Software Tenders
Software Tenders
Ministry Of Ecological Transition, Ministry Of Territorial Cohesion, Ministry Of The Sea Tender
Software and IT Solutions
France
Closing Date20 Nov 2024
Tender AmountRefer Documents
Details: The Public Contract is for the Renewal of the Intensive Computing System for Météo-France by a System Enabling a Significant Increase in Performance. The Objective of This Public Contract is: - The Provision, Installation and Maintenance of an Initial Configuration of a New Intensive Computing System in the Météo-France Data Centers in Toulouse as well as the Associated Software and Equipment; - The Provision, Installation and Maintenance of Additions to the Initial Configuration; - The Performance of Various Services.
Philippine National Oil Company - PNOC Tender
Civil And Construction...+3Electrical and Electronics, Solar Installation and Products, Water Storage And Supply
Philippines
Closing Date12 Nov 2024
Tender AmountPHP 1.3 Million (USD 23.3 K)
Details: Description Terms Of Reference 1. Project Description The Philippine National Oil Company (pnoc), Under Its Three Arrows Strategy, Is Revolutionizing Sustainable Energy Solutions By Spearheading Rooftop Solar Power Projects For Various Government Buildings. This Initiative Supports The Government's Strategy To Reduce Its Dependence On International Fuel Markets And Promote Renewable Energy Use. In Line With The Inter-agency Energy Efficiency And Conservation Committee (iaeecc) Resolution Of 07 July 2023, Government Entities, Including Government-owned And Controlled Corporations (goccs), State Universities And Colleges (sucs), And Local Government Units (lgus), Are Mandated To Install At Least 20% Of Their Electricity Requirements From Solar Photovoltaic (pv) Systems Or Equivalent Renewable Energy Technologies Within Three Years. Additionally, This Project Aligns With The Government Energy Management Program (gemp), Which Encourages A Minimum 10% Reduction In Electricity Consumption Across All Government Entities. By Ensuring Zero Export Of Energy To The Distribution Grid, This Forward-thinking Project Not Only Reduces Costs But Also Elevates Environmental Stewardship, Setting A New Standard For Green Energy In The Public Sector. Pnoc Invites Submissions From Reputable Organizations (referred To As "the Contractor") Capable Of Providing A Comprehensive Turnkey Solution Encompassing Engineering, Procurement, Construction, Commissioning, And Testing And Commissioning, And One-year Operations And Maintenance (referred To As "epctc") For The Project. The Project Shall Be Named “supply, Delivery, Installation, Testing And Commissioning Of 25kwp Solar Pv Rooftop System At Carmona Water District Admin Building”. The Project Site Is Located At Cityland Subdivision, Brgy. Carmona, Cavite. 2. Objectives Of The Contract The Intent Of The Terms Of Reference Is To Provide The General And Technical Requirements Necessary For The Implementation Of The Project. However, It Is The Contractor’s Obligation To Investigate And Validate All Information Herewith As Part Of Their Work To Be Undertaken. Thus, Any Discrepancies In The Tor In Accordance With Applicable And Generally Accepted Engineering And Construction Practices, Government Rules And Regulation And The Latest Industry Codes And Standards For Solar Pv Development Shall Not Relieve The Contractor Of The Accuracy Of Their Work. A. Define Project Scope: Clearly Outline The Scope Of Work For The Turnkey Epc (engineering, Procurement, And Construction) Contractor, Including Project Preparation, Procurement, Installation, Construction, Testing, Commissioning, And Operation And Maintenance (o&m). B. Establish Deliverables: Specify The Required Deliverables, Including Documentation, Performance Guarantees, And O&m Plans, To Ensure Comprehensive Project Execution And Accountability. C. Set Performance Standards: Provide Criteria For The Performance And Quality Of The Solar Pv Systems, Ensuring They Meet Industry Standards And Regulatory Requirements. D. Detail Compliance Requirements: Ensure The Epc Contractor Adheres To All Relevant Local, National, And International Regulations And Standards, Promoting Safety, Reliability, And Environmental Responsibility. E. Specify Evaluation Criteria: Establish The Criteria For Selecting The Epc Contractor, Focusing On Experience, Technical Expertise, Financial Stability, And The Quality Of The Proposed Solutions. F. Ensure Zero Export Compliance: Mandate That The Solar Pv Systems Operate With Zero Export To The Distribution Grid, Ensuring On-site Energy Optimization And Compliance With Regulatory Requirements. G. Provide Maintenance Guidelines: Include A Comprehensive One-year O&m Plan To Ensure The Longevity, Efficiency, And Optimal Performance Of The Installed Solar Pv Systems. H. Promote Transparency And Reporting: Require Regular Progress Reports From The Epc Contractor To Pnoc, Detailing Project Milestones, Challenges, And Resolutions, Fostering Transparency And Effective Project Management. 3. Approved Budget For The Contract (abc) Pnoc Has An Approved Corporate Budget In The Amount Of One Million Three Hundred Fifty Thousand Pesos (php 1,350,000.00) For The Project. 4. Scope Of Works The Scope Of Work For The Contractor Includes: 4.1. Project Preparation The Contractor Shall Facilitate All Preliminary And General Works On Time So That Any Issues Or Problems Encountered Can Be Addressed. If The Contractor Fails To Timely Execute The Works, Then Any Delays Due To Pending Issues And Problems Shall Be Of The Contractor’s Account. ● Kick-off Meeting The Contractor Shall Schedule A Kick-off Meeting No Later Than Ten (10) Calendar Days Starting From The Date Of Commencement As Stated In The Ntp. The Kick-off Meeting Shall Be Held At Site To Discuss Mobilization And Construction Schedules And Other Details Necessary Prior Project Execution. All Key Personnel Must Be Available During The Kick-off Meeting. ● Mobilization The Contractor Shall Facilitate The Mobilization Of Manpower And Equipment, Including Operating Supplies And Tools Necessary For The Project Immediately After The Kick-off Meeting. ● Temporary Facilities And Storage/staging Area The Contractor Shall Be Provided With A Temporary Headquarters Immediately After The Kick-off Meeting. The Location Of The Headquarters And Storage/staging Area Shall Be Determined With The Consent Of The Building Owner. ● Site Survey And Assessment The Contractor Shall Undertake Its Own Site Survey, Verification, And Assessment, Including Actual Measurements Of Voltage, Current, Frequency And Power Quality For A Period Of Seven (7) Calendar Days Upon Mobilization, Identification Of Access, Etc., To Identify All Necessary Information About The Site Conditions And Design Parameters. Additionally, The Contractor Shall Perform An Energy Yield Assessment To Estimate The Potential Solar Energy Generation In The Installation Site The Assessment Shall Also Include The Condition Of Roof And Existence Of Roof Leaks, And The Safety And Reliability Of The Existing Electrical System(s) And The Whole Installation, And Maintenance Concerns. All Findings And Necessary Engineering Intervention Shall Be Incorporated In The Detailed Project Designs And Engineering Plans And Shall Be Properly Addressed During Construction. ● Permits And Clearances The Contractor Shall Secure The Construction Permit, Safety Permit, Building Permit And Other Approvals, Clearances, And Licenses Necessary Prior To The Start Of Construction And Installation. The Contractor Shall Also Secure Necessary Permits/documents As Required By The Distribution Utility For The Installation Of The Rooftop Solar Pv System On The Installation Site. ● Detailed Project Designs And Engineering Plans The Contractor Shall Submit Detailed Project Designs And Engineering Plans No Later Than Ten (10) Calendar Days Starting From The Date Of Commencement Stated In The Ntp. The Detailed Project Designs And Engineering Plans Must Reflect All Additional Requirements And Information Needed Based On The Reviewed Preliminary Design Drawings. The Detailed Project Designs And Engineering Plans Shall Be Furnished Using Engineering Standard Templates, Adequate, Readable And Must Be Written In English. The Contractor Must Use Computer-aided Design And Drafting Software (cad) Or Equivalent. Likewise, Electronic Components With Built-in Programs And Software Shall Be Accompanied By Their Corresponding Programs And Ladder Logic Diagrams For Submission To Pnoc Prior To The Installation Of The Systems. The Detailed Project Designs And Engineering Plans Shall Be Signed And Sealed By Professional Engineers (electrical And/or Civil/structural Engineer), And Pnoc And Building Owner’s Authorized Representatives. Pnoc Shall Have The Right To Require The Contractor Additional Drawings Or Information As May Be Necessary. The Minimum Number Of Original Copies To Be Produced By The Contractor Shall Be 3 Sets Of A3 Size And 2 Electronic Copies Containing Cad And Pdf Files, As An Advance Copy. The Contractor Must Also Submit A Hard Copy As An Official Document. Pnoc Reserves The Right To Reproduce Any Drawings Or Documents Received From The Contractor As May Be Necessary. To Avoid Revisions, The Contractor May Submit First Draft Drawings Or E-file Via Email Before Printing The Detailed Project Designs And Engineering Plans. 4.2. Procurement The Contractor Shall Be Responsible For The Procurement Of All Equipment And Construction Materials, Including Consumables, Necessary To Complete The Project. All Delivered Equipment And Construction Materials, Including Consumables, Shall Be Subject To Testing And Inspection By Pnoc. Testing And Inspection Includes Visual Checking, Measurement, Validation Of Specifications (in The Nameplates) And Other Applicable Testing Methods As Deemed Necessary. Pnoc Shall Release A Materials Inspection Report (mir) For The Findings Of The Inspected Materials. Any Damage Or Deficiency Shall Be Rectified Or Replaced By The Contractor Without Additional Charges To Pnoc. ● Equipment And Construction Materials The Contractor May Source All Equipment And Construction Materials, Including Consumables Locally Or Abroad Provided These Shall Conform To The Required Design Specifications And Standards. In Case Of Changes In The Source Of Supply Or Brand, The Contractor Shall Submit A Letter Of Request Stating The Reasons For The Changes For Pnoc’s Review And Approval. ● Factory Acceptance Test (fat) The Contractor Must Provide Any Proof That The Manufacturer’s Factory Or Fabricator’s Shop Has Passed The Fat For The Solar Panels And Inverters. All Related Testing Expenses Shall Be Of The Contractor’s Account. Receipt And Acceptance Of The Certified Test Reports And Inspection & Testing Certificate By Pnoc Shall In No Way Relieve The Contractor Of Its Responsibility. ● Handling And Delivery The Contractor Shall Perform Proper Packing, Loading, Transportation, Hauling And Unloading Of Equipment In Accordance With The Manufacturer's Standards And Recommendations. All Duties And Taxes Including Export Permits And Clearances, Insurances And Warranties Shall Be Of The Contractor’s Account. The Equipment And Construction Materials Shall Be Delivered Directly To The Project Site(s). The Contractor Shall Secure Handling And Delivery Manuals From The Manufacturer. The Contractor Shall Notify Pnoc For All Incoming Materials And Submit Delivery Receipt Upon Delivery For Inspection And Acceptance By Pnoc Prior To Installation. All Equipment Shall Be Delivered Unbroken, Not Deformed And Without Cracks And Scratches. In General, The Packaging Of The Equipment Shall Be Based On Generally Accepted Industry Practices Or Standards. Packaging Shall Be Adequate To Prevent Damage From Any Mechanical Stresses That May Occur And To Ensure Safety During Loading, Hauling, Unloading, Unpacking And Storage. Boxes Shall Contain Barcode Sheet/label Showing The Following Information: ✔ Name Of The Manufacturer; ✔ Model Number; ✔ Code No./serial Number; ✔ Product Barcode; And ✔ Manufacturing Date. ● On-site Storage The Contractor Shall Perform On-site Storage Of Equipment And Construction Materials In Accordance With The Manufacturer's Standards And Recommendations. Equipment Shall Be Placed At The Designated Storage/staging Area. The Contractor Shall Secure Equipment On-site Storage Manuals From The Manufacturer. 4.3. Installation And Construction The Contractor Shall Provide All Consumables, Tools, Equipment, And Manpower, Including Ppe, Necessary To Perform The Necessary Works. The Contractor Shall Only Be Allowed To Work At The Designated Area Agreed Upon With Pnoc To Avoid Any Interruptions To The On-going Operations And Activities At The Site. In Case Of Concrete Drilling Or Breaking, The Contractor Must Ensure That Such Work Shall Not Compromise The Integrity Of The Existing Structures. In The Case Of Painting, Appropriate Painting Shall Be Used For The Structures To Be Painted In Accordance With Applicable Standards. The Painting Shall Be Done With A Primer And Topcoat As A Minimum. In The Case Of Earthworks And Concreting, It Shall Be Performed In Accordance With Applicable Codes And Standards. Concrete Foundations Must Be Designed Using Applicable Mixtures And With Reinforcing Bars As Per Standards. The Pv System Shall Be Designed For Simple Mechanical On-site Installation With No Requirement For Welding Or Complex Machinery At The Site. In Extreme Cases Where Welding Or Machinery Is Necessary, The Contractor Shall Submit Welding Methodology. Welding Shall Be Tested As Per Standards. The Contractor Must Also Ensure Minimal Disruption To The Daily Operations Of The Installation Site. ● Pre-leak And Post-leak Test The Contractor Shall Conduct Pre-leak Test Prior To, And After The Installation Of Pv Modules And Appurtenances, Respectively. Schedule Of The Leak Test Shall Be Properly Coordinated With Pnoc And Building Owner Representatives. The Contractor Shall Submit A Leak Test Procedure For Review And Approval By Pnoc Prior To Execution. ● Work Permit The Contractor Shall Coordinate With Pnoc Representative For Every Work To Be Performed Prior To Execution. The Work To Be Performed Shall Specify The Following: ✔ Type Of Work, Such As: Hot Works/cold Work/working At Heights/confined Space/concrete Chipping/excavation Works; ✔ Target Start And End Dates; ✔ Methodology; ✔ Hazard Associated With The Works; ✔ Safety And Precautionary Measures; ✔ Equipment And Construction Materials With Attached Approved Brochures And/or Drawings; And ✔ Equipment, Tools, And Personal Protective Equipment (ppe). ● Mounting And Installation Of Equipment All Equipment Shall Be Mounted In Accordance With Engineering And Construction Standards And Practices And Manufacturers’ Recommendations And Standards And Safety And Health Standards. Spacing, Orientation, And Location Shall Be Based On The Approved Detailed Project Designs And Engineering Plans. ● Cabling And Raceway Routing Dc Cables Shall Be Housed In A Hot Dip Galvanized Cable Tray/ladder With Cover. All Ac Cables Shall Be Housed In Rigid Steel Conduit. Instrumentation And Communication Cables Shall Be Housed In A Separate Uv Rated Conduit. For Buried Cables, It Must Be Housed In A Pvc Pipe With Concrete Trench, Warning Tape Or Tiles Placed Above And Marking Posts At Suitable Intervals On The Surface. The Minimum Depth Of Burial Is 700mm Depending On The Location And Condition Of The Ground Surface. Cables Shall Occupy Less Than 66% Of The Raceway Space And Properly Loop, Not Too Tight To Avoid Any Damages To The Wires. Dc Cables Shall Be Installed In A Manner Which Minimizes Induction Loops Between Positive And Negative Cables. For String Cables, Large Loops Of Excess Dc Cabling Shall Be Avoided. The Raceway Shall Be Placed In A Manner That It Will Not Create Any Obstructions Or Hazards To Operations And Maintenance. The Contractor Shall Use Pull Box/junction Box On All Intersections And Sharp Curves Or Bends And Provide Rubber And Bushing On All Junctions And Endings To Avoid Cut In The Wire Insulation. The Contractor Shall Apply Silicone Sealant, As Applicable, On Raceway Openings To Prevent Access Of Dirt, Water, And Vermin. The Contractor Shall Comply With The Distribution Utility (du) Net-metering Requirements For The Cable Installation And Other Electrical Components. ● Grounding, Termination, And Interconnection All Equipment Shall Have Adequate Grounding. All Cables Shall Be Properly Dressed/secured/fixed And Terminated Using Terminal Lugs, Clamps, Crimps And Solder. There Should Be No Exposed Conductors To Avoid Short Circuits And Arc Flash. The Contractor Shall Request A Schedule For Shutdown For The Interconnection To The Existing Electrical Distribution System. The Contractor Shall Conduct A Torque Test After Termination And Interconnection. ● Lifting Appropriate Lifting Equipment Shall Be Utilized When Performing Heavy Lifting. Access Shall Be Identified To Avoid Obstructions. Schedule Of Lifting Shall Be Properly Coordinated With The Building Owner. ● Foundations And Structural Supports Structural Supports Necessary For The Mounting Of Equipment (e.g., Inverters, Enclosures, Transformers, Pv Modules, Etc.) Shall Be Made Of Hot Dip Galvanized Structural Steel Minimum Of 2 Mm Metal Thickness And Minimum Coating Thickness Of 3 Mils As Per Astm A 386 Or Equivalent. In Case The Galvanized Coating Is Damaged During Installation, The Supplier Shall Apply The Necessary Rectification In Accordance With Astm A 780-01 (standard Practice For Repair Of Damaged And Uncoated Areas Of Hot Dip Galvanized Coatings). Reinforced (with Deformed Bars) Concrete Blocks/ballast Or Foundations May Be Provided To Provide Stability. For Penetrated Supports, It Shall Be Non-corrosive, And Waterproof Using Flashings, Gasket Or Other Approved Chemical Sealing And Coating Material. In Case Of Concrete Penetration, The Anchor Bolts (dowel) Shall Be Made Also Of Hot-dipped Galvanized Or Equivalent. 4.4. Testing And Commissioning The Contractor Shall Conduct Testing And Commissioning For A Minimum Of Seven (7) Days Upon Completion Of The Installation Of The Pv System, To Be Witnessed By Pnoc And Representatives Of The Building Owner. The Schedule And Duration Of The Testing And Commissioning Shall Be Mutually Agreed By The Contractor, Pnoc And Building Owner. However, The Testing And Commissioning Activities Shall Be Satisfactorily Completed Within The Time Required Under The Contract. Any Corrections Resulted From Errors In The Workmanship Or Design Made By The Contractor Which Were Found During The Conduct Of Testing And Commissioning Or Prior To The Rooftop Solar Pv System Operation Thereon, With The Resulting Extra Expenses Due To Repair Or Cost For The Replacement For Damaged Equipment/materials Shall Be Solely Charged To The Account Of The Contractor. Testing And Commissioning Shall Be Performed In A Systematic Process Whereby All Systems And Equipment Are Tested And Brought Into Operation And Performed Interactively According To The Design Intent And In Accordance With The Performance Criteria Set Upon. Equipment And Accessories Shall Be Inspected To Determine The Completeness Of The Pv System And Conformance In Accordance With The Specifications. All Testing Instruments Including Consumables, Temporary Structures, And Manpower Required For The Testing And Commissioning Activities Shall Be Provided And At The Account Of The Contractor. The Contractor Shall Ensure That The Rooftop Solar Pv System Operates With Zero Export To The Distribution Grid By Configuring Inverters To Clip Any Excess Energy Generated. The Contractor Shall Also Arrange The Joint Inspection With The Representatives Of Distribution Utility And The Office Of Building Official (if Applicable) To Conduct Demonstration Of The Required Features Of The Rooftop Solar Pv System. This Is For The Eventual Acceptance Of The System By The Du And Lgu-obo By Furnishing The Necessary Certificates. Pnoc Shall Release A “certificate Of Project Completion” After The Testing And Commissioning Provided That All Works Have Been Performed And All Issues Have Been Addressed. ● Testing And Commissioning Plan The Contractor Shall Submit Tcp/procedures Prior To The Conduct Of Testing And Commissioning For Pnoc’s Review And Approval. The Tcp Shall Include The Following Information: ✔ Itinerary (date) Of The Testing And Commissioning; ✔ Detailed Methodology And Step-by-step Procedures; ✔ List Of Tools And Equipment, Including Ppe, To Be Used; ✔ Manpower Requirement; ✔ Hazards And Safety Protocol; And ✔ Target Results Or Acceptance Criteria. ● Testing And Commissioning Works The Minimum Testing And Commissioning Shall Include The Following: ✔ Inspection And Calibration Of Tools And Testing Instruments; ✔ Visual And Physical (quality And Quantity) Inspection Of The Installed Equipment And Appurtenances; ✔ Torque Test Of All Terminations And Mounting; ✔ Continuity Test (open Circuit And Closed Circuit) Of All Breakers, Fuses, Switches, Protection Devices And Other Equipment With Circuitry; ✔ Insulation Test Of All Dc And Ac Wires Including Grounding (line-to-line And Line-to-ground); ✔ Open Circuit Voltage/ Short Circuit Current String Test; ✔ Polarity Test; ✔ Phase Sequence Test; ✔ Ac Operating Voltage Test; ✔ Inverter Synchronization Test; ✔ Inverter Frequency Test; ✔ Inverter Power Generation Test; ✔ Operating Voltage And Operating Current String Test; ✔ Thermal Scanning; ✔ Optimizer Device Functionality; ✔ Voltage Harmonic Rise - Should Not Be Greater Than 5% Or Inverter Specification (whichever Is Lower); ✔ Lighting Arrester Grounding And Counter Tests; ✔ Anti-islanding Test; ✔ Cease To Energize Test; And ✔ Other Necessary Tests The Minimum Tools And Equipment To Be Used Shall Include The Following: Torque Wrench; Clamp Meter; Irradiance Meter; Thermal Scanner; Power Quality Analyzer; 2-way Radios; Insulation Resistance Tester; Earth Ground Tester; And Lock-out/tag-out The Contractor May Use A Multi-function Instrument That Is Capable Of Performing The Testing And Commissioning Such As A Solar Pv Installation Tester. Personnel Who Will Conduct The Testing And Commissioning Shall Be Equipped With The Minimum Ppe: ✔ Safety Shoes (electrical Hazard Compliant); ✔ Safety Jacket; ✔ Safety Pants; ✔ Electrical Gloves (1kv); And ✔ Protective Eye Glass. The Contractor Shall Also Provide A First-aid Kit And Fire Extinguisher (dry Powder). ● Testing And Commissioning Report The Contractor Shall Submit The Tcr After The Completion Of The Testing And Commissioning. The Tcr Shall Be Reviewed And Accepted By Pnoc And Building Owner Representative(s). 4.5. Operation And Maintenance The Contractor Shall Perform A One-year O&m Support To Pnoc. The Contractor Shall Provide A Comprehensive One-year Maintenance Plan, Which Shall Include, But Not Limited To, Daily Monitoring Of System Performance, Preventive Maintenance And Repair Works, Technical Support In Case Of Unforeseen Decreasing Pv System Performance, And End-user Training. The Training Shall Include, But Not Limited To Lectures And On-site Strategy Covering The Methods Of Operation, Maintenance, Basic Troubleshooting, And Management Of The Facility. All Costs And Expenses For The Training, Except Those Incurred By Pnoc Which Include, But Not Limited To Their Own Transportation And Accommodation Expenses, Shall Be Borne By The Contractor. A Corresponding Certificate Of Completion Shall Be Issued To The Participants In The Training. During The One-year O&m, The Epcc Contractor Shall Guarantee The Minimum Annual Production Of 30,132.00 Kwh For The Rooftop Solar Pv System. If Ever The Minimum Annual Pv Production Was Not Achieved Mainly Due To Uncontrollable Factors, Then No Penalty Will Be Imposed On The Contractor. However, If Defects In Any Of The System Components, Especially In The Inverters, Are Found To Contribute To The Performance Issues Of The Pv System, Then The Contractor Shall Pay A Corresponding Compensation Equivalent To The Total Amount Of Revenue Lost To Pnoc From The Declared Minimum Annual Production Guarantee Of 30,132.00 Kwh. Moreover, The Cost Of Any And All Rework And/or Restoration Of Damaged Properties Due To The Contractor’s Poor Workmanship Or Negligence Shall Be Borne By The Contractor. 5. Deliverables The Contractor Shall Ensure That The Following Deliverables Must Be Provided To Pnoc With Physical Copies As The Official Submission And Electronic Copies As Advance Submissions. Any Later Correction And Changes Found Necessary By Pnoc, And All Resulting Additional Costs And/or Delays Shall Be Of The Contractor’s Account. Pnoc Reserves The Right To Reproduce Any Drawings Or Documents Received From The Contractor As May Be Necessary. The Contractor Shall Provide All The Necessary Deliverables Before The Start Of The Testing And Commissioning, Except For The Deliverables That Need To Be Submitted At Earlier Date For Review And Approval Of Pnoc (e.g., Detailed Project Plan And Timeline, Site And Energy Yield Assessment Reports, Detailed Project Designs And Engineering Plans, And Procurement Records And Equipment Warranties). 5.1. Documentation ● Detailed Project Plan And Timeline ● Site And Energy Yield Assessment Reports ● Detailed Project Designs And Engineering Plans ● Procurement Records ✔ Bill Of Materials ✔ Shop/fabrication Drawings ● Installation And Commissioning Reports ● Wiring And Termination Diagrams ● As-built Drawings (power & Control Circuits) And Electronic Programs/ladder Logic Diagrams ● Equipment And O&m Manuals ● List Of Necessary Spare Parts, Tools, And Consumables ● Warranty Certificates Of The Solar Panels And Balance Of System (bos) And All Other Applicable System Components And Tools 5.2. Performance Guarantees ● Assurance Of System Performance Metrics ● Warranty And Maintenance Agreements 5.3. Operation And Maintenance (o&m) ● Detailed One-year O&m Plan ● Regular Maintenance Schedule And Procedures ● Immediate Response And Repair Protocols ● Performance Monitoring And Reporting ● List Of Necessary Spare Parts, Tools, And Consumables 6. Commencement Date And Period Of Implementation The Commencement Date Of The Project Shall Be Upon Receipt Of Notice To Proceed (ntp). There Will Be Two (2) Main Activities For This Entire Engagement: The Epcc And O&m Support. The Duration Of The Epcc And O&m Support Shall Be Ninety (90) Maximum Days From The Receipt Date Of The Notice To Proceed And 365 Days From The Official Start Of Operation Of The 25 Kwp Rooftop Solar Pv System, Respectively. 7. Payment Terms Milestone Payments Will Be Adopted Where The Payment Shall Be Released Upon Reaching The Specific Project Milestone, To Ensure That These Conform To The Requirements Set For The Purpose. The Payments Are Subject To The Usual Government Accounting And Auditing Requirements. Hence, The Contractor Is Expected To Be Familiar With The Government Accounting And Auditing Manual (gaam). Project Milestone* Percentage Of Payment Completion Of Installation And Testing & Commissioning 90% Handover And Completion Of Training For Building Operators 10% *retention Money: 10% For Every Progress Billing. 8. Evaluation Criteria Bids Exceeding The Identified Approved Budget For The Contract (abc) Will Automatically Be Disqualified. The Selection Of The Contractor Will Be Based On: 8.1. Experience And Track Record In Similar Projects • Bidders Must Have Completed Solar Pv Contracts With A Minimum Total Aggregate Installed Capacity Of 1 Mwp, Where At Least Two (2) Contracts Must Be Fully Operational For The Last Two (2) Years, From The Date Of Bid Submission. • Must Be Compliant With The Iso 9001:2015 Standard On Quality Management System (qms). 8.2. Technical Expertise And Key Personnel The Contractor Shall Employ And Certify To Their Competency The Minimum Key Personnel Dedicated For The Project. Personnel Qty Qualifications Experience Project Manager 1 Shall Be Licensed Electrical Engineer ● Has Completed At Least Three (3) Solar Pv Projects, One (1) Of Which With At Least 50% Of The Project Capacity (kwp) ● Minimum Of Three (3) Years’ Experience In Solar Project Management Electrical Design Engineer 1 Shall Be Licensed Electrical Engineer ● Has Completed At Least Three (3) Solar Pv Projects, One (1) Of Which With At Least 50% Of The Project Capacity (kwp) ● Minimum Of Three (3) Years’ Experience In Design Of Solar Project Structural Design Engineer 1 Shall Be Licensed Civil Engineer ● Has Completed At Least Three (3) Solar Pv Projects, One (1) Of Which With At Least 50% Of The Project Capacity (kwp); Minimum Of Three (3) Years’ Experience In Structural Integrity Assessment Project Site Engineer 1 Shall Be Licensed Electrical Engineer ● Has Completed At Least Three (3) Years Of Experience In Project Supervision Of Solar Pv Projects, One (1) Of Which With At Least 50% Of The Project Capacity (kwp); Safety Officer 1 With Bachelor’s Degree And Either Bosh Or Cosh Certification ● Minimum Of Three (3) Years Of Experience In Construction. Qa/qc Engineer 1 Shall Be Licensed Electrical Engineer ● Minimum Of Three (3) Years Of Experience In Construction Of Solar Pv Projects. Testing And Commissioning Engineer 1 Shall Be Licensed Electrical Engineer ● Has Completed At Least Three ● (3) Years’ Experience In Testing And Commissioning Of Solar Pv Projects, One (1) Of Which With At Least 50% Of The Project Capacity (kwp); Must Have Adequate Knowledge In Inverter Programming Configuration And Programmable Logic Controllers. The Contractor May Nominate The Personnel In Dual Positions, Except For The Project Manager, For As Long As They Are Qualified And Capable Of Doing Multiple Tasks And With The Assurance That It Can Deliver The Work On Time Without Compromising The Quality. 8.2.1. Roles Of The Key Personnel ● Project Manager - Shall Be The Single Point Of Contact With Pnoc For All Matters Pertaining To The Project. The Project Manager Shall Always Be Available During Weekly Meetings And In Cases Where His/her Presence Is Needed. ● Electrical Design Engineer - Shall Be Responsible For The Engineering Design Of The Pv System. The Design Team Shall Always Be Available During Meetings Pertaining To The Design And Specifications. ● Structural Design Engineer – Shall Be Responsible For The Validation Of The Structural Integrity Of The Building(s). ● Project Site Engineer - Shall Be In-charge Of The Overall Supervision Of The Project Execution. The Project Engineer Shall Always Be Available At The Site During The Epcc. During The Three-year O&m Period, He/she Shall Conduct All Required O&m Activities For The Project. ● Safety Officer – Shall Ensure The Safety And Health Of All Personnel Involved In The Construction By Monitoring And Assessing Possible Hazards In The Area. ● Qa/qc Engineer – Shall Ensure That All Delivered Materials And Works Performed Are Within Standards And Specifications. ● Testing And Commissioning Engineer – Shall Lead The Proper Testing And Commissioning Of The Pv System. 9. Project Schedule As Part Of Bid Submission, The Contractor Shall Provide The Project Schedule, Which Should Include Key Milestones Such As: 9.1. Completion Of Site And Energy Yield Assessments. 9.2. Procurement And Delivery Of Equipment. 9.3. Completion Of Installation And Commissioning. 9.4. Handover And Training For Building Operators. 9.5. One-year O&m Period. The Contractor Shall Use Applicable Software Or Computer Programs In Presenting The Project Schedule. 10. Preliminary Design Drawings The Preliminary Design Shall Be Provided For The Rooftop Solar Pv System To Give An Overview Of The Project To Be Developed, As Part Of The Bid Submission Of The Contractor. This Must Be Adequate And Sufficient To Understand The Concept And Orientation Of The Pv System Being Proposed. Design Drawings Shall Be Submitted In A3 Size, Including, But Not Limited To The Following: Sheet Content Cover Page Project Title G / 1 List Of Drawings, Legend And General Notes G / 2 Project Location Map, Site Development Plan, Project Site Conditions And Technical Features E / 1 Tapping Point E / 2 Single Line/riser Diagram E / 3 Dc And Ac Load Schedule Calculation E / 4 Control And Monitoring System Topology E / 5 Solar Pv Array Stringing Plan E / 6 Dc, Ac And Communication Cable Routing Details E / 7 Proposed Grounding System Location And Wiring E / 8 Ct And Metering Installation E / 9 Lightning Arrester And Grounding S / 1 Solar Pv Array Mounting & Framing Details S / 2 Inverters Station And Tapping Point Station Details S / 3 Access Ladders/railings For Maintenance S / 4 Concrete Roof Deck Foundation And Calculation (as Needed) 11. Compliance With Industry Standards And Codes Without Limiting The Contractor’s Obligations, All Engineering And Construction/installation Works Performed, All Equipment Furnished, And All Tests Carried Out Under This Engagement Shall Be Undertaken In Accordance With The Latest Industry Standards And Regulation, Including, But Not Limited To The Following: ● Grid Code Or Distribution Code ● Distribution Services And Open Access Rules (dsoar) ● Philippine Electrical Code (pec) ● National Building Code Of The Philippines (nbcp) ● National Fire Protection Association Standards (nfpa) ● National Structural Code Of The Philippines (nscp) ● Revised Fire Code Of The Philippines Of 2008 ● International Electrotechnical Commission (iec) Standards ● Underwriter’s Laboratories Inc. (ul) And/or Factory Manual (fm) Or Equivalent Standards 12. Weekly Construction Meetings And Progress Reports The Contractor Shall Conduct Weekly Construction Meetings To Be Held Either On Site Or Online And Provide Progress Reports. Progress Reports Must Be Submitted To Pnoc Also At A Weekly Basis, Which Shall Include Program Of Work, Materials Delivery Status And Accomplishment And Target Report. For Urgent Matters, Pnoc May Advise Emergency Meetings. ● Program Of Work – Shall Include Pert/cpm, S-curve, Bar Chart, Manpower, And Equipment Utilization Schedule. The Contractor Shall Utilize Applicable Software Or Computer Programs In Presenting The Program Of Work. ● Materials Delivery Status – Shall Reflect The Status Of All Materials Being Procured Including The Descriptions, Quantity, Name Of Suppliers, Purchased Order Number, Eta Site, Etc. ● Accomplishment And Target Report – Shall Be Presented In Ms Powerpoint Or Equivalent. It Should Include The Percentage Of Weekly Accomplishments, Safety Reports And Targets. In Case Of Delays Or Slippage, The Contractor Shall Provide A Detailed “catch-up” Plan. 13. Workmanship Workmanship Shall Follow The Iso 9001:2015 Standard On Quality Management System (qms). The Contractor Shall Accept Full Responsibility For Its Work In The Design, Specifications, Procurement, Fabrication, Manufacture, Construction, Erection, Installation, Calibration And Testing, Quality Control, Documentation, Testing And Commissioning And Performance Testing. The Contractor Shall Be Responsible For The Safety And Security Of Its Personnel Within The Project Site(s) And Provide Proper Personal Protective Equipment (ppe). The Contractor Shall Also Be Responsible For All Compliance With The Distribution Utility (du) And Energy Regulatory Commission (erc) Requirements To Attain Smooth Synchronization And Commercial Operation. The Contractor Shall Be Deemed Solely Liable For All Its Suppliers And Subcontractors And Shall Compensate Pnoc Against All Third-party Claims Or Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Supplied Equipment Or Any Part Thereof. 14. Certificate Of Acceptance Certificate Of Acceptance For Accomplished Works Shall Be Issued To The Contractor By Pnoc To Certify Its Successful Execution And Performance. ● A Certificate Of Partial Project Completion Shall Be Issued After The 90% Completion Of The Scope Of Work; And ● A Certificate Of Final Acceptance Shall Be Issued By Pnoc After The Completion Of The Defects And Liability Period And The Submission Of Warranty Certificates And Security. 15. Project Turnover The Project Shall Be Turned Over To Pnoc Upon Completion Of The Scope Of Work. The Contractor Shall Issue An Endorsement Letter For Proper Turnover. 16. Warranty Certificates The Contractor Shall Turnover The Warranty Certificates For The Following Structures And Equipment To Pnoc Prior To Issuance Of Certificate Of Final Acceptance: ● A Twenty-five (25)-year Linear Power Warranty From The Manufacturer On The Solar Pv Modules With At Least Eighty Percent (80%) Power Output Guaranteed At Twenty-five (25) Years. The Solar Pv Module Manufacturer Shall Confirm That The Warranty Applies On An “as Installed Basis,” I.e., It Will Confirm The Modules Were Installed According To Its Requirements And Specifications For Installation. ● A Fifteen (15)-year Warranty On The Permanent Structures Which Include Mounting And Racking Systems Used In The Rooftop Solar Pv System. ● A Ten (10)-year Warranty From The Manufacturer On The Solar Pv Modules. The Pv Module-manufacturer Shall Confirm That The Warranty Applies On An “as Installed Basis,” I.e., It Will Confirm The Pv Modules Were Installed According To Its Requirements And Specifications For Installation. ● A Five (5)-year Warranty From The Manufacturer On The Inverters. The Inverter Manufacturer Shall Confirm That The Warranty Applies On An “as Installed Basis,” I.e., It Will Confirm The Inverters Were Installed According To Its Requirements And Specifications For Installation. ● A One (1)-year Warranty For Safety And Protection Devices, Cables, Instrumentation, And Control/ Communication Devices Including Software, Ip Cameras And Web Portal And All Other Accessories Used In The Solar Pv System. 17. Defects And Liability Period Defects And Liability Period Shall Include Servicing Of Defective Goods And Services Under The Warranty Obligations And Conditions Stipulated In The Contract. Repairs, Troubleshooting, And Other After-sales Support To Commence Within Seven (7) Calendar Days Upon Receipt Of Notification From Pnoc. Replacement For Locally Available Components Shall Not Exceed Fifteen (15) Calendar Days Upon Receipt Of Notification From Pnoc. Replacement For Imported Components Shall Not Exceed Sixty (60) Calendar Days Upon Receipt Of Notification From Pnoc. 18. Spare Parts, Tools, And Consumables The Contractor Shall Supply The Necessary Spare Parts, Tools, And Consumables For The Installation, Testing And Commissioning, As Well As The Operation And Maintenance Of The Project. These Items Will Be Turned Over To Pnoc Upon Completion Of Testing And Commissioning. Particulars Qty Unit Electrical Pliers 6" 1 Unit Electrical Pliers 8" 1 Unit Long Nose Pliers 6" 1 Unit Long Nose Pliers 8" 1 Unit Side Cutter Pliers 6" 1 Unit Side Cutter Pliers 8" 1 Unit Allen Wrench (black Iron), Metric 1 Set Crimping Tools (rj45) 1 Unit Screwdriver (flat, 8") 1 Unit Screwdriver (cross, 8") 1 Unit Adjustable Wrench 1 Unit Combination Wrench (applicable Sizes) 1 Set Toolbox 20" (big) 1 Unit Clamp Meter (1,000volts; With Rogowski Coil) 1 Unit Vice Grip 8" 1 Unit Torque Wrench 3/8” Square Drive With Complete Set Of Sockets (solar Pv For Distribution Panel) 1 Set Portable Washer With Pump, 7.5mpa Pressure, 5 Liter/minute 1 Unit 16 Ton Quick Hydraulic Crimper Cable Plier Tool Kit, 16-300mm/11 Die 1 Unit Dry Chemical Fire Extinguisher (10 Pounds) 1 Unit Rj 45 Connector (100pcs Per Pack) 1 Pack Electrical Tape (0.16mm X 19mm X 8meters; Black) 5 Roll Cable Tie (uv Resistant; 12”; 100pcs Per Pack) 1 Pack Rubber Tape (18mm X 8meters; Black) 1 Length Others (please Specify, If Needed) 19. Allied Services 19.1. Markings And Labeling The Contractor Shall Provide Markings And Labelling On All Electrical Equipment (including Wires) In Accordance With Applicable Codes And Standards Or As Otherwise Agreed Upon With The Building Owner. Markings Shall Be Clearly Visible, Located Visibly On The Equipment, Constructed And Installed To Remain Eligible For The Whole Of The Design’s Life Of 25 Years. The Marking And Labeling Shall Be Compliant With The Following Codes: ● Pec Article 6.90 And Article 1.10 ● Ul 696 19.2. Safety Signages And Fire Extinguishers The Contractor Shall Provide Safety Signages As Per Standards Including Warnings For High Voltage, Cable Burial, Etc. The Contractor Shall Likewise Provide A Fire Extinguisher To Be Mounted Near Each Of The Identified Solar Array Stations, Inverter Station And Tapping Point Station As Per Design Drawings. 19.3. Power Supply The Contractor Shall Provide Power Supply, Complete With Protection Devices (e.g., Circuit Breakers, Avr, Etc.) For Equipment That Will Require Power Such As Poe Hub, Inverter Controller, Router, Etc. The Contractor Shall Identify The Location Of The Tapping Source And Request Permission To The Building Owner. 19.4. Water Source The Contractor Shall Coordinate With The Building Owner For The Location Of The Water Source To Be Used During Maintenance (e.g., Pv Module Cleaning). 19.5. Canopy In Case An Inverter Station Or Any Equipment Is Placed Outdoors, A Canopy Shall Be Provided As Per Manufacturer’s Standards And Recommendation. 19.6. Access Platforms, Stairs And Safety Handrails The Contractor Shall Provide Access Such As Sufficient Portable Access Ladder Along The Pv Facility For Safety And Protection During Construction And Pnoc’s Operations And Maintenance. The Contractor Shall Provide Anchors At Strategic Locations For Safety Harnesses. 19.7. Relocation Or Modification Of Existing Structures The Pv System Shall Be Designed With No Requirement For Relocation Or Modification Of The Existing Structures. In Extreme Cases When Relocation Or Modification Of Existing Structures Is Necessary, The Contractor Shall Submit Modification Or Relocation Plan To Ensure That The Structures Shall Be Maintained, Restored Or Upgraded. 20. Available Data And Schedule Of Site Inspection Potential Bidders Can Access The Relevant Site Data (e.g., Electric Consumption Information, Plans, And Drawings) Via The Following Link: • Https://bit.ly/carmona-water-district The Site Inspection Is Scheduled For October 22 And 25, From 9:00 Am To 12:00 Pm (can Be Subject To Change). Bidders Must Inform Pnoc Representatives In Advance Using The Contact Details Provided Below: • Louie Aaron L. Razon: +639564761790 • Richard Miguel D. Allauigan Jr.: +639178460403 • Patrick Jose Iv V. Andaya: +639369318841 21. Technical Specifications And Standards 21.1. Design Calculations The Design Of The Pv System Shall Be For A Minimum Service Life Of Twenty-five (25) Years. Design Shall Consider Service Conditions That Will Affect The Performance Of The Solar Pv System Such As Irradiation, Uv Radiation, Temperature Variations, Rainfall Intensity, Humidity, Pollution Etc. Design Shall Be Able To Protect And Harness The Equipment From Natural Calamities Such As Earthquake, Tropical Typhoons, Cyclones And Wind Gustiness Prevailing In The Philippines. 21.1.1. Electrical Design Maximum Dc Voltage Per String Shall Not Exceed 1500 Volts At A Temperature Of 15 Degrees Celsius. Minimum Dc Voltage Per String Shall Be More Than The “minimum Input Voltage” Of The Inverter At A Temperature Of 50 Degrees Celsius. Minimum Dc Voltage Per String After 20 Years Shall Be More Than The “minimum Input Voltage” Of The Inverter At A Temperature Of 50 Degrees Celsius. Maximum Dc Power Per Array (combination Of Strings) Shall Be Less Than The Maximum Allowable Generator Power Of Inverter. Maximum Voltage Drop Between Equipment To Equipment Shall Not Exceed 1% On Dc System And 5% On Ac System. 21.1.2. Structural Design Seismic Loading Shall Be Selected To Ensure The Performance Criteria Set Out Below Are Achieved: ● All System’s Components Which Are Critical To The Generation Of Electricity Shall Remain Undamaged And Operational Following A Moderate Earthquake; ● In Case Of A Massive Earthquake, The Damage To Structures And Equipment Shall Be Limited To That Which Can Be Repaired Sufficiently Quickly For The Generation Of Electricity To Resume Safely Within Thirty (30) Days, Unless Otherwise The Main Building Has Collapsed; And ● Potential Costs Of Repair Or Replacement And The Duration Of Inability To Generate Electricity After A Large Seismic Event Shall Be Minimized. The Wind Resistant Design Required For The Facility Shall Be At Minimum Of 270 Kph. In Case The Basis For Wind Resistant Design In The Latest National Structural Code Of The Philippines (nscp) Is Higher, Then Nscp Shall Govern. 21.2. Minimum Pv System Components Specifications 21.2.1. Solar Pv Modules The Modules Must Follow The Iec 61215 Standards (i.e., Crystalline Silicon Terrestrial Photovoltaic Modules; Design Qualification And Type). These Shall Be Made Of Monocrystalline Material Solar Cells, Tested In Extreme Weather Conditions, And Equipped With Safety Protection Mechanisms. These Shall Also Have A Minimum Efficiency Of 17% At Standard Testing Conditions (stc). The Solar Pv Panels Supplied Must Include A Performance Warranty Guaranteeing No More Than 2% Efficiency Degradation In The First Year And No More Than 0.5% Annual Degradation Thereafter. At The End Of 25 Years, The Panels Must Still Produce At Least 85% Of Their Original Rated Power Output. The Solar Pv Modules Supplied Must Be Manufactured By A Tier 1 Manufacturer As Defined By Industry-recognized Standards Such As Bloomberg New Energy Finance (bnef) Or Equivalent. 21.2.2. Pv Mounting System The Pv Mounting System Shall Be Suited To The Environment And Atmospheric Conditions (e.g., Corrosion, Salt). Structures Shall Be Fixed, Metallic And Have Appropriate Design And Adequate Strength Which Can Withstand The Load Of The Modules, Cyclonic And High Wind Velocities As Applicable To The Site Condition. The Material Shall Be Robust And Non-corrosive, Made From Anodized Structural Grade Aluminum 6005 T5 And/or Stainless-steel Components Or Equivalent. Use Of Different Metals Shall Be Avoided Where Practically Possible To Prevent Galvanic Corrosion. The Structure Shall Prevent Water Accumulation. The Mounting System Must Be Compliant To As/nzs1170.2:2011 Amdt 2-2012 Standard Or Equivalent. 21.2.3. Inverter The Inverter To Be Used Shall Be String Type, Weatherproof And Equipped With A Safety Protection Mechanism. The Inverter Shall Be Compatible With The Existing Electrical System. The Inverter And Its Appurtenances Shall Be State-of-the-art With Energy Management And Communication System And Maximum Power Point Trackers (mppt) For Optimum Performance. The Inverter Shall Have Efficiency Of Not Less Than 98.5%, With A 10-year Guaranteed Service Life. It Also Must Have The Following Minimum Communication Specifications: Wlan/ethernet, Wi-fi, And 4g/3g/2g. The Mounting Shall Be Robust And Non-corrosive, Made From Hot-dipped Galvanized Structural Steel Or Equivalent. The Foundation Shall Be Fixed And Secured. The Inverter Shall Have Adequate Spacing, Free From Obstructions And Well Ventilated. 21.2.4. Inverter Controller The Inverter Controller Shall Be The Central Communication Unit For System Monitoring, Recording Data And Controlling. It Shall Be Capable Of Interconnection Of Other Measuring Devices Such As Solarimeter, Weather-meter, Etc. 21.2.5. Dc Combiner In Cases Where Design Requires The Need For A Dc Combiner, The Dc Combiner Shall Be Made Of Glass-fiber Reinforced Polyester Material Or Approved Equivalent. Enclosure Protection Shall Be Sealed, Dust Proof, Vermin, Waterproof And Sturdy – Compliant To Ip65/nema 3r Or Equivalent. Mounting May Be Wall-mounted Type Or Stand-alone Support. The Dimensions And Thickness Are As Per Manufacturer’s Standard. It Shall Be Rated 1500vdc Minimum. The Dc Combiner Shall Have Appropriate Cable Entry Points, With Cable Glands, Fitted For Input And Output Cables And A Lockable Door. The Dc Combiner Shall Be Equipped With Auxiliaries Such As Circuit Breakers, Surge Protection Devices And Grounding Terminals, Mounted On Din Rail Or Equivalent And With Adequate Spacing For Easy Termination And Testing. Auxiliaries Shall Conform To Iec Standards Or Equivalent. All Circuit Breakers And Fuses Shall Be Compliant With Iec 60947 Part I-iii, Is 60947 Part I-iii And En 50521 Or Equivalent. The Voltage Rating Shall Be A Minimum Of 1000vdc. The Ampere Trip/ampere Frame, Number Of Poles And Other Mechanical Parameters Shall Be As Per Design Standards. 21.2.6. Ac Combiner Enclosure Protection Shall Be Sealed, Dust Proof, Vermin, Waterproof And Sturdy – Compliant To Ip65/nema 3r Or Equivalent. Mounting May Be Wall-mounted Type Or Stand-alone Support. The Dimensions And Thickness Are As Per Manufacturer’s Standard. It Shall Be Rated 0.6/1kv Minimum. The Ac Collector Shall Have Appropriate Cable Entry Points, With Cable Glands, Fitted For Input And Output Cables And Lockable Doors. The Ac Collector Shall Be Equipped With Auxiliaries Such As Circuit Breakers (mounted On Busbar With Adequate Spacer) And Neutral And Grounding Terminal Mounted On Din Rail Or Equivalent And With Adequate Spacing For Easy Termination And Testing. Auxiliaries Shall Conform To Iec Standards Or Equivalent. All Circuit Breakers Shall Be Compliant With Iec 60947 Part I-iii, Is 60947 Part I-iii And En 50521 Or Equivalent. The Minimum Voltage Rating Shall Be Equivalent To Inverter Output Voltage. The Ampere Trip/ampere Frame, Number Of Poles And Other Mechanical Parameters Shall Be As Per Design Standards. 21.2.7. Transformer In Cases Where Design Requires The Need For A Transformer, The Transformer Configuration Shall Be Based On The System Configuration Or Topology Between The Inverter I.e., Tn-s, Tn-c, Tn-c-s, Tt And It And Grounding Configuration And Voltage. Depending On The Location, The Transformer Shall Either Be Outdoor Type Or Indoor Type In Compliance With Nema Or Ip Standards. The Compartment Shall Be Metal-enclosed And Non-corrosive. The Transformer Shall Be Dry-type, Self-cooled And Floor Mounted. The Foundation Shall Be Equipped With An Anti-vibration Pad Or Equivalent. The Transformer Shall Be Ul/iec Listed Or Equivalent. 21.2.8. Transient Voltage Surge Suppressor With Isolation Switch The Tvss Shall Be Capable Of Bi-directional Filtering Of Harmonics And Surges That May Be Created From The Pv System And From The Grid. The Surge Protection Devices Shall Be Compatible With The Existing Electrical System. The Ampere-interrupting Capacity (aic) Rating Of The Devices Shall Be Equal To Or Greater Than The Available Fault Current To Which They Might Be Subjected. Enclosure Protection Shall Be Sealed, Dust Proof, Vermin, Waterproof And Sturdy – Compliant To Ip65/nema 3r Or Equivalent. It Shall Be Rated 0.6/1kv Minimum. 21.2.9. Pv Generation (revenue) Meter Including Ct/pt And Terminals The Pv Generation (revenue) Meter Shall Be Digital Multi-function Power Meters Complete With Cts And Potential Fuses. The Meter Shall Conform To The Following Minimum Requirements: ● Iec Or Ansi Revenue Metering Standards (i.e., Class 0.3 Accuracy); And ● Capable Of Providing Outputs And Terminal Strips For Remote Monitoring And Data Acquisition Using Rs485 Or Equivalent. The Meter Shall Be Boxed In A Standard Enclosure With A Viewing Window Made Of Fiberglass Or Equivalent. 21.2.10. Ecb Main Disconnect Switch The Enclosed Circuit Breaker Shall Act As The Main Fault Current Protection Device And Disconnect Switch To Isolate The Solar Pv System From The Existing Electrical System. Enclosure Protection Shall Be Sealed, Dust Proof, Vermin, Waterproof And Sturdy – Compliant To Ip65/nema 3r Or Equivalent. The Dimensions And Thickness As Per Manufacturer’s Standard. It Shall Be Rated 0.6/1kv Minimum. The Circuit Breaker Shall Be Compliant With Iec 60947 Part I-iii, Is 60947 Part I-iii And En 50521 Or Equivalent. The Minimum Voltage Rating Shall Be Equivalent To System Voltage. The Ampere Trip/ampere Frame, Number Of Poles And Other Mechanical Parameters Shall Be As Per Design Standards. 21.2.11. Cables Pv Cables Shall Be Copper Type. It Shall Be Uv-rated, Sunlight-resistant, Water-proof Protection And Manufactured Under Ul Standard. It Shall Be Designed And Manufactured In Accordance With: ● Iec 60811: Insulation And Fire Protection ● Iec 60227 And Iec 60502: Design ● Iec 60228: Conductors ● Ul 1581 (xeno-test), Iso 4892-2 (method A) Or Hd 506/a1-2.4.20: Dc Solar Cables All Power Cables Shall Be Of Xlpe Insulated With Pvc Sheathed, 0.6/1kv Single Or Multicore, Stranded Copper Conductor. The Conductor Shall Be Made From Electrical Purity Copper For Power Cables And Annealed High Conductivity Copper For Control Cables. Conductors Shall Be Stranded For Copper Power Cables And Solid For Copper Control Cables. All Cables Shall Be Designed To Withstand The Mechanical, Electrical, And Thermal Stresses Under The Steady State And Transient/ Fault Conditions. All Cables Shall Be Suitable For High Ambient Temperature, High Humidity And Tropical Climatic Conditions. All Cables Shall Be Color Coded As Per Iec 60364 And Should Be Provided With Tag/marking. All Cable Ties Should Be Uv Protected And Can Withstand High Heat Stress Without Damaging The Cables. Cable Ties Shall Conform To En 50146 And Iec 62275 Standards. Cables To Be Supplied Are Categorized As Follows: Particular Description Requirement Pv String Cables Cables From Pv Strings To Dc Enclosures Must Be 2 X 6mm2 Dc Enclosure Cables Cables From Dc Enclosures To Inverters As Per Pec Standards Inverter Cables Cables From Inverters To Ac Collector As Per Pec Standards Ac Collector Cables Cables From Ac Collector To Transformer As Per Pec Standards Transformer Cables Cables From Transformer To Ecb For Disconnect Switch As Per Pec Standards Tapping Point Cables Cables From Ecb For Disconnect Switch To Tapping Point As Per Pec Standards Grounding Cables Cables For Grounding As Per Pec Standards Neutral Cables Cables For Neutral As Per Pec Standards Communication Cables Cables For Controls And Monitoring Utp, Ethernet, Cat5/cat6 Power Supply Cables Cables For 220-240v Power Supply As Per Pec Standards 21.2.12. Raceways (cable Trays, Conduits, Pvc Pipes And Fittings, Accessories) Cable Trays And Fittings Shall Be Hot-dipped Galvanized With A Minimum Of 2mm Thickness In Accordance With Iec Standards Or Equivalent. Conduit Shall Be Rigid Steel In Accordance With Iec Standards Or Equivalent. Pvc Systems That Are To Be Buried Underground Shall Conform To Iec 61386 Part 24 Standards Or Equivalent. Raceways Shall Be Color Coded As Per Standards Or As Per Existing Color Coding Of The Building. 21.2.13. Lightning Arrester And Grounding System In Cases Where Design Requires The Need For A Lightning Arrester And Grounding System, The Lightning Protection Shall Be Made Of Conventional Lightning Protection Or The Early Streamers Emission (ese) Type. It Shall Be Equipped With A Lightning Strike Counter. The Protection Radius Shall Cover The Whole Solar Pv Facility. The Grounding System Shall Have A Maximum Resistivity Of 5 Ohms. The Size And Diameter Of Bare Copper And Grounding Rod Shall Be As Per Standard. The Safety Protection Devices Shall Provide Optimum Filtering In Relation To The Specification Of Inverter And Pv Panels. The Surge Protection Device Shall Be Compact And Shall Comply In Accordance With The Ul 1449 3rd Edition Testing, Ansi/ieee C62 And Ansi/ieee Std. 1100-1999 The Surge Protection Devices Shall Be Compatible With The Existing Electrical System. The Ampere-interrupting Capacity (aic) Rating Of The Devices Shall Be Equal To Or Greater Than The Available Fault Current To Which They Might Be Subjected. The Grounding Wires Shall Be Placed In A Standard Uv-rated Pvc Or Equivalent. 21.2.14. Pv Monitoring And Data Acquisition System (internet Connection) The Pv Monitoring And Data Acquisition System Shall Be Capable Of Both Remote And Onsite Access And Monitoring Via A Subscription-free Online Platform. The System Shall Be Able To Provide The Following Minimum Data: ● Energy Generation (kwh); ● Power (kw); ● Power Factor; ● Voltage; ● Current; ● Irradiance; ● Weather; And ● Temperature The System Shall Be Capable Of Detecting Failures And Fault Conditions. Data Transmission Shall Be Real-time And Shall Be Equipped With Safety And High-security Protocol. The Data Shall Be Displayed In Graphical Trends And In Figures. Historical Data Shall Be Available For A Minimum Of One (1) Year. 21.2.15. Cctv/ip Surveillance Camera The Cctv/ip Surveillance Camera Shall Be Capable Of Onsite Monitoring, Continuous Recording, And Remote Access And Monitoring Via A Subscription-free Online Platform. Viewing Shall Be Real-time And Can Operate 24/7. Video Recording Shall Be Capable For A Minimum Of One (1) Month. The Camera Shall Be Robust, Weatherproof And With High-resolution. Type Fixed Bullet Video Camera 2 Units Resolution 1080hd Enclosure Weatherproof, Outdoor Ip65 Or Equivalent, Minimum Hard Disk Drive 2tb Sata 6.0gb/s Cache 64mb Surveillance Type Nvr Minimum 8 Channel Ip Camera, Resolution Minimum Of 1920x1080 Poe Hub/switch 8 Ports Cpe/router/modem 1 × Usb 2.0 Port For Connecting 4g/3g Modem As Wan Backup; 4 × Gigabit Wan/lan Ports; Non-wifi Router 21.2.16. Communication And Control Cables, Radio Transmission Or Fiber Optics Or Equivalent If Long Distance Controls Are Needed, A Radio Transmission Or Fiber Optics Or Any Equivalent Communication Protocol May Be Used. In The Case Of Wireless Communication, It Shall Be Equipped With Reliable Communication Equipment Such That It Will Not Create Unacceptable Delays And Interference That Would Compromise The Operability Of The Whole System.
AGENCY FOR HEALTHCARE RESEARCH AND QUALITY USA Tender
Telecommunication Services
United States
Closing Date13 Nov 2024
Tender AmountRefer Documents
Details: This Is A Small Business Sources Sought Notice (sbss). This Is Not A Solicitation For Proposals, Proposal Abstracts, Or Quotations. The Purpose Of This Notice Is To Obtain Information Regarding: (1) The Availability And Capability Of Qualified Small Business Sources; (2) Whether They Are Small Business; Hubzone Small Businesses; Service-disabled, Veteran-owned Small Businesses; 8(a) Small Businesses; Veteran-owned Small Businesses; Woman-owned Small Businesses; Or Small Disadvantaged Businesses; And (3) Their Size Classification Relative To The North American Industry Classification System (naics) Code For The Proposed Acquisition. Your Responses To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method, Including Whether A Set-aside Is Possible. An Organization That Is Not Considered A Small Business Under The Applicable Naics Code Should Not Submit A Response To This Notice. project Description And Requirements: the Medical Expenditure Panel Survey (meps) Is A Set Of Large-scale Surveys Of Families And Individuals, Their Medical Providers (doctors, Hospitals, Pharmacies, Etc.), And Employers Across The United States. Collectively These Meps Surveys Collect Data On The Specific Health Services That Americans Use, How Frequently They Use Them, The Cost Of These Services, And How They Are Paid For, As Well As Data On The Cost, Scope, And Breadth Of Health Insurance Held By And Available To U.s. Workers. It Has Been Conducted Since 1996 And Is Administered By The Agency For Healthcare Research And Quality (ahrq). this Sbss Notice Pertains To The Meps Household Component (meps-hc). The Meps-hc Collects Data From A Sample Of Families And Individuals In Selected Communities Across The United States, Drawn As A Subsample From A Nationally Representative Sample Of Households That Participated In The Prior Year’s National Health Interview Survey (nhis). During The Meps-hc Household Interviews, Field Interviewers (fis) Collect The Following Detailed Information For Each Person In The Household From A Single Household Respondent: Demographic Characteristics, Health Conditions, Health Status, Use Of Medical Services, Charges And Sources Of Payments For Medical Services, Access To Healthcare, Satisfaction With Healthcare, Health Insurance Coverage, Income, And Employment. The Meps-hc Also Includes Supplemental Self-administered Questionnaires (saqs) That Are Administered In Web-based And/or Paper-based Form To Certain Sample Members. As Well, For Respondents Reporting Medical Events The Meps-hc Administers Authorization Forms That Seek Signed Permission From The Respondent To Contact Their Medical Providers (as Part Of The Meps Medical Provider Component Or Meps-mpc), The Full Content Of The Meps-hc Survey Is Available Online At Https://meps.ahrq.gov/mepsweb/survey_comp/survey_questionnaires.jsp. the Meps-hc Employs A Panel Design, With A New Panel Fielded Every Calendar Year. For Each Panel, Data Collection Consists Of Contacting Upwards Of 14,500 Households (representing 35,000 Individuals) Five Times Over A Two-and-a-half-year Period (approximately Every 6 Months). The Fi Workforce Consists Of Approximately 350 Interviewers Recruited And Employed Throughout The United States And Spread Across Approximately 200 Primary Sampling Units. The Meps-hc Interviews Are Conducted Primarily Face-to-face In The Respondents’ Households Using Computer Assisted Personal Interviewing (capi). However, Following The Covid-19 Pandemic Other Data Collection Modes Have Been Introduced, Including Both Computer Assisted Virtual Interviewing (cavi) And Phone Interview Modes, With Data Collection Mode Varying For Purposes To Gaining Data Collection Efficiencies. Households Sampled For Voluntary Meps-hc Participation Are Initially Contacted By Phone And/or Mail For The Purpose Of Legitimizing The Survey And Maximize Cooperation Rates Before Scheduling In-person Interviews. The Most Recent Panel 28 Round 1 Finished With A 65 Percent Response Rate. the Existing Capi Instrument For The Core Meps-hc Interview Is Programmed In Blaise Software And Consists Of Approximately 50 Different Questionnaire Sections Representing Over 1,000 Pages Of Hardcopy Material With An Average Interview Time Of Approximately 90 Minutes. The Main Meps-hc Interview Is Routinely Updated To Accommodate New Questionnaire Content Or To Apply Edits To Existing Content. Additionally, The Capi Instrument Contains A Medical Provider Directory To Enable To A More Efficient Search And Entry Of Reported Medical Providers And Searchable Lookup Tools For Commonly Reported Medical Conditions And Prescribed Medicines. Annually, New Fis Are Recruited, Hired, And Trained Over A One-week Period To Address Staffing Needs As A Result Of Field Interviewer Attrition From Previous Hiring Cohorts. New-to-project (ntp) Fi Training Is A Combination Of In-person Training Conducted At A Central Location And Web-based Training. Following The Ntp Training, Fis Receive In-home Training Materials That Are Designed To Continue Training In Support Of Data Collection Spanning A Two- And Half-year Time Period. Additionally, All Veteran (returning) Fis Receive In-person Refresher Training Every Third Year Of Employment On The Project. Data Security Measures Consistent With A Fips-moderate Classification Must Be Deployed To Maintain Confidentiality Protections Of The Meps-hc Data Collected. This Consists Of, But Is Not Limited To, The Encryption Of Interviewer Laptops, The Electronic Transfer Of Data Through Encrypted Means To A Central Location For Data Processing, And The Preparation Of Public Use Data Files. several Analytic Weights Are Developed To Enable Nationally Representative Point Estimates And Accurate Standard Errors. Data Are Cleaned And Processed Through Data Editing, Coding, Statistical Imputation Of Some Variables With Missing Data, And Implementation Of Statistical Disclosure Limitation Techniques. Editing And Imputation Work Requires Coordination With The Meps Medical Provider Component (meps-mpc) Contractor, Which Collects Information From Healthcare Providers On Charges And Sources Of Payments For Medical Events. Approximately 20 Public Use Data Files Are Released Annually Representing Thousands Of Analytical Variables Pertaining To Health Care Utilization And Expenditures As Well As Demographic Characteristics Of The Sample Population. More Information On The Public Use Data Files That Meps-hc Releases Is Available At Https://meps.ahrq.gov/mepsweb/data_stats/download_data_files.jsp. this Project Consists Of The Following Tasks: project Management, Reporting, And Meetings project Meetings project Planning, Including Quality Control Plan And Continued Operation Of The Meps-hc project Reporting, Including Monthly Progress, Finance, And Evm Reports data Security Plan, Ato Documentation, And Continuous Monitoring meps-hc And Meps-mpc Project Coordination Activities project Closeout/transfer Of Operations instrumentation instrument Development, Including Updating Main Interview And Self-administered Questionnaires (saq) In Both English And Spanish programming (and Testing) The Capi, Cavi, And Saq Instruments In Both English And Spanish develop Supporting Household Data Collection Field Materials In Both English And Spanish omb Paperwork Reduction Act (pra) Clearance sample Design And Selection designing And Implementing The Meps-hc Sample Design nhis-hc Sample File Linkages meps-hc Panel Sample Maintenance prepare And Transfer Meps-mpc Sample Files To Mpc Contractor field Staff Preparation field Interviewer And Supervisor Recruitment/hiring For Nationwide Panel Survey field Interviewer And Supervisor Training And Management For Nationwide Panel Survey meps-hc Data Collection collect Main Interview Household Data collect Saq Data collect Authorization Forms From Meps-hc Respondents For Meps-mpc Sample collect Pharmacy Patient Profiles data Management And Data Processing data Management And Data Processing Plan forms Control And Receipt between Round Data Processing data Coding/recoding data Editing And Imputation data Weighting And Variance Estimation, And Benchmarking To Outside Data Sources And Previous Meps Estimates meps-hc/mpc Statistical Matching data Files And Documentation public-use File (puf) Disclosure Review preparing Developing Puf Analytic Files And Supporting Documentation survey Documentation annual Meps-hc Methodology Report ad-hoc Methods Reports further Discussion And Detail Pertaining To The Meps-hc May Be Found At: Http://www.meps.ahrq.gov/mepsweb/survey_comp/household.jsp anticipated Period Of Performance: idiq Ordering Period: 5 Years task Order 1 Base Period: 5 Months task Order 1 Option Years 1-6: 12 Months Each task Order 1 Option Year 7: 3 Months capability Information Sought: capabilities Necessary To Fulfill This Requirement Include: project Director Experienced In The Full Survey Operations Lifecycle For A Large, National Health Household Survey ability To Recruit, Hire, Train, And Manage A Field Interviewer Workforce Of Approximately 350 Individuals That Can Interview In Any Sampled Location Within The 50 States And District Of Columbia experience Fielding Large National Longitudinal Household Panel Surveys In Both English And Spanish That Includes Multiple Rounds Of Data Collection Simultaneously experience Programming, Updating, And Maintaining Capi Survey Programs In Blaise And Cavi Programs For Video-based Interviewing. ability To Administer Supplemental Saqs And Authorization Forms On A Large Scale, Including: Printing And Mailing Pre-contact Survey Materials To Sampled Households; Administering Authorization Forms For Signature And Receipt; Programming And Implementing Web Surveys; And Creating, Printing, And Administering Paper-based Surveys experience Obtaining Clearances Such As Omb Paperwork Reduction Act (pra) And Fisma Authorization To Operate (ato) For A Fips-moderate Classified System staff With Technical Expertise In Producing Weights And Variance Estimation Variables From A Complex Survey Design, Including Nonresponse Adjustments And Calibration To Control Totals staff With Experience In All Aspects Of Data Processing For Survey Data, Including Data Editing, Coding Health Data, Statistical Imputation, And Statistical Disclosure Limitation ability To Produce Approximately 20 High-quality Public Use Data Files Per Year, Including Supporting Documentation And Codebooks the Capability Statement Response To This Small Business Sources Sought Notice Should Include The Following Information: A) Staff Expertise, Including Their Availability, Experience, And Formal And Other Training; B) Current In-house Capability And Capacity To Perform The Work; C) Corporate Experience And Information On Prior Projects Of Similar Size And Complexity; D) List Any Government Wide Contracting Vehicle For Which The Respondent Has A Contract (example, Gsa Schedule, Etc). information Submission Instruction: interested Qualified Small Business Organizations Should Submit A Tailored Capability Statement For This Requirement. the Cover Page Must Include The Following: uei Number organization Name organization Address size And Type Of Business (e.g., 8(a), Hubzone, Etc.) Pursuant To Naics Code 541910. technical Point(s) Of Contact, Including Names, Titles, Addresses, Telephone, And E-mail Addresses. all Capability Statements Sent In Response To This Small Business Sources Sought Notice Must Be Submitted Electronically (via E-mail) To Tara Bertolini, Contract Specialist, Tara.bertolini@ahrq.hhs.gov In Ms Word, Or Adobe Portable Document Format (pdf), No Later Than 2:00 Pm On November 13, 2023. Responses Should Not Exceed 20 Single-sided Pages (including The Cover Page, All Attachments, Resumes, Charts, Etc.) Presented In Single-space And Using A 12-point Font Size Minimum, That Clearly Details The Ability To Perform The Aspects Of The Notice Described Above. disclaimer And Important Notes: this Notice Does Not Obligate The Government To Award A Contract Or Otherwise Pay For The Information Provided In Response. The Government Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate. Any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization’s Qualifications To Perform The Work. Respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provide Feedback To Respondents With Respect To Any Information Submitted. After A Review Of The Responses Received, A Pre-solicitation Synopsis And Solicitation May Be Published In Sam.gov. However, Responses To This Notice Will Not Be Considered Adequate Responses To A Solicitation. confidentiality: no Proprietary, Classified, Confidential, Or Sensitive Information Should Be Included In Your Response. The Government Reserves The Right To Use Any Non-proprietary Technical Information In Any Resultant Solicitation(s).
DEPT OF THE ARMY USA Tender
Aerospace and Defence
United States
Closing Soon1 Nov 2024
Tender AmountRefer Documents
Details: The Nebraska Army National Guard Intends To Award A Sole Source Contract To The Daily Nebraskan For Advertising On The University Of Nebraska-lincoln Campus. The Limited Competition Worksheet And The Performance Work Statement Are Included In This Notice. the Daily Nebraska Will Provide Digital Banner Ads, Student Union Screen Rotations, Four Event Booths, Spring Festival Sponsor, Elevator Wrap, Two Full Page Ads In Print Publications, A Monthly E-newsletter, And A Flyer Insertion Into The New Student Orientation Welcome Bags. The Nearng Responsibility Is To Provide The Following Items To The Daily Nebraskan: The Content For The Digital Banner Ads, The Digital Content For The Student Union Rotating Screen, Support Staff To Work The Four Event Booths, Support Staff For The Spring Festival Sponsor, Artwork For The Elevator Wrap, Artwork For Two Full Page Color Ads In Two Print Publications, Announcement Content For Monthly E-newsletter And The Flyer Inserts For Roughly 6,000 New Student Orientation Welcome Bags. period Of Performance: december 2024-31 July 2024; 1 August 2024-31 July 2025; 1 August 2025-31 July 2026 contractor Deliverables:
-the Daily Nebraskan Will Ensure That The Digital Banner Ad Runs And Continues To Provide Monthly
impressions On The Unl Website For The 2023 To May 2024 School Year.
-the Daily Nebraskan Will Visibly Monitor The Two Student Union Screens For Continued Rotation Of The
nearng Rotating Ads For The 2023 To May 2024 School Year.
-the Daily Nebraskan Will Provide Ample Guidance And Details To The Nearng With Locations And
guidance For The Six Event Booths:
fall Housing
fall Pet The Stress Away
spring Housing Fair
spring Job Fair
spring Pet The Stress Away
husker Mania
-the Daily Nebraskan Ensure That The Nearng Has The Proper Information For The Booth Setup And
manning, If Available The Location Of The Large Inflatable Obstacle Course, Guidance Over The Printed
information Items And Promotional Items.
-the Daily Nebraskan Will Have The Printed Art Wrap Installed At The 19th & Vine Location
-the Daily Nebraskan Will Provide Two Copies Of The Print Publications To The Marketing; Campus Visitors Guide And The Welcome Back Guide
-the Daily Nebraskan Will Utilize The Service Announcement Content Provided By The Marketing Team At The Nearng In The E-newsletter. The Daily Nebraskan Will Send Screen Shots Of The Announcement In The Newsletter To The Marketing Team Which Will Be Determined Later.
-the Daily Nebraskan Will Provide Guidance On The Event Sponsor Of The Spring Festival To Include Social Media, Printing, Booth Space And Signage.
-the Daily Nebraskan Will Provide Guidance On The Big Red Street Festival Which Will Include Naming Rights, Signage At The Event, Logo Included In All Event Promo, Two Booths At Entrance, One Booth Inside Event, Swag Bags At Entrance, Parent Orientation Bag Inserts And Student Bag Inserts
-the Nearng Marketing Department And The Assigned Rrnco Will Verify That All Deliverables Are Being Met By The Daily Nebraskan With Monthly Meetings To Review The Roi And Effect Of The Deliverables. nearng Support:
the Nearng Will Supply The Content For One Full Digital Banner Ad That Will Run On The Unl Website, 30 Days Prior To Execution.
the Nearng Will Provide The Advertising Content For The Two Digital Rotating Screens At Each Of The Student Unions, 30 Days Prior To Execution.
the Nearng Will Provide Support Staff, Printed Materials, And Small Promotional Items At Each Of The Four Booths: Spring Housing Fair, Spring Job Fair, Husker Mania, And The Big Red Street Festival, On The Day Of The Event.
the Nearng Will Be The Sponsor At The Spring Festival Tile Event. The Nearng Will Provide The Support Staff For The Booth Setup And Manning, If Available The Nearng Will Provide The Large Inflatable Obstacle Course, Printed Information Items And Promotional Items On The Day Of The Event.
the Nearng Will Provide The Print Art For The Elevator Wrap, 30 Days Prior To Execution.
the Nearg Will Provide A Full-page Color Ad To Be Placed Into The Two Print Publications: Campus Visitor Guide And Welcome Back, 30 Days Prior To Execution.
the Nearng Will Provide New Content Monthly For The E-newsletter, 30 Days Prior To Execution.
the Nearng Will Provide A 1-page Full Color Flyer To Be Inserted Into The New Student And Parent Orientation Bags, The Quantity Of 9,000 Parents And 7,000 Students. the Following Clauses Will Be Included By Reference And Full Text In The Contract: clauses Incorporated By Reference: 52.203-6 Restrictions On Subcontractor Sales To The Government Jun 2020 52.203-11 Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions sep 2007 52.203-12 Limitation On Payments To Influence Certain Federal Transactions Jun 2020 52.204-7 System For Award Management Oct 2018 52.204-16 Commercial And Government Entity Code Reporting Aug 2020 52.204-17 Ownership Or Control Of Offeror Aug 2020 52.204-18 Commercial And Government Entity Code Maintenance Aug 2020 52.204-19 Incorporation By Reference Of Representations And Certifications. Dec 2014 52.204-21 Basic Safeguarding Of Covered Contractor Information Systems Nov 2021 52.204-23 Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities Nov 2021 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment Nov 2021 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment Nov 2021 52.204-26 Covered Telecommunications Equipment Or Services--representation. Oct 2020 52.209-6 Protecting The Government's Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment Nov 2021 52.209-10 Prohibition On Contracting With Inverted Domestic Corporations Nov 2015 52.212-1 Instructions To Offerors--commercial Products And Commercial Services Sep 2023 52.212-2 Evaluation - Commercial Items Nov 2021 52.212-3 Offeror Representations And Certifications--commercial Products And Commercial Services sep 2023 52.212-4 Contract Terms And Conditions--commercial Products And Commercial Services Dec 2022 52.217-8 Option To Extend Services Nov 1999 52.217-9 Option To Extend The Term Of The Contract Mar 2000 52.222-3 Convict Labor Jun 2003 52.222-19 Child Labor -- Cooperation With Authorities And Remedies Dec 2022 52.222-21 Prohibition Of Segregated Facilities Apr 2015 52.222-26 Equal Opportunity Sep 2016 52.222-36 Equal Opportunity For Workers With Disabilities Jun 2020 52.222-40 Notification Of Employee Rights Under The National Labor Relations Act Dec 2010 52.222-41 Service Contract Labor Standards Aug 2018 52.222-42 Statement Of Equivalent Rates For Federal Hires May 2014 52.222-43 Fair Labor Standards Act And Service Contract Labor Standards - Price Adjustment (multiple Year And Option Contracts) Aug 2018 52.222-48 Exemption From Application Of Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment--certification May 2014 52.222-50 Combating Trafficking In Persons Nov 2021 52.222-51 Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment--requirements May 2014 52.222-52 Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services--certification May 2014 52.222-53 Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services--requirements May 2014 52.222-55 Minimum Wages For Contractor Workers Under Executive Order 14026 Jan 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 Jan 2022 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving Jun 2020 52.225-3 Buy American--free Trade Agreements--israeli Trade Act Dec 2022 52.225-13 Restrictions On Certain Foreign Purchases Feb 2021 52.227-1 Authorization And Consent Jun 2020 52.232-1 Payments Apr 1984 52.232-33 Payment By Electronic Funds Transfer--system For Award Management Oct 2018 52.233-3 Protest After Award Aug 1996 52.233-4 Applicable Law For Breach Of Contract Claim Oct 2004 52.245-1 Government Property Sep 2021 52.247-34 F.o.b. Destination Nov 1991 52.253-1 Computer Generated Forms Jan 1991 252.203-7000 Requirements Relating To Compensation Of Former Dod Officials Sep 2011 252.203-7002 Requirement To Inform Employees Of Whistleblower Rights Dec 2022 252.204-7008 Compliance With Safeguarding Covered Defense Information Controls Oct 2016 252.204-7012 Safeguarding Covered Defense Information And Cyber Incident Reporting Jan 2023 252.204-7015 Notice Of Authorized Disclosure Of Information For Litigation Support Jan 2023 252.204-7016 Covered Defense Telecommunications Equipment Or Services -- Representation Dec 2019 252.204-7017 Prohibition On The Acquisition Of Covered Defense Telecommunications Equipment Or Services -- Representation May 2021 252.204-7018 Prohibition On The Acquisition Of Covered Defense Telecommunications Equipment Or Services Jan 2023 252.211-7003 Item Unique Identification And Valuation Jan 2023 252.211-7007 Reporting Of Government-furnished Property Mar 2022 252.223-7008 Prohibition Of Hexavalent Chromium Jan 2023 252.225-7001 Buy American And Balance Of Payments Program--basic Jan 2023 252.225-7048 Export-controlled Items Jun 2013 252.225-7055 Representation Regarding Business Operations With The Maduro Regime May 2022 252.225-7056 Prohibition Regarding Business Operations With The Maduro Regime Jan 2023 252.225-7060 Prohibition On Certain Procurements From The Xinjiang Uyghur Autonomous Region Jun 2023 252.232-7003 Electronic Submission Of Payment Requests And Receiving Reports Dec 2018 252.232-7010 Levies On Contract Payments Dec 2006 252.233-7001 Choice Of Law (overseas) Jun 1997 252.244-7000 Subcontracts For Commercial Products Or Commercial Services Jan 2023 252.245-7001 Tagging, Labeling, And Marking Of Government-furnished Property Apr 2012 252.245-7002 Reporting Loss Of Government Property Jan 2021 252.245-7003 Contractor Property Management System Administration Apr 2012 252.245-7004 Reporting, Reutilization, And Disposal Dec 2017 clauses To Be Incorporated By Full Text: 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders-commercial Items Nov 2020 52.217-9 Option To Extend The Term Of The Contract Mar 2000 52.232-39 Unenforceability Of Unauthorized Obligations (jun 2013) 52.252-2 Claues Incorporated By Reference 252.232-7006 Wide Area Workflow Payment Instructions (dec 2018)
City Of Pasig Tender
Philippines
Closing Soon6 Nov 2024
Tender AmountPHP 840.2 K (USD 14.5 K)
Details: Description Items Quantity / Units 1 Microphone Stand, Height: 1115mm – 1680mm (43.9"" – 66.1"") Weight: : 2.9 Kg (6.4 Lbs.) Base Radius: 340mm (13.4"") Boom Length: 780 Mm (30.7"") Folded Size: 925 Mm X 90 Mm X 90 Mm (36.4"" X 3.5"" X 3.5"") 2 Unit 2 Wireless Microphone, Polar Pattern: Super-cardioid Frequency Response: 50hz~18khz Impedance: 600 Ampere Sensitivity: 5.5mm X 4.5m, Xlr To Xlr Color: Black / Metallic Gray Dimension (mm):ø54.9 X 181.2 Mm Up To 255mm Weight (without Cable): 311g(ac-900) / 302g(ac-900s) 1 Unit 3 Mixer 6 Channel, 6-channel Compact Mixer With Usb And Bluetooth - Usb I/o For Audio Playback And Stereo Recording - Dedicated Bluetooth Channel With Mix-minus Return For Feedback-free Phone Pairing - Dual Headphone Outputs With Independent Volume Control - 1/4” Main, Tape, Headphone, And Aux Outputs - Two Mic Input Channels With Phantom Power And Balanced Line Inputs - Two Stereo Input Channels With Balanced 1/4” Trs Jacks - Two-band Eq On All Channels - 2-track Inputs W/ Assignable Routing: Main Mix Or Headphone Out - Eight-segment Led Vu Meter For Precise Level Monitoring - Extra Knob Caps 1 Set 4 Speaker With Stand, Stand • Lightweight Aluminum Speaker Stand • Dual Diameter Inner Tube For 35mm And 38mm Speaker Mount • Red Safety Trim On Feet (removable) • Minimun 60 Lb Weight Capacity (at Least 27kg- 30kg) Speaker • Min / Max Height: 48/81 Inches (1219/2057 Mm) • Water-resistant 600d Black Polyester Exterior Fabric • Soft, 210d Polyester Interior Fabric With Protective Padding • Top Handle Cutout With Hook-and-loop Flap Closure • Exterior Dimensions: 14”/356mm (l) X 16”/406mm (w) X 25.5”/ 648mm (h), Net Weight: 1.6 Lbs./0.7 Kg • Interior Dimensions: 13.5”/343mm (l) X 15.5”/394mm (w) X 24.75”/629mm (h) 1 Set 5 Bluetooth Speaker With 2 Cordless Microphones, Portable 60w Bluetooth Speaker With Rgb Light Effect, Subwoofer, Portable Speaker With Microphone 1 Unit 6 Bass Mixer With Microphone, Audio Mixer 5-8 Channel Uhf, Wireless Michrophone 2-4, 1700w-1800w, Power Amplifier 3 In 1, 2 Layer Equalizer, 15-18 Dsp Reverb, With Bluettoth, Pc, Usb, Mp3 Playback 1 Unit 7 Camera, Sensor Size: Cmos Sensor Resolution: 33 Mp To 61 Mp View Finder: At Least 2,360k Dots Monitor: 3.2-inch Articulating Touchscreen, 2.1m Dots Autofocus: At Least 693 Pdaf + 425 Cdaf Supported File Format: C-raw, Heif, Jpeg Power Supply: Power Adaptor Dc 5v/1a (input: Ac 100~240v Output: Dc 5v/1a.) 1 Unit 8 Digital Video Camera Recorder, Lens: F=7.0 Mm, F2.6 Screen: 3.0 Inch Lcd Touch Screen Video Resolution: Fhd(1920 * 1080) 60/30fps, Hd(1280 * 720) 120/60fps Vga-640*480 Image Resolution: 24m/20m/14m/12m/8m/5m//2m/1.2m/vga Format: Jpeg (photo); Mov4 (video) Power Supply: Dc 5v/1a Battery Type: 3.7v Np-40 1500mah Up To 2000mah Memory Card: Support Up To 64gb External Card Item Size: 126 * 58 * 41mm Item Weight: 280g / (with Battery.) 1 Unit 9 Cctv Camera (indoor/network Camera), Angle View: 270 Degrees Left And Right And Rotates 90 Degrees Vertically Resolution:full Hd (between 350 500 Tvl) Storage Capacity: At Least 128gb To 512gb Audio: Two-way Audio Distance (m): At Lest 20 Ft. Digital Zoom: 10x Optical Zoom:12x Cctv Software: Video Management System (vms) Memory Card Type: Micro Sd (stores At Least 128gb) Sensor: Cmos Input: 5v Dc 2a 4 Unit 10 Locker Cabinet, Model: 12 Door Storage Locker Color: Gray/ Dark Gray Lock Type: Key Lock Or Key-controlled Code Change Materials: Cold-rolled Steel, Powder Coated Measurement: Width: 90 Cm Depth: 40 Cm Height: 185 Cm Weight Capacity: Atleast 45kgs/drawer 5 Unit 11 Sofa (high Quality), Materials: Leather 2 To 3 Seater Couch With Armrest And Back, Metal Frame Color: Black Or Dark Gray Measurement: 90” Width X 38” Depth X 34” Height 1 Unit 12 Ream Paper Cutter, Paper Cutter/paper Trimmer Cutting Capacity: At Least 400 Sheets Of 80gsm Paper Size: A4 Size (210mm X 300mm), A3 Size (297mm X 420 Mm) Blade Size : 18 Cm (blade Made Of High-quality Steel) Cutting Width: A4: 12.6” Cutting Width A3: 17” Cutting Width Weight. 25 Kg. (approx.) Dimension. 72x45x20 Cm. 1 Unit 13 Monoblock Chair, Material: Stackable Polypropylene Chair Dimension; Width: 500mm Depth: 430mm Height: 810mm Seat Height: 455mm Wieght Capacity: At Least 200kg Color: Dark Gray Or Any Solid Color Stacked Atleast 6-8 High 34 Unit 14 Push Cart Trolley, Material: 2 Swivel And 2 Fixed For Caster Wheels, Steel Powder Coated Platform – Durable, Metal Handle Capacity: At Least 500kg Dimension Length: 90cm Width: 60cm 17 Unit 15 Transparent Storage Box, 120l, Materials: Plastic Dimension: L72 X W52 X H44cm Weight Capacity: 120l 2 Unit 16 Water Dispenser, Dimensions: (l)31 X (w)34 X (h)105 Cm Bottom Loading Hot And Cold-water Dispenser • Stainless Steel Finish Panel • Double Faucet For Hot And Cold Water • With Safety Lock For Hot Water Button • With Led Indicator For Cooling, Heating And Empty Bottle • Removable Drip Tray For Easy Cleaning • 85 Watts Cooling Power Down To 10 Degrees Centigrade • 500 Watts Heating Power Up To 90 Degrees Centigrade • 2.0 Liters Per Hour Cooling Capacity • 5.0 Liters Per Hour Heating Capacity 1 Unit 17 Coffee Maker, Technical Specifications; Voltage. 220 - 240 V; Cord Length. 0.85 M; Frequency. 50/60 Hz; Capacity Water Tank. 0.6 L; Brewing Time For A Jug. 10 Minute(s). Glass Type Of Jug 1 Unit 18 Electric Kettle, Weight: 0.7 To 1.0 Kg Dimensions: L 16 X W 22 X H 28 (cm) Power Input: 1500w Capacity: 1.8 Liters Dry-boil Protection System 360 Degrees Revolving Cordless Base Power Indicator Light Automatic Shut-off System Concealed Stainless Steel Heating Element Glass Type Body And Interior 1 Unit 19 Refrigerator, Door Type : Steel Door Color: Dark Gray Number Of Door: 2 Doors Cooling System: Fan Cool, No Frost Compressor: Inverter Control System: Electronics Voltage, Frequency: 220-240v, 50/60hz Refrigerant: R600a Net Capacity (total Liter): 194 Net Capacity (freezer Room): 61 Dimension (wxdxh): 545x623x1345mm Pns Iec Safety Standard Certificate 3 Unit 20 Microwave Oven, Oven Type: Countertop, Digital Capacity: At Least 28kg Power Consumption: 230 V / 60 Hz Microwave Power: 400 W Power Output:900 W Oven Cavity Dimension (wxhxd): 338 X 233 X 327 Mm Outside Cavity Dimension (wxhxd): 482 X 273 X 375 Mm Metal Body Pns Iec Safety Standard Certificate 1 Unit 21 Portable Aircon, Aircon Type: Portable Horsepower: 1.5 Hp Refrigerant :r410a / 195 G Power Supply: 1 Ph / 230 V / 60 Hz Cooling Capacity: At Least 12000 Btu/hr Dimensions (wxlxh): 458 X 373 X 775 Mm Pns Iec Safety Standard Certificate 1 Unit 22 Air Humidifier, Indoor 1hp Anti-virus Feature Digital Screen Display Dimension (w X H X D): 346*173*526 Mm. Net Weight: 5.3 Kg. Color: White/ Black Rated Power/cooling Power: 280w Area Coverage: 255 Sqm Capacity: 80l Power Supply: 230 V / 60 Hz Pns Iec Saftey Standard Cerificate 1 Unit 23 Evaporated Air Cooler, Weight: 33.5 Kg Dimensions: L 81.28 X W 43.18 X H 174 (cm) • 40 Liters Water Tank Capacity • 350 Watts Power For 55-60 Sqm. Area • 3-speed Powerful Airflow 7,000 Cu.m/hr. • Heavy-duty Type • Continuous Water Supply Inlet • Auto Shut-off Water Pump With Low Water Alarm • With 1-8 Hours Timer • With Remote Controller • Automatic Vertical Louver • Floor Standing With Caster Wheels • Pns Iec Saftey Standard Cerificate 1 Unit Price Quotation/s Should Be Printed On Company’s Official Letterhead Together With The Following Updated Documents; -mayor’s/business Permit -philgeps Registration Number -income/business Tax Return -accomplished And Notarized Omnibus Sworn Statement (https://www.gppb.gov.ph/assets/forms/omnibus%20sworn%20statement (revised).docx) -proof Of Authorization: Secretary’s Certificate If Corporation, Or Special Power Of Attorney, If Individual __________________________________________________________________________________ Note: To Be Submitted Sealed And Labeled On A Long Brown Envelope, Following This Format As Follows: __________________________________________________________________________________ For: Atty. Josephine C. Lati-bagaoisan Bac Chairperson Thru: Atty. Bea Therese P. Villanueva Officer In Charge, Procurement Management Office 4th Floor, Pasig City Hall, Caruncho Avenue, Pasig City Date :____________________ Company’s Name :____________________ Philgeps Reference Number :____________________ Project Title :____________________
University Of Northern Philippines Tender
Publishing and Printing
Philippines
Closing Date19 Nov 2024
Tender AmountPHP 2.3 Million (USD 41.2 K)
Details: Description Republic Of The Philippines University Of Northern Philippines Tamag, Vigan City Invitation To Bid For The Procurement Of Books 1. The University Of Northern Philippines, Through The Fiduciary Fund, 2024 Intends To Apply The Sum Of ₱ 2,391,808.50 The Abc To Payments Under The Contract For Procurement Of Books/g-2024-38. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The University Of Northern Philippines Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within 60 Calendar Days For Locally Published And 120 Calendar Days For Internationally Published Upon Receipt Of Notice To Proceed. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From University Of Northern Philippines And Inspect The Bidding Documents At The Address Given Below During 8:00 Am – 12:00 Pm And 1:00-5:00 Pm, From Monday To Friday Except Non-working Holidays. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 30 – November 19, 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee To The Cashier’s Office For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, To Wit: Lot No. Abc Price Of Bid Documents Per Lot Lot No. Abc Price Of Bid Documents Per Lot 1 ₱ 150,000.00 ₱ 500.00 9 ₱ 200,000.00 ₱ 500.00 2 200,000.00 500.00 10 150,000.00 500.00 3 150,224.00 500.00 11 150,000.00 500.00 4 150,000.00 500.00 12 150,000.00 500.00 5 150,000.00 500.00 13 150,000.00 500.00 6 147,062.00 500.00 14 149,440.00 500.00 7 150,000.00 500.00 15 195,082.50 500.00 8 150,000.00 500.00 1-15 2,391,808.50 5,000.00 If The Bidder Shall Submit Its Bid For More Than One Lot, The Bidder Shall Pay The Corresponding Maximum Fee For The Bidding Documents Stated In The Guidelines Issued By The Gppb Based On The Total Abc Of The Lots To Be Bid. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The University Of Northern Philippines Will Hold A Pre-bid Conference On November 7, 2024, 9:00 Am At Bac Meeting Room, 2/f Roco Lina Building, University Of Northern Philippines, Tamag, Vigan City, Ilocos Sur And/or Through Video Conferencing Or Webcasting Via Google Meet (https://meet.google.com/jxm-txqj-xov) Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through: (i) Manual Submission At The Office Address Indicated Below On Or Before November 19, 2024, 9:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On November 19, 2024, 9:00 Am At The Given Address Below And/or Via Google Meet (https://meet.google.com/jxm-txqj-xov). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The University Of Northern Philippines Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Dr. Fatima F. Rocamora/dr. Frances R. Duldulao University Of Northern Philippines Tamag, Vigan City, Ilocos Sur 2700 Bac@unp.edu.ph (077) 632-6895 Www.unp.edu.ph You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph October 29, 2024 Fatima F. Rocamora, Edd Bac Chairperson Procurement Of Books Abc: ₱ 2,391,808.50 Lot No. Item No. Unit Item Description Qty Abc --procurement Of Books Per Program Of The Different Colleges, Library Services Office (pr #2024-06-24-562) Fiduciary Fund Lot 1--college Of Technology--abc:₱ 150,000.00 1. Copy Herman, Atkins 2024 Electrical Wiring Industrial W And Blueprints Isbn 9780357767245 -1- 2. Copy Shumway-cook (2023 & Beyond), Motor Control, International Edition, Isbn 9781975158309 -1- 3. Copy John Siegenthaler (2023 & Beyond), Modern Hydronic Heating And Cooling: For Residential And Light Commercial Buildings, 4th Edition, Isbn 9781337904919 -1- 4. Copy Steven Hanssen, Jeffery Hampson (2023 & Beyond), Electrical Trade Principles, 6th Edition, Isbn 9780170458856 -1- 5. Copy J. Richard Elliott, Vladimir Diky, Thomas A. Knotts Iv, W. Vincent Wilding (2023 & Beyond), The Properties Of Gases And Liquids Isbn 9781260116342 -1- 6. Copy Wisner, Tan, Leong (2023 & Beyond), Principles Of Supply Chain Management: A Balanced Approach Isbn 9780357715604 -1- 7. Copy Glover, Overbye, Sarma (2023 & Beyond), Power System Analysis And Design, Si Edition Isbn 9780357676196 -1- 8. Copy Ewald Fuchs (2023 & Beyond), Power Quality In Power Systems, Electrical Machines, And Power-electronic Drives Isbn 9780128178560 -1- 9. Copy Terry Borden, Richard A. Cox (2023 & Beyond), Technician's Guide To Programmable Controllers Isbn 9780357622490 -1- 10. Copy Rawat (2023 & Beyond), Robotic Process Automation Isbn 9781394166183 -1- 11. Copy Rob Thompson (2023 & Beyond), Automotive Maintenance & Light Repair Isbn 9780357766620 -1- 12. Copy Piyush Zode (2024), Electric Circuits Isbn 9788119365012 -1- 13. Copy Bhagwan Prasad (2024), Electrical Installation In Hazardous And Non-hazardous Area Isbn 9788119677764 -1- 14. Copy Collin Dias (2024), Electro Technology Isbn 9788119205646 -1- 15. Copy Sanfras Monteiro (2024), Welding Technology Isbn 9788119523023 -1- 16. Copy Parth Chavda (2024), Work And Energy Isbn 9788119365234 -1- 17. Copy Delilah Sam (2024), Workshop Theory And Practice Isbn 9788119365098 -1- 18. Copy Hannes Diet (2024), Business Communication Isbn 9788119523221 -1- 19. Copy Hannes Diet (2024), Business Opportunities Isbn 9788119523238 -1- 20. Copy Samual Rodrigues (2024), Advances In Hypersonic Vehicles Isbn 9788119365500 -1- 21. Copy Richard Carvalho (2024), Advances In Industrial Automation And Process Control Isbn 9788119365661 -1- 22. Copy Samual Rodrigues (2024), Machine Shop Theory Isbn 9788119205639 -1- 23. Copy Peter Phillips (2023 & Beyond) Electrical Principles 5th Edition Isbn 9780170458412 -1- 24. Copy Sean Bennett (2021 & Beyond). Modern Diesel Technology Light Duty Diesels Isbn 9781337624978 -1- Lot 2--college Of Arts And Sciences--abc: ₱ 200,000.00 25. Copy Sneddon, Simon (2024), Unlocking Environmental Law Isbn 9780367682873 -1- 26. Copy Eugene S. Bardach (2024) A Practical Guide For Policy Analysis Isbn 9781071884133 -1- 27. Copy Andrew Stephen Penock (2024) The Cq Press Writing Guide For Public Policy Isbn 978-1071858288 -1- 28. Copy Natasha Lindstaedt (2024) What Do We Know And What Should We Do About Authoritarian Regimes? Isbn 9781529670295 -1- 29. Copy Andrea Mark Pomerantz (2024) Clinical Psychology - International Student Edition Isbn 9781071915615 -1- 30. Copy Joel Vos (2023 & Beyond) Doing Research In Psychological Therapies Isbn 9781529733730 -1- 31. Copy Dawn M. Mcbride (2023 & Beyond) Lab Manual For Psychological Research Isbn 9781071847312 -1- 32. Copy Roger Watt (2023 & Beyond) Statistics For Psychology Isbn 9781529777932 -1- 33. Copy William T. Blows (2024) The Biological Basis Of Clinical Observations Isbn 9781032484402 -1- 34. Copy Om Prakash Jena, Mrutyunjaya Panda, Utku Kose (2024) Medical Data Analysis And Processing Using Explainable Artificial Intelligence Isbn 9781032191126 -1- 35. Copy Ilkka Juuso (2024) Medical-grade Software Development Isbn 9781032594729 -1- 36. Copy Harry Pappas (2024) The Rise Of The Intelligent Health System Isbn 9780367769345 -1- 37. Copy Rooma Devi, Aman Chauhan, Simmi Kharb, Chandra Shekhar Pundir (2024) Clinical Biochemistry Isbn 9789814968751 -1- 38. Copy Goldberg (2024) Genetics: From Genes To Genomes Isbn 9781266246678 -1- 39. Copy Lewis (2024) Human Genetics Isbn 9781266283192 -1- 40. Copy Kanoglu, (2024) Fundamentals And Applications Of Renewable Energy Isbn 9781265079659 -1- 41. Copy Doweiko, Evans (2024) Concepts Of Chemical Dependency Isbn 9780357764497 -1- 42. Copy Gehart (2024) Mastering Competencies In Family Therapy Isbn 9780357764565 -1- 43. Copy Ivey, Ivey, Zalaquett (2023 & Beyond) Ae Intentional Interviewing And Counseling: Facilitating Client Development In A Multicultural Society Isbn 9789815059472 -1- 44. Copy Coon, Mitterer, Martini (2024) Ae Introduction To Psychology Gateways O Mind & Behavior Isbn 9789815077797 -1- 45. Copy Flemming (2024) Reading Keys Isbn 9780357794272 -1- 46. Copy Prasad (2023 & Beyond), Agroecological Approaches For Sustainable Soil Management Isbn 9781119911968 -1- 47. Copy Pan, Jeronimo & Pratolongo, Paula (2022 & Beyond). Marine Biology Isbn 9780367024987 -1- 48. Copy Burdge (2024), Chemistry: Atoms First 9781266136788 -1- 49. Copy Hyde (2024), Understanding Human Sexuality Isbn 9781266269806 -1- 50. Copy Mccord, Tepper (2024), Litigation Paralegal: A Systems Approach Isbn 9780357767337 -1- 51. Copy Gerald Corey, Marianne Schneider Corey, Cindy Corey (2024), Issues And Ethics In The Helping Professions Isbn 9780357622599 -1- 52. Copy Cronk, Brian C. (2024) How To Use Spss®: A Step-by-step Guide To Analysis And Interpretation 12th Edition Isbn 978-1032585192 -1- Lot 3--college Of Communication And Information Technology--abc: ₱ 150,224.00 53. Copy June Jamrich Parsons, June Jamrich Parsons (2023 & Beyond), New Perspectives Computer Concepts Comprehensive Isbn 9780357674611 -1- 54. Copy Kyla Mcmullen, Elizabeth Matthews, June Jamrich Parsons, June Jamrich Parsons (2023 & Beyond), Programming With Python Isbn 9780357637456 -1- 55. Copy Campbell, Ciampa, Freund, Frydenberg, Sebok, Vermaat, Clemen (2023 & Beyond), Discovering Computers 2023: Digital Tech Data Devices Isbn 9780357675366 -1- 56. Copy Mary Bolin (2023 & Beyond) Refocusing Academic Libraries Through Learning And Discourse: The Idea Of A Library Isbn 9780323951104 -1- 57. Copy Lowe (2023 & Beyond), Java All-in-one For Dummies Isbn 9781119986645 -1- 58. Copy Alison Valk, Ximin Mi, Ashley L. Schick (2024) Making Virtual Reality A Reality: Designing Educational Initiatives In Libraries With Emerging Technologies Isbn 9781440878978 -1- 59. Copy Behrouz A. Forouzan (2023 & Beyond), Foundations Of Computer Science Isbn 9781473787322 -1- 60. Copy Barbara Clemens (2023 & Beyond), Ae Discovering Computers: Digital Technology, Data, And Devices Isbn 9789815097313 -1- 61. Copy S.k. Rao (2024), Artificial Intelligence: Current Trends And Future Perspectives Isbn 9788119365180 -1- 62. Copy S.k. Rao (2024), Artificial Neural Networks: Advanced Applications Isbn 9788119523146 -1- 63. Copy Paul Rodrix (2024), Cloud Computing Security Issues Isbn 9788119523078 -1- 64. Copy Carlton Braganza (2024) Computer Technology Isbn 9788119205974 -1- 65. Copy Carlton Braganza (2024), Machine Learning And Data Mining Isbn 9788119365630 -1- 66. Copy Harwood (c2024) 3ed Internet And Web Application Security, Isbn 9781284206166 -1- 67. Copy Ed Bott (2023 & Beyond). Windows 11 Inside Out Isbn 9780137691333 -1- 68. Copy Aaron Guilmette, Darryl Kegg, Et Al. (2023 & Beyond) Microsoft 365 Administration Inside Out, Isbn 9780137908851 -1- 69. Copy Nathalie Rebe (2023 & Beyond) Regulating Cyber Technologies: Privacy Vs Security Isbn 9781800612853 -1- 70. Copy Behrouz A. Forouzan (2023 & Beyond) Computer Science: A Structured Programming Approach In C: A Structured Programming Approach In C Isbn 9780357506134 -1- 71. Copy Stacey Greenwell, G. Edward Evans (2024) Library Programs And Services: The Fundamentals Isbn 9781440878695 -1- 72. Copy Katy B. Mathuews, Ryan A. Spellman (2024). Creating A Staff-led Strategic Plan: A Practical Guide For Libraries. Isbn 9781440879111 -1- 73. Copy Blanche Woolls, Joyce Kasman Valenza, April M. Dawkins (2024). The School Library Manager: Leading Through Change. Isbn 9781440879296 -1- 74. Copy Wayne Disher (2024). Crash Course In Collection Development. Isbn 9781440880438 -1- Lot 4--college Of Hospitality And Tourism Management--abc: ₱ 150,000.00 75. Copy Agustina Barros, Ross Shackleton, Lisa Rew, Cristóbal Pizarro, Aníbal Pauchard (2022 & Beyond), Tourism, Recreation And Biological Invasions Isbn 9781800620452 -1- 76. Copy Anukrati Sharma, Priyakrushna Mohanty, Azizul Hassan (2022 & Beyond), Covid-19 And The Tourism Industry. Isbn 978-1032075020 -1- 77. Copy Robertico Croes (2023 & Beyond), Small Island And Small Destination Tourism Isbn 9781774637357 -1- 78. Copy Veslemøy Andersen (2023 & Beyond), Food Safety Management: A Practical Guide For The Food Industry Isbn 9780128200131 -1- 79. Copy Caryn E. Neumann, Lori L. Parks, Joel G. Parks (2024), Global Dishes: Favorite Meals From Around The World Isbn 9781440876479 -1- 80. Copy Aarnio (2023 & Beyond), Cruise Ship Handbook Isbn 9783031116315 -1- 81. Copy Cedrick Lawrence (2024), Tourism Management Isbn 9788119365043 -1- 82. Copy Christopher Stanislaus (2024), Travel And Tourism Operations Isbn 9788119365685 -1- 83. Copy Daryl Pereira (2024), Travel Management Isbn 9788119365135 -1- 84. Copy Venet Josh (2024), Nutrition And Dietetics Isbn 9788119205806 -1- 85. Copy Deresky (2023 & Beyond). International Management: Managing Across Borders And Cultures, Text And Cases, Global Edition Isbn 9781292430362 -1- 86. Copy Caryn E. Neumann, Lori L. Parks, Joel G. Parks (2024). Global Dishes: Favorite Meals From Around The World. Isbn 9781440876479 -1- 87. Copy David Bowen (2022 & Beyond) Contemporary Tourist Behaviour Isbn 9781786391698 -1- 88. Copy Robertico Croes (2022 & Beyond) Small Island And Small Destination Tourism Isbn 9781774637357 -1- 89. Copy Jasmin Mahadevan (2023 & Beyond) Cross-cultural Management Isbn 9781526459244 -1- 90. Copy Jean Phillips (2023 & Beyond) Strategic Staffing Isbn 9781948426381 -1- 91. Copy Packaged Food, Packaged Life: Corporate Food In Metro Manila Slums (2023 & Beyond) Isbn 9786214482429 -1- 92. Copy Perez, Ramonito (2024), Spanish For Beginner 2nd Ed. Isbn 978-621-409-228-4 -1- 93. Copy Remaneses, Et Al. (2023 & Beyond) Kitchen Essentials And Basic Food Preparation 978-621-409-225-3 -1- 94. Copy Corazon Barateta-prades (2023 & Beyond) Quantity Cookery And Catering Management (a Guide To Students, Leading To Commercial Cooing Nc Iii) 978-621-409-184-3 -1- 95. Copy E.v. Gabriel (2023 & Beyond) Passion To Bake - Baking Guide For Beginners (revised Ed.) 978-621-409-210-9 -1- 96. Copy Cultural Sustainability, Tourism And Development (routledged Studies In Culture And Sustainable Development 1st Ed. (2023 & Beyond) 978-036775663 -1- 97. Copy Chatzou, (2023 & Beyond) Ethnic Hospitality Marketing (routledge Studies In Marketing 1st Edition 978-103212672 -1- Lot 5--college Of Nursing--abc:₱ 150,000.00 98 Copy Byrne (2024), Artificial Intelligence For Improved Patient Outcomes 9781975197933 -1- 99. Copy Debruyne, Linda Kelly (2023 & Beyond), Nutrition For Health And Healthcare 9780357730317 -1- 100. Copy Edberg, Mark (2023 & Beyond), Essentials Of Health, Culture, And Diversity 9781284226256 -1- 101. Copy Huston, Carol (2023 & Beyond), Professional Issues In Nursing 9781975175641 -1- 102. Copy Tucker, Rebecca (2023 & Beyond) Lippincott Pocket Drug Guide For Nurses 9781975198619 -1- 103. Copy Lebeouf (2023 & Beyond), Cutaneous Reactions To Anti-cancer Therapies 9781975157890 -1- 104. Copy Edwards (2023 & Beyond), Genital Dermatology Manual 9781975161453 -1- 105. Copy O'connell (2023 & Beyond), A Comprehensive Review For The Certification And Recertification Examinations For Pa's Isbn 9781975158200 -1- 106. Copy Cook, Shumway (2023 & Beyond), Motor Control, International Edition Isbn 9781975158309 -1- 107. Copy Andrade (2023 & Beyond), Outcome-based Massage Isbn 9781975153809 -1- 108. Copy Mann, Olawoye (2023 & Beyond), Covid 19 And The Response Of Central Banks Isbn 9781802205367 -1- 109. Copy Hamilton, Paul (2023 & Beyond), Blood Tests Made Easy Isbn 9780323870443 -1- 110. Copy Atchison (2023 & Beyond), Conditions In Occupational Therapy, International Edition Isbn 9781975192044 -1- 111. Copy Taylor (2023 & Beyond), Skill Checklists For Fundamentals Of Nursing Isbn 9781975168193 -1- 112. Copy Whitney, Ellie (2023 & Beyond), Understanding Nutrition Isbn 9780170457972 -1- 113. Copy Patlas, Michael, (2024). Emergency Imaging Of At-risk Patients: General Principles Isbn 9780323876612 -1- 114. Copy Marjorie Kelly Cowan, Heidi Smith (2024) Microbiology: A Systems Approach Isbn 9789813312876 -1- 115. Copy Carlson, (c2023 & Beyond), 1ed Human Health And The Climate Crisis, Isbn 9781284207293 -1- 116. Copy Jacobsen, (c2024), Introduction To Global Health, 4ed Isbn 9781284234930 -1- 117. Copy Epc: Emergency Pediatric Care (paperback + Ebook), Naemt, (c2023 & Beyond), 4ed Isbn 9781284245929 -1- 118. Copy The Doctor Of Nur Practice: A Guidebook For Role Development And Professional Issues, Chism, (c2023 & Beyond), 5ed Isbn 9781284233155 -1- Lot 6--college Of Health Sciences--abc: ₱ 147,062.00 119. Copy Paola (2024), Ethical And Legal Aspects Of Health Care Practice Isbn 9781284178395 -1- 120. Copy Kronenberger (2024), Jones & Bartlett Learning's Pocket Guide For Medical Assisting Isbn 9781284256697 -1- 121. Copy Kronenberger (2024), Study Guide For Jones & Bartlett Learning's Comprehensive Medical Assisting Isbn 978-1284256680 -1- 122. Copy Bruder (2024), Hot Stone Massage: A Three-dimensional Approach, Isbn 9781284223026 -1- 123. Copy Flajnik (2023 & Beyond), Paul's Fundamental Immunology Isbn 9781975142513 -1- 124. Copy Ricci (2023 & Beyond), Orthopaedic Knowledge Update: Trauma 6 Print + Ebook (aaos - American Academy Of Orthopaedic Surgeons) Isbn 9781975163686 -1- 125. Copy Moloney, Ali & Joustra, Catherine (2023 & Beyond), Holistic Mental Health Support Isbn 9780170457798 -1- 126. Copy Crawford, Michael H. (2023 & Beyond), Current Diagnosis & Treatment Cardiology Isbn 9781265418427 -1- 127. Copy Reilly, Jennifer Et. Al. (2023 & Beyond), Clinical Procedures For The Ocular Examination Isbn 9781264277438 -1- 128. Copy Patlas, Michael (2024), Emergency Imaging Of At-risk Patients: General Principles Isbn 9780323876612 -1- 129. Copy Zaidi, Arsalan (2023 & Beyond), Rapid Response Events In The Critically Ill: A Case-based Approach To Inpatient Medical Emergencies Isbn 9780323872393 -1- 130. Copy Shiland, Betsy (2023 & Beyond), Mastering Healthcare Terminology Isbn 9780323825238 -1- 131. Copy Ltd Abc Scribes (2023 & Beyond), The Complete Medical Scribe: A Guide To Accurate Documentation Isbn 9780323812658 -1- 132. Copy Glynn, Michael (2023 & Beyond), Hutchison's Clinical Methods International Edition: An Integrated Approach To Clinical Practice Isbn 9780702082665 -1- 133. Copy Charles, Oxnard (2023 & Beyond), Aiming At Medicine? Human Biology, Health Sciences And Medicine Futures Isbn 9789811264191 -1- 134. Copy Mottram, Carl (2023 & Beyond), Ruppel's Manual Of Pulmonary Function Testing Isbn 9780323762618 -1- 135. Copy Robinson, Debbie S. (2023 & Beyond), Essentials Of Dental Assisting Isbn 9780323764025 -1- 136. Copy Waldman, Steven D. (2023 & Beyond), Headache And Facial Pain: Pain Medicine: A Case-based Learning Series Isbn 9780323834568 -1- 137. Copy Tish Davids (2024) Medical Firsts: Innovations And Milestones That Changed The World Isbn 9781440877339 -1- Lot 7--college Of Public Administration--abc: ₱ 150,000.00 138. Copy Apfeld (2024). A Liberal Education: The Social And Political Impact Of The Modern University. Isbn 9781009424738 -1- 139. Copy Schoonheim (2024). Beauvoir And Politics: A Toolkit, Isbn 9781032431918 -1- 140. Copy Killingsworth (2024). Civility, Barbarism, And The Evolution Of International Humanitarian Law: Who Do The Laws Of War Protect? Isbn 9781108488495 -1- 141. Copy Clack (2024). Climate Change, Conflict, And (in)security Isbn 9781032455792 -1- 142. Copy Bjola (2024). Digital International Relations: Technology, Agency And Order, Isbn 9781032571317 -1- 143. Copy Dunn, (2023 & Beyond). Drones, Force And Law: European Perspectives, Isbn 9781009451482 -1- 144. Copy Narayan, (2023 & Beyond). Electronic Government: Information System In Public Administration. Isbn 9789357510295 -1- 145. Copy Kumar (2023 & Beyond). Going Public: The Unmaking And Remaking Of Universal Healthcare, Isbn 9781009209571 -1- 146. Copy Chandler (2024). Governance And Development, Isbn 9798891611450 -1- 147. Copy Thompson (2024). Human Rights And Humanitarian Law, Isbn 9798891612037 -1- 148. Copy Esterling (2024). Indigenous Cultural Property And International Law: Restitution, Rights And Wrongs. Isbn 9780367182007 -1- 149. Copy Bouchoux (2024). 6th Ed. Intellectual Property: The Law Of Trademarks, Copyrights, Patents, And Trade Secrets. Isbn 9780357767474 -1- 150. Copy Gutner (2024). 2nd Ed. International Organizations In World Politics, Isbn 9781544374666 -1- 151. Copy Oatley (2023 & Beyond). 7th Ed. International Political Economy. Isbn 9781032447933 -1- 152. Copy Hopper (2024). Modern Political Theory, Isbn 9798891611368 -1- 153. Copy Roncaglia (2024). Power And Inequality: A Reformist Perspective, Isbn 9781009370479 -1- 154. Copy Pathak (2023 & Beyond). Psychology Of Public Administration, Isbn 9789357510233 -1- 155. Copy Gregory (2024). Public Policy And Program Administration, Isbn 9798891611504 -1- 156. Copy Wilcox, (2024). Social, Economic And Political Thought, Isbn 9798891612020 -1- 157. Copy Menezes (2024). Social Justice, Equity, And Diversity In Education And Training, Isbn 9781682508794 -1- 158. Copy Haynes (2023 & Beyond). 3rd Ed. World Politics: International Relations & Globalization In The 21st Century. Isbn 9781529774580 -1- 159. Copy Bankert (2023 & Beyond). When Politics Becomes Personal: The Effect Of Partisan Identity On Anti-democratic Behavior, Isbn 9781009055512 -1- 160. Copy Shark (2023 & Beyond). 2nd. Ed. Technology And Public Management Isbn 9781032341125 -1- Lot 8--college Of Social Work--abc: ₱ 150,000.00 161. Copy Hadley, Steven (2024) Cultural Leadership In Practice Isbn 9781032487724 -1- 162. Copy Bansal, Brij Mohan (2023 & Beyond) Safety In Industry Isbn 9781032630120 -1- 163. Copy Allcorn, Seth (2024) Managing Toxic Leaders And Dysfunctional Organizational Dynamics Isbn 9781032734903 -1- 164. Copy Lever, Chris (2024) Leading Transformational Change Isbn 9781032464763 -1- 165. Copy Kenny, Susan & Hand, Tammy (2023 & Beyond), Developing Communities Isbn 9780170452755 -1- 166. Copy Zastrow, Charles & Hessenauer, Sarah L. (2023 & Beyond), Empowerment Series: Introduction To Social Work And Social Welfare Empowering People Isbn 9780357623398 -1- 167. Copy Parker, Jonathan (2023 & Beyond), Introducing Social Work Isbn 9781529798562 -1- 168. Copy Navarro, (2024) Comprehensive Study Of Classical Sociological Theory Isbn 9798886263824 -1- 169. Copy Singh (2024) Rural Sociology Isbn 9789395577403 -1- 170. Copy Ponam, Social Change Development And Globalization 2023 Isbn 9789395577984 -1- 171. Copy Schaefer (2024) Sociology Matters Isbn 9781266139291 -1- 172. Copy Androff (2024) The Routledge International Handbook Of Social Development, Social Work, And The Sustainable Development Goals Isbn 9781032011264 -1- 173. Copy Nikolic, (2024) Overview Of Early Customary Laws Across The World Isbn 9781774698532 -1- 174. Copy Roncaglia (2024) Power And Inequality: A Reformist Perspective Isbn 9781009370479 -1- 175. Copy Kerry M. Kartchner (2023 & Beyond) Routledge Handbook Of Strategic Culture Isbn 9780367445485 -1- 176. Copy Menezes, (2024) Social Justice, Equity, And Diversity In Education And Training Isbn 9781682508794 -1- 177. Copy Esterling (2024) Indigenous Cultural Property And International Law: Restitution, Rights And Wrongs Isbn 9780367182007 -1- 178. Copy Kumar (2024) Introduction To Sociobiology Isbn 9781774698556 -1- 179. Copy Zastrow (2023 & Beyond) Introduction To Social Work And Social Welfare: Empowering People Isbn 9780357623398 -1- 180. Copy Palmer (2023 & Beyond) Introduction To Cultural Studies Isbn 9781639876808 -1- Lot 9--college Of Business Administration And Accountancy--abc: ₱ 200,000.00 181. Copy Hull (2023 & Beyond), Risk Management And Financial Institutions Isbn 9781119932482 -1- 182. Copy Nussenbaum (2023 & Beyond), The Online Marketplace Advantage: Sell More, Scale Faster, And Create A Worldclass Digital Customer Experience Isbn 9781119864745 -1- 183. Copy Dodson (2023 & Beyond), The Manager's Handbook: Five Simple Steps To Build A Team, Stay Focused, Make Better Decisions, And Crush Your Competition Isbn 9781394174072 -1- 184. Copy Jarboe (2023 & Beyond), Digital Marketing Fundamentals: Omcp's Official Guide To Omca Certification Isbn 9781119894575 -1- 185. Copy Kotler (2023 & Beyond), Entrepreneurial Marketing: Beyond Professionalism To Creativity, Leadership, And Sustainability Isbn 9781119835202 -1- 186. Copy Edmonds (2023 & Beyond), Fundamental Managerial Accounting Concepts Isbn 9781265045920 -1- 187. Copy Owen, Glenn (2023 & Beyond), Using Quickbooks® Online For Accounting 2023 Isbn 9780357722213 -1- 188. Copy Deegan, Craig (2023 & Beyond), Financial Accounting Theory Isbn 9780170460491 -1- 189. Copy Pratt, Michael (2023 & Beyond), Auditing Theory And Practice Isbn 9780170458955 -1- 190. Copy Garman, E. Thomas Et.al. (2023 & Beyond), Financial Planning And Personal Finance Isbn 9780170449502 -1- 191. Copy Fabozzi (2023 & Beyond), Fixed Income Mathematics Isbn 9781264258277 -1- 192. Copy Brealey (2023 & Beyond), Fundamental Of Corporate Finance Isbn 9781265102593 -1- 193. Copy Zahay, Debra (2023 & Beyond), Social Media Marketing: A Strategic Approach Isbn 9780357516188 -1- 194. Copy Karla M. Zehms (2024). Auditing. Isbn 9780357721872 -1- 195. Copy Herbert B. Mayo, Michael J Lavelle (2024). Basic Finance. Isbn 9780357714744 -1- 196. Copy Hoyer, Macinnis, Pieters (2024) Ae Consumer Behavior Isbn 9789815160611 -1- 197. Copy Kuratko (2024) Ae Entrepreneurship: Theory, Process, Practice Isbn 9789815160628 -1- 198. Copy Camm, Cochran, Fry, Ohlmann, Anderson, Sweeney, Williams (2023 & Beyond) Ae Essentials Of Statistics For Business And Economics Isbn 9789815119350 -1- 199. Copy Pride, Hughes, Kapoor (2023 & Beyond) Ae Foundations Of Business Isbn 9789815059458 -1- 200. Copy Peng (2023 & Beyond) Ae Global Business Isbn 9789815059786 -1- 201. Copy Czinkota, Ronkainen, Cui (2023 & Beyond) Ae International Marketing Isbn 9789815059496 -1- 202. Copy Camm, Cochran, Fry, Ohlmann (2024) Business Analytics Isbn 9780357902202 -1- 203. Copy Walsh (2024) Employment Law For Human Resource Practice Isbn 9780357717547 -1- 204. Copy Kuratko (2024) Entrepreneurship: Theory, Process, Practice Isbn 9780357899502 -1- 205. Copy Xavier Dias (2024) Accounting Technology Isbn 9788119205776 -1- 206. Copy William Rodrigues (2024) Business Administration Isbn 9788119205813 -1- 207. Copy Richardson (2023 & Beyond) Data Analytics For Accounting Isbn 9781265094454 -1- 208. Copy Noe (2023 & Beyond) Human Resource Management Isbn 9781265064013 -1- 209. Copy Hill (2023 & Beyond) International Business: Competing In The Global Marketplace Isbn 9781265038540 -1- 210. Copy Jacobs (2023 & Beyond) Operation And Supply Chain Management: Core Isbn 9781265076825 -1- 211. Copy Schilling (2023 & Beyond) Strategic Management Of Technological Innovation Isbn 9781265073350 -1- 212. Copy Lucas (2023 & Beyond) Customer Service Skills For Success Isbn 9781265037536 -1- 213. Copy Al Marshall (2023 & Beyond) Marketing Research Isbn 9781446256152 -1- 214. Copy Tucker (2023 & Beyond) Microeconomics Today Isbn 9780357721094 -1- Lot 10--college Of Criminal Justice Education--abc: ₱ 150,000.00 215. Copy Wortley, Richard, (2024). Psychological Criminology, Isbn 9780367281021 -1- 216. Copy Laycock, Gloria (2024). Crime, Science And Policing, Isbn 9780367761783 -1- 217. Copy Arvidsson, Matilda (2024). International Law And Posthuman Theory, Isbn 9781032044040 -1- 218. Copy Kanovitz, Jacqueline R. (2024). Constitutional Law For Criminal Justice Isbn 9781032161235 -1- 219. Copy Graham, Roderick S (2024). Cybercrime And Digital Deviance, Isbn 9781032249193 -1- 220. Copy Clevenger, Shelly (2024). Understanding Victimology, Isbn 9781032253145 -1- 221. Copy Williams,christopher (2024). Strategic Business Case Analysis, Isbn 9781032265698 -1- 222. Copy Baker, Deane-peter, (2024). Ethics At War, Isbn 9781032321202 -1- 223. Copy Farrall, Stephen. (2024). The Politics Of Crime, Punishment And Justice Isbn 9781032357454 -1- 224. Copy Cowley, Christopher (2024). The Philosophy Of Criminal Law. Isbn 9781032398969 -1- 225. Copy Stephen George Tibbetts, Alex R. Piquero, (2022 & Beyond), Criminological Theory 4ed Isbn 978-1071838242 -1- 226. Copy Craig Paterson, Ed Pollock, (2022 & Beyond) Criminology For The Police, 1ed Isbn 9780367532307 -1- 227. Copy Police Behavior, Hiring, And Crime Fighting, John A. Eterno, Ben Stickle, Diana Scharff Peterson, Dilip K, C2022 & Beyond, Isbn 9780367491000 -1- 228. Copy Techniques Of Crime Scene Investigation, Barry A. J. Fisher, David R. Fisher, C2022 & Beyond, Isbn 9781498758130 -1- 229. Copy Criminology, Siegel, C2023 & Beyond, Isbn 9780357624746 -1- 230. Copy Ethical Dilemmas And Decisions In Criminal Justice, Joycelyn M. Pollock, C2022 & Beyond, Isbn 9780357512913 -1- 231. Copy Forensic Chemistry, K. Mathew, C2023 & Beyond, Isbn 9788119205301 -1- 232. Copy Forensic Photography, K. Mathew, C2023 & Beyond, Isbn 9788119205288 -1- 233. Copy Girard (2023 & Beyond). Criminalistics: Forensic Science, Crime, And Terrorism. Isbn 9781284211450 -1- 234. Copy Reed, (2023 & Beyond). Fault In Criminal Law: A Research Companion, Isbn 9781032245362 -1- 235. Copy Nikolic (2023 & Beyond). Multiculturalism, Crime, And Criminal Justice, Isbn 9781774690192 -1- 236. Copy Kaushik (2023 & Beyond). Criminal Procedure And Court Testimony, Isbn 9789386559401 -1- 237. Copy Storey (2023 & Beyond). 8th Ed, Unlocking Criminal Law, Isbn 9780367611286 -1- 238. Copy Heilbrun (2024). Wrightsman's Psychology And The Legal System, Isbn 9780357797464 -1- Lot 11--college Of Fine Arts And Design--abc: ₱ 150,000.00 239. Copy Cline (2023 & Beyond) Sketchup For Interior Design: 3d Visualizing, Designing, And Space Planning Isbn 9781119897743 -1- 240. Copy Thomas B. Altstiel, Jean Marie Grow, Dan Augustine, Joanna L. Jenkins (2022 & Beyond), Advertising Creative Isbn 9781071846650 -1- 241. Copy Wilson (2022 & Beyond), Art Law And The Business Of Art Isbn 9781800885776 -1- 242. Copy Sendpoints Editorial Department (2022 & Beyond), Japanese Layout Design Isbn 9789887608783 -1- 243. Copy Sendpoints Editorial Department (2022 & Beyond), Japanese Color Matching Isbn 9789887608790 -1- 244. Copy Smith (2023 & Beyond), Design Portfolios - A Recruiter’s View Isbn 9781394150465 -1- 245. Copy Rom (2023 & Beyond), Upcycling Furniture & Home Decor For Dummies Isbn 9781394150021 -1- 246. Copy Chace (2022 & Beyond), Low-water Landscaping For Dummies Isbn 9781119985808 -1- 247. Copy Firley (2023 & Beyond), The Urban Housing Handbook Isbn 9781119653684 -1- 248. Copy Mukhopadhyay (2023 & Beyond), Ergonomics In Fashion Design Isbn 9789811945366 -1- 249. Copy Jens Schmukal (2024), Digital Design Isbn 9788119523467 -1- 250. Copy Jonathan Stech (2024), Entrepreneurial Behavior Isbn 9788119523726 -1- 251. Copy Selvin Fernandes (2024), Engineering Management Isbn 9788119205882 -1- 252. Copy Jonathan Stech (2024), Entrepreneurial Management Isbn 9788119523757 -1- 253. Copy Jonathan Stech (2024), Entrepreneurship Isbn 9788119523795 -1- 254. Copy Jonathan Stech (2024), Entrepreneurship And Business Planning Isbn 9788119523863 -1- 255. Copy Jonas Kozle (2024), E-commerce And Internet Marketing Isbn 9788119523313 -1- 256. Copy Chavez, (2023 & Beyond) 1ed. Adobe Photoshop Classroom In A Book Isbn 9780137965892 -1- 257. Copy Concepcion (2023 & Beyond). 1st Ed. Adobe Photoshop Lightroom Classic Classroom In A Book Isbn 9780137625154 -1- 258. Copy Chun, C2023 & Beyond, 1ed Adobe Animate Classroom In A Book Isbn 9780137982424 -1- 259. Copy Wood (2023 & Beyond). 1st Ed. Adobe Illustrator Classroom In A Book Isbn 9780137967179 -1- 260. Copy Anton (2023 & Beyond). 1st Ed. Adobe Indesign Classroom In A Book Isbn 9780137967445 -1- 261. Copy Labrecque, C2023 & Beyond, 1ed Adobe Creative Cloud Classroom In A Book: Design Software Foundations With Adobe Creative Cloud Isbn 9780137914708 -1- 262. Copy Van De Wiele, C2023 & Beyond, 1ed Adobe Photoshop, Illustrator, And Indesign Collaboration And Workflow Isbn 9780137908462 -1- 263. Copy French, (2023 & Beyond). 1st Ed. Adobe Photoshop Visual Quickstart Guide Isbn 9780137640836 -1- 264. Copy Padova, (2022 & Beyond) 1st Ed. Adobe Photoshop Elements Advanced Editing Techniques And Tricks: The Essential Guide To Going Beyond Guided Edits Isbn 9780137844029 -1- 265. Copy Wood, C2023 & Beyond, 1ed Adobe Illustrator Classroom In A Book, Isbn 9780137597741 -1- 266. Copy Concepcion (2022 & Beyond). 3rd Ed. Adobe Photoshop And Lightroom Classic Classroom In A Book Isbn 9780137652938 -1- 267. Copy Fridsma (2022 & Beyond). 1st Ed. Adobe After Effects Classroom In A Book Isbn 9780137623921 -1- 268. Copy Wood, (2022 & Beyond). 1st Ed. Adobe Illustrator Classroom In A Book Isbn 9780137622153 -1- 269. Copy Anton, (2022 & Beyond), 1st Ed. Adobe In Design Classroom In A Book Isbn 9780137622962 -1- 270. Copy Jones (2022 & Beyond) 1st Ed. Going Digital Isbn 9781292375670 -1- Lot 12--college Of Architecture--abc: ₱ 150,000.00 271. Copy Garber (2023 & Beyond), Building Futures: Technology, Ecology, And Architectural Practice Isbn 9781119829218 -1- 272. Copy Durrett (2022 & Beyond), Cohousing Communities; Designing For High Functioning Neighborhoods Isbn 9781119897705 -1- 273. Copy Iano (2022 & Beyond), The Architect’s Studio Companion: Rules Of Thumb For Preliminary Design Isbn 9781119826798 -1- 274. Copy Laura Sanderson, Sally Stone (2022 & Beyond), Emerging Practices In Architectural Pedagogy Isbn 9781032004150 -1- 275. Copy Neufert (2023 & Beyond), Architects' Data Isbn 9781119873945 -1- 276. Copy Spiller (2022 & Beyond), Radical Architectural Drawing Isbn 9781119787778 -1- 277. Copy Carta (2022 & Beyond), Machine Learning And The City: Applications In Architecture And Urban Design Isbn 9781119749639 -1- 278. Copy Schreyer (2023 & Beyond), Architectural Design With Sketchup - 3d Modeling, Extensions, Bim, Rendering, Making, Scripting, And Layout Isbn 9781394161133 -1- 279. Copy Reicher (2022 & Beyond), Urban Design Isbn 9783658343729 -1- 280. Copy Di Paola (2023 & Beyond), Parametric Experiments In Architecture Isbn 9783030962784 -1- 281. Copy David Brenner (2024), Architectural Interiors Isbn 9788119677139 -1- 282. Copy Francis Fernandes (2024), Architectural Structures Isbn 9788119677306 -1- 283. Copy Federico C.f. Cuervo (2023 & Beyond), Foundations Of Philippine Real Property Valuation Isbn 9789719820994 -1- 284. Copy Olga Popovic Larsen (2023 & Beyond), Conceptual Structural Design: Bridging The Gap Between Architects And Engineers, Third Edition Isbn 9780727765987 -1- 285. Copy Cline (2023 & Beyond) Sketchup For Interior Design: 3d Visualizing, Designing, And Space Planning Isbn 9781119897743 -1- 286. Copy R.k. Khitoliya (2023 & Beyond). Construction Project Management. Isbn 9789394917026 -1- 287. Copy R.k. Khitoliya (2023 & Beyond). Construction Project Planning. Isbn 9789394917002 -1- 288. Copy Jens Schmukal (2024). Digital Design. Isbn 9788119523467 -1- 289. Copy Francis Fernandes (2024). Steel And Timber Design Isbn 9788119677283 -1- 290. Copy Larco, Nico (2024) The Sustainable Urban Design Handbook 1st Ed Isbn 978-1138945692 -1- 291. Copy Ingram, Alexa (2023 & Beyond). Climate Change Simplified: A Comprehensive Guide To Global Warming And Sustainable Living With 101 Essential Tips For A Greener Future And Reduced Carbon Footprint (climate Consciousness Series) Isbn 978-1962795005 -1- 292. Copy Sykes, Oliver (2023 & Beyond). International Planning Studies: An Introduction (planning, Environment, Cities) 978- Isbn 9811954061 -1- 293. Copy Lian, Jonathan Km (2023 & Beyond), Facilities Planning And Design: An Introduction For Facility Planners, Facility Project Managers And Facility Managers (world Scientific Series On The Built Environment Book 4) 2nd Edition 978- Isbn 9811265488 -1- 294. Copy Owens, Patsky Eubanks (2023 & Beyond). Outdoor Environments For People: Considering Human Factors In Landscape Design 1st Edition Isbn 978-1138296435 -1- 295. Copy Ratcliffe, John (2023 & Beyond) Urban Planning And Real Estate Transformations For The Future: A Built Environment Bricolage 1st Edition Isbn 978-1032410883 -1- 296. Copy Tan, Willie (2023 & Beyond) Urban Management: Managing Cities In Uncertain Times (world Scientific Series On The Built Environment Book 5 Isbn 978-9811266935 -1- Lot 13--college Of Engineering--abc: ₱ 150,000.00 297. Copy Imane Khalil, Issam Lakkis (2023 & Beyond), Computational Fluid Dynamics: An Introduction To Modeling And Applications Isbn 9781264274949 -1- 298. Copy Bethune (2023 & Beyond), Engineering Design And Graphics With Solidworks 2023 Isbn 9780137899524 -1- 299. Copy R.k. Khitoliya (2023 & Beyond), Construction Project Planning Isbn 9789394917002 -1- 300. Copy R.k. Khitoliya (2023 & Beyond), Fundamentals Of Ground Improvement Engineering Isbn 9788195916948 -1- 301. Copy Peter Desoza (2023 & Beyond), Electronics And Communication Engineering Isbn 9788119205578 -1- 302. Copy Bina Rani (2023 & Beyond), Air Pollution Impacts On Health, Prevention Strategies Isbn 9788195916986 -1- 303. Copy Claude Corda (2023 & Beyond), Metallurgical Engineering Isbn 9788119205462 -1- 304. Copy Wicander, Monroe (2023 & Beyond), Physical Geology: Investigating Earth Isbn 9780357730690 -1- 305. Copy Keith Cooper (2023 & Beyond), Engineering A Compiler Isbn 9780128154120 -1- 306. Copy Anderson (2024), Fundamentals Of Aerodynamics Isbn 9781266076442 -1- 307. Copy Stefan Waner (2024), Finite Mathematics And Applied Calculus Isbn 9780357723630 -1- 308. Copy Fiorentini (2023 & Beyond), Fire Risk Management: Principles And Strategies For Buildings And Industrial Assets Isbn 9781119827436 -1- 309. Copy Van De Poel (2023 & Beyond), Ethics, Technology, And Engineering - An Introduction Isbn 9781119879435 -1- 310. Copy Graham (2023 & Beyond), Project Management For Dummies Isbn 9781394201884 -1- 311. Copy Klell (2023 & Beyond), Hydrogen In Automotive Engineering Isbn 9783658350635 -1- 312. Copy Saeed Moaveni (2023 & Beyond), Engineering Fundamentals An Introduction To Engineering, Si Edition Isbn 9780357684429 -1- 313. Copy Francis Fernandes (2024), Steel And Timber Design Isbn 9788119677283 -1- 314. Copy Gregor Groner (2024), Calculus For Business Isbn 9788119523283 -1- 315. Copy Sam John (2024), Strength Of Materials Isbn 9788119677061 -1- 316. Copy Adler Dsouza (2024), Surveying Isbn 9788119677269 -1- 317. Copy Jim Charles (2024), Vectors And Projectiles Isbn 9788119365111 -1- 318. Copy Savio Rozario (2024), Vibration Engineering Isbn 9788119205660 -1- 319. Copy Savio Rozario (2024), Vibrations And Waves Isbn 9788119365050 -1- 320. Copy Nikhil Anthony (2024), Water Supply Engineering Isbn 9788119205615 -1- 321. Copy V.k. Panday (2024), Geophysics Isbn 9788119365906 -1- 322. Copy Blossom Joseph (2024), Software Engineering Isbn 9788119205868 -1- 323. Copy Blossom Joseph (2024), Software Intelligent Agents Isbn 9788119523535 -1- 324. Copy Alexandra Germer (2024), Abstract Algebra Isbn 9788119523139 -1- 325. Copy Andreas Koch (2024), Advanced Calculus Isbn 9788119523450 -1- 326. Copy Felix Kaser (2024), Algebraic Topology Isbn 9788119523405 -1- 327. Copy Gregor Groner (2024), Calculus Of Variation Isbn 9788119523245 -1- 328. Copy Aslam Kassimali (2023 & Beyond), Structural Analysis Isbn 9789815160680 -1- 329. Copy Braja M. Das (2023 & Beyond), Principles Of Geotechnical Engineering Isbn 9789815160697 -1- 330. Copy David Sobecki (2023 & Beyond), Math In Our World Isbn 9789813313217 -1- 331. Copy James Stewart, Daniel K. Clegg, Saleem Watson (2023 & Beyond), Calculus, Metric Version Isbn 9789815160765 -1- 332. Copy Ron Larson (2023 & Beyond), Calculus International Metric Edition Isbn 9789815161120 -1- 333. Copy Delilah Sam (2024), Auxiliary Machinery Isbn 9788119523511 -1- 334. Copy Delilah Sam (2024), Machine Design 9788119365104 -1- 335. Copy Samual Rodrigues (2024), Machine Elements Isbn 9788119205691 -1- 336. Copy Rollen Frantz (2024), Thermal Physics Isbn 9788119205929 -1- Lot 14--college Of Teacher Education--abc: ₱ 149,440.00 337. Copy Milady (2023 & Beyond), Milady's Standard Cosmetology With Standard Foundations Isbn 9780357871492 -1- 338. Copy Ellie Whitney, Sharon Rady Rolfes, Sharon Rady Rolfes, Tim Crowe, Adam Walsh, Adam Walsh (2023 & Beyond), Understanding Nutrition Isbn 9780170457972 -1- 339. Copy Milady (2023 & Beyond), Milady Standard Cosmetology Isbn 9780357378908 -1- 340. Copy Narendra Sharma (2023 & Beyond), Advanced Technologies In Organic Farming Isbn 9789394917071 -1- 341. Copy Harsha Sharma (2023 & Beyond), Agricultural Microbiology Isbn 9788195916900 -1- 342. Copy V.b. Sakhare (2023 & Beyond), Mcqs In Fisheries And Aquaculture Isbn 9789394917019 -1- 343. Copy Henry Tran (2024) Strategic Human Resources Management In Schools, Isbn 78-1032598017 -1- 344. Copy Murad Alam (2023 & Beyond), Procedures In Cosmetic Dermatology: Hair Restoration Isbn 9780323829212 -1- 345. Copy Elizabeth Tanzi (2023 & Beyond), Procedures In Cosmetic Dermatology: Lasers, Lights, And Energy Devices Isbn 9780323829052 -1- 346. Copy Jean Carruthers (2023 & Beyond), Procedures In Cosmetic Dermatology: Soft Tissue Augmentation Isbn 9780323830751 -1- 347. Copy Frances Sizer, Ellie Whitney (2023 & Beyond), Nutrition: Concepts & Controversies Isbn 9780357727614 -1- 348. Copy Stefan Waner, Steven Costenoble (2024), Finite Mathematics Isbn 9780357723265 -1- 349. Copy An Introduction To Formal Languages And Automata, Linz And Rodger, C2023 & Beyond, Isbn 9781284231601 -1- 350. Copy The Leadership Experience, Richard L. Daft, C2023 & Beyond, Isbn 9780357716304 -1- 351. Copy Rizaldi C. Nocon, Ederlina G. Nocon (2024) Essential Mathematics For The Modern World Isbn 9789719820239 -1- 352. Copy Valerie Hansen, Ken Curtis (2023 & Beyond) Voyages In World History Isbn 9780357662106 -1- 353. Copy Sheila Zamar (2023 & Beyond) Filipino: An Essential Grammar Isbn 9781138826281 -1- 354. Copy Santrock (2024) Educational Psychology 9781266149023 -1- 355. Copy Li (2023 & Beyond). Preservice Teacher Education Policy Development Isbn 9789819958641 -1- 356. Copy Killen, O'toole (2023 & Beyond) Effective Teaching Strategies: Lessons From Research And Practice Isbn 9780170457590 -1- 357. Copy Lisa A. Wines, Judy A. Nelson, Natalie Fikac (2024) Administrative Leaders And School Counselors Isbn 9781032114019 -1- 358. Copy Barrett (2023 & Beyond) Assessment By Design Isbn 9781642675573 -1- 359. Copy Melody Bowdon (2024) Ethical Considerations Of Virtual Reality In The College Classroom Isbn 9781032359915 -1- Lot 15--filipiniana Collection--abc: ₱ 195,082.50 360. Copy Ethel Cecille Baltazar, Carmelita Ragasa, Justina Evangelista (2024), Mathematics In The Modern World Isbn 9789719820031 -6- 361. Copy Edward Jay Mansarate Quinto (2024), Science, Technology And Society: An Evidence-driven Outcomes-based Module Isbn 9789719820505 -6- 362. Copy Daniel Joseph Mcnamara, Vida Mia Valverde, Ramon Beleno Iii (2024), Science, Technology And Society Isbn 9789719819349 -11- 363. Copy Rhodalyn Wani-obias, Aaron Abel Mallari, Janet Reguindin-estrella (2024). The Life And Works Of Jose Rizal. Isbn 9789719819790 -3- 364. Copy Ma. Joycelyn A. Go-monilla (2024), Disaster And Mental Health, Isbn 9789719819530 -5- 366. Copy Agustin Martin G. Rodriguez, A.m. Leal Rodriguez (2023 & Beyond). Gender And Society: Fostering A Gender Equal Society Isbn 9789719820178 -5- 367. Copy John Paolo R. Rivera (2023 & Beyond) Statistical Analysis With Software Applications 978-621-8205-07-9 -5- 368. Copy Jovito V. Cariño (2023 & Beyond) Fundamentals Of Ethics. Isbn 9789719820376 -5- 369. Copy Federico C.f. Cuervo (2023 & Beyond) Foundations Of Philippine Real Property Valuation Isbn 9789719820994 -5- 370. Copy Jocelyn D. Domingo, Ma. Frieda Z. Hapan, Alvin Rey F. Flores, Ruby Sp Garcia-meim, Rowen T. Yolo (2023 & Beyond) Laboratory Manual In Human Histology Isbn 9789719821151 -5- 371. Copy Gamaliel Issamar De Vera, Ma. Frieda Z. Hapan, Edilberto P.manahan, Gregorio L. Martin I, Rodolfo R. Rabor (2023 & Beyond) Medical Technology Laws And Bioethics (a Work Textbook) Isbn 9789719821458 -5- 372. Copy Carmelita C. Cardona, Gregorio L. Martin I, Ruby Sp Garcia-meim (2023 & Beyond). Laboratory Manual In Blood Banking Isbn 9789719821434 -5- 373. Copy Dawn Iacobucci (2023 & Beyond) Marketing Management Isbn 9789815097290 -3- 374. Copy Nick L. Aduana (2023 & Beyond). Cost Accounting And Control Isbn 978962124-3 -3- 375. Copy Earth And Life Science Self Learning Module + Earth And Life Science Self Learning Module Answer Key (strictly Set) Isbn 8888823000351 (2024) -5- 376. Copy Frances Antoinette C. Cruz, Nassef Manabilang Adiong, John Harvey D. Gamas, Archill Niña Faller-capistrano, Lorna Q. Israel (2024) The Contemporary World Isbn 9789719820437 -3- 377. Copy Maria Teresa T. Rodriguez (2023 & Beyond) Review Handbook In Clinical Chemistry Isbn 9789719820772ce -3- 378. Copy Stanley Block, Geoffrey Hirt, Bartley Danielsen (2023 & Beyond) Foundations Of Financial Management (customized) Isbn 9781307893939 -3- 379. Copy Bethe Jumalon-sacabin, Nourelle Murod Calam (2024) Biochemistry Laboratory Manual 2307jumbioclm -3- 380. Copy Eden V. Evangelista, Luisito T. Evangelista (2024) Worktext In General Botany (second Edition) Isbn 9789719821984 -3- 381. Copy Carthelyn C. Adajar, Et Al. (2024) Art Appreciation Isbn 978-621-08-0051-7 -5- 382. Copy Gilbert M. Sali-ot, Et Al (2024) Specialized Crime Investigation 1 With Legal Medicine Isbn 978-621-08-0049-4 -5- 383. Copy Milcah R. Mangubat & Jivulter C. Manguba (2023 & Beyond) Cad Basics 1 Introduction To 2d Writing Isbn 978-621-08-0042-5 -3- 384. Copy Milcah R. Mangubat & Jivulter C. Manguba (2023 & Beyond) Drawing 1 - Fundamentals Of Technical Drawing Isbn 978-621-08-0013-5 -3- 385. Copy Milcah R. Mangubat & Jivulter C. Mangubat (2023 & Beyond) Drawing 2 - Advanced Technical Drawing Isbn 978-621-08-0010-4 -4- 386. Copy Vincent Theodore M. Balo, Et A (2023 & Beyond) Technology For Teaching And Learning 1 (a Course Module) Isbn 978-621-08-0014-2 -4- 387. Copy Angelo B. Jabilles, Et Al. (2023 & Beyond) Environmental Science (a Simplified Approach For College Students) Isbn 978-621-08-0019-7 -3- 388. Copy Winston B. Gallinero, Et Al. (2023 & Beyond) Gender And Society Isbn 9 978-621-08-0021-0 -3- 389. Copy Belinda C. Silverio, Et Al. (2023 & Beyond) Statistics And Probability Isbn 978-971-821-923-2 -3- 390. Copy Sally M. Cadiz, Et Al. (2023 & Beyond) The Essential Of Practicing Values Education With Work Ethics Isbn 978-621-08-0043-2 -3- 391. Copy Vergie S. Otig, Et Al. (2023 & Beyond) Vergie S. Otig, Et Al. 2023 Understanding The Self Isbn 978-621-08-0030-2 -5- 392. Copy Cruz (2024) The Contemporary World (l) Isbn 9789719820437 -3- 394. Copy Pasco, Suarez & Rodriguez, (2023 & Beyond) Ethics (l) Isbn 9789719819615 -5- 395. Copy Rodriguez, (2023 & Beyond) Gender And Society: Fostering A Gender Equal Society (l) Isbn 9789719820178 -4- 398. Copy Silberberg (2024) Chemistry: The Molecular Nature Of Matter And Change (l) Isbn 9789813312913 -5- 399. Copy Aduana (2023 & Beyond) Cost Accounting And Control (l) Isbn 9789719821243 -3- 400. Copy Cuervo 1st Ed. (2023 & Beyond) Foundations Of Philippine Real Property Valuation (l) Isbn 9789719820994 -5- 401. Copy 3rd Ed. (2023 & Beyond) Human Person Gearing Towards Social Development: Nstp-cwts 1 A Worktext For College Students (updated Edition) (l) Isbn 9789719821687 -5- 402. Copy Villasoto (2023 & Beyond) 3rd Ed. Service-learning And Immersion Towards Community Building: Nstp-cwts 2 A Worktext For College Students (updated Edition) (l) Isbn 9789719821908 -5- 403. Copy Gonzalo, Richard Philip A. (2023 & Beyond) Applied Business Tools And Technologies In Hotel And Restaurant Management (hrm) Isbn 978-621-04-4843-6 -5- 404. Copy Danny A. Cabulay (2023 & Beyond) Professional Development And Applied Ethics Isbn 978-621-04-4665-4 -5- 405. Copy Sarah Monzon-po (2023 & Beyond) Fundamentals In Lodging Operations Isbn 978-621-04-4354-7 -5- 406. Copy John Mark Flores Bondoc (2024) History Of Mathematics Isbn 978-621-04-5060-6 -5- 407. Copy Maureen Domingo-bondoc (2024) Teaching And Assessment Of Literature Studies Isbn 978-621-04-5078-1 -5- 408. Copy Cristina Rowena Salcedo-padilla Greg Tabios Pawilen Coordinator: Greg Pawilen (2024) Learners With Emotional Behavioral, Language, And Communication Disabilities Isbn 978-621-04-5044-6 -5- 409. Copy Ronato S. Ballado, Marlo D. Alvarez, Alejandro L. Giray Jr. (2023 & Beyond) Technology For Teaching And Learning 1 Isbn 978-621-04-4826-9 -5- 410. Copy Charesma Grace K. Lud-ayen Et Al. (2023 & Beyond) Theories Of Crime And Causation: Concepts, Policy Implications, And Research Focus Isbn 978-621-04-4858-0 -5- 411. Copy Gerry J. Caño Roan Salon (2024) Juvenile Delinquency & Juvenile Justice System Isbn 978-621-04-5077-4 -5- 412. Copy Mecmack, Nartea, (2024) Professional Salesmanship Isbn 978-621-04-5077-4 -5- 413. Copy Jovelyn Q. Yu Stevenson Q. Yu (2024) Financial Management Isbn 978-621-04-5086-6 -5- 414. Copy Baniline Jone V. Abantao (2024) Marketing Research Isbn 978-621-04-5036-1 -5- 415. Copy Maria Victoria U. Sy (2024) Organizational Management Isbn 978-621-04-5043-9 -3- 416. Copy Pauline Kristine M. Fulgencio Jackqui R. Moreno, (2024) Intermediate Accounting Essentials Volume 1 Isbn 978-621-04-5165-8 -5- 417. Copy Ijackqui R. Moreno Pauline Kristine M. Fulgencio Albert I. Riveran (2024) Termediate Accounting Essentials Volume 2 Isbn 978-621-04-5164-1 -5- 418 Copy Albert I. Rivera Jackqui R. Moreno (2024) Pauline Kristine M. Fulgenciointermediate Accounting Essentials Volume 3 Isbn 978-621-04-5163-4 -5- 419. Copy Sap, (2023 & Beyond) Learning+ English Vocabulary Workbook 5 Isbn 9789813421936 -3- 420 Copy Canaday (2023 & Beyond) Coaching Essentials Managers Isbn 9781264573585 -3- 421. Copy Shivaji Gyanba Jetithor (2023 & Beyond) Reservoir Fisheries Isbn 9788195916955 -3- 422. Copy Patricia Dacudao (2023 & Beyond) Ang Bisa Ng Pag-uulit Sa Katutubong Panitikan Isbn 9786214481972 -3- 423. Copy Raquel Cementina-olpoc,maria Assunta C. Cuyegkeng & Ana Marina A. Tan (2023 & Beyond) Social Enterprise Stories Of Resilience And Innovation Isbn 9786214483136 -3- 424. Copy Tan, (2023 & Beyond) A History Of The Philippines Student Ed. 2023 Isbn 9789715425681 -3- 425. Copy Sirug, (2023 & Beyond) Business Mathematics, A Comprehensive Approach For Senior High School Isbn 978-9719655190 -3-
DEPT OF THE ARMY USA Tender
Telecommunication Services
United States
Closing Soon6 Nov 2024
Tender AmountRefer Documents
Description: Contractor Will Provide Personnel, Management,tools, Equipment, Parts And Materials, Transportation And Other Items And Services
necessary To Install 18 Nipr Drops In Cdc Bldg, 9098 Schofield Barracks.contractor Will Abide By Nec Standardized Labeling Program. Contractor Shallabide By All Tia Standards For Telecommunication Installation. 0001 - Materials/equipment 0002 - Labor site Visit Scheduled For 28 October 2024 @1000 Hours, Building 9098 Located On Schofield Barracks Hi 52.237-1site Visit (apr 1984) offerors Or Quoters Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award. (end Of Provision) (i) This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Conducted Usingfar 13 - Simplified Acquisition Procedures,as Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Separate Written Solicitation Will Not Be Issued. (ii) Competitive Quotes Are Being Requested Under Request For Quote (rfq) Number <w912cn-24-q-0032>. (iii) This Solicitation Document Incorporates Provisions And Clauses That Are Those In Effect Through Federal Acquisition Circular (fac) 2024-0610 and Dfars Publication Notice (dpn) 20240815which Can Be Found At Https://www.acq.osd.mil/dpap/dars/change_notices.html. (iv) The North American Industry Classification System (naics) Code Applicable To This Acquisition Is <insert Naics Code And Title> And The Small Business Size Standard Is Xxx Employees Or $xx Million. The Product Service Code Is <insert Psc Code>.this Procurement Is A <insert Eithercompetitive, Unrestricted Action –or- Type Of Set-aside (i.e. 8(a), 100% Small Business Set-aside, Sd-vosb Set-aside, Wosb Set-aside, Hubzone Set-aside>. Only Quotes Submitted By Small Business Concerns Will Be Accepted By The Government. The Government Intends To Award A <insert Contract Type, Such As Firm-fixed Price (ffp), Indefinite Delivery, Indefinite-quantity (idiq), Requirements, Etc.> Contract. (v) For The Purposes Of Quoting, The Contract Line Item Number (clin) Structure Is Identified Below: clin description qty. unit Of Issue unit Price extended Price 0001 material/equipment/shipping 0002 labor total Overall Price: (vi) Contractors Shall Review The <insert Attachment Number/title> For The Full Description Of Requirements To Be Acquired. rfq Attachments attachment 1 – Performance Work Statement, Statement Of Work, Salient Characteristics, List Of Technical Specifications) attachment 2 – Drawings <depending On The Primary Buy Type (supply Or Service), Insert One Of The Following Statements:> <service> (vii) The Anticipated Period Of Performance Is: base Period: <insertday-month-year To Day-month-year> the Anticipated Place Of Performance For The Effort Is: Bldg 9098 Schofield Barracks, Hi. (viii) Instructions To Offerors:the Provision At Far52.212-1 Instructions To Offerors – Commercial Products And Commercial Services (sep 2023), Applies To This Acquisition. addendum To Far 52.212-1 Instructions To Offerors – Commercial Products And Commercial Services (sep 2023) pursuant To Far 12.302(d), The Provision At Far 52.212-1 Is Augmented As Follows: Offerors Shall Prepare Their Quotations Iaw Far 52.212-1 And This Addendum. A Complete Quote Must Be Received To Be Considered For Award.quotes That Fail To Address All Requirements Or Follow All Instructions Will Be Considered Non-responsive And Ineligible For Contract Award. A Complete Quote Includes A Response And Submission To Each Of The Following: general Information: Business Name, Address, Cage Code, Uei Number, Business Size And Type Of Small Business Based On Applicable Naics Code As Provided Above, Federal Tax Id, Primary Point Of Contact (to Include Telephone And E-mail Address), Payment Terms (net 30) And Provide A Gsa Contract Number If Some Or All Items Proposed Are On The Gsa Schedule. price Quote: The Quoter Shall Submit Complete Pricing For Each Clin Listed In Paragraph (v) Above To Include The Unit Price And The Extended Price For Each Line Item And A Total Price In Us Dollars ($). All Options Must Be Priced; Partial Quotes Will Not Be Accepted. technical Capability Submission: The Quoter Shall Submit, As Part Of Its Quote, A Technical Capability Narrative, Not To Exceed Xx Pages With 12-point Font, Demonstrating The Quoter’s Thorough Understanding Of The Scope Of Work And Capability To Provide The Products Or Services Outlined In Paragraph (v) And The Performance Work Statement And Drawings . To Facilitate Evaluation, The Technical Narrative Shall Provide The Government With Reasonable Assurance That The Quoter Has The Relevant Technical Capability Required To Meet The Stated Requirements And Shall Be Prepared In A Format Consistent With The Evaluation Criteria For Award Set Forth In This Solicitation. The Technical Capability Submission Should Be A Stand-alone Document Containing All Information Necessary For The Government To Perform A Complete Technical Evaluation. Quoters May Submit Pictures, Brochures, Product/service Literature, Product Samples Or Any Other Pertinent Technical Information Of The Quoted Product (or Services) To Facilitate Evaluation And Demonstrate The Offeror’s Ability To Meet The Technical Requirements, But May Not Exceed The Page Limitation Above. past Performance Information: Offerors Need Not Submit Past Performance Information. The Government Will Consider Past Performance Information, If Available, From The Web-enabled Supplier Performance Risk System (sprs) Regarding The Offeror’s Past Performance History To Supplement The Technical Evaluation. The Government May Query Other Internal Databases (e.g. Cpars) At Its Discretion. formatting Requirements: All Quotes And Attachments Shall Be In Word, Excel, Or Adobe Acrobat (.pdf) Format. Drawings For The Proposal May Be Completed Using Autocad Or Powerpoint For The Proposal. solicitation Requirements, Terms And Conditions: Quoter Are Required To Meet All Solicitation Requirements, Such As Terms And Conditions, Representations And Certifications, And Technical Requirements, In Addition To Those Identified As Evaluation Criteria In Section (ix). Failure To Comply With The Terms And Conditions Of The Solicitation May Result In The Quoter Being Ineligible For Award. As Such, Quoter Must List Any Exceptions To The Terms And Conditions In The Solicitation. period For Acceptance Of Quotes: Quoters Shall Indicate How Long The Quote Is Valid. As A Minimum The Quote Shall Be Valid For 90 Days. (ix) Evaluation Factors For Award: The Provision At Far52.212-2 Evaluation – Commercial Products And Commercial Services (nov 2021) Applies To This Acquisition. addendum To Far 52.212-2, Evaluation – Commercial Products And Commercial Services (nov 2021) pursuant To Far 12.302(d), The Provision At Far 52.212-2 Is Augmented As Follows: basis For Award: Procedures In Far 13.106 Are Applicable To This Procurement. The Government Will Award Afirm-fixed-price (ffp) Contract Resulting From This Solicitation To The Responsible Quoter (as Determined Within The Meaning Of Far Part 9, Paragraph 9.104), Whose Quote Conforming To The Solicitation Is The Best Value Considering Price And Other Factors. The Following Factors Shall Be Used To Evaluate Quotes: <price And Technical Capability> the Specific Evaluation Criteria For These Factors Is Defined Below: technical Capability Factor (supplies):the Government Will Evaluate The Quote To See If The Quote And Any Supporting Product Documentation Meet <or Exceed> The Technical Requirements Identified In Paragraph (v) Of This Solicitation And The Performance Work Statement. technical Capability Factor (services): The Government Will Evaluate The Quote To See If The Quote And Supporting Documentation Meet <or Exceed> The Technical Requirements Identified In Paragraph (v) Of This Solicitation And Performance Work Statement. minimum Requirement: Provide A Written Narrative Describing Quoters Ability To Meet The Following Technical Capability Requirements: proposal drawings (per Pws Para 1.4) cost Of Equipment & Labor (to Include Travel And Lodging) price Factor:the Government Will Evaluate The Total Overall Price For Completeness And To Determine If It Is Fair And Reasonable Iaw Far13.106-3(a). If Competitive Quotes Are Not Received, The Government Reserves The Right To Utilize Other Methods Identified In The Far To Determine Price Reasonableness. award Will Be To The Lowest Priced Technically Acceptable Offeror. (x) The Contractor Shall Include The Provisions At 52.212-3, Offeror Representations And Certifications – commercial Products And Commercial Services And Shall Be Registered In The System For Award Management (sam) Database: Https://www.sam.gov/portal/public/sam/. Failure To Comply With Sam Registration May Deem A Vendor Ineligible For Award Consideration. (xi) The Clause At 52.212-4, Contract Terms And Conditions -- Commercial Products And Commercial Services (dec 2022), Applies To This Acquisition. (xii) The Clause At 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders -- Commercial Products And Commercial Services (jun 2023), Applies To This Acquisition. (xiii) The Following Far Clauses And Provisions Are Applicable To This Acquisition: 52.204-7 System For Award Management (oct 2018) 52.204-13 System For Award Management Maintenance (oct 2018) 52.204-16 Commercial And Government Entity Code Reporting (aug 2020) 52.204-17 Ownership Or Control Of Offeror (aug 2020) 52.204-18 Commercial And Government Entity Code Maintenance (aug 2020) 52.204-20 Predecessor Of Offeror (aug 2020) 52.204-23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (nov 2021) 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) 52.204-26 Covered Telecommunications Equipment Or Services-representation (oct 2020) 52.204-27 Prohibition On A Bytedance Covered Application (jun 2023) 52.209-10 Prohibition On Contracting With Inverted Domestic Corporations (nov 2015) 52.212-1 Instructions To Offerors—commercial Products And Commercial Services (mar 2023) 52.212-2 Evaluation—commercial Products And Commercial Services (nov 2021) 52.212-3 Offeror Representations And Certifications—commercial Products And Commercial Services (dec 2022) 52.212-4, Contract Terms And Conditions—commercial Products And Commercial Services. (dec 2022) 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders—commercial Products And Commercial Services (jun 2023) 52.217-5 Evaluation Of Options (jul 1990) 52.217-8 Option To Extend Services (nov 1999) 52.217-9 Option To Extend The Term Of The Contract (mar 2000) 52.219-28, Post Award Small Business Program Representation (mar 2023) 52.222-21, Prohibition Of Segregated Facilities (apr 2015) 52.222-26, Equal Opportunity (sep 2016) 52.222-50, Combating Trafficking In Persons (nov 2021) 52.223-18, Encouraging Contractor Policies To Ban Text Messaging While Driving (jun 2020) 52.232-33, Payment By Electronic Funds Transfer— System For Award Management (jul 2013) 52.232-39 Unenforceability Of Unauthorized Obligations (jun 2013) 52.232-40 Providing Accelerated Payments To Small Business Subcontractors (nov 2021) 52.233-4 Applicable Law For Breach Of Contract Claim (oct 2004) the Following Dfars Clauses Are Applicable To The Acquisition: 252.203-7000 Requirements Relating To Compensation Of Former Dod Officials (sep 2011) 252.203-7002 Requirement To Inform Employees Of Whistleblower Rights (dec 2022) 252.203-7003 Agency Office Of The Inspector General (aug 2019) 252.203-7005 Representation Relating To Compensation Of Former Dod Officials (sep 2022) 252.204-7003 Control Of Government Personnel Work Product (apr 1992) 252.204-7008 Compliance With Safeguarding Covered Defense Information Controls (oct 2016) 252.204-7012 Safeguarding Covered Defense Information And Cyber Incident Reporting (jan 2023) 252.204-7015 Notice Of Authorized Disclosure Of Information For Litigation Support (jan 2023) 252.204-7016 Covered Defense Telecommunications Equipment Or Services—representation (dec 2019) 252.204-7017 Prohibition On The Acquisition Of Covered Defense Telecommunications Equipment Or Services—representation (may 2021) 252.204-7018 Prohibition On The Acquisition Of Covered Defense Telecommunications Equipment Or Services (jan 2023) 252.204-7019 Notice Of Nist Sp 800-171 Dod Assessment Requirements (jan 2023) 252.204-7020 Nist Sp 800-171 Dod Assessment Requirements (jan 2023) 252.204-7024 Notice On The Use Of The Supplier Performance Risk System (mar 2023) 252.211-7003 Item Unique Identification And Valuation (jan 2023) 252.223-7008 Prohibition Of Hexavalent Chromium (jan 2023) 252.225-7048 Export-controlled Items (jun 2013) 252.232-7003 Electronic Submission Of Payment Requests And Receiving Reports 252.232-7006 Wide Area Work-flow Payment Instructions (jan 2023) 252.232-7010 Levies On Contract Payments (dec 2006) 252.244-7000 Subcontracts For Commercial Items (jan 2023) 252.246-7008 Sources Of Electronic Parts (jan 2023) 252.247-7023 Transportation Of Supplies By Sea, Basic provisions/clauses Incorporated By Full Text: 52.252-1 Solicitation Provisions Incorporated By Reference (feb 1998) this Solicitation Incorporates One Or More Solicitation Provisions By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Offeror Is Cautioned That The Listed Provisions May Include Blocks That Must Be Completed By The Offeror And Submitted With Its Quotation Or Offer. In Lieu Of Submitting The Full Text Of Those Provisions, The Offeror May Identify The Provision By Paragraph Identifier And Provide The Appropriate Information With Its Quotation Or Offer. Also, The Full Text Of A Solicitation Provision May Be Accessed Electronically At This Address: Https://www.acquisition.gov. (end Of Provision) 52.252-2 Clauses Incorporated By Reference (feb 1998) this Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This Address: Https://www.acquisition.gov. (end Of Clause) 52.252-5authorized Deviations In Provisions (nov 2020) (a) The Use In This Solicitation Of Any Federal Acquisition Regulation (48 Cfr Chapter 1) Provision With An Authorized Deviation Is Indicated By The Addition Of "(deviation)" After The Date Of The Provision. (b) The Use In This Solicitation Of Any Defense Federal Acquisition Regulation (48 Cfr Chapter 2) Provision With An Authorized Deviation Is Indicated By The Addition Of "(deviation)" After The Name Of The Regulation. (end Of Provision) 52.252-6 Authorized Deviations In Clauses (nov 2020) (a) The Use In This Solicitation Or Contract Of Any Federal Acquisition Regulation (48 Cfr Chapter 1) Clause With An Authorized Deviation Is Indicated By The Addition Of "(deviation)" After The Date Of The Clause. (b) The Use In This Solicitation Or Contract Of Any Defense Federal Acquisition Regulation (48 Cfr Chapter 2) Clause With An Authorized Deviation Is Indicated By The Addition Of "(deviation)" After The Name Of The Regulation. (end Of Clause) (xiv) The Defense Priorities And Allocations System (dpas) And Assigned Rating Is Not Used For This Requirement. (xv)due Date And Submission Information site Visit: A Site Visit Will Occur On Date At Time Hst, Located At Address. Please Coordinate With First.last.civ@army.mil If You Will Be Attending The Site Visit No Later Than Date At Time Hst. There Is Only One Site Visit Planned For This Solicitation. Any Discussions, Comments, Or Explanations That May Be Made By Any Government Representative (during This Site Visit) Will Not Change The Terms Of The Solicitation And The Technical Specifications, Unless The Solicitation Is Amended In Writing. Any Questions Vendors Have During This Visit, Must Be Submitted In Writing Via E-mail To First.last.civ@army.mil(assigned Contract Specialist). Government’s Responses To All Potential Quoters’ Questions Will Be Provided Via An Amendment, Which Will Be Posted On The Sam.gov Website. questions Due Date And Submission Requirements: Any Questions Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The <insert “contract Specialist” Or “contracting Officer,” Name, And E-mail Address> And Must Include Rfq# W912cn-xx-q-xxxx. All Questions Must Be Received Before<insertdate Month Year At Xx:xx Am/pm>,hawaii Standard Time (hst). Questions May Be Addressed At The Discretion Of The Government. A Summary Of Questions Received And Government Responses Will Be Provided Via Amendment And Posted On The Sam.gov Website. rfq Due Date And Submission Requirements: This Rfq Closes On <insert Date Month Year At Xx:xx Am/pm>, Hawaii Standard Time (hst). Quotes Must Be Submitted Electronically Through Upload To The Sam.gov Website. In The Event Of Technical Issues With The Website, Quotes May Be Submitted Via Email To <insert “contract Specialist” And/or “contracting Officer,” Name, And E-mail Address> And Received Not Later Than <insert Time And Date>. It Is The Responsibility Of The Quoter To Ensure Quotations Are Received And Acknowledged By The Contracting Officer Or Contracting Specialist. Late Submissions Will Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). (xvi) Government Rfq Point Of Contract: The Point Of Contact For This Solicitation Is <insert Name Of Contracting Officer/contract Specialist, Phone, And Email First.last.civ@army.mil>. Reference Rfq# W912cn-xx-q-xxxx On All Email Exchanges Regarding This Acquisition. ******* End Of Combined Synopsis/solicitation ******** if Amendments To The Solicitation Are Needed, Upload An Amended Version Of The Original Combined Synopsis/solicitation That Includes A Statement(s) Similar To The Following At The Top Of The Document: completed Far Clause 52.212-3 Offeror Representation And Certifications – Commercial Items (if Not Entered Into System For Award Management (sam). If Any Representation Or Certification Cannot Be Completed In Sam, Fill In The Provision Provided In The Rfp And Submit With The Proposal. responsibility Determination Narrative. For Purposes Of Conducting Responsibility Determination, Submit A 1-page Narrative Addressing The Following. The Responsibility Determination Will Only Be Conducted On The Apparent Successful Contractor. a. Adequacy Of Financial Resources To Perform The Contract, Or The Ability To Obtain Them; b. Ability To Comply With The Required Or Proposed Delivery Or Performance Schedule, Taking Into Consideration All Existing Commercial And Governmental Business Commitments; c. Adequacy Of The Company/firm’s Performance Record. d. Description Of How The Company/firm Maintains Integrity And Business Ethics. e. Adequacy Of The Company/firm’s Organization, Experience, And Technical Skills, Or The Ability To Obtain Them (including, As Appropriate, Such Elements As Quality Assurance Measures And Safety Programs Applicable To Materials To Be Delivered And Services To Be Performed By The Prospective Contractor And Subcontractors).
Establishments And Organizations Of Higher Education, Research And Innovation Tender
Others
France
Closing Date29 Nov 2024
Tender AmountRefer Documents
Details: This Market Is A Phased Market, Comprising A Firm Phase And An Optional Phase Firm Phase (tf): • Task 1: Contribute To The Development And Preliminary Testing Of Software Enabling The C2omodo Project Team To Conduct Sensitivity Tests On Scene Classification • Task 2: Contribute To The Validation Of Radiative Transfer Simulations Associated With The Development Of The C2omodo Project Optional Phase (to): • Task 3: Conduct Sensitivity Tests Related To The Configuration Of The Observation System
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon7 Nov 2024
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
transportation Of Supplies By Sea (jan 2023)|2|||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
annual Representations And Certifications (may 2024)|13|339991|600||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Due Date Is Extended Until 07 November 2024. All Other Terms And Conditions Remain The Same. A Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory. Unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation. Please Specify (if Other Than 60 Days) ______________ Days. If You Are Submitting Your Quote Via Email Or Neco, Please Specify The
number Of Days Pricing Is Valid. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
\
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order.
block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. date Of First Submission=eoc
submit At The Time Of Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Navsup-wss Code N9433. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock
number And Item Nomenclature Specified In The Schedule Of Supply/services.
di-misc-a81356 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control
number - Certification Package To Be Iaw Did Di-misc-81356(latest Rev). date Of First Submission=eoc
submit At Time Of Material Delivery, A Cure Date Certificate Iaw Di-misc-81318 To Navsup-wss Code N9433.
a Separate Certificate Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-misc-a81318 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Certification Package To Be Iaw Did Di-misc-81318(latest Rev).
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon8 Nov 2024
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|see Schedule|tbd|||n/a||||||
transportation Of Supplies By Sea (oct 2024)|2|||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
annual Representations And Certifications (may 2024)|13|326299|650||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
unless Otherwise Specified, Pricing For This Quotation
is Valid For 60 Days After The Closing Date As Indicated On The Quotation.
please Specify (if Other Than 60 Days) ______________ Days.
if You Are Submitting Your Quote Via Email Or Neco,
please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
\
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order.
block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable.
6.3 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
mark The Packaging Label With The Nomenclature Identified On The Irpod. date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev). date Of First Submission=eoc
submit At Time Of Material Delivery, A Cure Date Certificate Iaw Di-misc-81318 To Navsup-wss Code N9433.
a Separate Certificate Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-misc-a81318 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Certification Package To Be Iaw Did Di-misc-81318(latest Rev).
5491-5500 of 5559 active Tenders