Details: Contact Information|4|n792.14|lrd|see Email|helen.i.carmelo.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00383|tbd|tbd|see Schedule|see Schedule |see Schedule||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|1 Year After Date Of Delivery|45 Days From Discovery Of Defect|||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|334514|850 Emp|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
offerors Shall Submit Proposals Via Neco Or Email Only.
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;brandywine Communications; Drawing Number ( ;03nf8; ) ;025000001; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
time Distribution S ;025000001; P/n, ;7rh 6625 015855245 P8; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
time Distribution S ;boeing; Company Name , ;mail Stop 45-24 P.o. Box 3707, Seattle Wa 98124-220; Address , ;81205; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Soon31 Jan 2025
Tender AmountRefer Documents
The Village Of Cachovice Tender
Others
Corrigendum : Closing Date Modified
Czech Republic
Details: The subject of the Public Order is Construction Work and Related Supplies Consisting of the Construction of Partially New Sidewalks and the Reconstruction (modification) of Existing Sidewalks in the Municipality of Čachovice in the Central Bohemian Region. Modifications of Existing Bus Stops are part of the Solution. The reconstruction and addition of sidewalks is divided into 14 separate sections. A more detailed specification of the subject of the public contract is given in other parts of the tender conditions of the public contract, i.e. Binding Sample Contract for the Work (hereinafter referred to as the "contract"), in the Project Documentation for the Implementation of Construction and the Assignment of Construction with the Title: "increase in Safety Transportation in the Municipality of Čachovice" (hereinafter referred to as the "project Documentation") and the List of Construction Works prepared on its basis, Supply And Services With Bill Of Quantities.
Closing Date7 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Machinery and Tools
United States
Details: This Is A Combined Synopsis/solicitation For Commercial Items And Services Prepared In Accordance With (iaw) The Format In Subpart 12.6 “streamlined Procedures For Evaluation And Solicitation For Commercial Items”, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Proposals Are Being Requested And A Written Solicitation Will Not Be Issued.
the Purpose Of This Requirement Is To Provide The Fleet Readiness Center South West (frcsw) Preventative Maintenance And Service On Eighteen (18) Machines Manufactured By Dmg Mori, Mori Seiki, And Fastems. The Work To Be Performed Under The Contract Will Include Preventative Maintenance, Emergent Service And Scheduled Service Repairs, And Over And Above Work.
set Aside: None. This Will Be A Full And Open Competition. Naics Code For This Announcement Is 811310.
solicitation Closing Date: All Proposals Must Be Received By The Closing Date/time On December 9, 2024 At 4:00 Pm Est. Preferred Delivery Method For Submission Of Your Proposal Is Via Dod Safe. A Dod Safe Link Will Be Provided By Contacting Amanda Taylor, At Email: Amanda.j.taylor80.civ@us.navy.mil. Requests Shall Be Made Within 7 Calendar Days Of The Closing Of The Solicitation. Proposals Shall Include At A Minimum, The Following:
unit Pricing Per Line Item As Shown On The Separately Attached Schedule Of Items Table;
vendor Contact Name, Phone Number And Email Address
company Cage Code And Duns Number/unique Entity Id Number
business Size: Small/large/other: _______________
to Obtain Or Renew A Duns Number And/or Cage Code, Please Visit Https://beta.sam.gov/.
all Companies Must Be Registered In The System For Award Management At Https://beta.sam.gov/ To Be Considered For Award. The Government Will Not Provide Contract Financing For This Acquisition. Invoice Instructions Shall Be Provided At Time Of Award
note: A Price Matrix Table Has Been Provided As A Separate Attachment To Assist With Supplying The Required Pricing And Vendor Contact Information.
contract Type: Under Far Part 13.5 The Government Intends To Award A Single Firm Fixed Price (ffp) Contract.
description Of Requirement:
the Commander, Fleet Readiness Center (comfrc) Procurement Group (pg), In Support Of The Fleet Readiness Center Southwest (frcsw) – North Island, Intends To Procure Preventative Maintenance And Emergent Repair Services For 18 Cnc Machines Manufactured By The Following: Dmg Mori, Dmg Mori/burener Maschinenfabrik, Mori Seiki, And Fastems. The Requirement Will Include Providing Preventative Maintenance, Emergent And/or Scheduled Maintenance, And Over And Above Work.
please See Attached Statement Of Work And Cdrls For Full Requirements
warranties: A Warranty Shall Be Provided For A Minimum Of Twelve (12) Months (e.g. 365 Days) That Follows “start-up, System(s) Testing, And Acceptance/recognition Of Project Completion,” By The Government And Final Payment Acceptance By The Contractor. Please See Attached Statement Of Work For Additional Warranty Requirements.
place Of Performance, Inspection, And Acceptance: Deliver Fob Destination, Services Shall Start No Later Than Fifteen (15) Days From Date Of Contract Award.
address For Delivery And Place Of Performance: Frcsw Nas North Island Bldgs 347 And 472, San Diego, Ca 92135
list Any Acceptance Criteria: All Or None Basis.
conformance To Sow: You Must Provide The Supplies And Services In Accordance With The Statement Of Work. Unless An Exception Is Specifically Noted Within Your Proposal, Your Proposal Will Be Considered To Be In Complete Conformance To The Solicited Requirements.
submissions: The Provision At 52.212-1, Instructions To Offerors-commercial, Applies To This Acquisition, And Is Amended As Follows:
the Offeror Agrees To Hold The Prices In Its Offer Firm For 120 Calendar Days From The Date Specified For Receipt Of Offers.
the Response Will Consist Of The Following:
part I – The Proposal Consists Of A Cover Page That Is Signed And Includes The Authorizing Point-of-contact. In Doing So, The Offeror Agrees To The Contract Terms And Conditions As Written In The Solicitation, With Attachments. The Cover Letter May State Any Delineating Exceptions Taken To The Solicitation Terms And Conditions With Accompanying Rationale. However, Offerors Are Cautioned That Any Noncompliance With The Terms And Conditions Of The Solicitation May Cause Their Quote To Be Determined Not Eligible For Award. Offerors Shall Ensure That All Clauses And Provisions That Require "fill In" Information Are Appropriately Completed (attachment 4).
part Ii - Price - Submit One (1) Electronic Copy Of The Completed Price Matrix (attachment 3) (electronic Copies Must Be Compatible With Microsoft Excel).
basis For Selection: Pursuant To Far 12.603, Contract Award Will Be Made Using Simplified Acquisition Procedures In Accordance With Far 13.5. Offeror’s Submissions Will Be Evaluated Based Upon The Following:
technical: Offeror Shall Clearly Demonstrate Its Technical Approach To Meet The Requirements Of Clin/line Items Based On The Requirements Of The Request For Proposal, Quantity, Quality And Timeliness Of Delivery.
price: The Offeror Shall Complete Clin Pricing Matrix, Attachment 4, Of This Solicitation. In Addition To The Completed Clin Pricing On Page One (1), The Offeror Shall Provide Sufficient Price Information To Allow The Contracting Officer To Determine The Completeness And Reasonableness Of The Offerors Prices.
far 52.212-2, Evaluation - Commercial Items, Applies To This Acquisition And Is Amended As Follows:
the Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Will Be Used To Evaluate Offers:
factor:
(1) Technical
(2) Price
technical Is Less Significant Than Price.
options. The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s). A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Unless A Written Notice Of Withdrawal Is Received Before Award.
this Is A Competitive Lowest Price, Technically Acceptable Acquisition Following Simplified Acquisition Procedures Iaw Far Subpart 13.5 In Which Competing Offerors Price Will Be Evaluated On A Basis Significantly More Important Than Technical. By Submission Of Its Offer In Accordance With The Instructions Provided In Clause Far 52.212-1, Instructions To Offerors, The Offeror Accedes To The Terms Of This Model Contract And All Such Offers Shall Be Treated Equally Except For Their Prices And Technical Records. Offerors Must Clearly Identify Any Exception To The Solicitation Terms And Conditions And Provide Complete Accompanying Rationale. The Evaluation Process Shall Proceed As Follows:
price Evaluation. All Offerors Will Be Ranked According To Price In Order Of Lowest To Highest Based On Their Total Evaluation Price, Including Option Prices. An Offeror’s Total Price Will Be Determined By Adding Together The 12-month Price For The Line Items For Preventive Maintenance For The Base Year And Each Option Period.
the 6-month Extension Of Services Is Iaw Far 52.217-8, "option To Extend Services" And Will Only Be Utilized If Necessary. The 6-month Extension Of Services Is Not Considered Part Of Option Period 4 And Will Be A Separate Option Exercise If It Is Utilized. However, Proposed Pricing For The 6-month Extension Will Be Based On Option Period 4 Pricing.
technical Evaluation. Beginning With The Lowest Priced Offer, The Contracting Officer Will Seek Recent And Relevant Technical Information On All Offers Based On The References Provided By The Offeror, If The Lowest Priced Evaluated Offer Is Judged Technically Acceptable, Then That Offer Represents The Best Value For The Government And The Evaluation Process Stops At This Point. Award Shall Be Made To That Offeror Without Further Consideration Of Any Other Offers. If The Lowest Priced Offeror Is Not Judged Technically Acceptable, The Next Lowest Priced Offeror Will Be Evaluated, And The Process Will Continue (in Order By Price) Until An Offeror Is Judged Technically Acceptable Or Until All Offerors Are Evaluated.
offerors Shall Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services, With Its Offer (attachment 3).
discussions: The Government Intends To Award A Purchase Order Without Discussions With Respective Vendors. The Government However, Reserves The Right To Conduct Discussions/interchanges If Deemed In Its Best Interest. Communication Conducted To Resolve Minor Or Clerical Errors Will Not Constitute Interchanges And The Contracting Officer Reserves The Right To Award A Contract Without The Opportunity For Revision. The Government Reserves The Right To Hold Interchanges Using Interchange Notices (ins) If, During The Evaluation, It Is Determined To Be In The Best Interest Of The Government. Offeror Responses To Ins Will Be Considered In Making The Award Decision. The Government May Conduct Interchanges With One, Some, None, Or All Vendors At Its Discretion.
cost Of Proposals: Expenses Incurred In The Preparation Of Proposals In Response To This Rfp Are The Vendor’s Sole Responsibility And Not Reimbursable By The Government.
invoicing And Payment: Invoices Shall Be Submitted As A 2-in-1 Or Combo Invoice Via Wide Area Workflow (wawf) To A Wawf Acceptor That Will Be Identified In The Resulting Contract Per Dfars Clause 252.232-7006 Wide Area Work Flow. It Is The Contractor’s Responsibility To Register In The Wawf System In Order To Insure Prompt Payment. Once The Invoice Is Received In Wawf, The Acceptor Will Review And If Correct Accept It For Payment.
applicable Provisions And Clauses: The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2024-07. The Government Intends To Include The Following Far And Dfar Clauses And Provisions, Either By Reference Or In Full Text In The Resulting Award.
note: The Far And Dfars Clauses May Be Accessed In Full Text At Http://www.acquisition.gov/browse/index/far.
provisions By Reference:
52.203-11
certification And Disclosure Regarding Payments To Influence Certain Federal Transactions
sep 2007
52.204-7
system For Award Management
oct 2018
52.204-16
commercial And Government Entity Code Reporting
aug 2020
52.204-17
ownership And Control Of Offeror
aug 2020
52.204-20
predecessor Of Offeror
aug 2020
52.209-7
information Regarding Responsibility Matters
oct 2018
52.209-11
representation By Corporations Regarding Delinquent Tax Liability Or A Felony Conviction Under Any Federal Law
feb 2016
52.212-1
instructions To Offerors – Commercial Items
dec 2021
52.212-3
offeror Representations And Certifications—commercial Items
dec 2021
52.217-5
evaluation Of Options
jul 1990
52.222-25
affirmative Action Compliance
apr 1984
52.223-22
public Disclosure Of Greenhouse Gas Emissions And Reduction Goals – Representation
dec 2016
52.225-25
prohibition On Contracting With Entities Engaging In Certain Activities Or Transactions Relating To Iran – Representation
jun 2020
252.203-7005
representation Relating To Compensation Of Former Dod Officials
nov 2011
252.204-7008
compliance Safeguarding Covered Defense Information Controls
oct 2016
252.204-7016
covered Defense Telecommunications Equipment Or Services- Representations
dec 2019
252.204-7017
prohibition On The Acquisition Of Covered Defense Telecommunications Equipment Or Services- Representation
may 2021
252.204-7019
notice Of Nist So 800-171 Dod Assessment Requirements
nov 2020
252.204-7024
notice On The Use Of The Supplier Performance Risk System
mar 2023
252.225-7974
representation Regarding Persons That Have Business Operations With The Maduro Regime (deviation 2020-o0005)
feb 2020
clauses By Reference:
52.203-6
restrictions On Subcontractor Sales To The Government
jun 2020
52.203-12
limitation On Payments To Influence Certain Federal Transactions
jun 2020
52.204-9
personal Identity Verification Of Contractor Personnel
jan 2011
52.204-13
system For Award Management Maintenance
oct 2018
52.204-18
commercial And Government Entity Code Maintenance
aug 2020
52.204-19
incorporation By Reference Of Representation And Certifications
dec 2014
52.204-21
basic Safeguarding Of Covered Contractor Information Systems
nov 2021
52.209-2
prohibition On Contracting With Inverted Domestic Corporations
nov 2015
52.209-6
protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarrment
nov 2021
52.211-6
brand Name Or Equal
aug 1999
52.212-1
instructions To Offerors-commercial Products And Commercial Services
nov 2021
52.212-3 Alt I
offeror Representations And Certifications- Commercial Products And Services Alternative I
nov 2021
52.212-4
contract Terms And Conditions – Commercial Items
dec 2021
52.226-8
encouraging Contractor Policies To Ban Txt Messaging While Driving
may 2024
52.232-1
payments
apr 1984
52.232-39
unenforceability Of Unauthorized Obligations
jun 2013
52.232-40
providing Accelerated Payments To Small Business Subcontractors
dec 2021
52.233-3
protest After Award
aug 1996
52.233-4
applicable Law For Breach Of Contract Claim
oct 2004
52.244-6
subcontracts For Commercial Items
jan 2022
52.245-1
government Property
jan 2017
52.245-9
use And Charges
apr 2012
52.246-4
inspection Of Services – Fixed Price
aug 1996
52.247-34
f.o.b. Destination
nov 1991
52.249-2
termination For Convenience Of The Government (fixed Price)
apr 2012
52.252-2
clauses Incorporated By Reference
feb 1998
52.253-1
computer Generated Forms
jan 1991
252.201-7000
contracting Officer’s Representative
dec 1991
252.203-7000
requirements Relating To Compensation Of Former Dod Officials
sep 2011
252.203-7002
requirement To Inform Employees Of Whistleblower Rights
sep 2013
252.204-7002
payment For Contract Line Or Subline Items Not Separately Priced
apr 2020
252.204-7003
control Of Government Personnel Work Product
apr 1992
252.204-7004
dod Antiterrorism Awareness Training For Contractors
feb 2019
252.204-7012
safeguarding Of Unclassified Controlled Technical Information
dec 2019
252.204-7015
notice Of Authorized Disclosure Of Information To Litigation Support Contractors
may 2016
252.204-7018
prohibition On The Acquisition Of Covered Defense Telecommunications Equipment Or Services
jan 2021
252.204-7020
nist Sp 800-171 Dod Assessment Requirements
nov 2020
252.211-7003
item Unique Identification And Valuation
mar 2016
252.211-7007
reporting Of Government Furnished Property
aug 2012
252.223-7008
prohibition Of Hexavalent Chromium
jun 2013
252.225-7001
buy American And Balance Of Payments Program
dec 2017
252.225-7048
export-controlled Items
jun 2013
252.227-7015
technical Data—commercial Items
feb 2014
252.227-7037
validation Of Restrictive Markings On Technical Data
sep 2016
252.232-7003
electronic Submission Of Payment Requests And Receiving Reports
dec 2018
252.232-7006
wide Area Workflow Payment Instructions
dec 2018
252.232-7010
levies On Contract Payments
dec 2006
252.232-7017
accelerating Payments To Small Business Subcontractors—prohibition On Fees And Consideration
apr 2020
252.244-7000
subcontracts For Commercial Items
jan 2021
252.246-7008
sources Of Electronic Parts
may 2018
252.247-7023
transportation Of Supplies By Sea – Basic
feb 2019
incorporated By Full Text: The Following Provisions And Clauses In Full Text Have Been Separately Attached:
52.204-24
representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment
dec 2021
52.204-25
prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment
dec 2021
52.204-26
covered Telecommunications Equipment Or Services – Representation
oct 2020
52.212-5
contract Terms And Conditions Required To Implement Statues Or Executive Orders – Commercial Items
jan 2022
52.217-8
option To Extend Services
nov 1999
52.217-9
option To Extend The Term Of The Contract
mar 2000
52.252-1
solicitation Provisions Incorporated By Reference
feb 1998
52.252-2
clauses Incorporated By Reference
feb 1998
52.252-5
authorized Deviations In Provisions
nov 2020
52.252-6
authorized Deviation In Clauses
nov 2020
questions And Inquiries Concerning This Rfp: All Questions And Inquiries Concerning Any Aspect Of This Requirement Must Be Submitted In Writing To Amanda Taylor And Tiffany Crayle, Amanda.j.taylor80.civ@us.navy.mil; Tiffany.l.crayle.civ@us.navy.mil. Telephone Requests Will Not Be Honored. Deadline For Submittal Of Questions Is December 2, 2024 At 4:00 Pm Est. The Government’s Response To Inquiries Will Be Made In Writing. Any Resulting Additions, Deletions Or Changes To The Rfp Will Be Updated On This Sam.gov Posting.
please Note: A Proposal Does Not Constitute An Award; Therefore, An Obligation To Your Company Is Not Official Until You Receive An Awarded Contract.
attachments:
attachment 1: Statement Of Work
attachment 2: Contract Data Requirement List (cdrls)
attachment 3: Price Matrix
attachment 4: Clauses And Provisions Incorporated By Full Text
Closing Date9 Dec 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Contact Information|4|n722.10|b4m|2156972486|jeremy.p.barney.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo.||tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days After Delivery Of Unit|45 Days After Defect Was Found|||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1,250|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein.
early And Incremental Deliveries Accepted.
all Terms And Conditions Are In Accordance With Boa: N00383-22-g-sh01.
\
1. Scope
1.1 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.2 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.3 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
windshield Panel,ai ;74a350002-1025; P/n, ;1560-014471104; Nsn, ;tech Data Found In Boeing Edal; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
windshield Panel,ai ;sierracin Corporation; Company Name , ;12780 San Fernando Rd, Sylmar, Ca 91342-3728; Address , ;12035; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date6 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Commercial Product Procurement Notice|5||||||
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
contract Terms And Conditions Required To Implement Statutes Or Executiveorders--commercial Products And Commercial Services (jan 2025))|83||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
continued: Contract Terms And Conditions Required To Implement Statutes Or Executive Orders--commercial Products And Commercial Services (jan 2025))|16|||||||||||||||||
offeror Representations And Certifications--commercial Products And Commercialservices (may 2024))|3||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
minimum Bid Acceptance Period (apr 1984)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (jan 2025)|12|334511|1250|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|||
evaluation--commercial Products And Commercial Services (nov 2021)|4|||||
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein.
early And Incremental Deliveries Accepted.
all Terms And Conditions Are In Accordance With Boa:n0038321gym01required Mandatory Government Sources Of Supply Have Been Reviewed Inaccordance With Far 8.002 And Dfars 208.002. None Of The Required None Of Therequired Sources Are Able To Provide The Required
item(s).
1. Scope
1.1 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document.
1.1.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements.
repair Of:
wra-tcas Processor, ; 5998015788536; Nsn , ;7517900-56106; Part Number, Shall Be Performed Iaw: Wra-tcas Processor, ;latest Approved Processes, Procedures, And Instructions; Publication (s).
1.1.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And
recommendations Via Form 1998.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
wra-tcas Processor, ;7517900-56106; P/n, ;5998015788536; Nsn, ;iaw Latest Revision; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
wra-tcas Processor, ;aviation Communication & Surveillance Sstems Llc; Company Name , ;19810 N 7th Avenue Phoenix Az 85027; Address , ;1wyd3; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Soon31 Jan 2025
Tender AmountRefer Documents
Keski Uudenmaan Sote Kuntayhtym Tender
Others
Finland
Details: Personnel transportation of social and health care Other necessary forms of transportation. The transport service must include the necessary vehicle and the driver. The total control of the transports, the Order Mediation and the Trailer Res.ds to the Order Control Centre. “Transports are mainly based on the Legislation of Social Care and Health Care. Users of the service are mainly Customers. There may also be Sote service personnel and other groups. Transports are Individual Transports on Individual Routes or they can be carried out as routes. The target may be Sote transports replace the Service Line and corresponding Transports to the Customers of the municipality. The target of the acquisille is also the Service Line Transportation of the City of Hyvinkää with the residents of the municipality, which is deliberate to transfer to Together with the Customers of Social and Health Care. The value of the Acquisn is 450 000 euros.", "The target of the acquisisessä may be a Ore transfer of goods linked to the operation of the Municipality Group as well as the transport of the Dead by the Deceased with the Ne Muary Mutual Vehicle. The terms and conditions of the procurement system are described in the Annex \"The principles of the dynamic purchasing system". “This application will establish a dynamic purchasing system for social and health services. The acquis. system is in force six (6) years from its establishment. The subscriber may continue to enter into force with a new contract notice. In the future, the contracting entity will implement changes in the services of personnel in the dynamic purchasing system as needed. In order to participate in the Offer Compet Ons, the Service Producer must submit an application for injury by responding to To this request for injury.", "The Mid-New Country Sote joint venture is responsible for maintaining the procurement system on behalf and on behalf of all contracting entities. The Central Country Society Group makes the establishment of the procurement system in accord with the Conisilleing System and subsequently the necessary procurement decisions and other solutions associated with the Procurement Procedure and inform the parties involved. Each Orderer makes Self-Purchase Agreements with Accepted Service Providers and is responsible for complying with the Agreement only on their own terms.” The first Inä Offer Plcs in the Purchase System will be sent once all Applications received within the set deadline have been processed. “Central Concepts ,” Candidate = Requirement to Leave the Service Provider.” » Request for participation = Request for Acceptance to the Dynamic Procurement System of Personal Transport Services », Request for Participation = This Document Attachment, To which the Resnsible Service Provider may submit applications for infringement.” This takes place after the final stage of the establishment of the crew." - "Provider = Accepted Service Provider that leaves the Offer by responding to the crew's In. Offer. """
Closing Date17 Jun 2027
Tender AmountRefer Documents
Bureau Of Corrections leyte Regional Prison Abuyog Leyte Tender
Others
Philippines
Details: Description Philippine Bidding Documents (as Harmonized With Development Partners) Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Government Of The Republic Of The Philippines Sixth Edition January 2025 Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….2 Section I. Invitation To Bid……………………………………………………..5 Section Ii. Instructions To Bidders…………………………………………...8 1. Scope Of Bid ………………………………………………………………………. 9 2. Funding Information………………………………………………………………. 9 3. Bidding Requirements ……………………………………………………………. 9 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 9 5. Eligible Bidders…………………………………………………………………… 9 6. Origin Of Goods ………………………………………………………………….. 10 7. Subcontracts ……………………………………………………………………… 10 8. Pre-bid Conference ………………………………………………………………. 10 9. Clarification And Amendment Of Bidding Documents …………………………… 10 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 10 11. Documents Comprising The Bid: Financial Component …………………………... 11 12. Bid Prices …………………………………………………………………………. 11 13. Bid And Payment Currencies ……………………………………………………… 12 14. Bid Security ………………………………………………………………………. 12 15. Sealing And Marking Of Bids ……………………………………………………… 12 16. Deadline For Submission Of Bids …………………………………………………. 13 17. Opening And Preliminary Examination Of Bids ………………………………….. 13 18. Domestic Preference ……………………………………………………………… 13 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 13 20. Post-qualification ………………………………………………………………… 14 21. Signing Of The Contract …………………………………………………………… 14 Section Iii. Bid Data Sheet …………………………………………………..15 Section Iv. General Conditions Of Contract ……………………...………..17 1. Scope Of Contract ………………………………………………………………… 18 2. Advance Payment And Terms Of Payment ……………………………………….. 18 3. Performance Security ……………………………………………………………. 18 4. Inspection And Tests ……………………………………………………………… 18 5. Warranty …………………………………………………………………………. 18 6. Liability Of The Supplier ………………………………………………………….. 19 Section V. Special Conditions Of Contract ………………………………….20 Section Vi. Schedule Of Requirements ……………………………………....24 Section Vii. Technical Specifications …………………………………………25 Section Viii. Checklist Of Technical And Financial Documents …………..29 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Leyte Regional Prison Abuyog, Leyte Invitation To Bid For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) 1. The Leyte Regional Prison, Through The General Appropriations Act (gaa) Of 2025 Intends To Apply The Sum Of Three Hundred Ten Thousand Pesos Only (₱310,000.00) Being The Abc To Payments Under The Contract For Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Leyte Regional Prison, Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Until December 31, 2025 From The Receipt Of Notice To Proceed (ntp) And Contract Agreement. Bidders Should Have Completed, Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Twenty-five Percent (25%) Of The Abc. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Leyte Regional Prison Bac Secretariat Using The Contact Below And Inspect The Bidding Documents At The Address Given Below During Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 17, 2025 8:00am - 5:00pm To January 24, 2025 8:00am – 8:55pm From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos Only (₱500.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees And Presented In Person. 6. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 24, 2025 @ 9:00am. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 8. Bid Opening Shall Be On January 24, 2025 @ 9:00am At The Lrp – Conference Room, Administration Building, Leyte Regional Prison. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 9. Schedule Of The Bidding Activities Shall Be As Follows: Activites Date/time Venue 1. Sale And Issuance Of Bid Documents January 17, 2025 8:00am To 5:00pm To January 24, 2025 8:00am To 8:55am Office Of The Bac/bac Secretariat, Leyte Regional Prison, Abuyog, Leyte 2. Submission And Opening Of Bid Documents January 24, 2025 @ 9:00am Conference Room, Admin Building, Lrp, Abuyog, Leyte 10. The Lrp Bac Shall Use Non-discretionary And Non-discriminatory Measure Based On Sheer Luck As A Tie-breaking Tool (draw Lots) In The Event That Two Or More Bidders Were Declared As Lcrb In-order To Determine The Final Lcrb Based On The Following: I. In Alphabetical Order, The Bidder Shall Pick One Rolled Paper Ii. The Lucky Bidder Who Would Pick A Paper With “congratulations” Remark Shall Be Declared As The Final Lcrb And Recommended For The Award Of The Contract. 11. The Leyte Regional Prison Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Jeruel Go Office Of The Bac Secretariat Leyte Regional Prison, Abuyog, Leyte Cp # 09455311532, Email: Leurejz@yahoo.com 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.bucor.gov.ph/ Www.philgeps.gov.ph Date Of Issue: January 16, 2025 Mr. Tracy B. Soriano Bac Chairperson Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Leyte Regional Prison Wishes To Receive Bids For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) With Identification Number Bid 2024-05rb. The Procurement Project For Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Is Composed Of One (1) Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Ten Thousand Pesos Only (₱310,000.00). A. The Source Of Funding Is National Expenditure Program. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That Subcontracting Is Not Allowed 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address {[insert If Applicable] And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.5. Financial Proposals For Single Or Multi-year Framework Agreement Shall Be Submitted Before The Deadline Of Submission Of Bids As Prescribed In The Ib. For Multi-year Framework Agreement, Evaluation Of The Financial Proposal During This Stage Is For Purposes Of Determining Eligibility And Whether Or Not Such Financial Proposal Is Within The Abc. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. A. Payment Of The Contract Price Shall Be Made In Philippine Pesos 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until May 24, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On January 24, 2025 @ 9:00 Am At Lrp Administrative Building Conference Room As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.1. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Any Food Catering Services. B. Completed Within The Last Two (2) Years Equivalent To At Least Twenty-five Percent (25%) Of The Abc, Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 No Further Instruction. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than ₱6,200.00, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than ₱15,500.00 If Bid Security Is In Surety Bond. 15 Electronic Copy/electronic Submission Is Not Allowed Each Bidder Shall Submit One (1) Original Copy And Three (3) Photocopies Of The First And Second Components Of Its Bid. 19.4 One Project Having Several Items That Shall Be Awarded As One Contract. 20.1 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (sales Invoice Or Official Receipt Or End-users Acceptance) 3. Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Certificate Of Compliance Occupational Safety And Health Standards Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause Delivery And Documents – Delivery Of The Catering Services Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi. Schedule Of Requirements. Delivery Time Of The Food To Be Served As Follows: Am Snacks – Not Later Than 9:30 Am Lunch – Not Later Than 11:30 Am Pm Snacks – Not Later Than 2:30 Pm Upon Delivery Of The Catering Services To The Project Site, The Supplier Shall Notify The Procuring Entity And Present The Following Documents To The Procuring Entity: (i) Original And Four Copies Of The Supplier’s Invoice Showing Goods’ Description, Quantity, Unit Price, And Total Amount; (ii) Delivery Receipt Detailing Number And Description Of Items Received Signed By The Procuring Entity’s Representative At The Project Site; (iii)certificate Of Acceptance/inspection Report Signed By The Procuring Entity’s Representative At The Project Site; For Purposes Of This Clause, The Procuring Entity’s Representative At The Project Site Is The End-user, Or His Duly Authorized Representative. When A Seminar Has Been Rescheduled Or Cancelled, Leyte Regional Prison, Reserves The Right To Cancel The Catering Service Upon Formal Notice To The Caterer Two (2) Days Prior To The Start Of The Occassions. In Such Case, Leyte Regional Prison, Has No Obligation To Pay The Supplier The Amount Corresponding To The Cancelled Catering Service. Where There Is An Increase Or Decrease Of Participants, The End-user Shall Inform The Supplier Of The Same Three (3) Days Prior The Occasion Date. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Transportation – The Transport Of The Food To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. The Procuring Entity Accepts No Liability For The Damage/spoilage Of Food During Transit. The Contract Price For The Catering Service Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Amount Stipulated In The Purchase Request (pr). After Each Occasion, The Supplier Is Responsible For Sending To The Leyte Regional Prison, A Billing Or Final Invoice For The Costs Of The Catering Service For Every Occasion Completed. It Shall Also Turn Over To The Bureau Any Remains/left Over Of The Catering Services Every End Of The Day For Its Use. 2.2 Partial Payment Is Not Allowed Cost For E-vat And Other Governmental Costs Which Fall Equally On All Prospective Suppliers Are Presumed To Be Included In The Computation Of The Bid Price 4 The Inspections And Tests That Will Be Conducted Are: The Evaluation Activities That Will Be Conducted At The Leyte Regional Prison, Upon Delivery Are As Follows: (1) Food Tasting On A Sampling Basis To Determine The Quality Of Food Served. (2) Ocular Inspection To Determine The Quantity And Completeness Of The Food Delivered In Accordance To The Menu Set In The Schedule Of Requirements. (3) Observation Before, During And After The Training Schedule To Determine The Quality Of Service Given By The Supplier. (4) Surveys Among The Participants To Determine The Level Of Satisfaction Of The Participants To The Service Rendered By The Supplier 6 Liability Of The Supplier: A. To Provide Food And Services For The Number Of Participants On The Basis Of The Information Given By The Procuring Entity Thru Df Of Pr Signed By The End-user Or Authorized Representative, At Least Two (2) Days Prior To The Training Schedule. B. During The Training, To Increase/ Decrease The Number Of Meals/snacks To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day, Provided That Written Notice Is Given By The Procuring Entity Signed By The End-user Or Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training. C. During The Training, To Adjust On Any Specific Food/diet Restrictions (religion Or Health Reasons) Of Participants’ Meals To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day Provided That Written Notice Is Given By The Procuring Entity Signed By The End-user Or Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training D. To Substitute The Menu For A Specific Training Schedule Due To Justifiable Reasons (unavailability In The Market, Red Tide, Supply And Demand Forces, Tropical Depression, Advisory Of Nonslaughter, Etc.) Provided That Notice Is Given To The Procuring Entity At Least One (1) Day Prior To The Schedule. Provided Further That The Change In The Menu Will Not Change The Unit Cost. E. To Reschedule/cancel The Seminar Due To Fortuitous Event/instances Beyond The Control Of Leyte Regional Prison F. To Provide The Necessary Clean And/or Sterile Dining Utensils During The Training As Enumerated In But Not Limited To The Following: 1) Glasses; 2) Spoons; 3) Forks; 4) Serving Spoons; 5) Cups; 6) Bowls; 7) Knives; 8) Trays; 9) Pitchers; 10) Glass Rack; 11) Ice Bucket; 12) Food Warmers; 13) Toothpicks; And 14) Condiments. G. To Provide Clean Table Cloth, Seat Covers And Table Napkins In The Designated Dining Area. H. To Assign At Least Two (2) Waiters/ Waitresses In Clean Working Garments Per Class/seminar And Shall Secure An Updated Health Certification From The Medical Health/authorized Officer. I. To Maintain A High Standard Of Sanitation And Cleanliness Of The Dining Area And Its Immediate Surroundings At All Times Adopting The Policy Of “clean As You Go”. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. State “comply” Or “not Comply” To The Statement Of Compliance. Item No. Description Quantity Delivery Schedule 1 Meals: Breakfast 620 Pax From The Receipt Of Ntp Up To December 31, 2025 Lunch 620 Pax From The Receipt Of Ntp Up To December 31, 2025 Dinner 620 Pax From The Receipt Of Ntp Up To December 31, 2025 2 Snacks: Am Snacks 620 Pax From The Receipt Of Ntp Up To December 31, 2025 Pm Snacks 620 Pax From The Receipt Of Ntp Up To December 31, 2025 The Quantity/units Is For Bidding Purposes Only. In The Actual Implementation Of The Contract, The Quantity/units That May Be Required May Increase/decrease As The Need Arises. I/we Hereby Commit To Comply And Deliver All The Above Requirements In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vii. Technical Specifications Republic Of The Philippines Department Of Justice Bureau Of Corrections Leyte Regional Prison Abuyog, Leyte Section Vii. Technical Specifications Item Specification Statement Of Compliance I The Catering Service Provider Shall Comply With The Government Regulations As Provided In Presidential Decree No. 856 Otherwise Known As “the Code On Sanitation Of The Philippines”. A. Sanitary Permit B. Health Certificate Of Food Handlers C. Quality And Protection Of Food Ii The Catering Service Provider Agrees: A. To Provide Food And Services For The Number Of Participants On The Basis Of The Information Given By The Procuring Entity Thru A Notice Signed By The Coordinator And Service Chief, Atfs Or Her Authorized Representative, At Least Two (2) Days Prior To The Training Schedule. B. During The Training, To Increase/ Decrease The Number Of Meals/ Snacks To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day, Provided That Written Notice Is Given By The Procuring Entity Signed By The Coordinator And Service Chief, Atfs Or Her Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training. C. During The Training, To Adjust On Any Specific Food/diet Restrictions (religion Or Health Reasons) Of Participants’ Meals To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day Provided That Written Notice Is Given By The Procuring Entity Signed By The Coordinator And Service Chief, Atfs Or Her Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training. D. To Substitute The Menu For A Specific Training Schedule Due To Justifiable Reasons (unavailability In The Market, Red Tide, Supply And Demand Forces, Tropical Depression, Advisory Of Nonslaughter, Etc.) Provided That Notice Is Given To The Procuring Entity At Least One (1) Day Prior To The Schedule. Provided Further That The Change In The Menu Will Not Change The Unit Cost. E. To Reschedule/cancel The Seminar Due To Fortuitous Event/instances Beyond The Control Of Leyte Regional Prison. F. To Provide The Necessary Clean And/or Sterile Dining Utensils During The Training As Enumerated In But Not Limited To The Following: 1) Glasses; 2) Spoons; 3) Forks; 4) Serving Spoons; 5) Cups; 6) Bowls; 7) Knives; 8) Trays; 9) Pitchers; 10) Glass Rack; 11) Ice Bucket; 12) Food Warmers; 13) Toothpicks; And 14) Condiments. G. To Provide Clean Table Cloth, Seat Covers And Table Napkins In The Designated Dining Area. H. To Assign At Least Two (2) Waiters/ Waitresses In Clean Working Garments Per Class/seminar And Shall Secure An Updated Health Certification From The Medical Health/authorized Officer. I. To Maintain A High Standard Of Sanitation And Cleanliness Of The Dining Area And Its Immediate Surroundings At All Times Adopting The Policy Of “clean As You Go”. Additional Requirements 1 The Lrp Shall Inform The Concessionaire Of The Total Number Of Actual Participants At Least Three (3) Days Before The Conduct Of The Training. 2 The Service Provider Shall Assure The Quality Of Food To Be Served Maintaining High Standards Of Sanitation. In The Event That That The Food Served Has Indication Of Spoilage, The Caterer Shall Be Allowed To Make Substitution Upon The Approval Of The Course Administrator. 3 The Service Provider Shall Submit Or Provide Menu Including Healthy Foods Such As Rice, Beef, Chicken, Pork, Seafoods, Vegetables, Dessert/fruits, Fruit Juice 4 The End User Can Request Specific Meals Or Snacks And Services They Prefer As Long As Requests Remain Within The Allocated Budget Per Meal, Snacks And Services 5 Subject To Increase/decrease Of Participants. 6 The Caterer Shall Serve Consumables Of One (1) Lunch And Two (2) Snacks Per Day Which Shall Be Ready For Inspection By 11:15am, Snacks By 8:45am And 2:30pm, Respectively. 7 The Service Provider Shall Not Require Advance Payment And Deposit To Guarantee Reservation. 8 The Concessionaire Shall Assign At Least Four (4) Waiters/waitresses In Clean Working Garments In Trainings With 50 Or More Participants And At Least 2-3 Waiters/waitresses For Trainings With Less Than Or Equal To 50 Participants. 9 The Lrp Reserves The Right To Cancel/reschedule The Delivery Of Catering Services In Case Of Major Institutional Mandates/changes, Calamities, Etc. Upon Formal Notice To The Caterer At Least Three (3) Days Prior To The Event. 10 The Lrp Shall Pay The Concessionaire At Least Five (5) Days After The Billing Statements Have Been Received By The Office. 11 The Lrp Reserves The Right To Substitute/reschedule Trainings. 12 The Service Provider Shall Provide At Least Two (2) Buffet Tables With Centerpiece For Trainings With Less Than Or Equal To Fifty (50) Participants And At Least Four (4) Buffet Tables Inside The Function Hall For Trainings With More Than Fifty (50) Participants. 13 The Lrp Reserves The Right To Substitute/reschedule Trainings. Rice: A Serving Must Be Provided With Each Meal Viand: Each Meal Should Include One Main Viand Vegetables: A Side Of Vegetables Should Accompany The Meal To Ensure Balanced Nutrition. Desserts Or Sweets: Each Meal Should Include A Dessert Or Any Sweet Treat. Beverage: Participants Should Be Offered Bottled Water/canned Juice/softdrinks. I Hereby Certify That The Statement Of Compliance To The Foregoing Technical Specifications Are True And Correct, Otherwise, If Found To Be False Either During Bid Evaluation Or Post- Qualification, The Same Shall Give Rise To Automatic Disqualification Of Our Bid ___________________________________________ Name Of Company In Print ___________________________________________ Signature Over Printed Name Of Authorized Representative Section Viii. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (d) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (e) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (f) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (g) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (h) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (i) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (j) Original Of Duly Signed And Accomplished Price Schedule(s). Ix. Bidding Forms Company Letterhead Statement Of Ongoing Government & Private Contracts Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Value Of Outstanding Contract Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Delivery End User’s Acceptance Or Official Receipt(s) Or Sales Invoice Issued For The Contract, (attached Copy) Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Certificate Of Net Financial Contracting Capacity ((please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _________________________(p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _______day Of __________2025 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Leyte Regional Prison I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [insert Name Of Bidder’s Authorized Representative] [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Of The Leyte Regional Prison As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Of The Leyte Regional Prison, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Bid Form Date: Invitation To Bid No: Bid 2024-05rb To: Mr. Tracy B. Soriano, Msca Bac Chairperson Leyte Regional Prison Abuyog, Leyte Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply & Deliver Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) In Conformity With The Said Bidding Documents For The Sum Of __________________________________________₱ ________ Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements Of The Bidding Documents. I/we Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert]: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Supply & Deliver Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid). We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 20______. [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Republic Of The Philippines Department Of Justice Bureau Of Corrections Leyte Regional Prison Abuyog, Leyte Schedule Of Prices Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Qty. Unit Of Issue Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat Meals 620 Pax Breakfast ₱62,000.00 620 Pax Lunch ₱93,000.00 620 Pax Dinner ₱93,000.00 Snacks 620 Pax Am Snacks ₱31,000.00 620 Pax Pm Snacks ₱31,000.00 Total Bid Price Inclusive Of Vat In Words The Quantity And Unit Of Issue Is For Bidding Purposes Only. In The Actual Implementation Of The Contract, The Quantity That May Be Required May Increase/decrease As The Need Arises. [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________
Closing Soon24 Jan 2025
Tender AmountPHP 310 K (USD 5.2 K)
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Item Unique Identification And Valuation (jan 2023)|19|n723.15|b5p|215-697-2782|meghan.e.gubicza.civ@us.navy.mil||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) Type||cognizant Dfas|n00383|cognizant Dcma|cognizant Dcma|see Schedule |source|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
this Requirement Is For The Repair Of The Items Herein This Solicitation.
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor?s Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt.
The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In The Subsequent Contract.
Required Rtat: 129.822 Days After Receipt Of Asset.
throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of 0000 Per Month Reflects No Throughput Constraint.
induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
reconciliation: A Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such
prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;bae Systems; Drawing Number ( ;80249; ) ;1072288p-7; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
display Unit ;1072288p-7; P/n, ;7rh 7025 017016736 P8; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
display Unit ;bae Systems; Company Name , ;450 Pulaski Road Greenlawn, Ny 11740-1606; Address , ;80249; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date6 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Details: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) Type||dfas|n00383|dcma|dcma|see Schedule|source|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days Upon Notice Of Defect|||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
the Purpose Of This Amendment Is To Extend The Solicitation Period To 24 Jan 2025.
this Requirement Is For The Repair Of The Items Herein Thissolicitation.
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt.
The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In The Subsequent Contract.
required Rtat: ## ____ Days After Receipt Of Asset.
Throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of ##____ Per Month Reflects No Throughput Constraint.
Induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
reconciliation:a Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such
prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications)related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or
Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
Early And Incremental Deliveries Accepted And Preferred.
\
1. Scope
1.1 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.2 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.3 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
indicator,horizont, ;133000-29; P/n, ;6605015591172; Nsn, ;oem Tech Drawings; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
indicator,horizont, ;canadian Commercial Corp; Company Name , ;350 Rue Albert Street Suite 700, Ottawa K1a Os6 Canada; Address , ;98247; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Soon24 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Aerospace and Defence
United States
Details: Important Information For Interested Parties:
this Notice Of Intent Is Not A Request For Competitive Proposals. However, Responsible, Interested Parties May Identify Their Interest And Capability By Responding To This Notice. The Government Will Consider All Information Received Prior To The Closing Date Of This Notice. A Determination By The Government Not To Compete This Proposed Contract Based Upon Responses To This Notice Is Solely Within The Discretion Of The Government. There Are No Commitments By The Government To Issue Any Solicitations, Make An Award Or Awards, Or To Be Responsible For Any Monies Expended By Any Interested Parties Before Award Of A Contract For The Efforts Mentioned Above. Information Provided Herein Is Subject To Change And In No Way Binds The Government To Solicit For Or Award A Contract. No Telephone Responses Will Be Accepted.
this Is Not A Request For Proposal. It Does Not Constitute A Solicitation And Shall Not Be Construed As A Commitment By The Government. Responses In Any Form Are Not Offers And The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. No Funds Are Available To Pay For Preparation Of Responses To This Announcement. Any Information Submitted By Respondents To This Technical Description Is Strictly Voluntary.
this Request For Information Is A Market Research Tool Being Used In Accordance With Federal Acquisition Regulation (far) Subpart 15.2 To Determine Potential And Eligible Businesses Capable Of Providing The Services Described Herein.
1.0 Introduction
the Naval Air Systems Command (navairsyscom) Program Executive Office, Unmanned Aviation And Strike Weapons, Peo(u&w), Pma-263, At Patuxent River, Maryland, Announces Its Intention To Broaden Industry Partnership And To Procure, On A Competitive Basis, Coco Services Necessary To Provide Uas Isr Services For The Navy And Marine Corps Small Tactical Unmanned Aircraft Systems (stuas) Program Office (pma-263) In Support Of The Department Of Defense (dod) And Other Government Agencies (oga).these Services Will Support Domestic And Coalition Military Partners In Combat And Contingency Operations. Currently, These Services Are Being Delivered Under Performance-based Basic Ordering Agreements (boas) Issued In March 2021 To Insitu, Inc. Of Bingen Wa, And Textron Systems Of Hunt Valley Md, For Land-based And Sea-based Isr Services. The Existing Boas, N0001921g0007 And N0001921g0008, Respectively, Are Firm-fixed-price Type And Expire March 2026. Detailed Information On The Existing Boas Can Be Obtained Via The Following Website: Https://www.navair.navy.mil/foia. This Request For Information Is Issued With The Intent To Award Boa(s) To Onboard Additional Qualified Vendor(s) To Compete For Future Isr Coco Services.
2.0 Objective
pma-263 Is Seeking To Identify Additional Contractors Capable Of Providing Coco Isr Services In Support Of Dod, Oga, And Combat And Contingency Operational Requirements. This Request For Information Is Related To Support For Land-based And Sea-based Operations To Provide Reliable Delivery Of Sensor Data. Contractors Would Be Responsible For Resources To Produce Sensor Data, Such As Trained Personnel, Non-developmental Uas Equipment, Certifications, Operation And Maintenance, Spares And Product Support. Contracted Services Would Be In Direct Support Of Isr Missions Requiring Around The Clock Imagery And Other Sensor Capability In Support Of Those Missions. Contractors Shall Be Capable Of Providing Isr Services On A Normal And Surge Basis, Day And Night, 24 Hours A Day, Seven Days A Week. Pre-deployment, Deployment, And Post-deployment Support Would Be Required, And Would Entail Execution Of A Variety Of Responsibilities Inherent To Execution Of Such Support, Including But Not Limited To, Equipment Transportation, Export Control Licensing, Insurance, Personnel Travel, Processing For Overseas Movement And Accountability, Visa Coordination, Compliance With Requirements At Dfars 252.225-7040, Compliance With Dodi 3020.41, Etc.
3.0 Requirements
pma-263 Is Specifically Interested In Uas Isr Services Capable Of The Following Performance Parameters. The Following Parameters Constitute Mandatory Minimum Requirements:
technology Readiness Level (trl): Trl 8 Per Dod Deskbook 5000.2
operational Range: At Least 75 Nautical Miles (nm) From The Ground Control Station Located At The Launch Site, With A Single Air Vehicle, For Both Sea-based And Land-based Uas Operations
datalink Range (communications And Full Motion Video (fmv)): Line-of-sight With Type-1 Encryption Utilizing The Bandwidth Efficient Common Data Link (be-cdl) Waveform
on Station Time: 10 Hours Time-on-station (tos) At Maximum Range
simultaneous, Multi-intelligence (multi-int) Capable With Fmv Sensor(s) And An Electronic Warfare (ew) Type Sensor Or Wide Area Maritime Search (wams) Sensor
fmv: Electro Optic (eo)/ Infrared (ir) – National Imagery Interpretability Rating Scale (niirs) Of Level 8.4 Or Above For Eo And 7.2 Or Above For Ir When Taken From The Uav At An Altitude Of 3,000 Feet Above Ground Level (agl) At A 45-degree Slant Range
global Positioning System (gps) Precise Positioning Service (pps) Receiver
operate In Gps-contested-/degraded Situations (uas Shall Be Capable Of Continued Navigation In A Gps-contested Environment Up To A Minimum 74db For All Phases Of Flight)
operate In Adverse Weather Conditions And Austere Environments
runway Independent
for Land-based Operations, The Air Vehicle (av) Shall Operate On Commonly Available Fuels At Forward-deployed Locations, Such As Mil-dtl-5624, Grade Jp-4/jp-5; Mil-dtl-83133 Grade Jp-8/jp-8+100; Astm D910, Aviation Gasoline Grade 100ll; And Their Equivalent Nato And Commercial Versions. For Ship-based Operations, The Av Shall Operate On Mil-dtl- 5624, Grade Jp-4/jp-5.
in Accordance With Dodi 8510.01, Obtain An Authorization To Operate (ato) From The Navair Function Authorization Official (fao) (ato With Provision (ato-p), Or Reciprocity Ato Inherited From Another Dod Service Branch Are Acceptable.
meet The Ndaa2023 Section 817 Requirements For Country Of Origin Of Uas And Critical Components.
submission Of A Data Package That Contains Engineering Data Necessary To Support A Category 3 Interim Flight Clearance (ifc) In Accordance With Navairinst 13034.1, Airworthiness Policy.
sensors Output Stanag 4545, 4607, And 4676 Messages
4.0 Requested Information
interested Vendors Should Submit A Brief Capability Statement Package (not To Exceed 15 Pages) Demonstrating Ability To Perform The Services Based On The Parameters In Paragraph 3.0. The Response Shall Contain The Respondent’s Primary Point Of Contact With Phone Number And Email Address.
the Capabilities Statement Package Should Include But Not Limited To The Following Information:
4.1 Company Profile/status:
4.1.1 What Is Your Experience And Maturity (a) With Manufacturing And Developing Unmanned Aircraft System Products And (b) With Providing Isr Services?
4.1.2 Provide Your Cage Code, Unique Entity Identifier Number, Current Number Of Employees, Annual Revenue History, Office Location(s), The Respondent’s Web Page Url, And A Statement Regarding Current Small Or Large Business Status Based On The Designated Naics Code.
4.1.3 What Is The Technology Readiness Level (trl) Of Your Candidate Uas As Described In The Dod Technology Readiness Assessment Handbook?
4.1.4 Is The Uas Currently Available On One Or More Gsa Schedules? If So, Which One(s)?
4.1.5 Did You Receive Funding To Develop Your Uas From A Government Agency?
4.2 Uas Operating Parameters/configuration:
4.2.1 Describe How The Uas Satisfies The Minimum Requirements Stated In Paragraph 3.0 Above. In Addition, Describe The Following:
4.2.1.1 System’s Anti-jam Capabilities.
4.2.1.2 System’s Alternative Positioning, Navigation, And Timing (apnt) Solutions Capabilities In A Degraded/contested Gps Environment.
4.2.1.3 System’s Weather Limitations To Include But Not Limited To Ice, Rain, And Wind.
4.2.1.4 System’s Environmental Limitations (altitude, Temperature, Etc).
4.2.1.4.1 System’s Level Of Compliance With Mil-std-461g.
4.2.1.4.2 System’s Level Of Compliance With Mil-dtl-901e (grade B).
4.2.1.4.3 System’s Design Criteria With Respect To Minimizing Radar Cross Section (rcs).
4.2.1.5 System’s Ability To Remain Visually And Audibly Non-detectable At Operating Altitude.
4.2.1.6 Data Link Used Including Waveform, Operational Frequency Band, Analog Or Digital, And Encryption Capabilities.
4.2.1.7 Data Link Range At Different Operating Altitudes.
4.2.1.8 How Ground Control Station Communicates With The Air Vehicle Should The System Be Operating In A Beyond Line Of Sight (blos) Situation.
4.2.1.9 How Is The Air Vehicle Launched And Recovered?
4.2.1.9.1 How Many Launches, Recoveries, And Total Flight Hours Have Been Successfully Accomplished For This Configuration?
4.2.1.10 Describe How Ship-based Operations Would Occur To Include Launch And Recovery Profiles And Ship Infrastructure Requirements.
4.2.1.11 Describe Staffing Requirements At The Organizational Level.
4.2.1.11.1 How Many People Are Required To Operate The Uas?
4.2.1.11.2 How Many People Are Required To Maintain The Uas?
4.2.1.12 A Field Packed System Is Defined As Having All The Required Equipment To Accomplish A Mission And Be In A State Safe To Be Transported. How Long Does It Take To Go From A Field Packed System To Air Vehicle Launch?
4.2.1.13 Provide Data Supporting That The Uas Has Been Tested In A Relevant Operational Environment, Including Day And Night Video, If Available.
4.2.1.14 Has The Uas Conducted Field User Evaluations For The U.s. Government? If So, Please Provide The Following:
4.2.1.14.1 Applicable (unclassified) Results As To What Was Demonstrated
4.2.1.14.2 Any Changes Since The Demonstration, As Relevant To This Rfi
4.2.1.14.3 U. S. Government Point Of Contact.
4.2.1.15 What Software Operating System Does The Uas Use? Was The Software Developed And Coded In The U.s.? Does The Operating Software Interface With Dod Software And Dod Mapping Imagery Software Or Does It Require Company Proprietary Software To Operate The System?
4.2.1.16 How Does The Uas Download And Store Data Through The Ground Control Station And For How Long?
4.2.1.17 Is The Uas Controlled Under The International Traffic In Arms Regulations (itar)?
4.2.1.18 Do You Have An Export Configuration? If So, Please Describe The Export Configuration.
4.2.1.19 Has Critical Program Information (cpi) Or Critical Technology (as Defined In The Dodi 5200.39) That Requires Anti-tamper Protection And/or Low Observable Requirements Been Identified For The Uas? (unclassified Responses Only)
4.3 Training And Field Support:
4.3.1 Describe Any Other Ancillary Equipment That Is Not Included As Part Of The System Configuration, Such As Calibration Equipment.
4.3.2 Indicate Whether There Are Existing Operational And Maintenance Publications Or Manuals.
4.3.3 Provide The Uas’s Sparing Requirements Based On 9,000 Flight-hours Per Year Per Site For Land-based Isr Services And 2,400 Flight-hours Per Year For Ship-based Isr Services.
4.3.4 Describe The Uas’s Facility And Infrastructure Requirements At A Fielded Site.
4.3.5 Describe Continental United States (conus) And Outside The Continental United States (oconus) Field Support On The Uas While Deployed To Include Harsh Or Hostile Environments Overseas.
4.3.6 Describe The Existing Training Curriculum (course Type Classes, Devices, Duration, Training Location And Any Certification Requirement Timelines).
4.3.7 Provide Any Other System Features That The Uas Has That Are Unique And Stand Out From Other System Platforms.
4.4 Cybersecurity Support
4.4.1 Describe Whether The System Has Undergone A Dod Sanctioned Ato Or Iatt Using The Risk Management Framework (rmf) Process Prescribed In Dodi 8510.01.
4.4.2 Does The System Have An Active Ato/iatt From A Dod Service Branch? If So, Which Branch?
4.4.3 Can Artifacts Be Provided To Support A Navy/navair Ato?
4.4.4 Is The Service Branch Ao Possessing The Ato Amenable To Supporting A Reciprocity Ato And Engaging In A Memorandum Of Agreement With Navair?
4.4.5 Describe The Current Processes That You Have Implemented To Ensure The System Meets The Information Security Requirements Established Within The Nist 800-53 Sp Framework.
4.4.6 Has The System Undergone Cybersecurity Test And Evaluation?
4.4.7 Is There A Network Architectural Diagram For The System? If So, Does This Include Component/subcomponent Interfaces, Information Flow, Ports, Protocols, And Ip Addressing Used?
4.4.8 Does The System Have A System Security Plan (ssp) Outlining Its Implementation Status With Security Controls?
4.4.9 Has The System Undergone Network Vulnerability Scans, And Network Enumeration Scans (nessus, Wireshark, Nmap, Etc.)?
4.4.10 Does The System Have A List Of Hardware Used To Process, Store, And Transmit Information? (i.e., Full Bill Of Material (bom))
4.4.11 Does The System Have A Complete List Of The Software Used On The System And Its Function(s)? (i.e., Software Bill Of Material (sbom)
4.4.12 Have Software Assurance Techniques Been Applied To The System, Ensuring Origins Of The Code And That It Is Free From Vulnerabilities (secure Sdlc, Code Scanning, Quality Checks, Patch Management Planning, Software Testing, Configuration Control, And Sbom)?
4.4.13 Describe How Your Company Has Implemented Enterprise Cybersecurity Standards Onto Your Resident It Equipment To Be Ability To Process, Store, And Transmit Dod Controlled Unclassified Information (cui).
4.4.14 Is The Company’s It Infrastructure Capable Of Meeting The Requirements Directed In Dfars 252.204-7012 For Safeguarding Covered Defense Information And Cyber Incident Reporting?
4.4.15 Has The Company Assessed Their Cybersecurity Implementation Against The Nist Sp 800-171 Sp Framework?
4.4.16 Has Your Company Undergone A Cybersecurity Maturity Model Certification (cmmc)?
4.4.17 Does The Company Have An Enterprise Ssp?
5.0 Responses/submission
all Interested Sources Shall Submit Responses Electronically, Consisting Of A Capability Statement (paragraph 3.0) As Wells As Addressing The Information Required By Paragraph 4.0 Above Via Email To Contract Specialist, Ms. Heather Buckler At Heather.m.buckler.civ@us.navy.mil And Procuring Contracting Officer, Ms. Kristen Ferro At Kristen.w.ferro.civ@us.navy.mil.
e-mail Must Contain The Following In The Subject Line: "rfi Response To Notice 243-24-189 Uas Coco Isr Services, (pma-263)”
note That File Sizes Larger Than 5mb Are Not Recommended, As They May Not Be Receivable Due To Navy Marine Corps Intranet Security Protocol.
6.0 Format
request For Information Responses Are Limited To 15 Pages, In 12-point Font, Not Including Preprinted (pre-published) Information Material.
in Order To Maximize Efficiency And Minimize The Effort Involved In The Evaluation Process, All Submissions Must Comply With The Following Format And Content:
8.5 X 11 Inch Page
single-spaced Typed Lines
newspaper Column Formatting Is Not Permitted
1 Inch Margins On All Sides
not Smaller Than A 12 Point Font Without Condensing
photographs, Pictures Or Hyperlinks Are Permitted
files Shall Be Microsoft Office 2016 Compatible Or Pdf Format; No Zip Files
all Material Provided In Response To This Request For Information Shall Be Unclassified.
to The Maximum Extent Practicable, Respondents Should Limit The Delivery Of Non-proprietary Information. Responses To This Request For Information Will Not Be Returned. If The Response Includes Proprietary Information, (1) Ensure Proprietary Information Is Marked Appropriately, (2) Identify Disposition Instructions, And (3) Indicate Whether You Require Government Support Contractors Providing Advisory And Assistance Services To The Government To Facilitate The Execution Of Information/proprietary Exchange Agreements With You. Government Support Contractors May Assist In The Review Of Any Data Provided By Applicants.
government Support Contractors Have Entered Into Non-disclosure Agreements (ndas) With The Government, Which Precludes Them From Disclosing Any Proprietary Data Outside Of The Government. However, If Respondents Desire A Separate Nda With Government Support Contractors, Respondents Should Submit An Nda Form, Along With Instructions, To The Points Of Contact Listed In This Notice At The Time Of Their Submission. If Respondents Choose Not To Submit An Nda Form For Completion, Their Submission Of A Response To This Announcement Constitutes Consent That The Government Support Contractors Will Have Access To Their Proprietary Information. The Government Will Not Be Responsible For The Disclosure Of Any Confidential/proprietary Information Not Clearly Marked. At Any Time After Receipt Of Request For Information Responses, The Government May Contact Respondents Independently For Further Clarification Of The Submittal.
7.0 Past Responses To Questions Received
7.1 The Below Questions And Answers Are In Previous Responses To An Inquiry Regarding Section 3.0, Requirements From Past Industry Days:
7.1.1 Is This [operational] Range Based On A Maritime Deployment/installation?
answer: The 75nm Range Is For Both Sea-based And Land-based Uas Operations.
7.1.2 Is This [operational Range] Considered A Connection Between The Ground Control System At The Launch Site Or Could That Also Include A “handoff” Between The Air Vehicle And A Forward Node To Extend Operational Flexibility?
answer: A Single Air Vehicle Must Be Able To Operate A Minimum Of 75nm From The Ground Control Station Located At The Launch Site.
7.1.3 Is The Operational Range Based On A Customer Concept Of Operation Or Is There Any Additional Information Available?
answer: There Is No Additional Information That Can Be Provided.
7.1.4 Is There Any Additional Information On This Jam-to-signal Calculation?
answer: There Is No Additional Information That Can Be Provided.
7.2 The Below Questions And Answers Are In Response To An Inquiry Regarding Section 4.0, Requested Information, Part 4.3.3.
7.2.1 Is 54,000 [flight-hours Per Year] Intended To Be 5,400 [flight-hours Per Year]?
answer: 54,000 Flight-hours Per Year Was For All Six Sites Currently Operating. Part 4.3.3 Has Been Updated To Reflect 9,000 Flight-hours Per Year Per Site.
7.2.2 Are The Sparing Requirements For Spare Air Vehicles Or Component Parts Based On Mean Time Before Failure?
answer: Sparing Requirements And Details Are Based Solely On The Original Equipment Manufacturer (oem) Assessments Of What Is Required To Meet The Previously Stated Flight-hour Requirements
Closing Date6 Feb 2025
Tender AmountRefer Documents