Waterproofing Tenders

Waterproofing Tenders

Bureau Of Corrections Muntinlupa City Metro Manila Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (procurement/contract No. 009) Sixth Edition July 2020 Bids And Awards Committee 202 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 59 Section Viii. Bill Of Quantities 60 Section Ix. Checklist Of Technical And Financial Documents 61 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) 1. The Bureau Of Corrections, Through The National Expenditure Program (nep) Of 2025 Capital Outlay, Intends To Apply The Sum Of Three Hundred Million Pesos Only (₱300,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) With Identification Number _epa-009__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections Super Maximum Security Facility, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _december 28, 2024 (08:00am To 05:00pm) To January 20, 2025 (01:29 Pm)_____ From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On _january 06, 2025 (01:30pm)__ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before __january 20, 2025 (01:30pm)_____. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)____ At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf), With Project Identification Number__________________. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Million Pesos Only (₱300,000,000.00). 2.2. The Source Of Funding Is: Nga, The National Expenditure Program 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is One Tenth Of One Percent Of The Total Contract Price. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Terms Of Reference Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Sablayan Prison And Penal Farm, Occidental Mindoro 1. Project Information 1.1 Project Description The Mission Of The Bucor Is To Protect Society By Confining Offenders In The Controlled Environments Of Prisons And Community-based Facilities That Are Safe, Humane, Cost-efficient, And Appropriately Secure, And That Provide Self-improvement Opportunities To Assist Offenders In Becoming Law-abiding Citizens. The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Shall Be Conducive To The Reformation And Rehabilitation Of Inmates That Will Bring Them Back Into The Mainstream Of Society As Useful Citizens Of The Country. The Contract Will Involve The Design And Build Scheme Leading To The Construction Of The Bureau Of Corrections Super Maximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm, Sablayan, Occidental Mindoro. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Bucor Planning And Design Division Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bureau Of Corrections Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Bucor Super Maximum Prison Facility (phase 2) Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. This Project Aims To Be Completed Within A Year, Aligning With Our Decongestion Program. This Expedited Timeline Underscores Our Commitment To Addressing Urgent Needs Within The Correctional System And Providing Timely Solutions For The High Risk Committed Pdl. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Division (pdd) Under. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Construction Of Super Maximum-security Facility Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdd. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Director Of Directorate For Engineering Services (des). B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdd Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: I. One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Oncomposed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. Ii. 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); Iii. Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); Iv. Road Networks And Culverts • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts." 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdd For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdd. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A. Render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical. All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdd Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate, When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdd Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The Engineering Services (es) Of The Sppf On Behalf Of The Bucor Pdd • Sppf-es To Impose To Contractor Testing Of All Items After Installation And/or Application. Es To Send Pdd Copy Of The Test Report/s. • Sppf-es To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Sppf- Es To Inform Pdd Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdd) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdd Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Sppf Es Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Ippf Es Will Be Reviewed And Approved By Pdd - Nhq Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdd. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdd And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply And Distribution System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Sewage Treatment Plant • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Electrical System Layout 4. Mechanical System Layout 5. Instrumentation And Control System Diagrams 6. Piping And Instrumentation Diagrams (p&ids) 7. Equipment Details And Specifications 8. Electrical Power Distribution 9. Emergency Power Systems 10. Grounding And Lightning Protection 11. Control And Monitoring Systems, If Applicable 12. Safety Systems 13. Miscellaneous Details B. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Backup Power Generator With Capacity Not Less Than Total Computed Kva Load Without Demand Factor. D. 3-phase Electrical Supply Shall Be Sourced From The Local Electrical Utility. E. Power Line Connection From Main Source To The Facility Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements  Technical Specifications  Boring Test  Structural Design And Analysis And Computation  Final Design And Construction Plans  Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdd Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bureau Of Corrections. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following:  An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or  Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184 V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 5. Minimum Heavy Equipment Requirement (as Needed) For Site Development Such As: No. Item Specification 1. Backhoe 0.8 Cu. M. 2. Backhoe Wheel Mounted With Breaker 0.90 Cu. M. 3. Cargo/service Truck 2-5 Mt., 160 Hp 4. Dump Truck 12 Cu. Yd. 5. Motorized Road Grader G710a, 140hp 6. Payloader 1.5 Cu. M. 7. Vibrator Roller 10 Mt 8. Bulldozer 170 Hp 9. Scraper 515 Hp 10. Truck Mounted Crane, Hydraulic Telescopic Bommer Capacity: 41 – 45 Mt. 11. Crawler Crane 41-45 Mt 12. Generator Set 300 Kw/375 Kva 13. Water Pump 100mm Suction Dia. 14. One Bagger Mixer 4-6 Ft3/min 15. Concrete Vibrator Ey20, 5hp, 32-70mm 16. Vibro Hammer 45000 Kg-m 17. Excavator 17.5 Kw Or Any Specify Types Of Heavy Equipment Needed For A Site Development Will Be Determined By The Winning Bidder. 6. Environmental Compliance 7. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 8. Billboard 9. Traffic Management (if Applicable). Vii. Building Construction 1 Lot One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Composed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. 1 Lot 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); 1 Lot Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); 1 Lot Road Networks And Culverts • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts. A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finished - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. (at Elevated Water Tank Area) J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Contractor Encouraged To Adapt: Lpf Flush Valve For Water Closet Or Stainless Toilet-lavatory Combination. Waterless Urinals N. Sprinkler System To All Prison Dormitories In Accordance With The Provisions Of Revised Plumbing Code Of The Philippines. O. Contractor To Provide A Water System To Supply The Facility 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 300,000,000. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php300,000,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D. Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criteria That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Safety And Security: Excellent (100%): The Design Features Robust Perimeter Walls, Guard Towers, And Security Features Ensuring Optimal Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Highly Reliable, With Comprehensive Safety Measures For Both Psdl And Staff. Good (80%): The Design Incorporates Effective Perimeter Walls, Guard Towers, And Security Features, With Minor Areas For Enhancement. Fire Protection And Detection Systems Are Reliable, With Adequate Safety Measures For Psdl And Staff. Acceptable (70%) The Design Includes Satisfactory Perimeter Walls, Guard Towers, And Security Features, Meeting Basic Requirements For Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Functional, With Sufficient Safety Measures For Psdl And Staff. Some Reservations (50%): The Design Features Partially Effective Perimeter Walls, Guard Towers, And Security Features, With Notable Deficiencies In Pdl Containment And Facility Security. Fire Protection And Detection Systems Lack Reliability, With Limited Safety Measures For Psdl And Staff. Serious Reservations (20%): The Design Lacks Effective Perimeter Walls, Guard Towers, And Security Features, Compromising Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Inadequate, Posing Significant Risks To Psdl And Staff Safety. Unacceptable (0%): The Design Neglects Perimeter Walls, Guard Towers, And Security Features, Failing To Ensure Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Absent Or Non-functional, Posing Severe Risks To Psdl And Staff Safety. D. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. E. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Ninety (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued Doc. No. _____ Page No. _____ Book No. _____ Series Of ____ Company Letterhead Omnibus Sworn Statement Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________
Closing Date20 Jan 2025
Tender AmountPHP 300 Million (USD 5.1 Million)

Department Of Agriculture Tender

Electronics Equipment...+1Electrical and Electronics
Philippines
Details: Description Invitation To Rebid For The Procurement Of Supply And Delivery Of Ict Supplies And Accessories 1. The Department Of Agriculture-western Visayas, Through The National Expenditure Program 2025 (early Procurement Short Of Award) Intends To Apply The Sum Three Million Seven Hundred Forty Two Thousand Three Hundred Eighty Nine Pesos (php3,742,389.00) Being The Abc To Payments Under The Contract For Procurement Of Supply And Delivery Of Ict Supplies And Accessories/ib No. 2025-030 (gas). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-western Visayas Now Invites Bids For The Procurement Of Supply And Delivery Of Ict Supplies And Accessories With The Following Specifications: Adapter, Hdmi To Hdmi Hdmi Male To Hdmi Female Cable Adapter, 4k@60hz, Maximum Uhd 3840×2160,backwa Rds Compatible 2560x1600, 2560x1440, 1920x1200, 1080p Resolutions, 22 Cm Long 1 Piece Adapter, Usb To Hdmi Usb-c + Usb-a To Hdmi Adapter, 2 Ports, Resolution: 1080p@60hz, Advanced Chip, Mirror And Extended Modes 1 Piece Digital Caliper Measuring Tool, Plastic Vernier Caliper Digitalmicrometer With Lcd Screen (0-150mm) 1 Unit Extension Cord With Voltage Surge Protector, 1 Switch Breaker, 6 Outlets With Ground, 5 Meters Long 106 Pieces Flash Drive 16gb, Usb 2.0, Backwards Compatible With Usb 1.1, Read Speed: 100mbps, Write Speed: 100 Mbps 60 Pieces Flash Drive 64gb, Usb 3.0, Backwards Compatible With Usb 2.0, Read Speed: 150mbps 126 Pieces Flash Drive 64gb, Usb 3.2, Gen 1 Compliant, Transfer Speed: 100mb/s2 5 Pieces Flash Drive 256gb, Usb 3.0, Read Speed: 150mbps 103 Pieces Hdmi Cable 2.1 4k 120hz, 48gbps, 7.3mm, Dynamic Hdr & Earc, Including Vrr, Qms, Qft And Allm, 3 Meters Long, Black 2 Pieces Hdmi Cable High Speed Hdmi 2.0, 4k 3d Cable Metal Case, 60hz, 18gbps, Transfer Rates: 10.2 Gbps / 340 Mhz, Hdcp Compliant, 5 Meters Long, Black, 23 Pieces Headlamp Rechargeable, Waterproof, 80 W, 6500 Mah, 4 Hours Bright Light, 9 Hours Weak Light, 50w Aluminum Reflect Cup With Light Led Source 3 Pieces Ink Bottle, Brother Btd60bk, Black, Genuine 29 Bottles Ink Bottle, Brother Bt5000c, Cyan, Genuine 46 Bottles Ink Bottle, Brother Bt5000m, Magenta, Genuine 46 Bottles Ink Bottle, Brother Bt5000y, Yellow, Genuine 46 Bottles Ink Bottle, Hp Deskjet/smart Tank Gt53 Xl Black 51 Bottles Ink Bottle, Hp Deskjet/smart Tank, Gt52 Cyan 53 Bottles Ink Bottle, Hp Deskjet/smart Tank, Gt52 Magenta 53 Bottles Ink Bottle, Hp Deskjet/smart Tank, Gt52 Yellow 53 Bottles Ink Cartridge, Brother Lc539xl, Black 20 Cartridges Ink Cartridge, Brother Lc535xl, Cyan 20 Cartridges Ink Cartridge, Brother Lc535xl, Magenta 20 Cartridges Ink Cartridge, Brother Lc535xl, Yellow 20 Cartridges Ink Cartridge, Brother Toner Cartridge, Tn 2260 10 Cartridges Ink Cartridge, Canon Cl-741, Colored 3 Cartridges Ink Cartridge, Canon Cl-811, Colored 3 Cartridges Ink Cartridge, Canon Pg-740, Black 3 Cartridges Ink Cartridge, Canon Pg-810, Black 3 Cartridges Ink Cartridge, Canon Pixma Pgi-35 Black 45 Cartridges Ink Cartridge Canon Pixma Cli-36 Color 35 Cartridges Ink Cartridge, Canon Pixma Printhead Cartridge, G4010 (black) (bh-7) 10 Cartridges Ink Cartridge, Canon Pixma Printhead Cartridge, G4010 (tri Color) (ch-7) 9 Cartridges Ink Cartridge, Epson C13t664100 (t6641), Black 253 Bottles Ink Cartridge, Hp 682, Black 102 Cartridges Ink Cartridge, Hp 682, Tri-color 181 Cartridges Ink Cartridge, Hp Cn692aa (hp704), Black 15 Cartridges Ink Cartridge, Hp Cn693aa (hp704), Tri-color 9 Cartridges Ink Cartridge, Hp Cz107aa (hp678), Black 31 Cartridges Ink Cartridge, Hp Cz108aa (hp678), Tri-color 31 Cartridges Ink Cartridge, Hp F6v26aa (hp680), Tri-color 350 Cartridges Ink Cartridge, Hp F6v27aa (hp680), Black 354 Cartridges Ink Cartridge, Hp L0s60aa (hp955), Black Original 6 Cartridges Ink Cartridge, Hp L0s63aa (hp955xl), Cyan Original 20 Cartridges Ink Cartridge, Hp L0s66aa (hp955xl), Magenta 20 Cartridges Ink Cartridge, Hp L0s69aa (hp955xl), Yellow 20 Cartridges Ink Cartridge, Hp L0s72aa (hp955xl), Black Original 29 Cartridges Ink Refill, Canon Gi-790bk 67 Bottles Ink Refill, Canon Gi-790c 65 Bottles Ink Refill, Canon Gi-790m 65 Bottles Ink Refill, Canon Gi-790y 65 Bottles Ink Refill, Canon Gi-71bk 4 Bottles Ink Refill, Canon Gi-71c 3 Bottles Ink Refill, Canon Gi-71m 3 Bottles Ink Refill, Canon Gi-71y 3 Bottles Ink Refill, Epson (001) Black 307 Bottles Ink Refill, Epson (001) Magenta 224 Bottles Ink Refill Epson (001) Cyan 219 Bottles Ink Refill, Epson (001) Yellow 215 Bottles Ink Refill, Epson (003) Eco Tank, Black 270 Bottles Ink Refill, Epson (003) Eco Tank, Cyan 194 Bottles Ink Refill, Epson (003) Eco Tank, Magenta 194 Bottles Ink Refill, Epson (003) Eco Tank, Yellow 194 Bottles Ink Refill, Epson (008) Eco Tank, Black 2 Bottles Ink Refill, Epson (008) Eco Tank, Cyan 2 Bottles Ink Refill, Epson (008) Eco Tank, Magenta 2 Bottles Ink Refill, Epson (008) Eco Tank, Yellow 2 Bottles Ink Refill, Epson C13t664200 (t6642), Cyan 186 Bottles Ink Refill, Epson C13t664300 (t6643), Magenta 188 Bottles Ink Refill, Epson C13t664400 (t6644), Yellow 188 Bottles Laser Pointer Laser Class 2, 2 Aaa Battery, 2.4 Ghz Wireless Technology 29 Pieces Maintenance Box, For Epson L6160/l6170, C13t04d100 24 Pieces Male Hdmi To Male Hdmi Cable Hdmi 2.0 Male To Male High Speed 18gbps 4k, 30hz, 1080p, 3d Hdmi Ethernet , 2 Meters Long 2 Pieces Male Usb To Male Hdmi Cable Usb 3.0 Male To Hdmi Male Cable, Support Usb2.0, Usb3.0, Output: 1920x1080p@ 60hz, 2 Meters Long 2 Pieces Memory Card, For Camera Use Extreme Pro Sd Card, 1 Tb, Shot Speed: 140mb/s, Read Performance: 200mb/s, Write Performance: 90mb/s 3 Pieces Micro Sd Card, 128gb, Sequential Read Performance: 140mbps, Transfer Speed: 150 Mb/s 64 Pieces Mouse Pad Non-slip Rubber Base, Fine Knit Edges, 25 X 20 X 0.2 Cm 23 Pieces Otg/dual Usb Drive 128gb, Read Speed: 150mb/s , Write Speed: 100 Mbps 104 Pieces Portable Hard Drive 1 Tb, Usb 3.2, Type C Connector, Read Performance: 1050 Mbps; Write Speed 1000 Mbps 22 Pieces Powerbank, 10000mah 20w, Lithium Polymer Battery, Usb-c Input/output: 20w Max, Usb-a Output: 22.5w Max, Battery Capacity: 37wh (10000mah 3.7v), Rated Capacity: 6250mah (5v 3a) 121 Pieces Powerbank, 20000mah 20w, Lithium Polymer Battery, Usb-c Input/output: 20w Max, Usb-a (out 1/out 2) Output: 22.5w, Battery Capacity: 20000mah 3.7v (74wh), Rated Capacity: 12500mah (typ 5v 3a) 7 Pieces Rechargeable Battery Aa, 1.2v, 2450 Mah, Ni-mh Battery, 2 Pieces/pack 4 Packs Rechargeable Battery Aaa, 1.2 V, 900 Mah, Ni-mh Battery, 2 Pieces/pack 4 Packs Ribbon Cartridge For Epson , For Use With Fx-2175/2190 (so15327, 32.0 Meters/ 104.9 Feet) 9 Pieces Solid State Drive, Portable, 500 Gb, Usb 3.2 Gen 2, Read Speed: 1050 Mb; Write Speed: 1000 Mb (max) W/ Usb C To Usb C Cable & Usb A Adaptors 5 Pieces Solid State Drive 256gb, 2.5 Inch Sata Iii, 6 Gb/s, Read Speed: 500mb/s, Write Speed: 320mb/s, Tbw: 80tb 2 Pieces Solid State Drive 1 Tb, Usb 3.2 Gen , 10gb/s, Read Speed: 1050 Mb/s, Write Speed: 1000 Mb/s 3 Pieces Toner Cartridge, Mx-315ft, Black 5 Pieces Toner Cartridge, Tn118 (konica Minolta Bizhub 215) 11 Cartridges Usb 3.0 Hub, 4 Ports Multi- Splitter Otg Adapter 4 Ports, Usb 3.0 Hub, 5 Gbps Transfer Speed, Supports Two 2.5 Inch Capacity 1 Tb Ssd, Backwards Compatible With Usb 2. 0 (480mbps), Usb 1. 1(12mbps), 1 Meter Long 5 Pieces Usb 3.0 Hub, 6 In 1 Sd Tf For Laptop Pc 6-in-1 Usb 3.0 Hub, Tf/sd Double Card Slot 2.0 Protocol, Applicable For 256g Memory Cards, 5 Gbps Transfer Speed, Micro-usb Power Port, 900ma Output Max Current 5 Pieces Wired Keyboard 12 Fn Multimedia Hotkeys, Resolution: 1000 Dpi, 3 Buttons, Usb Port, Cable Length: 150 Cm 7 Pieces Wireless Mouse 1000 Dpi, 3 Buttons, 2d Scroll Wheel, 2.4 Ghz Wireless Connection, 2.4ghz Wireless Connection W/ Usb Nano Receiver, W/ 1 Aa Battery 170 Units 3-pin Power Adaptor Universal Adapter, Compatible With Various Types Of Sockets 12 Pieces Terms And Conditions: • All Items Which Have An Expiration Period Shall Have An Expiry Date Of At Least Two (2) Years After The Date Of The Notice Of Award • The Supplier Must Submit A Copy Of Manufacturer’s Product Brochures, Specification Sheet, Manuals Etc., As Appropriate Of All The Required Items Or Equipment. Any Of These Evidences Should Be Downloadable From Product Or Manufacturer’s Website Or Otherwise Verifiable By Any Means Reasonable And Acceptable To The Bids And Awards Committee. • Certificate That The Supplier Operates A Commercial Physical Store Indicating The Complete Address Where Ict Products Are Displayed And Available For Purchase. • All Items Should Be Genuine And Not Imitation Delivery Of The Goods Is Required Within 90 Calendar Days From Receipt Of Notice To Proceed And To Be Delivered At Da-wesviarc, Hamungaya, Buntatala, Jaro, Iloilo City. Bidders Should Have Completed, Within Three (3) Years (2021-present) From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. The Prospective Bidder Must Be Registered In The Philgeps. 4. Prospective Bidders May Obtain Further Information From Department Of Agriculture - Visayas And Inspect The Bidding Documents At The Address Given Below During Office Hours, 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 30, 2024 – January 22, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (php5,000.00).the Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees To Be Presented In Person. 6. The Department Of Agriculture-western Visayas Will Hold A Pre-bid Conference At 9:30 P.m. On January 8, 2025 At The Rcpc Library, Rcpc Building, Da Wesviarc Compound, Brgy. Buntatala, Jaro, Iloilo City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 9:30 A.m. On January 22, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In The Amount Of Any Of The Acceptable Forms And In The Amount Of Php74,847.78 (if The Bid Security Is In The Form Of Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit) Or Php187,119.45 (if The Bid Security Is In The Form Of Surety Bond). In Lieu Of A Bid Security, The Bidder May Submit A Duly Notarized Bid Securing Declaration That Is An Undertaking Which States, Among Others, That The Bidder Shall Enter Into Contract With The Procuring Entity And Furnish The Required Performance Security Within 10 Calendar Days From Receipt Of The Notice Of Award, And Committing To Pay The Corresponding Fine And Be Suspended For A Period Of Time From Being Qualified To Participate In Any Government Procurement Activity In The Event That It Violates Any Of The Conditions Stated Therein As Required In The Guidelines Issued By The Gppb. 9. Bid Opening Shall Be At 9:30 A.m. On January 22, 2025 At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Agriculture-western Visayas Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. The Department Of Agriculture-western Visayas Does Not Condone Any Forms Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 12. For Further Information, Please Refer To: Zarlina B. Cuello Bac Chairperson Da-wesviarc Compound Brgy. Buntatala, Jaro, Iloilo City Tel. No. (033) 320-23-73 Www.westernvisayas.da.gov.ph Procurement@wv.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps December 30, 2024 Zarlina B. Cuello Bac Chairperson
Closing Date22 Jan 2025
Tender AmountPHP 3.7 Million (USD 64.4 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: Combined Synopsis/solicitation Notice combined Synopsis/solicitation Notice page 3 Of 11 combined Synopsis/solicitation Notice *= Required Field combined Synopsis/solicitation Notice page 1 Of 9 description combined Synopsis/solicitation Notice combined Synopsis/solicitation Notice page 11 Of 11 combined Synopsis/solicitation Notice *= Required Field combined Synopsis/solicitation Notice page 1 Of 10 page 1 Of this Is A Combined Synopsis/solicitation For Commercial Products Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. this Is A Brand Name Or Equal To Request For Quote (rfq), And The Solicitation Number Is 36c26025q0159. The Government Anticipates Awarding A Firm-fixed Price Supply Order From This Solicitation. this Is A Solicitation For A Smart Mattress, Base Frame, Mattress Cover, Remote And Set-up. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular Fac 2025-02 January 3, 2025. this Solicitation Is An Unrestricted Open Market Solicitation. The Associated North American Industrial Classification System (naics) Code For This Procurement Is 337910, With A Small Business Size Standard Of 1000 Or Fewer Employees, And The Psc Is 6530. all Interested Companies Shall Provide Quotations That Are Brand Name Or Equal To Sleep Number As Follows: quantity manufacturer Part description 6 i2p5 sleep Number New P5 360 Queen Smart Mattress 60 X80 6 sleep Number New Flexfit 2 Queen Bed Base 6 424201 sleep Number Total Encasement Mattress Cover For Smart Beds Queen 6 126016 sleep Number New Smart Remote Compatible With Mattress And Frame 1 sleep Number Half Day Delivery Install Set Up standard Warranty Shall Apply To All Parts Listed. A 15 Year Warranty Is Desired. must Meet All Required Federal Mandates For Medical Use. salient Characteristics queen Smart Mattress: 60 X 80 weight Capacity: Supports Up To 550 Lb. adjustable Firmness includes Air Hoses And A Power Supply To In/deflate Mattress power Supply Compatible With A 100 240 Vac Grounded Wall Socket must Be Compatible With Adjustable Base breathable queen Bed Base: weight Capacity: Can Support A Working Load Of Mattress, Mattress Cover, System Hardware And An Additional 550 Lb adjustable To Multiple Positions, Including Supine To Upright Head Position And Varied Levels Of Foot Positions. designed For And Supports Queen Mattress includes An Electric Control System, Power Cord Connections And Cables total Encasement Mattress Cover: washable, Zippered Cover Fully Encases Mattress And Hose Openings. waterproof And Will Block Bed Bugs, Dust Mites And Allergens smart Remote: hand Control That Adjusts Firmness Of Mattress And The Position Of The Base (hardwired To The Bed Is Desired, But Not Required) compatible With Smart Frame And Mattress delivery/install Set-up: deliver And Assemble Complete Bed Packages To Va Medical Center American Lake Sleep Lab, Set Up Beds In Designated Rooms And Haul Away Packaging, Old Mattresses And Frames coordinate With Poc At Sleep Lab For Delivery Times 52.211-6â brand Name Or Equal. as Prescribed Inâ 11.107(a), Insert The Following Provision: brand Name Or Equalâ (aug 1999) (a)â if An Item In Thisâ solicitationâ is Identified As "brand Name Or Equal," The Purchase Description Reflects The Characteristics And Level Of Quality That Will Satisfy The Government S Needs. The Salient Physical, Functional, Or Performance Characteristics That "equal"â productsâ mustâ meet Are Specified In Theâ solicitation. (b)â to Be Considered For Award,â offersâ of "equal"â products, Including "equal"â productsâ of The Brand Name Manufacturer,â must- (1)â meet The Salient Physical, Functional, Or Performance Characteristic Specified In Thisâ solicitation; (2)â clearly Identify The Item By- (i)â brand Name, If Any; And (ii)â make Or Model Number; (3)â includeâ descriptive Literatureâ such As Illustrations, Drawings, Or A Clear Reference To Previously Furnished Descriptive Data Or Information Available To Theâ contracting Officer; And (4)â clearly Describe Any Modifications Theâ offerorâ plans To Make In A Product To Make It Conform To Theâ solicitationâ requirements. Mark Any Descriptive Material To Clearly Show The Modifications. (c)â theâ contracting Officerâ will Evaluate "equal"â productsâ on The Basis Of Information Furnished By Theâ offerorâ or Identified In Theâ offerâ and Reasonably Available To Theâ contracting Officer. Theâ contracting Officerâ is Not Responsible For Locating Or Obtaining Any Information Not Identified In Theâ offer. (d)â unless Theâ offerorâ clearly Indicates In Itsâ offerâ that The Product Being Offered Is An "equal" Product, Theâ offerorâ shallâ provide The Brand Name Product Referenced In Theâ solicitation. (end Of Provision) delivery Fob Destination Is Preferred, 30-60 Days After Receipt Of Order. All Deliveries Will Be Coordinated With The Puget Sound Va Medical Center Point Of Contact. place Of Delivery: department Of Veterans Affairs va Puget Sound american Lake Medical Center 9600 Veterans Dr. tacoma, Wa 98493 . the 6 Rooms Within The Sleep Lab Located At The American Lake Campus: Room Numbers Are 301,303,304,305,306,307. the Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html http://www.va.gov/oal/library/vaar/index.asp the Following Solicitation Provisions Apply To This Acquisition: far 52.212-1, Instructions To Offerors Commercial Products addendum To Far 52.212-1 Instructions To Offerors Commercial 52.204-7 system For Award Management (oct 2018) 52.204-16 commercial And Government Entity Code Reporting (aug 2020) 52.204-24 representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) 52.211-6 brand Name Or Equal (aug 1999) 52.212-3 offeror Representations And Certifications-commercial Products And Commercial Services (may 2024) 52.225-2 buy American Certificate (oct 2022) 52.252-1 provisions Incorporated By Reference (feb 1998) vaar Provisions: 852.239-75 information And Communication Technology Accessibility Notice (feb 2023) (a) Gray Market Items Are Original Equipment Manufacturers (oem) Goods Sold Through Unauthorized Channels In Direct Competition With Authorized Distributors. This Procurement Is For New Oem Medical Supplies, Medical Equipment And/or Services Contracts For Maintenance Of Medical Equipment (i.e., Replacement Parts) For Va Medical Centers. No Remanufactures Or Gray Market Items Will Be Acceptable. (b) Offeror Shall Be An Oem, Authorized Dealer, Authorized Distributor Or Authorized Reseller For The Proposed Medical Supplies, Medical Equipment And/or Services Contracts For Maintenance Of Medical Equipment (i.e., Replacement Parts), Verified By An Authorization Letter Or Other Documents From The Oem, Such That The Oem S Warranty And Service Are Provided And Maintained By The Oem. All Software Licensing, Warranty And Service Associated With The Medical Supplies, Medical Equipment And/or Services Contracts For Maintenance Of Medical Equipment Shall Be In Accordance With The Oem Terms And Conditions. (c) The Delivery Of Gray Market Items To The Va In The Fulfillment Of An Order/award Constitutes A Breach Of Contract. Accordingly, The Va Reserves The Right Enforce Any Of Its Contractual Remedies. This Includes Termination Of The Contract Or, Solely At The Va S Election, Allowing The Vendor To Replace, At No Cost To The Government, Any Remanufactured Or Gray Market Item(s) Delivered To A Va Medical Facility Upon Discovery Of Such Items. (d) Any Award Made As A Result Of This Solicitation Will Be Made On An All Or Nothing Basis. (e) Offerors Are Warned Against Contacting Any Va Personnel Other Than The Contracting Officer And Contract Specialist Prior To Placement Of Any Award Made Resulting From This Rfq. If Such Contact Occurs And Found To Be Prejudicial To Competing Contractors, The Offeror Making Such Contact May Be Excluded From Award Considerations. (f) All Proprietary Information Shall Be Clearly And Properly Marked. If The Offeror Submits Annexes, Documentation, Attachments, Or The Like, Not Specifically Required By This Solicitation, Such Will Count Against The Offeror S Page Limitations Unless Otherwise Indicated In The Specific Volume Instructions Below. (g) All Information Shall Be Confined To The Appropriate File. The Offeror Shall Confine Submissions To Essential Matters, Sufficient To Define The Quote And Provide An Adequate Basis For Evaluation. Offerors Are Responsible For Including Sufficient Details, In A Concise Manner, To Permit A Complete And Accurate Evaluation Of Each Quote. (end Of Addendum To 52.212-1) far 52.212-2, Evaluation-commercial Items : The Government May Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. In Accordance With Far 9.104-2, The Special Standards Of Responsibility Described Below Apply To This Procurement. Offerors Who Fail To Meet Any Special Standards Of Responsibility Will Not Be Eligible To Receive Contract Award. The Following Factors Shall Be Used To Evaluate Offers: special Standards Of Responsibility: (per Far 9.104-2) The Following Special Standards Of Responsibility Apply To This Procurement: sp1: Offeror Must Be A Manufacturer Authorized Provider For The Items Provided. A Letter From The Manufacturer Stating Such Must Be Included With Any Response To This Solicitation. price (a) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offeror's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. far 52.213-3 Offerors Are Advised To Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications -- Commercial Items, With Its Offer If Has Not Been Completed On Sam.gov. Offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Items. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. all Service-disabled Veteran Owned Businesses Or Veteran Owned Businesses Must Be Registered/certified With The U.s Small Business Administration At Veteran Small Business Certification Veteran Small Business Certification (sba.gov). the Following Contract Clauses Apply To This Acquisition: far 52.212-4, Contract Terms And Conditions Commercial Products (oct 2018) addendum To Far 52.212-4 The Following Clauses Are Included As A Part Of The Addendum: http://www.acquisition.gov/far/index.html (far) http://www.va.gov/oal/library/vaar/index.asp (vaar) 52.203-17 contractor Employee Whistleblower Rights (nov 2023) 52.204-13 system For Award Management Maintenance (oct 2018) 52.204-18 commercial And Government Entity Code Maintenance (aug 2020) 52.219-6 notice Of Total Small Business Set-aside (nov 2020) (15 U.s.c. 644) 52.225-1 (buy American Supplies) 52.232-40 providing Accelerated Payments To Small Business Subcontractors (dec 2013) 52.233-3 protest After Award (aug 1996) (31 U.s.c. 3553). 52.252-2 clauses Incorporated By Reference (feb 1998) vaar Clauses: 852.203-70 commercial Advertising (may 2018) 852.212-71 gray Market Items (nov 2018) 852.232-72 electronic Submission Of Payment Requests (nov 2018) 852.239-76 information And Communication Technology Accessibility (feb 2023) 852.242-71 administrative Contracting Officer (oct 2020) 852.246-71 rejected Goods (oct 2018) 852.247-73 packing For Domestic Shipment (oct 2018) far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products (mar 2023) the Following Subparagraphs Of Far 52.212-5 Are Applicable And Incorporated By Reference: 52.204-10 52.204-27 reporting Executive Compensation & First-tier Subcontract Awards (jun 2020) (pub. L. 109-282) (31 U.s.c. 6101 Note) prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117-328) 52.209-6 protecting The Government S Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (nov 2021) (31 U.s.c. 6101 Note) 52.219-6 notice Of Total Small Business Set-aside (nov 2020) (15 U.s.c. 644). 52.219-28 52.219-27 post Award Small Business Program Representation (mar 2023) (15 U.s.c 632(a)(2)) notice Of Service-disabled Veteran-owned Small Business Set-aside (oct 2022) 52.222-3 52.222-19 convict Labor (jun 2003) (e.o. 11755) child Labor Cooperation With Authorities And Remedies (feb 2024) (e.o. 13126) 52.222-21 prohibition Of Segregated Facilities (apr 2015) 52.222-26 equal Opportunity (sep 2016) (e.o. 11246) 52.222-36 equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793) 52.222-50 combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627) 52.223-18 encouraging Contractor Policies To Ban Text Messaging While Driving (jun 2020) (e.o. 13513) 52.225-1 buy American-supplies (oct 2022) (41 U.s.c. Chapter 83) 52.225-13 restrictions On Certain Foreign Purchases (feb 2021) (e.o.'s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury) 52.226-8 encouraging Contractor Policies To Ban Text Messaging While Drivingâ (mayâ 2024)â  52.232-33 payment By Electronic Funds Transfer System For Award Management (jul 2018) (31 U.s.c. 3332) 52.240-1 prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act-covered Foreign Entities (nov 2024) (sections 1821-1826, Pub. L. 118-31, 41 U.s.c. 3901 Note Prec.) all Quoters Shall Submit According To The Following: quotes Must Be Emailed To Rachel.richardson@va.gov And Received No Later Than 3:00 Pm Pst On 01/08/2025. Quotes May Be Submitted On This Document Or The Vendor S Own Form And Must Include, If Not The Manufacturer, An Authorized Distributor Letter, And A Completed Buy American Certificate. Any Offer That Does Not Provide The Supporting Documentation May Be Considered Non-responsive. Required Supporting Documentation And Information: authorized Distributor Letter If Not The Manufacturer completed Buy American Certificate certification That Equipment Meets/exceeds The Salient Characteristics Of The Desired Brand Above delivery Date warranty Details the Government Intends To Make Award Without Discussions. for Information Regarding The Solicitation, Please Contact Rachel Richardson At Rachel.richardson@va.gov. (end Of Provision) mandatory Electronic Invoicing va Published The Final Rule Requiring Vendors To Submit Invoices Electronically To The Financial Services Center (fsc) In The November 27, 2012 Federal Register. The Rule Became Effective December27,2012.the Rule Includes A New Contract Clause To Be Inserted In All Solicitations And Contracts By The Contracting Officer (vaar 852.232-72). Vendors Can Comply With The Rule By Using Either Of The Two Methods Below: facsimile, E-mail, And Scanned Documents Are Not Acceptable Forms Of Submission For Payment Requests. Electronic Form Means An Automated System Transmitting Information Electronically According To The Accepted Electronic Data Transmission Methods Below: va S Electronic Invoice Presentment And Payment System The Fsc Uses A Third-party Contractor, Tungsten, To Transition Vendors From Paper To Electronic Invoice Submission. Please Go To This Website:http://www.tungsten-network.com/us/en/veterans-affairs/to Begin Submitting Electronic Invoices, Free Of Charge. a System That Conforms To The X12 Electronic Data Interchange (edi) Formats Established Bythe Accredited Standards Center (asc) Chartered By The American National Standards Institute (ansi). The X12 Edi Web Site (http://www.x12.org). vendor E-invoice Set-up Information: please Contact Tungsten At The Phone Number Or Email Address Listed Below To Begin Submitting Your Electronic Invoices To The Va Financial Services Center For Payment Processing, Free Of Charge. If You Have Question About The E-invoicing Program Or Tungsten, Please Contact The Fsc At The Phone Number Or Email Address Listed Below: tungstene-invoicesetupinformation:1-877-489-6135 tungstene-invoiceemail:va.registration@tungsten-network.com fsce-invoicecontactinformation:1-877-353-9791 fsce-invoiceemail:vafsccshd@va.gov
Closing Soon8 Jan 2025
Tender AmountRefer Documents 

National Farming Promotion Tender

Software and IT Solutions
Corrigendum : Closing Date Modified
Poland
Details: Ag.b.0162.1.2024.133.ak Kraków, Dn.19/07/2024 Price Inquiry Title: "service consisting in the renovation of PDOZ premises in Building No. E at ul. Mogilska 109, 31-571 Kraków” The proceedings are conducted pursuant to Art. 2(1), point 1 of the Act of September 11, 2019 - Public Procurement Law - hereinafter referred to as the Act and in accordance with Decision No. 58/2021 of the Provincial Police Commander in Krakow of November 4, 2021. I. General Information: 1. The offer should be sent by: July 29, 2024 by 12:00. In this way: Offers and all inquiries should be submitted by July 29, 2024 by 12:00. Via the Purchasing Platform to the address: https://malopolska-policja.eb2b.com.pl, "proceedings" tab - "list of open proceedings". In case of problems with submitting an offer, please contact the Eb2b Helpdesk - Contact in the footer of the website. 2. The Offer should be prepared in accordance with this Request. II. Description of the Subject of the Order: 1. The subject of the Order is the provision of a service consisting in the renovation of PDOZ rooms in Building No. E at ul. Mogilska 109, 31-571 Kraków. 2. The scope of the renovation includes: Renovation works in 3 Pdoz rooms, such as: Laying tiles on the walls of one room and painting the walls and ceilings in all 3 Pdoz rooms. The Ordering Party requires subdued colors of the rooms (white, gray, natural shades imitating sandstones found in stoneware tile collections). Under-tile waterproofing of all wall surfaces and wall joints with insulating/sealing tapes, and then vertical waterproofing with liquid foil. Execution of wall cladding - Rectified wall tiles, 9 mm thick, with water absorption not higher than 3%, made of unglazed porcelain stoneware of the "matt Full Body" type, dyed in the mass, arranged on the external corners of semi-circular plastic in a color similar to the color of the tiles. The joints should be filled with epoxy grout in a color similar to the selected porcelain tiles. The cladding materials used must be of quality I. Painting walls and ceilings with acrylic-composite, matte, stain-resistant Latex paint in light colors (acrylic-composite paint, with the highest class of resistance to washing and wet scrubbing, with increased resistance to stains and dust) . Painting metal door frames with oil paint in a color similar to the color of the tiles - 2.0 pcs. 3. Scope of work that needs to be done in connection with the renovation of the room The minimum allowance is: A) Making wall tiles from glazed tiles with a height of 2.0 m - Approx. . 25.0 M2, B) Vertical Waterproofing Coating – Approx. 25.0 M2, C) Laying Wall Tiles Up to a Height of 2.0 M – Approx. 25.0 M2, D) Local filling and painting of walls with washable paint – Approx. 72.0 M2, E) Local filling and painting of ceilings – Approx. 34.0 M2, F) Disassembly and reassembly of the washbasin with the faucet and siphon, and laying silicone around the washbasin - 1.0 pcs., G) Painting metal frames - 2 pcs. H) Removal of debris and dismantling waste. 4. The Works Will Be Performed in an Operating Facility. In connection with this, the Ordering Party requires that the Contractor, before commencing construction works, submit to the Ordering Party a list of persons who will perform the work as part of the Contractor's activities, providing the following data (name and surname, PESEL number) and a list of vehicles necessary to carry out the works (make and type Along with Providing Registration Numbers). The above requirement results from the fact that the works are to be carried out in an active police facility, parts of which can only be accessed by previously agreed persons. In the event of a need for new (additional) people to perform the work, the Contractor is obliged to inform the Ordering Party about this fact in advance, updating the list of people accordingly. In the case of countries other than Poland, please provide the Date of Birth, Father's Name and Passport Series and Number. The Ordering Party reserves the right to refuse to allow persons indicated by the Contractor to carry out the work. III. Conditions Relating to the Offer and Order Fulfillment: 1. The Price for the Service will be a lump sum and will be payable once upon completion of the order. 2. Payment for the execution of the order will be made within 30 days from the date of receipt of a correctly issued invoice - by transfer to the account indicated by the contractor. 3. It is possible (optionally) to carry out an on-site visit to the facility in order for the contractor to precisely determine the lump sum price for the provision of the service. Failure to conduct an on-site visit to the facility will not constitute grounds for rejection of the offer. The on-site visit will take place after prior arrangement with the Ordering Party. Order Completion Date: Order Completion Date Up to one month from the date of receipt of the order. The Date of Commencement of Works is to be agreed with the User of the Facility. In the event of untimely completion of the task by the Contractor, the Contractor will pay the Ordering Party a penalty of 0.5% of the Gross Order Value for each day of delay, but not more than 15% of the Gross Order Remuneration. Place of Order Fulfillment: Building No. E on the premises of the Municipal Police Headquarters in Kraków, ul. Mogilska 109, 31-571 Kraków Contact telephone numbers In the case: Provincial Police Headquarters in Kraków: 47–83–54–917 Iv. Criteria for Research, Evaluation and Selection of Offers: Lowest Price. V. Attachments: Offer template: Attachment No. 1
Closing Soon10 Jan 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: Page 14 Of 14 no Phone Calls. Send Any Responses By E-mail Only. As This Is A Sources Sought Notice For Market Research Purposes, The Government Will Not Accept Any Technical Questions At This Time. this Is A Sources Sought Notice To Determine Small Business Sources Capable Of Providing Hazardous Waste Management Services Per This Notice Under Naics 562211 (hazardous Spill Containment And Clean-up Equipment And Material). Small Business Size Standard Is $47 Million. Product Service Code (psc) Is 4235 (hazardous Waste Treatment And Disposal). background: this Is A Sources Sought Notice Being Released Pursuant To Federal Acquisition Regulation (far) Part 10: Market Research. This Notice Is Issued Solely For Informational, Market Research, And Planning Purposes Only. It Does Not Constitute A Solicitation Or A Promise To Issue A Solicitation In The Future.â  This Notice Does Not Commit The Federal Government To Contract For Any Service At This Time. further, The U.s.t Department Of Veterans Affairs, Network Contracting Office (nco) 23/ Supply Services Team 1 Is Not At This Time Seeking Offers And Will Not Accept Unsolicited Offers.â  respondents Are Advised That The Federal Government Will Not Pay For Any Information Or Administrative Costs Incurred In Response To This Notice. All Costs Associated With Responding To This Notice Will Be Solely At The Responding Party S Expense. responses To This Notice Are Not Offers And Cannot Be Accepted By The Federal Government To Form A Binding Contract.â  Although The Term Offeror Is Used In This Notice, Your Respective Organization S Response Will Be Treated As Information Only And Shall Not Be Used As An Offer. objective: the Objective Of This Notice Is To Conduct Market Research To Determine If There Are Service Disabled Veteran Owned Small Business (sdvosb) Or Veteran Owned Small Business (vosb) Sources, Or Any Other Small Businesses Capable Of Providing Hazardous Waste Management Services For The St. Cloud, Mn Va Hcs. description Of Service: see Attached Proposed Statement Of Work. places Of Performance: see Attached Proposed Statement Of Work. potential Scope Of Work: see Attached Proposed Statement Of Work. potential Certifications And Licensure: see Attached Proposed Statement Of Work. submittal Of Responses: responses Shall Be Sent Via Electronic Mail Only By 5:00 Pm Central Standard Time (cst), 1-10-2025 To: amanda Patterson-elliott contracting Specialist e-mail: Amanda.patterson-elliott@va.gov offerors Shall Submit A Capability Statement Indicating Their Ability And Experience To Provide The Services Cited Above; Such Statement Shall Also List: name Of Offeror address Of Offeror uei Number Of Offeror point Of Contact Name, Phone Number, And E-mail Of Offeror whether Or Not Vendor Is Sdvosb Or Vosb; Sdvosb And Vosb Will Be Verified Through Vet Biz At Https://veterans.certify.sba.gov/ . whether Or Not Vendor Has General Services Administration (gsa) Federal Supply Schedule (fss) Contract; If So, Please Provide Gsa Fss Contract Number Certifications And Licensure That Its Applicable Staff Holds disclaimer This Rfi Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Rfi That Is Marked As Proprietary Will Be Handled Accordingly. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Rfi. statement Of Work title: Hazardous Waste Management Services overview: The St. Cloud Va Has A Need For A Qualified Contractor With The Capability And Capacity To Provide Disposal Services For Hazardous Waste, Non-hazardous Chemical Waste, Specialty Waste (i.e. Hazardous Pharmaceutical, High Hazardous Waste, Dea Drug Waste, Non-hazardous Pharmaceutical, And Dual Waste [hazardous Chemical And Bio-hazardous Combined]), Universal Waste, Emergency Spill Response Services, Lab Pack Services That Include Supplies, Labeling, Lab-packing, Consolidation, Shipment, Manifesting, And Consulting. this Contract Will Not Include The Disposal Of Infectious, Bio-hazardous, Radiological, Or Pathological Waste Except For Dual (chemical And Infectious Combined) Waste. acronyms: a. Co Contracting Officer b. Cor Contracting Officer S Representative c. Va Department Of Veterans Affairs d. Vahcs St. Cloud Va Health Care System e. Sow Statement Of Work f. Osha - Occupational Safety And Health Administration g. Epa - Environmental Protection Agency h. Dot Department Of Transportation i. Mpca Minnesota Pollution Control Agency j. Jc Joint Commission k. Mdh Minnesota Department Of Health l. Cdc Centers For Disease Control m. Dea Drug Enforcement Administration n. Rcra Resource Conservation And Recovery Act o. Cfr Code Of Federal Regulations p. Contractor Employee Means All Contractor Staff, Technicians, Personnel, Subcontractors Or Persons Working On Behalf Of The Contractor. 4. Place Of Performance: st. Cloud Va Health Care System, 4801 Veterans Drive, St. Cloud, Mn 56303 period Of Performance: this Contract Will Be A Single Award, Firm Fixed Price Indefinite Delivery, Indefinite Quantity, Service Contract For One (1) Base Year From 02/01/2025 01/31/2026 With Four (4) Option Years. Renewal Of Option Years Is Subject To Availability Of The Next Fiscal Year Funding. qualifications And Special Certifications: contractor Must Obtain All Necessary Permits And/or Licenses Regarding The Pickup And Incineration Or Other Acceptable Disposition As Regulated By State And Federal Epa Guidelines For Hospital Hazardous/dual Waste. *the Primary Contractor Must Own Their Own Licensed Treatment, Storage, And Disposal Facilities. treatment, Storage And Disposal Facilities (tsdfs) Need A Resource Conversation And Recovery Act (rcra) Permit. federal Certificate Of Registration To Transport Hazardous Waste federal Safety Permit To Travel On Highways if Waste Covered Under This Contract Must Be Transported Through A Jurisdiction Which Requires Special Licensing Or Permitting, The Contractor And/or Subcontractor Shall Obtain And Maintain All Necessary Licenses And Permits. The Contractor Shall Provide Copies Of These Licenses And Permits To The Cor. the Contractor And/or Subcontractor Shall, Without Additional Cost To The St. Cloud Vahcs Or Federal Government, Provide And Maintain All Licenses And Permits For Personnel, Trailers, Containers, Vehicles, And Other Resources Required For Proper Transportation And Disposal Of The Wastes Covered Under This Contract In Accordance With All Applicable Federal, State, Local, Municipal, And Va, Laws, Regulations, And Requirements. if Appropriate Licenses And Permits Are Not Maintained In Accordance With These Applicable Laws, Regulations And Requirements, The St. Cloud Vahcs May Terminate The Contract Effective Upon Discovery. the Contractor Is Required To Perform Characterization Of All Waste Streams Identified By Each Facility Using Process Knowledge, Identity Of The Chemicals, And Other Types Of Chemical Analysis Including But Not Limited To Toxicity Characteristic Leaching Procedure (tclp). chemical Wastes Shall Include But Not Be Limited To Flammables, Corrosives, Poisons/toxics/lethal, Reactive Wastes, Dual And Hazardous Waste, And Universal Waste. Work Shall Be Performed In Accordance With All Applicable, Federal, State, Local And All Governing Regulations. the Successful Offeror Must Possess The Necessary Technical Expertise And Resources Required By This Statement Of Work To Be Considered For Contract Award. regulations / Directives / Policies: the Contractor Must Comply With All Applicable Federal (us Epa, Us Osha, Us Dot), State (mn Osha, Mpca), Interstate, National Consensus Standards (jc), And Local Requirements, Rules, Regulations, And Laws Relative To The Handling, Removal, Manifesting, Transportation, Management, Disposal And/or Treatment Of Hazardous, Non-hazardous And Specialty Wastes. the Contractor May Not Attempt To Circumvent Mn01 Lethality Waste Characteristics By Repackaging And Reprofiling In Another State. scope Of Work: contractor Shall Provide All Labor, Personnel, Transportation, Vehicles, Equipment, Tools, And Materials Necessary To Provide Hazardous Waste Management Services. contractor Shall Have The Capability And Capacity To Provide Hazardous, Dual, Universal, And Dea Drug Waste, Waste Disposal Services, Lab Packs, And Removal Of Non-hazardous Chemical Waste Removal And Disposal From The Vahcs, In Accordance With Current Federal, State, And Local Regulations. services Shall Include Pharmaceutical Formulary Review; Technical Consulting; Electronic Record Keeping; Emergency Spill Response; Analysis, Documentation, Waste Treatment, Disposal And Support Services Required To Categorize, Package, Transport, Document And Dispose Of Hazardous, High Hazardous, Dual, And Universal, And Non-hazardous Chemical Wastes And Their Containers. the Certification And Accreditation Requirements Under Va Handbook 6500 Do Not Apply, And As Such A Security Accreditation Package Is Not Required. wate Removal And Shipment: the Contract Will Include Removal, Documentation, And Shipment Of Wastes From The Designated Hazardous Waste Storage Area At The St. Cloud Va Hcs. this Will Include Periodic Shipments Of Dea Controlled Substances Waste And All Labor And Equipment To Package, Transport, Treat And Dispose Of Waste. Protection And Mandates: contractor Will Provide Appropriate Protection For His/her Employees To Be Within Cdc Guidelines That Include Barrier Precautions, I.e., Gloves, Masks, Eyewear And/or Waterproof Gowns, Aprons, (lab) Coats Or Respirators As Necessary. cor Or Cor Designee Will Notify Contractor Of Areas With The Health Care Systems Or Unusual Circumstances Requiring Personal Protective Equipment (ppe) Beyond Standard Practices. contractor Will Comply With All Applicable Osha, Mpca, The Joint Commission, Mdh, Federal, State, Interstate And Local Requirements, Rules, Regulations, And Laws Respecting Control And Abatement Of Pharmaceutical And Hazardous Waste Disposal And Management. obtain All Necessary Permits And/or Licenses Regarding The Pickup And Incineration Or Other Acceptable Disposition As Regulated By State And Federal Epa Guidelines For Hospital Hazardous/dual Waste. this Includes Any Laws In Other States That Are Applicable To The Transportation Of Hazardous/dual Waste Across State Lines. potential Successful Contractor May Be Asked For Documentation That Will Help Determine Contractor Responsibility And Whether The Transporter Is Aware Of And In Compliance With (these) Regulatory Requirements. the Vahcs Requires Hazardous Waste Removal At A Minimum Of Six (6) Visits Per Year/every Other Month. contractor Must Check In With The Cor Or His/her Designee Prior To Beginning Any Work And After Completion. shipments Of Hazardous, Dual, Universal, And Non-hazardous Healthcare Waste Must Be Provided Every Other Month, Or As Needed Based On Generation. periodic Shipments Of Dea Controlled Substances Waste. all Labor And Equipment To Package, Transport, Treat And Dispose Of Waste. technical Expertise To Categorize And Profile Waste And Advise On Federal, State, Municipal And Local Regulatory Compliance. consulting Services at The St. Cloud Va S Request, The Contractor Will Provide Technical Expert Consulting Services On Topics Related To Epa, State Specific Rcra, Dot, And Other Environmental Regulations. pharmaceutical Formulary Review Annual Update annual Pharmaceutical Formulary Review And Report That Identifies All Listed And Characteristic Waste And Codes Including Minnesota Specific Waste Codes. the Contractor Will Provide An Electronic Review Of The Vahcs Formulary And Provide Recommendations As Appropriate. the Completed Review Will Identify All Listed Waste, Characteristic Waste, And Rcra-equivalent Waste, Including State Specific Waste Codes, E.g. Mn01 Lethal. the Final Review Will Be Submitted In Microsoft Excel Spreadsheet In An Electronic File. electronic Record Keeping And Reporting. controlled Substances Disposal contractor Personnel Will Be Escorted By Vahcs Staff. the Contractor Will Be Responsible For The Disposal Of Controlled Substances From The St. Cloud Va Hcs Pharmacy In Compliance With All Applicable Dea, Epa, Mpca, And Local Regulations And The Needs Of The Department Of Veterans Affairs. transportation: Hazardous Waste Shall Be Transported On The Public Highways In Vehicles That Are Licensed, Permitted, Or Otherwise Registered In Accordance With All Applicable Federal, State, Municipal And Local Laws. license Number(s) Must Be Posted On The Exterior Of The Vehicles. each Vehicle Transporting Hazardous Waste Must Have An Emergency Spill Clean-up Plan And Basic Cleanup Equipment On Board. out Of Country Shipments Are Prohibited Under This Contract. disposal: Contractor Will Dispose Of Hazardous Waste In A Manner That Leaves No Future Expense Potential To The Va Or The Federal Government. Chemicals Should Be Disposed Of In The Following Preferred Priority: the Treatment Of The Chemical Waste (at A Facility Approved For Such Processing By An Appropriate State Or Federal Agency) In A Manner That Renders It No Longer A Hazardous Waste As Defined In The 40 Cfr Series. These Processes Include (but Are Not Limited To): reprocessing Or Recovery Followed By Recycling/reuse. chemical Neutralization Or Detoxification. thermal Treatment (e.g. Incineration, Pyrolysis). the Long-term Internment (burial) In A Secure Chemical Landfill Site Approved For Such By The Appropriate State Or Federal Agency. acceptance Of The Hazardous Property (chemical Wastes) At A Properly Permitted Treatment, Storage, Or Disposal Site Does Not Constitute Disposal And/or Completion Of The Contract. it Is The Prime Contractor S Responsibility To Obtain All Necessary Documentation To Prove That The Timely End Disposal Of All Items Has Been Accomplished. contractor Shall Provide The Cor With A List Of Disposal Facilities That Will Be Used In Conjunction With This Contract. This List Must Include The Name Of The Company, Address, City, And State, Zip Code, Telephone Number, Epa Id And State Permit Number. this Contract Will Not Include The Disposal Of Infectious, Bio-hazardous, Radiological, Or Pathological Waste With The Exception Of Dual (chemical And Infectious Combined) Waste. waste Spill Or Release: Should Waste Be Spilled Or Released During The Performance Of Services, Through No Fault Of The St. Cloud Va Hcs, The Contractor Will Be Responsible For Cleanup And All Costs Associated With The Satisfactory Remediation Of The Incident. this Will Include The Cost Of All Labor And Materials, Repair Of Any Damage, And/or Harm Caused To Patients, Visitors, And Staff. Cleanup Shall Be Performed To The Satisfaction Of Regulatory Authorities And The Cor. when Waste Is Spilled Or Release By The Contractor During The Performance Of Services The Contractor Shall Submit A Spill Report. such Incidents Shall Be Reported To The Cor Immediately By Telephone And In Writing No Later Than Seven (7) Workdays After Leaving The Site. the Spill Report Shall List At A Minimum The Type Of Spill, Amount Of Waste, And Personnel Exposed To The Spilled Waste. the Contractor Shall Provide Certification That The Spill Was Cleaned Up, A Statement Concerning The Effect On Any Employees, And A Description Of The Cause And Corrective Measure Instituted By Contractor To Ensure Spills Do Not Occur Again. Schedule: the Contractor And Cor Will Arrange For Scheduled/routine (non-emergency) Services That Occur On A Bi-monthly Basis. work Hours: the Contractor Shall Perform Services During Normal Business Hours, 8:00 Am - 4:30 Pm, Monday Through Friday, Excluding Federal Holidays. The Eleven National Holidays Observed By The Federal Government Are: New Years Day January 1st Martin Luther King Jr. Day Third Monday In January Presidents Day Third Monday In February Memorial Day Last Monday In May Juneteenth June 19th Independence Day July 4th Labor Day First Monday In September Columbus Day Second Monday In October Veterans Day November 11th Thanksgiving Day Fourth Thursday In November Christmas Day December 25th Any Additional Federal Holiday Declared By The President Of The United States if The Holiday Falls On A Saturday, The Previous Friday Will Be Observed And If The Holiday Falls On A Sunday, The Following Monday Will Be Observed. the Cor Or Dot Hazmat Certified Designee Are Available During Those Hours For The Approval/signature Of Shipping Manifests And Other Required Documentation Unless Exigent Circumstances Require Services During An Unscheduled Time. any Service Performed Outside Of Normal Working Hours Shall Be Approved In Advance By The Contracting Officer S Representative Cor. after-hours Access Will Be Coordinated With The Gems Program Manager Or The Gems Program Manager S Site Designee. emergency Services: the Contractor Must Be Available 24/7 And Will Take Responsibility For Up To Two (2) Chemical Spills/releases Per Year At The St. Cloud Va Hcs. the Contractor Shall Provide A Primary And Alternate Point Of Contact To The Cor Within 5 Days Of Contract Award. Information Shall Include A 24-hour Emergency Contact (name, Telephone #, Mobile #) Available During Contractor S Non-business Hours. training For Contractor Personnel: the Contractor S On-site Staff Shall Have Training In Hazardous Waste Handling And Emergency Procedures And Provide Documentation Of This Training. this Training Shall Include Osha, Epa, Minnesota Pollution Control, And Dot (including Hm 181) Regulations. permits, Licenses, And Regulatory Compliance: the Contractor Shall Maintain All Applicable Permits And Licenses For Services Provided And Comply With All Applicable Federal, State, Municipal And Local Laws, Rules, And Regulations. the Contractor Will Obtain And Maintain Any Additional Permits And Licenses That May Be Required Because Of Changes In Regulations. this Includes Compliance With All Occupational Safety And Health Administration (osha), Environmental Protection Agency (epa), Minnesota Pollution Control Agency (mpca), Joint Commission (jc), Minnesota Department Of Health (mdh) Requirements And Requirements In Other States Applicable To The Transportation And Disposal Of Waste That Crosses State Lines. the Following Shall Be Provided To The Contracting Officer With Bid Proposal Submission For Evaluation Purposes And Annually Within Thirty (30) Days Of The Renewal Date Of This Contract With Any Changes To Original Submission Clearly Identified And Highlighted: current Waste Transporter Permit(s) For The Contractor And Subcontractors. list Of All Transfer Stations, Treatment, Storage, And Disposal Facilities (tsdfs) Including Incineration, Wastewater And Sludge Treatment Facilities That Shall Be Utilized During This Contract To Include The Capacity Of These Facilities And The Waste Codes For The Waste Streams They Are Permitted To Accept By Treatment Technology. address, Phone Number And Other Contact Information Shall Be Provided. the Va Reserves The Right To Inspect Each Of These Facilities Before Approving Its Use Or At Any Time During Or After Contract Period While Va Wastes Are Present. copy Of Operator Permit(s) certificates Of Training And Experience Of Contractor/subcontractor Staff And Personnel Who Will Perform Site Work Under This Contract (all Technicians That Will Work On Va Premises Will Be Expected To Have Received At Least The Minimum Training Required By Law As Specified In 29cfr 1910-120, 40 Cfr Parts 260-265 And 49 Cfr Parts 171-178). provide The Contractor S/subcontractor Experience In Hazardous Waste Packaging, Transport, And Disposal. provide A Copy Of Us Epa Identification Number(s) Certificate For Each Business Entity Operated Or Contracted By The Contractor That Will Provide Service Regarding Any Aspect Of Va Waste Disposal Program (i.e. Storage, Transfer, Incinerator Sites.) provided A Copy Of Certificate Of Registration With The State Epa As A Hazardous Waste Hauler For Each Business Entity Operated By The Contractor That Will Provide Hazardous Waste Transportation Services For Any Aspect Of Va Waste Disposal Program. provide Written Acknowledgement Of Responsibility For Acquisition Of All Applicable Business Licenses And Permits Required By Law. contractor Shall Certify That It Acknowledges And Is In Possession Of All Required Business Licenses And Permits. provide A List Of Any Violations And/or Citations That The Contractor And Subcontractors Have Received For Non-compliance With Any Hazardous Waste Laws, Permit Requirements, And/or Osha Requirements For The Past Three Years From The Date Of Submission. contractor Shall Include Information On All Related Business Entities Including Associated Firms That Are Owned By The Contractor Or Owned By A Common Parent Company That Will Be Involved In Any Portion Of The Processing Of Va Waste Disposal Program. if No Discharge Or Violations Have Occurred, Contractor Must Provide A Statement That Certifies No Discharges Or Violations Have Occurred. provide A Plan Describing Standard Operating Procedures (sops) That Will Be Followed While Conducting Normal Hazardous Waste Management Activities. The Contractor Shall Describe: site Safety And Contingency Procedures (e.g. Spill Management). operational Procedures And Site Management Structure. supplies And Equipment Practices. material Sampling Procedures. hazard Assessment And Categorization Procedures. packing Procedures. quality Assurance And Quality Control Procedures To Ensure Materials Are Properly Identified, Categorized, And Packaged, And Paperwork Is Properly Completed. procedures For Gaining Waste Acceptance Into A Transfer/ Disposal Facility. contractor And Project Management Procedures. provide The Following Information Regarding The Hazardous Waste Fleet Owned And Operated By The Contractor: basic Description Of Transportation Services Offered And Capabilities. fleet Description Of Number, Types, And Ages Of Vehicles. description Of Service And Maintenance Programs. types Of Materials Licensed To Haul. latest Dot Or Mcs Rating (include A Copy Of The Last Inspection). the Dot/mn Dot Compliance Record. description Of Driver Qualifications Including Training Programs, And Experience. provide Evidence That Background Checks Have Been Performed On All Employees That Will Perform Any Duties Under This Contract. provide The Following Information On The Contractor's Emergency Response (er) Capabilities (or Any Changes To Original Submission): contractor's Er Policies. Er Capabilities And Experience And Limitations. type Of Er Equipment Maintained (specify If Owned Or Subcontracted And From Whom). personnel Availability, Training, And Experience. contractor's Emergency Response Procedure Shall Describe: how To Request An Emergency Response. how The Contractor Notifies Personnel And Initiates Response Action. incident Command Procedures Followed By The Contractor. er Work Practices. er Protection Of Health And Safety Practices. er Invoicing Policy. provide A Detailed Site Safety Plan That Will Be Used To Ensure That Workers And Nearby Population Will Be Adequately Protected During Packaging And Removal Operations. provide Information Identifying Any Proposed Subcontractors And Identifying Services To Be Performed By The Subcontractors. contractor Must Submit Evidence That Subcontractor Is Qualified And Legally Able To Provide Services. (all Subcontractors Must Be Approved By The Facility Gems Program Manager And Contracting Officer Prior To Performing Any Duties Under This Contract). the Government Reserves The Right To Prohibit The Contractor From Employing The Services Of A Subcontractor Who Does Not Possess The Ability To Satisfactorily Perform In Accordance With The Provisions Of This Statement Of Work. the Use Of A Subcontractor Or Subcontractors Does Not Relieve The Contractor From Any Requirements Set Forth In This Statement Of Work. the Contractor Is Responsible For Ensuring That Any Subcontractor(s) Perform In Accordance With The Terms And Conditions Of This Statement Of Work. Subcontractors Will Also Comply With (j) Of This Section. provide A List Of Names, Titles, Addresses, Telephone Numbers (including Cellular), Pager/beeper Numbers, Facsimile Numbers, And E-mail Addresses Of Key Managers, Supervisors, Customer Service, And Field Service Personnel Performing Under This Contract. provide Written Standard Operating Procedures (sops) For The Collection, Handling, Accumulation, Sampling, Lab Testing, Characterization, Packing, And Shipping Of Hazardous, Universal, And Non-hazardous Wastes. provide A Single Point Of Contact For Each Facility With Backup. provide A List Of Names, Titles, Addresses, Telephone Numbers (including Cellular), Pager/beeper Numbers, Facsimile Numbers, And E-mail Addresses Of Key Managers, Supervisors, Customer Service, And Field Service Personnel Performing Under This Contract. records And Reporting Requirements: contractor Shall Provide A Centralized Online Electronic Waste Tracking System That Is Exportable To The Va System Via Microsoft Excel Spreadsheet. the Centralized Tracking System Will Include A Centralized Database For All Waste Characterizations And Determinations, Waste Profiles, Hazardous Waste Manifests, Universal Bill Of Lading For Universal Wastes, Methods Of Final (end) Disposal, Final (end) Disposal Sites, Shipping Information, Monthly, Quarterly And Annual Waste Generation Reports By Facility, Training Records, A Tracking System For Hazardous Materials Spills And All Recordkeeping, And Reporting Needed To Operate And Manage The St. Cloud Va Hcs Hazardous Waste Management Program. the Contractor Will Be Responsible For Providing A Database That Will Be Able To Generate Reports On Hazardous Waste Activities, Waste Characterization Profiles, Annual Generation By Facility And Other Information Necessary For The Successful Operation And Management Of A Hazardous Waste Management Program. this Will Be Readily Exported To A Format Such As Microsoft Excel. prior To The Shipment Of Waste, The Contractor Will Furnish A Properly Prepared And Legible Copy Of The Appropriate Manifests And Shipping Papers. fully Executed Manifests Will Be Provided To The St. Cloud Va Hcs Within Thirty (30) Days Of Shipment. the Contractor Will Provide A Certificate Of Disposal For All Waste Disposed Clearly Indicating Proper Treatment And Disposal. 14. Safety: The Contractor Shall Take Such Safety Precautions As The Co Or Cor May Determine To Be Reasonably Necessary. the Co Or His/her Designee Will Notify The Contractor Of Any Noncompliance. the Contractor Shall, After Receipt Of Such Notice, Immediately Correct The Conditions To Which Attention Has Been Directed. such Notice, When Served In Person On The Contractor Or His/her Representative At The Site Of Work, Or Telephonically To Contractor S Designated Representative, Shall Be Deemed Sufficient For The Previously Mentioned. if The Contractor Fails Or Refuses To Comply Promptly To Satisfactorily Abate The Hazardous Condition Or Situation, The Co May Issue An Order Stopping All Or Any Part Of The Work And Hold The Contractor In Material Breach Of This Contract. 15. Work Practices And Standards: The Contractor Shall Have Established Standard Operating Procedures That Will Be Followed While Conducting Hazardous Waste Management Activities. this Includes Site Safety And Contingency Procedures, Strike Contingency Plan, Operational Procedures, Use And Maintenance Of Supplies And Equipment Procedures, Material Sampling Procedures, Waste Categorization Procedures, Packaging Procedures, Quality Assurance Plan, Procedures For Gaining Waste Acceptance Into A Facility, And Project Management Procedures. 16. Quality Assurance: The Contractor Shall Maintain A Quality Assurance Program To Assure Services Are Performed In Accordance With Commonly Accepted Commercial Practices. the Contractor Shall Implement Procedures To Identify, Prevent, And Ensure Non-recurrence Of Defective Services. as A Minimum, The Contractor Shall Develop Quality Control Procedures Addressing The Areas Identified In The Next Paragraph. timely Shipment Of Hazardous, Dual, Universal, And Non-hazardous Healthcare Waste And Dea Controlled Substances Waste. timely And Properly Completed Manifest And Shipping Papers. sufficient And Competent Personnel Including Personnel With Expertise To Perform Waste Characterizations, Profiles, And Consultation Services. sufficient Equipment And Supplies In Good Working Condition. fully Functional Online Record Keeping And Reporting System Accessible Always. timely And Accurate Billing System. the Government Will Periodically Evaluate The Contractor Performance By Appointing A Representative(s) To Monitor Performance To Ensure Services Are Received. the Government May Inspect Each Task As Completed Or Increase The Number Of Quality Control Inspections If Deemed Appropriate. likewise, The Government May Decrease The Number Of Quality Control Inspections If Performance Dictates. 17. Competent Personnel: Contractor Personnel Who Perform Services For The St. Cloud Va Hcs Must Be Competent, Experienced, And Qualified To Perform Such Services. all Work Shall Be Performed In Accordance With Established Waste Management Practices. appropriate Handling Of Waste Is Essential For The Safety Of Government And Contractor Employees And Cost Containment. the Contractor Shall Furnish And Ensure All Personal Protective Equipment (ppe) For Contractor Employees Is In Good Condition. the Contractor Shall Provide Employee Training On Established Policies And Procedures For Waste Handling. contractor Employees Providing Site Services Shall Be Certified In Forty (40) Hour Hazardous Waste Operations And Emergency Response (hazwoper) Training And Wear Appropriate Protective Equipment When Handling Hazardous Waste. the Contractor Shall Submit Proof Of Appropriate Training And Experience To The Cor Upon Request. contractor Employees Should Be Enrolled In A Medical Surveillance Program That Meets The Standards Of 29 Cfr 1910 At The Expense Of The Contractor. 18. Identification, Check-in, Parking And Smoking: Contractor Employees Shall Notify Cor Or Designees Upon Arrival To Campus And Prior To Commencement Of Work. during Off-hours Emergency Response Activities Contractor Personnel Should Check In With Va Police If The Cor Or Designee Is Not Available. smoking Is Prohibited On Va Property. possession Of Weapons Or Contraband Is Prohibited. enclosed Containers, Including Tool Kits, Shall Be Subject To Search. 19. Indemnification: It Shall Be Expressly Agreed And Understood By The Contractor And The St. Cloud Va Hcs That The Contractor Agrees To Indemnify The St. Cloud Va Hcs Against All Liabilities, Claims, Penalties, Incident Of Death, Bodily Injuries, Destruction Or Damage To Property, Contamination Or Adverse Effects On The Environment Or Any Violation Of Government Laws, Rules Or Regulations, Caused In Whole Or Part By The Contractor S Breach Of Any Term Of The Contract Or Any Negligent Or Willful Act Or Omission Of The Contractor, Its Employees Or Subcontractors In The Performance Of This Contract. 20. Penalties And Fines: The Contractor Shall Satisfy All Applicable Regulatory Agency Requirements. in The Event A Regulatory Agency Assesses A Monetary Fine Against The St. Cloud Va Hcs For Violations Caused By The Contractor, The Contractor Shall Reimburse The St. Cloud Va For The Fine. 21. Authorized Services: Only The Services Specified In The Sow Will Be Authorized Under The Contract. the Co In Consultation With The Cor May Authorize Additional Services Or Repairs Under A Separate Purchase Authorization. reimbursement Will Not Be Made Unless Prior Authorization Is Obtained. 22. Invoices And Payment: Payment Of Services Rendered Under This Contract Will Be Made In Arrears Upon Satisfactory Completion Of Each Service And Receipt Of A Properly Prepared Invoice. invoice Must Include, But Not Limited To: contract Number purchase Order Number manifest Number(s) complete And Accurate Description Of Services dates Of Performance amounts unit Price extended Totals any Other Data Relevant For Payment Purposes the Government Shall Not Authorize Payment Until Such Time That The Cor Or His/her Designee Receives All Properly Executed And Signed Documentation. 23. Insurance: Owners And Contractor S Insurance: The Contractor Shall Obtain At His Own Expense, General Liability Insurance In The Amount Of Not Less Than $500,000.00 For Protection Against Claims Of Personal Injury, And $50,000.00 Per Occurrence For Damage To Property, Arising Out Of This Contract. professional Liability Insurance: The Contractor Shall Obtain At His Own Expense, Professional Liability Insurance For Services To Be Performed Pursuant To This Contract, Insuring The Contractor Against Malpractice Or Errors And Omissions Of The Contractor In The Amount Required By State And Local Authorities. $10 Million In Pollution Control Liability Insurance. workers Compensation And Employer Liability: $100,000.00 automobile Liability: $200,00.00 Per Person And $500,000.00 Per Occurrence For Bodily Injury And $20,000 Per Occurrence For Property Damage. at All Times During Performance, The Contractor Shall Maintain With The Contracting Officer, A Current Certificate Of Insurance Showing At A Minimum, The Insurance Required Above, And Providing Thirty (30) Days Written Notice To The Contracting Officer By The Insurance Company Prior To Cancellation Or Material Change In Policy Coverage. note: Any Additional Charges Claimed Must Be Approved By The Contracting Officer In Writing Before Service Is Completed!
Closing Soon10 Jan 2025
Tender AmountRefer Documents 

Western Visayas Sanitarium Doh Tender

Healthcare and Medicine
Philippines
Details: Description Republic Of The Philippines Department Of Health Western Visayas Sanitarium And General Hospital Santa Barbara, Iloilo Invitation To Bid For Supply, Delivery And Installation Of Various Hospital Equipment Ib No. 2024-12-018-g The Western Visayas Sanitarium, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors To Apply For Eligibility And To Bid For The Hereunder Project: Name Of Project : Supply, Delivery And Installation Of Various Hospital Equipment Location : Western Visayas Sanitarium And General Hospital, Inangayan, Santa Barbara, Iloilo Approved Budget For : Php 34,665,000.00 The Contract (abc) Fund Source : Caf No. 2024-133-gf Delivery Period : Within Ninety (90) Working Days After Receipt Of The Notice To Proceed Line Items Abc: Php 34,665,000.00 Lot 1 No. Description Unit Of Measure Quantity Approved Budget Cost (php) 1 Electrical Machine. Brand New. Product Specifications: Combination Of Electrotherapy And Ultrasound; With 3 Independent Channels And Body Diagram Installed; Power Supply: Ac 100- 240 V, Number Of Channels: 3 Independent (2 For Electrotherapy, 1 For Ultrasound) Electrotherapy; Ten& Ems, Ultrasound Functions; Electrode Pads For Tens & Ems; Us Probe Head: Large And Small. Warranty -1 Year From Delivery And Installation. Unit 1 290,000.00 2 Hand Dynanometer. Brand New. Product Specifications: Hydraulic Adjustable Handle. Strength Can Be Viewed In Pounds Or Kilogram. Can Measure Up To 90kg (200lbs.). Durable Metal Gauge. Warranty –at Least 6 Months Upon Delivery And Installation. Unit 1 55,000.00 3 Parallel Bars. Brand New. Product Specifications: Adjustable And Foldable. Stainless Steel Bars And Steel Base. Height Adjust Within 26''-40''. Width -24''-36". Length Ranges: 7-10 Feet. Warranty -at Least 6 Months Upon Delivery And Installation Unit 1 50,000.00 4 Pulley System. Brand New. Product Specifications: Single Handle/dual Tower. Chest And Floor Height Mounted Handle. Easily Adjustable Handles. Wheelchair Accessible. Warranty –at Least 1 Year Upon Delivery And Installation. Unit 1 150,000.00 5 Pbx, Smart Hybrid. Brand New. Product Specifications: Designed For Telemedicine Use. Genuine And High Quality Brand. Pabx Built-in Extensions 16 Analog. At Least 2 Card Slots And 2 Slots Trunk Extension Card Switch System. Ability To Equip Sub-frame Ns-320; 12-32 Trunk Extensions. Sub-frame To Extend Pbx Ns300. Port Connected To The Main Frame. Dimensions: 40-45 X 35-36 X 86-90 Cms. Warranty –at Least 6 Months From Delivery And Installation * Unit 1 100,000.00 6 Uninterrupted Power Supply. Brand New. Products Specifications: Designed For Telemedicine Operation. 3000va. Output Power Capacity-3000va, Mount: 3u Rack Mountable. Nominal Output Voltage -230v. Dimensions: 20-22 X 19-20 X 5-6 Inches. Warranty –at Least 6 Months Upon Delivery And Installation. * Unit 1 400,000.00 7 Medical Waste Shredder. Brand New. Product Specifications: 20hp Motor Slow-speed And High Torque Dual Shaft Shredders, 5/16″ Wide Cutters, With Bearing Protection And Cleaning Fitters. Features: Efficiently Shred Syringes, Face Masks, Boxed Medical Waste, Pill Bottles, Etc., Available With A Split Cutting Chamber That Allows For Two Different Shred Widths Within One Shredder, The Manner Of In Feed And Output Are Also Divided. Includes Training And Certification, Warranty 1 Year Upon Installation Unit 1 350,000.00 8 Portable Multi-parameter Analyzer Flow Water Quality Testing. Brand New. Product Specifications: Measures Water Quality Parameter For Ph/ec/ise/do/temp. Mv/orp/px/resistivity/tds/sal./do Saturation. Features: Portable Device, Color High Contrast Lcd Touchscreen, Data Storage1000 Sets For Each Parameter, Support For Usb Communication, Ip65 Waterproof, Includes All Necessary Accessories And Consumables, Includes Training And Certification For Use, Warranty For 1 Year Upon Installation Unit 1 200,000.00 9 Water Purification System. Brand New. Product Specifications: 6000 Gdp Reverse Osmosis Machine. Up To 1200 Containers Per Day. Double U.s. Membrane. 2 Tanks 1000ltrs. For Raw & Product Water. At Least 28 Stages Of Water Filtration. To Include Piping Line From Water Station To Specified Areas Within The Health Facility. To Include Necessary. Building/structure For The Water Station. Service Warranty 1 Year After Delivery And Installation. To Include Service And User Training. Including Consumables: 50 Gallons Round Containers, 50 Gallons Slim Containers, 1 Sack Industrial Salt. * Unit 1 350,000.00 10 Anesthesia Machine With Cardiac Monitor. Brand New. Product Specifications: Main Gas Supply -oxygen, Air. Pin Index Supply System: Oxygen, Air. Ventilatior: With At Least Six (6) Ventilation Modes. Machine Must Be Able To Ventilate Patient Using The Preset Settings Provided By The End-user Even Presence Of Driving Gas Is Temporarily Unavailable. Ventilator Must Be Enclosed With Metal Casing To Prevent Entry Of Foreign Items Including Fluid. Ceramic Type Of Inspiratory And Expiratory Valve. Ventilator Must Have High Pressure Valve That Ensures Release Of Excess Pressure When Required. Ventilator Must Be Functional When Machine Is Connected Either Through Direct Power Supply Or Back Up Battery. Breathing System: The Volume Of The Compact Breathing System And Co2 Absorber Must Be 1.7l Excluding Hoses And Breathing Bag. Volume Of Co2 Absorber Reusable Canister Must Be 1.5l. With Bypass Valve Located In Breathing System Allowing Continuous Machine Operation While Changing Co2 Absorber. With Fresh-gas Decoupling Valve That Prevents Direct Entry Of Pressure In The Patient Airway When Pressing The O2 Flush Button, Peep And Pressure Limitation. With Breathing System That Can Be Detached From The Main Unit Without Tools Required. Breathing System Should Be Separated From The Main Unit With Mounting That Can Be Positioned From Any Direction Without Moving The Entire Anesthesia Machine. With Ceramic Type Of Inspiratory And Expiratory Valve. With Sample Gas Return Port. With Pup Off Pressure Release Valve Located At The Apl Valve. With Moisture Reduction System. Hot Steam Sterilization Can Be Carried Out At 134 ° C (273.2 ° F). With Heated Breathing System. Anesthesia Gas Supply Module: Range Of Fresh Gas Flow Indicators: 0.0 To 12.0 L/min. O2 Flush (bypass): At 87 Psi (6 Kpa X 100): Max. 75 L/min At 41 Psi (2.8 Kpa X 100): Min. 25 L/min. With Metering Valve And Dual Flow Tubes For Fresh-gas. With Integrated O2 Monitoring Located In The Screen. Vaporizer: With Two (2) Selectatec Vaporizer Mounting. With One (1) Unit Sevoflurane And One (1) Unit Isoflurane Vaporizer. Vaporizer Must Have No Cloth Component Which Allows Item To Be Functional Immediately Even Transporting It In An Upside Down Position. Oxygen Sensor: With Oxygen Sensor That Measures Percentage Of Oxygen. Flow Sensor: With Constant Temperature Hot-wire Anemometer Flow Sensor. Must Be Located Within The Anesthesia Unit Distal To The Patient Area. Flow Sensor Must Be Reusable. Auxillary Low Flow Oxygen: With Integrated Low Flow Oxygen Supply For Mask And Nasal Cannula Application. Writing Table/drawers/mounting: With At Least 3 Drawers As Storage For Other Accessories. With A Retractable Writing Table That Can Hold At Least 10kgs. Advanced And Safety Features: Functional Even The Battery Is Completely Discharged, All Pneumatic Functions Continue To Be Available (apl Valve, Breathing Pressure Gauge, Cylinder And Pipeline Gauges, Fresh Gas And Agent Delivery, And O2, Air, Flow Meters).manual Or Spontaneous Ventilation Can Be Maintained During Power Failure And Discharged Of Battery. In Case Of No Power And Totally Discharged Battery, Machine Must Be Shifted Automatically From Ventilator Mode To Manual Mode Without Any Switch Or Button Required. Start-up Time Must Be Less Than 15 Seconds. Power Input Data: Power Supply: Rating Non-configurable 100 To 240 Vac, 50/60 Hz, 145 Va. Battery Operation Time: Up To 2 Hours, Minimum Of 45 Minutes. Parameters: Minimum Tidal Volume (vt) Required: 20 Ml. Breathing Frequency (rate): 4 To 60 Bpm (1/min). Inspiratory Pressure: Peep + 5 To 65 Cmh2o. Inspiratory Flow (inspflow): 10 To 75 L/min In Volume And Pressure Control Modes, 10 To 85 L/min In Pressure Support And Simv/ps Modes. Inspiration Pause: 0 To 50 %. Simv Inspiratory Time: 0.3 - 4.0 Sec. Positive End Expiratory Pressure: (peep) 0 To 20 Cmh2o. Inspiration/expiration Ratio: (ti:te) 4:1 To 1:4. Pressure Limiting: 70 Cmh2o. Range Of Fresh Gas Flow Indicators: 0.0 To 12.0 L/min. Pressure Support Level: Peep + 3 To 20 Cmh2o. Min. Frequency For Apnoe-ventilation: (freq. Min.) 3 To 20 Bpm And “off”. Trigger Level: 2 To 15 L/min. Standard Accessories: One (1) Unit O2 Regulator, One (1) Unit Air Regulator, O2, Air Fittings And Hose Clamps, One (1) Unit Adult Anesthesia Circuit With 2l Bag. Biolight M12 Patient Monitor (basic Configuration). Technical Specification: Display/waveforms: Screen Size Display: Not Less Than 12" Color Tft Screen. Screen Navigation: Touch Screen With Quick Volume And Brightness Adjustment. Support Quick Key, Able To Access Specific Functions Or Perform Operations Easily And Quickly. No. Of Waveforms: At Least 7 Waveforms (using Standard Screen Display). Battery: Internal Battery Duration Must Be: ≥ At Least 240 (built In Battery). Can Upgrade Lithium Battery, Battery Power Supply ≥480 Min. Ecg: Ecg Leads: 3/5 Leads, Display Sensitivity: ×0.25, ×0.5, ×1, ×2, ×4,auto Gain, Must Have A Smart Lead Off Feature, Must Have An Ecg Calibration Feature, Must Have An St Segment Analysis And Monitoring. Heart Rate Range Must Be: Adu: 10 To 300 Bpm, Ped/neo: 10 To 350 Bpm, Must Have Two (2) Hr Averaging Method. With Ecg Multi-lead Synchronous Analysis Function, Analysis Of Multiple Cardiac Leads At The Same Time, Can Be Accurately Monitored In The Case Of Individual Lead Interference, With Intelligent Lead Fall Monitoring Function. St-segment Analysis Can Show The St Graphic, Which Help Indicates The St Alarm Status More Faster. Nibp: Nibp Measurements Must Comply With The American National Standard For Electronic Or Automated Sphygmomanometers: - (ansi/aami/iso 81060-2:2009, Ansi/aami Sp10:2002) In Relation To Mean Error And Standard Deviation. Measurement Mode: Manual, Auto, Stat, And Sequence. Sequence Mode Could Support 5 Different Modes. Maximum Measuring Interval In Auto Mode Must. Must Have An Overpressure Protection For Nibp. Temperature: Must Have Dual-channel Body Temperature Monitoring With Difference Display Measurements. Must Support Skin And/or Oral/rectal. If More Than One Temperature Probe Is Used, The Monitor Will Be Capable Of Calculating And Displaying A Delta Reading. Measuring Range: 0~50 ℃. Spo2: Must Be Used In Low Pi (perfusion Index). Resp: Detection Method: Respiratory Rate And Respiratory Waveform Must Be Monitored By Pulse Wave. Trends: Trend Data For All Parameters In Tabular And Graphic Formats Must Be: 180h. Stored Nibp Measurements Must Be: Up To 2400 Groups. Stored Alarm Events Must Be: 3000 Groups And Associated Waveform. Holographic Waveform Must Be 72 Hours. Printer/recorder: Must Support 3-channel Recorder To Realize Thermal Printing; Support Network Printing Function. Network Capability: The Ip Address Of Each Patient Monitor Shall Be User Configurable. Features: -the Monitor Must Provide Electronic Early Warning Scor (ews, Glasgow Coma Scale (gcs), And Oxycrg Screen. -oxycrg Screen Shows Two Trend Curves And A Compression Waveform, Support To Review 48 Hours Trend Curve And Compression Waveform On The Oxycrg Review Screen. -accessories Storage Box, Help Manage Accessories And Prevent Accessories Missing Or Broken Problem. -user Shall Be Able To Freeze The Waveforms On The Screen And Then Review It To Carefully Observe The Patient During This Time. -up To 4 Timers Shall Be Able To Be Configured On Monitor Display To Count Up Or Down The Required Time In Minute And Second With Audio Alarm To Alert User. - The Monitor Shall Provide Following Specific Working Modes: Standby, Intubation, Night, Privacy, And Demo Modes. Accessories Included: 3/5 Lead Ecg Cable, 3/5 Lead Ecg Lead Wires, Adult Spo2 Sensor, Pediatric Spo2 Sensor, Temperature Probe Skin, Temperature Probe Oral/rectal, Nibp Cuff Adult, Nibp Cuff Pedia, Wall Mount / Trolley, One (1) Unit Pediatric Anesthesia Circuit With 1l Bag, Two (2) Units Power Adapter. Includes Avr Machine For Anesthesia Machine. Warranty -2 Years From Delivery, Installation, And Training/orientation. Unit 1 3,300,000.00 11 Cardiac Monitor With Capnograph. Brand New. Product Specifications: Display/waveforms: Screen Size Display: Not Less Than 12" Color Tft Screen. Screen Navigation: Touch Screen With Quickly Volume And Brightness Adjustment By Gestures Operate. Support Quick Key, Can Easily And Quickly Access Some Functions Or Perform Operations. No. Of Waveforms: At Least 7 Waveforms (using Standard Screen Display). Size Must Be: At Least 175mm X 320mm X262mm. With Auto Speech Recognition Module Implements The Voice Interaction With The Patient Monitor. Battery: Internal Battery Duration Must Be: ≥ At Least 240 (built In Battery). Can Up-grade Lithium Battery Power Supply ≥480min. Ecg: 5 Leads Display Sensitivity: ×0.25, ×0.5, ×1, ×2, ×4, Auto Gain. Must Have A Smart Lead Off Feature, Must Have An Ecg Calibration Feature, Must Have An St Segment Analysis And Monitoring. Heart Rate Range Must Be: Adu: 15 To 300 Bpm, Ped/neo: 10 To 350 Bpm. Must Have Two (2) Hr Averaging Method. With Ecg Multi-lead Synchronous Analysis Function, Analysis Of Multiple Cardiac Leads At The Same Time, Can Be Accurately Monitored In The Case Of Individual Lead Interference, With Intelligent Lead Fall Monitoring Function. St-segment Analysis Can Show The St Graphic, Which Help Indicates The St Alarm Status More Faster. Nibp: Nibp Measurements Must Comply With The American. National Standard For Electronic Or Automated. Sphygmomanometers: - (ansi/aami/iso 81060-2:2009, Ansi/aami. Sp10:2002) In Relation To Mean Error And Standard Deviation. Measurement Mode: Manual,auto, Stat, And Sequence,sequence Mode Could Support 5 Different Modes. Maximum Measuring Interval In Auto Mode Must. Must Have A Dual Overpressure Protection For Nibp. Temperature: Must Have Dual-channel Body Temperature Monitoring With Difference Display Measurements. Must Support Skin Or Oral If More Than One Temperature Probe Is Used, The Monitor Will Be Capable Of Calculating And Displaying A Delta Reading. Measuring Range: 0~50 ℃. Spo2: Must Be Used In Low Pi (perfusion Index). Resp: Detection Method: Respiratory Rate And Respiratory Waveform Must Be Monitored By Pulse Wave. Ibp: Support 2-channel Ibp Measurement Range: -50mmhg~+350mmhg. Types Of Measuring Blood Vessels: Arterial Pressure (art), Pulmonary Artery Pressure (pa), Central Venous Pressure (cvp), Right Atrial Pressure (rap), Left Atrial Pressure (lap), Intracranial Pressure (icp); Pulmonary Artery Wedge Pressure (pawp); Cerebral Perfusion Pressure (cpp). The Monitor Will Calculate The Ppv Based On Any Arterial Pressure Value Between Heartbeats. Etco2: Measuring Range: Etco 2 0 To 150 Mmhg. Fico: 3 To 50 Mmhg. Awrr: 0 To 150 Rpm (mainstream). Trends: Trend Data For All Parameters In Tabular And Graphic Formats Must Be: 180h. Stored Nibp Measurements Must Be: Up To 2400 Groups. Stored Alarm Events Must Be: 3000 Groups And Associated Waveform. Holographic Waveform Must Be 72 Hours Printer/recorder: Must Support 3-channel Recorder To Realize Thermal Printing; Support Network Printing Function Network Capability: The Ip Address Of Each Patient Monitor Shall Be User Configurable. The Upper/lower Limits Of Alarms Can Be Configured Via Networking From The Central. The Alarms At Bedside Can Be Paused Or Muted Via Networking From The Central. Features: -the Monitor Must Provide Electronic Early Warning Scor (ews), Glasgow Coma Scale (gcs ), And Oxycrg Screen. -oxycrg Screen Shows Two Trend Curves And A Compression Waveform, Support To Review 48 Hours Trend Curve And Compression Waveform On The Oxycrg Review Screen -accessories Storage Box, Help Manage Accessories And Prevent Accessories Missing Or Broken Problem -all-in-one Monitoring Adult, Children, And Newborn Patients. -user Shall Be Able To Freeze The Waveforms On The Screen And Then Review It To Carefully Observe The Patient During This Time. -up To 4 Timers Shall Be Able To Be Configured On Monitor Display To Count Up Or Down The Required Time In Minute And Second With Audio Alarm To Alert User. - The Monitor Shall Provide Following Specific Working Modes: Standby, Intubation, Night, Privacy, And Demo Modes. Warranty -1 Year From Delivery And Installation. Unit 2 500,000.00 12 Ceasarian Instrument Set. Brand New. Product Specifications: Made Of Heavy Duty Stainless Steel. Includes The Following Items: 1 Pc. Scalpel Handle #3 With Measure 125mm, 1 Pc. Scalpel Handle #4 135mm, 1 Pc. Tc Metzenbaum Scissors Cvd 180mm, 1 Pc. Lexer Scissors Narr Str 165mm, 1 Pc. Mayo-lexer Scissors Cvd 165mm, 1 Pc. Lister Bandage Scissors Hvy 180mm, 1 Pc. Standard Forceps Serr 160mm, 1 Pc. Standard Tissue Forceps 1x2 160mm, 5 Pcs. Lorna Towel Clamp Non-perf 130mm, 6 Pcs. Halsted-mosquito Forceps Delstr125mm, 6 Pcs. Halsted-mosquito Forceps Del Cvd125mm, 2 Pcs. Kelly Forceps Del Str 140mm, 6 Pcs Moynihan Hemostatic Forceps, Crv, 150mm, 1 Pc. Tc Mayo-hegar Ndlholderhvyserr150mm, 1 Pc. Tc Hegar Needle Holder Hvy-serr 205mm, 1 Pc. Us-army Retrac.26x15/43x15-23x15/40x15, 1 Pc. Richardson-eastman Bt471rbt472r, 6 Pcs. Boys-allis Forceps 5x6 155mm, 2 Pcs. Kidney Tray Stainless Steel 250mm, 1 Pc. Bottom For 3/4 Container Height:135 Mm, 1 Pc. Primeline Pro 3/4 Lid Red, 1 Pc. 3/4 Size Perf Basket 406x253x76mm, 1 Pc. Silicone Basket Liner 3/4 Size, 1 Pc.mayo Safety Pin F/ring-hdl Inst 140mm, 1 Pc. Ident. Label Up To 13 Letters Red. Warranty –at Least Eat 1 Year From Delivery. Set 2 1,520,000.00 13 Chemical Analyzer. Brand New. Product Specifications: Combined Instrument With Two Complementary Technologies: Raman Spectroscopy And Colorimetric Detection Confirmatory Testing: One Instrument Capable Of Confirmatory Testing Using Two Technologies Including 1) Swgdrug Category A Technique For Presumptive Testing, And 2) Swgdrug Category C Technique For Confirmatory Testing Safety Of Features For Measuring Energetic Samples: Trace Detection Testing For Energetics Without Need For Opening The Container Nor Inducing Laser Light To The Sample, Scan Delay Timer: 15 Sec – 10 Min Sample Size: Able To Detect / Identify Samples From 1 Microgram Traces To Large Bulk Samples Materials Covered: Common Raman Substances, Explosives, Narcotics, Cwas, Tics, Tims, Precursors, Common Chemicals, Fluorescent Materials Not Covered By 785nm Raman: E.g. Colored Materials, Heroin, Colored Mdma Pills, Oils, Npss, Etc., Low Concentration Materials Not Covered By Any Raman Instruments: Lsd, Thc, Magic Mushrooms, Gunpowder, Etc. Raman Excitation Wavelength: 1064nm Minimizes Fluorescence Effects: Allows For Direct Analysis Of Colored/impure Chemicals Through Colored Packaging. Spectral Wavelength Range 200 – 2500 Cm-1 Portability Power: Small Handheld Device, Optimized For One Handed Operation. , 18.5cm-20cm (l) X 15cm-20cm (w) X 7.9cm-10cm (h), 3.65lbs-5lbs (1.65 Kg-2.27kg)., Quantity 2 Lithium Ion Rechargeable Batteries With Battery Life Of More Than 6 Hours Per Charge Per Battery. Cr123a Rechargable Batteries Can Be Used. Including Spare 2 Lithium-ion Battery. Ruggedness Decontamination: Us Mil-std 810g Designed Rugged., Ip 68 Rated For Use In Varying Environmental Conditions And For Complete Decontamination. Operational Temperature Range: Unit Can Be Operated In -20°c To +50°c Temperatures., Withstands Temperature Fluctuations And Humidity Fluctuations. Rapid Start-up Rapid Results: 60 Seconds From Power On To Analysis., Analysis Results In Less Than One Minute. Operational Mode Options: Raman Analysis And Colorimetric Analysis Oraman: • Auto-collect Adjusts Raman Settings Automatically Optimizes Use For Routine Operations • Advanced User Adjustable Raman Settings For Advanced Operators And Custom Library Build: • Laser Power Level 30-490 Mw Adjustable In 5 Mw Increments Exposure Time 5ms To 30s In Increments • Custom Applications Optimize Raman Analysis Parameters Specific To Material Type Ocolorimetrics: • Pouches Including Both Swipes And Colorimetric Chemicals In One Pouch • Pouches For Explosives And Narcotics • General Pouches For Detecting A Wide Range Of Explosives Or Narcotics • Specific Pouches For One Explosive/narcotic Substance Or Substance Group Easy Raman Operation: • Scans In Direct Contact And Through Translucent Plastic Or Glass Containers. • Universal Sample Holder For Analysis Of Samples In Varying Forms And Packaging. • Smartphone Like Touch-screen Interface Or Large Button Activation. • User Prompted Step-by-step Onscreen Analysis Activation. • Typically, 4 Button Presses To Receive Analysis Result. • Onboard System Status Monitoring And Calibration. Reduces Down-time And Necessity For Re-calibration At A Service Depot Analytical Performance: • Liquids, Solids, Powders, Pastes, Gels, Invisible Traces. • Colored Substances And Substances Found In Colored Translucent Packaging. These Types Of Substances Are Most Often Encountered In Real-world Samples. • Comparative Spectral Analysis Overlay Easily Performed Onboard. • User Adjustable Focus Ensures Analysis Of Material And Not The Packaging. • 4c Software Automatically Monitors Results For Combinations Of Precursors Used In Threat, Drug Manufacturing, And Other Recipes. Users Receive Onscreen Alert To Potential Threat Or Clandestine Drug Manufacturing Activity. Library: Raman: • Over 12,000 Substances. • Resq Library Includes The Latest Explosives, Precursors, Cwas, Tics/tims, Narcotics And Psychotropic Drugs, Steroids, Cutting Agents, Pharmaceuticals, Diluents And Pesticides. • Easily Expandable To Add Emerging Threats And Other Substances. • Fleet Management And Library Transfer To Units In The Field. • 4c Library With Explosive, Drug Manufacturing And Other Types Of Threat Manufacturing Recipes. • Library Updates Provided More Than Once A Year Colorimetrics: • General Narcotics Pouches: Multi Drug Test Incl. Fentanyl, Special Opiate Pouch, Cannabinoids • General Explosives Pouches: Chlorates/perchlorates, General Explosives • Specific Pouches: Cocaine, Ephedrine, Heroin, Ketamine, Lsd, Meth/mdma, Mushrooms, Opiates, Pcp, Thc, Ghb Evidence Documentation Traceability: • Onboard 5mp Camera Captures Image Of Sample And Surroundings, As Well As Colorimetric Swab. • Image(s) Stored Along With Analysis Results In Tamper-resistant File. All Analysis Results Are Traceable And Include Unique Date, Time And Serial Number Stamp. • Ability To Activate Password Protect Operator Log-in. Record Of User Associated Activity Stored Onboard And Cannot Be Deleted. Data Access And Transfer Reporting: • View Results In Real Time On Cell Phone Or Tablet, Computer Or Laptop (pc, Ios, Android, Linux) Via Wifi (can Be Disabled). • Exportable Data In Numerous File Formats. • Data Access And Transfer On Computer Or Laptop Via Usb And Wifi (can Be Disabled). • Easy Report Generation. Customer Support Package: • 24/7/ 365 Days Reachback Service For The Life Of The Unit. • Library Updates Provided For The Life Of The Unit. • Software Updates Provided For The Life Of The Unit. • Support: Online, Phone, Email, And In Some Cases Text Message For The Life Of The Unit Cql Complete Package: • Rugged Shipping Case With Custom Foam Insert. • Qty 2 Rechargeable Lithium-ion Batteries. • Cr123a Battery Cartridge (does Not Include Cr123a Batteries). • External Battery Charger. • Ac Power Supply. • Adjustable Base Adaptor. • Universal Sample Holder. • Certified Benzonitrile Performance Verification And Calibration Standard. • Flash Drive Containing User Manual And Supporting Documentation. • Quick Start Guide. • Usb-c To Usb-a Data Transfer Cable. • 1064nm Laser Test Card. • Including Hand Strap And Wrist Strap. . Training: • Comprehensive Onsite Training For An Unlimited Number Of Users. Add-on Accessories And Software: • Periscope Adaptor. • Vial Holder. • Bottle Adaptor. • Integrated Quickdetect Automated Colorimetrics • Detect Trace Quantities Of Non-visible Residues Left On Surfaces: • Explosives And Explosive Precursors • Narcotics Standard Requirements: • Bidder’s Certificate That Will Provide Manual In English Language (2 Copies Of Operator's/user's Manual And 2 Copies Of Service/technical And Maintenance Manual) Upon Delivery. • Brochure/sales Literature. Training Requirements: • Bidder’s Certificate That Will Conduct Free Technical Training And Product Demo For The End-user/s And In-house Biomed On Equipment Operation And On Maintenance Of Equipment. • After Sales Service: Bidder’s Certificate That Parts Shall Be Available At The Authorized Philippine Service Center/s For A Period Of Five (5) Years After The Warranty Period. • Certification From Local Distributor On The Availability Of Service Technicians And/or Biomedical Engineers In Case Of Equipment Breakdown. Preventive Maintenance - • Bidder’s Certificate Free Quarterly Preventive Maintenance During The Warranty Period With Preventive Maintenance Plan. Warranty Certificate: • Warranty Certificate Minimum Of Five (5) Years For Service And Three (3) Years For Parts. The Warranty Period Shall Commence From The Date Of Acceptance By The End-user After Testing And Commissioning. • Calibration: With Certificate Of Calibration Upon Delivery. The Bidder Must Be Iso 9001 And The Manufacturer Should Be Iso 13485 Certified Unit 1 6,900,000.00 14 Common Bile Duct Exploration Supplement Set. Brand New. Product Specifications: Made Of Heavy Duty Stainless Steel. Includes The Following Items: 1 Pc. Randall Kidney-stone Frcpsslt-cvd225mm, 1 Pc. Randall Kidney-stone Forceps Cvd225mm, 1 Pc. Randall Kidney-stone Frcpshvy-cvd225mm, 1 Pc. Randall Kidney-stone Frcps U-cvd225mm, 1 Pc. Bakes Bile-duct Dilator 1mm, Bakes Bile-duct Dilator 2mm, 1 Pc. Bakes Bile-duct Dilator 3mm, 1 Pc. Bakes Bile-duct Dilator 4mm, 1 Pc. Bakes Bile-duct Dilator 5mm, 1 Pc. Bakes Bile-duct Dilator 6mm, 1 Pc. Bakes Bile-duct Dilator 7mm, 1 Pc. Bakes Bile-duct Dilator 8mm, 1 Pc. Bakes Bile-duct Dilator 9mm, 1 Pc. Bakes Bile-duct Dilator 1mm, 1 Pc. Randall Kidney-stone Forcepscvd190mm, 1 Pc. Randall Kidney-stone Fcpshvy-cvd190mm, 1 Pc. Bottom For 1/2 Container Height:135mm, 1 Pc. Prime Line Pro 1/2 Lid Green, 1 Pc. 1/2 Size Perf Basket 243x253x76mm, 1 Pc. Identification Label Green. Set 1 590,000.00 15 Defibrillator. Brand New. Product Specifications: General Features: 7-10 Inch Lcd Display, Maximum Of 3 Waveforms. High Contrast Display Mode For Bright Environments. Ambulance-ready, Rugged Casting: Ip44, Impact Test Of 0.75m. Output Energy: 1-360j. Charge Times Of <3s T O200j, <7s To 360j. Auto-volt With Smart Charging. Lithium-ion Battery Supports To 6 Hours Monitoring/200 Shocks @360j/ 4.5 Hours Pacing, With Built-in Led Power Level Indicator. Lightweight At 4-5kg., Full Configuration, Main Unit. Automatically Switch Defibrillator Energy, Cpr Prompts, And Alarm Limits Depending On Patient Type. Display Ecg During Aed Mode. Ecg Recovery Within 2.5s Or Less. Contact Status Can Be Checked Through Paddle And Monitor, Impedance Value Can Be Checked In Monitor. Auto-testing Includes Maximum Energy Discharge Test. Parameters: 3/5 Lead Ecg, Pacer. Includes: Thermal Recorder, External Paddle Kits, Ecg Cable And Lead Wires, Ecg Electrode, Multifunction Electrode Pad. Printer Paper, Electrode Gel, Power Cord, Lithium-ion Battery. Unit 5 1,500,000.00 16 Dish Sterilizer. Brand New. Product Specifications: − High Light Led Display, − With Special Boiler Temperature Drainage Settings, − Washing (non-recycling) Parameters Can Be Set Free And With Control Memory Function, − Can Meet Different Washing Demand, − Self - Research Internal Water Softener, − Double Construction Design For Top Cover, − Power: 380v/50hz, − Basket Dimension : 500x500mm, − Washing Ability : At Least 60 Basket / H, − Rinse Water Quantity : 3 L/h, − Inlet Height :400-430mm, − Machine Dimension : 800-850x800-820x1450-1500mm, − Rated Power : 14.75kw, − Gross Weight : 140-150, − Net Weight : 100-110, − Packing Size : 890-900x900-910x1630-1700mm. Warranty Period- Within 1 Year Upon Delivery And Installation To Cover Parts (excluding Wearable Parts) And Service With Preventive Maintenance Every 6 Months Within 2 Years Period. Provides Orientation And Training To End-user Representative.* Unit 1 500,000.00 17 Electrocardiography Machine (ecg) Brand New. Product Specifications. High Resolution Lcd Touch Screen, 320-330x240-250vivid Waveform Display. 12 Leads Ecg Resolution Thermal Printer. Built-in Rechargeable Li-ion Battery, Ac/dc Power Supply. Anti-defibrillator And Pace Maker Detection. Complete Digital Filtering, Resisting Baseline Drift, Automatic Baseline Adjustment. Automatic Ecg Measurement And Interpretation. Large Patient Data Storage; 150 Cases, Equipped With Usb Port For Data Transfer. Three (30 Printing Formats (auto, Manual And Rhythm) Selectable. 1/2/3 Channel Ecg Waveform And Rhythm Leads Record Out. Lead Status Diagram Display. Unit 4 200,000.00 18 Electrosurgical Dessicator Machine. Brand New. Product Specifications: Use For Removal Of Lesions, Warts, Skin Tags, And Other Blemishes Easily With Minimally-invasive Treatment. For Superficial Treatments, Safe To Use Around The Eye And Nose Area. Includes Re-usable Pen And Tips. Unit Specifications: Depth:4-5 Inches, Width:8-9 Inches, Height:7-8 Inches, Weight:6-8 Pounds, Output Power -low At 0-20watts (1/10 Watt Increments Up To 10 Watts), High At 0-35 Watts, Bipolar: 0-35 Watts. Offers Hand-or-foot Activated Operation. Autoclavable, Reusable Hand Control Pencil With Power Adjustment Buttons. Pencils Are Designed With Non-spinning Hex Collar For Multi-positional Fall-safe Blade Locking. Equipped With Mobile Stand. Includes Consumables.warranty-6 Months From Delivery And Installation. Set 1 100,000.00 19 Fetal Maternal Monitoring System: Brand New. Product Specifications: Foldable Screen. Probe Rack And Wall Mounting Rack. Handle For Easy Carrying. User-friendly Gui With 3 Display Modes. Four (4) Optional Color Background. Capable Of 24 Hours Ctg Storage. Fast Print For Store Traces. "smart Notes" Annotation. Signals Overlap Verification. Real-time And Offline Data Transmission To Pc. 10-12 Inch Color Touch Screen. Excellent Algorithm. 12-crystal And 1 Mhz Water-proof Transducer For Accurate Detection. Configuration: Dual-fhr, Toco, Fm, Afm, Mecg, Nibp, Mspo2, Temp. Includes: 3 Each Belt, 1 Each Event Marker, 1 Bottle Ultrasound Gel, 1 Ea. Fhr Transducer, Purple, 1 Each Transducer, Yellow, 1 Each Spo2 Sensor, Adult, 1 Each Temperature Probe, Skin, 1 Each Toco Probe, 1 Each Nibp Cuff, Adult, 1 Each Nibp Tube, Adult. Unit 3 1,110,000.00 20 Infusion Pump. Brand New. Product Specifications: Mechanism: Peristaltic Pump, Operating Mode: Flow Rate Mode, Drip Rate Mode(optional), Preset Volume: 1-9999 Ml, Flow Rate Range: 1 – 600 Ml/h, Increment: 1, 10, 100 (ml/h), Accuracy: ± 5%, Kvo Rate: 1 Ml/h, Bolus Rate: 600 Ml/h, Drop Rate Range: 1 – 400 Drop/min With Optional Drip Sensor, Screen: 2.7 Inches B/w Lcd, Information: Flow Rate, Preset Volume, Accumulated Infusion Volume, Completion, Occlusion, Air Bubble, Bed No, Ac Power Indicator, Battery Capacity, Battery Charge Indicator, Iv Set, Etc., Status Indicator: Stop, Run, Bolus, Kvo, Alarm Type: Air Bubble, Finish, Occlusion, No Ac Power, Low Battery, Battery Empty, Reminder To Operate, Communication Error (err1), Operation Error (err2), Drops Error (err3), Handle Open (err4), Air Bubble Level: 1-3 Levels Adjustable, Universal Compatibility, Turn On/off, Occlusion Alarm Pressure Range: 3 Levels: 60kpa, 100kpa, 140kpa (±20kpa), Battery Type: Lithium Polymer, Battery Life: Up To 4 Hours Continuous Operation 25 Ml/h Flow Rate, With Delivery And Installation, Provision Of Trainings Of Staff With Certificates, And Manual. Unit 4 320,000.00 21 Laboratory Oven. Brand New. Product Specifications: Working Temperature Range At Least 5 Above Ambient Temperature To +300 °c; Setting Accuracy Temperature Up To 99.9 °c: 0.1 / From 100 °c: 0.5; Setting Temperature Range +20 To +300°c; Temperature Sensor 1 Pt100 Sensor Din Class A In 4-wire-circuit. Control Cockpit Single Display. Adaptive Multifunctional Digital Pid-microprocessor Controller With High-definition Tft-colour Display; Timer Digital Backwards Counter With Target Time Setting, Adjustable From 1 Minute To 99 Days; Adjustable Parameters: Temperature (celsius Or Fahrenheit), Air Flap Position, Programme Time; Ventilation: Natural Convection, Vent Connection With Restrictor Flap; Works Calibration Certificate : Calibration At +160°c; Door Fully Insulated Stainless Steel Door With 2-point Locking (compression Door Lock); Internals 1 Stainless Steel Grid(s), Electro Polished; Stainless Steel Interior; Interior Easy-to-clean Interior, Made Of Stainless Steel, Reinforced By Deep Drawn Ribbing With Integrated And Protected Large-area Heating On Four Sides; Volume 32 L; Dimensions W(a) X H(b) X D(c): 400 X 320 X 250 Mm; Max. Number Of Internals: 3; Max. Loading Of Chamber 60 Kg; Max. Loading Per Internal 20 Kg; With Free Power Back-up System, With Free Installation And Demonstration. Unit 1 130,000.00 22 Newborn Hearing Screening Test Equipment. Brand New. Product Specifications: • Capable Of Screening And Diagnostic Testing With Te And / Or Dpoae. • Fast Automatic Test With Pass / Refer And Graphical Test Result Display. • Direct Evaluation Via Value And Bar Diagram. • Up To 12 Frequencies Displayed Within The Device, Dp Up To 12 Khz. • 5 Dp / 2 Te Protocols With User Customizable Parameters (diagnostic Version). • High Noise Immunity For Operation In Normal Clinical Environment. • Lightweight, Small Ear Probe. • Environmentally Friendly Due To Long Life, Rechargeable Battery. • Bluetooth Communication To Optional Printer And Pc • Evaluation Of Results In Pc. Screener With At Least 4 Frequency Dpoae Testing Protocols. • Qualified Protocols Built Into The Device. • 4 Dpoae Test Frequencies Reported. • Integration To State Tracking Systems, Hi-track Or Oz. Diagnostic With Up To 12 Frequency Dpoae Testing Protocols. • 1.5 To 12 Khz Frequency Range With Up To 12 Test Frequencies Reported. • Customizable Test Protocols Teoae Available As An Upgradeable Option. Measurement Type: Distortion Product Otoacoustic Emissions (dpoae) Transient Evoked Otoacoustic Emissions (teoae). Frequency Range: Screener Version: Dpoae: 2.0 Khz To 5.0 Khz Teoae: 1.5 Khz To 4.0 Khz. Diagnostic Version: Dpoae: 1.5 Khz To 12.0 Khz Teoae: 0.7 Khz To 4.0 Khz. Stimulus Intensity Range: Dpoae: 40 Db Spl To 70 Db Spl Teoae: 83 Db Spl Peak Equivalent (±3 Db). Microphone System Noise: -20 Db Spl @ 2 Khz (1 Hz Bandwidth)/ -13 Db Spl @ 1 Khz (1 Hz Bandwidth). Dimensions And Weight (unit): 2.5 To 3” W X 1.2 To 1.8” D X 5.5 To 6.5” H 6.2 To 6.8 Oz. Power Supply: Lithium-ion Rechargeable. Battery Life: 1000 Tests Per Charge, Minimum 15 Hours On-time. Connectors/ Communications: Integrated Usb Communication Capability For Battery Charging And Communication With Pc-based Database Programs Or An Optional Printer. Hdmi Connector For Connection To The Micro-probe. Integrated Bluetooth Class 2 + Edr With Spp. Protocol For Communication With Optional Printer. Standard Accessories: Micro-probe, Box Of Single Use Ear Tip And Ear Tip Remover, Package Of Probe Tubes, Micro-usb Power Supply For Charging Lithium Ion-battery, Pc Database Software With Manual, Micro B To A Usb Cable For Pc Communicator/charging, Protective Carrying Case, Data Management Tool That Provides The Ability To Transfer Patient. Oae Test Data From The Testing Device To A Pc For The Purposes Of Viewing, Archiving, Managing And Printing Oae Reports. Using The Database Also Gives You The Means To Create Letter Sized, Detailed Reports That Can Be Easily Filed Or Faxed. You Can Also Create A “paperless” Office By Saving The Test Results As A Pdf For Electronic Filing Or Email. Dpoae: 40 Db Spl To 70 Db Spl Teoae: 83 Db Spl Peak Equivalent (±3 Db). Includes Ups. Warranty –at Least 1 Year After Delivery And Installation. Unit 1 1,000,000.00 23 Operating Room Lights. Brand New. Product Specifications: Dual Head- Ceiling Type. Major Operating Room Light Multi-color. Merging Of Light Fields, Light Intensity Control. Comfortable Display Of Key-pad On Major Lighting Head. Back Light Key Pad Display. Depth And Merging Light Field Should Be Operated At The Sterilizable Handle. Cool Light Temperature Increasing In Head Area: 0.5 ºc. 360° Continuous Rotation Around All Major Joints. Anti-bacterial Coating Head. - Light Head Diameter: 66cm. Ideal Laminar Flow Ceiling System. With Endo Mode: Must Be Color Green Light. Main Light Head. Electronic Light Intensity Control At Lamp Head. - Light Intensity At 1 Meter Distance: 160,000 Lux. Colour Rendering Index Ra At Kelvin: 98 (for Better Quality Image Of Skin, Blood And Tissues). Colour Rendering Index R9 At Kelvin: 99 (for Better Quality Image Of Skin, Blood And Tissues). Focusable Light Field Size: 19-30 Cm. Colour Temperature: 3,750, 4,000, 4,250, 4,500, 4,750 K. - Adjusting The Shadow Activating Via The Touch Panel. - Maximum Of Four Groups Of Lenses Are Dimmed Simultaneously. Shadow Management System. Number Of Led’s: 99 On Lamp Head. Life Span Of Leds: > 60,000 H. Working Distance: 70-160 Cm. Light Intensity Control (standard): 5% - 100%. Outstanding Depth Illumination: 70, 100, 130 Cm. Laser Pointer On Head (main Light Head Only). Lf-index Leenemann: 26. Lf-index Oostlander: 28. Input Voltage: Single Phase 110 ~ 230 Vac Free Volt. Total Power Consumption: 82 - 92watts. Adjustable Brakes At The Horizontal Arm. Light Head Weights: 18.5 Kg. Protection Type Lamp Head: Iec60529. - Aluminum Housing. Satellite Head. Electronic Light Intensity Control At Lamp Head. - Light Intensity At 1 Meter Distance: 140,000 Lux. Colour Rendering Index Ra At Kelvin: 98 (for Better Quality Image Of Skin, Blood And Tissues). Colour Rendering Index R9 At Kelvin: 99 (for Better Quality Image Of Skin, Blood And Tissues). Focusable Light Field Size: 18-30 Cm. Colour Temperature: 3,750, 4,000, 4,250, 4,500, 4,750 K. Number Of Led’s: 69 On Lamp Head. Life Span Of Leds: > 60,000 H. Working Distance: 70-160 Cm. Light Intensity Control (standard): 5% - 100%. Outstanding Depth Illumination: 70, 100, 130 Cm. Input Voltage: Single Phase 110 ~ 230 Vac Free Volt. Total Power Consumption: 82-92 Watts. Adjustable Brakes At The Horizontal Arm. Light Head Weights: 17.9 Kg Minimum. - Aluminum Housing. Protection Type Lamp Head: Iec60529. Standard Accessories: - Sterilized Handle: 2 Pcs/ Lamp Head, - Ceiling Anchorage Ring With Screws, - Spring Arm, - Ceiling Cover, Including Installation Of Brackets To Embed Overhead Ceiling- User Manual, - Ups. Warranty Of Two (2) Years For Parts And Labor With Free Preventive Maintenance Every Quarter Within Warranty Period Five (5) Years Warranty For Led Bulb Only. Unit 1 2,500,000.00 24 Operating Room Table (motorized). Brand New. Product Specifications: Total Length: 2000-2100 Mm. Width Including Side Rails: 600-630 Mm. Mattress Width: 550-570 Mm. Total Weight: 200-210 Kg. Safe Working Load (swl): Up To 250 Kg. Height Adjustment Range: From 595 Up To 1005 Mm. Castors: Four Ø 120-125 Mm Central Locking Twin Castors. Head Section: -58° ... +37°, 135 Mm. Back Section: -10° ... +70°. Leg Section: -80° ... +10°. Lateral Tilt: 20° / 20°. Trendelenburg/anti-trendelenburg: 30° / 20°. Sliding Tabletop For C-arm Function: 300-320 Mm. Flex / Reflex: 220° / 120°. Electrical System: 24 Vdc, Battery Operated, 100 - 240 Vac, 50/60 Hz. Controls: Hand Control And Integrated Control Panel On The Column. Memory Positions: Four Programmable Positions. Visco-elastic Mattresses. Radio Lucent Tabletop For X-ray. Accessories For General Surgery: 1. Arm Rest, 2. Anesthesia Frame With Clamp And, 3. Attachment Clamp. Transport And Storage Conditions: Temperature 7 10° C + 50° C. Relative Humidity 10 %, 85 %. Air Pressure 700 Hpa, 1060 Hpa. Operating Condition: Temperature +10° C, + 40° C. Relative Humidity 30 %, 75 %. Air Pressure 700 Hpa 1060 Hpa. Side Rail Accessories: 25 X 10mm. Warranty-1 Year From Delivery And Installation. Certificate Of Parts Available In The Next 5 Years. Includes Training To End-user. Includes Product Manual. Unit 2 5,500,000.00 25 Radiant Warmer With Phototherapy Units. Brand New. Product Specifications: Fixed Height Radiant Warmer, Mounted On A Column. The Unit Is Supported By A T-shaped Sturdy And Stable Wheeled Base. Bases Is Provided With A Minimum Three (3) Anti-static Swivel Casters. At Least Two (2) Of The Casters Are Equipped With Brakes. The Base Is Equipped With A Side Handle/rail For Easy Positioning. The Design Of The Base Is Suitable To Be Fitted Over Standard Cradles, Cribs, And Bassinets. Overhead Radiant Heater At A Fixed Height Of 1.80-2.0m. Radiant Heating Is Achieved By Quartz/ceramic Elements, Placed In A Parabolic Reflector. The Radiator Is Equipped With A Safety Grid. The Unit Support Three (3) Modes: Pre-heating, Manual And Servo Mode. The Unit Allows For Instant Switching Been The Different Operating Modes. The Minimum Skin Temperature Setting Range Is 32°c To 37°c. The Resolution Of The Temperature Is: ± 0.5°c Or Better. In Manual And Pre-heating Modes Heating Settings Allow For A Range Of 0 – 100%. Led Spotlight(s) For Examination Are Integrated In The Overhead Radiant Heater, The Angle Of The Overhead Light Is Adjustable. Warm-up Time < 30 Min To 25°c. Power Requirements: 1 Ph, 100 - 240 Volts - 50/60 Hz 900 To 1300va (with Ups And Avr). Display Features: The Display Panel Is Integrated In The Column For Visualizing Working Parameters And Alarms. The Display Indicates: - The Current Active Mode: Pre-heating, Manual Or Servo, - The Current Heating Power In Percentages, - The Current Pre-set Temperature, - The Current Actual Skin Temperature, - The Current Air Temperature. The Unit Is Equipped With A Self-check Feature. Alarm And Safety Features: Alarms Are Audible And Visible. Alarms Indicating: - Sensor Disconnection Or Malfunction. - Power Failure. - Skin Temperature, After Stabilizing, Varying Beyond 0.5° To 1°c From Set-point. - 10 To 15 Minutes After Manual Mode Has Been Engaged An Audible Alarm Will Sound. In Addition, The Unit Will Either Reduce Or Cut The Power To The Heater. In Skin Mode, When The Temperature Exceeds 39°c, The Unit Will Cut The Power To The Heater. Supplied With: Instructions For Assembly, Use And Maintenance In English: 1 X Installed And 2 X Spare Reusable Skin Temperature Sensors, Including Connection Cable And Plug. 1 X Spare Quartz/ceramic Heating Element Or The Same With Installed Heating Element. 2 X Spare Examination Light Bulbs. 1 X Set Of Spare Fuses, If Applicable. Accessories: A Durable Light Weight Cradle/crib And Mattress. Oxygen Regulator Including A Pressure Gauge, Flow Meter, Humidifier Bottle And All Required Tubing. Integrated Weighing Scale. Electrically Operated, Slow Suction Unit Including A Vacuum Regulator, Vacuum Gauge And Autoclavable Collection Jar. Electrical Height Adjustment. T-piece Resuscitator. Integrated Phototherapy Unit. Led Phototherapy Unit 36cm: 620-2800μw/c㎡. Led Phototherapy Unit 50cm: 400-1620μw/c㎡. Estimated Life Span: Eight Years. Includes Avr. Unit 3 600,000.00 26 Refrigerator (biological). Brand New. Product Specifications: External Dimension: W = 700-750 Mm D = 730-750 Mm H = 2000-2100 Mm. Inside Dimension: Useful Space On Top W = 600-620 Mm D = 550-570 Mm H = 500-550 Mm. Useful Space At The Bottom W = 590-610 Mm D = 540-560 Mm H = 500-550 Mm. Capacity: 600 L Temperature Range: Top 2°c To 20°c Bottom 2°c To 20°c. Optional: Other Temperature Ranges. Housing Galvanized Sheet Steel With High Quality White Coating, Antibacterial Coated. With 4 Feet, Height Adjustable. Optional: Set Of 4 Casters, 2 With Brakes. Interior Space Inner Case Of Galvanized Sheet Steel With High Quality White Coating, Antibacterial Coated. Cleaning Friendly By Rounded Corners, Slippery Surface In The Interior, Meets Highest Hygiene Requirements Insulation High Density Foamed-in-place Polyurethane, With A Thickness Of 60 Mm. Cfc-free. Circulation Air Cooling For Rapid And Uniform Temperature Control, Reducing Temperature Gradients To A Minimum. When The Door Is ""open"" The Circulating Fan Is Switched Off Automatically By A Micro Switch In Order To Prevent Warmer Ambient Air Being Drawn In. Door 2 Pcs. Three-layer Thermally Insulating Glass Door (arranged On Above The Other), Supplied As Standard With Right Hand Hinge, Also Available With Left Hand Hinge At No Extra Cost. Grease Resistant Magnetic Seal. Optional: With Door Lock. Interior Fittings 4 Pcs. Grating-type Shelves (dim.: 530x550 Mm), White Coated. Interior Lighting With Automatic On/off Micro Switch. Optional: Stainless Steel Shelves Or Stainless-steel Drawer Compartments, With 3 Lengthwise Dividers With Telescopic-type Guides On Rollers With Stops, Drawer Dimensions: 500x480x77 Mm (wxdxh) Usable With Between The Lengthwise Dividers: 106 Mm (lengthwise Dividers Easily Removable). Working Range 1 From 2°c To 20°c (assuming The Ambient Temperature Is Approximately 4°c Above The Set Point). Temperature Accuracy +/- 1,8°c After Stabilization (with 50% Of Loading). Acoustics Signal When The Set Value Is Undercut Or Exceeded Potential-free Connection Socket For Extern Alarm Refrigerating Unit 2 Pcs. Fully Hermetically Sealed, Forced Ventilation, Fitted On Vibration – Absorbing Mounts (ambient Temperature Max. 32°c), Low Noise (48dba/1m), Energy Saving Compressor With High Quality Vaporization System. Refrigerant: R 290 Or Equivalent Defrost Automatically With Thermal And Time Limit. Condensate Evaporation In Heated Tray. During The Defrost Period, The Temperature Inside The Cabinet (only The Air Temperature – Not The Stored Goods) Will Arise For A Short Time. Electrical Date: Power Supply220-230 V/50 Hz/single Phase Optional: 60 Hz. Power Input 2x 0,20 Kw. Fuse 16a. Power Cable: 2x 1,5 M. Packing Details (palletized) Dimensions: Approx. 85x98x224 Cm. Net Weight: 150-170 Kg. Gross Weight: 180-200 Kg. Include Avr. Unit 1 100,000.00 27 Rigid Video Procto-sigmoidoscope. Brand New. Product Specifications: Plastic Obturator. Video Camera. Stainless Steel Tube. Handle Of Polyacetal (delrin), Usb Male Connector. Analogue To Digital Converter Nozzle For Gas. Instrumentation Channel. Silicone Washer. Includes Universal Fiber Optic Light Source Machine And Tube Connector From The Proctoscope To The Light Source Machine. Warranty -6 Months From Delivery And Installation. Set 1 50,000.00 28 Stretcher, Transport Type. Brand New. Product Specifications: Hydraulic Stretcher. Numbers Of Function: Five-function. Certification: Ce, Fda, Iso13485. Size: 2000-2100 Mm (l)*770-800mm (w)*600-610/900-920mm (h). Height:600mm-930mm. Lowest Position-floor To Platform-580mm. Highest Position-floor To Platform-905mm. Side Rail Height Above Mattress Platform-340 To 360mm. Maximum Back Rest-0-80 Degrees. Maximum Knee Rest-0-30 Degrees. Maximum Trendelenburg Reverse Tr-0-16 Degrees. Mattress Size -1850-1880 X 650-670 X 80-90mm. Loading Capacity -up To 200 Kg. Side Rails: Collapsible Aluminum Alloy Side Rails. Bed Platform: X-ray Transparent. Specification: Ce, Fda, Iso. Other Features: 1. Central Brake System: Equipped With Four Brake Pedals On All Sides Of The Bed Make The Brakes At The Optimal Position Effectively. 2. Multi-function Instrument Support: The Instrument Support Can Put The Monitor And Can Also Be Used As A Headboard To Prevent Accidental Slippage Of The Patient. 3. Push Handle: Reducing The Workload And Preventing The Injuries. 4. High Quality Mattress: The European Standard Waterproof Cloth With The Smooth Surface Of The Mattress, Easy To Clean And Not Misplaced. 5. Large Diameter Wheel: Using The Imported 8-inch Silent Caster Make It Flexible And Durable. 6. The Fifth Wheel: The Fifth Wheel Can Provide A Smaller Radius Of Gyration. The Telescopic Collapse Design Can Slide Smoothly Even On The Rough Surface Or Obstacles Such As The Elevator Sill, Reducing Effectively The Damage Caused By Transport To Patients. 7. Plastic Coated Side Rails: The Side Rails With Stainless Steel Column Guardrail Covers Almost Entire Length Of Bed. 8. High-strength Carbon Steel Structure And Spray Procedure: The High Quality Carbon Steel And Robot Welding Guarantee The Mechanical Strength. The Spray Surface Treatment Is Easy To Clean And Guarantees A Longer Life. 9. Rapid Lifting Hydraulics: The Imported Dual-pressure Lifting System Can Be Used To Quickly Lift The Bed Or The Push Handle For 2 Seconds In An Emergency, And The Bed Will Automatically Locate The Height To Form A Special Body Position Of The Patient. 10. X-ray Imaging: Equipped With X-ray Material Bed Surface And X Ray Cassette Holder, The Whole Body Can Be X-rayed. 11. With Oxygen Cylinder Holder. Warranty -1 Year From Delivery And Installation. Unit 18 5,400,000.00 29 Suction Machine. (heavy Duty). Brand New. Product Specifications: Floor, Standing Type. Oil-less Piston Suction Motor. Double Anti-overflow Protection (mechanical Float And Electronic Sensor). Flow Rate: 40-50 Liter Per Minute. Water Displacement. Vacuum -700-800mmhg. Includes 2x3 Liters Polycarbonate Collection Jar. Attach/detach Abs Plastic Cover Jar. Anti-bacterial And Hydrophobic Filter. Patented Anti-vibration System. Dimensions: 300-400mm X 380-420mm X 800-850mm (lxwxh). Weight -15-25 Kg. Equipped With Foot Switch. Power -250w. Power Requirement -ac 200, 50-60hz. Silicone Hose. Operation And Service Manual Included. Warranty Of 6 Months From Delivery And Installation. Includes Orientation And Training Of End-user Staff. Unit 2 600,000.00 30 Syringe Pump. Brand New. Product Specifications: With Delivery And Installation, Provision Of Trainings Of Staff With Certificates, And Manual.  Applicable Syringes (universal Compatibility To Various Brands): 10ml, 20ml, 30ml, 50ml/60ml, Accuracy: ±2% (mechanical ±1%).  Flow Rate: 10ml: 0.1 Ml/h -300ml/h, 20ml: 0.1 Ml/h -600ml/h, 30ml: 0.1 Ml/h -900ml/h, 50ml: 0.1 Ml/h -1500ml/h.  Bolus Rate: 10ml: 100-300ml/h (default 300ml), 20ml: 100-600ml/h (default 600ml), 30ml: 100-900ml/h (default 900ml), 50ml: 100-1500ml/h (default 1500ml).  Purge Rate: 10ml: 300ml, 20ml: 600ml, 30ml: 900ml, 50 Ml: 1500ml.  Volume To Be Infused: 0.1ml~1000ml.  Injection Increment: 0.1ml.  Infusion Mode: Rate Mode, Time Mode.  Time Mode: Volume Limit: 0.1~999.9ml. Pre-set Time: 1min To 99h99min. Remaining Time: **h **min.  Occlusion Pressure: 3 Adjustable Occlusion Pressure Settings: Low, Middle And High.  Alarm Function: Infusion Completion, Near Completion, Empty, Occlusion, Low Battery, Syringe Disengaged, Incorrect Installation Of Syringe Plunger, No Ac Power Supply, Low Battery, Battery Exhausted, Malfunction Etc.  Battery: Rechargeable Lithium Polymer Battery, 7.4v, 2100mah, Can Operate For More Than 3 Hours After Fully Charged At 25ml/h. Unit 5 300,000.00 Total 34,665,000.00 Note: Winning Bidder Shall Conduct Product Demonstration/end-user’s Training Of The Actual Unit And Issue Training Certificate To The End-user And Medical Equipment Technician Of Wvsgh. The Bidder’s Single Largest Completed Contract Similar To The Contract To Be Bid Should Have Been Completed Within 3 Years From The Date Of The Deadline Of Submission And Receipt Of Bids, Award For This Contract Should Have Been Awarded By A Hospital Or Health Facility And Not By Another Supplier, Except For Line Items With Asterisk (*) Which Have Been Awarded By A Non-health Facility. Likewise, The Contract Price Of The Slcc Should Be At Least 50% Of The Sum Of The Abc Of The Line Items Joined. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. The Complete Schedule Of Activities Is As Follows: Bac Activities Schedule Availability Of Bidding Documents December 12, 2024 At 8:00 Am To 4:00 Pm And Up To Before 9:00 Am Of January 7, 2025, At The Procurement/bac Office, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Pre Bid Conference December 20, 2024 (thursday), 9:00 Am At The 3rd Floor, Im Conference Room, New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Opening Of Bids January 7, 2025 (tuesday), 9:00 Am At The 3rd Floor, Im Conference Room, New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Bid Documents May Be Acquired By Interested Bidders On The Dates And Address Above And Upon Payment Of Applicable Fee For The Bidding Documents In The Amount Of: Php 25,000.00 Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac/procurement Office On Or Before 9:00 Am Of January 7, 2025. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Wvs.doh.gov.ph , Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Western Visayas Sanitarium And General Hospital Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Mr. Jasond Rex A. Huyaban/jessie H. Jarbadan Bac Secretariat Western Visayas Sanitarium And General Hospital Sta. Barbara, Iloilo Tel. No.: (033) 332-4778 Loc. 119 Email: Wvsbac.procurement@gmail.com Website: Wvs.doh.gov.ph Renia Grace G. Salapare, Md, Fpafp, Mpa Bac Chairperson
Closing Soon7 Jan 2025
Tender AmountPHP 36.6 Million (USD 631.7 K)

City Center for Culture and Sports Tender

Others
Czech Republic
Details: The subject of the small-scale public contract is the modernization of the social facilities of the open-air cinema in Sezimovo Ústí, in the building of the projection room. The current social facilities in the underground floor will be reconstructed, and a new toilet for the disabled will be created on the above-ground floor. The action is divided into two stages, which are necessarily related and will be directly connected to each other. In the first stage, all work in the 1st floor from the point of view of social facilities will take place. The subject of the second stage will be the construction of a ramp and a toilet for the disabled in the 1st floor. The construction plan represents construction modifications in the following scope: 1. Demolition and dismantling work. 2. Replacement of all interior cladding, plaster, floors, doors and sanitary ware, fixtures. 3. In the 1st floor, an opening will be bricked up into the projection room and a new one will be knocked down into the perimeter wall in place of the existing window as an entrance. An outdoor ramp with a railing will be built at the entrance and a new toilet will be installed. 4. New distributions of the technical equipment of the buildings will also be carried out, modifications to the existing air conditioning equipment and electrical installations will be made. 5. The water supply connection will be made new along the original route, and this will be 17 MA long, equipped with a water meter, and the heating of hot water will be solved by a boiler without circulation. 6. Modifications to the air conditioning system will be carried out; the suction part of the distributions, including the fan, will be dismantled and replaced with new ones, the exhaust part will be renovated. 7. The electrical installation of the modified parts will be connected from the existing switchboard, which will be modified to add circuit breakers to the DIN rail; Existing Circuits Will Be Disconnected And Canceled. 8. All Details Are Part Of The Attached Project Documentation. 9. The Contractor Is Obliged To Use Selected Reference Products During Implementation Regarding The Tiling And Flooring Selected By The Client: Flooring: • Vogue System Interni In Nero 20x20 Tile: • Vogue System Interni Ghiaccio 20x20 – White • Hidra Prisma White Mate 20x20/ Retro Flooring Deceram Pam Cement Star Black 20x20 Rett. (This is another name for the same cladding) 10. Requirements for the profession: Construction (demolition work, excavations, foundation construction of the ramp, waterproofing, replacement of window and door fillings, wall surface treatment), plumbing work, locksmith work, so-called - ventilation distribution, electrical 11. During the work, the investor will convene inspection days. Necessary consultations will be carried out continuously, according to the current situation in the progress of the work. All results of the consultations will be stated in a separate record. 12. The work will be valued and subsequently carried out according to the project documentation and the specified description of the public contract.
Closing Date24 Jan 2025
Tender AmountCZK 2.3 Million (USD 94.5 K)

The City Government Of Baguio Tender

Others...+1Electrical and Electronics
Philippines
Details: Description Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 1 Lot Various Materials For Smart City Command Center 15,500,000.00 22 Unit 16 Port Poe Switch - 16 Port Poe Switch - Cpu Core Count 1 Cpu Nominal Frequency 800 Mhz Size Of Ram 256 Mb Storage Size 16 Mb Storage Type Flash Mtbf Approximately 200'000 Hours At 25c Cooling Type Passive Poe-out Ports Ether1-ether16 Poe Out 802.3af/at Max Out Per Port Output (input 18-30 V) 1.1 A Max Out Per Port Output (input 30-57 V) 0.6 A Max Total Out (a) 2.8a (18v-30v) & 1.4a (48v-57v) X2 10/100/1000 Ethernet Ports 16 Number Of 1g Ethernet Ports With Poe-out 16 Sfp+ Ports 2 Certification Ce, Eac, Rohs Ip Ip54 Warranty :1 Year 88 Unit Adjustable Stainless Steel Strapping Band - Adjustable Stainless Steel Strapping Band - Material: Stainless Steel 304 Width: 1/2 Inch Thickness: 0.5 Mm Length: 30 Meters 44 Unit Cable Loop Holder - Cable Loop Holder - Galvanized Steel Pole Mountable 4 Branches At Least 400mmx400mm 1 Box Cat6 Utp Pure Copper Outdoor Cable - Cat6 Utp Pure Copper Outdoor Cable - Cat6 Utp Pure Copper Outdoor Cable 40 Unit Cctv Channel License - Cctv Channel License - Single Anpr Camera Connection For Use With Central Software Warranty :perpetual Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 1 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 40 Unit Cctv Lpr Camera - Cctv Lpr Camera - Camera Image Sensor 1/1.8″ Progressive Scan Cmos Max. Resolution 2688 × 1520 Min. Illumination Color: 0.001 Lux @ (f1.2, Agc On) Shutter Time 1/25 S To 1/100,000 S Day & Night Ir Cut Filter Lens Focal Length & Fov 2.8-12 Mm: Horizontal: 113.5° To 39°, Vertical: 58.4° To 22.7°, Diagonal: 141.3° To 44.3° Aperture 2.8-12 Mm: F1.38, 8-32 Mm: F1.7, 10-50 Mm: F1.7 Illuminator Built-in Supplement Light Type Ir Light Built-in Supplement Light Range Up To 40 M Ir Wavelength 850 Nm Video Main Stream 50 Hz: 25 Fps (2688 × 1520, 1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) 60 Hz: 30 Fps (2688 × 1520, 1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) Sub-stream 50 Hz: 25 Fps (1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) 60 Hz: 30 Fps (1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) Video Compression H.264 And H.265 Encoding Main Stream: H.265/h.264/mjpeg Sub-stream: H.265/h.264/mjpeg Video Bit Rate 32 Kbps To 16 Mbps Protocols Tcp/ip,icmp,http,https,ftp,sftp,dhcp,dns,ddns,rtp,rtsp,rtcp,ntp,smtp,snmp,igmp,qos,ipv4/ipv6,udp,ssl/tls,isup,arp,802.1x Simultaneous Live View Up To 6 Channels Road Traffic And Vehicle Detection Coverage Up To 3 Lane(s) Smart Function Traffic Flow Detection:average Speed, Traffic Flow, Queuing Length, And Traffic Status Incident Detection: Congestion, Stopped Vehicle, Lane Change, Wrong-way Driving, Speeding, Low-speed Driving Capture Speed Range 5 To 120 Km/h Blocklist And Allowlist Max. 50000 Records Warranty :2 Years Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 2 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 5 Unit Cctv Nvr - Cctv Nvr - Supports Redundant Power Supply To Improve The System Stability Supports Hdd Hot Swap With Raid0, Raid1, Raid5, Raid 6, And Raid10 Storage Scheme Configurable. Either Normal Or Hot Spare Working Mode Is Configurable To Constitute An N+1 Hot Spare System. Supports Some Specialist Cameras, Including People Counting Camera/anpr (automatic Number Plate Recognition) Camera/fisheye Camera Supports Video Analytic Functions Such As Vehicle Detection, License Plate Recognition --video & Audio Input -ip Video Input 128-ch -incoming/outgoing Bandwidth 576 Mbps/512 Mbps -incoming/outgoing Bandwidth (raid Mode) 576 Mbps/512 Mbps -tls Outgoing Bandwidth 128 Mbps, Or 64 Mbps (when Raid Is Enabled) --video & Audio Output -protocol Hikvision, Acti, Arecont, Axis, Bosch, Brickcom, Canon, Hunt, Onvif (version 2.5), Panasonic, Pelco, Rtsp, Samsung, Sony, Vivotek, Zavio --video & Audio Output -hdmi Output Two Independent Hdmi Outputs Of 4k Resolution. Resolution: 4k (4096 × 2160), 4k (3840 × 2160)/30hz, 2k (2560 × 1440)/60hz, 1080p (1920 × 1080)/60hz, Uxga (1600 × 1200)/60hz, Sxga (1280 × 1024)/60hz, 720p (1280 × 720)/60hz, Xga (1024 × 768)/60hz -vga Output 1-ch. Resolution: 1080p (1920 × 1080)/60hz, Uxga (1600 × 1200)/60hz, Sxga (1280 × 1024)/60hz, 720p (1280 × 720)/60hz, Xga (1024 × 768)/60hz --video & Audio Decoding -decoding Format H.265, H.265+, H.264, H.264+, Mpeg4, Mjpeg (for Hikvision Ip Camera Only) -video Resolution 32 Mp/24 Mp/12 Mp/8 Mp/7 Mp/6 Mp/5 Mp/4 Mp/3 Mp/1080p/uxga/720p/vga/4cif/dcif/2cif/cif/qcif *: 32 Mp And 24 Mp Is Only Available For Channel 1 To 4 When Ultra Hd Resolution Mode Is Enabled -synchronous Playback Up To 16 Channels -capability 1-ch@32 Mp (8160 × 3616, 30 Fps)/5-ch@8 Mp(30 Fps)/10-ch@4 Mp(30fps)/20-ch@1080p(30 Fps)/40-ch@720p(30 Fps) *: The Length Or Width Of Camera Resolution (each Track) Cannot Exceed 4096 Pixels --hdd -interface 16 Sata Interfaces Supporting Hot-plug -capacity Up To 10 Tb For Each Hdd -storage Extension 1 × Esata Interface, 2 × Mini Sas Interface (optional) --raid Raid Type Raid0, Raid1, Raid5, Raid 6, And Raid10 --network Management -protocol Ipv6, Https, Upnp, Snmp, Ntp, Sadp, Smtp, Nfs, Iscsi, Pppoe, Ddns Network Interface 4, Rj45 10m/100m/1000m Self-adaptive Ethernet Interface --external Interface -usb Interface Front Panel: 2 × Usb 2.0; Rear Panel: 2 × Usb 3.0 Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 3 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) -alarm Input/output 16/8 --general -power Supply 100 To 240 Vac, 50 To 60hz, 5 A -fan Redundant Dual Ball Bearing Fan; Speed Adjustable -consumption (without Hdd) ≤ 140w -warranty :2 Years 1. Responsibility Of The Supplier 1.1 Supply And Delivery Of Ict Equipment 1.2 Inventory Of The Items Deliverd With The Following Details 1.2.1 Brand 1.2.2 Model 1.2.3 Serial Number 1.2.4 Quantity 1.3 The Bidder Must Ensure That All Components Delivered Will Be Brand New 1.4 All Equipment Provided Must Be Compatible And Working With The Cctv System As A Whole 1.5 Materials And Equipment Delivery Within 90 Days 1.6 Cctv Contractor Should Have Manufacture Authorization And Certification. 1.7 Contractor Must Have A Valid Iso 9001:2015 Certificate 1.8 All Equipment Provided Must Be Capable/compatible To Interconnect With The Existing Systems Located At The Smart City Command Center (sc3) To Be Viewable And Configurable In The Sc3. 80 Unit Cctv Nvr Surveillance Hard Drive - Designed And Built To Handle Heavy Surveillance Workloads Advanced Vibration Management Capacity 10tb Interface Sata 6 Gb/s Max. Sustained Transfer Rate Od (mb/s) 250mb/s Cache (mb) 256 Tarnish Resistant Yes Mtbf 1,500,000 Hr Warranty :2 Years 15 Set Command Center Desktop Computer - Minimum Specifications: Operating System: Microsoft Windows 11 Pro 64bit Processor: Intel Core I5 14600k Turbo Frequency 5.3ghz 14 Cores/20 Threads, 24mb Cache, Socket Lga1700 Cpu Air Cooler: Twin Tower Cpu Air Cooler, With 6x6mm Sintered Copper Heatpipes, With 2x140mm Fans Motherboard: B760 Chipset, Lga1700 Socket, Ddr5 4xdimm Matx Form Factor Ram: Ddr5 5600mhz, 32gb (dual 2x16gb) Memory Modules Gpu: Rtx 4070, 12gb Gddr6/gddr6x Ssd: 512gb Capacity R/w 560/520 Mb/s 3d Tlc Ssd 2.5 Inch Form Factor Hdd: Capacity 2tb, 7200 Rpm, 256mb Cache, 3.5 Inch Form Factor Power Supply: 1000 Watts, 80 Plus Gold Certified, Fully Modular, With 120mm Smart Hydraulic Bearing (hyb) Fan, With Active Pfc, Mtbf: >100,000 Hours Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 4 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) Case: Tempered Glass Mid Tower Atx Case With At Least 3 Fans Monitor: 2 Units, 24 Inches, Resolution: Fhd 1920 X1080, Aspect Ratio:16:9, Brightness: 250cd, Color Gamut Ntsc 72%, Refresh Rate: 100hz, Response Time: 5ms(gtg), Connectivity: 1x Hdmi 1x Displayport Keyboard: Usb Connectivity, With Backlight, Rubber Dome, Usb Connectivity, Multi-key Anti-ghosting, Polling Rate: 1000hz, Cable Type: Attached, Braided, Cable Length: 5.9ft Mouse: Usb Connectivity, Optical Sensor, Mouse Button Durability: 30m L/r Click, Cable: 1.8m Tangle Free Rubber, Dpi: 12,400 Dpi Ups: Max Configurable Power (watts) 650 Watts / 1.2kva, At Least 3 Universal Socket Warranty :2 Years 2 Unit Command Center Field Laptop - Command Center Field Laptop - Intel Core I7-13700hx Processor (30 Mb Smart Cache, 2.1 Ghz Performance-core With Turbo Boost Max Technology 3.0 Up To 5.0 Ghz, Overclock Capable) 1x 16gb Of Ddr5 4800mhz System Memory, Upgradable To 32 Gb Using Two Sodimm Modules 2x 512gb Nvme Ssd; Total Of 1tb 16 Display With Ips (in-plane Switching) Technology, Wqxga 2560 X 1600, High-brightness (500 Nits) Nvidia® Geforce Rtx 4060 With 8 Gb Of Dedicated Vram Warranty :2 Years 2 Unit Command Center Printer - Command Center Printer - A3 Wi-fi Duplex All-in-one Ink Tank Printer Print Speed Of Up To 25.0 Ipm Prints Up To A3+ (for Simplex) Automatic Duplex Printing Ultra-high Page Yield Of 7,500 Pages (black) And 6,000 Pages (colour) Wi-fi, Wi-fi Direct, Ethernet Printer Type: Print, Scan, Copy, Fax With Adf Minimum Ink Droplet Volume: 3.8 Pl Print Direction: Bi-directional Printing Nozzle Configuration:800 X 1 Nozzles Black, 256 X 1 Nozzles Per Colour (cyan, Magenta, Yellow) Maximum Resolution: 4800 X 2400 Dpi Automatic 2-sided Printing: Yes (up To A3) Print Speed: Photo Default - 10 X 15 Cm / 4 X 6 " *1: Approx. 43 Sec Per Photo (border) / 52 Sec Per Photo (borderless)*2 Draft, A4 (black / Colour): Up To 32.0 Ppm / 22.0 Ppm *2 Iso 24734, A4 Simplex (black / Colour): Up To 25.0 Ipm / 12.0 Ipm *2 Iso 24734, A4 Duplex (black / Colour): Up To 16.0 Ipm / 9.0 Ipm *2 Iso 24734, A3 Simplex (black / Colour): Up To 13.5 Ipm / 6.0 Ipm *2 Iso 24734, A3 Duplex (black / Colour): Up To 10.0 Ipm / 5.0 Ipm *2 Warranty :1 Year Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 5 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 Unit Command Center Video Wall Controller - Command Center Video Wall Controller - Interface Alarm In Alarm Out 8-ch Alarm Out 8-ch Alarm In Serial Interface Rs-232 (rj45) × 1, Rs-485 × 1 Usb Interface Usb 2.0 × 2 Network Interface Rj45 × 2, 10 M/100 M/1000 Mbps Self-adaptive Ethernet Interface Optic Interface × 2 100 Base-fx/1000 Base-x Supports Optoelectronic Self-adaptation Video Walls 1 Video Wall Size <= 8 Layers Per Screen 1080p × 3 Or 4k × 1.5 Layers Layers Per Screen × Output Interface(s) Split Window Yes Scene Auto-switch Delay 3s Auto-switching Plans Support 256 Auto-switching Plans Max. Input Resolution 4k Audio Encoding Format G722.1, G711u, G711a, Aac-lc Video Output Interface Type Hdmi 1.4 Video Output Interface(s) 8 Video Decoding Resolution Up To 32 Mp Warranty:2 Years 8 Unit Command Center Video Wall Display - Command Center Video Wall Display - Display Panel Diagonal Size Class 55 Measured 54.6 Resolution 3,840 X 2,160 (16:9) Brightness (typ.) 700 Nit Orientation Landscape/portrait Haze 25% Contrast Ratio (typ.) 4,000:1 Type Va Active Display Area 1,209.6 (h) X 680.4 (v) Pixel Pitch (mm) 0.315 X 0.315 Color Gamut Ntsc 72% Operation Hour 24/7 Connectivity / Sound Input Video Dp 1.2 (1), Hdmi 2.0 (3) Audio N/a Usb Usb 2.0 X 2 Tuner N/a Output Audio Stereo Mini Jack Wifi / Bt O/o External Control Rs232c (in/out), Rj45 Speaker 10w 2ch Mechanical Spec Dimension (mm / In.) With Heavy Duty Full Motion Tv Wall Mount Warranty :3 Year 44 Unit Din Rail Mount - Din Rail Mount - 35mm At Least 7.5mm Depth Aluminum 22 Unit Electrical Box Enclosure - Electrical Box Enclosure - Electricalbox Panel Box Metal Enclosure(ip66, Nema 4 & 12) 300x250x150 Mm W/ 2 Fans And Fan Filter With Pole Mount Bracket X1 Molded Case Circuit Breaker Mccb30a 220v 2 Pole Din Rail Mount Type X1 Residual Current Circuit Breaker 63a 220v With Grounding/earthing 2 Pole Din Rail Mount Type X1 Grounding Bus Bar With Insulator X1 Din Rail Mount Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 6 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 40 Roll Fiber Optic Connectivity - Fiber Optic Connectivity - Fiber Optic Connectivity 2.0 Kms 4 Core Fiber Optic Cable Maintenance Of Outside And Inside Plant Equipment To Smart City Command Center For 1 Year 1 Unit Fiber Optic Fusion Equipment - Fiber Optic Fusion Equipment - Fiber Alignment Core/cladding Motor Number 6 Motors Splicing Time 5s Heating Mode 15s, Can Be Customized According To The External Environment Fiber Type Single-mode Fiber (smf/g.652), Bif/g.657); Suitable For Single Mode, Multi-mode, Bare Fiber, Tail Fiber, Drop Cable, Jumper, Invisible Fiber Fusion; The Cladding Diameter 80-150μm Splicing Loss 0.02db(sm)、0.01db(mm)0.04db(ds/nzds) Splicing Mode Automatic Focusing Core Alignment, Conventional/high Precision Welding Splicing Way Automatic, Semi-automatic Opm Wavelength: 850nm、1300nm、1310nm、1490nm、1550nm、1625nm、980nm、1270nm、1577nm、1650nm/measurement Range: -50+26dbm Absolute Error: <0.3db (-50dbm ~+3dbm Range) Battery Capacity 7800mah Large Capacity Lithium Battery Charging Time ≤3.5; It Can Continuously Weld And Heat About 260 Cores Magnification 320x (x Or Y Axis Single Display) 200x (x And Y Axis Dual Display) Fiber Diameter Coating Diameter: 80-150μm/coating Diameter: 100-1000μm Cutting Length Coating Layer 250μm Below: 8-16mm/coating Layer 250-1000μm: 16mm Heat Shrink Tube 60mm、50mm、40mm、25mm Tensile Testing Standard 2n Display 5 Inch Tft Color Display Screen Return Loss Better Than 60 Db Product Protection Waterproof, Dustproof And Fall Proof Warranty :1 Year 44 Unit Fiber Patch Cord Single-mode 9/125 Sc/upc To Lc/upc - Fiber Patch Cord Single-mode 9/125 Sc/upc To Lc/upc - Fiber Patch Cord Single-mode 9/125 Sc/upcto Lc/upc3 Meter 44 Unit Fiber Patch Cord Single-mode Sc/upc To Sc/upc - Fiber Patch Cord Single-mode Sc/upc To Sc/upc - Fiber Patch Cord Single-mode Sc/upcto Sc/upc3 Meter 45 Unit Gigabit Rj-45 Surge Protector Arrester - Gigabit Rj-45 Surge Protector Arrester - Protects Your Ethernet Device From The Damage Of Lightning & Surge Gigabit 10/100/1000 Specification: Connectors: Rj-45 Material: Shielded Aluminum Alloy 44 Unit Grounding Bus Bar With Insulator - Grounding Bus Bar With Insulator - Grounding Bus Bar With Insulatorat Least 8 Way At Least 8x12mm² 2 Roll Grounding Cable Pure Copper Wire - Grounding Cable 4mm Pure Copper Wire Round Solid 100m Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 7 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 22 Unit Grounding Rod And Clamp Copper Plated - Grounding Rod And Clamp Copper Plated - "grounding Rod Full Set - (1pc Grounding Rod + 1 Pc Grounding Clamp) Size: Approximately 50cm Length X 0.9cm Diameter" 22 Unit Heavy Duty Surface Type Extension Outlet 4 Gang - Heavy Duty Surface Type Extension Outlet 4 Gang - Heavy Duty Surface Type Extension Outlet 4 Gang 15 Amperes Capacity/ Maximum 3,750watts 1 Lot Installation, Integrations And Configuration Of Outside Plant Equipment - Installation, Integrations And Configuration Of Outside Plant Equipment - Installation, Integrations And Configuration Of All Outside Plant Project Equipment In Outside Project Sites Outside Of The Smart City Command Center 1 Lot Installation, System Integrations And Configuration Of All Inside Plant Project Equipment - Installation, System Integrations And Configuration Of All Inside Plant Project Equipment In The Smart City Command Center Such As The Hikcentral Camera License, Integration To Existing Hikcentral Software And Integration Of Existing Cctv Cameras Into New Nvr 22 Unit Iot Box Panelbox Metal Enclosure (ip66,nema4 & 12) 500x300x200mm W/ 2 Fans And Fan Filter With Pole Mount Bracket X1 Heavy Duty Surface Type Extension Outlet 4 Gang Terminal Block Distribution 2 Input 4 Output Push-in Type 40 Unit Lpr Camera Arm Mount - Gi Pipe Extension Arm 1.5-3 Meters 40 Unit Lpr Camera Memory Card - Product Capacity Covering 128g The Storage Mediumis Tlc Particles Long Reading And Writing Times, Which Can Meet More Than 1000 Cycles Optimized For Long Time On-board Video Recording, Offering More Stable Reading And Writing Experience Operating Voltage 2.7v~3.6v Compatibility Sd 6.1 Working Life 1,000 Cycles Storage Medium Tlc Speed Class Write/read Speed 64gb:up To 35/100mb/s 128gb:up To 70/100mb/s256gb:up To 90/100mb/s Durability 10,000 Insertion/removal Cycles Uhs-i Sdr104 Type Sdxc 40 Unit Lpr Camera Vertical Pole Mount - Vertical Pole Mounting Bracket Installed On The Cross Bar Galvanized Steel Sheet And Steel Material With Surface Spray Treatment Can Be Used For New Bullet Camera Outdoor Greycolo Must Be Compatible With Cctv Camera 22 Roll Metal Flexible Conduit 1 Inch - Metal Flexible Conduit 1 Inch 30 Meters Per Roll 44 Unit Molded Case Circuit Breaker Mccb 30a - Molded Case Circuit Breaker Mccb 30a 220v 2 Pole Din Rail Mount Type 22 Unit Molded Case Circuit Breaker Mccb 63a - Molded Case Circuit Breaker Mccb 63a 220v 2 Pole Din Rail Mount Type 22 Unit Poe Switch Power Supply - Power Supply 48v 2a 96w With Us Plug Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 8 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 22 Unit Residual Current Circuit Breaker 63a 220v - Residual Current Circuit Breaker 63a 220v With Grounding/earthing 2 Pole Din Railmount Type 44 Unit Sfp+ Module Lc Connector Type - Gigabit Single-mode Wdm Bi-directional Sfp Module Spec: Lc Connector, Tx:1550nm/rx:1310nm, Single-mode, 20 Km 7 Roll Solidwire Awg#12 - Solidwire Awg#12 75m Per Roll Use For Termination Inside Iot Box 7 Roll Solidwire Awg#16 - Solid Wire Awg#16 75m Per Roll Use For Termination Inside Iot Box 66 Unit Terminal Block Distribution 2 Input 4 Output - Terminal Block Distribution 2 Input 4 Output Push-in Type This Is A Lot Bidding, Partial Bids Are Not Allowed Please Indicate Brands Of Offers And Attach Complete Technical Brochures In The Eligibility And Technical Proposal Please Indicate Unit Prices Of Offers In The Financial Proposal Bidders Must Possess Valid Mayor's/business Permit With A Relevant Line Of Business For Use Of Cmo Mitd Under Pr No. 1 Please Refer To Attached Terms Of Reference In The Associated Components Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature
Closing Soon10 Jan 2025
Tender AmountPHP 15.5 Million (USD 267 K)
401-410 of 408 active Tenders