets Desktop Computer Core I5 29 1 Unit Acer Laptop Core I3 30 2 Unit Epson L3210 Printer 31 1 Set Cpu Only Core I3 32 1 Unit Apacer 1tb Ssd 33 1 Unit Bps 150 Digital Duplicator Machine 34 6 Rolls Master Roll For Bps 35 10 Carts Bps 150 Ink 36 1 Set Desktop Computer Core I3 W/ Printer 37 4 Unit Computer Set (ryzen 5 5600g 16 Gb Ram, 512gb Ssd) 38 4 Unit Laptop (acer Aspire 3 Silver 15.6n Ryzen 5 7520) 39 2 Unit Brother Dcp-t720dw 40 1 Pc Small Vacuum Cleaner Portable 41 10 Pcs Blue Print Solution: Digital Bps-150 Duplicator Ink (bps-413s C-4 Ink) 42 6 Pcs Ups (awp Aid 1000 Pro) 43 1 Box Utp Cable (cat 6 Ethernet Cable Outdoor Waterproof 1000 Mbps 300 Meters) 44 1 Pc Switch Hub (tp-link Ti-sg 1016d 16-port) 45 50 Pcs Rj45 Cat7 Passthrough 46 1 Pcs External Hard Drive 1tb Ssd 47 3 Pcs Flash Drive 64gb 48 1 Mtrs Hdmi Cable 5 Meters 49 3 License Microsoft 365 Family License 50 2 Unit Brother T720dw Printer 51 1 Unit Epson L5290 Printer Approved Budget For The Contract (abc)------->php 2,264,700.00 Eligibility Forms And To Bid Documents May Be Secured At The Office Of The Bac Chairman During Office Hours From 8:00 Am To 5:00 Pm Upon Payment Of Five Thousand Pesos (php 5,000.00) Only To The Office Of The Municipal Treasurer. All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bid Conference, Evaluation Of Bids, Post Qualification, And Award Of Contract Shall Be Governed By The Pertinent Provisions Of R.a. 9184 As Well As The Preliminary Examination Of Bids Shall Use Non-discretionary “pass”/“fail” Criteria. Post Qualification Of The Lowest Calculated Bid Shall Be Conducted. Schedule Of Activities: Issuance Of Bidding Documents-------------> December 27, 2024 – January 16, 2025, 8:00 Am-5:00 Pm (office Hour) Pre-bid Conference ---------------------------> January 06, 2025; 9:00 Am-bac Office, Bobon, Northern Samar Submission And Opening Of Bids------------> January 16, 2025; 9:00 Am-bac Office, Bobon, Northern Samar Bid Evaluation---------------------------------> January 17, 2025; 9:00 Am-bac Office, Bobon, Northern Samar Post Qualification-----------------------------> January 20, 2025 Approval Of Resolution/issuance Of Noa > January 21, 2025 Contract Preparation And Signing-----------> January 22, 2025 Issuance Of Notice To Proceed---------------> January 23, 2025 The Municipality Of Bobon Through The Office Of The Bac Reserves The Right To Reject Any Or All Other Bids, Waive Any Minor Defect Therein And Accept The Offer Most Advantageous To The Local Government Of Bobon, Northern Samar. Also, The Municipality Of Bobon Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of The Bid. Engr. Luncio N. Ramos Bac Chairman-bids And Awards Committee Date: December 27, 2024
Closing Date16 Jan 2025
Tender AmountPHP 2.2 Million (USD 39 K)
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid (cw-12-2024-033) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 5, Batangas Contract Id No. : 24dd0275 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 1,645.50 L.m. 6-lane Road With Complete Features(solar Streetlights, Sidewalk, Bicycle Lane, Curb & Gutter, Slope Protection And Median Barrier Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 270 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 6, Batangas Contract Id No. : 24dd0276 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 281.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 7, Batangas Contract Id No. : 24dd0277 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Bridge Foundation (23 Sets Of Pile Cap With 4-1.0m Dia. X 25.00 L.m. Height Bored Pile Each & 2-1.0m Dia. X 25.00 L.m. Height Bored Pile) Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 8, Batangas Contract Id No. : 25dd0084 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 308.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 9, Batangas Contract Id No. : 25dd0085 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 405.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 11, Batangas Contract Id No. : 25dd0086 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 434.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk And Bicycle Lane Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 12, Batangas Contract Id No. : 25dd0087 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 446.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Major/strategic Public Buildings/facilities, Construction Of Multi-purpose Building, Department Of Health Regional Office - Region 4a (phase 3), Lipa City, Batangas Contract Id No. : 25dd0088 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (108.10m X 44.10m) Including Concreting Of Structural Frame From Lower Ground Floor To Roof Level (grid 1-12) And Lower Ground Floor To Upper Ground Floor (grid 12-19), Concreting Of Lower Ground Floor Slab And Main Entrance, Plumbing Rough-ins, Waterproofing Works, Embankment Works (main Entrance) And Installation Of Roof Rafters Approved Budget For The Contract : Php 144,750,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package D, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0089 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (bored Pile To Coping Beam) Approved Budget For The Contract : Php 136,065,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package E, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0090 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (steel Girders, Cross Bracing And Steel Decking) Approved Budget For The Contract : Php 135,187,815.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 257 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage Structure, Barangay Dagatan, Lipa City, Batangas Contract Id No. : 25dd0091 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 570.00 L.m. 910mm Dia. Rcpc Drainage Including Manhole With Average Height Of 1.70m To 7.80m Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 154 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 27, 2024 To January 20, 2025, 8:00 A.m.-5:00 P.m.; January 21, 2025, 8:00 A.m.-9:15 A.m From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On January 09, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before January 21, 2025 At 09:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On January 21, 2025 At 09:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Ten (10) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph December 26, 2024 Approved By: Leo S. Matias Bac, Chairperson Noted By: Juan J. Panganiban Officer-in-charge Office Of The District Engineer Date Of Publication: December 27, 2024 To January 02, 2025 Publication: Dpwh Website/ Philgeps
Closing Date21 Jan 2025
Tender AmountPHP 193 Million (USD 3.3 Million)
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid (cw-12-2024-033) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 5, Batangas Contract Id No. : 24dd0275 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 1,645.50 L.m. 6-lane Road With Complete Features(solar Streetlights, Sidewalk, Bicycle Lane, Curb & Gutter, Slope Protection And Median Barrier Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 270 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 6, Batangas Contract Id No. : 24dd0276 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 281.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 7, Batangas Contract Id No. : 24dd0277 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Bridge Foundation (23 Sets Of Pile Cap With 4-1.0m Dia. X 25.00 L.m. Height Bored Pile Each & 2-1.0m Dia. X 25.00 L.m. Height Bored Pile) Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 8, Batangas Contract Id No. : 25dd0084 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 308.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 9, Batangas Contract Id No. : 25dd0085 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 405.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 11, Batangas Contract Id No. : 25dd0086 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 434.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk And Bicycle Lane Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 12, Batangas Contract Id No. : 25dd0087 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 446.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Major/strategic Public Buildings/facilities, Construction Of Multi-purpose Building, Department Of Health Regional Office - Region 4a (phase 3), Lipa City, Batangas Contract Id No. : 25dd0088 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (108.10m X 44.10m) Including Concreting Of Structural Frame From Lower Ground Floor To Roof Level (grid 1-12) And Lower Ground Floor To Upper Ground Floor (grid 12-19), Concreting Of Lower Ground Floor Slab And Main Entrance, Plumbing Rough-ins, Waterproofing Works, Embankment Works (main Entrance) And Installation Of Roof Rafters Approved Budget For The Contract : Php 144,750,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package D, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0089 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (bored Pile To Coping Beam) Approved Budget For The Contract : Php 136,065,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package E, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0090 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (steel Girders, Cross Bracing And Steel Decking) Approved Budget For The Contract : Php 135,187,815.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 257 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage Structure, Barangay Dagatan, Lipa City, Batangas Contract Id No. : 25dd0091 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 570.00 L.m. 910mm Dia. Rcpc Drainage Including Manhole With Average Height Of 1.70m To 7.80m Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 154 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 27, 2024 To January 20, 2025, 8:00 A.m.-5:00 P.m.; January 21, 2025, 8:00 A.m.-9:15 A.m From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On January 09, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before January 21, 2025 At 09:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On January 21, 2025 At 09:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Ten (10) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph December 26, 2024 Approved By: Leo S. Matias Bac, Chairperson Noted By: Juan J. Panganiban Officer-in-charge Office Of The District Engineer Date Of Publication: December 27, 2024 To January 02, 2025 Publication: Dpwh Website/ Philgeps
Closing Date21 Jan 2025
Tender AmountPHP 193 Million (USD 3.3 Million)
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid (cw-12-2024-033) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 5, Batangas Contract Id No. : 24dd0275 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 1,645.50 L.m. 6-lane Road With Complete Features(solar Streetlights, Sidewalk, Bicycle Lane, Curb & Gutter, Slope Protection And Median Barrier Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 270 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 6, Batangas Contract Id No. : 24dd0276 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 281.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 7, Batangas Contract Id No. : 24dd0277 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Bridge Foundation (23 Sets Of Pile Cap With 4-1.0m Dia. X 25.00 L.m. Height Bored Pile Each & 2-1.0m Dia. X 25.00 L.m. Height Bored Pile) Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 8, Batangas Contract Id No. : 25dd0084 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 308.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 9, Batangas Contract Id No. : 25dd0085 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 405.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 11, Batangas Contract Id No. : 25dd0086 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 434.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk And Bicycle Lane Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 12, Batangas Contract Id No. : 25dd0087 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 446.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Major/strategic Public Buildings/facilities, Construction Of Multi-purpose Building, Department Of Health Regional Office - Region 4a (phase 3), Lipa City, Batangas Contract Id No. : 25dd0088 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (108.10m X 44.10m) Including Concreting Of Structural Frame From Lower Ground Floor To Roof Level (grid 1-12) And Lower Ground Floor To Upper Ground Floor (grid 12-19), Concreting Of Lower Ground Floor Slab And Main Entrance, Plumbing Rough-ins, Waterproofing Works, Embankment Works (main Entrance) And Installation Of Roof Rafters Approved Budget For The Contract : Php 144,750,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package D, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0089 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (bored Pile To Coping Beam) Approved Budget For The Contract : Php 136,065,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package E, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0090 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (steel Girders, Cross Bracing And Steel Decking) Approved Budget For The Contract : Php 135,187,815.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 257 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage Structure, Barangay Dagatan, Lipa City, Batangas Contract Id No. : 25dd0091 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 570.00 L.m. 910mm Dia. Rcpc Drainage Including Manhole With Average Height Of 1.70m To 7.80m Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 154 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 27, 2024 To January 20, 2025, 8:00 A.m.-5:00 P.m.; January 21, 2025, 8:00 A.m.-9:15 A.m From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On January 09, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before January 21, 2025 At 09:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On January 21, 2025 At 09:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Ten (10) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph December 26, 2024 Approved By: Leo S. Matias Bac, Chairperson Noted By: Juan J. Panganiban Officer-in-charge Office Of The District Engineer Date Of Publication: December 27, 2024 To January 02, 2025 Publication: Dpwh Website/ Philgeps
Closing Date21 Jan 2025
Tender AmountPHP 193 Million (USD 3.3 Million)
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid (cw-12-2024-033) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 5, Batangas Contract Id No. : 24dd0275 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 1,645.50 L.m. 6-lane Road With Complete Features(solar Streetlights, Sidewalk, Bicycle Lane, Curb & Gutter, Slope Protection And Median Barrier Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 270 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 6, Batangas Contract Id No. : 24dd0276 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 281.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 7, Batangas Contract Id No. : 24dd0277 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Bridge Foundation (23 Sets Of Pile Cap With 4-1.0m Dia. X 25.00 L.m. Height Bored Pile Each & 2-1.0m Dia. X 25.00 L.m. Height Bored Pile) Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 8, Batangas Contract Id No. : 25dd0084 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 308.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 9, Batangas Contract Id No. : 25dd0085 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 405.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 11, Batangas Contract Id No. : 25dd0086 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 434.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk And Bicycle Lane Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 12, Batangas Contract Id No. : 25dd0087 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 446.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Major/strategic Public Buildings/facilities, Construction Of Multi-purpose Building, Department Of Health Regional Office - Region 4a (phase 3), Lipa City, Batangas Contract Id No. : 25dd0088 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (108.10m X 44.10m) Including Concreting Of Structural Frame From Lower Ground Floor To Roof Level (grid 1-12) And Lower Ground Floor To Upper Ground Floor (grid 12-19), Concreting Of Lower Ground Floor Slab And Main Entrance, Plumbing Rough-ins, Waterproofing Works, Embankment Works (main Entrance) And Installation Of Roof Rafters Approved Budget For The Contract : Php 144,750,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package D, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0089 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (bored Pile To Coping Beam) Approved Budget For The Contract : Php 136,065,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package E, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0090 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (steel Girders, Cross Bracing And Steel Decking) Approved Budget For The Contract : Php 135,187,815.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 257 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage Structure, Barangay Dagatan, Lipa City, Batangas Contract Id No. : 25dd0091 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 570.00 L.m. 910mm Dia. Rcpc Drainage Including Manhole With Average Height Of 1.70m To 7.80m Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 154 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 27, 2024 To January 20, 2025, 8:00 A.m.-5:00 P.m.; January 21, 2025, 8:00 A.m.-9:15 A.m From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On January 09, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before January 21, 2025 At 09:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On January 21, 2025 At 09:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Ten (10) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph December 26, 2024 Approved By: Leo S. Matias Bac, Chairperson Noted By: Juan J. Panganiban Officer-in-charge Office Of The District Engineer Date Of Publication: December 27, 2024 To January 02, 2025 Publication: Dpwh Website/ Philgeps
Closing Date21 Jan 2025
Tender AmountPHP 136 Million (USD 2.3 Million)
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid (cw-12-2024-033) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 5, Batangas Contract Id No. : 24dd0275 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 1,645.50 L.m. 6-lane Road With Complete Features(solar Streetlights, Sidewalk, Bicycle Lane, Curb & Gutter, Slope Protection And Median Barrier Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 270 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 6, Batangas Contract Id No. : 24dd0276 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 281.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 7, Batangas Contract Id No. : 24dd0277 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Bridge Foundation (23 Sets Of Pile Cap With 4-1.0m Dia. X 25.00 L.m. Height Bored Pile Each & 2-1.0m Dia. X 25.00 L.m. Height Bored Pile) Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 8, Batangas Contract Id No. : 25dd0084 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 308.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 9, Batangas Contract Id No. : 25dd0085 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 405.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 11, Batangas Contract Id No. : 25dd0086 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 434.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk And Bicycle Lane Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 12, Batangas Contract Id No. : 25dd0087 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 446.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Major/strategic Public Buildings/facilities, Construction Of Multi-purpose Building, Department Of Health Regional Office - Region 4a (phase 3), Lipa City, Batangas Contract Id No. : 25dd0088 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (108.10m X 44.10m) Including Concreting Of Structural Frame From Lower Ground Floor To Roof Level (grid 1-12) And Lower Ground Floor To Upper Ground Floor (grid 12-19), Concreting Of Lower Ground Floor Slab And Main Entrance, Plumbing Rough-ins, Waterproofing Works, Embankment Works (main Entrance) And Installation Of Roof Rafters Approved Budget For The Contract : Php 144,750,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package D, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0089 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (bored Pile To Coping Beam) Approved Budget For The Contract : Php 136,065,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package E, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0090 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (steel Girders, Cross Bracing And Steel Decking) Approved Budget For The Contract : Php 135,187,815.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 257 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage Structure, Barangay Dagatan, Lipa City, Batangas Contract Id No. : 25dd0091 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 570.00 L.m. 910mm Dia. Rcpc Drainage Including Manhole With Average Height Of 1.70m To 7.80m Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 154 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 27, 2024 To January 20, 2025, 8:00 A.m.-5:00 P.m.; January 21, 2025, 8:00 A.m.-9:15 A.m From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On January 09, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before January 21, 2025 At 09:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On January 21, 2025 At 09:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Ten (10) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph December 26, 2024 Approved By: Leo S. Matias Bac, Chairperson Noted By: Juan J. Panganiban Officer-in-charge Office Of The District Engineer Date Of Publication: December 27, 2024 To January 02, 2025 Publication: Dpwh Website/ Philgeps
Closing Date21 Jan 2025
Tender AmountPHP 14.8 Million (USD 255.8 K)
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid (cw-12-2024-033) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 5, Batangas Contract Id No. : 24dd0275 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 1,645.50 L.m. 6-lane Road With Complete Features(solar Streetlights, Sidewalk, Bicycle Lane, Curb & Gutter, Slope Protection And Median Barrier Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 270 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 6, Batangas Contract Id No. : 24dd0276 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 281.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 7, Batangas Contract Id No. : 24dd0277 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Bridge Foundation (23 Sets Of Pile Cap With 4-1.0m Dia. X 25.00 L.m. Height Bored Pile Each & 2-1.0m Dia. X 25.00 L.m. Height Bored Pile) Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 8, Batangas Contract Id No. : 25dd0084 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 308.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 9, Batangas Contract Id No. : 25dd0085 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 405.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 11, Batangas Contract Id No. : 25dd0086 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 434.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk And Bicycle Lane Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 12, Batangas Contract Id No. : 25dd0087 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 446.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Major/strategic Public Buildings/facilities, Construction Of Multi-purpose Building, Department Of Health Regional Office - Region 4a (phase 3), Lipa City, Batangas Contract Id No. : 25dd0088 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (108.10m X 44.10m) Including Concreting Of Structural Frame From Lower Ground Floor To Roof Level (grid 1-12) And Lower Ground Floor To Upper Ground Floor (grid 12-19), Concreting Of Lower Ground Floor Slab And Main Entrance, Plumbing Rough-ins, Waterproofing Works, Embankment Works (main Entrance) And Installation Of Roof Rafters Approved Budget For The Contract : Php 144,750,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package D, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0089 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (bored Pile To Coping Beam) Approved Budget For The Contract : Php 136,065,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package E, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0090 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (steel Girders, Cross Bracing And Steel Decking) Approved Budget For The Contract : Php 135,187,815.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 257 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage Structure, Barangay Dagatan, Lipa City, Batangas Contract Id No. : 25dd0091 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 570.00 L.m. 910mm Dia. Rcpc Drainage Including Manhole With Average Height Of 1.70m To 7.80m Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 154 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 27, 2024 To January 20, 2025, 8:00 A.m.-5:00 P.m.; January 21, 2025, 8:00 A.m.-9:15 A.m From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On January 09, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before January 21, 2025 At 09:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On January 21, 2025 At 09:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Ten (10) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph December 26, 2024 Approved By: Leo S. Matias Bac, Chairperson Noted By: Juan J. Panganiban Officer-in-charge Office Of The District Engineer Date Of Publication: December 27, 2024 To January 02, 2025 Publication: Dpwh Website/ Philgeps
Closing Date21 Jan 2025
Tender AmountPHP 144.7 Million (USD 2.4 Million)
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid (cw-12-2024-033) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 5, Batangas Contract Id No. : 24dd0275 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 1,645.50 L.m. 6-lane Road With Complete Features(solar Streetlights, Sidewalk, Bicycle Lane, Curb & Gutter, Slope Protection And Median Barrier Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 270 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 6, Batangas Contract Id No. : 24dd0276 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 281.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 7, Batangas Contract Id No. : 24dd0277 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Bridge Foundation (23 Sets Of Pile Cap With 4-1.0m Dia. X 25.00 L.m. Height Bored Pile Each & 2-1.0m Dia. X 25.00 L.m. Height Bored Pile) Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 8, Batangas Contract Id No. : 25dd0084 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 308.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 9, Batangas Contract Id No. : 25dd0085 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 405.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 11, Batangas Contract Id No. : 25dd0086 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 434.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk And Bicycle Lane Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 12, Batangas Contract Id No. : 25dd0087 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 446.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Major/strategic Public Buildings/facilities, Construction Of Multi-purpose Building, Department Of Health Regional Office - Region 4a (phase 3), Lipa City, Batangas Contract Id No. : 25dd0088 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (108.10m X 44.10m) Including Concreting Of Structural Frame From Lower Ground Floor To Roof Level (grid 1-12) And Lower Ground Floor To Upper Ground Floor (grid 12-19), Concreting Of Lower Ground Floor Slab And Main Entrance, Plumbing Rough-ins, Waterproofing Works, Embankment Works (main Entrance) And Installation Of Roof Rafters Approved Budget For The Contract : Php 144,750,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package D, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0089 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (bored Pile To Coping Beam) Approved Budget For The Contract : Php 136,065,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package E, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0090 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (steel Girders, Cross Bracing And Steel Decking) Approved Budget For The Contract : Php 135,187,815.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 257 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage Structure, Barangay Dagatan, Lipa City, Batangas Contract Id No. : 25dd0091 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 570.00 L.m. 910mm Dia. Rcpc Drainage Including Manhole With Average Height Of 1.70m To 7.80m Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 154 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 27, 2024 To January 20, 2025, 8:00 A.m.-5:00 P.m.; January 21, 2025, 8:00 A.m.-9:15 A.m From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On January 09, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before January 21, 2025 At 09:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On January 21, 2025 At 09:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Ten (10) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph December 26, 2024 Approved By: Leo S. Matias Bac, Chairperson Noted By: Juan J. Panganiban Officer-in-charge Office Of The District Engineer Date Of Publication: December 27, 2024 To January 02, 2025 Publication: Dpwh Website/ Philgeps
Closing Date21 Jan 2025
Tender AmountPHP 135.1 Million (USD 2.3 Million)
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid (cw-12-2024-033) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 5, Batangas Contract Id No. : 24dd0275 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 1,645.50 L.m. 6-lane Road With Complete Features(solar Streetlights, Sidewalk, Bicycle Lane, Curb & Gutter, Slope Protection And Median Barrier Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 270 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 6, Batangas Contract Id No. : 24dd0276 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 281.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Organizational Outcome 1 : Ensure Safe And Reliable National Road System, Network Development Program, Construction Of By-pass And Diversion Roads, Construction Of Lipa City-mataas Na Kahoy Diversion Rd. Leading To Taal Circumferential Road Phase 7, Batangas Contract Id No. : 24dd0277 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Bridge Foundation (23 Sets Of Pile Cap With 4-1.0m Dia. X 25.00 L.m. Height Bored Pile Each & 2-1.0m Dia. X 25.00 L.m. Height Bored Pile) Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2024 General Appropriations Act (gaa) Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 8, Batangas Contract Id No. : 25dd0084 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 308.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 9, Batangas Contract Id No. : 25dd0085 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 405.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 11, Batangas Contract Id No. : 25dd0086 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 434.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk And Bicycle Lane Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Building/facilities, Construction Of Lipa City - Mataasnakahoy Diversion Rd Leading To Taal Circumferential Road, Phase 12, Batangas Contract Id No. : 25dd0087 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 446.00 L.m. 6-lane Road With Width Of 30.00m And Thickness Of 0.30m Including Slope Protection Using Cribwall And Mechanically Stabilized Earth Wall Structure Vegetated Facia, Drainage, Sidewalk, Bicycle Lane And Solar Streetlights Approved Budget For The Contract : Php 193,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium B License Category : A Amount Of Bidding Documents : Php 50,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Major/strategic Public Buildings/facilities, Construction Of Multi-purpose Building, Department Of Health Regional Office - Region 4a (phase 3), Lipa City, Batangas Contract Id No. : 25dd0088 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (108.10m X 44.10m) Including Concreting Of Structural Frame From Lower Ground Floor To Roof Level (grid 1-12) And Lower Ground Floor To Upper Ground Floor (grid 12-19), Concreting Of Lower Ground Floor Slab And Main Entrance, Plumbing Rough-ins, Waterproofing Works, Embankment Works (main Entrance) And Installation Of Roof Rafters Approved Budget For The Contract : Php 144,750,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package D, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0089 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (bored Pile To Coping Beam) Approved Budget For The Contract : Php 136,065,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Interjurisdictional Roads And/or Bridges (roads That Traverse Multiple Lgu Jurisdictions), Construction Of Manila-batangas - Bugtong Na Pulo - Star Tollway Interchange, Package E, Bugtong Na Pulo, Lipa City, Batangas Contract Id No. : 25dd0090 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 70.00 L.m. 6-lane Steel Bridge (steel Girders, Cross Bracing And Steel Decking) Approved Budget For The Contract : Php 135,187,815.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 257 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage Structure, Barangay Dagatan, Lipa City, Batangas Contract Id No. : 25dd0091 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 570.00 L.m. 910mm Dia. Rcpc Drainage Including Manhole With Average Height Of 1.70m To 7.80m Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 154 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 27, 2024 To January 20, 2025, 8:00 A.m.-5:00 P.m.; January 21, 2025, 8:00 A.m.-9:15 A.m From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On January 09, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before January 21, 2025 At 09:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On January 21, 2025 At 09:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Ten (10) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph December 26, 2024 Approved By: Leo S. Matias Bac, Chairperson Noted By: Juan J. Panganiban Officer-in-charge Office Of The District Engineer Date Of Publication: December 27, 2024 To January 02, 2025 Publication: Dpwh Website/ Philgeps
Closing Date21 Jan 2025
Tender AmountPHP 193 Million (USD 3.3 Million)
411-420 of 436 active Tenders