Valve Tenders

Valve Tenders

Municipality Of Mercedes, Camarines Norte Tender

Solar Installation and Products...+1Electrical and Electronics
Philippines
Details: Description Republic Of The Philippines Province Of Camarines Norte Municipality Of Mercedes Bids And Awards Committee Bids And Awards Committee Office, Lgu - Mercedes, Camarines Norte Invitation To Bid For Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte. The Local Government Unit Of Mercedes, Camarines Norte, Through The Trust Fund Intends To Apply The Sum Of Two Million Seven Hundred Twenty-five Thousand Two Hundred Sixty-six Pesos Only (php2,725,266.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte - Identification Number 401-24-11-1495/1496/1497/1498/1499. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Local Government Unit Of Mercedes, Camarines Norte, Now Invites Bids For The Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte As Follows: Item No. Qty Unit Description Lot 1 - Hardware Tools 1 1 Unit Air Compressor Machine, Motor: 1/2 Hp; No. Of Cylinder: 2; Phase: 1; Pressure: 85 Psi; Capacity 46 Liters; Approximate Dimension: 95-100cm (l) X 31-35cm (w) X 64-70cm (h); Weight: 47kg; Inflation Time: 53min; Air Displacement: 208l/min 2 1 Unit Air Spray Gun, Standard Nozzle:1.4mm, Pattern Width:180-250mm, Paint Capacity:600cc, Suitable For Finishing Coat, Optional Nozzle:1.3-2.5mm, Operating Pressure:2-3.5bar Air Cons:4.2-7.1cfm(119-200l/min)" 3 11 Set Angle Grinder Cutting Disk, 10 Pcs.per Set; Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8") 4 11 Unit Angle Grinder, Rated Input Power: 730w; Wheel Diameter: 4"; Rated Voltage: 220v; Frequency: 60hz; No Load Speed: 12,000 Rpm; Weight: Approximately 1.6kg; Grinding Spindle Thread: M10; Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h) 5 7 Pc Chipping Hammer, Item Weight: ‎atleast 13.8 Ounces; Product Dimensions: ‎11" (l) X 1" (w) X 7.5" (h); Material:, Genuine Leather Grip And Forged Steel 6 3 Set Circular Saw With Diamond Blade, 1400w, 185 Mm Blade, Spindle Lock With 24t Diamond Blade 7 3 Pc Claw Hammer, Head Weight: 16oz; Overall Weight: 17oz-23oz; Forged Steel Head; Smooth Face; Fiberglass Handle With Rubber Cushion; Overall Length: 12-14" 8 3 Pc Concrete Chisel, 10'' Forged Steel Chisel 9 3 Pc Crow Bar, 36" Long; Length Tolerance: +- 1/8; Forged Steel Carbon 10 1 Pc Electric Planer; Voltage: 220-240v; Input Power: 1050w; No Load Speed: 1600rpm; Planing Width And Depth: 82x3mm; Heavy Duty Aluminum Base; 11 1 Pc Framing Hammer, Handle Material: Alloy Steel; Item Dimensions: Approximately 16-17" (l) X 5.75-6" (w) X 1.5-2" (h); Item Weight: Atleast 1.4 Pounds 12 1 Unit Gasoline Marine 7hp Speed Type, Single Cylinder; 4 Stroke, Forced Air Cooling; Ohv Displacement (cc): 196 Compression Ratio: 8.5:1 Bore X Stroke (mm): 68x54 Min. Fuel Consumption;395/(kw.h) Valve Clearance: Input Valve: 0.10-0.15mm Idle Speed (rpm): 1400+-140 Max A.c. Output/rpm:3.8/3600 Noise Level:70db (a) Ignition System: Transistorize Magento Ignition Max Torque (n.m/rpm): 10.7/300 Starting System: Recoil Start (recoil Start/electric Starting) 13 10 Pc Hacksaw With Blade, Adjustable Aluminun Alloy Frame With Soft-grip Handle, 90" Adjustable Bladec Angle, 12 Inches (+/- 1/4") Bi-metal Hacksaw Blade, 24 Tpi 14 10 Unit Heavy Duty Corded Drill, Rated Input Power: 750w; Chuck Capacity: Upto 13mm; Drill Capacity: Metal (16mm), Wood (25mm), Masonry (12mm); Dimension: 268mm (l) X 69mm (w) X 192mm (h); Weight W/out Cable: Approximately 1.6-1.8 Kg; Spindle Collar Diameter Of 43 Mm 15 1 Pc Level, Box Beam Style, Material: Alluminum; Dimension: Approximately 24-24.5" (l) X 2-2.6" (w) X 1.2-1.5" (h); Weight: Atleast 0.8 Pounds 16 3 Pc Mashing Hammer, 3 Lb With Fiberglass Handle, Forged Steel Head 17 3 Pc Masonry Hammer, 800g Solid Rubber Head, Fiberglass Core And Bi-material Slip-resistant Handle, 18 3 Pc Masonry Hand Saw, 15" 380mm Carbon Steel 19 3 Pc Masonry Square, 24"x 16"aluminum, 1/8 '' Thick 20 3 Pc Mason's Level, 60cm Aluminum Reinforced Frame 21 3 Tube Mason's Line, #18 Braided Nylon, 500 Ft, 170 Lb Test 22 10 Set Metal Drill Bit Set, Material: High Speed Steel; 19pcs Per Set (1mm,1.5mm,2mm,2.5mm,3mm,3.5mm,4mm,4.5mm,5mm,5.5mm,6mm,6.5mm,7mm,7.5mm,8mm,8.5mm,9mm,9.5mm,10mm); Point Angle:118degree C; Standards: Din 338; Bit Geometry: Standard Twist Bit 23 8 Pc Meter Tape With Magnetic Hook, Blade Material: Nylon Coated Blade; Dimensions: 16ft (l) X 25mm (w) 24 7 Pc Mig Welding Pliers, Overall Length: Atleast 210mm; Material: High Carbon Steel; Handle Material: Thermoplastic Rubber 25 1 Unit Portable Hand Drill, Power Sourced: Battery Powered - 2pc 21 Volt 1500mah Lithium-ion Batteries; Maximum Rotational Speed: 1500 Rpm; Voltage: 21v; Amperage: 1.5 Amps; Chuck Size: 0.38"; Bit Heads Diameters: From 0.8mm - 10mm; Product Dimensions: ‎9.6" (l) X 2.1" (w) X 7.5" (h); Material: ‎plastic, Rubber, Metal; Item Dimensions: Approx. ‎9.6" (l) X 2.1" (w) X 7.5" (h); Item Weight: Atleast ‎2.5 Pounds; Item Torque: 330 Inch Pounds; Inclusions: 1x21 Volt Inspiritech Cordless Power Drill, 2x Rechargeable Battery, 1x English User Manual, 10x Self-drilling Drywall Anchors,10x Screwdriver Bits, 2x Double Ended Bits, 3x Drilling Bits, 1x Magnetic Extension Socket Bit Holder, 10x Anchors With Screws,1x One-hour Fast Charger, 1x Flexible Extension Shaft, 1x Carrying Bag 26 7 Unit Portable Welding Machine, Input Voltage: 220-240; Frequency: 50-60hz; Output Current: 10-220a; Led Display; No-load Voltage: 85v; Max. Output Current: 220a; Diameter Of Electrode: 1.6-3.2mm; Inclusions: 1 Pc Electrode Holder, 1 Pc Earth Clamp With Cable, 27 3 Pc Pull-push Rule, Blade Length 8m/26ft, Blade Width 1", High Impact Abs Case With Durable Rubber, Corrosion Resistant Tru-zero End 28 3 Pc Putty Knife, 3" Stainless Steel With Rubber Handle 29 1 Pc Roofing Hammer: Item Weight: ‎1.25 Pounds; Product Dimensions: Approx. 13.7" (l) X 6.75" (w) X 1.5" (h) 30 1 Unit Sander, Item Dimensions: Approx 11.63" (l) X 5.63" (w) X 6.19" (h); Voltage: 110 Volts; Power Source: Corded Electric; Amperage Capacity:‎ 8.8 Amps; Variable Speed Control Dial (690 -1,440 Ft./min.); Grit Number: 80; Item Weight: Atleast ‎9.5 Pounds; Included Components: ‎belt Sander, 1 Belt, Dust Bag 31 3 Pc Shovel, Rectangular End, Tempered Steel Blade (0.8mm Gauge Orv Higher), 17-23 Cm Blade Tip Width,22-28cm Blade Tip Lenght, All Metal Handle, Overall Lenght 100cm-115 Cm 32 3 Pc Shovel, Round End, Tempered Steel Blade (0.8mm Gauge Orv Higher), 17-23 Cm Blade Tip Width,22-28cm Blade Tip Lenght, All Metal Handle, Overall Lenght 100cm-115 Cm 33 1 Pc Speed Square, Material: Cast Aluminum; Size: About 18x18x2cm/7.09x7.09x0.79"; Weight: About 130g; Triangle-shaped 34 3 Pc Spirit Level Bar, Aluminum Frame With Magnet, Size 12" (+-1/8"), With 3 Vials (horizontal, Vertical And 45 Degrees) 35 3 Pc Steel Float/plastering Trowel, Thickness 0.7 Mm, Surface Measurement 280mm X 125 Mm(+/- 1mm), High Carbon Steel, Soliod Forged Steel With Plastic Handle 36 1 Pc Trim Hammer, Handle Material: Wood; Head Material: Alloy Steel; Item Dimensions Approximately: 14-15" (l) X 5-6"(w) X 1-2" (h); Item Weight: Atleast 594 Grams 37 3 Pc Trowel, 280x120mm Stainless Plastering Trowel With Plastic Handle 38 1 Pc Utility Knife, Handle Material: Aluminum; Material: Aluminum Alloy; Weight: 120g/pcs; Blade Size: 19mm (w) X 61mm (h) X 0.6mm (t); Blade Material: Steel; Thickness: Atleast 0.6mm 39 7 Pc Welding Helmet, Auto Darkening Helmet, Power Supply: Battery And Solar Powered; Light Shade: Din9-1;, Dark Shade: Din4; Switching Time: 1/25000s; Delay Time: 0.1-0.8s; Sensitivity Adjustment: Stepless Control; Operation Temperature: -5 Degrees- 55 Degrees; Active Viewing Area: 93mmx43mm; Active Viewing Area Size: (+/- 10mm); Item Weight: Atleast 1.85 Pounds; Package Dimensions: ‎approximately 12-12.4" (l) X 9-9.61" (w) X 7-7.68" (h) 40 7 Set Welding Magnets, 6 Pcs/set, Overall Length: Atleast (3"); Hold Capacity: Up To 25lbs; Arrow Design Supports Angle: 45°, 90°, And 135°; Item Weight: 295g; Package Dimensions: ‎4.88 X 4.72 X 3.98 Inches; ‎material: Steel; Magnets Size: Approximately - Top (1-1.4cm), Bottom (6.5-7cm), Side (7-7.5cm) Thickness (1-1.3cm) 41 1 Set Wood Chisel; 4-piece Set (6mm; 12mm; 19m; 25mm); Tempered Chrome Carbon Steel Blade; Hardened Shank; Rust-resistant, Lacquered Coated Blade; Bi-material Handle 42 3 Pc Wooden Float, 18"x 32", Multi-layered Lot 2 - Food Preparation 1 1 Unit 3 In 1 Burger Griller With Deep Fryer And Steamer, Gas Type; Made Of Stainless Steel And Polished Metal Griddle Plate; Dimensions: Burger Griddle - 18" (l) X 12" (w); Deep Fryer - 8" (l) X 12" (w), Capacity: 2.5 L; Steamer: 11" (l) X 12" (w) 2 6 Unit Barbeque Grill With Sauce Holder And Top Grill, Material: Stainless Steel, Dimension(lwh): 24 In X 12 In X 30 In (3.5 In Grill Pan's Depth) 3 33 Pc Basin; Stainless; Diameter: 22"; Base: 16"; Depth: 7"; Thickness: 1cm 4 47 Pc Beach Umbrella; Round-shaped; Material: Poly Canvass; Diameter: 40""; Pole Stand Length: At Least 45""; Pole Material: Stainless Steel Chrome" 5 6 Pc Boiler Caldero; Big Size & Heavy Duty; Size: Diameter 48cm; Height: 42cm; Makapal, Material: Aluminum 6 6 Pc Boning Knife, 27.3cm, Blade Length:14.6cm, Blade Thickness: 4mm, Wood Handle 7 32 Pc Butcher's Knife; Materials: Stainless; Wood Handle; Size: About 10" 8 29 Pc Caldero With Double Handle; Aluminum Material; Diameter: 46cm; Height: 37cm; With Double Handle; Capacity 5kilos/20l(volume Capacity) 9 48 Set Casserole Set, Stainless Steel, 28, 30 And 32cm Diameter; 16, 18, 20cm Height 10 50 Pc Chef's Knife; About 10 3/4" Long; Material: Stainless Steel; Blade: Full Tang; Riveted Handle 11 56 Pc Chest Cooler, Item Package Dimensions: ‎25.8" (l) X 16.2" (w) X 15.7" (h), Package Weight: ‎5.76kg, Inside Dimensions: 24.95" (l) X 14.58" (w) X 14.77" (h), Material: ‎plastic, Chamber Depth: 24.95", Capacity: 52l, Color: Any Color 12 51 Pc Chopping Board; Thick Wood; 12"x12" 13 6 Pc Cleaver Knife, 11" Stainless Steel, Weight: 310-340g, Blade Size: 6.5 Inches 14 48 Pc Colander; Stainless Steel; 11"diameter; With Stainless Base And Handle 15 6 Unit Digital Weighing Scale ,30kg Capacity,stainless Tray Size: 35x23cm For 30kg Capacity Weighing Scale, Dual - Display : Weight, Unit Price, Amount, High Light Led Display, Rechargeable Battery, Power Supply: Ac/dc Charger (included) 16 47 Unit Double Burner Gas Stove; Stainless Top And Front; Automatic Ignition; Reversible Trivet; Double Detachable Top Burner; Removable Drip Pan; Dimension: 700mm(l) X 390mm(w) X 140mm(h) 17 7 Unit Double Ring Burner; Heavy-duty Cast Iron; Includes Pol Regulator And 1-metre Hose 16750 Btu Brass Valve With Individual Gas Control Minimal Assembly Required Weight; 3.9kg, Material;cast Iron, Dimensions: (lwh) 36cm X 20cm X 9cm, Fuel Type: Lpg Tank Cylinder With Content And Accessories 18 2 Pc Egg Ring, Stainless Steel, 8.5cm Diameter, 1.5cm Height 19 4 Box Face Masks; 3 Ply Non-woven Disposable Earloop Mask; Quantity: 50pcs/box 20 30 Pc Fish Drying Rack, 4-layer, 45x45x66cm, Foldable 21 6 Pc Fish Scaler, 20cm Stainless Steel 22 6 Pc Fish Scraping Tool, 20cm Stainless Steel 23 54 Unit Food Shelve, 2 Layers: Glass Thickness: 3/16 And 1/4, (w-14" X H-17" X L-30"); Adjustable Layer, Material: Glass & Aluminum With Sliding Door, Offer: Screen Sliding Door To Prevent Moisture 24 204 Pc Food Tray With Glass And Stainless Lid/cover, Stainless Body, Rubberized Stand 32x28x10cm 25 12 Pc Food Tray, Flat, Stainless, 60x40x2cm, Depth: 2cm 26 2 Unit Freezer Chest Type, Gross / Net Volume 10.6 Cu.ft. (10 Liters) / 10.1 Cu.ft. (286 Liters), Functionality 3-in-1 Function – Chilling | Freezing | Fast Freezing, Defrosting System: Manual Defrost, Evaporator:aluminum Defrost,led: 6 Led’s, P:2w, Lamp Life: Min. 50,000 Hours, Weight 40 Kg, Dimensions L 63 X W 111.4 X H 84.7 (cm), Key Features: Inverter Compressor, Sliding Glass Door, Embossed Door & Cabinet, Recessed Side Handle (left & Right), Led Light, Removable Gasket , 1x Basket Wire Shelf, 4x Roller Wheel 27 5 Pc Fruit Crate Plastic 21 X 15 X 12 Inches, Heavy Duty Plastic Material, Color : Black 28 37 Pc Frying Pan 14" In Diameter, Cast Iron 29 4 Unit Gas Range, Approx. 55-70cm (l) X 50-60cm (w) X 86-93cm (h); 4-gas Burner; 62l Gas Oven; Button Ignition; Top Glass Lid; Net Weight: Maximum Of 28kg; Pan Support: Light Cast Iron Pan Support 30 1 Box Gloves; 100pcs; Food Grade; Size: Medium(7.5cm); Thermoplastic Elastomer(tpe) Material 31 23 Pc Hairnet With Cap; White; Nylon; Washable 32 1 Unit Industrial Oven Stainless Steel, With Wall Insulator To Minimize Penetration Of Heat To The Walls, With Temperature Gauge, Approx. Outer Dimension: 46.5 X 23.5 X 30 Inches; Oven Stand/rack Is Made Of Metal With Rollers And Braking Systems; Stainless Steel Front Panel, With See Thru Glass; About 4 Inch Thickness Of Walls With 2 Trays Per Deck - 4 Trays Capacity; Gas Type 33 35 Pc Kawa 62 Cm Diameter 18 Cm Height, Aluminum With 2 Aluminum Handles 34 12 Pc Kitchen Apron, Waterproof; Stain Resistant Leather Apron 35 6 Pc Kitchen Scissors, Material: Stainless Steel And Plastic Silicone, Size: 22.5x7.3x1.2cm 36 3 Pc Long Handle Stainless Steel Soup Spoon; Color: Silver; Caliber Length; Approx. 12cm.14cm.16cm.18cm, Handle Length; Approx.45cm(17.72inches) 37 6 Pc Long Wooden Ladle; 14" Stainless Steel 38 58 Set Lpg Tank, 11kg Cylinder With Gas Regulator, 1.8m Hose & Steel Hose Clamp 39 9 Set Measuring Cup (set For Liquid), 1 Measuring Cup With Red Graphics; Made Of Nonporous Glass That Won't Warp, Stain, Or Absorb Odors; Glass Is Preheated Oven, Microwave, Fridge, Freezer & Dishwasher Safe; Dimension: Approx. 7.13" (l) X 6.75" (w) X 4.38" (h); Measuring Capacity: 500ml 40 9 Set Measuring Cups (set For Dry), Smithcraft Stainless Steel Measuring Cups Set Have 8 Cups.the Sizes Are: 1 Cup (240ml), 3/4 Cup (180ml), 2/3 Cup (160ml), 1/2 Cup (120ml), 1/3 Cup (80ml), 1/4 Cup (60ml), 1/8 Cup (30ml), 1/16 Cup (15ml),1 Locking Ring. 41 6 Unit Mini Electric Fan 7.5" - With Base 10'' 69hz 20w (for Bbq), Non-adjustable Height; Any Color; Electric Powered Fan; 3 Blade 42 21 Pc Mixing Bowl Medium, Approx. Diameter: 28cm, Height:11.2cm; Material: Stainless; Capacity: Atleast 4l 43 200 Pc Monoblock Chair Front:monoblock Chair, Front Legs Distance: 355mm Width Seat, With Backrest, Color: Beige, Seat Width :375 Mm, Deapth: 330 Mm, Side Legs Distance Left: 378 Mm, Side Legs Distance Right 378 Mm, Back Legs Distance: 210 Mm, Back Rest Height:779 Mm, Set Back Height: 405 Mm, Seat Height: 376 Mm, Gross Weight: 2.25 Kgs 44 54 Pc Monoblock Table, 36x36 Inches, H- 28 Inches, Color: Beige, Atleast 3mm Thick 45 2 Pc Non-slip Rectangular Chopping Board; Materials:polypropylene Plastic; Approx Length: 40cm; Width: 25cm; Thickness: 0.5cm; Color : White 46 45 Pc Palamigan Container W/ Gripo 15l, Dimension: 31.8x23.8x48.5cm, Material: High Quality Durable Plastic 47 1 Unit Pressure Cooker 50 Liters Capacity, Aluminum Alloy Material, Pressure: 90kpa, Dimension: 44cm Diameter X 47cm Height 48 40 Pc Round Glass Jars With Lid, 220ml 49 41 Pc Sandok, Stainless Steel, 24.7" Length, With Wooden Handle 50 33 Pc Sandok, Stainless Steel, Length: 14" 51 39 Pc Shansi, Stainless Steel, Length: 14" 52 9 Pc Stainless Steel Dough Cutter Scraper Baking Smoother Cake , Approx. Size: 14-15cm (l) X 11.5-12cm (w) And 22cm (h); Material: Stainless Steel 53 41 Pc Stainless Steel Food Tong 14" Length 54 5 Unit Steamer; Aluminum; About 16"/42cm Diameter; 3 Layers With Cover; With Handle Per Layer 55 3 Unit Vacuum Sealer Machine, 220v, 90w, Sealing Width: 270mm, Power Supply: Ac100-240v/50-60hz, Temperature Control Range: 170-210 Celsius, Abs Material, Size: 370*75*50 (mm) 56 15 Pack Vacuum Sealer Storage Pouches | Bpa Free, Commercial Grade For Food Storage & Sous Vides, Size: 17 X 25cm Material: Plastic, 100pcs/pack 57 27 Pc Water Jug/dispenser With Faucet, 5 Gallons, 20 Liters, Color: Blue, Durable And High Quality Plastic Material 58 7 Unit Weighing Scale; Analog; 20kg Capacity; Approx. Dimensions: 6-7" (l); 8-9" (w); 10-11" (h); Dual Unit (kg And Pounds) 59 2 Pc Wide Mouth Funnel, Stainless Steel, Top Opening: At Least 17 X 5.5 X 6cm, Bottom Opening: At Least 13 X 3.7 X 4cm 60 8 Pc Wire Whisk, Large, Stainless, Approx. 14-15" (l) Lot 3 - Fabrication Of Food Cart 1 7 Unit Bicycle With Sidecar: Bicycle Specifications: Bmx Type Bike (frame 1//2 Gi Hd, Rim Set Front X 10 G Wide Jap Hub, Rim Set Rear X 10g Wide Jap Hub, Tire 20 X 2.125 Jumbo, Tube 20 X 2.125, Handle Bar Painted Black, Fork Ex-900 Landing Gear Cp, Head Parts Nikyo/whw, H-post Bmx Ord.m, H-grip Ord. Opc Parts Neco Bearing Type, Opc Plate 36t, Chain Cp Bmx, Freewheel 24t, Pedal Opc Bearing Type, Seat Clamp/s-pin/ S-post P, Saddle With Spring, Footbreak With Spring "full Size" Frame, 175-180mm Cranks Side Car With Provision Of Umbrella And 2 Chest Coolers (52l Capacity) - Dimensions: ‎25.8" (l) X 16.2" (w) X 15.7" (h) Materials: 1/2 J1 Pipe 540, 316 X 1 Flat Square Bar, J1 Pipe De Una 520, 1/4 X 2 Flat Bar, 6203 Gi Set, Tire 20 X 2.125 Jumbo, Note: With Dole, Dilp Logo Fully Painted In A Galvanized Sheet Iron Attached On The Front Of The Sidecar With Approx. 15.7 Inches(h)x15.7 Inches(l) Fully Painted Color: Any Color 2 1 Unit Motorcycle Sidecar (for Fruits And Vegetable Vending): Metal Body, Dimensions L-4ft W-2ft H-2ft, With 17inch Side Wheel 3 11 Unit Negocart With Bicycle Roofing Materials: Bolt & Nut W/ Washer 3/16 X 1 Polycarbonate 6mm X 1.2 X 1.70 Welding Rod Body Materials:tubular 1 X 1 X 1.5;flat Bar 1/8 X 1;flat Bar 2' X 3/8 X 1;plain G.i.;sheet 4' X 8' #26;cylindrical Hinge 1/2" ᴓ;blind Rivets 1/8 X 1/2;cylindrical 1/2;cabinet Handle;cabinet Lock;round Bar 8mm ᴓ;transparents Barrier 1/4 X 4' X 8';welding Rod;stainless Sheet 4' X 8';plain Round Bar 16mm ᴓ: Bicycle Specs: Bmx Type Bike Frame, Front And Rear Free Wheel Hub For Rim Set Single Speed (wheel Set), Tire Size (20"x2.125 Jumbo), Interior Tube (20"x2.125), Bmx Handle Bar, Bmx Fork, Head Parts (h Post, Handle Grip), Chain (single Speed), Pedal (bearing Type), Seat Clamp, Saddle With Spring, Foot Brake (clamp W/ Spring), Crank Pedals (175mm-180mm Cranks) Note: With Dole, Dilp Logo And Tourism Spot At The Front And Side Of Cart, Logo Material: Weather Proof Sticker, Sizes Of Sticker: H-60cm X W-130cm (for Front Of Cart) And H-60cm X W:75cm (for Side Of Cart) Or H-23.6" X W-51" And H-23.6" X W-29.5" Fully Painted Color: Light Blue Lot 4 - Grooming Tools 1 1 Pc All Purpose Comb, 7inch, Plastic Material 2 3 Pc Barber Apron, With Two Pockets, Waterproof, Material: Fiber Size: Approximately 89x69cm - 35x27.2 Inches 3 1 Pc Barber Cape, 140cmx100cm Silk, Waterproof 4 1 Unit Barber Chair, Reclining, Modern Style, Chair Back Height: High-back; Upholstery: Faux Leather; Material: Stainless Steel; Dimension: 21"x22.5"x38" 5 1 Unit Clipper, Cordless, Includes 3 Metal Clip Attachment Comb Cutting Guides, 1/16", 1/8",3/16, 6.25 Inches And Weighs 13 Oz, Equipped With A 2191 Adjustable 0000 Blade 6 2 Unit Curling Iron, 38.5cm, Tourmaline Ceramic, 25-39w, 360 Degree Rotatable 7 2 Set Eyebrow Grooming Kit, 6pcs (2 Eyebrow Razor, 1 Facial Razor, 1 Brush, 1 Scissors, 1 Tweezer) 8 1 Pc Fade Brush, Material: Plastic & Nylon, (hxw) 12.3 X 2.3 Cm, Weight: 0.015 Kg 9 2 Unit Flat Iron, Ceramic Wide Plate, 100-240v Dual Votage, 40-59w, 27.8cm Long 10 2 Unit Hair Blower, 2 Speed - 3 Heat Settings, 2400w, Removable Filter Cover, Cool Shut Function, Dimension: 21.5x8.5x26.5cm 11 1 Set Hair Clips, Plastic, Size: Approximately 7.8cm 12 2 Set Hair Dying Tool Set, (5-pc) Small Brush - 19.5cmx4.5cm, Big Brush - 20.5x6cm, Secondary Comb - 19x5.5cm, Small Bowl - 13x4.5cm, 1 Pair Of Earmuffs 8x4.5cm 13 3 Pc Hair Shear, 6.9 Inch Stainless 14 10 Pc Hair Towel Turban, 49x18cm Microfiber 15 2 Set Make Up Brush Kit, 12 Pcs With Box 16 2 Set Make Up Kit, 35pcs (1 Eyeshadow, 1 Concealer, 4 Osmetic Brush, 3 Lipgloss, 1 Eyebrow Pencil, 1 Pressed Powder, 4 Lipstick, 4 Face Makeup, 1 Lip Balm, 1 12.5cmx19cm Makeup Bag, 1 Eyebrow Cream, 1 Primer, 1 Powder Puff, 1 Mascara) 17 2 Pc Makeup Kit Organizer, 50cmx39.5cmx21.5cm, Black,046 Glittery, Checkered 18 1 Pc Mirror, Double Sided Folding Mirror, (wxh) 24x 37cm, Weight: 0.532 Kg 19 1 Pc Neck Duster, Weight : 100g , Size : 18x7x7cm 20 1 Roll Neck Strips, (28cmx6.5cm) Self Adhesive, Material: Paper 21 4 Set Plastic Hair Roller, 25mm Assorted, 10-pc Large 22 3 Pc Pomade, 80g, Water-based 23 1 Pack Razor Blades, Durable, Stainless, 100 Pcs, (lxwxh) 14x10x1 24 1 Set Shaver, Abs Material,110-220v, Power: 3w, Size: 16.6x5.8cm, Battery Capacity: 600mah 25 2 Pc Shaving Gel, 195g With Aloe 26 2 Pc Talc Powder, 500g 27 1 Set Trimmer, Rechargable, 2 Blades, Power: 50-60 Hz, Voltage:100-240v, Dimension: 11.5x6.5x3cm 28 4 Pc Wide-tooth Comb, 16cm Plastic, Durable 29 1 Pc Wide-tooth Comb, Size: Approximately 21.5x5 Cm, Plastic Material Lot 5 - Sewing 1 7 Set Ball Point Pins, 250 Pcs Per Box With 8 Colors; Durable 2 8 Unit Bobbin Case, Diameter: 20.3mm Width: 11.7mm 3 8 Pc Bobbin, Diameter: 20.3mm Width: 11.7mm 4 4 Set Dressmaker's Shears, Material: Stainless Steel; Item Dimensions: Approximately 0.8" (l) X 3.9" (w) X 10" (h); Blade Length: 8"; Item Weight: Approximately 8.8 Ounces 5 1 Pc Edging/ Overlock Sewing Machine, Metal Material; Overlocker; 1 Stitch; Dimension(lxwxh) 12x13x14 6 3 Pc Electric High Speed Sewing Machine, Power: 90w; Rated Voltage: 220v; Gross Weight: About 7kg; Max Sewing Speed: 1,100 Stiches/min; Materials: Stainless Steel Needle Plate, Metal Frame; Dimensions: Approximately 44cm (l) X 16cm (w) X 28cm (h); Voltage: 220v, Secondary Lifting Height Or Presser Foot: 14mm; Needle Pitch: From 0-4.5mm, Needle Width: From 0-7.0mm 7 4 Pc Flat Iron, 1200w; Stainless Steel Sole Plate; Power Light Indicator; With Steaming/spray Function 8 4 Set French Curve, Dimension(21.65x0.39x7.09); 4.6 Ounce; Made Of Aluminum Or Plastic 9 4 Pc L-square, Material: Stainless; Item Weight: 0.32oz; Product Dimensions: Approx. 14" (l) X 24" (w) 10 1 Pc Manual Sewing Machine With Motor And Foot Controller, Metal Material, Heavy Duty, 9kg Weight, 1 Stitch Dimensions, (lxwxh) 12x13x14 11 4 Unit Meter Stick, Yellow Color; Wood Type 12 4 Pc Needle Threader, Metal Material; Oval Shape; 1 Inch Size 13 31 Pack Sewing Machine Needle, Flat Needles 10pcs/pack 14 11 Pc Sewing Threads 12pcs/box, Material: Cotton; Package Dimensions: Approx. 5.71" (l) X 3.74" (w) X 2.36" (h); Thread Size: Approx. 56mm (h) X 22mm (w); 550 Yards Each Roll 15 25 Pc Tailor’s Chalk, Square Shape; Orange Color;fades Or Brushes Away Easily 16 4 Pc Tape Measure, Material: Durable Soft Plastic; Color: Blue; Measurements: Inches (can Measure Upto 60") And Centimetres (can Measure Upto 150cm) Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 2. Delivery Of The Goods Is Required Ninety (90) Calendar Days Delivery Period And Upon Receipt Of Notice To Proceed And Purchase. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Mercedes, Camarines Norte-bac Secretariat And Inspect The Bidding Documents At The Address Given Below During Office Hours - 8:00 Am-12:00 To 1:00 Pm-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 14, 2024 Until 8:30 Am Of January 6, 2025 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only Php5,000.00. 6. The Local Government Unit Of Mercedes, Camarines Norte Will Hold A Pre-bid Conference On December 23, 2024 9:00am At Bids And Awards Committee Office- Second Floor Jpl Sports Complex - Municipal Compound, Eco Avenue Street, Barangay 5, Mercedes, Camarines Norte Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below, On Or Before 8:30am January 6, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 9:00 Am Of January 6, 2025 At The Bids And Awards Committee Office- Second Floor Jpl Sports Complex - Municipal Compound, Eco Avenue Street, Barangay 5, Mercedes, Camarines Norte. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Mercedes, Camarines Norte, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Macario B. Totanes Municipal Planning And Development Office Lgu Mercedes Municipal Compound, Barangay 5, Mercedes, Camarines Norte 0998-576-8321 Arsenia M. Ordiales Bac Secretariat Bids And Awards Committee Office 2nd Floor Jpl Sports Complex, Lgu Mercedes Municipal Compound, Barangay 5, Mercedes, Camarines Norte 0908-896-9684 Email Address: Lgubac.mercedes@yahoo.com 12. You May Visit The Website: For Downloading Of Bidding Documents: Www.mercedes.gov.ph December 13, 2024 ________________________________ Macario B. Totanes Bac Chairman
Closing Date6 Jan 2025
Tender AmountPHP 2.7 Million (USD 46.9 K)

Balicuatro College Of Arts And Trades Tender

Electronics Equipment...+2Machinery and Tools, Electrical and Electronics
Philippines
Details: Description Tesda Viii-tti-op-06-f02 Rev. No. 00 – 03/18/2024 Request For Quotation Date: Rfq No.: 2025 – 01 – 0018 Pr No: 2025 – 01 - 0018 Name Of Business/ Company: Address: Tax Identification No.: Philgeps Registration No.: The Balicuatro College Of Arts And Trades, Through Its Procurement Unit, Intends To Procure Materials, Tools And Equipment For Registration Of Mechatronics Servicing Nc-iii, Which Will Be Undertaken In Accordance With Section 53.9 (small Value Of Procurement) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. Please Quote Your Best Offer For The Item/s Described Herein Subject To The Terms And Conditions Provided In The Last Page Of This Rfq. Submit Your Quotation Duly Signed By You Or Your Duly Authorized Representative Not Later Than __________, 2025 At 2:00pm Through Email At Tesdabcatsupply17@gmail.com. Interested Suppliers Are Required To Submit Copies Of The Following As Per Annex “h” Of The 2016 Revised Irr Of Republic Act No. 9184 Along With Your Quotation/proposal: A) Philgeps Registration Number B) Mayor’s/business Permit C) Income/business Tax Return (for Abc Above P500k) D) Omnibus Sworn Statement (for Abc Above P50k) Open Quotations May Be Submitted Manually At The Tesda-bcat Campus, Magallanes St., Sabang Ll, Allen Northern Samar Or Email At Tesdabcatsuppy17@gmail.com In Pdf Format. For Further Queries, You May Contact Us At Telephone No. 09275821039 Or Email Address At Bcat2016@tesda.gov.ph Daryl P. Lim Administrative Officer Iv Head, Finance And Administrative Unit   Tesda Viii-tti-op-06-f03 Rev. No. 00 – 03/18/2024 Price Quotation Form Date: __________________ Balicuatro College Of Arts And Trades Magallanes St. Sabang Zone 2 Allen Northern Samar Bcat2016@tesda.gov.ph Sir/madam: After Having Carefully Read And Accepted The Terms And Conditions, I/we Submit Our Quotation/s For The Item/s As Follows: No. Item/technical Specifications Qty. Unit Approved Budget For The Contract (in Peso) Offer Compliance With The Technical Specifications (please Check) Price Offer Remarks Yes No 1. 1 Long-nosed Pliers 6" 10 ₱931.00 ₱9,310.00 [ ] [ ] 2. 2 Diagonal Cutters 6" 10 ₱931.00 ₱9,310.00 [ ] [ ] 3. 3 Standard Screw Driver 6" 10 ₱517.00 ₱5,170.00 [ ] [ ] 4. 4 Phillip Screw Driver Set 6" 10 ₱517.00 ₱5,170.00 [ ] [ ] 5. 5 Electrical Pliers 6" 10 ₱931.00 ₱9,310.00 [ ] [ ] 6. Soldering Iron Set 10 ₱931.00 ₱9,310.00 [ ] [ ] 7. Adjustable Wrench 6" 10 ₱931.00 ₱9,310.00 [ ] [ ] 8. Wire Stripper 5 ₱1,035.00 ₱5,175.00 [ ] [ ] 9. Crimping Tool 5 ₱1,759.00 ₱8,795.00 [ ] [ ] 10. Allen Wrench 7pcs, 2.5-10mm 5 ₱1,035.00 ₱5,175.00 [ ] [ ] 11. Precision Screwdrivers 5 ₱724.00 ₱3,620.00 [ ] [ ] 12. Multimeters (auto-range High Precision True Rms Digital Multimeter) 10 ₱3,105.00 ₱31,050.00 [ ] [ ] 13. Air Compressor (silent) Working Pressure: Up To 160 Psi 1 ₱20,700.00 ₱20,700.00 [ ] [ ] 14. Transmitter Or Transducer 3 ₱5,175.00 ₱15,525.00 [ ] [ ] 15. Regulated Dc Power Supplies 5 ₱6,555.00 ₱32,775.00 [ ] [ ] 16. Cylinder Actuator (single-acting) 5 ₱6,325.00 ₱31,625.00 [ ] [ ] 17. Cylinder Actuator (double-acting) 5 ₱6,990.00 ₱34,950.00 [ ] [ ] 18. Buzzers 10 ₱414.00 ₱4,140.00 [ ] [ ] 19. Industrial Panel Switch 25 ₱414.00 ₱10,350.00 [ ] [ ] 20. Indicating Lamps 10 ₱172.00 ₱1,720.00 [ ] [ ] 21. Directional Solenoid Valves (fittings:6mm) (3/2 Way , 4/2 Way Or 5/2 Way) 10 ₱1,984.00 ₱19,840.00 [ ] [ ] 22. Pressure Guage 5 ₱1,035.00 ₱5,175.00 [ ] [ ] 23. Filter-regulated-lubricator Set 5 ₱9,315.00 ₱46,575.00 [ ] [ ] 24. Limit Switches 5 ₱431.00 ₱2,155.00 [ ] [ ] 25. Photoelelectic Switches 10 ₱2,070.00 ₱20,700.00 [ ] [ ] 26. Proximity Switches 10 ₱1,035.00 ₱10,350.00 [ ] [ ] 27. Relays 25 ₱1,035.00 ₱25,875.00 [ ] [ ] 28. Magnetic Contactors 10 ₱2,070.00 ₱20,700.00 [ ] [ ] 29. Timers 10 ₱5,175.00 ₱51,750.00 [ ] [ ] 30. Counters 10 ₱6,210.00 ₱62,100.00 [ ] [ ] 31. Laptop (w/ Graphics Card Gtx Or Rtx, 512gb Ssd And 16gb Ram) (w/ Ethernet Port) 10 ₱35,707.00 ₱357,070.00 [ ] [ ] 32. Safety Helmet 5 ₱724.00 ₱3,620.00 [ ] [ ] 33. Safety Harness 5 ₱1,035.00 ₱5,175.00 [ ] [ ] 34. Safety Glasses/googles 5 ₱1,035.00 ₱5,175.00 [ ] [ ] 35. Earplugs/earmuffs 5 ₱517.00 ₱2,585.00 [ ] [ ] 36. Gas Mask 5 ₱724.00 ₱3,620.00 [ ] [ ] 37. Face Shield 5 ₱724.00 ₱3,620.00 [ ] [ ] 38. 20 I/o`s Plc 2 ₱19,142.00 ₱38,284.00 [ ] [ ] 39. Solder Lead (core Flux) 1 ₱1,035.00 ₱1,035.00 [ ] [ ] 40. Shielded Cable 1 ₱2,070.00 ₱2,070.00 [ ] [ ] 41. Terminal Lugs 1 ₱2,070.00 ₱2,070.00 [ ] [ ] 42. Terminal Strips/blocks 1 ₱2,070.00 ₱2,070.00 [ ] [ ] 43. Cotton Gloves 25 ₱207.00 ₱5,175.00 [ ] [ ] 44. Plastic Tubing 1 ₱6,210.00 ₱6,210.00 [ ] [ ] 45. Quick-connect Fittings 1 ₱4,140.00 ₱4,140.00 [ ] [ ] 46. Electric Tape 10 ₱103.00 ₱1,030.00 [ ] [ ] 47. Wire Markers 1 ₱4,140.00 ₱4,140.00 [ ] [ ] 48. Cable Ties (3x 100mm) 1 ₱310.00 ₱310.00 [ ] [ ]   Terms And Conditions 1. Bidders Shall Provide Correct And Accurate Information Required In This Form. 2. Bidders May Quote For Any Or All Of The Items. 3. Price Quotation/s Must Be Valid For A Period Of Thirty (30) Calendar Days From The Date Of Submission. 4. Price Quotation/s, To Be Denominated By Philippine Peso Shall Include All Taxes, Duties, And Or Levies Payable. 5. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 6. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Technical Specifications, And Other Terms And Conditions Stated Herein. 7. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. 8. The Item/s Shall Be Delivered According To The Requirements In The Technical Specifications. 9. Tesda Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Technical Specifications. 10. Liquidated Damages Equivalent To One Tenth Of One Percent (0.001) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. Tesda Shall Rescind The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. Name Of Business/company Signature Over Printed Name Office Telephone/fax No. Mobile No. Email Address
Closing Date23 Jan 2025
Tender AmountPHP 975.1 K (USD 16.6 K)

DIVISORIA NATIONAL HIGH SCHOOL BONTOC, SOUTHERN LEYTE Tender

Civil And Construction...+2Construction Material, Machinery and Tools
Philippines
Details: Description Select Item No Product/service Name Description Quantity Uom Budget 1 Construction Of Temporary Wash Facility Mobilization/temporary Structures 3 Lot 4947.27 2 Construction Of Temporary Wash Facility Safety And Health 3 Lot 4947.27 3 Construction Of Temporary Wash Facility Earthworks 56 Square Meter 1112.72 4 Construction Of Temporary Wash Facility Earthworks 27 Cubic Meter 5082.78 5 Construction Of Temporary Wash Facility Concreting Works-wall Footing-portland Cement 24 Bag 6469.68 6 Construction Of Temporary Wash Facility Wall Footing-crushed Gravel 3/4" 3 Cubic Meter 4914.69 7 Construction Of Temporary Wash Facility Wall Footing-washed Sand 2 Cubic Meter 2741.25 8 Construction Of Temporary Wash Facility Column-portland Cement 21 Bag 5660.97 9 Construction Of Temporary Wash Facility Column-crushed Gravel 1" 2 Cubic Meter 3739.50 10 Construction Of Temporary Wash Facility Column-washed Sand 2 Cubic Meter 2741.25 11 Construction Of Temporary Wash Facility Beam-portland Cement 12 Bag 3234.84 12 Construction Of Temporary Wash Facility Beam-crushed Sand 3/4" 2 Cubic Meter 2493 13 Construction Of Temporary Wash Facility Beam-washed Sand 1 Cubic Meter 1370.63 14 Construction Of Temporary Wash Facility Slab On Grade-portland Cement 27 Bag 7278.39 15 Construction Of Temporary Wash Facility Slab On Grade-crushed Gravel 3/4" 3 Cubic Meter 4914 16 Construction Of Temporary Wash Facility Slab On Grade-washed Sand 2 Cubic Meter 2741.25 17 Construction Of Temporary Wash Facility Handwashing-portland Cement 6 Bag 1617.42 18 Construction Of Temporary Wash Facility Handwashing-crushed Gravel 3/4" 1 Cubic Meter 1246.50 19 Construction Of Temporary Wash Facility Handwashing-washed Sand 1 Cubic Meter 1370.63 20 Construction Of Temporary Wash Facility Rebar Works-deformed Round Bars, 12mmx6m, Grade 40 690 Kilo 31473.58 21 Construction Of Temporary Wash Facility Rebar Works-deformed Round Bars, 10mmx6m, Grade 40 129 Kilo 5866.98 22 Construction Of Temporary Wash Facility Rebar Works-g.i. Tie Wire 18 Kilo 1489.50 23 Construction Of Temporary Wash Facility Rebar Works-coco Lumber, 2"x3"x12" 216 Board Feet 4903.20 24 Construction Of Temporary Wash Facility Rebar Works-plywood Ordinary, 1/4", 4'x8' 6 Piece 2922 25 Construction Of Temporary Wash Facility Rebar Works-cwn, Assorted 3 Kilo 240 26 Construction Of Temporary Wash Facility Beams-coco Lumber, 2"x2"x12" 60 Board Feet 1362 27 Construction Of Temporary Wash Facility Beams-plywood Ordinary 1/4", 4'x8' 3 Piece 1462.50 28 Construction Of Temporary Wash Facility Beams-cwn, Assorted 3 Kilo 240 29 Construction Of Temporary Wash Facility Handwashing-coco Lumber, 2"x2"x12" 24 Board Feet 544.80 30 Construction Of Temporary Wash Facility Handwashing-plywood Ordinary 1/4", 4'x8' 3 Piece 1462.50 31 Construction Of Temporary Wash Facility Handwashing-cwn, Assorted 3 Kilo 240 32 Construction Of Temporary Wash Facility Masonry Works-masonry Wall-chb 6" Thk 906 Piece 27352.14 33 Construction Of Temporary Wash Facility Masonry Wall-portland Cement 24 Bag 6480 34 Construction Of Temporary Wash Facility Masonry Wall-washed Sand 3 Cubic Meter 5754 35 Construction Of Temporary Wash Facility Masonry Wall-10mm X 6m Rsb 96 Kilo 4587.84 36 Construction Of Temporary Wash Facility Masonry Wall-g.i. Tie Wire 3 Kilo 255 37 Construction Of Temporary Wash Facility Plastering-portland Cement 30 Bag 8100 38 Construction Of Temporary Wash Facility Plastering-washed Sand 3 Cubic Meter 5754 39 Construction Of Temporary Wash Facility Doors And Windows-d-3 Flush Door O 70m X 2.10m On 150mm Wooden Jamb Complete With Accessories 6 Set 24507 40 Construction Of Temporary Wash Facility Steel Works-lc 75x38x15x2.0mm 272 Kilo 13837.81 41 Construction Of Temporary Wash Facility Steel Works-l 50 X 50 X 6mm 55 Kilo 5556.98 42 Construction Of Temporary Wash Facility Steel Works-g I Pipe 75mm Sch 40 6 Piece 12432 43 Construction Of Temporary Wash Facility Steel Works-tubular 50mm X 100mm X 1.5mm 6 Piece 8227.50 44 Construction Of Temporary Wash Facility Steel Works-50mm X 75mm X 1.2mm Tubular Pipe 15 Piece 9375 45 Construction Of Temporary Wash Facility Steel Works-welding Rod 9 Kilo 1012.50 46 Construction Of Temporary Wash Facility Roofing Works-long Span Roofing, Corrugated, Pre-painted, 1220mm X 0.4mm Thick 26 Meter 10313.22 47 Construction Of Temporary Wash Facility Roofing Works-flashing Ga 26, 24"x8" 6 Piece 2988 48 Construction Of Temporary Wash Facility Roofing Works-teckscrew 2-1/2" 207 Piece 517.50 49 Construction Of Temporary Wash Facility Roofing Works-roof Sealant 6 Liter 1800 50 Construction Of Temporary Wash Facility Roofing Works-polycarbonated Sheets Twin Wall 6mm Thick Including Accessories 20 Square Meter 35006.40 51 Construction Of Temporary Wash Facility Carpentry Works-ceiling-rough Lumber, Sun Dried, Tanguile, 2"x2"x12" 84 Board Feet 4121.88 52 Construction Of Temporary Wash Facility Ceiling-plywood Marine 1/4" X 4'x8' 9 Piece 5435.10 53 Construction Of Temporary Wash Facility Ceiling-finishing Nails 3 Kilo 256.20 54 Construction Of Temporary Wash Facility Ceiling-common Wire Nails 3 Kilo 292.80 55 Construction Of Temporary Wash Facility Ceiling-fascia Board, Fiber Cement 10" X 12' 12 Piece 5160.60 56 Construction Of Temporary Wash Facility Ceiling-ceiling Vent 1" X 12" X 4' With Screen 3 Piece 896.70 57 Construction Of Temporary Wash Facility Electrical Works-roughing-ins-electrical Conduit Upvc, 15mm 15 Piece 2085 58 Construction Of Temporary Wash Facility Junction Box, 4"x4" G.i. 3 Piece 120 59 Construction Of Temporary Wash Facility Utility Box, 2"x4" G.i. Wires & Fixtures 6 Piece 201.60 60 Construction Of Temporary Wash Facility 3.5 Mm2 Thw Wire, Stranded 144 Meter 6422.40 61 Construction Of Temporary Wash Facility Single Switch With Plate 9 Piece 1620 62 Construction Of Temporary Wash Facility Ceiling Receptacle 3-1/2" 9 Piece 342 63 Construction Of Temporary Wash Facility Incandescent Bulb 50w 9 Set 1847.25 64 Construction Of Temporary Wash Facility Electrical Tape 3 Piece 162.39 65 Construction Of Temporary Wash Facility Plumbing Works-water Closet 1.6gpf With Accessories 6 Set 26,220.00 66 Construction Of Temporary Wash Facility Plumbing Works-water Closet Flange 6 Set 1,809.00 67 Construction Of Temporary Wash Facility Plumbing Works-faucet, Plain Bibb, Brass 1/2" 9 Piece 1,591.20 68 Construction Of Temporary Wash Facility Plumbing Works-s S Floor Drain 4'x4" 15 Piece 1,681.95 69 Construction Of Temporary Wash Facility Plumbing Works-gate Valve, 1/2" 3 Piece 975.00 70 Construction Of Temporary Wash Facility Plumbing Works-pp-r Pipe 1/2" 15 Piece 4,350.00 71 Construction Of Temporary Wash Facility Plumbing Works-pp-r Elbow 90o X 1/2" 15 Piece 235.50 72 Construction Of Temporary Wash Facility Plumbing Works-pp-r Tee, 1/2" 9 Piece 171.90 73 Construction Of Temporary Wash Facility Plumbing Works-pp-r Coupling Reducer, 1/2" X 3/4" 3 Piece 45.90 74 Construction Of Temporary Wash Facility Plumbing Works-pp-r Adapter Female Thread 1/2" 15 Piece 1,702.35 75 Construction Of Temporary Wash Facility Plumbing Works-teflon Tape 3 Roll 86.40 76 Construction Of Temporary Wash Facility Sanitary Works-upvc Sanitary Pipe 4" 6 Piece 6,034.80 77 Construction Of Temporary Wash Facility Upvc Sanitary Pipe 2" 15 Piece 7,186.50 78 Construction Of Temporary Wash Facility Upvc Elbow 90o X 2" 9 Piece 499.50 79 Construction Of Temporary Wash Facility Upvc Tee 2"x2" 9 Piece 502.20 80 Construction Of Temporary Wash Facility Upvc Elbow 90o X 4" 9 Piece 1,114.20 81 Construction Of Temporary Wash Facility Upvc P-trap 2" 15 Piece 1,872.00 82 Construction Of Temporary Wash Facility Brass Cleanout 4"x4" 3 Piece 1,365.00 83 Construction Of Temporary Wash Facility Pvc Cement 3 Can 630.00 84 Construction Of Temporary Wash Facility Chb, 4"x8"x16", Standard 600 Piece 16974 85 Construction Of Temporary Wash Facility Deformed Round Bars, 10mmx6m, Grade 40 534 Kilo 25519.86 86 Construction Of Temporary Wash Facility Portland Cement 30 Bag 8100 87 Construction Of Temporary Wash Facility Washed Sand 6 Cubic Meter 11509.98 88 Construction Of Temporary Wash Facility G.i. Tie Wire 9 Kilo 738 89 Construction Of Temporary Wash Facility Painting Works-concrete Surface-neutralizer 1 Gallon 348.30 90 Construction Of Temporary Wash Facility Concrete Surface-latex, Flat 3 Gallon 2926.11 91 Construction Of Temporary Wash Facility Concrete Surface-latex, Semi Gloss 3 Gallon 3279 92 Construction Of Temporary Wash Facility Concrete Surface-acri Color 3 Quart 343.20 93 Construction Of Temporary Wash Facility Wood Surface-enamel Flatwall 1 Gallon 1708.50 94 Construction Of Temporary Wash Facility Wood Surface-enamel Semi Gloss 1 Gallon 1738.50 95 Construction Of Temporary Wash Facility Wood Surface-paint Thinner 1 Gallon 753 96 Construction Of Temporary Wash Facility Tile Works-wall-glazed Wall Tiles 20cm X 20cm 1092 Piece 21294 97 Construction Of Temporary Wash Facility Wall-tile Adhesive 25kg/bag 9 Bag 2621.97 98 Construction Of Temporary Wash Facility Wall-tile Trim 6mm 12 Piece 1476 99 Construction Of Temporary Wash Facility Wall-tile Grout 5 Kg/bag 6 Bag 1170 100 Construction Of Temporary Wash Facility Flooring-unglazed Floor Tiles 20cm X 20cm 291 Piece 5674.50 101 Construction Of Temporary Wash Facility Flooring-tile Adhesive 25kg/bag 3 Bag 873.60 102 Construction Of Temporary Wash Facility Flooring-tile Grout 5kg/bag 3 Bag 585 103 Construction Of Temporary Wash Facility Handwashing-unglazed Floor Tiles 20cm X 20cm 195 Piece 3802.50 104 Construction Of Temporary Wash Facility Handwashing-tile Adhesive 25kg/bag 3 Bag 872.99 105 Construction Of Temporary Wash Facility Handwashing-tile Grout 5kg/bag 3 Bag 585
Closing Date21 Jan 2025
Tender AmountPHP 504.6 K (USD 8.6 K)

Nueva Ecija University Of Science And Technology - NEUST Tender

Electronics Equipment...+1Electrical and Electronics
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid The Nueva Ecija University Of Science And Technology (neust) Through The Bids And Awards Committee (bac), Hereby Invites All Interested Entities Registered With The Philippine Government Electronic Procurement System (philgeps) To Bid For The Hereunder Project, Subject To The General Conditions Stated Herein. Name Of Project: Upgrading Of Programmable Logic Controller (plc) System In The Mechatronics Laboratory Location: College Of Industrial Technology, Neust Gen. Tinio (st.) Campus, Cabanatuan City Approved Budget For The Contract: Php6,419,764.00 Contract Duration: 120 Calendar Days Source Of Fund: Income Cost Of Bidding Documents: Php10,000.00 Project Description: 1lot Item No. Description Qty Unit 1 Programmable Logic Controller For Mechatronics Training System Training Device For The A4 Mounting Frame Or As A Desktop Device With Modern, Industrially Used Programmable Logic Controller And System Interfaces For A Mechatronics Station. It Ensures Highest Performance And User-friendliness For Medium And High-end Applications Of Machine And Plant Automation. Benefits • Stable, Powder-coated, Sheet-steel Mounting System • Suitable For One Mechatronics Station And Suitable As A Tabletop Unit • Mounting Rail For 19" Module Is Attached To The Mounting System • Equipped With 4 Mm Safety Sockets • Integrated Power Supply Further Information The Stable Powder-coated Sheet Steel Support System Contains A 19" Module System Plug Syslink (9 Te), With 2x Syslink Plug-in Connection For Mechatronics Station And Control Panel, Each With 8 Digital Inputs And 8 Digital Outputs And 1x D-sub 15-pin Plug-in Connection With 4 Analog Inputs And 2 Analog Outputs, Emergency Stop Bridge For Connecting A Safety Circuit To Switch Off 8 Digital Outputs. Technical Data: - Dimensions (w X H): 305 Mm X 297 Mm (size 1) - Integrated Power Pack: 100 ... 240 V Ac ±10%; Necessary Accessories: Iec Cables 5 Units 2 Programmable Logic Controller For Electro-pneumatics Training Device For Er Recording Frame (pneumatic/hydraulic) For Solutions In Discrete And Stand-alone Automation Applications Of The Lower Power Range. Further Information The Modular Small Controller Can Be Used For Solutions In Discrete And Stand-alone Automation Applications In The Lower Performance Range. Technical Details: • Digital Inputs On 4 Mm Safety Sockets And Switches/buttons For Signal Simulation • Digital Outputs On 4 Mm Safety Sockets • Analog Inputs And Outputs On 4 Mm Safety Sockets • Simulation Module With 2x Syslink Connector For Control Panel With Digital Inputs And Outputs And D-sub 15-pin Connector With Analog Inputs And Outputs; 4 Mm Safety Sockets For Emergency Stop Bridge To Connect A Safety Circuit For Digital Outputs The Carrier System Consists Of A Lightweight Injection-moulded Housing, Suitable For An Er Mounting Frame Size 2, Dimensions (w X H X D): 364 Mm X 170 Mm X Approx. 80 Mm. The Unit Is Delivered Fully Assembled. Special Licensing Rules Apply To Schools And Training Centers In The Commercial Sector. 6 Units 3 Electro-pneumatics Simulator Software Simulation Software For Pneumatics Is An Application For Creating And Simulating Pneumatic And Electropneumatic Circuits. Valuable Technical Skills Are Learned By Designing Circuits And Simulating Them Interactively. Learning Goals • Creation Of Circuit Diagrams • Identifying And Preventing Errors • Optimization Of Solution Circuit Diagrams Through Interactive Simulations • Understanding Solution Development • Observing Effects Through Real-time Simulations Benefits • Convenient Creation Of Circuit Diagrams And Their Interactive Simulation • Content Tailored To Festo Didactic Learning Systems • Can Be Used Online And Offline • Learning The Effects Of Changes In A Technical Setup And Observing Their Immediate Consequences Through Real-time Simulation • Extensive Library Of Pneumatic, Hydraulic, Electrical Engineering, Electronic And Digital Components. • Further Information Simulation Software For Pneumatics Makes It Possible To Create (electro-)pneumatic Circuits And Simulate Them Interactively. State Changes And Switching Processes Are Calculated Realistically, And Interactive Interventions Can Be Made By Actuating Switches Or Switching Valves. Signals Can Also Be Transmitted Via Connected Hardware Or From Other Programs. In Addition To Real Measuring Devices, Fluidsim 6 Offers Virtual Measuring Devices. Circuits Can Be Constructed From A Library Of Various Electropneumatic Components. In Addition, Grafcet Diagrams Can Be Created And Included In The Simulation If Desired. Simulation Software For Pneumatics Covers The Following Topics: • Pneumatics/electropneumatics • Closed-loop Pneumatics • Vacuum Technology • Electrical Controllers • Digital Technology • Grafcet 6 Units Warranty: • One (1) Year Against Factory Defects Must Include: • On-site Installation And Testing • Three (3) Days Rigid Training For Faculty And Laboratory Technicians • Must Provide Official Partner Or Authorization To Bid From Manufacturer • Iso 9001:2015 Quality Management System Certification From The Manufacturer • Iso 14001: 2015 Environmental Management Certificate From The Manufacturer The Summary Of The Bidding Activities Is As Follows: Activities Schedule 1. Advertisement December 11-18, 2024 2. Issuance Of Bid Documents December 19, 2024 To January 3, 2025 3. Pre-bid Conference December 19, 2024, 2:30pm (via Zoom) 4. Deadline For Submission Of Bids (manual Submission) January 3, 2025, Until 5:00pm Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City 5. Opening Of Bids (face To Face) January 6, 2025, 9:00am Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City General Conditions: All Particulars To The Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation Of Bids, Post Qualification And Award Of Contract Shall Be Governed By The Pertinent Provisions Of R.a. 9184 And Its Implementing Rules And Regulations. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Business Organizations With At Least Sixty Percent (60%) Interest Or Ownership Of At Least 60% Of The Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Business Organizations Of A Country Where The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From December 19, 2024 To January 3, 2025 Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Pay The Applicable Fee For The Bidding Documents Not Later Than The Deadline For Submission Of Bids. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 3, 2025, Until 5:00pm. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In The Pbd. Late Bids Shall Not Be Accepted. On The Last Day For The Submission Of Bids And No Prospective Bidder/s Submitted Its Bid Documents Or Only One (1) Bid Was Submitted For The Above-mentioned Project, The Same Is Deemed Extended Until January 10, 2025, 5:00 Pm. This Is To Protect The Interest Of The University And Full Opportunity For A Competitive Bidding May Be Achieved. The University Likewise Reserves The Right To Cause Extension Or Postponement Of The Filing Of Bids Should Similar Situation Arises. Bid Opening Shall Be On January 6, 2025, 9:00 Am At The Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City Unless Extended. Bids Will Be Opened In The Presence Of The Bidder Or His/her/its Duly Authorized Representative/s. Failure To Attend During The Opening Of Bids Shall Be Considered A Waiver On The Part Of The Bidder Who Likewise Waives His/her/its Right To Raise Questions During The Bidding Procedures. The Nueva Ecija University Of Science And Technology Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For More Information Concerning This Bidding, Please Contact The Following: Engr. Joel G. De Mesa Head, Bac Secretariat For Goods And Services Neust Gen. Tinio St., Cabanatuan City Email Address: Neust.bacsec@gmail.com Approved By: Dr. Honorato P. Panahon (sgd.) Bac Chairperson
Closing Date6 Jan 2025
Tender AmountPHP 6.4 Million (USD 110.6 K)

Adela Serra Ty Memorial Medical Center Tender

Healthcare and Medicine
Philippines
Details: Description 1 Dermatoscope Machine 2 Unit 150,000.00 300, 000.00 Purpose: Used For Examining Skin Lesions And Structures In Detail, Aiding In The Early Detection Of Skin Camcers (like Melanoma) And Other Dermatological Conditions. It Provides High-quality Imaging With Polarized And Non-polarized Light, Enhancing Visualization Of Vascular Patterns, Pigmentation And Subsurface Features. It’s Valuable For Both Contact And Non-contact Dermoscopy, Making It A Vital Tool For Dermatologists And Skincare Professionals. Features And Benefits 10x Magnication With 30mm Viewing Area. Polirized And Non-polirized Modes With High-powered Leds. Long-lasting Battery Life Includes A Leather Pouch, Silicone Sleeve, And Usb Cable Camera Compatibility Having The Ability To Take A Photo Of A Special Case (prior To Excision), With A Camera, Smartphone Or Ipad, Is Powerful. Carbon Cannot Be Attached To Those Devices. Lens Size Three Lens Sizes: 15, 25 Or 30 Mm. Larger Lenses Provide A Greater Field Of View And Distance From The Patient. Technical Specification Polarization Yes Infection Control Yes Spectrum Control Yes Optics Yes Battery Rechargeable Camera-compatible Yes Phone & Ipad-compatible Yes 10 Mm Markings Yes Ø30 Mm 10x Yes Magnification Ø30 Mm 10x Accessories Usb Cable Leather Pouch Silicone Sleeve Eyepiece Icecap Samples Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety And Operation Checks Before Handover *** Local Clinical Staff To Affirm Completion Of Installation Training End Users & Biomedical/engineer On-site Training And Orientation Upon Installation. On-site Training And Orientation For Machine Handling And Operation. *** Training Of Users In Operation And Basic Maintenance And Calibration Shall Be Provided *** Supplier To Issue Certificate Of Training *** Advanced Maintenance Tasks Required Shall Be Documented User Care*** Unit Layout To Enable Easy Cleaning And Sterilization Of All Surfaces. Warranty And Maintenance Warranty 3 Years Warranty Should Be Provided By The Supplier Parts = At Least 5 Years Maintenance And Service = At Least 2 Years Spare Parts Availability Post-warranty 10 Years Software / Hardware Upgrade Availability Routine Software Updates Should Be Provided Documentation Documentation Requirements *** User, Technical And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of Manufacturer, Supplier And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada And Eu) 2 Auto-clave (steam Sterilizer) 1 Unit 70,000.00 70,000.00 Purpose : Usteam Sterilizers — Also Known As Autoclaves — Are An Essential Piece Of Equipment In Any Laboratory, Research, Or Healthcare Setting, Ensuring Sterility For Important Equipment And Instruments. Autoclaves Are Available In A Wide Array Of Designs, Each Tailored For Specific Applications, Ranging From Small-scale Laboratory Sterilization To Large-volume Industrial Processes. Features And Benefits Automatic Sterilization Controlled By Computer. Temperature Is Max Up To 134 ºc, Suitable For 4-6 Minutes Rapidly Sterilizing. Safety Protection For Water Lacking. Over-temperature, Over-pressure Automatic Protection. Automatically Cuts Off The Power And Then Alarm After Sterilized. Fully Stainless Steel Structure Technical Specification Chamber Volume 24l(φ270×410) Mm / 6.3gallon Working Pressure 0.22mpa Working Temperature 134ºc (273ºf) Temperature Adjust Range 105-134ºc (221-273ºf) Timer Range 0~60min Heat Average ≤±1ºc Power 1.5kw / Ac110v.60hz Sterilizing Plate 340*200*30mm / 13.4*7.9*1.2'', 3 Pieces Overall Dimension 560*350*500mm / 22.0*13.8*19.7'' Packing Dimension 620*410*570mm / 24.4*16.1*22.4'' G.w 20kg / 44lb N.w 18kg / 39lb Accessories 1 Unit 2kva Avr Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety And Operation Checks Before Handover *** Local Clinical Staff To Affirm Completion Of Installation Training End Users & Biomedical/engineer On-site Training And Orientation Upon Installation. On-site Training And Orientation For Machine Handling And Operation. *** Training Of Users In Operation And Basic Maintenance And Calibration Shall Be Provided *** Supplier To Issue Certificate Of Training *** Advanced Maintenance Tasks Required Shall Be Documented User Care*** Unit Layout To Enable Easy Cleaning And Sterilization Of All Surfaces. Warranty And Maintenance Warranty 3 Years Warranty Should Be Provided By The Supplier Parts = At Least 5 Years Maintenance And Service = At Least 2 Years Spare Parts Availability Post-warranty 10 Years Software / Hardware Upgrade Availability Routine Software Updates Should Be Provided Documentation Documentation Requirements *** User, Technical And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of Manufacturer, Supplier And Local Service Agent To Be Provided 3 Cryogenic Handheld Cryosurgery Device (liquid Nitrogen Sprayer System) For Destruction Of Benign Skin Lesions 1 Set 110,000.00 110,000.00 Purpose: Used To Treat Benign Skin Lesions Such As Warts, Skin Tags, And Certain Keratoses. It Applies Extreme Cold To Targeted Areas, Causing Controlled Destruction Of Abnormal Tissue. Features And Benefits The Minimally Invasive Procedure That Uses An Extremely Cold Liquid Or Instrument To Freeze And Destroy Abnormal Tissue That Requires Elimination. It Requires About 1/3 Time Required By Co2 Snow Or N20 To Achieve The Appropriate Degree Of Freezing Because Of The Relative Temperatures(-196°c Compared With -79°c) It Can Be Applied Directly By Spraying The Gun. No Form Of Anaesthesia Is Required For Freezing`; It Can Be Carried Out Single-handed And With No Scarring Results. It Starts Freezing Instantly Because Liquid Nitrogen Is Released Directly On The Internal Metal Probe Wall Which Contacts The Lesion. Portable And Can Be Used In Any Consulting Room. Complete Haemostasis And High Patient Acceptance. A Good Number Of Lesions Can Be Treated At A Time. Carcinoma And Skin Tumours Can Be Treated. Easy To Operate And No Sterilization Is Required To The Tool Or Tips. Technical Specification Durable Stainless Steel And Brass. Capacity: 16 Oz Fingertips Trigger Control, Safely Autovent For Gradual Pressure Release, And A Streamlined Relief Valve For Consistent Freezing. Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety And Operation Checks Before Handover *** Local Clinical Staff To Affirm Completion Of Installation Training End Users & Biomedical/engineer On-site Training And Orientation Upon Installation. On-site Training And Orientation For Machine Handling And Operation. *** Training Of Users In Operation And Basic Maintenance And Calibration Shall Be Provided *** Supplier To Issue Certificate Of Training *** Advanced Maintenance Tasks Required Shall Be Documented User Care*** Unit Layout To Enable Easy Cleaning And Sterilization Of All Surfaces. Warranty And Maintenance Warranty 2 Years Warranty Should Be Provided By The Supplier Spare Parts Availability Post-warranty 10 Years Documentation Documentation Requirements *** User, Technical And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of Manufacturer, Supplier And Local Service Agent To Be Provided 4 Portable Electrosurgical Unit With Trolley 1 Unit 200,000.00 200,000.00 Purpose: A Multi-function Electrosurgical Generator With Both Monopolar And Bipolar Modes, Self-diagnostics, And Recall Of Stored Power Settings High Output Terminal For Heavy Desiccation And Fulguration Procedures Requiring High Intensity. Low Output Terminal For Light Desiccation And Fulguration Procedures Requiring Low Intensity And Increased Precision. Features And Benefits High Output Terminal For Heavy Desiccation And Fulguration Procedures Requiring High Intensity. Low Output Terminal For Light Desiccation And Fulguration Procedures Requiring Low Intensity And Increased Precision. Dual Microprocessors: One Microprocessor Controls The Output And Functionality Of The System While The Second Monitors The System And Terminates Activation If A Safety Hazard Is Detected. This Results In Regulated Delivery Of Current While Simultaneously Ensuring Safe Operation. Technical Specification Depth: 4 Inches (102mm) Width: 8.75 Inches (222mm) Height: 7.5 Inches (190mm) Weight: 6 Pounds (2.7kg) Output Power: Low 0-20 Watts (1/10 Watt Increments Up To 10 Watts) High: 0-35 Watts Bipolar: 0-35 Watts Bipolar Forceps Bipolar Forceps Are Designed To Grasp, Manipulate, And Coagulate Selected Tissue. The Electric Current Alternates Between The Two Tips, Reducing The Length Of The Current’s Path And Producing A Precise, Controlled Therapeutic Effect. Foot Control Pencil Autoclavable Pencils Autoclavable, Reusable Hand Control Pencil Reusable 7-900-5 Steam Autoclavable Hand Control Pencil With Power Adjustment Buttons Directly On The Pencil. Hand Control Pencil Autoclavable, Reusable Foot Control Pencil Consumables Pencil Sheaths – Non-sterile 100/box Pencil Sheaths – Sterile 25/box Accessories Sharp Tip Pencil Sheath Fine Needle Electrode Ball Electrode Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety And Operation Checks Before Handover *** Local Clinical Staff To Affirm Completion Of Installation Training End Users & Biomedical/engineer On-site Training And Orientation Upon Installation. On-site Training And Orientation For Machine Handling And Operation. *** Training Of Users In Operation And Basic Maintenance And Calibration Shall Be Provided *** Supplier To Issue Certificate Of Training *** Advanced Maintenance Tasks Required Shall Be Documented User Care*** Unit Layout To Enable Easy Cleaning And Sterilization Of All Surfaces. Warranty And Maintenance Warranty 2 Years Warranty Should Be Provided By The Supplier Spare Parts Availability Post-warranty 10 Years Documentation Documentation Requirements *** User, Technical And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of Manufacturer, Supplier And Local Service Agent To Be Provided 5 Medical Surgical Smoke Evacuator Evacuation System For Laser And Electrocautery 1 Unit 200,000.00 200,000.00 Purpose: A Medical Surgical Smoke Evacuator Is A Device That Captures And Filters Smoke Generated During Laser And Electrocautery Procedures. These Devices Are Designed To Protect Patients And Surgical Staff From The Harmful Particles And Toxins In The Smoke: Features And Benefits Automated Alert System When Ulpa Filter Is Not Capturing Plume At 100% And Needs To Be Changed. Wide Range Of Accessories To Configure Based On Procedural Needs And Personal Preferences Can Be Placed On A Mobile Cart Or Accessory Shelf On A Surgical Boom. Laser Sensor Utilizes A Convenient Foot Pedal To Activate The Smoke Evacuator. Rf Sensor Is The First Automatic Sensor System For Surgical Smoke Detection And Evacuation. The Rf Sensor Is Capable Of Detecting Any Cutting Device And Simultaneously Activating The Smoke Evacuator. Technical Specification Power Requirements: 100-240 Vac, Single Phase, And 4.0 A, 47-63 Hz Flow Rate: Open Range: At Least 90 Lpm Lap Range: At Least 18 Lpm Display Indicators: Visual, Visual & Audio, Led Meter, Led Display Lcd Display: With Lcd Display Working Noise: 55db Rotating Speed: 2750/min Output Volume: 3.5-4.2cbm3/hr Power Supply: 220/110v,50/60hz Working Mode: Operate Continuously Consumables Smoke Evacuator Filters Hydrophobic Ulpa Filter W/ Fluid Trap Large Charcoal Filter Accessories Esu Pencils With Integrated Smoke Evacuation Smoke Evacuator Tubing Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety And Operation Checks Before Handover *** Local Clinical Staff To Affirm Completion Of Installation Training End Users & Biomedical/engineer On-site Training And Orientation Upon Installation. On-site Training And Orientation For Machine Handling And Operation. *** Training Of Users In Operation And Basic Maintenance And Calibration Shall Be Provided *** Supplier To Issue Certificate Of Training *** Advanced Maintenance Tasks Required Shall Be Documented User Care*** Unit Layout To Enable Easy Cleaning And Sterilization Of All Surfaces. Warranty And Maintenance Warranty 2 Years Warranty Should Be Provided By The Supplier Spare Parts Availability Post-warranty 10 Years Documentation Documentation Requirements *** User, Technical And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of Manufacturer, Supplier And Local Service Agent To Be Provided Total Amount 880,000.00
Closing Date24 Jan 2025
Tender AmountPHP 880 K (USD 15 K)

Municipality Of Pintuyan, Southern Leyte Tender

Automobiles and Auto Parts
Philippines
Details: Description Item No. Item And Descriptions Quantity Unit 1 Lot Of Mobile Command And Control Vehicle (moccov) With Triage Technology Specifications: Trailer; 1 Set Trailer Dimension: L 16’ft X 6’8” Ft Trailer 40 Sq.m. Covered Area, Command Center Tent Maximum Capacity: 18 Persons Capacity: 10,000 Lbs. Multi-use Compartment For Rescue Equipment Swing Out Sink Rear/kitchen Top Tailgate Water Tank Gauge Indicator Automatic Water Pump For Faucet Reflectorized Trailer Side Markers Full Color Decal Suspension And Under Chassis Details: Round Axle With Hubs And Heavy-duty Bearings Rear Stabilizer Swivel Legs Front Stabilizer Swivel Legs Tandem Wheel And Fender With Spare Tires Front Swing/swivel Hand Jack With Tire Electromagnetic Brake System Swing Out Rear Tail Gate Dust And Waterproof Pvc Travel Cover Tent System; 1 Set Material: Wax Poly Cotton Canvas Fabric Annex 1: Mission Room Convertible To Bedroom Annex 2: Kitchen And Pantry Room Annex 3: Mission Room Annex Walls, With Extra-large Mesh Screens, Roll Down Window Cover, Poles, Pegs And Guy Ropes All Made With Heavy Duty Materials Maximum Capacity: 18 Persons Annex Walls With Extra-large Mesh Screens, Roll Down Window Cover, Poles, Pegs And Guy Ropes All In Heavy Duty Material Tent Material Is Water Repellent 3-season Tent That Can Withstand A Wind Force Of 7.5 Mph Baseline With Approximately 38 Mph Winds And Gusts Trailer Utilities; 1 Set Trailer Built-ins 150 Liters Water Tank Pump And Plumbing System Ac And Dc Power Inlet Mounted And Wash Basin Dust And Waterproof Pvc Travel Cover Portable Air-conditioning Unit Horsepower: 1 Hp Weight: 29 Kg Dimensions: 36.5 × 44.5 × 71.5 Cm Cooling Capacity: 12,600 Kj/h Power Consumption: 1100 W Applicable Area: 18-28 M 3 Units Independent Portable Toilet Material: Pp, Abs Dimension:35x42x43cm / 13.8×16.5×17" Capacity: 24l Flush Method: Press Compact Size And Lightweight Design Also Fit For Outdoor 1 Unit Toilet/shower Tent Material: Waterproof Cloth Rod: Glass Fiber Pop-up Dimension: 1.2x1.2x1.8 M With 1unit Portable Camping Shower, Rechargeable 2 Units Fuel Tank Standard: As/nzs 2906:2001 Capacity: 20l Of Fluid Spill Proof Vented Pouring Spout. Material: Uv Stabilized High Density Polyethylene 4 Units Fire Extinguisher 5lb Abc Non-toxic And Non-corrosive Chemicals Refillable Mono Ammonium Phosphate Chemical, Non-conductor, Non-toxic, Stored Pressure Equipped With Pressure Gauge, Brass Valve And Heavy-duty Air Hose With Nozzle 1 Unit Communication And Surveillance Pneumatic Mast Operation: Arc Movement + Vertical Movement Height: 10m Pan Movement: 360°gross Weight: 50 Kg Operation Platform: Arc Movement Horizontal And Vertical Rotation Speed: 6r/min Wind Resistance: 66km/h Control Way: Rs485, Pelco-d/p Agreement, Remote Control Material: Aluminum Alloy Power Supply: Dc12v-10a 1 Unit Wireless Siren Voltage: Dc 12v Output Power: 200w Siren And Microphone 1 Set Weather Station System Measurements: Hygrometer//humidity, Rainfall, Temperature, Wind Direction, Wind Speed Sensors: Anemometer, Rain & Temperature Solar-powered With Stored Energy Backup. Corrosion-proof And Can Withstand Extreme Weather Environments Has Wireless Transmission Range Of 1000 Ft. (300 M) Transmits Data Every 2.5 Seconds 1 Set Rescue Quadcopter Drone Waterproof Extended Flight Time Up To 20 Minutes Power-flip Function When Floating Flight Control Feel Tuned For Lifesaving As Well As Search And Rescue Operations 2.7k Color Camera, Remote Control Specially Designed Rescue Buoyancy Sausage Live As Well As Recorded Video Footage Payloads Up To 1.2kg 1 Set Satellite Internet Starlink; Standard Roaming Account (subscription Not Included) 1 Unit Uhf/vhf Radio Communication System Frequency Range 136-174 Mhz Or 450-520 Mhz Number Of Channels Max. 32 Channel Spacing Analog 12.5 Khz Digital 6.25 Khz Operating Voltage 13.6 V Dc ± 15% Frequency Stability ± 2.0 Ppm ± 1.0 Ppm Antenna Impedance 50 Ω Weight: 1.10 Kg 1 Set Management Laptop Intel Core I5 Ram 8gb Display: 15.6 Inches (main Display) Windows 10/11 Home/webcam/bt/wifi/cardreader/backlit Keyboard 1 Set Led Robotic Search Light Lighting Mode: Low Light, High Light, And Flashing Image Resolution: 1280 × 720 Max. Rotation Range Yaw: - 70° To + 70°, Pitch: - 135° To 45° Power Consumption: ≤ 40 W 1 Unit Ptz Perimeter Camera System Pan, Tilt, Zoom 1/2.8" Hd Progressive Scan Cmos 1920 × 1080 Resolution 25× Optical Zoom 120 Db True Wdr (wide Dynamic Range) Up To 100 M Ir Distance 3d Intelligent Positioning Switchable Tvi/ahd/cvi/cvbs Video Output 1 Unit Bullet Camera System Image Sensor 1/3" Progressive Scan Cmos Min. Illumination Color: 0.01 Lux @ (f1.2, Agc On), 0.018 Lux @ (f1.6, Agc On), 0 Lux With Ir Day & Night Ir Cut Filter Angle Adjustment: Pan: 0° To 360°, Tilt: 0° To 100°, Rotate: 0° To 360° Max. Resolution: 2688 × 1520 4 Units Cctv Nvr 8 Channel (ds-7208huhi-k1/e) Digital Video Recorder Mouse, Manual And Power Cord Remote Viewing Anytime, Anywhere Live View From Pc, Smartphone Or Tablet Turbo Hd Camera Ultra-low Light Chromatic Night Vision 1 Set Console Box Heavy Duty Case For Cctv System And Media System Laminated Water Resistant, 1 Unit All In One Pc, 2 Units 22inch Multimedia Tv With Tv Box, 1 Unit 32-inch Smart Tv, 7inch Am/fm Audio Receiver With Speakers, Wireless Keyboard And Mouse 1 Unit Step Ladder 3 Step Foldable Aluminums Ladder 1 Unit Table For Mapping Folding Half Table With Foldable Steel Legs 4ft 122 X 60 X 74cm 1 Unit White Board Magnetic White Board 30cm X 60cm 1 Unit Rescue And Triaging Foldable Rescue Boat With Outboard Motor Width (beam) When Open: 60″ 1.52mdraft: 4″ 11.4cmdepth Mid-ship: 24″ 56cmcapacity: 807 Lbs. Number Of Seats: 6material: Hard Plastic 1 Set Water Rescue Equipment. 2 Rescue Helmet, 4 D Shape Carabineer, 4 Oval Shape Carabineer, 2pairs Glove, 2 Rescue Vest, 1 Rescue Can, 1 Half Body Harness, 1 50meters 12mm Rope, 2pcs Waterproof Headlamp, 1 Carry Bag 1 Set High Angle Rescue Equipment. 2 Rescue Helmet, 4 D Shape Carabineer, 4 Oval Shape Carabineer, 2pairs Glove, 1 Half Body Harness, 1 50meters 12mm Rope, 2pcs Waterproof Headlamp, 1 Carry Bag, 1 Swing Spinner Carabiner,1 Hand Ascender Device, 1 Adjustable Foot Loop Sling, 1 Descender Rescue 8, 1 Pulley Single Sheeve, 1 Pulley Double Sheave 1 Set Automated External Defibrillator Protocol: Semiautomatic And Fully Automatic Configuration Defibrillator Charge Hold Time: 30 Seconds. Aed 3 Automatic Model: 3 Seconds Prior To Automatic Shock Delivery Energy Selection: Factory Pre-programmed Selection Patient Safety: All Patient Connections Are Electrically Isolated Size: (h X W X D) 12.7 Cm X 23.6 Cm X 24.7 Cm. 5.0 In X 9.3 In X 9.7 In Weight: 2.5 Kg; 5.5 Lbs. (with Battery) 1 Unit Emergency And Trauma Bag. 1 Btl Alcohol 150ml 1 Btl Betasol Povidone 60ml 1 Btl Hydrogen Peroxide 60ml 1pc. Tourniquet 1 Set Oxygen Tank W/ Regulator 1 Pc. Emergency Blanket 1 Pc. Arm Splint / Sam Splint 1 Pc. Leucoplast ½ 1pc. Cpr Mask Surgi-tech 1 Pc. Cervical Collar 1 Pc. Triangular Bandage 1 Pc. Hot And Cold Pack 160g Surgi-tech 1 Pc. Digital Thermometer Advan 1 Btl Dextrose Partners 1 Pc. Iv Tubing Surgi-tech 1 Pc. Iv Cath G.24 1 Pc. Cosmed Butterfly G.23 1 Pc. Pulse Oximeter 1 Set Ambu Bag Pvc 1 Pc. Pen Light Indoplas 1 Set Blood Pressure / Bp Set 1 Pc. Kelly Forceps Straight 1 Pc. Surgical Scissor Straight 1 Set Foldable Military Spec Medical Beds Material: High-grade Aluminum Foldable Product Size: 194 X 66 X 41cmfolded Size: 90 X 12 X 20cmweight: 9.5kgload Bearing: Less Than 159kg 5 Units Jack 3-ton Crocodile Jack 1 Unit Rescue Axe Gross Weight: 32oz Or 910g Length: 15" Or 38cm Carbon Steel Head Dual Fiberglass Handle Rubberized Grip 1 Unit Bolt Cutter Size: 12" Max. Cutting Size: 5mm Cr-v Blade 1 Unit Hi-lift Responder Jack Material: Cast Iron Steel Size: 42” Leverage: 4660 Lbs. 1 Unit Medical Stretcher Product Size (length*width*height): 214*54*13cm Foldable 1 Unit Shovel Full Length: 42cm Spade Width: 10cm Shovel Length: 12.5cm Pick Length: 11cm 1 Unit Power Supply And Electronics Jump Starter/power Bank Ce/rohs/emc Battery Capacity:15000mah Input: 14/a Output:5v/4a; 12v/12a; 19v/3.5a Charging Time: 5 Hours Start Current: 300a Peak Current: 600a 1 Unit Solar Power Generator System Rated Power: 200w Rated Voltage (vmp): 18v Rated Current (imp): 3.34a Open-circuit Voltage: 21.6v Short-circuit Current: 3.64a Number Of Cells: 36 Cell Type: Poly-crystalline Silicon Glass Type: High Transmission, Low Iron, Tempered Glass, Glass Thickness Of Glass: 3.2mm 1 Set Wind Power Generator System - Material: Nylon Fiber - Blade Length:600mm - Wind Wheel Diameter:900mm - Weight:12.5kg - Rated Power: 400w - Starting Wind-speed: 12m/s - Rated Voltage: 12/24vr 1 Unit Generator Set Power Inlet Mounted220-240vopen Type Generator Starting System: Recoil/electrical Starting Alternator Material: 100% Cu Frequency (hz): 60voltage(v): 120-240rated Output (kw): 8max Output (kw): 8thd (%): 25running Time At 50% Loading(h): 8.5fuel Tank Size(l): 21noise Db(a): 97insulation Grade: F 1 Unit 220v Backup Inverter Power System 3000 Watts Power Inverter Dc Charging System Output Voltage: 220v (+-) 10% Output Frequency: 60hz (+-) 2 Output Wave Form: Modified Sine Wave Peak Efficiency: 65% 1 Unit Battery Bank Power Supply 100ah X 4 (total Capacity= 400ah) Lithium Ion Battery 1 Unit Training - Seminar Technical Seminar Training For Ingress And Digress Of Trailer-tent System Gain Knowledge Of Equipment And Its Specifications Proper Handling And Proper Use Of Tools And Equipment's Ergonomic Placement Of Equipment Individual Seminar Training And Testing Of Each Individual For A Specific Role Ex: Basic Drone Pilot Training, Cctv Controller Etc. Note: Caap Certification Not Included Team Seminar Conducting Team For Ground Training And Actual Response Action Efficient Ingress And Digress Of Mocov Synchronization Of Individual And Their Roles At A Specific Time Of Action Tool Set 82 Pcs Tool Set 1 Set Cook Set 6 Persons Cook Set 1 Set Portable Stove 2 Burner Portable Butane Stove 1 Unit Vehicle Modified 4x4 Xl Ford Ranger 2024 Or Its Equivalent Or Better Powertrain 4x4 Drivetrain 2.0l Turbo Diesel Maximum Power 170hp @ 3,500maximum Torque 405nm @ 1,750-2500 Rpm6-speed Manual Transmission Chassis & Suspension Front Suspension Double Wishbone With Coil Springs Rear Suspension Leaf Spring Front Ventilated Discs/rear Drum Wheels & Tires16" Off-road Mag-wheels 255 / 70r 16 Tires Accessories: Snorkel Led Bar Light, Roof Tray, Led Emergency Strobe Light Bar, Load Plus (suspension), Tow Hitch Set 1 Lot Notes: 1. All Items Should Be Supplied, Delivered And Installed On-site As Designated By The End-user Unit. 2. Mobile Command And Control Vehicle With Triage Technology And Its Accessories Should Be Accredited Or Recognized From Department Of Science And Technology (dost) Or Any Appropriate Government Agencies. 3. Vehicle Inclusions: Lto Registration – 3years, Ctpl-3years, Insurance With Aog – 1 Year, With Logo Of The Municipality (pintuyan). 4. Product Warranty Certificates For Vehicle. 5. Product Warranty Certificates For Equipment, Devices And Accessories Not Less Than One (1) Year. 6. Trainings For Operators Of All Equipment, Devices And Accessories And Corresponding Seminars For Conducting Team Shall Be Formed Part Of The Contract.
Closing Date7 Jan 2025
Tender AmountPHP 17.8 Million (USD 306.7 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Software and IT Solutions
United States
Details: This Is A Sources Sought Announcement Only. It Is Neither A Solicitation Announcement Nor A Request For Proposal Or Quote And Does Not Obligate The Government To Award A Contract. Responses To This Sources Sought Must Be In Writing. The Purpose Of This Sources Sought Announcement Is For Market Research, To Make Appropriate Acquisition Decisions, And To Gain Knowledge Of Potential Qualified Businesses Capable Of Providing The Following: ge Maclab/combolab System Maintenance And Repair For Columbia Vamc *** See Statement Of Work Below For Details *** If This Is Within Your Capability, Please Respond With The Information Below: company Name address point Of Contact phone, Fax, And Email uei Number gsa Contract (as Applicable) capability Statement That Clearly And Convincingly Identifies Your Ability To Fulfill This Requirement. brochures Of Product Being Offered To Include Specifications. authorized Service Provider Letter From Oem interested Firms Are Reminded That In Accordance With Far 4.12, Prospective Contractors Shall Complete Electronic Annual Representations And Certifications To Be Considered For Award. In Addition, Far 4.11 States That Prospective Contractors Shall Be Registered In The System For Award Management (www.sam.gov) Database. All Service-disabled Veteran Owned Small Businesses (sdvosb) And Veteran Owned Small Businesses (vosb) Shall Be Verified In Vetcert At Https://veterans.certify.sba.gov point Of Contact For This Sources Sought Is: veronica.flores@va.gov (913) 946 - 1167 department Of Veterans Affairs network Contracting Office -15 3450 S. 4th Street Trafficway leavenworth, Ks. 66048â  statement Of Work 1. Period Of Performance the Contract Shall Consist Of One (1) Base Year And Four (4) Optional One-year Periods. 2. Background the Cardiac Cath Labs And Hybrid Operating Room Currently Is Requesting Routine Maintenance For Their Ge Healthcare Maclab/combolab Systems And Associated Equipment. This Equipment Is Used To Monitor And Document Patient Treatment And Vital Signs During Cardiac Diagnostic Procedures Such As Coronary Angiogram, Cardiac Catheterization With Angioplasty, Electrophysiology Studies; And Various Therapeutic Interventions Which May Include Percutaneous Angioplasty, Coronary Stent Placement, Rotoblation, Icd Placement, Pacemaker Implant And Tavi (transcutaneous Aortic Valve Implantation, Impella Device Placement And Intra-aortic Balloon Pump Placement. The Service Also Provides Peripheral Vascular Angiography, Peripheral Vascular Angioplasty And Stent Placement. the Columbia Va Medical Center Is Requesting Routine Maintenance As Required By The Joint Commission, The Truman Va Medical Center Healthcare Technology Management Medical Equipment Management Program And The Oem Specifications For The Ge Healthcare Maclab/combolab Systems. Timely Repair Of This Equipment Is Essential To The Safety Of The Patient Population And The Efficient Operation Of The Cardiology And Operating Room Departments. 3. Required Services 3.1 The Contractor Shall Provide Maintenance And Repair On Site (when Determined By Contract Cor/poc), To Include All Replacement Parts, Labor, Travel Expenses, Telephone Technical Support, Remote On-line Support (maintain A Current Mou/isa Allowing Vpn Access), Tools, Test Equipment And Other Incidentals Necessary To Maintain And/or Restore The Listed Equipment), To Operating Specifications According To The Manufacturer's Specifications. All Maintenance And Repairs Shall Be Provided During The Contract Business Hours Of 8:00am 5:00 Pm, Monday Through Friday, Excluding Federal Holidays Unless Otherwise Approved By Contract Cor/poc. Upon Placement Of A Service Request, The Contractor Must Respond To The Contract Cor/poc Within One (1) Hour By Telephone For Diagnostic Response And Must Provide Priority On-site Service Response Within Eight (8) Business Hours After Contacting The Va, Unless Otherwise Determined By Contract Cor/poc. federal Holidays: new Year S Day Labor Day martin Luther King Birthday Columbus Day presidents Day Veterans Day memorial Day Thanksgiving Day juneteenth Day Christmas Day independence Day and Any Other Federal Holiday That Is Not Listed Above. 3.2 The Contractor Shall Provide Full Scheduled And Unscheduled Maintenance And Repair (when Determined By The Contract Cor/poc), To Include All Replacement Parts, Labor, Travel Expenses, Telephone Technical Support, Remote On-line Support (if Applicable), Tools, Test Equipment And Other Incidentals Necessary To Maintain And/or Restore The Equipment Below: â â â â â â â â â â â â â â â  Nameâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â  Serial#â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â  Locationâ â â â â â â â â â â â â â  altix Maclab Acquisition Computer  â â â â â â â â  Ssd23148539taâ â â â â â â â â â â â â â â  D193a altix Combolab Acquisition Computer  â â  Ssd23198617taâ â â â â â â â â â â â â â â  D194a altix Maclab Acquisition Computer  â â â â â â â â  Ssd23148535taâ â â â â â â â â â â â â â â  G104 client Workstation  â â â â â â â â  Sse23017659taâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â d193 client Workstation  â â â â â â â â  Sse23017673taâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â d194 client Workstation  â â â â â â â â  Sse23017671taâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â d180 client Workstation  â â â â â â â â  Sse23017672taâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â d181 client Workstation  â â â â â â â â  Sse23017658taâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â d183 client Workstation  â â â â â â â â  Sse23017660taâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â d182 patient Data Module (pdm)  â â â â â  Spx23220191saâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â  D193 patient Data Module (pdm) Base Station  â â â â â â â â â â â su723190059saâ â â â â â â â â â â â â â â  D193 respironics C5 Co2 Module  â â â â â â  163-386619â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â  D193 patient Data Module (pdm)  â â â â â  Spx23220187saâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â  D194 patient Data Module (pdm) Base Station  â â â â â â â â â â â su723190007saâ â â â â â â â â â â â â â â  D194â â â â â â â â â â â â  respironics C5 Co2 Module  â â â â â â  163-386690â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â  D194 patient Data Module (pdm)  â â â â â  Spx23220173saâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â  G103 patient Data Module (pdm) Base Station  â â â â â â â â â â â su722290023saâ â â â â â â â â â â â â â  G103 respironics C5 Co2 Module  â â â â â â  163-383759â â â â â â â â   â â â â â â â â â â â â â â â â â â â â â â â â â â  G103 altix Inw Server Software  â â â â â â â â â  Sa723224435taâ â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â  Virtual/no Location cardio/ Combolab 128 Channel Amplifier  â â â â â â â â â â rxj16310025taâ â â â â â â â â â â â â â â â  D194 all Maintenance And Repairs Shall Be Provided During The Contract Business Hours Of 8:00am 5:00 Pm, Monday Through Friday, Excluding Federal Holidays Unless Otherwise Approved By Contract Cor. Upon Placement Of A Service Request, The Contractor Must Respond To The Contract Cor Within One (1) Hour By Telephone For Diagnostic Response, And Must Provide Priority On-site Service Response Within Four (4) Business Hours After Contacting The Va, Unless Otherwise Determined By Contract Cor. 3.3 All Scheduled Preventive Maintenance For Equipment Listed In Paragraph 3.2 Will Be Performed By Contractor. Contractor Will Provide (at No Additional Cost) Any Part(s) Found Out Of Manufacture Specification During The Preventive Maintenance Inspection Activities. Contractor Shall Assist With Planned Maintenance, Quality Assurance And Safety Checks. Scheduling Of Preventive Maintenance Will Be Coordinated Between The Contractor And The Contract Cor. 3.4 All Services For This Contract Must Meet Manufacturer Performance And Technical Specifications, Federal Regulations, And Other Specifications That May Apply Such As National Electric Code (nec), Life Safety Code (lsc), Joint Commission (jc), And Va Regulations. 3.5 The Contractor Shall Only Respond To Service Calls Placed By Biomedical Engineering To Include: The Contracting Officer S Representative (cor) Or Point Of Contact (poc). Personnel Will Be Stated In The Contract. 3.6 The Contractor Accessing The Listed Equipment Must Have An Approved Va Vpn Network Account Established (existing Mou/isa). All Vpn Accounts Will Be Coordinated Through The Facilities Iso (information Security Officer) And Will Comply With All Va Regulations And Standards To Include Oa&mm Information Letter (il 90-01-6) Dated July 16, 2001. Additionally, The Contractor Will Be Responsible For Adhering To The Following Security Requirements/clauses: 3.7 Contractor Shall Provide All Manufacture Required Hardware And Software Updates, Upgrades, Patches, Revisions And Licenses And Service Keys At No Additional Charge To The Hstmvh. 3.8 All Service Engineers Must Report To The Fm Office (building 22) To Sign In Before Work Is Begun On The Premises Of The Hstmvh And Must Also To Sign Out After Work Has Been Completed. The Contractor Must Furnish A Detailed Field Service Report, Or Equivalent, Showing Work Completed, Listing All Repairs And/or Repair Parts Used To Maintain Operating Efficiency Of The Equipment. When Possible, This Report May Be Delivered To Biomedical Engineering Before Contractor Leaves The Station Or Via Email To The Poc/cor. If It Is Necessary For The Contractor To Work After 4:30pm, Permission Must Be Granted From The Contract Cor/poc. If The Service Was Completed After Regular Duty Hours, The Fse Will Sign Out And Leave The Report In The Engineering Control Center, Room D019 Of The Hospital. Payment Will Be Withheld Pending Receipt Of This Report. The Service Report From The Contractor Must Contain, At A Minimum, The Following Information: a. Date And Time Of The Contractor S Arrival On Station, b. Type, Model, And Serial Number(s) Of All Equipment On Which Maintenance Was Performed, c. Total Time Spent Performing Maintenance, Excluding Travel Time, d. Detailed Narrative Description Of The Malfunction Or Pm Action Required, e. Complete List Of Parts Replaced, f. Comments As To The Cause Of The Malfunction When Applicable, g. Date And Time The Work Is Completed. 3.9 There Is A Potential For Exposure To Bloodborne Or Other Infectious Material With Equipment Throughout The Hospital. All Maintenance Persons Must Use The Universal Precautions (i.e. Decontamination Of Medical Equipment, Wearing Protective Gloves, Aprons, And Goggles) During Cleaning And Maintenance/repair Procedures Required By This Contract. Contractor Will Be Responsible For Providing Their Own Personal Protective Equipment As Applicable. 4. Personnel Qualifications upon Request By The Cor/poc, Contractor Is Required To Provide Proof Of Qualified, Trained, And Competent Personnel Performing Maintenance Services On All Listed Equipment.
Closing Date21 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Machinery and Tools...+1Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n774.4|bv5|(717) 605-3080|tyler.l.curfman.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| production Lot Testing|1|120| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|see Schedule|tbd|||n42794|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg| equal Opportunity (sep 2016)|2||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| annual Representations And Certifications (may 2024)|13|333998|700|x|x|||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| the Solicitation Response Date/time Is Extended To 27 Jan 2025 At 4:30 Pm Eastern. the Solicitation Response Date/time Is Extended To 17 Jan 2025 At 4:30 Pm Eastern. 1. This Is A Limited Competitive Navy Spare Requirement. 2. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization. 3. Quotes Shall Be Emailed To Tyler.l.curfman.civ@us.navy.mil. Quotes Shall Be Received No Later Than 4:30 Pm Eastern On The Response Date Specified In The Solicitation In Order To Be Considered. 4. Fob Destination. Quotes Shall Include Shipping Costs For Shipment Of Units To The Destination. 5. Production Lot Testing Applies For The Requirement. The Eod Technician Has 90 Days In Which To Test/inspect/accept The Production Quantity. The Contract Administrator Has An Additional 30 Days In Which To Notify The Contractor Of The Results; Total 120 Days. 6. Evaluation Factors: evaluation Utilizing Simplified Acquisition Procedures the Government Will Issue An Order Resulting From This Request For Quotation To The Responsible Offeror Whose Quotation Results In The Best Value To The Government, Considering Both Price And Non-price Factors. The Following Factors Will Be Used To Evaluate quotations In Order Of Relative Importance: 1) Price. 2) Past Performance. The Offeror's Past Performance On Related Contracts Will Be Evaluated To Determine The Following As Appropriate: Successful Performance Of Contract Requirements, Quality And Timeliness Of Delivery Of Goods And Services, Cost Management, communications Between Contracting Parties, And Customer Satisfaction. 3) Supplier Performance Risk As Described In Dfars 252.204-7024. (end Of Provision) 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Screw,machine . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=mil-std-130 | | |n |121116|a| | | document Ref Data=mil-dtl-19595 | | |d |030211|a| | | 3. Requirements 3.1 Cage Code/reference Number Items - The Screw,machine Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;99251 8324510/830-002 6djn9 830-002; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Production Lot Approval (government Testing) - Production Lot Test And Approval Is Required. 3.4 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.5 Non-magnetic Inspection Shall Be In Accordance With Mil-dtl-19595. 3.6 The Contractor Shall Notify The Government Testing Activity ;30; Days Prior To Shipment Of Material To Be Tested. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Production Lot Test - The Contractor Shall Deliver ;all; Unit(s) To ;naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division Indian Head, Md 20640-5070, Attn: Cory Legagneux.; For 100% Production Lot Testing In accordance With ;for All Requirements For Part Number 830-002/8324510 And All Associated Specifications.; . Upon Satisfactory Completion Of The Production Lot Test, The Government Facility Shall Prepare And Package The Unit(s) For Transshipment To Final Shipment Destination(s) In Accordance With The Requirements Of This Contract/purchase Order. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.4 ;all Vendors Are Required To Submit Material C Of C's On All First Article (fa) And Production Lot Testing (plt) Materials Arriving For Final Acceptance; 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Washer,lock . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=mil-std-130 | | |n |121116|a| | | document Ref Data=mil-dtl-19595 | | |d |030211|a| | | 3. Requirements 3.1 Cage Code/reference Number Items - The Washer,lock Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;99251 830-003/8324510 Rev D 6djn9 830-003; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Production Lot Approval (government Testing) - Production Lot Test And Approval Is Required. 3.4 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.5 Non-magnetic Inspection Shall Be In Accordance With Mil-dtl-19595. 3.6 The Contractor Shall Notify The Government Testing Activity ;30; Days Prior To Shipment Of Material To Be Tested. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Production Lot Test - The Contractor Shall Deliver ;all; Unit(s) To ;naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division Indian Head, Md 20640-5070, Attn: Cory Legagneux.; For 100% Production Lot Testing In accordance With ;for All Requirements For Part Number 830-003/8324510 Rev D And All Associated Specifications; . Upon Satisfactory Completion Of The Production Lot Test, The Government Facility Shall Prepare And Package The Unit(s) For Transshipment To Final Shipment Destination(s) In Accordance With The Requirements Of This Contract/purchase Order. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.4 ;all Vendors Are Required To Submit Material C Of C's On All First Article (fa) And Production Lot Testing (plt) Materials Arriving For Final Acceptance Inspection.; 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Frame,breathing App . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=mil-std-130 | | |n |121116|a| | | document Ref Data=mil-dtl-19595 | | |d |030211|a| | | 3. Requirements 3.1 Cage Code/reference Number Items - The Frame,breathing App Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;99251 820-100/8324510 Rev D 6djn9 820-100; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Production Lot Approval (government Testing) - Production Lot Test And Approval Is Required. 3.4 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.5 Non-magnetic Inspection Shall Be In Accordance With Mil-dtl-19595. 3.6 The Contractor Shall Notify The Government Testing Activity ;30; Days Prior To Shipment Of Material To Be Tested. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Production Lot Test - The Contractor Shall Deliver ;all; Unit(s) To ;naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division Indian Head, Md 20640-5070, Attn: Cory Legagneux.; For 100% Production Lot Testing In accordance With ;for All Requirements For Part Number 820-100/8324510 Rev D And All Associated Specifications; . Upon Satisfactory Completion Of The Production Lot Test, The Government Facility Shall Prepare And Package The Unit(s) For Transshipment To Final Shipment Destination(s) In Accordance With The Requirements Of This Contract/purchase Order. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.4 ; All Vendors Are Required To Submit Material C Of C's On All First Article (fa) And Production Lot Testing (plt) Materials Arriving For Final Acceptance Inspection.; 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Mask,underwater . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=mil-std-130 | | |n |121116|a| | | document Ref Data=mil-dtl-19595 | | |d |030211|a| | | 3. Requirements 3.1 Cage Code/reference Number Items - The Mask,underwater Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;99251 820-126/8324510 Rev D 6djn9 820-126; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Production Lot Approval (government Testing) - Production Lot Test And Approval Is Required. 3.4 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.5 Non-magnetic Inspection Shall Be In Accordance With Mil-dtl-19595. 3.6 The Contractor Shall Notify The Government Testing Activity ;30; Days Prior To Shipment Of Material To Be Tested. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Production Lot Test - The Contractor Shall Deliver ;all; Unit(s) To ;naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division Indian Head, Md 20640-5070, Attn: Cory Legagneux.; For 100% Production Lot Testing In accordance With ;for All Requirements For Part Number 820-126/8324510 Rev D, And All Associated Specifications.; . Upon Satisfactory Completion Of The Production Lot Test, The Government Facility Shall Prepare And Package The Unit(s) For Transshipment To Final Shipment Destination(s) In Accordance With The Requirements Of This Contract/purchase Order. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.4 ;all Vendors Are Required To Submit Material C Of C's On All First Article (fa) And Production Lot Testing (plt) Materials Arriving For Final Acceptance Inspection.; 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Valve,breathing App . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=mil-std-130 | | |n |121116|a| | | document Ref Data=mil-dtl-19595 | | |d |030211|a| | | 3. Requirements 3.1 Cage Code/reference Number Items - The Valve,breathing App Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;99251 810-050/8324510 6djn9 810-050; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Production Lot Approval (government Testing) - Production Lot Test And Approval Is Required. 3.4 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.5 Non-magnetic Inspection Shall Be In Accordance With Mil-dtl-19595. 3.6 The Contractor Shall Notify The Government Testing Activity ;30; Days Prior To Shipment Of Material To Be Tested. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Production Lot Test - The Contractor Shall Deliver ;all; Unit(s) To ;naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division Indian Head, Md 20640-5070, Attn: Cory Legagneux.; For 100% Production Lot Testing In accordance With ;for All Requirements For Part Number 810-050/8324510 And All Associated Specifications.; . Upon Satisfactory Completion Of The Production Lot Test, The Government Facility Shall Prepare And Package The Unit(s) For Transshipment To Final Shipment Destination(s) In Accordance With The Requirements Of This Contract/purchase Order. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.4 ; All Vendors Are Required To Submit Material C Of C's On All First Article (fa) And Production Lot Testing (plt) Materials Arriving For Final Acceptance Inspection.; 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Bit,mouthpiece,brea . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=mil-std-130 | | |n |121116|a| | | document Ref Data=mil-dtl-19595 | | |d |030211|a| | | 3. Requirements 3.1 Cage Code/reference Number Items - The Bit,mouthpiece,brea Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;99251 810-027/8324510 Rev D 6djn9 810-027; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Production Lot Approval (government Testing) - Production Lot Test And Approval Is Required. 3.4 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.5 Non-magnetic Inspection Shall Be In Accordance With Mil-dtl-19595. 3.6 The Contractor Shall Notify The Government Testing Activity ;30; Days Prior To Shipment Of Material To Be Tested. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Production Lot Test - The Contractor Shall Deliver ;all; Unit(s) To ;naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division Indian Head, Md 20640-5070, Attn: Cory Legagneux.; For 100% Production Lot Testing In accordance With ;for All Requirements For Part Number 810-027/8324510 Rev D, And All Associated Specifications.; . Upon Satisfactory Completion Of The Production Lot Test, The Government Facility Shall Prepare And Package The Unit(s) For Transshipment To Final Shipment Destination(s) In Accordance With The Requirements Of This Contract/purchase Order. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.4 ;all Vendors Are Required To Submit Material C Of C's On All First Article (fa) And Production Lot Testing (plt) Materials Arriving For Final Acceptance Inspection.; 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cover . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=mil-std-130 | | |n |121116|a| | | document Ref Data=mil-dtl-19595 | | |d |030211|a| | | 3. Requirements 3.1 Cage Code/reference Number Items - The Cover Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;99251 810-038/8324510 Rev D 6djn9 810-038; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Production Lot Approval (government Testing) - Production Lot Test And Approval Is Required. 3.4 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.5 Non-magnetic Inspection Shall Be In Accordance With Mil-dtl-19595. 3.6 The Contractor Shall Notify The Government Testing Activity ;30; Days Prior To Shipment Of Material To Be Tested. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Production Lot Test - The Contractor Shall Deliver ;all; Unit(s) To ;naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division Indian Head, Md 20640-5070, Attn: Cory Legagneux.; For 100% Production Lot Testing In accordance With ;for All Requirements For Part Number 810-038/8324510 Rev D,and All Associated Specifications.; . Upon Satisfactory Completion Of The Production Lot Test, The Government Facility Shall Prepare And Package The Unit(s) For Transshipment To Final Shipment Destination(s) In Accordance With The Requirements Of This Contract/purchase Order. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancel
Closing Date27 Jan 2025
Tender AmountRefer Documents 

City Government Iligan Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Bid The Iligan City Government Bids And Awards Committee (bac), Through General Fund-20% / Dev. Fund, Intend To Apply The Sum Of P 1,622,577.91 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Improvement Of Brgy. Health Center, Temp. Room Extension - Iligan Health Center, Brgy. Del Carmen, Iligan City With Project No. Cb(b)-25-002 (ceo-infra). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Improvement Of Brgy. Health Center, Temp. Room Extension - Iligan Health Center, Brgy. Del Carmen, Iligan City General Requirements • Installation Of Project Billboard • Occupational Safety And Health Program • Mobilization And Demobilization Removal Of Structures And Obstruction • Remove And Replace Ceiling Board At Abtc And Roof Eaves • Demolish Chb Wall Partition At Utility Access And Female Toilet • Remove And Replace Doors And Jambs • Demolish Some Chb Wall Partition For Door Opening At Doffing Station Level 01 & 02 • Demolish Plant Box At Receiving Area For Stairs Earthworks • Excavation Work For Pedestal Footings • Gravel Bedding For Pedestal Footings • Backfilling Of Common Soil Using Excavated Soil Must Be Compacted Layer By Layer Concrete Work, Formwork & Scaffolding • Pedestal Column And Zocalo For Waiting Area And Receiving Area • Slab For Waiting Area And Receiving Area • Sputum Collection At Injection Area And Laboratory Steel Reinforcements • Pedestal Column And Zocalo For Waiting Area And Receiving Area • Slab For Waiting Area And Receiving Area • Masonry Wall Reinforcement • Sputum Collection At Injection Area And Laboratory Steel Works • Rectangular Tube 50 X 75 X 1.2mm For Purlins At Waiting Area And Receiving Area • Rectangular Tube 50 X 100 X 1.2mm For Rafter And Column At Waiting Area And Receiving Area Masonry & Plastering Works • 100mm Thk. Chb Wall Partition For Counseling Room • 100mm Thk. Chb Wall For Additional Pwd Toilet, Female Toilet And Sputum Collection Ceiling Works • Replace Ceiling Board At Tb Dots/ Is Dots With 4.5mm Thk. Fiber Cement Board • Replace Ceiling Board At Roof Eaves With Pvc Ceiling Panel Dry Wall Partition • Install Drywall Partition At: - File/ Stock Room & Medical Supplies Room - Examination/ Treatment Area - Arv & Supplies Storage Area - Consultation Room And Laboratory Roofing Works • Install 3mm Polycarbonate Solid Sheet For Roofing At Waiting Area And Receiving Area Tile Works • Installation Of 300mm X 300mm Ceramic Floor Tiles (non-skid) At Additional Pwd Toilet Floor And Female Toilet • Installation Of 300mm X 300mm Ceramic Wall Tiles (glossy) At Additional Cr Wall, Female Toilet And Sink Electrical Works • Remove Lighting And Wirings In The Two Rooms To Be Renovated • Installation Of Conduits ,junction Box ,utility Box • Installation Of New Electrical Wire ,switches , Aircon Outlet • Installation Of Lighting Fixture In Its New Location According The Electrical Plan (note Use The Old Lighting Fixture) • Lighting Circuits Must Be Connect In Circuit No. 1 And Circuit No. 5 As Refer To The Electrical Plan • Additional Aircon Outlet Installed Must Be Connected To Electrical Panelboard Spare Plumbing Works • Pipes (water, Waste And Soil) For Additional Pwd Toilet, Female Toilet And Sputum Collection • Replace P-trap In Every Sink • Installation Of Water Closet, Lavatory And Faucet • Install Of Grab Bar Ss 304 L 49 X W 7.5 X H 6 Cm, Grab Bar,vertical Wall Support 32mmø Ss304 Painting Works • Repaint Existing Interior Ceiling Board • New Paint For Ceiling Board At Abtc (tb Dots/ Is Dots) • New Paint For Interior Chb Wall Partition At Counseling Room And Additional Pwd And Female Toilet • Paint Steel Rafter, Purlins And Steel Columns • Seal Joints At Drywall And Ceiling Using Gypsum Putty Doors And Windows • W1- 2250mm X 1500mm Analok- Aluminum Framed, 6mm Thk. Fixed Glass Window • D1- 800mm X 2100mm Wooden Panel Door (kiln Dried) With 50 X 150 Mm Door Jamb And Complete Accessories • D2- 1300mm X 2100mm Double Swing Flush Door With Vision Glass ,50 X 150 Mm Door Jamb And Complete Accessories • D3- 1000mm X 2100mm Wooden Flush Door With Exhaust, 50 X 150 Mm Door Jamb And Complete Accessories • D4- 600mm X 2100mm Wooden Flush Door With Exhaust, 50 X 150 Mm Door Jamb And Complete Accessories • D5- 1?00mm X 2650mm Analok- Aluminum Framed,6mm Thk. Sliding Glass Door With Complete Accessories • D6- 1600mm X2650mm Accordion Door With Complete Accessories • Dw1- 2200mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories • Dw2- 2350mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories • Dw3- 2375mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories • Dw4- 4850mm X 2650mm Analok- Aluminum Framed,6mm Thk. Swing Glass Door With Transom & Complete Accessories I. General Requirements A. Project Billboard (q = 1.00 Lot) Includes 4' X 8' Tarpaulin, 8' X 8' Tarpaulin, Rx 3"x 14" Coco Lumber, 2"x 3"x10" Coco Lumber, 2"x 2" X8" Coco Lumber, Assorted Sizes C.w. Nails. B. Occupational Safety And Health Program (q = 1.00 Lot) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe. C. Mobilization / Demobilization (q = 1.00 Lot) Ii. Removal Of Structures And Obstruction (q = 1.00 Lot) Includes Remove And Replace Ceiling Board At Abtc (new Tb Dots/is Dots) And Roof Eaves, Demolish Chb Wall Partition At Utility Access And Female Toilet, Remove And Replace Doors And Jambs, Demolish Some Chb Wall Partition For Door Opening At Doffing Station Level 01 & 02, Demolish Plant Box At Receiving Area For Stairs. Iii. Earthworks (q = 2.88 Cu.m.) Includes Volume To Be Excavated, Volume Of Gravel Bedding. Iv. Concrete Work, Formwork & Scaffolding (q = 3.45 Cu.m.) Includes Portland Cement, Washed Sand, Washed Gravel, Marine Plywood 12mm Thk. X 4' X 8', 2" X 3" X 8' Coco Lumber, 2" X 2" X 8' Coco Lumber, Assorted Sizes C.w. Nails. V. Steel Reinforcements (q = 312.42 Kgs.) Includes 10mm Ø Dsb X 6m, 12 Mm Ø Dsb X 6m, No. 16 G.i. Tie Wire. Vi. Steel Works (q = 299.56 Kgs.) Includes Rectangular Tube 50 X 75 X 1.2 X 6000 Mm, Rectangular Tube 50 X 100 X 1.2 X 6000 Mm, Welding Rod (6011), Baseplate 12mm X 8"x16", 1/2" X 4" Expansion Bolt, Stud Anchor M8x75mm, 4" Cutting Disk, 4" Grinding Disk. Vii. Masonry & Plastering Works (q = 43.27 Sq.m.) Includes 4" Chb 700psi, Portland Cement, Washed Sand,injectable Chemical Anchor. Viii. Doors And Windows (q = 37.00 Set) Includes Wl: 2250mm X 1500mm Analok- Aluminum Framed, 6mm Thk. Fixed Glass Window; Dl: 800mm X 2100mm Wooden Panel Door (kiln Dried) With 50 X 150 Mm Door Jamb And Complete Accessories; D2: 1200mm X 2100mm Double Swing Flush Door With Vision Glass , 50 X 150 Mm Door Jamb And Complete Accessories; D3: 900mm X 2100mm Wooden Flush Door With Exhaust, 50 X 150 Mm Door Jamb And Complete Accessories; D4: 600mm X 2100mm Wooden Flush Door With Exhaust, 50 X 150 Mm Door Jamb And Complete Accessories; Ds: 1700mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Sliding Glass Door With Complete Accessories; D6: 1600mm X2650mm Accordion Door With Complete Accessories; D7: 900mm X2100mm Wooden Flush Door W/50 X 150 Mm Door Jamb And Ss Lick Plate With Complete Accessories; Dwl: 2200mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories; Dw2: 2350mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories; Dw3: 2375mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories; Dw4: 4850mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories; Ss Lever Type Lockset, Heavy Duty; Ss Knob Type Lockset, Heavy Duty. Ix. Painting Works (q = 372.77 Sq.m.) Includes Skim Coat (20kg/pack), Pennacoat Rat Latex, Masonry Putty, Red Oxide Primer, Quick Drying Enamel, Paint Thinner, Paint Roller 7" W/ Paint Tray, Paint Brush 2-1/2 ", Sand Paper (assorted Sizes), Tape Fiberglass Mesh (48mm X 30m), Gypsum Putty (5kg/gal). X. Ceiling Works (q = 177.65 Sq.m.) Includes 4.5mm Thk X 4" X 8" Ficem Board, Blind Rivets, 1000pcs/box; Riveter. Xi. Dry Wall Partition (q = 90.09 Sq.m.) Includes 4.5mm Thk X 4' X 8' Ficem Board; Metal Studs, 0.50mm Thk. X 2" X 3" X 2" X 3.00m; Metal Tracks, 0.50mm Thk. X 2" X 3" X 2" X 3.00m; Hardiflex Screw ( Rat Head) #7x 25mm (500 Pcs); Blind Rivets, 1000pcs/box. Xii.roofing Works ( Q = 27.05 Sq.m.) Includes 4' X 8' X 3mm Polycarbonate Solid Sheet, Analok Flat Bar 1/8" X 1" X 16ft, Tek Screw 12 X 65mm (100pcs). Xiii.tile Works (q = 27.71 Sq.m.) Includes 300mm X 300mm Ceramic Floor Tiles (non-skid), 300mm X 300mm Ceramic Wall Tiles, Tile Grout (2kg), Tile Adhessive 25kg (heavy Duty), Portland Cement, Washed Sand, Diamond Cutter Wheel. Xiv. Electrical Works ( Q = 1.00 Lot) Includes Led Panel Light 20w 30x30cm Daylight Recessed Type 230vac; Single Gang Switch 230v; Three Gang Switch 230v; T8 Led Tube Light,18w,43x1220x31mm,g13,single Ended W/ Fixture; Junction Box; Utility Box; Aircon Outlet 20a 230vac; 3.smm2 Thwn-2 Stranded Copper Wire; 8.0mm 2 Thwn-2 Stranded Copper Wire; Electrical Pvc 20mm Schedule 40; Electrical Tape 0.16mmx19mmx16m; Circuit Breaker 50at Bolt On 10kaic. Xv.plumbing Works (q = 1.00 Lot) Includes Stainless Steel Lavatory Faucet, Heavy Duty; Two Piece Water Closet, 705x400x775mm; Lavatory , 500x655x835mm; Stainless Sink, Heavy Duty; Grab Bar Ss 304 L 49 X W 7.5 X H 6 Cm; Grab Bar Vertical Wall Support 32mm0 Ss304; Floor Drain 100x150xx2.7mm; 4" Dia. Pvc Wye; 4" Dia. Pvc Coupling; 4" Dia. Pvc Clean Out; 4" Dia. Pvc Elbow, 1/8 Bend; 4" Dia. X 10' Pvc Pipe, S-1000; 2" Dia. Pvc P-trap; 2" Dia. Pvc Wye; 2" Dia. Pvc Elbow, 1/8 Bend; 2" Dia. Pvc Elbow, 1/4 Bend; 2" Dia. X 10' Pvc Pipe, S-1000; 3 Way Angle Valve; Pvc Cement, 400cc; 1/2" Dia. G.i. Elbow; 1/2" Dia. G.i.tee; 1/2" Dia. G.i. Coupling; 1/ 2" Dia. X 20' G.i. Pipe; Teflon Tape (big). Approved Budget For The Contract (abc): P 1,622,577.91 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within Ninety (90) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Bac Office, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Issuance Of Bid Documents: January 7 – January 28, 2025 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 2. Pre-bid Conference: January 14, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 3. Submission Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4 . Opening Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 5,000.00 To The Iligan City Government Cashier, At The Bac Office, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City.the Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: January 7, 2025 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 25-002 (ceo-infra)
Closing Date28 Jan 2025
Tender AmountPHP 1.6 Million (USD 27.6 K)

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| time Of Delivery (june 1997)|20|0001aa|5 Ay|tbd|0001ab|15 Ay|tbd||||||||||||||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n /a|see Dd Form 1423 | Port_ptnh_wawf_notification@navy.mil | navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2||| integrity Of Unit Prices (nov 2021)|1|| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| small Business Subcontracting Plan (sep 2023)|4||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (jan 2023)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic (nov2023))|5|||||| requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7|||||||| list Of Award Attachments|5|||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (nov 2023))|5|||||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (mar 2023)|13|332919|750|||||||||||| type Of Contract (apr 1984)|1|firm Fixed| alterations In Solicitation (apr 1984)|3|||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| dd1423 Data Item A001 May Be Waived If Already On File Atnavsup Wss Mechanicsburg. any Contract Awarded As A Result Of This Solicitation Will Be Do Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;s1e10203 99517 G B s3c10053 99517 E B s3c10054 99517 E B v3e10103 99517 J B v3d10436 99517 E B v3d10425 99517 G B v3d10424 99517 D B f3c10321 99517 D B wi-s1e10203 99517 A B ptp-s1e10203-03 99517 C B; document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-b138 | | | |110101|a| | | document Ref Data=astm-b150 | | | |190401|a| | | document Ref Data=astm-a182 | | |a |191101|a| | | document Ref Data=astm-a240 | | |a |201115|a| | | document Ref Data=astm-a262 | | | |150901|a| | | document Ref Data=astm-a574 | | | |211201|a| | | document Ref Data=astm-a581 | | |b |950910|a| | | document Ref Data=astm-a582 | | | |211101|a| | | document Ref Data=astm-f606 | | | |191115|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=sae Ams 5643 | | |v |180101|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=s9074-aq-gib-010/248 | | | |950801|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=astm-f606 | | | |191115|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;complete Pressure Reducing Manifold Assembly To Be In Accordance With Vacco Drawing S1e10203, Assembly Part Number S1e10203-03 With Vacco Document Wi-s1e10203, Except As Amplified Or Modified Herein.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: ;vacco Drawing S1e10203, Assembly Part Number S1e10203-03 (manifold Assembly); part - ;body, Item 1; material - ;sae Ams-qq-s-763, Class 304, Condition A Or Astm-a182, Class 304 Or Astm-a240, Class 304; part - ;filter Cap, Item 2 And Tube, Item 8; material - ;astm-a582, Type 303; part - ;port Adapter (inlet), Item 3; Port Adapter (outlet), Item 7; Inlet Thread Piece, Item 12; And Outlet Thread Piece, Item 13; material - ;sae Ams 5643, Condition H-1025; part - ;self-locking Socket Head Cap Screws, Items 23, 27, 28, 29, 30, 31, 32, And 34; material - ;sae Ams 5643, Condition H-1025 With Self-locking Element Per Mil-dtl-18240; part - ;plug, Item 4; material - ;astm-a581, Type 303 Or Astm-a582, Type 303; ;vacco Drawing S3c10053, Assembly Part Number S3c10053-01 (gage Connector); part - ;body, Item 1; material - ;sae Ams-qq-s-763, 300 Series Or Astm-a582, 300 Series; part - ;stem, Item 2; material - ;sae Ams 5643, Condition H-1025 With Self-locking Element To Meet The Intent Of Mil-dtl-18240, Type N; ;vacco Drawing S3c10054, Assembly Part Number S3c10054-01 (pressure Bleed Block); part - ;body, Item 1; material - ;astm-a582, 300 Series Or Sae Ams-qq-s-763, 300 Series; part - ;stem, Item 2; material - ;sae Ams 5643, Condition H-1025 With Self-locking Element To Meet The Intent Of Mil-dtl-18240, Type N; ;vacco Drawing V3e10103, Assembly Part Number V3e10103-02 (pressure Regulator); part - ;poppet, Item 4 And Guide, Item 17; material - ;sae Ams 5643, Condition H-1025; part - ;seat Retainer, Item 2; material - ;sae Ams 5643, Condition H-1025 With Self-locking Element To Meet The Intent Of Mil-dtl-18240, Type N; part - ;self-locking Socket Head Cap Screws, Item 28; material - ;sae Ams 5643, Condition H-1025 With Self-locking Element Per Mil-dtl-18240, Type L; part - ;seat Plate, Item 10; material - ;sae Ams 5643, Condition H-1150; part - ;dome Cap, Item 21; material - ;sae Ams-qq-s-763, Class 304, Condition A; part - ;retainer, Item 5; material - ;astm-a582, Type 303; part - ;plug, Item 29 And Bleed Plug, Item 30; material - ;sae Ams-qq-s-763, Class 304, Condition A With Self-locking Element To Meet The Intent Of Mil-dtl-18240, Type N; ;vacco Drawing V3d10436, Assembly Part Number V3d10436-01 (loading Block); part - ;body, Item 1 And Orifice Block, Item 2; material - ;sae Ams-qq-s-763, Class 304, Condition A; part - ;seat, Item 3; material - ;astm-b138, C67500 Or Astm-b150, Alloy C62400 Or Alloy C63200; part - ;stem, Item 5; material - ;sae Ams 5643, Condition H-1025; part - ;gland, Item 6; material - ;astm-b138, Alloy C67500, Half Hard; ;vacco Drawing V3d10425, Assembly Part Number V3d10425-01 (inlet / Bypass Valve); part - ;bonnet, Item 4; material - ;astm-a582, Type 303, Condition A; part - ;poppet, Item 3; material - ;sae Ams 5643, Condition H-1025; ;vacco Drawing V3d10424, Assembly Part Number V3d10424-01 (outlet Valve); part - ;bonnet, Item 1; material - ;astm-a582, Type 303; part - ;orifice Block, Item 2 And Poppet, Item 3; material - ;sae Ams 5643, Condition H-1025; ;vacco Drawing F3c10321, Assembly Part Number F3c10321-225 (dp Indicator); part - ;body, Item 1 And Bonnet, Item 4; material - ;astm-a582, Type 303; part - ;adjusting Screw, Item 9; material - ;astm-a582, Type 303 With Self-locking Element To Meet The Intent Of Mil-dtl-18240, Type N; part - ;piston, Item 2; material - ;sae Ams 5643, Condition H-1025; 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below. test - ;visual Inspection (root And Final Layer); item - ;weldments; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035; test - Non-destructive Tests item - ;weld Repair And/or Production Weld (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining) item - ;item 1 Of Drawing S1e10203; Item 1 Of Drawing S3c10053; Item 1 Of Drawing S3c10054; Items 21, 29, And 30 Of Drawing V3e10103; And Items 1 And 2 Of Drawing V3d10436; performance - Sae-ams-qq-s-763 acceptance - Sae-ams-qq-s-763 test - ;quality Conformance Tests; item - ;each Manifold Assembly; performance - ;ptp-s1e10203-03; acceptance - ;ptp-s1e10203-03; test - ;liquid Penetrant Inspection; item - ;items 23, 27, 28, 29, 30, 31, 32, And 34 Of Drawing S1e10203 And Item 28 Of Drawing V3e10103; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - Intergranular Corrosion Testing item - ;item 1 Of Drawing S1e10203 (only For Astm-a240 Material); performance - Astm-a262, Practice E acceptance - Astm-a262 3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.5 Heat Treat Requirements - Mechanical Properties (via Tension Testing And Hardness Testing If Hardness Is Required By The Applicable Material Specification) Are Required For Each Heat In Each Heat Treat Charge For Astm-a234, Astm-a403, Astm-a182, And astm-a105 Material. 3.5.1 If Heat Treatment Is Performed In Continuous-type Furnaces With Suitable Temperature Control And Equipped With Recording Pyrometers So That Complete Heat-treatment Records Are Available, A Heat-treatment Charge Must Be Considered As Any Continuous Run not Exceeding An 8-hr Duration. One Tension Test Must Be Taken From One Forging Per Heat In Each Heat Treatment Charge At A Minimum Of Every 8 Hours. 3.5.2 Certification Of Mechanical Properties (mechanical Analysis, Tension Testing) Must Include The Condition Furnished. The Contractor Must Maintain A Complete Record On File Of The Heat Treatment Given Each Piece, Including Stress Relief. The Contractor must Provide Either The Record Of The Final Heat Treatment Or A Heat Treatment Certification Statement. The Certification Statement Must Be Signed By The Heat-treater And Include The Date Of Heat Treatment, Duration And Temperature Of Heat Treatment Operations and Quenching Medium (if Required). 3.6 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate fasteners From Those Required For The Yield Test. 3.6.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1. 3.6.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used. a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge. b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge. c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows: sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable. 3.6.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot. 3.7 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.8 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887355434; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.9 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications, or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.10 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.11 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.11.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.11.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.11.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.12 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.12.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.13 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.13.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.13.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.13.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.14 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.15 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.16 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.17 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.17.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.17.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.17.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.17.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.17.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.17.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.17.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.17.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.17.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.17.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.17.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.17.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.18 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.18.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.18.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.18.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.18.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.18.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.19 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.19.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.19.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.20 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.20.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.20.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.20.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.20.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.20.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.21 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.21.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.21.2 Inspection For Completeness And Proper Type. 3.21.3 Verification Of Material Quality Received. 3.21.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.21.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.21.6 Identification And Protection From Improper Use Or Disposition. 3.21.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.21.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.21.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.22 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.22.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.23 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.23.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.23.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.23.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.23.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ; 3.24 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.24.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.24.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.24.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.24.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.24.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.25 Material Handling - The Written Material Control Process Must Include The Following: 3.25.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.25.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.25.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.25.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.25.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.25.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.26 Receiving Inspection - 3.26.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.26.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.27 Discrepancy Reporting - 3.27.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.28 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.28.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.28.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.28.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.28.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.29 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222. Sae-ams-5643, Condition H-1025 Material Is Material Designator Smm; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds. 3.29.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.30 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.2.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.2.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.2.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.2.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.2.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.2.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.2.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.2.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.2.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.2.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.2.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.2.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.2.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.2.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.2.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.2.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.2.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.2.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.2.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.2.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.2.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.3.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ; - 10/20/2016 - Updated Ecds Url - Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed - Oct 29 2010 - Added Sampling Std For Li In-process Testing - Feb 03 2011 - Clarified Intergranular Corrosion Test On Raw Stock - Oct 22 2012 - Identified Intergranular Corrosion Test Material Classes - Dec 17 2011 - Began Using Ecds For Submis
Closing Date8 Jan 2025
Tender AmountRefer Documents 
5051-5060 of 5070 archived Tenders