Vehicle Tenders
Vehicle Tenders
OFFICE OF THE ASSISTANT SECRETARY FOR ADMINISTRATION AND MANAGEMENT USA Tender
Education And Training Services
United States
Details: Sources Sought Notice For Request For Information (rfi) Number 1605jw-25-n-00002. The Government Reserves The Right To Compete Any Acquisition Resulting From This Notice. This Sources Sought Notice Is For Planning Purposes Only And Does Not Commit The Government To Pay For The Information Requested, Issue A Solicitation, Or Award A Contract. No Solicitation Document Exists At This Time. A Determination By The Government To Proceed With The Acquisition As A Set-aside Is Within The Discretion Of The Government. This Is Not A Request For Proposal
the Us Department Of Labor (dol), Office Of The Assistant Secretary For Administration And Management (oasam), Office Of The Senior Procurement Executive (ospe), Job Corps Acquisition Services (jcas) Is Conducting Market Research For The Upcoming Procurement Requirement For The Operation Of Dayton Job Corps Center. The Naics Code Is 611519, With A Size Standard Of $41.5m.it Is Anticipated That A Fixed Price Type Contract With Two Base Years And Three Option Years Will Be Awarded. The Procurement Will Involve The Operation And Management Of A Residential Education, Training And Employment Program At Dayton Job Corps Center Located In Dayton, Ohio. The Procurement Will Also Involve Outreach And Admissions (oa) And Career Transition Services (cts).
contractors Will Be Expected To Provide All Material, Services, And Necessary Personnel To Operate This Jcc As Set Forth In The Workforce Innovation And Opportunity Act (wioa) Of 2014. Wioa Authorizes The Job Corps Program.
contractors Are Also Required To Comply With The Job Corps Policy And Requirements Handbook (prh). The Prh Is Available At Https://prh.jobcorps.gov/pages/home.aspx.
job Corps Is A National Residential Training And Employment Program Administered By The U.s. Department Of Labor To Address The Multiple Barriers To Employment Faced By At-risk Youth, 16-24 Years Of Age, Throughout The United States. Job Corps Provides Educational And Career Technical Skills Instruction, And Support Services. The Combination Of Services Provided By Job Corps Is Intended To Prepare Youth To Pursue Further Education Or Training, Obtain And Hold Gainful Employment, Or Satisfy Entrance Requirements For Careers In The Armed Forces. The Contractor Shall Provide:
program Outreach And Admissions Services;
educational Instruction;
career Technical Skills Instruction;
social And Employment Readiness Skills;
work-based Learning Opportunities;
career Transition Services/job Placement Assistance;
stakeholder Engagement In Support Of Student Job Placement, Including Relationships With Workforce Development Systems, Employers, And Business Organizations And Entities; And
operation And Management Of A Government-owned, Full-time Residential Campus/facility, Including Providing Safe And Secure Living And Training Environment, Health And Wellness Services, Food Services, Recreational Programming, Transportation, Property Maintenance And Management, Financial Management And Reporting, Staff Training And Development, And Program Performance Management And Recordkeeping.
the Planned Measure Of Student Utilization For The Center Or Center Onboard Strength (obs) For The Dayton Job Corps Center Is 170 Students Consisting Of 80 Residential Male Students, 40 Residential Female Students, 30 Nonresidential Male Students, And 20 Nonresidential Female Students. The Center Is Located On 3849 Germantown Pike, Dayton, Ohio 45417.
the Contractor Shall Provide Oa Services In The Following Workforce Development Areas In The State Of Ohio: Lucas County, Wood County, Van Wert County, Richland County And Franklin County, And Shall Ensure The Arrival Of A Minimum Of 360 Students Into The Job Corps Program Annually For Residential Male And Female Students, And Nonresidential Male And Female Students. Of The 360 Arrivals, The Contractor Shall Provide A 40 Arrivals For The Cleveland Job Corps Center And 40 Arrivals For The Cincinnati Job Corps Center.
the Contractor Shall Also Provide Career Transition Services (cts) For All Graduates And Former Enrollees Of The Dayton Job Corps Center, Regardless Of Where The Graduate Or Former Enrollee Resides Or Matriculates, And Former Enrollees Within Their Eligibility Period That Separated Under The Prior Operator.
all Contractors Doing Business With The Federal Government Shall Be Registered In Central Contractor Registration (ccr) Database Which Is Located On The System For Award Management Website, Sam.gov. The Website For Registration Is Https://www.sam.gov.all Active Ccr Records Have Migrated To Sam. All Qualified Small Businesses Including 8(a) Firms Are Encouraged To Participate.
interested Contractors Responding To This Rfi Will Be Required To Indicate Their Ability To Successfully Manage And Operate A Job Corps Center Operation By Responding To The Capability Requirements Listed Below. The Contractor Should Also Indicate The Number Of Students/program Participants Served For Each Described Contract. If The Contractor References A Job Corps Contract, The Contractor Should Also Provide The Referenced Center’s On Board Strength At The Time That The Contractor Held The Contract. For A Contractor To Be Deemed Capable, The Contractor Must Be Found Capable In All Fourteen Requirements Listed Below.
capabilities Requirements
describe Your Organizational Experience Operating A Large Scale Residential Education And Job Training Program Similar In Size And Scope To The Job Corps Center. Demonstrated Experience Should Encompass Key Aspects Of Operating A Similar Program, Including Providing Food Services; Medical, Dental, And Mental Health Care; Facility And Property Management Including Facility Maintenance And Repairs; Providing Residential Management And Supervision Of At-risk Youth; Recreational Programming; Student Transportation; Oversight And Purchase Of Government Owned Property; Managing Gsa Fleet Vehicles; And Protecting Personally Identifiable Information (pii).
describe How Your Organization Will Meet The Requirements Of Wioa Section 159(a) That Requires Maintaining A Financial Management Information System That Provides Accurate, Complete, And Current Disclosures Of The Costs, And Sufficient Data For The Effective Evaluation Of Activities Carried Out Through The Job Corps Program. Describe The Internal Controls Your Organization Has In Place To Ensure Proper Accounting Of Federal Funds Consistent With Far Section 159(a) That Requires Each Operator To Maintain Funds Received In Accounts In A Manner That Ensures Timely And Accurate Reporting As Required By The Secretary Of Labor.
describe Your Ability To Comply With All Health And Safety Standards In The Residential, Food Preparation Area And Dining Hall.
describe Your Organizational Experience Procuring, Managing And Executing Facilities Repairs/improvements In Excess Of $600,000 And Doing So In A Timely Manner. Add Any Experience With Timeworn And/or Historic Buildings And Aging Infrastructure.
describe Your Organizational Experience Overseeing, Managing, And Administering Educational And Technical Skill Training Programs.
describe Your Organizational Experience Implementing Effective Behavioral Management Programs And Enforcing Student Code Of Conduct Policies.
describe What Organizational Infrastructure Exists For Providing Corporate Oversight And Support For Managing Multiple Residential Educational And/or Skills Training Programs That Include One Or More Of The Following: Career Training, Academic Instruction, Career Preparation, Work-based Learning And Transition Services, And Job Placement.
demonstrate Your Organization's Ability To Access Financial Resources Sufficient To Satisfy Requirements Of Operating The Contract For The First 60 Days Of Operation Or The Ability To Obtain Them Prior To Award.
describe Your Organizational Experience Conducting Outreach And Admissions Services To Attract Individuals To A Program, Screen For Eligibility, And Arrange For Admission Placement Into The Program.
describe Your Organizational Experience Working With At-risk And Disadvantaged Youth And Young Adults.
describe Your Organizational Experience Providing Career Counseling, Planning And Placement Services. Describe Your Experience Providing Career Counseling, Planning And Placement Services Should Include Assessments, Counseling, Resume Development And Interviewing Techniques; Transition Support With Housing, Childcare And Transportation During The Specified Service Window; Job Development And Referral Services; And Follow Up Placement Services.
describe Your Organizational Experience Obtaining, Establishing, And/or Overseeing Post-secondary Educational Programs And Program Providers.
describe Your Organizational Experience Collaborating With Career Skills Training Provider(s) To Identify Trade-specific Employers To Hire Center Graduates Into Meaningful Careers Related To The Training Completed.
describe Your Organizational Experience Identifying And Establishing Strategic Relationships With Industry Specific Employers, Business And Business Organizations, And Workforce Development Systems.
all Interested Parties Are Invited To Submit In Writing, By The Closing Date Indicated Below For Receipt Of Responses, A Package Entitled "statement Of Qualifications / Capabilities Statement (which Must Include The Contractor's Indication Of Their Ability To Fulfill Requirements). The Statement Of Qualifications / Capabilities Statement Package Must Be Transmitted Under A Cover Letter. The Response Must Be Specific To Each Of The Capability Requirements Listed Above. The Submittals Shall Not Exceed 15 Pages, Total. The Capabilities Statement Package Must Cite The Following Information At A Minimum:
response To Rfi 1605jw-25-n-00002;
company Name, Address, And A Company Point Of Contact;
unique Identity Id (from Sam.gov);
business Size Standard/classification, And Socio-economic Status, If Applicable;
naics Code Certifications.
the Closing Date For The Receipt Of Responses Is January 27, 2025 At Noon, Eastern Standard Time.send Your Responses To Sheiann Ross At The Following Email Address, Ross.sheiann.m@dol.gov. Please Note: The Subject Line Of Your Email Must State: “response To Sources Sought Notice 1605jw-25-n-00002.”
no Questions In Connection With This Notice Will Be Accepted. Only Submit Responses To The Qualifications And Capabilities Requirements Provided Above.
Closing Date27 Jan 2025
Tender AmountRefer Documents
DEPT OF THE ARMY USA Tender
Real Estate Service
United States
Details: Rlp Procurement Summary/solicitation – United States Army Corps Of Engineers
the U.s. Government, By And Through United States Army Corps Of Engineers (usace), Seeks To Lease The Following Space:
state: Washington
city: Port Angeles
delineated Area:
north: City Limits Of Port Angeles
south:city Limits Of Port Angeles
east:city Limits Of Port Angeles
west:city Limits Of Port Angeles
gross Square Feet:1,300
net Square Feet:1,144
space Type: Retail
gov Parking Spaces (total): 5
full Term: 60 Months
option Term: None
address: U.s. Army Corps Of Engineers, Seattle District, Attn: Cenws-res, 4735 East Marginal Way South, Building 1202, Seattle, Washington 98134-2388
email Address: Cenwsre-rfp@usace.army.mil
real Estate Contracting Officer Thomas Seymour Will Be Signing The Lease For The Government.
electronic Offer Submission:
offers Must Be Submitted Electronically Via Email Listed Above. Offers Are Due On Or Before: 1/31/2025.
any Questions Regarding This Solicitation May Be Directed To Primary Or Secondary Points Of Contact Listed In The “contact Information” Section Of This Notice.
the U.s. Government, By And Through Usace, Currently Occupies Retail And Related Space In A Building Under A Lease In The City And State Specified Above, That Will Be Expiring. The Government Is Considering Alternative Space If Economically Advantageous. In Making This Determination, The Government Will Consider, Among Other Things, The Availability Of Alternative Space That Potentially Can Satisfy The Government’s Requirements, As Well As Costs Likely To Be Incurred Through Relocating, Such As Physical Move Costs, Replication Of Tenant Improvements And Telecommunication Infrastructure, Non-productive Agency Downtime, And Costs, Including Rent, Related To Vacating The Current Location Prior To Lease Termination.
the Government’s Desire Is For A Full-service Lease To Include Base Rent, Cam, Utilities, And Janitorial Services For A Retail Space For An Armed Forces Career Center For A Term Of Five (5) Years With Government Termination Rights And Location Within The Delineated Area Specified Above. Non-exclusive Parking For Government Vehicles Must Be Provided 24 Hours 7 Days. Offered Space Must Meet Government Requirements Per The Terms Of The Government Lease. Interested Respondents May Include Building Owners And Representatives With The Exclusive Right To Represent Buildings Owners. Representatives Of Building Owners Must Include The Exclusivity Granting The Exclusive Right To Represent The Building Owner With Their Response To This Advertisement.
additional Requirements:
space Must Be Located In A Prime Retail Area With Attractive Surroundings With A Prevalence Of Modern Design And/or Tasteful Rehabilitation In Modern Use.
space Shall Be Located In A Professional Retail Setting And Preferably Not Within Close Proximity To Residential Areas, Railroad Tracks, Or Power Transmission Lines.
space Should Not Be Located Within The 100-year Flood Plain Or Wetland Unless The Government Has Determined It To Be The Only Practicable Alternative.
space Should Not Located Near Establishments Whose Primary Operation Is The Sale Of Alcoholic Beverages, Firearms Sold/discharged, Marijuana Dispensaries, Or Where There Are Tenants Or Invitees Related To Drug Treatment Or Detention Facilities.
employee And Visitor Entrances Of The Building Must Be Connected To Public Sidewalks Or Street By Continuous, Accessible Sidewalks.
regularly Scheduled Public Transportation (if Provided By Municipality) During The Workday Is Required Within 1,000 Feet.
parking Must Be Available Per Local Code And Be Available Within Walkable 4 Blocks From The Building. The Parking-to-square -foot Ratio Available Onsite Shall At Least Meet Current Local Code Requirements. Restricted Or Metered Parking Of One Hour Or Less Within The Four-block Area Of The Space Does Not Meet Parking Requirements.
subleases Are Not Acceptable.
retail Space Should Be On The Ground Floor.
space Configuration Shall Be Conducive To An Efficient Layout. Considerations For An Efficient Layout Include, But Are Not Limited To, The Following: Size And Location Of Interior Fire (support) Walls, Size And Number Of Columns, Column Placement, Bay Depts, Window Size And Placement, Convector Size And Placement, Electrical And Telephone Accessibility, And Angles, Curves, Or Offsets That Will Result In An Inefficient Use Of Space.
the Following Space Configurations Will Not Be Considered: Space With Atriums And Other Areas Interrupting Contiguous Space, Extremely Long Or Narrow Runs Of Space (more Than Twice As Long As Wide), Irregularly Shaped Space Configurations Or Other Unusual Building Features Adversely Affective Usage.
columns Cannot Exceed Two (2’) Square Feet And Space Between Columns And/or Walls Cannot Be Less Than Twenty (20’) Feet.
the Offered Space Must Meet Or Be Capable Of Meeting Government Requirements For Security, Fire Life Safety And Handicapped Accessibility.
if Space Offered Is Above Ground Level, There Must Be Elevator Access.
the Government Requires A Fully Serviced Lease. All Services, Janitorial Supplies, Utilities, And Tenant Alterations Are To Be Provided As Part Of The Rental Consideration.
the Government Will Have Access To The Space 24 Hours A Day, 7 Days A Week. Normal Hours Of Operation Are Monday Through Friday 0800 To 1700 (excluding Weekends And Federal Holidays).
additionally, Offerors Must Review The Attached Documents Which Contain Other Government Leasing Requirements:
request For Lease Proposals
exhibit A – Rental Proposal Worksheet, Usace Recruiting Form 1364
exhibit B – U. S. Government Lease For Real Property
exhibit C – General Clauses, Gsa Template 3517b
exhibit D – Construction And Security Specifications
exhibit E – Construction Specifications Bid Proposal Worksheet
exhibit F – Janitorial Specifications
exhibit G – Sam Representations And Certifications, Gsa Form 3518
exhibit H – Lessor’s Annual Cost Statement, Gsa Form 1217
exhibit I – Certificate Of Authorization
exhibit J – Agency Agreement, Authorization For Property Manager To Act On Behalf Of Owner (where Applicable)
to Be Responsive, Your Offer Should Be Based On All The Terms, Conditions, And Responsibilities Expressed Throughout The Rlp And Lease And Be Submitted Electronically Via Email Addressed To Cenwsre-rfp@usace.army.mil. Offerors’ Emails Shall Include The Completed Rental Proposal Worksheet, Attached Hereto As Exhibit “a” As An Attachment To The Email. The Subject Line Of The Email Must Contain The Request For Lease Proposal (rlp) Number (16 Characters Beginning With “dac”) Listed On The First Page Of The Rlp. Please Review The Rlp And All Attachments Carefully Paying Particular Attention To The Solicitation Requirements.
the Following Forms Must Be Completed, Initialed, And/or Signed And Returned Electronically With Your Initial Offer. (note: There May Be Other Required Forms. Refer To The Enclosed Rlp For Details.)
exhibit A – Rental Proposal Worksheet, Usace Recruiting Form 1364
exhibit E – Construction Specifications Bid Proposal Worksheet (if A New Build Out Is Required)
for Your Proposal For New Builds, Please Ensure That You Obtain At Least Three (3) Bids From Contractors To Complete The Build-out Based On The Construction And Security Specifications. Once You Have Obtained Contractors’ Bids, Please Complete, Sign, And Submit The Attached Rental Proposal Worksheet And Construction Specifications Bid Proposal Worksheet. For Existing Spaces, Please Complete, Sign, And Submit The Attached Rental Proposal Worksheet Only; A Completed Construction Specifications Bid Proposal Worksheet Is Not Required.
exhibit G – Sam Representations And Certifications, Gsa Form 3518 (if Offeror Is Not Registered In Sam At The Time Of The Offer Submission)
exhibit H – Lessor’s Annual Cost Statement, Gsa Form 1217
exhibit K – Seismic Offer Forms (where Applicable)
evidence Of Ownership (warranty Deed) Or Control Of Building Or Site.
please Note That You Are Not Required To Initial And Return The Following Documents At This Time:
request For Lease Proposal (rlp)
exhibit B – U. S. Government Lease For Real Property
exhibit C – General Clauses, Gsa Template 3517b
exhibit D – Construction And Security Specifications
exhibit F – Janitorial Specifications
exhibit I – Certificate Of Authorization
please Review All The Attached Documents Thoroughly To Obtain A Complete Understanding Of The Government’s Requirements. One Item Of Note In The General Clauses, Gsa Form 3517b, Is The Requirement To Register In The System For Award Management (sam) At Www.sam.gov (general Clause 17, Cfr 52.204-7). This Registration Is Mandatory For Any Entity Wishing To Do Business With The Government And Must Be Completed At The Time Of Lease Award. Entities Not Currently Registered In Sam Are Advised To Start The Registration Process As Soon As Possible.
after Receipt Of All Proposals, Conclusions Of Any Discussions, And Receipt Of Best And Final Offers, The Government Will Select A Location Based On The Best Value Specified In The Enclosed Rlp. Past Performance, If Applicable, Will Also Be Taken Into Consideration. The Selection Is Expected To Occur Approximately Thirty (30) Days Following The Initial Proposal Response Date Stated Above. A Government Market Survey, Appraisal, Or Value Estimate Will Be Conducted To Determine Fair Market Rental Value.
offered Space Must Meet Government Requirements For Fire Safety, Accessibility, Seismic, And Sustainability Standards Per The Terms Of The Lease. Offered Space Shall Not Be In The 1-percent-annual Chance Floodplain (formerly Referred To As “100-year” Floodplain).
entities Are Advised To Familiarize Themselves With The Telecommunications Prohibitions Outlined Under Section 889 Of The Fy19 National Defense Authorization Act (ndaa), As Implemented By The Federal Acquisition Regulation (far).). For More Information, Visit: Https://acquisition.gov/far-case-2019-009/889_part_b.
funds May Or May Not Be Presently Available For This Effort. No Award Will Be Made Under This Solicitation Until Funds Are Available. The Government Reserves The Right To Cancel This Solicitation, Either Before Or After The Closing Date For Receipt Of Proposals. In The Event The Government Cancels This Solicitation, The Government Has No Obligation To Reimburse Offeror(s) For Any Cost.
Closing Date1 Feb 2025
Tender AmountRefer Documents
DEPT OF THE ARMY USA Tender
Civil And Construction...+1Others
United States
Details: Solicitation Number: W912ee25o0001
set Aside – Total Small Business
title: Indefinite Delivery Type (idc) Contract For Automated Hydrographic Surveying For Gage And Discharge Measurements And In Support Of The Maintenance Dredging Program Within The Geographic Boundaries Of The Mississippi Valley Division
this Pre-solicitation Notice Is For Interested Firms To Submit Their Sf 330 By 19 February 2025 14:00 Hours, Cst. Firms Will Be Selected For Negotiations Based On Demonstrated Competence And Qualifications For The Required Work. This Is Not A Request For Proposal.
1. W912ee - Contract Information: Sf 330s Are Due By 14:00 Hours On 19 February 2025. Firms Will Be Selected For Negotiation Based On Demonstrated Competence And Qualifications For The Required Work. Three (3) Indefinite Delivery Contracts (idcs) Will Be Negotiated And Awarded As A Result Of This Solicitation. These Contracts Will Share A $15m Cumulative Capacity And Will Comprise A Multiple Award Task Order Contact (matoc). Each Contract Will Have A Performance Period Of Five (5) Years From The Date Of Contract Award Or Exhaustion Of The Cumulative Matoc Capacity Of $15 Million, Whichever Comes First. Each Contract Awarded As A Part Of The Matoc Will Have A $1,000 Minimum Guarantee.
the Work Will Be Accomplished Primarily Within The Vicksburg District But May Be Within The Mississippi Valley Division (mvd) And Other Areas As Needed To Support The Mission Of The Us Army Corps Of Engineers.
work Will Be Issued By Negotiated Firm Fixed-price Or Labor-hour Task Orders. It Is Anticipated That The Estimated Workload For Each Year Will Be Approximately $3.0 Million. The Cumulative Total Of Task Orders Issued Over The Life Of The Matoc Shall Not Exceed The Capacity Of $15.0 Million. Allocation Of Task Orders Will Be Based On Specialized Experience, Past Performance, Project Schedules, And/or Current Workload. Work Will Be Issued By Negotiated Firm Fixed-price Or Labor-hour Task Orders.
this Announcement Is A Total Small Business Set-aside, Which Includes Small Disadvantaged Businesses, Section 8(a) Firms, Hubzone Small Businesses, Women-owned Small Businesses, Veteran-owned Small Businesses, Service-disabled Veteran-owned Small Businesses, And Historically Black Colleges Or Universities/minority Institutions. The Small Business Size Standard For Surveying And Mapping Services Is $19.0 Million, Naics Code 541370 For Surveying And Mapping Services.
2. Project Information: The Work Consists Of Providing Professional Services As Required In Connection With Automated Hydrographic Surveying, Including Both Single-beam And Multi-beam Methods, And Automated Topographic Surveying In Support Of The Vicksburg District Maintenance Dredging And Mat Sinking Operations At Various Locations Primarily Within The Limits Of The Vicksburg District But May Include Any District Within Mvd. Automated Real-time Kinematic (rtk) Differential Gps Hydrographic Surveys And Automated Topographic Surveys Will Be Required On The Mississippi River, Its Tributaries, And Smaller Rivers And Streams And Associated Harbors.
adcp Surveys For The Acquisition Of River Current And Discharge Data May Be Required For Acquisition Of Current And Flow Patterns At Locks And Dams, Around Dikes, Bridge Piers Or Obstructions In Channels. The Work Consists Of Taking A Defined Number Of Discharge Measurements On A Routine Basis Along The Mississippi, Red, And Ouachita Rivers. The Measurements Will Be Taken With The Use Of An Acoustic Doppler Current Profiler (adcp) And A Single Beam Depth Sounder. The Data Collected Will Be Imported Into Personal Computer Software Specifically Designed To Calculate And View Flow Measurements. The Proposal Shall Include The Contractor’s Software(s) To Be Employed Under This Solicitation If Selected. The Work Will Also Require Collecting Daily Water Stage Data At Approximately 50 Gaging Sites Throughout The Vicksburg District And Reporting Information Daily And Monthly To The Vicksburg District. Additional Work Will Consist Of Maintenance Of Permanent Reference Elevation Markers At Each Gaging Site And Infrequent Collection Of Suspended Sediment Samples At Specific Discharge Ranges. Extreme Flow Conditions May Require A Combination Of The Adcp, A Single Beam Depth Sounder, And Differential Gps. The Contractor May Be Required To Take Special Purpose Flow Pattern And Discharge Measurements At Lock And Dam Locations. The Contractor May Be Required To Verify His System By Comparison With Conventional Discharge Methods. All Measurements Will Be In English Units.
3. Selection Criteria: Selection Will Be Based On The Following Criteria, Which Are In Descending Order Of Importance With A And B Being Of Equal Value. Criteria A Through F Are Primary; Criteria G Is Secondary And Will Only Be Used As A "tie-breaker," If Necessary.
a. Specialized Experience With Sub-factors In Descending Order Of Importance:
(1) Firm Must Have Prior Recent Experience In Automated Hydrographic Surveying In Streams Ranging In Size From The Mississippi River To Small Creeks, Oxbows, And Canals.
(2) Firm Must Have Prior Recent Experience In Topographic, Construction, And Maintenance Dredging Surveys. Firm Should Demonstrate The Capability To Provide All Services In A Timely, Professional Manner And In A Format Consistent With Corps Of Engineers Cadd/gis Systems By Submission Of Examples Of Completed Work.
(3) Firm Must Have Prior Recent Experience In Horizontal And Vertical Control Surveys.
(4) Firm Must Have Experience In Adcp Hydrographic Surveying With Data Collection Integrating A Single Beam Depth Sounder And Differential Gps Positioning.
(5) Firm Must Have Experience In Collecting Discharge Measurements By Conventional Methods.
(6) Firm Must Have Experience In Collecting And Analyzing Suspended Sediment Samples From River Streams Ranging In Size From The Mississippi River To Small Creeks, Oxbows, And Canals.
b. Professional Qualifications With Sub-factors In Descending Order Of Importance:
(1) Firm Must Have At Least One Professionally Registered Land Surveyor In Arkansas, Mississippi And Louisiana.
(2) Firm Must Delineate The Capability, Background, And Experience Of The Key Personnel Within The Firm Who Will Be Responsible For The Administration Of The Contract And Should Indicate The Ability To Ensure The Successful Performance Of The Work Required.
(3) Firm Must Clearly Demonstrate The Availability Of Adequate Numbers Of Experienced Personnel To Perform The Various Tasks Associated With Automated Hydrographic Surveys, Automated Topographic Surveys, Adcp Data Collection And With Dredge Alignment Surveys.
c. Past Performance With Subfactors In Descending Order Of Importance:
(1) Consideration Will Be Given To Ratings On Previous Dod Contracts.
(2) Consideration Will Be Given To The Performance Of Firms That Have Experience With Other Dod Organizations In The Type Of Work Required Under This Contract And Work Of Similar Nature, Complexity, And Difficulty.
d. Capacity With Sub-factors In Descending Order Of Importance:
(1) Firm Must Clearly Demonstrate The Ability To Respond To Emergency Dredge Alignment Survey Requirements Which May Require Commencement Of Field Work On Less Than 8 Hours’ Notice, Onboard And/or Real-time Plot Of Unedited Data, Analysis Of Plotted/graphed/printed Data, Setting Of Dredge Alignment Points With Determination Of Coordinates, And May Require Submittal Of Final Plotted Survey Within 24 Hours Of Completion Of Field Work. Firm Must Clearly Indicate The Capability In Writing Or Through Demonstration, If Required, To Respond On Short Notice To Emergency Dredging Requirements. This Includes Travel To The Job Site, Completion Of Fieldwork, Field Plotting Of Information, And Setting Of Survey Control Points For Dredge Alignment As Directed.
(2) Firm Must Clearly Demonstrate The Accuracy And Speed Of Data Collection, Editing, Processing, Plotting, And Output Of Final Submission.
(3) Firm Must Clearly Demonstrate The Availability Of All Incidentally Required Equipment Such As Tools, Markers, Stakes, Paint, Boats, Vehicles, Spare Units, Etc.
(4) Firm Must Clearly Demonstrate The Capability To Furnish A Minimum Of Two Complete And Independent Automated Hydrographic Survey Parties As Well As A Two-man Adcp Hydrographic Survey Party With All Necessary Equipment And Supplies, Including Boat.
e. Knowledge Of The Locality. Consideration Will Be Given To Familiarity With The Waterways Of The Vicksburg District.
f. Dod Contract Awards In The Past 12 Months; The Greater The Award The Lesser The Consideration.
g. Geographic Proximity To Vicksburg Mississippi.
4. Submission Requirements: Interested Firms Having The Capabilities For This Work Must Send One Electronic Copy Of Their Sf-330, Along With A Signed Sf-330 Part Ii For Each Prime And Subconsultant Listed. Sf-330 Packages Should Be Sent To: Mvkaecoordinator@usace.army.mil And Kasey.t.davis@usace.army.mil No Later Than 14:00 Hrs, Cst, On 19 February 2025. Include Both The Solicitation Number And The Company’s Uei On All Submittals.
note The Following Restrictions On Submittal Of Sf330; Block E – Resumes Of Key Persons, Specialist And Individual Consultants Anticipated For This Project Will Be Limited To A Maximum Of 20 Pages (one Side). Block H—additional Information Will Be Limited To A Maximum Of 20 Pages (one Side). Pages In Excess Of The Maximum Of 20 Will Be Discarded And Not Used In Evaluation. All Telephone Calls Should Be Directed To Ms. Lane Vargas, (601) 631-7021.
appointments Will Not Be Scheduled To Discuss This Announcement.
this Is Not A Request For Proposal (rfp). A Fee/price Solicitation Will Be Issued At A Later Date, To The (3) Firms Determined To Be The Most Highly Qualified.
****note: Contractors Must Be Registered In The System For Award Management (sam), For Information See Http: Www.sam.gov.
Closing Date19 Feb 2025
Tender AmountRefer Documents
PUBLIC BUILDINGS SERVICE USA Tender
Real Estate Service
United States
Details: Description
this Advertisement Is Hereby Incorporated Into The Rlp- 25reg10 By Way Of Reference As An Rlp Attachment.
u.s. Government Seeks To Lease The Following Office Space Through The Automated Advanced Acquisition Program (aaap):
city: The City Areas Of Seattle, Burien, Seatac, Tukwila, And Renton As Depicted On The Delineated Area Map.
state: Wa
delineated Area:
northern Boundary: Intersection Of West Seattle Bridge And Sw Avalon Way, East On West Seattle Bridge To South Columbia Way, Then Southeast On South Columbia Way To S Alaska St, And Continuing To Martin Luther King Jr Way S.
eastern Boundary: Intersection Of S Alaska St And Martin Luther King Jr Way S, South On Martin Luther King Jr Way S To S Cloverdale St. Intersection Of Martin Luther King Jr Way S And S Cloverdale St, East On Cloverdale St To Rainier Ave S. Intersection Of S Cloverdale St And Rainier Ave S, South On Rainier Ave S To Rainier Ave N, And Continuing To Airport Way. Intersection Of Rainier Ave N And Airport Way, East To Logan Ave N. Intersection Of Airport Way And Logan Ave N, North To Interstate 405. Intersection Of Rainier Ave N And Airport Way, East To Logan Ave N. Intersection Of Logan Ave N And Interstate 405, South On Interstate 405 To Sr-167. Intersection Of Interstate 405 And Sr-167, South To Sr-516.
southern Boundary: Intersection Of Sr-167 And Sr-516, West On Sr-516 To S 227th St. Intersection Of Sr-516 And S 227th St, West On S 227th St To Puget Sound Coastline.
western Boundary: Intersection Of S 227th St And Puget Sound Coastline, North Along Puget Sound Coastline To The Fauntleroy Ferry Entrance Road. Intersection Of The Puget Sound Coastline And Fauntleroy Ferry Entrance.
minimum Aboa Square Feet: 24,075 Aboa
maximum Aboa Square Feet: 25,279 Aboa
space Type: Office
lease Term: 17 Years, 15 Years Firm
offerors Are Encouraged To Submit Rates For All Terms Available In The Aaap For Consideration Against Future Gsa Requirements.
amortization Term: 8 Years For Both Tenant Improvementsand Building Specific Amortized Capital.
agency Unique Requirements
parking: Three (3) Government Vehicles On-site. Parking Spaces Can Be Surface Or Covered/structured.
space Offered Must Allow For Access To A Private Bus For Drop Off And Pick Up. Access Point Shall Be Within Direct Line Of Site And No More Than 50 Feet Of The Main Entrance.
space Offered Must Be Within 30-minute Commuting Time Of A Major Airport At Any Hour Of The Day, Including Rush Hour.
space Offered Must Be Within Walkable ¼ Mile Of Restaurants, Public Light Rail Or Bus Transit Stop, And Public Parking Facilities If On-site Parking Is Not Available.
space Offered Must Be Capable Of Meeting Facility Security Level 3.
site Must Not Exceed An 8-hour Time-weighted Average (twa) Of 85 Db(a) And For Impulse Noise Of 140 Db(a).
space Offered Must Be Contiguous On One Floor.
space Offered Should Provide For The Efficient Layout Of The Agency:
must Not Exceed 3:1 Length To Width Ratio.
must Not Be “u” Or “l” Shaped.
must Not Have Centrally Located Atriums, Light Wells, Elevator Banks, Stair Wells, Vertical Shafts Or Other Areas Interrupting Contiguous Space.
must Not Have Irregular Space Configurations Or Other Unusual Building Features Adversely Affecting Layout And Usage.
must Not Have Column Spacing Less Than 20 Feet Center To Center, Or To Other Fixed Structures.
must Provide 10 Feet Ceiling Height In Specific Areas For A Ceremony Room And Audio Booth Room, 700 Square Feet Of Total Space.
must Provide Necessary Floor Loading Capacity For The Audio Booth. Approximate Weight And Dimensions: 4000 Lbs; 8’-0” W X 6’-0” L X 7’-4” H.
space Offered Shall Have Minimum Ceiling Finished Heights Of 9’.
agency Must Not Be Collocated Where Alcoholic Beverages Are Served Or Sold Or With Marijuana Retailers.
agency Must Not Be Collocated With Drug And Alcohol Rehab Or Confinement Facilities, Or Syringe Service Program Centers.
agency Must Not Be Located Where Crime Exceeds City Wide Average.
see Custodial Service Level Attachment For Above Aaap Lease Janitorial Sevices Which Are To Be Included With Opex.
agency Tenant Improvement Allowance:
existing Leased Space: N/a
other Locations Offered: $78.41 Per Aboa Sf
building Specific Amortized Capital (bsac):
existing Leased Space: N/a
other Locations Offered: $25.00 Per Aboa Sf
project Specific Construction Schedule For The Agency Is Included. Please See Attachments.
important Notes:
check The Attachments And Links Section Of This Notice For Possible, Additional Project-specific Requirements Or Modifications To The Rlp.
offerors Are Advised To Familiarize Themselves With The Telecommunications Prohibitions Outlined Under Section 889 Of The Fy19 National Defense Authorization Act (ndaa), As Implemented By Federal Acquisition Regulation (far). For More Information, Visit: Https://acquisition.gov/far-case-2019-009/889_part_b
offerors Are Advised That All Shell Work Associated With Delivering The Tenant Improvements Are At The Lessor’s Cost. Please Refer To Section 3(construction Standards And Shell Components)and Specifically To Paragraph 3.07(building Shell Requirements)of Theaaap Rlp Attachment #2 Titled "lease Contract" (gsaform L100_aaap ) For More Detail. Tenant Improvement Components Are Detailed Under Section 5 Of The Aaap Rlp Attachment#2 Titled "lease Contract" (gsaform L100_aaap) .
it Is Highly Recommended That Offerors Start The Sam Registration Process Directly Following The Offer Submission. Refer To Rlp Clause 3.06.
the Government Intends To Award A Lease To An Offeror Of A Building That Is In Compliance With Seismic Standards. Section 2.03 Of The Request For Lease Proposals (rlp) Outlines Compliance Activities Required For All Leases In Moderate Or High Seismic Zones. To Determine If Your Property Lies In A Moderate Or High Zone, Please Reference The Map And Documents On Our Website.
how To Offer
the Automated Advanced Acquisition Program (aaap), Located At Https://leasing.gsa.gov/, Will Enable Interested Parties To Offer Space For Lease To The Federal Government In Response To The Fy25 Aaap Rlp. In Addition, The Government Will Use Its Aaap To Satisfy The Above Space Requirement.
offerors Must Go To The Aaap Website, Select The “register To Offer Space” Link And Follow The Instructions To Register. Instructional Guides And Video Tutorials Are Offered On The Aaap Homepage And In The “help” Tab On The Aaap Website. Once Registered, Interested Parties May Enter Offers During Any “open Period”. For Technical Assistance With Aaap, Email Leasing@gsa.gov.
the Open Period Is The 1st Through The 7th Of Each Month, Ending At 7:30 P.m. (et) Unless Otherwise Stated By The Government And Unless The 7th Falls On A Weekend Or Federal Holiday. If The 7th Falls On A Weekend Or Federal Holiday, The Open Period Will End At 7:30 Pm (et) On The Next Business Day. Refer To Aaap Rlp Paragraph 3.02 For More Details On The Offer Submission Process. The Government Reserves The Right To Allow For Multiple Open Periods Prior To Selecting An Offer For Award To Meet This Specific Space Requirement. Offers Cannot Be Submitted During The Closed Period And Will Not Be Considered For Projects Executed During That Time Period.
lease Award Will Be Made To The Lowest Price, Technically Acceptable Offer, Without Negotiations, Based Upon The Requirements In This Advertisement And In The Rlp Requirements Package Found On The Aaap Website. During An Open Period, Offerors Will Be Permitted To Submit New Offers Or Modify Existing Offers. Offerors Can Draft An Offer At Any Time; However, You Can Only Submit An Offer During The Open Period.
the Offered Space Must Comply With The Requirements In This Advertisement And The Rlp And Must Meet Federal Government, State, And Local Jurisdiction Requirements, Including Requirements For Fire And Life Safety, Security, Accessibility, Seismic, Energy, And Sustainability Standards In Accordance With The Terms Of The Lease. The Lease And All Documents That Constitute The Lease Package Can Be Found At Https://leasing.gsa.gov/leasing/s/aaap-portalhome.
if You Have Previously Submitted An Offer In Fy 2024, The Aaap Application Has A Copy Feature Which Will Allow Existing Offers To Be Copied Over To The Fy 2025 Rlp In Order To Avoid Having To Re-enter All Of The Data Manually. Please Be Sure To Review Fy25 Aaap Rlp Package And Each Page Within The Aaap Application Prior To Submitting Your Offer As Some Of The Questions Have Changed. You Must Re-enter Your Space And Rates On The ‘space And Rates’ Tab In The Aaap. Your Previous Offered Space Will Not Be Copied.
Closing Date8 Feb 2025
Tender AmountRefer Documents
DEPT OF THE ARMY USA Tender
Real Estate Service
United States
Details: Rlp Procurement Summary/solicitation – United States Army Corps Of Engineers
the U.s. Government, By And Through United States Army Corps Of Engineers (usace), Seeks To Lease The Following Space:
state: Oregon
city:bend
delineated Area:
north: Nw Spruce Ave, Redmond, Or
south:murphey Rd, Bend, Or
east:ne 9th St, Redmond, Or
west:nw Mount Washington Dr, Bend, Or
gross Square Feet:3,880 - 4,850
net Square Feet: 3,376 - 4,220
space Type: Retail
gov Parking Spaces (total): 13
full Term: 60 Months
option Term: None
address: U.s. Army Corps Of Engineers, Seattle District, Attn: Cenws-res, 4735 East Marginal Way South, Building 1202, Seattle, Washington 98134-2388
email Address: Cenwsre-rfp@usace.army.mil
real Estate Contracting Officer:thomas J. Seymour
electronic Offer Submission:
offers Must Be Submitted Electronically Via Email Listed Above. Offers Are Due On Or Before: January 31, 2025
any Questions Regarding This Solicitation May Be Directed To Primary Or Secondary Points Of Contact Listed In The “contact Information” Section Of This Notice.
the U.s. Government, By And Through Usace, Currently Occupies Retail And Related Space In A Building Under A Lease In The City And State Specified Above. The Government Is Considering Relocation To An Alternative Space If Economically Advantageous. In Making This Determination, The Government Will Consider, Among Other Things, The Availability Of Alternative Space That Potentially Can Satisfy The Government’s Requirements, As Well As Costs Likely To Be Incurred Through Relocating, Such As Physical Move Costs, Replication Of Tenant Improvements And Telecommunication Infrastructure, Non-productive Agency Downtime, And Costs, Including Rent, Related To Vacating The Current Location Prior To Lease Termination.
the Government’s Desire Is For A Full-service Lease To Include Base Rent, Cam, Utilities, And Janitorial Services For A Retail Space For An Armed Forces Career Center For A Term Of Five (5) Years With Government Termination Rights And Location Within The Delineated Area Specified Above. Non-exclusive Parking For Government Vehicles Must Be Provided 24 Hours 7 Days. Offered Space Must Meet Government Requirements Per The Terms Of The Government Lease. Interested Respondents May Include Building Owners And Representatives With The Exclusive Right To Represent Buildings Owners. Representatives Of Building Owners Must Include The Exclusivity Granting The Exclusive Right To Represent The Building Owner With Their Response To This Advertisement.
additional Requirements:
space Must Be Located In A Prime Retail Area With Attractive Surroundings With A Prevalence Of Modern Design And/or Tasteful Rehabilitation In Modern Use.
space Shall Be Located In A Professional Retail Setting And Preferably Not Within Close Proximity To Residential Areas, Railroad Tracks, Or Power Transmission Lines.
space Should Not Be Located Within The 100-year Flood Plain Or Wetland Unless The Government Has Determined It To Be The Only Practicable Alternative.
space Should Not Located Near Establishments Whose Primary Operation Is The Sale Of Alcoholic Beverages, Firearms Sold/discharged, Marijuana Dispensaries, Or Where There Are Tenants Or Invitees Related To Drug Treatment Or Detention Facilities.
employee And Visitor Entrances Of The Building Must Be Connected To Public Sidewalks Or Street By Continuous, Accessible Sidewalks.
regularly Scheduled Public Transportation (if Provided By Municipality) During The Workday Is Required Within 1,000 Feet.
parking Must Be Available Per Local Code And Be Available Within Walkable 4 Blocks From The Building. The Parking-to-square -foot Ratio Available Onsite Shall At Least Meet Current Local Code Requirements. Restricted Or Metered Parking Of One Hour Or Less Within The Four-block Area Of The Space Does Not Meet Parking Requirements.
subleases Are Not Acceptable.
retail Space Should Be On The Ground Floor.
space Configuration Shall Be Conducive To An Efficient Layout. Considerations For An Efficient Layout Include, But Are Not Limited To, The Following: Size And Location Of Interior Fire (support) Walls, Size And Number Of Columns, Column Placement, Bay Depts, Window Size And Placement, Convector Size And Placement, Electrical And Telephone Accessibility, And Angles, Curves, Or Offsets That Will Result In An Inefficient Use Of Space.
the Following Space Configurations Will Not Be Considered: Space With Atriums And Other Areas Interrupting Contiguous Space, Extremely Long Or Narrow Runs Of Space (more Than Twice As Long As Wide), Irregularly Shaped Space Configurations Or Other Unusual Building Features Adversely Affective Usage.
columns Cannot Exceed Two (2’) Square Feet And Space Between Columns And/or Walls Cannot Be Less Than Twenty (20’) Feet.
the Offered Space Must Meet Or Be Capable Of Meeting Government Requirements For Security, Fire Life Safety And Handicapped Accessibility.
if Space Offered Is Above Ground Level, There Must Be Elevator Access.
the Government Requires A Fully Serviced Lease. All Services, Janitorial Supplies, Utilities, And Tenant Alterations Are To Be Provided As Part Of The Rental Consideration.
the Government Will Have Access To The Space 24 Hours A Day, 7 Days A Week. Normal Hours Of Operation Are Monday Through Friday 0800 To 1700 (excluding Weekends And Federal Holidays).
additionally, Offerors Must Review The Attached Documents Which Contain Other Government Leasing Requirements:
request For Lease Proposals
exhibit A – Rental Proposal Worksheet, Usace Recruiting Form 1364
exhibit B – U. S. Government Lease For Real Property
exhibit C – General Clauses, Gsa Template 3517b
exhibit D – Construction And Security Specifications
exhibit E – Construction Specifications Bid Proposal Worksheet
exhibit F – Janitorial Specifications
exhibit G – Sam Representations And Certifications, Gsa Form 3518
exhibit H – Lessor’s Annual Cost Statement, Gsa Form 1217
exhibit I – Certificate Of Authorization
exhibit J – Agency Agreement, Authorization For Property Manager To Act On Behalf Of Owner (where Applicable)
to Be Responsive, Your Offer Should Be Based On All The Terms, Conditions, And Responsibilities Expressed Throughout The Rlp And Lease And Be Submitted Electronically. Please Review The Rlp And All Attachments Carefully Paying Particular Attention To The Solicitation Requirements.
the Following Forms Must Be Completed, Initialed, And/or Signed And Returned Electronically With Your Initial Offer. (note: There May Be Other Required Forms. Refer To The Enclosed Rlp For Details.)
exhibit A – Rental Proposal Worksheet, Usace Recruiting Form 1364
exhibit E – Construction Specifications Bid Proposal Worksheet
for Your Proposal For New Builds, Please Ensure That You Obtain At Least Three (3) Bids From Contractors To Complete The Build-out Based On The Construction And Security Specifications. Once You Have Obtained Contractors’ Bids, Please Complete, Sign, And Submit The Attached Rental Proposal Worksheet And Construction Specifications Bid Proposal Worksheet. For Existing Spaces, Please Complete, Sign, And Submit The Attached Rental Proposal Worksheet Only; A Completed Construction Specifications Bid Proposal Worksheet Is Not Required.
exhibit G – Sam Representations And Certifications, Gsa Form 3518 (if Offeror Is Not Registered In Sam At The Time Of The Offer Submission)
exhibit H – Lessor’s Annual Cost Statement, Gsa Form 1217
evidence Of Ownership (warranty Deed) Or Control Of Building Or Site.
please Note That You Are Not Required To Initial And Return The Following Documents At This Time:
request For Lease Proposal (rlp)
exhibit B – U. S. Government Lease For Real Property
exhibit C – General Clauses, Gsa Template 3517b
exhibit D – Construction And Security Specifications
exhibit F – Janitorial Specifications
exhibit I – Certificate Of Authorization
exhibit J - Agency Agreement
please Review All The Attached Documents Thoroughly To Obtain A Complete Understanding Of The Government’s Requirements. One Item Of Note In The General Clauses, Gsa Form 3517b, Is The Requirement To Register In The System For Award Management (sam) At Www.sam.gov (general Clause 17, Cfr 52.204-7). This Registration Is Mandatory For Any Entity Wishing To Do Business With The Government And Must Be Completed At The Time Of Lease Award. Entities Not Currently Registered In Sam Are Advised To Start The Registration Process As Soon As Possible.
after Receipt Of All Proposals, Conclusions Of Any Discussions, And Receipt Of Best And Final Offers, The Government Will Select A Location Based On The Best Value Specified In The Enclosed Rlp. Past Performance, If Applicable, Will Also Be Taken Into Consideration. The Selection Is Expected To Occur Approximately Thirty (30) Days Following The Initial Proposal Response Date Stated Above. A Government Market Survey, Appraisal, Or Value Estimate Will Be Conducted To Determine Fair Market Rental Value.
offered Space Must Meet Government Requirements For Fire Safety, Accessibility, Seismic, And Sustainability Standards Per The Terms Of The Lease. Offered Space Shall Not Be In The 1-percent-annual Chance Floodplain (formerly Referred To As “100-year” Floodplain).
entities Are Advised To Familiarize Themselves With The Telecommunications Prohibitions Outlined Under Section 889 Of The Fy19 National Defense Authorization Act (ndaa), As Implemented By The Federal Acquisition Regulation (far).). For More Information, Visit: Https://acquisition.gov/far-case-2019-009/889_part_b.
funds May Or May Not Be Presently Available For This Effort. No Award Will Be Made Under This Solicitation Until Funds Are Available. The Government Reserves The Right To Cancel This Solicitation, Either Before Or After The Closing Date For Receipt Of Proposals. In The Event The Government Cancels This Solicitation, The Government Has No Obligation To Reimburse Offeror(s) For Any Cost.
Closing Date1 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Germany
Description: Preliminary information for information purposes only - general guidelines (services) award of the Neckargemünd line bundle. The Rhein-Neckar district, the city of Heidelberg and the Verkehrsverbund Rhein-Neckar GmbH as local and regional task carrying organization in the Bergstrasse district intend to award a public service contract within the meaning of Regulation 1370/2007 with an expected term until the timetable change in December 2036 as public transport task carrying organization and the competent authorities within the meaning of Regulation 1370/2007 in accordance with Art. 5 Para. 1 Vo 1370/07 in conjunction with Part 4 of the GWB as of December 13, 2026 for the Neckargemünd Vrn line bundle. They use the Rhein-Neckar Kör transport association, represented by the Rhein-Neckar transport association GmbH - both B1 3-5, 68159 Mannheim - as a joint awarding body. The provision of scheduled services in the form of bus services to be licensed is awarded on the basis of the current local transport plans of the Rhein-Neckar district, the Bergstrasse district and the city of Heidelberg. The Neckargemünd route bundle currently consists of the VRN bus routes 735, 736, 737, 743, 744, 746, 748, 752, 753, 754, 755 and 817, the timetables of which can be accessed via the VRN timetable information at www.vrn.de. The qualitative and operational specifications to be observed in the context of the transport contract in addition to the timetable scope to ensure adequate transport service arise from the stipulations of the local transport plans of the responsible authorities and the joint local transport plan of the Rhine-Neckar transport association (in this regard, the chapters on quality and quality assurance within the framework of the Gnvp of the VRN are to be observed in particular). On the basis of the statute on a uniform network tariff in the Rhine-Neckar transport association (general regulation), the network tariff of the Rhine-Neckar transport association is to be applied, including all transitional tariff regulations. The timetable concept is to be retained at least in its current scope. On the existing lines, individual adjustments are to be made with regard to travel times, cycle times, service periods and route routes. These include, among other things, changing routes in Neckargemünd and optimizing the travel times of lines 735, 752, 754 and 755 between Heidelberg and Neckargemünd in order to avoid parallel journeys with line 35 and to make better use of synergy effects. On all lines, the S-Bahn timetables current at the start of operations will be taken into account in order to improve coordinated connecting connections to the relevant local public transport hubs (in particular Neckargemünd station, Neckarsteinach). The connection to areas not previously served by local public transport will be examined. This includes, among other things, examining a connection to the Mühlrain / Hollmuth area in Neckargemünd. The establishment of additional stops or the relocation of current ones will also be examined. The use of vehicles with alternative drives is planned on some lines. It will also be examined whether an on-demand service can also be introduced for some lines. An automatic passenger counting system is to be used to determine demand values. The bidder's offer must include the transport services covered by the transport area, in accordance with Section 8a, Paragraph 2, Sentence 4 in conjunction with Section 13, Paragraph 2a, Sentence 2 of the Transport Services Act (Pbefg) and will be evaluated on the basis of the overall performance. (type and quantity of services or specification of needs and requirements) Bus service in the Neckargemünd line bundle The regulations for adequate transport service for commercial transport in the Neckargemünd line bundle are set out here: Joint local transport plan of the Rhine-Neckar transport association: https://www.vrn.de/verbund/planung/dokumente/gnvp_2006.pdf Supplementary volume for the West Palatinate region 2009: https://www.vrn.de/verbund/planung/dokumente/gnvp_region_westpfalz_2009.pdf Supplementary volume 2011: https://www.vrn.de/verbund/planung/dokumente/gnvp_ergaenzung_2011.pdf Supplementary volume 2013: https://www.vrn.de/verbund/planung/dokumente/gnvp_ergaenzung_2013.pdf Supplementary volume 2023: Https://www.vrn.de/mam/verbund/planung/dokumente/gnvp_teilfortschreibung-rhein-neckar-2023.pdf Local transport plan for the Rhein-Neckar district: Https://www.vrn.de/mam/verbund/planung/dokumente/nvp-rnk.pdf Local transport plan for the city of Heidelberg: Https://www.vrn.de/mam/verbund/vergabestelle/dokumente/nvp_stadt_heidelberg.pdf Local transport plan for the Bergstrasse district: Https://www.vrn.de/mam/verbund/planung/dokumente/nvp-bergstr-2021/nvp_kreis_bergs_2020-2024.pdf The statute on a uniform network tariff in the Rhein-Neckar transport association (general regulation) can be found at: Https://www.vrn.de/mam/verbund/dokumente/satzungen/2023-satzung_verbundtarif_konsolidierte_fassung_gueltig_ab_1.5.2023.pdf Reference is made to the deadline set in Section 12 Paragraph 6 of the Pbefg insofar as applications must be submitted to the responsible approval authority no later than 3 months after this publication. The deadline begins with the publication of this preliminary announcement. After the deadline has expired, applications for private economic reasons are inadmissible.
Closing Date2 Dec 2025
Tender AmountRefer Documents
Muhoksen Kunta Tender
Others
Finland
Details: In Sisä tensions of the dynamic purchasing system are acquired by the Orderer”, “misessacial and Environmental Construction and Maintenance Required Machinery and”, “transport services to the Resäsibility Areas of Muhos Munich’s Technical Services.” As a rule, the thoughts touch the Vehicle and Machinery classes that are presented in Appendix 2,” “procurements may divide into Framework Agreements, Small Con.s or Individual Con.s.” “Acquis",s” mainly include the acquis. of the Services on an Hourly Debit or Yksit Price basis. The acquisins may also include the Personal Work Service", "the predicted value of the acquis.s is N. 0.8 M€, which is distri.ed to Use. Eri." The total value mentioned in the announcement has been calculated from the winner of the crew,” says the Supposed Duration.
Closing Date22 Dec 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Electrical Cables And Wires...+1Electrical and Electronics
Corrigendum : Closing Date Modified
United States
Details: 556-23-101 Renovate B134-2c Clc
july 22, 2024
construction Statement Of Work
date: July 22, 2024
project Number: 556-23-101
project Name: Renovate B134-2c Clc
location: B134 C-wing 2nd Floor Clc
captain James A. Lovell Fhcc 3001 Green Bay Rd,
north Chicago, Il 60064
part 1: Project Scope Of Work Overview:
contractor Shall Provide All Tools, Materials, Labor, Quality Assurance, And Supervision For Renovations Resulting In A Complete, Compliant, And Fully-functional Clc, Including Erection Of Temporary Enclosures Preventing The Release Of Dust Outside Of The Work Area, Selective Demolition, Metal Studs, Gypsum Wall Board, Paint, Ceilings, Flooring, Electrical Power And Light, Modifications To The Fire Protection System, Telecom Cabling, Fire Alarm, And Other Work To Affect A Complete Turn-key Space Supporting Described Clinical Function(s) And Equipment. Finished Square Footage Is Approximately 12,590. The Current Hvac System And All Its Components Installed On The Roof Will Be Tied Into The New Space On The 2nd Floor.
part 2: Period Of Performance:
the Following Model Presents The Summary Logic Of The Milestone Sequence Working Backward From The Delivery Date Of The Longest Lead Time In The Critical Path To Determine A Mobilization Date, And Then Forward From The Delivery Date Of The Longest Lead Time To Completion Of All Work.
notes:
durations Shown Are In Calendar Days.
actual Award And Ntp Dates Will Be Revised To Match Their Occurrence.
time Consumed For Resubmission And Review Must Be Made Up By The Gc To Ensure That All Submittals Of This Contract Are Approved Within 60 Days Of Ntp.
see Section 01 32 16.15 Project Schedules With Long Lead Items (d/b/b Projects At Fhcc).
part 3: Detailed Project Requirements:
project Objectives:
this Project Is Required To Renovate The Described Space As Expediently And Compliantly As Practical.
meet Or Exceed All Code, Technical, And Programmatic Requirements Adopted, Established, Revised, And Or Published By Va Or The Many Organizations Listed In The Several Specifications.
expedite The Delivery Of A Highly Functional, Complete, Compliant, And Safe Workspace For The User Service.
list Of Ae Documents To Be Included In This Contract:
see: 00 01 10 Table Of Contents And The Entire Project Manual
see: 00 01 15 List Of Drawing Sheets And The Entire Volume Of Drawings
pre-bid Conference:
va Shall Schedule Two Pre-bid Conferences Required To Be Attended By Prospective Bidders To Observe Current Conditions Within The Work Area(s).
the Ae Shall Not Attend The Pre-bid Events. No Questions Will Be Allowed During The Events. All Questions By All Prospective Contractors Shall Follow The Rfi Process Described In The Solicitation.
prospective Bidders Shall Not Attempt To Contact The Ae Or Va Facilities Engineering Staff During The Solicitation And Bidding Period. The Ae And Va Facilities Engineering Staff Are Instructed To Ignore All Such Inquiries And Report Them To The Va Contracting Officer. All Inquiries Regarding This Project Shall Be Presented As Complete And Coherent Requests For Information (rfi) Specifically Citing Design Or Specification Sections, Pages, Paragraphs, Notes, Details, Etc. To Enable Responses To Rfi S. Follow The Instructions Provided By The Contracting Officer Within The Solicitation Regarding Submission Of Rfi S. Va Will Post Responses Developed To Enable All Prospective Bidders To Receive The Same Information At The Same Time.
project Scheduling And Mobilization On Site:
the Contractor Shall Not Mobilize On Site Until All Required Submittals Are Prepared, Transmitted, Reviewed, And Accepted By Va, And The Delivery Dates Of Long Lead Items Have Been Established By The Respective Manufacturers. Significant Time For This Essential Is Included In The Period Of Performance.
critical Components And Other Long Lead Items Shall Require Proof Of Purchase And An Established Delivery Date Delivered To The Contracting Officer And Cor To Complete Va Approval Of The Schedule.
approval To Mobilize Shall Be In Writing By The Contracting Officer In Consultation With The Cor And Facility Safety Manager.
prior To Beginning Work, Post And Maintain At Each Work Area All Current Emergency Contact Information, Va Infection Control Risk Assessment (icra)/permit, Interim Life Safety Measures (ilsm), And Other Information Required By Va And The Gc Project- Specific Safety Plan, At All Entry Points To The Work Area.
the Target Mobilization Date Is Determined By First Establishing The Delivery Date Of The
longest Lead Time Material Or System Along The Critical Path, Which In This Project Is Predominantly Hvac Equipment, But Is Likely To Also Consider Shop-fabricated Doors And Frames, And Then Working Back Along The Critical Path Listing All Predecessor Work Activities.
the Baseline Period Of Performance Is Certain To Change Between Initial Project Schedule And Acceptance Of The Final Project Schedule. The Contracting Officer, At His Or Her Discretion And Judgement, Will Issue A Contract Modification Revising The Period Of Performance End Date. As There Is No Change To The Quantity Or Quality Of The Work, The Contract Value Shall Not Change.
performance Of The Work:
erect And Maintain A Dust-tight Containment Around The Work Area Which Complies With Applicable Code Associated With Ul-rated Wall Assemblies And Maintenance Of Egress Paths.
containment Shall Enable Access To The Work, Without Obstructing Access To Adjacent Suites Or Rooms. Establish Hepa Air Purification. Review And Follow Specification 01 35 33 Infection Control Requirements As Applicable To This Location And Work. Follow Pra & Icra Plan And Permit Generated And Issued By Va. Remove Only Upon Completion Approval Of The Cor.
after Establishing And Gaining Approval Of The Temporary Modular Hard Plastic Dust-tight Construction Dust Control Barrier System, Including Lockable Door. Where This Is The Sole Containment, Include Differential Pressure Monitoring For The Work Area, With Monitor Located Adjacent To The Temporary Entry Door.
where Fire Or Smoke-rated Wall Assemblies Are Planned For Alternation Even If Temporarily, Provide A Dust-tight 1-hour Rated Temporary Construction Wall With Locking Door To Isolate The Area Of Work, Finished With One Coat Of Paint On The Outside Were Indicated.
the 1-hour Temporary Wall Shall Include Differential Pressure Monitoring For The Work Area, With Monitor Located Adjacent To The Temporary Entry Door.
the 1-hour Temporary Wall And Differential Pressure Monitoring Must Be Complete And Approved Prior To Removal Of The (outer) Temporary Modular Wall Barrier, And Commencement Of Demolition Within The Space.
prior To Removal Of A Temporary Fire Or Smoke-rated Walls, Completely Restore Rated Wall Assemblies Required Of The Work, And Then Re-erect The Temporary Modular Hard Plastic, Dust-tight, Barrier System.
in No Case Shall Any Containment Be Removed Unless And Until The Work Area, Including The Inside Of The Ventilation System, Has Been Thoroughly Cleaned And Approved For Progress Toward Activation.
immediately Prior To Turnover, Remove All Air Filters From The Ventilation System Used During Construction, And Supply And Install New Specified Filters. Supply Case Quantities Of Each Filter To Va With The System.
perform Selective Demolition And Construction As Described In The Specifications And Drawings.
special Acceptance Criteria For The Work Shall Include:
hvac System Shall Not Be Acceptable In Whole Or In Part Unless And Until Testing, Adjusting, And Balancing (tab) Is Completed And Accepted In Accordance With The Specifications, Drawings, And The Current Edition Ashrae 170 Ventilation Of Health Care Facilities (and Errata) Requirements Specific To The Room/suite Type And Purpose. Va Reserves The Right To Conduct, Or Have Conducted, Verification Testing, And Deduct Its Cost From The Contract If Noncompliant Conditions Are Found.
the Contractor Shall Provide Eia/tia Testing And Certification Of All New Cat 6a Communications Cable.
restore All Finishes Damaged During The Work Match Existing.
thoroughly Clean All Surfaces Using Hepa-filtered Vacuum Cleaner And Anti-bacterial Wipes.
part 4: Meetings, Submittals, And Deliverables:
kick-off Meeting And Documentation
the Contractor S Project Manager And Field Supervisor Shall Attend A Preconstruction Safety And Coordination Meeting To Discuss Project Details.
kick-off Meeting Documentation:
prepare And Submit For Review And Acceptance A Draft Critical Path Method (cpm) Baseline Schedule Reflecting Each Phase And Activity Of The Work Beginning With Mobilization, Including Each Critical Activity, And Each Essential Task Required To Optimally Meet The Objectives Of The Project.
the Baseline Schedule Must Also Include All Activities To Be Performed By Va, Including Maintenance Shops Support, Safety And Infection Control, The Ae, The Commissioning Agent, Etc.
it Is Expected That This Timeline Will List All Activities Of The Work Leading Up To The Delivery Of Long Lead Items, The Target Dates Of Long Lead Items, Installation Of Long Lead Items, And Each Work Activity That Follows Until All Work Is Complete, Compliant, And Ready For Acceptance. The Durations Of Each Phase Will Change Once The Gc Completes All Procurement Activities And Submit For Review And Approval The Final Baseline Schedule.
to Enable Objective Assessment Of Costs And Progress, The Baseline Schedule Shall Be Cost-loaded At Each Work Activity (essentially Division 02 On), Ensuring That The Total Cost Of Each Phase And Division Of Work Match The Corresponding Schedule Of Values, And The Total Of The Construction Contract At Award.
develop The Cpm Schedule In Sufficient Detail To Enable Readers To Understand All Planned Activities, Their Predecessors, And Successors, Who Is Performing The Work, Durations, And Costs. Activity Durations Shall Not Exceed Two Calendar Weeks. Indicate Resource Sdvosb Status.
the Project Manual Index Of Specifications Is A Useful Guide For Starting The Cpm Schedule And Schedule Of Values In Sufficient Detail. For Example: Simply Listing Hvac Is Unacceptable For Projects Including More Than Basic Work In This Category. The Inclusion Of Specifications For An Ahu, Controls, Ductwork, Demolition Of Each, Testing And Balancing, Etc. Also Prompt Their Inclusion As Categories Of Activities And Tasks In The Schedule. In Fact, For Larger Work Categories, Breaking Down The Cost By System/material And Installation And Testing Enables Partial Payment For Higher Cost Items Upon Delivery Into The
facility Work Area.
preparation And Processing Of Submittals Are Gc Procurement (administrative) Activities And Not Work Activities Contributing To The Compensable Work In The Field. Should The Contractor Elect To Include Submittal Planning In Their Internal Use Schedule For Their Own Purposes, Do Not Show Those Line Items In The Schedule Submitted To Va For Consideration In The Baseline Schedule.
not Less Than One Item Per Subcontractor At Any Tier. Subcontractors, By Definition, Are Contributing Work In The Field To The Project. Pass-throughs Are Not Acceptable.
include All Expected Utility System Shutdowns, Road Closures, Crane Lifts, And Off- Hours Work In The Cpm Schedule.
do Not Include Costs Associated With Non-work Administrative Activities Inherent In The Listed Work Items. The Government Cannot Pay For What It Has Not Inspected And Accepted As Compliant, Or For Activities Which Add No Value To Va Facilities. Front-loading Proposals, Bids, Schedules Of Values, And Line-item Costs Of Cost-loaded Cpm Schedules With Non-work Items Puts The Contractor, The Government, And The Bonding Company At Otherwise Avoidable Risk Associated With Paying Out More Than The Value Of Work In Place Should The Work Stop Prior To Completion. Administrative And Managerial Activities Associated With Each Work Line Item Are To Be Included In Each Line Item, Along With Prorated Overhead And Profit.
the Contractor Shall Prepare And Submit Sf-1413 For Each Subcontractor To The Co, Copying The Cor. List Of All Subcontractors And Suppliers, Including Company Names, Office Address, And Main Point Of Contact Name With Telephone Number, And Sdvosb Status.
as Required At 01 35 26 Safety Requirements: Develop And Submit A Project- Specific Construction Safety And Accident Prevention Plan With Project-specific Procedures, Processes, Analysis, And Details, Including But Not Limited To:
access And Use The U.s. Army Corps Of Engineers Em 385-1-1 Safety And Health Requirements And Its Appendix A Minimum Basic Outline For Accident Prevention Plans For Development Of Meaningful, Effective, And Compliant Project Safety Plans.
submission Of Generic, Non-project Specific Safety Plans Will Be Rejected, Resulting In A Contractor-caused Delay In Commencement Of The Work.
project-specific Activity Hazard Analysis (aha), Which Forms The Basis Of The Construction Safety And Accident Prevention Plan Highlighting Identified Risks Such As Isolation Of Stored Energy (lock-out*), Fall Protection, Or Confined Space Access.
(*) Note That Tag-out Is Not An Acceptable Form Of Isolation, Therefore It Was Intentional Not To Use The Term Loto.
submit An Electronic Copy Of The Gc And All Subcontractor Competent Persons Osha 30-hour Construction Safety Training Certificates With Project-specific Construction Safety And Accident Prevention Plan.
submit An Electronic Copy Of All Workers Osha 30-hour Construction Safety Training Certificates Or Cards Prior To Allowing Entry To The Site.
assist The Cor In Completing Project-specific Va Infection Control Risk Assessment (icra) And Interim Life Safety Measures (ilsm) Documentation.
public Safety Compliance Requirements:
the Following Applies To All Va And Navy Properties, Including Leased Facilities, Regardless Of Building Occupancy Or Current Use And Does Not Differentiate Between Medical Or Administrative Spaces As All Are Occupied By People We Are Collectively Working To Protect From Harm Including Contractor Staff.
contractors Shall Adhere To And Ensure Compliance With Federal Laws, Regulations, And Executive Orders Regarding Screening, Vaccinations, And Or Testing Designed To Protect Contractor Employee And General Public Health And Safety, As Well As All Associated Health Information And Personally Identifiable Information.
all Contractor Staff Share A Common Moral Responsibility To Stay Away From The Facility When Feeling Ill.
quality Control Plan And Quality Assurance Plan:
01 40 00 Quality Requirements Is Included In Its Entirety In This Contract. This Specification Is Brief But Very Informative And Enabling To Those Who Approach It As An Opportunity.
submittal Register (aka Submittal Log) Is Described In Quality Assurance Of The Above Specification, And The Project Manual At 01 33 23.
submittal Register Must List Each Submission Listed In Each And Every Specification. Because Each Project Is Different, Do Not Recycle Submittal Logs From Other Projects.
(dis)approval Of A Submittal Never Constitutes A Change To The Quantity, Quality, Cost, Or Duration Of A Contract. The General Contractor Is Solely Responsible For Submitting And Delivering Complete And Compliant Work. Defective Work Shall Be Removed And Replaced At The Contractor S Expense. The Government Has The Right And Responsibility To Withhold Funds Equivalent To The Cost For The Government To Complete The Work Should The Contractor Fail To Promptly Act In Executing The Work Or Remedying Defective Work.
to Help Prevent (unfortunately) Common Shortcomings And Mistakes With Submittal Preparation And Submission, As Well As Ensure That The Installation Of Systems Is Complete And Compliant, The Gc Shall Provide The Services Of At Least One Licensed Professional Engineer To Pre-review And Certify As Compliant All Submittals And Subsequent Systems Prior To Requests For Va Or Its Ae To Review For Compliance. For Projects Requiring Alteration Or Replacement Of Mechanical Systems, The Gc Consulting Engineer Is Required To Be A Licensed Mechanical Engineer. Similarly, For Projects With Significant Electrical Scope, Retain A Licensed Electrical Engineer. The Consulting Engineer May Be A Firm. Engaging A Verified Sdvosb Firm Is Always Encouraged. The Consulting Engineer (or Firm) Cannot Be The Ae Of-record Or Part Of Their Consulting Team. Upon Issuance Of Notice To Proceed, Gc Shall Immediately Submit To Va For Review And Information The Contact Information And Credentials Of The Contracted Consulting Engineer.
construction Progress Meetings:
the Contractor S Project Manager And Field Supervisor Shall Provide On-site Weekly Construction Progress Meetings With The Cor For The Entire Period Of
performance.
include Preparation Of Meeting Agendas, And Subsequent Minutes Of The Meeting For Each Event Not Later Than 1 Day (next Business Day) After Each Meeting.
construction Progress Meeting Agenda S And Minutes Shall Include No Less Than: List Of Invitees/attendees, List Of Past/ongoing And New Issues Or Concerns, Indicate Days Remaining Per The Contract, Detail Any Safety Incidents, And Include Current Updated Copies Of The Rfi Log, The Shop Drawing Log, And A Detailed 3-week Look- Ahead And Utility Shutdown Schedule.
daily Reports:
the Contractor Shall Provide A Daily Report Each Day, Along With Accompanying Digital Photos And Other Supporting Documents. The Daily Report Shall Include: List Of Issues Or Concerns, Days Remaining Per The Contract, Detail Regarding Any Safety Incidents, Detail Of Daily Safety Inspections (including Items Checked And Corrective Actions Taken), Notations Regarding Any Visitors To The Work Area.
use Of Va Form 10101 Contractor Production Report (fillable Pdf At Https://www.va.gov/vaforms/va/pdf/va10101.pdf) Is Required Each Day Even On Days With No Contractor Activity, Which Is What To Report On Such Days. Contractor May And Should Provide More Information Than Shown In The Standard Form, But The Standard Form Is Required.
the Report Must Be Accompanied By Relevant Time And Date-stamped Photos Of Construction Progress Of Sufficient Quantity And Detail To Enable Viewers To Clearly See The Progress Of All Work To-date, All Issues Discovered (including Those Which Become The Subject Of Rfi S). Email The Va Form 10101 Contractor Production Report And Photos To The Cor Not Later Than 9 Am The Next Working Day.
no Photography On Va Premises Is Allowed Without Written Permission Of The Cor.
in No Case Shall The Gc Allow Any Team Member To Take Photographs With Patients, Visitors, Or Employees In The Picture.
acceptance And Closeout:
acceptance Criteria For The Work:
schedule Demonstration Of New Equipment And Systems At Least 21 Calendar Days In Advance With The Cor.
provide Factory Startup And Certification Of All Systems.
demonstrate The Operation Of The System.
newly Installed Water Or Medical Gas Piping And Distribution System Components Shall Be Flushed And Disinfected Prior To Being Placed In Service. Include Documenting Completion/certifications.
startup And Testing Of New Systems Or Equipment, Or Moving In Va Purchased Equipment Or Furnishings, Or Their Use, Does Not Constitute Any Form Of Acceptance (or Beneficial Occupancy). The Project Is Planned Around The Complete, Complaint, And Unconditional Fulfillment Of All Requirements Of The Contract Which Enable The Work To Be Complete By Definition. Please Work With Va To Expedite This Process.
closeout Records: Provide One Full-size, And One Half-size Printed Set Of As-built Drawings, As Well As Cd-rom Or Dvd-rom Media Containing A Complete Archive Of
all Project Documents And Files, Including But Not Limited To:
as-built Record Drawings Of The Installed Condition As Cad And Pdf Files.
approved Shop Drawings.
operations And Maintenance Manuals.
spare Parts Lists.
all Photographs.
all Daily Reports.
all Communications.
all Pay Applications.
all Communication, Change, And Cost Data.
all Safety Records.
a Project Warranty For Construction Written By The General Contractor, Projected To Start Upon Final Acceptance By Va (typically Within A Business Week Of Receiving A Complete And Compliant Closeout Package).
where Manufacturer S Warranties Exceed One Year, Provide All Documentation Necessary For Va To Exercise Warranty Rights Beyond The Standard Gc Warranty.
where Specified, Such As With Roofing Systems, Provide The Warranty Written By The Manufacturer To Va For The Term Specified Or Greater (typically 20 Years).
note That Moving Furnishings Or Equipment Into The Space Does Not Constitute Occupancy Or Acceptance, However, Damage To Completed Work During These Activities Shall Be The Responsibility Of Va To Correct.
lien Waivers And Other Documents Required By The Contracting Officer.
part 5: Applicable Performance Standards
all Work Shall Comply With
all Va And Fhcc Policies Including And Not Limited To: Va Construction Safety And Va Infection Control Policies.
codes, Standards And Executive Orders (topic 1) Found At Http://www.cfm.va.gov/til/cpro.asp
01 32 16.15 Project Schedules With Long Lead Items (d/b/b Projects At Fhcc)
01 35 26 Safety Requirements
01 35 33 Infection Control Requirements
01 40 00 Quality Requirements
01 41 00 Regulatory Requirements
01 42 16 Definitions And Abbreviations
coordinating With Va-retained Commissioning Agent (cxa) And Architect-engineer (ae).
va Intends To Retain The Services Of An Independent Cxa.
ae Field-verification And Documentation Of Compliant Systems Remains An Essential Part Of Construction Period Services.
the General Contractor Is Responsible For Communication And Cooperation With The Ae And Cxa And Enabling Compliant Execution Of Contracts.
no Action Or Inaction By The Ae, Cxa, Va, Or Other Government Agencies Ever Relieves The Gc From Responsibility To Deliver 100% Of The Project Requirements As Specified And Designed.
the General Contractor Shall Have A Competent Supervisory Person On Site At All Times When Any Worker(s) Or Subcontractor(s) Are Present. The General Contractor Is Also Required To Maintain On Site A Competent Site Safety And Health Officer (see 01 35 26 Safety Requirements When Any Worker(s) Or Subcontractor(s) Are Present. The Va Cor May, At His Or Her Discretion, May Allow The Competent Supervisory Person To Also Act At The Ssho, Based On Demonstrated Competency And Performance In The Two Roles. If Demonstrated Lack Of Competency Or Effectiveness In Either Role Is Observed, The Va Cor May Revoke The Privilege.
safety:
prior To Any Activity, Review The Following With All Project And Craft Team Leaders: 01 35 26
safety Requirements.
the Contractor Shall Provide A Proactive And Complaint Construction Safety And Accident Prevention Plan In Accordance With The Occupational Safety And Health Act, 01 35 26 Safety Requirements, And Site-specific Policies:
all Persons Working On Any Electrical Systems Rated 50 Volts Or More Shall Have The Minimum Qualification As A State Licensed Master Electrician Or Registered Journeyman Electrician, And All Activities Shall Follow The Safe Work Practices In Compliance With Nfpa 70e Electrical Safety In The Workplace.
01 35 26 Safety Requirements Is Included In Its Entirety In This Contract. Each Contractor-employer Is Required To Be Solely Responsible For The Health And Safety Of Its Employees In Accordance With 29 Cfr 1910, 1926, & 1960 Of The Occupational Safety And Health Act Of 1970, As Amended.
because Each Contractor-employer Is Required To Be Solely Responsible For The Health And Safety Of Its Employees, Part Of A Compliant And Effective Safety Management Program Requires Each Employer To Plan And Implement Their Own Compliant Permit- Required Work Including Written Permits. Do Not Rely On, Or Request That Va Generate Required Permits Such As Hot Work Or Confined Space Documents.
prior To The Beginning Of Any Work, Fire Extinguisher(s) Complying With Nfpa 10 Shall Be Pedestal-mounted In The Work Area. Inspection Of The Work Area Includes Verification That Inspection Tags Are Current. Where Non-compliant, The Contractor May Be Required To Remove And Replace The Unit(s) Before Resuming Work Activity.
all Work In Crawl Spaces Shall Be Planned And Carried Out As Osha Permit-required Confined Space.
immediately Stop Work And Notify The Cor If Asbestos Is Noticed Or Suspected In The Area Of Work.
exception: The Above Will Not Necessarily Apply To Areas Where The Documents Call
for Abatement Activities. This Item Is Concerned With Unplanned Locations.
fire-seal All Penetrations Made Or Discovered Through Any Wall Or Floor Assembly With Ul Listed Fire-rated Products Or Systems.
infection Control:
01 35 33 Infection Control Requirements Is Included In Its Entirety In This Contract. Its Construct Is Enabling For Each Condition Experienced Through Each Phase Of The Work. The Following Are High-level Requirements Most Often Found Deficient During Inspections Yet Required.
prior To Any Activity, Review The Following With All Project Team Leaders: 01 35 33
infection Control Requirements.
review And Comply With Containment Construction And Sequence Described In The Design And Specification Documents.
provide A Modular Dust-tight System Designed And Manufactured Specifically To Be Used As A Temporary Construction Isolation Barrier.
before The Start Of Work Provide Pressure Differential Monitoring System At The Entry Door To The Construction Area To Prove That The Construction Area Is Under Negative Pressure. Maintain Daily Logs Of Readings And Submit To The Cor Weekly. Remove At The Completion Of Construction.
walk-off Sticky Mats Are Required At All Times Inside And Outside All Entry / Exit Points To All Workspaces. Sticky Mats Must Be Changed At Least Once Per Shift, Or More As Required By The Construction Or Cor. Size Sticky Mats To Match The Width Of The Door Opening And Ensure That No Less Than 24 Depth Is Provided.
block Off All Hvac Return Ductwork And Louvers To Prevent Introduction Of Dust Into The Hvac System.
1) Where Existing Hvac Ducts Are Being Removed, Immediately, Permanently, And Compliantly Seal Off The Opening.
provide High-efficiency Particulate Air Filtration (hepa) Recirculating Air Equipment Inside The Workspace. Size The Air Filtration System Sufficiently Large Enough To Ensure That Negative Pressure Remains Effective When Doors Are Opened.
when Working Above The Ceiling Outside Of The Work Area, Such As In A Corridor, Open Only One Ceiling Tile At A Time, And Provide Dust Containment Tent Or Portable Containment Cube, With Hepa Filtering Negative Air System To Seal The One Opening.
broom-sweep The Work Area At The End Of Each Day (or Shift During Days With Multiple Shifts). Provide Hepa Vacuum And Damp (not Wet) Mop Daily Where Broom Sweeping Creates Airborne Dust.
provide Fire-sealing Of All Existing Wall And Ceiling Openings In Area Of Work Needed To Allow The Hepa Filtration Equipment To Effectively Generate Negative Air Pressure Within The Work Area, With Respect To The Surrounding Area.
provide Hepa-filtered Vacuum Cleaning Of All Surfaces, And Damp Mop The Work Area Every Day.
do Not Allow Corrugated Carboard To Be Stored For Any Period Of Time Within The Hospital. Upon Arrival, Unpack, And Transfer All Products From Cardboard Containers To Sealed
plastic Containers, And Immediately Dispose Of The Cardboard Outside Of The Building.
part 6: Site-specific Requirements
project Number And The Contract Number In The Subject Line Of All Emails And Documents. Example: 556-23-101 Renovate B134-2c Clc , Or Simply 556-23-101 B134-2c And Then Specific Subject Such As Pay App, Rfi, Submittal, Meeting, Etc. Transmissions Deviating From This Focused And Simple Standard May Be Rejected, Or Simply Lost Because Recipients Could Not Readily-acquire Their Subject Or Importance Over The Plethora Of Ambiguous Emails Received Each Day.
comply With All Site-specific Requirements And Sops Including And Not Limited To: Key Policy, Badging Policy, Rules Of Behavior, And Smoking Policy.
normal Construction Work Hours Are 7:00 Am To 3:30 Pm Monday Through Friday.
normal Work Hours Can Be Modified Only By Written Approval Of The Cor, And At No Additional Cost To Va.
no Work By The Contractor On Federal Holidays, And No Work On The Weekend When The Federal Holiday Is On The Respective Monday Or Friday.
no Work In Stairs, Corridors, Lobbies, Or Other Interior / Exterior Public Areas Shall Be Performed During The Above-designated Work Hours.
any Work Including And Not Limited To Noise, Vibration, Dust, Odors, Core Drilling, Hammer- Drilling, Saw Cutting, Equipment Moving In Public Corridors, Soil Compaction Shall Be Performed During The Above-designated Work Hours Only.
crane Lifts, Or Any Work That Closes Drive Isles, Closes Building Entries, Or Closes Public Corridors Shall Be During Low Patient Times And Performed Between Saturday 6 Pm Through Midnight Concluding By 6 Pm On The Following Sunday.
all Building Systems Shall Be Maintained In Full Operation At All Times:
request Utility System Shutdowns In Writing Not Less Than 21 Calendar Days In Advance And Scheduled With The Cor At Times Least Impacting Patient Care.
shutdown Work Shall Be During Low Patient Times And Performed Between Saturday 6 Pm Through Midnight Concluding By 6 Pm On The Following Sunday.
wherever Demolition Is Planned, Ceiling Tiles Are To Be Removed, Or The Sprinkler System Is To Be Disabled, Gc Shall First Provide Uniform Heat Detection Throughout The Work Area, Connected To The Existing Supervised Building Master Fire Alarm System, For The Duration Of The Work. Fire And Or Smoke Detection Devices Shall Be Provided Prior To Turnover And Acceptance.
deliveries, Parking, Elevators:
deliveries At The Dock: At Time Of Delivery: Provide Vehicle Information To The Va Police And Remove The Vehicle As Soon As Delivery Is Complete. Move Materials In Public Corridors During Low Patient Times Between 6 Pm Through 6 Am The Following Day.
no Parking In The Va Garages. As Part Of The Mobilization Plan Submission, Indicate Where Workers Are To Park.
contractor Shall Use Freight Elevators. Do Not Move Materials And Employees In Passenger Elevators Without Written Approval Of The Cor, And Never Within Elevators Occupied By Staff Or Patients.
the Mobilization Plan Submission Shall Indicate If And Where A Construction Dumpster Is Intended To Be Placed. The Contractor Shall Provide A Construction Dumpster With A Locked Safety Fence Surrounding It, At A Location Submitted To And Approved By The Cor. Pavement, Concrete Surfaces, And Landscaping Shall Be Protected From Damage Resulting From Delivery And Retrieval, Loading And Unloading, And Dumpster Weight.
construction Waste Diversion Reports Are Required For Every Dumpster Removed From Every Construction Site At Every Va Facility. Provide These Reports To Va Cor Immediately After The Waste Hauler Removes Each Dumpster To Comply With Va Gems Policy.
no Trash, Used Packaging, Or Construction Spoils Shall Be Stored In The Work Area. Never Use Dumpsters Other Than Those Rented For This Work. Severe Penalties, Including Potential Criminal Charges May Be Levied For Use Of Government-rented Or Owned Containers, Or Those Of Other Contractors.
trash Removal From The Work Area Shall Be Within Gondolas Which Have Sealed Covers (completely Enclosed), And During Non-business Hours, Via The Freight Elevators.
no On-site Office Or Storage Container Shall Be Allowed. Provide Just-in-time Delivery And Pickup. Coordinate With The Cor For Staging Within The Area Of Work.
no Music Radios Within Work Areas.
no Noise Generated Within The Work Area Can Be Allowed To Leave It.
the Use Of Powder-actuated Fasteners Is Forbidden.
performing Demolition Using Motorized Equipment, Whether Tracked Or Wheeled, Pushed Or Driven, Is Forbidden.
two-way Communications Radios Are Allowed Where Transmit/receive Frequencies Will Not Disrupt Any Hospital System.
before Starting Work The Contractor Shall Give 21 Days Notice To The Cor So That Security Arrangements Can Be Provided For The Employees. This Notice Is Separate From Any Notices Required For Utility Shutdown Described Elsewhere In This Section.
va Reserves The Right To Close Or Shut Down The Project Site And Or Require Contractor Employees To Leave The Premises In The Event Of A Civil Emergency Or Operational Requirement. The Contractor May Return To The Site Only With The Written Approval Of The Cor.
compatible System Procurements Shall Include The Following:
locks And Keys: Temporary And Permanent Door Hardware Shall Be Compatible With Bestâ® 7-pin, G-keyway, Interchangeable Core. Prior To Commencement Of Work, The Contractor Shall Provide Va With Blank Cores; Quantity Matching The Number Of Openings Planned. Va Shall Then Provide Construction Coring, And A Key For Same To The General Contractor, Who Will Sign Acknowledgement And Receipt And Responsibility For The Key Until Returned To The Va Cor. Final Pinout And Keying Is Provided By Va.
exit Signs: All Exit Signs Shall Be City Of Chicago Approved Specification Red Letters On White Edge-lit Led Fixtures Continuously Illuminated 90 Mins. After Loss Of Power, Push-to- Test Switch And Led Pilot Light On The Housing, Available As Single Or Double-sided Models, And Meeting Ul924.
building Automation: Components, Programming And Start Up: Native Bacnet Communications Protocol For Building Automation And Control (bac) Connected To The Existing Johnson Controls Head End Equipment.
27 15 00 Communications Cabling (and Other Specifications Which Include Telecom Cabling): All New Telecom Cabling Shall Be Cat 6a Vs. 5e. Cat 6a Telecom Cable, Termination Punch-down T-568-(b.1, B.2, C.2, Etc.), Tested And Certified (submit Result To Cor), 6-port Modular Wall Jacks With Two Rj45 On Top And Bottom And Two Blanks In Middle. While Va Facilities Generally Do Not Include Plenum Return Spaces Above Ceilings, It Nonetheless Requires Plenum-rated Teledata Cabling Complying With Codes Pertaining To Plenum Environments.
sole Source Procurement, The Contractor Shall Provide Fully Functional Complete Systems, Including The Following Sole Source Procurements For The Following Special Systems:
fire Alarm: Components, Programming And Start Up Within The West Campus Is By Johnson Controls/simplex.
building Automation: Components, Programming And Start Up: Automated Logic Company Of Chicago.
proximity Card Reader And Door Lock Release Entry System: Components, Programming And Start Up: Enorman
patient Lift Systems And Components: Guldmann
Closing Date14 Feb 2025
Tender AmountRefer Documents
Landkreis Oberhavel Tender
Others...+2Civil And Construction, Civil Works Others
Germany
Details: The Oberhavel district (client - Ag) is preparing the development of the Mildenberg brickworks park into a museum and event location and the expansion of tourist offers on the basis of the development concept for the brickworks park. In addition to the core museum tasks of the brickworks park, the use of the site as an event and festival or event location will become the focus in the future. The acoustic investigation (noise protection report) to be commissioned is intended to provide the basis for the stipulations of the development plan for noise protection and their justification. To this end, the noise emissions that arise directly from future (large) events and from the associated motor vehicle traffic are to be estimated and evaluated in terms of their effects on key emission locations: - Acoustic investigation of event emissions - Acoustic investigation of traffic emissions - Examination of noise emissions in relation to nature and species protection For more information, see the tender documents
Closing Date17 Feb 2025
Tender AmountRefer Documents
Stadt Erkner Tender
Civil And Construction...+1Civil Works Others
Germany
Details: Lot 14 - Heating and plumbing work, 2nd phase The aging vehicle hall at the Erkner city building yard is being expanded and renovated in two construction phases. The expansion was completed in the first construction phase this year and the building is currently being used provisionally over the winter in its shell form. In the coming year, the renovation of the existing building, the expansion and the energy renovation are to take place. The conversion enables adaptation to the current conditions of the building yard: larger garages, the division from one to two workshops, modern sanitary facilities and a high energy standard with insulation of the floor, the external walls and the roof, an air heat pump, a photovoltaic system and the renewal of the entire electrical system. The current list of services includes the sanitary and heating installation. The following services are to be provided in the area of sanitary installation: - Wastewater underground pipes under the floor slab - Drinking water pipe (supply) under the floor slab - Wastewater and drinking water pipes/insulation - Electric instantaneous water heater - Sanitary objects and pre-wall elements The following services are to be provided in the area of heating installation: - Underfloor heating in the floor slab --> laying on the middle reinforcement layer - Air-water heat pump 16 kW - Buffer storage 2000 litres - Heating element for using PV power to generate heat in the vehicle hall and in the administration building - Heating distribution 1.5 M³/h - Heating pipes/insulation The following services are to be provided in the area of ancillary work: - Excavation work for wastewater underground and drinking water pipes - Excavation work for heat pump foundation and connecting pipe between indoor/outdoor unit - Core drilling
Closing Date6 Feb 2025
Tender AmountRefer Documents
9031-9040 of 9073 active Tenders