Pumps Tenders
Pumps Tenders
City Of Cagayan De Oro Tender
Healthcare and Medicine
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines City Of Cagayan De Oro Bids And Awards Committee Invitation To Bid For Supply And Delivery Of Medical, Dental And Laboratory Supplies (lot No. 1 To 6,8,10 To 12); Pr No. 24-4171 Dated October 09, 2024; Sn 347a - 2024 1. The City Government Of Cagayan De Oro, Through The Jrbgh - Medical, Dental And Laboratory Supplies Expenses , Intends To Apply The Following Sums Being The Corresponding Approved Budgets For The Contract (abcs) To Payments Under The Corresponding Lots Of The Contract For Supply And Delivery Of Medical, Dental And Laboratory Supplies (lot No. 1 To 6,8,10 To 12); Pr No. 24-4171 Dated October 09, 2024; Sn 347a - 2024, Viz: Lot Identification Number Lot Abc (php) Lot No. 1 816,000.00 Lot No. 2 1,227,000.00 Lot No. 3 1,430,500.00 Lot No. 4 595,500.00 Lot No. 5 1,278,500.00 Lot No. 6 2,057,500.00 Lot No. 8 761,000.00 Lot No. 10 1,512,000.00 Lot No. 11 260,000.00 Lot No. 12 1,012,200.00 Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Cagayan De Oro Now Invites Bids For: Lot No. 1 Item No. Quantity Unit Of Issue Item Description 1 5 Bottle Alkytriamine Cationic 2.5% + Trigger Spray 750ml, 2 5 Gal Alkytriamine Cationic 2.5% High-level Disinfectant Solution: Lemon Scent 3 5 Liter Alkytriamine Cationic 2.5% High-level Disinfectant Solution: Lemon Scent 4 5 Gal Disinfectant Solution : High-level Enzymatic Pre-cleaning Device 5 10 Gal High-level Disinfectant : Hydrogen Peroxide 75 Ready To Use,2.5l/gal 6 50 Pack Laparotomy : Sterile Disposable (1 Laparotomy Drape, 1 Mayo Stand Cover, 1 Outerwrap/back Table Cover, 4 Surgical Gown) 7 15 Pack Ceasarian Pack : Sterile (1 Cs Incise Drape With Pouch, 4 Surgical Gown, 8 Hand Towels, 1 Mayo Stand Cover, 1 Outer Wrap Back Table Cover, 4 Absorbable Hand Towels, 2 Baby Blanket) Lot No. 2 Item No. Quantity Unit Of Issue Item Description 8 400 Box Blue Nitrile Gloves Powder Free : Large 9 400 Box Blue Nitrile Gloves Powder Free : Medium 10 100 Box Sterile Gloves : Surgeon Gloves No. 6.0 50's Non-powdered 11 200 Box Sterile Gloves : Surgeon Gloves No. 7.0 50's Non-powdered 12 100 Box Sterile Gloves : Surgeon Gloves No. 7.5 50's Non-powdered 13 20 Box Sterile Gloves : Surgeon Gloves No. 8.0 50's Non-powdered 14 5000 Pc Shoe Wrap : Pair Lot No. 3 Item No. Quantity Unit Of Issue Item Description 15 50 Pack Battery : Alkaline Aa, 2's 16 50 Pack Battery : Alkaline Aaa, 2's 17 300 Pc Bacterial Filter : For Anesthesia 18 20 Box Surgical Blade : No. 10 100's 19 20 Box Surgical Blade : No. 15 100's 20 20 Box Surgical Blade : No.12 100's 21 300 Pc Cautery : Pad 22 300 Pc Cautery : Pencil 23 20 Pack Decontaminating Mat : W/glue 90x120cm- 30 Sheets 24 100 Pc Surgical Clipper Blade : . 25 100 Gal Povidone Iodine : 10% 26 100 Gal Povidone Iodine : 7.5% 27 100 Bottle Wound Irrigation Solution : 300ml Lot No. 4 Item No. Quantity Unit Of Issue Item Description 28 100 Box Catheter Foley Bag : No. 14 10's 29 100 Box Catheter Foley Bag : No. 16 10's 30 300 Pc Catheter Suction : No. 10 31 300 Pc Catheter Suction : No.12 32 1500 Pc Catheter Suction : No.14 33 500 Pc Catheter Suction : No.16 34 1500 Pc Catheter Suction : No.8 35 50 Pc Endotracheal Tube : No. 3.0 Uncuffed 36 50 Pc Endotracheal Tube : No. 3.5 Uncuffed 37 200 Pc Endotracheal Tube : No. 4.5 Cuffed 38 200 Pc Endotracheal Tube : No. 5.0 Cuffed 39 200 Pc Endotracheal Tube : No. 7.5 Cuffed 40 200 Pc Tube Feeding : Fr.14 41 1000 Pc Tube Feeding : Fr.16 42 1000 Pc Tube Feeding : Fr.8 43 50 Pc Umbilical Catheter : 4.0 44 50 Box Umbilical Cord Clamp, Box Of 100's : . Lot No. 5 Item No. Quantity Unit Of Issue Item Description 45 200 Roll Gauze Roll - 2 Ply 36x100 Yd (28x24) : Hospital Size 46 300 Roll Plaster Of Paris : 4" 47 50 Tube Plaster : Hospital Size -medical Plaster With Strong Adhesive, Water-resistant 48 200 Tube Plaster : Hospital Size-medical Plaster With Adhesive, Water- Resistant (regular) 49 50 Box Surgical Tape : Hypoallergenic Surgical Silk Tape 1" X 10yd 12's 50 50 Box Surgical Tape : Hypoallergenic Surgical Silk Tape 1/2" X 10yd 24's 51 50 Box Surgical Tape : Hypoallergenic Surgical Silk Tape 2 X 10yd 6's 52 50 Box Surgical Tape : Hypoallergenic Surgical Silk Tape 3 X 10yd 4's Lot No. 6 Item No. Quantity Unit Of Issue Item Description 53 200 Box Needle Sterile : G-26, 100's 54 100 Pc Skin Stapler : . 55 200 Box Sterile Syringe : 0.5cc Insulin 100 "s (needle Attached) 56 250 Box Sterile Syringe : 10cc Disp. 50's (needle Attached) 57 250 Box Sterile Syringe : 1cc Disp. 100's (needle Attached) 58 100 Box Sterile Syringe : 1cc Insulin 100's(needle Attached) 59 100 Box Sterile Syringe : 20cc Disp. 50's (needle Attached) 60 250 Box Sterile Syringe : 3cc Disp. 100's (needle Attached) 61 250 Box Sterile Syringe : 5cc Disp. 100's (needle Attached) 62 500 Pc Sterile Syringe Asepto 4oz : (needle Attached) Lot No. 8 Item No. Quantity Unit Of Issue Item Description 80 10 Pc Stethoscope : Adult - Medical Grade 81 100 Box Patient I.d. Band - Adult : White 100's 82 150 Box Patient I.d. Band - Pedia : Blue 100's 83 100 Box Patient I.d. Band - Pedia : Pink 100's 84 10 Pc Pulse Oximeter : Fingertip - Pedia 85 50 Pc Pulse Oximeter : Sensor - Adult 86 100 Pc Pulse Oximeter : Sensor - Neonate 87 50 Pc Pulse Oximeter : Sensor - Pedia 88 20 Pc Resuscitator Bag : Adult 89 20 Pc Resuscitator Bag : Pedia 90 20 Pc Resuscitator Bag : Neonate 91 50 Kit Epidural : Pack (anesthetic Device) 92 100 Pc Eye Drape : . 93 20 Gal Formalin : Solution 35% Solution 94 10 Pc Guide Wire : Pedia Fr6/2.0mm 95 10 Pc Guide Wire : Adult 96 30 Pc Wound Drainage : Reservoir For Infra And Post Operation Procedure (jackson-pratt),100ml Lot No. 10 Item No. Quantity Unit Of Issue Item Description 104 2000 Pc Heplock : . 105 3000 Pc Intravenous Administration Set : Adult 106 1500 Pc Intravenous Administration Set : Pediatric 107 3000 Pc Intravenous Cannula : G-18 108 3000 Pc Intravenous Cannula : G-20 109 3000 Pc Intravenous Cannula : G-22 110 3000 Pc Intravenous Cannula : G-24 111 3000 Pc Intravenous Cannula : G-26 112 200 Pc I.v Extension Tubing : 2-way 113 150 Pc I.v Extension Tubing : 3-way 114 1030 Pc I.v. : Infusion Set W/burette 150cc (soluset) 115 200 Pc I.v. : Infusion Set, Blood Volumetric (bloodset) 116 150 Pc Stopcock 3-way : . 117 300 Pc Tourniquet : Rubber 118 300 Roll Wadding Sheet : 4" Lot No. 11 Item No. Quantity Unit Of Issue Item Description 119 100 Pack Monitoring Electrode : W/foam 50's 120 150 Pc Mouth Guard Oral Airway : #2 (green) 121 100 Pc Mouth Guard Oral Airway : #3 (yellow) 122 1000 Pc Nebulization Set : Pedia 123 100 Pc Non-rebreather Mask : Pedia 124 100 Pc Mucus Trap : . 125 50 Pc Suction Bulb : W/ Mucous Air Pump 60ml 126 100 Pc Suction Connecting Tube : W/yankauer 127 100 Pc Suction Set Poole : Drain Lot No. 12 Item No. Quantity Unit Of Issue Item Description 128 100 Gal Bleaching Solution : . 129 50 Bottle Bleaching Solution : Color Safe 900ml 130 50 Bottle Fabric Conditioner : 800-900ml 131 30 Gal Disinfectant Solution : For Surface, Toilet And Bathroom 132 385 Gal Distilled Water : 6.6l 133 30 Pc Disinfectant Spray : 510g (tin) 134 3000 Pc Trash Bag 11x11x24 .002 Thickness : Black Medical Grade 135 3000 Pc Trash Bag 11x11x24 .002 Thickness : Green Medical Grade 136 3000 Pc Trash Bag 11x11x24 .002 Thickness : Yellow Medical Grade 137 4000 Pc Trash Bag 15x15x37 .002 Thickness : Black Medical Grade 138 4000 Pc Trash Bag 15x15x37 .002 Thickness : Green Medical Grade 139 4000 Pc Trash Bag 15x15x37 .002 Thickness : Yellow Medical Grade 140 12000 Pc Trash Bag 18.5"x18.5"x40",.002 Thickness : Black Medical Grade 141 8000 Pc Trash Bag 18.5"x18.5"x40",.002 Thickness : Green Medical Grade 142 8000 Pc Trash Bag 18.5"x18.5"x40",.002 Thickness : Green Medical Grade 143 500 Pc Trash Bag 18.5"x18.5"x40",.002 Thickness : Transparent Medical Grade Delivery Of The Goods Is Required Within Thirty (30) Calendar Days From The Receipt Of The Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From City Government Of Cagayan De Oro And Inspect The Bidding Documents At The Address Given Below During Office Hours Of 19 December 2024 To 12:00 Noon Of 09 January 2025. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On Office Hours Of 19 December 2024 To 12:00 Noon Of 09 January 2025 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Corresponding Amounts: Lot Identification Number Fee (php) Lot No. 1 1,000.00 Lot No. 2 5,000.00 Lot No. 3 5,000.00 Lot No. 4 1,000.00 Lot No. 5 5,000.00 Lot No. 6 5,000.00 Lot No. 8 1,000.00 Lot No. 10 5,000.00 Lot No. 11 500.00 Lot No. 12 5,000.00 It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The City Government Of Cagayan De Oro Will Hold A Pre-bid Conference On 26 December 2024; 2:00 P.m. At The Bids And Awards Committee Office Conference Room, 3rd Floor Administrative Building, City Hall, Cagayan De Oro City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below Between 1:00 P.m. - 2:00 P.m. Of 09 January 2025. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On 2:00 P.m. Of 09 January 2025 At Bids And Awards Committee Office Conference Room, 3rd Floor Administrative Building, City Hall, Cagayan De Oro City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 8. The City Government Of Cagayan De Oro Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 9. For Further Information, Please Refer To: Mr. Antonio Ramon Resma, Jr. Bids And Awards Committee-secretariat 3rd Floor Administrative Building, City Hall, Cagayan De Oro City Tel No. (088) – 881-1567 (sgd.) Atty. Joeffrey D. Namalata Bac Chairperson
Closing Soon16 Jan 2025
Tender AmountPHP 10.9 Million (USD 188.6 K)
Caraga Regional Hospital Tender
Healthcare and Medicine
Philippines
Details: Description Republic Of The Philippines Department Of Health Caraga Regional Hospital Surigao City Ooooooooo @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Bids And Awards Committee Invitation To Bid Ib No. 2024-01-23 (120) Supply And Delivery Of Various Intravenous Sets And Other Accessories Under Single-year Framework Agreement ( Early Procurement Activity ) Approved Budget For The Contract: Php 3,254,200.00 ========================================================= 1. The Caraga Regional Hospital (crh), Through The Fy2025 Raf / Gaa Intends To Apply The Sum Of Being The Approved Budget For The Contract (abc) Of Three Million Six Hundred Eighty One Thousand Four Hundred Pesos Only ( Php 3,254,200.00 ) As To Payment Under The Contract For Supply And Delivery Of Various Intravenous Sets And Other Accessories Under Single-year Framework Agreement (early Procurement Activity). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening And Items Below Are Subject For A Competitive Bidding As Framework Agreement List. This Is A Partial Bid. Item No. Description Qty Unit Of Measure Unit Cost Total Cost 1 Extension Set With Two Injection Sites, Kink Resistant Tubing, With Secure Male Luer Lock Adapter 50 Pcs 240.00 12,000.00 2 Blood Infusor With Gauge And Inflator, Washable 14 Unit 1,200.00 16,800.00 3 Microset - Y-type Microdrip Dropper Set With A Clear Flexible Drip Chamber With Bacterial And Fluid Retentive Air Inlet 60gtts/ml Drop Rate; With Sharp And Break Resistant Piercing Spike And Coupler; With Kink-resistant Extra Soft Transparent Non-latex Long Tubing Approximate Length 60” Or More With Needle Free Catheter Adapter Or Latex-free Valve; A Roller Clamp Or Flow Regulator With Superior And Precise Control Of Flow Rate, With Male-luer Lock Connector, May Have Close Slide Clamp; Non-toxic, Sterile. 16,000 Set 25.00 400,000.00 4 Stopcock, 3-way, Sterile Consist Of 2 Female Luer Lock And 1 Male Luer Lock With Capped 1,000 Pcs 72.00 72,000.00 5 Heplock, Latex Free, Sterile, Non-toxic And Pyrogen Free, Made Of High-quality Medical Grade Silicone Rubber. With Luer-lock Connector 13,000 Set 15.00 195,000.00 6 Blood Transfusion Set, Contains Phthalates Bis (2-ethylhexyl Phthalate(dehp);with Venipuncture Needle Color Pink;with Polyprolene Big Double Chamber 140+/-5 Mm Length,175-210 Micron Pore Mesh Filter Located At The Upper Top Of The Chamber, With Sharp Spikemade Of Soft Medical Grade Pvc, ;20 Drops Per Ml;b Type;functions Morethan 4hours Duration Of Transfusion Without Hemolysis(occurence Of Blood Clots In Its Chamber And Tubings) ;ethylene Oxide Sterilized 11,000 Pcs 150.00 1,650,000.00 7 Macroset - Y-type Macrodrip Dropper Set With A Clear Flexible Drip Chamber With Bacterial And Fluid Retentive Air Inlet 20gtts/ml Drop Rate; With Sharp And Break Resistant Piercing Spike And Coupler; With Kink-resistant Extra Soft Transparent Non-latex Long Tubing Approximate Length 180cm Or 80 Inches ;with Lumen 3 X 4.1 Mm; With Standard Lumen 3 X 4.1 Mm, Dehp Free Plasticizer With Superior, Well Documented Safety Properties;large 15 Μm Filter;screw Tight Luer Lock Fitting;ergonomically Designed 3-part Drip Chamberwith Needle Free Catheter Adapter Or Latex-free Valve; A Roller Clamp Or Flow Regulator With Superior And Precise Control Of Flow Rate, With Male-luer Lock Connector, May Have Close Slide Clamp; Non-toxic, Sterile Ethylene Oxide; 20,000 Set 25.00 500,000.00 8 Platelet Administration Set;plastic Spike;luer Lock Connector;b Type-th U701b; Sterile Non Pyrogenic Not Made With Di-2-ethylhexyl Phthalate Dehp 500 Pcs 138.00 69,000.00 9 Extension Tube, Triple Lumen With Positive Pressure Needleless Connector, Neutral Displacement And Different Colored Hub For Identification,color Coded Slide , Needle-freefemale Luer Access Valve Lock, ;closed System; Male Luer Slip Adapter And Spin Connector, Minimum Length Of 8 Inches And Above Kink-resistant Tubing Made From Medical Grade Polyurethane 630 Pcs 380.00 239,400.00 10 Extension Line For Iv Administration Compatible With Syringe Pump ,luer Lock, Small Tube Diameter (0.9x1.9mm)pvc Type 100 Pcs 1,000.00 100,000.00 Grand Total ₱ 3,254,200.00 Terms Of Reference Terms Of Delivery: 15-20 Calendar Days Upon Receipt Of Call-off Delivery Schedule: End-user’s Demand Through Call-off This Procurement Is Under Framework Agreement -single Year Framework Agreement Expiration: Minimum Of Two (2) Years Expiry Upon Delivery Terms Of Payment. Payment Shall Be Made Upon Complete Delivery Per Call – Off. Necessary Documents Are Required In Compliance With Auditing Rules And Regulations. This Procurement Is A Partial Bid Or Line Item Bid. Bid Evaluation/post-qualification During The Evaluation And Post – Qualification Stage, The Twg And Bac Shall Consider The Previous Findings From The Product Quality Assurance Evaluation Report. This Includes Incorporating Assessments Of Product Quality, Performance And Suitability. During The Actual Product Sampling Evaluation, The Bidder’s Representative Shall Be Present. The Product Presented Should Demonstrate “excellent” Performance, As Defined By The Twg And The End-user Based On The Pqae. This “excellent” Mark Signifies That The Product Meets The Needs And Expectations Of Both Medical Experts And The End-user, As Determined Through The Actual Product Samples And Previous Performance Evaluation. In Addition To The Evaluation Process, A Product Demo Or Sample Is Strongly Recommended Particularly For Products That Are New, Unfamiliar To The Twg And End-user. The Bidder Shall Comply The Post-qualification Requirements Set By The Procuring Entity Especially During Product Demonstration Or Requiring For A Product Sample On A Given Schedule. Failure To Comply Shall Be Ground For Post-disqualification. The Procuring Entity Shall Require The Bidder To Deliver A Product Sample Or Demo To Caraga Regional Hospital Vicinity. Additionally, The Procuring Entity May Have Preferences Regarding How This Hospital Can Find Reliable And Easily Accessible Procedures During The Post-qualification Phase. Consequently, During This Phase, The Bidder Must Always Be Ready To Comply With Any Requirements Or Standards Made By The Procuring Entity. Validity Of The Contract / Contract Termination Without Prejudice To The Provision Of Applicable Laws, Rules And Guidelines, The Contract Shall Be Automatically Terminated Under The Following Conditions: A. When The Total Quantity Specified In The Contract Has Been Exhausted; Or B. For Any Justifiable Reason Ground Where The Contract Will Not Redound To The Benefit Of The Government Or There Is Violation Of The Contract. Repeat Order: 1. No Repeat Order For An Item In Contract Being Awarded Shall Be Allowed Until After The Procuring Entity Has Exhausted The Estimated Quantity For The Same Item Specified Therein Or After The Contract Has Expired, Whichever Comes First, And Subject To The Conditions Provided In Section 51 Of Ra 9184 And Its Irr. For This Purpose, The Repeat Order Shall Be Availed Of Only Within Six (6) Months From The Date Of The Last Of Final Call-off. 2. In Case Repeat Order Is Allowed And Resorted To, The Twenty-five (25%) Maximum Allowable Quantity Shall Be Based On The Total Quantity Of Awarded Item. General Conditions All Other Rules Governing Contract Implementation And Termination Under Ra 9184 And Its Irr, And Relevant Procurement Policies Shall Be Applicable. Technical Specification And Terms Of Reference Are Hereby Posted In Philgeps And Form An Integral Part Of This Invitation To Bid. 2. The Crh Now Invites Bids For The Procurement Of The Above-captioned Project. Delivery Of The Goods Is Required Within The Period Specified Under Section Vi (schedule Of Requirements). Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. Section 23.4.1.3.(ra 9184). The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty Five Percent ( 25% ) Of The Abc. Slcc Must Be Within 2 Years From The Submission Of Bids. (based On The Completion Date). The Single Largest Completed Contract (slcc) Shall Be The Same Or Similar In Nature, As Determined And Defined By The Bids And Awards Committee ( Bac ). For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: A. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And B. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Secretariat, Caraga Regional Hospital, Surigao City And Inspect The Bidding Documents At The Address Given Above During 8:00 Am – 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 23, 2024 To January 23. 2025 On Or Before 10:00 A.m. From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Specified Below: Bidding Schedule Pre-bidding Conference January 08, 2025 At 9:00 A.m. Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/81436610601?pwd=7tl1ddadvw9e6rbcrg3ujfnbieszck.1 Meeting Id: 814 3661 0601 Passcode: 680614 Deadline Of Submission Of Bids January 23, 2025 At 10:00 A.m... Via Online And Submit Your Bidding Documents To This Email Address: Crhbac2020@gmail.com. Please Be Advised That Failure To Submit Bidding Documents To The Designated Official Email Address Will Result In Automatic Rejection And Disqualification. Opening Of Bids January 23, 2025 At 2:00 P.m. Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/83463324086?pwd=v0oqxfjfaald3bhaytqzgaxrmkjduz.1 Meeting Id: 834 6332 4086 Passcode: 724897 Complete Philippine Bidding Documents Please Click The Link Below For The Complete Pbd: Https://drive.google.com/drive/folders/1q9owgmlez3yxlysgyt1g1wvh-5j8hbcd?usp=sharing Bidding Documents Php 5,000.00 It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Following Phlippine Bidding Documents Can Be Accessed In The Philgeps And All Form And Part Of This Invitation To Bid, To Wit: A. Technical Specification / Terms Of Reference/ List Of Items B. Instruction To Bidders: B.1. Documents To Be Submitted (checklist- This Will Be Discussed During The Pre-bid Conference) B.2. Memorandum Of Undertaking – Provision Thereof Is Strictly Implemented C. Guidelines On The Conduct Of The Electronic Submission And Receipt Of Bids By The Procuring Entity – Caraga Regional Hospital (crh) D. Philippine Bidding Documents E. Framework Agreement Guidelines F. Framework Agreement Lists G. Other Documents Essential Documents Required By This Procuring Entity And Ra 9184 6. The Crh Will Hold A Pre-bid Conference On The Above-mentioned Date, Time And Venue, Which Shall Be Opened To Prospective Bidders. The Pre-bidding Conference And Opening Of Bids Shall Be Conducted Through Videoconferencing, Webinar Or Virtual. Please Send Your Intent To Participate To Our Email Address As Provided Below. 7. Bids Must Be Duly Received By The Bac Secretariat At Via Designated Email On Or Before January 23, 2025 At 10:00 O’clock In The Morning. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On January 23, 2025 At 2:00 O’clock In The Afternoon At The Bac Conference Room, Beside Procurement Office, Caraga Regional Hospital, Rizal Street, Surigao City As Virtual / Electronic Bidding Via Zoom Platform. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above. Late Bids Shall Not Be Accepted Under Any Circumstances May It Cause. 8. Furthermore, The Standard Philippine Bidding Document (pbd) Is Form And Part Of This Invitation In Accordance To Ra 9184 And Other Applicable Laws, Rules And Policy. 9. The Crh Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. The Opening And Receipt Of Bids Is Strictly Implemented Through Electronic Submission. Given The Covid-19 Pandemic, Procurement Activity Has Been Expedient And One Of This Is The Conduct Of Electronic Submission Of Bids. The Crh Thru The Bids And Awards Committee (bac) Has Submitted Certification, Certified By The Highest Official Managing The Information Technology, Describing The Electronic System Or Procedure To Be Used By The Crh For The Electronic Submission And Receipts Of Bids And A Statement That The Same Is Compliant With The Gppb Resolution No. 12-2020 Requirements. 11. Bidding Documents Shall Be Emailed To This Email Address, With Activated Password To: Crhbac2020@gmail.com. You May Deposit On Line For The Payment Of The Bidding Documents To This Account Below: Bank Name: Land Bank Of The Philippines Account Name: Caraga Regional Hospital-trust Fund Account Number: 0982 -1288 – 70 12. Furthermore Deposit Slip Shall Be Submitted Via Email To: Crhprocurement.bac@gmail.com 13. The Procuring Entity Will No Longer Accept Nor Entertain Any Form Of Bids Submission Except Electronic. Failure To Comply Electronic Submission Will Be Immediately Disqualified. Guideline On The Electronic Submission Is Hereby Attached. 14. Join The Caraga Regional Hospital Supplier Network By Filling Out The Registry Form From This Link : Https://bit.ly/crh_suppliersregistry 15. For Further Information, Please Inquire To: Bac Secretariat Caraga Regional Hospital. Rizal Street, Surigao City Tel. Nos. (086) 826-1575 Local 194 (086) 826-9058 Mobile Nos: Globe: 0953-9212-832 / Smart: 0985-0508-783 E-mail Address: Crhprocurement.bac@gmail.com Fb Page: Caraga Regional Hospital – Bids And Awards Committee Approved By: (sgd) Fermarie C. Dulpina, Rmt, Mpa, Jd Chief Health Program Officer Chairman, Bids And Awards Committee
Closing Date23 Jan 2025
Tender AmountPHP 3.2 Million (USD 56 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Details: This Is A Sources Sought Notice Only.
this Is Not A Solicitation For Bids, Proposals, Proposal Abstracts, Or Quotations. The Purpose Of This Sources Sought Notice Is To Obtain Information Regarding The Availability And Capability Of Qualified Sources To Perform The Potential Requirement. This Sources Sought Notice Is Part Of Market Research Effort And Invites Contractors Capable Of Fulfilling The Requirement In Accordance With The Statement Of Work And Salient Characteristics.â The Responses Received From Interested Contractors Will Assist The Government In Determining The Appropriate Acquisition Method.
the Department Of Veterans Affairs (va), Network Contracting Office (nco) 23, Is Conducting Market Research To Identify Potential Sources Which Can Provide The Following:â
statement Of Work
mold Remediation Services
introduction/background
air Quality Testing In A Va Building, Revealed Levels Of Airborne Microbial Particles That Exceed An Acceptable Level For A Healthcare Facility. Due To This Hazard, The Building Has Been Vacated Of All Patients And Staff And Will Remain So Until It Is Safe To Occupy.
project Objective
remediation Services To Remove Or Clean All Surfaces And Materials Located Inside Building.
Building To Be Placed Under Negative Pressure, With Additional Units To Be Used As Air Filtrations. Hvac System To Be Isolated, All Diffusers Removed, Cleaned, Then Set Aside, All Flex Ducting To Be Removed (to Later Be Replaced), And All Duct Openings To Be Sealed. All Carpet In The Building To Be Removed. All Ceiling Tiles In The Building To Be Removed. All Drywall (including Above The Drop Ceiling) That Has Microbial Growth Or Moisture Damage To Be Removed. All Pipe And Ductwork Insulation Showing Evidence Of Growth Or Moisture Damage To Be Removed. All Building Semi And Non-porous Surfaces - Such As But Not Limited To Cabinetry, Countertops, Metal, Glass, Rubber Baseboards, Lighting And Plumbing Fixtures - Needs To Be Thoroughly Disinfected Via Appropriate Cleaning Methods.
specifications
mold Remediation Technical Specifications
part 1 General
scope
this Specification Covers The Remediation Of Mold Including Removal, Cleanup And Disposal Of Mold Contaminated Materials From A Va Building. The Methods And Procedures In This Specification Are Based On The Observations And Previously Collected Background Air Samples.
an Estimate Of The Amount Of Material To Be Removed Or Cleaned Is Not Given. The Determination Of The Actual Amounts, For Bidding Purposes, Is The Responsibility Of The Contractor. By Submitting A Bid, The Contractor Acknowledges That He Has Investigated And Satisfied Himself As To:
the Conditions Affecting The Work, Including, But Not Limited To, Physical Conditions Of The Site Which May Affect Site Access, Handling And Storage Of Tools And Materials, Access To Water, Electricity Or Other Utilities, Or Otherwise Affect Performance Of Required Activities.
the Character And Quantity Of All Surface And Subsurface Materials Or Obstacles To Be Encountered As Far As This Information Is Reasonably Ascertainable From An Inspection Of The Site, Including Exploratory Work Done By The Building Owner Or A Designated Consultant, As Well As Information Presented In Drawings And Specifications Included With This Contract. Any Failure By The Contractor To Acquaint Himself With Available Information Will Not Relieve Him From The Responsibility For Estimating Properly The Difficulty Or Cost Of Successfully Performing The Work. The Building Owner Is Not Responsible For Any Conclusions Or Interpretations Made By The Contractor On The Basis Of The Information Made Available By The Building Owner.
description
the Work Specified Herein Shall Be The Remediation Of Mold By Competent Persons
trained, Knowledgeable And Qualified In The Techniques Of Remediation, Handling And Disposal Of Mold Contaminated Materials And The Subsequent Cleaning Of Contaminated Areas, Who Comply With All Applicable Federal, State And Local Regulations And Are Capable Of, And Willing To Perform, The Work Of This Contract.
the Contractor Shall Supply All Labor, Materials, Services, Insurance, Permits,
licenses, Patents, And Equipment Necessary To Carry Out The Work In Accordance With All Applicable Federal, State And Local Regulations And These Specifications.
the Contractor Is Responsible For Restoring The Work Area And Auxiliary Areas Utilized During The Remediation To Conditions At Least Equal To Original Conditions. (this Excludes Any Material Removed As Part Of Scope.) Any Damages Caused During The Performance Of Remediation Activities Shall Be Repaired By The Contractor (e.g., Paint Peeled Off By Barrier Tape, Nail Holes, Water Damage, Broken Glass) At No Additional Expense To The Owner.
applicable Standards And Guidelines
all Work Under This Contract Shall Be Done In Strict Accordance With All Applicable Federal, State, And Local Regulations, Standards, And Codes Governing Mold Remediation And Any Other Trade Work Done In Conjunction With The Remediation.
the Most Recent Edition Of Any Relevant Regulation, Standard, Document Or Code Shall Be In Effect. Where Conflict Among The Requirements Or With These Specifications Exists, The Most Stringent Requirements Shall Be Utilized.
specific Requirements:
title 29, Code Of Federal Regulations, 1926. Occupational Safety And Health Administration (osha), U.s. Department Of Labor.
quality Assurance
bidders Must Be Licensed As Required By The Iowa Bureau Of Labor.
bidders Shall Demonstrate Prior Experience On Mold Remediation Projects Of Similar Nature And Scope Through The Submission Of Letters Of Reference From The Owners Including The Name, Address, And Telephone Numbers Of Contact Person (someone Specifically Familiar With The Contractor's Work) For At Least Three (3) Previous Users Of Service If Requested By The Owners.
the Owner Reserves The Right To Reject Bids For Any Reason That Serves The Best Interests Of The Owner Or Building Occupants. The Owner Also Reserves The Right To Waive Any Technicality Or Irregularity In A Bid. Failure To Submit Requested
information/documentation Can Result In Automatic Disqualification Of Bid Package.
submittals And Notices
pre-remediation:
submit The Location Of The Landfill To Be Used For Disposal Of The Mold Contaminated Material.
submit A List Of All Personnel Who Will Be Involved In The Remediation Activity Including, Supervisors, Workers, And Any Other Personnel Or Agent Who May Be Responsible For Any Aspect Of The Remediation Activities.
submit Documentation From A Physician That All Employees Or Agents Have Been Medically Monitored To Determine Whether They Are Physically Capable Of Working While Wearing The Respirator Required Without Suffering Adverse Health Effects.
submit Documentation Of Respirator Fit Testing For All Employees And Agents Who Must Enter The Work Area. Document Niosh Approval Of All Respiratory Protective Devices Utilized On-site.
submit A List Of Equipment For This Project.
with The Owner Or Owner's Representative, Inspect The Premises Wherein All Remediation And Remediation Related Activities Will Occur And Submit A Statement Signed By Both, Agreeing On Building And Fixture Condition Prior To The Commencement Of The Work.
submit Manufacturer's Certification That Hepa Vacuums, Negative Pressure Ventilation Units, And Other Local Exhaust Ventilation Equipment Conform To Ansi 29.2-79.
when Rental Equipment Is To Be Used In Remediation Areas Or To Transport Mold Contaminated Waste, A Written Notification Concerning Intended Use Of The Rental Equipment Must Be Provided To The Rental Agency With A Copy Submitted To The Owner.
during Remediation Activities:
submit Weekly Job Progress Reports Detailing Remediation Activities And Progress.
submit Copies Of All Transport Manifests, Trip Tickets And Disposal Receipts For All Mold Waste Materials Removed From The Work Area During The Remediation Process.
post In The Clean Room Area Of The Worker Decontamination Enclosure:
a List Containing The Names, Addresses, And Telephone Numbers Of The Contractor, The Owner, The Assessment Professional, The Testing Laboratory And Any Other Personnel Who May Be Required To Assist During Remediation Activities.
a Logbook To Record Names Of All Personnel Who Enter The Work Area.
a Copy Of Emergency Procedures.
telephone Numbers Of All Emergency Personnel And Principals For This Remediation Project.
the Project Will Not Be Considered Completed Until All Submittals Are Received By The Owner. This Will Affect Payment For The Project.
site Security
the Work Area Is To Be Restricted Only To Authorized, Trained, And Protected Personnel. These May Include The Contractor's Employees, Employees Of
subcontractors, Owner Employees And Representatives, State And Local Inspectors And Any Other Designated Individuals.
entry Into The Work Area By Unauthorized Individuals Shall Be Reported Immediately To The Owner By The Contractor.
access To The Work Area Shall Be Through A Single Worker Decontamination System. All Other Means Of Access (doors, Windows, Hallways, Etc.) Shall Be Blocked Or Locked So As To Prevent Entry To Or Exit From The Work Area. The Only Exceptions For This Rule Are The Waste Pass Out Airlock Which Shall Be Sealed Except During The Removal Of Containerized Mold Waste From The Work Area, And Emergency Exits In Case Of Fire Or Accident. Emergency Exits Shall Not Be Locked From The Inside; However, They Shall Be Sealed With Polyethylene Sheeting And Tape Until Needed.
the Contractor Shall Have Control Of Site Security During Remediation Operations Whenever Possible, In Order To Protect Work Efforts And Equipment.
contractor Will Have Owner's Assistance In Notifying Building Occupants Of Impending Activity And Enforcement Of Restricted Access By Owner's Employees.
emergency Planning
emergency Planning Shall Be Developed Prior To Remediation Initiation And Agreed To By Contractor And Owner.
emergency Planning Shall Include Considerations Of Fire, Explosion, Toxic Atmospheres, Electrical Hazards, Slips, Trips And Falls, Confined Spaces, And Heat Related Injury. Written Procedures Shall Be Developed And Employee Training In Procedures Shall Be Provided.
employees Shall Be Trained In Evacuation Procedures In The Event Of Work Place Emergencies.
part 2 Materials And Equipment
materials
general:
deliver All Materials In The Original Packages, Containers, Or Bundles Bearing The Name Of The Manufacturer And The Brand Name.
store All Materials Subject To Damage Off The Ground, Away From Wet Or Damp
surfaces, And Under Cover Sufficient Enough To Prevent Damage Or Contamination.
polyethylene Sheeting For Walls And Stationary Objects Shall Be A Minimum Of 4 Mil Thick. For Floors And All Other Sheeting Of At Least 6 Mil Thickness Shall Be Used In Widths Selected To Minimize The Frequency Of Joints.
tape - Duct, Glass Fiber, Or Other Type Capable Of Sealing Adjacent Sheets Of Polyethylene And Capable Of Sealing Polyethylene To Dissimilar Finished Or Unfinished Surfaces Under Both Wet And Dry Conditions Including The Use Of Amended Water.
polyethylene Sheeting Utilized For Worker Decontamination Enclosure Shall Be Opaque White Or Black In Color.
disposal Bags Shall Be Of 6 Mil Polyethylene.
disposal Drums Shall Be Metal Or Fiberboard With Locking Ring Tops.
equipment
general:
a Sufficient Quantity Of Negative Pressure Ventilation Units Equipped With Hepa Filtration Shall Be Utilized To Provide One Workplace Air Change Every 15 Minutes Or A Static Pressure Within The Work Area Of At Least -0.02 Inches Of Water Column. These Ventilation Units Must Be Commercially Produced Units And Not Self-manufactured. Ventilation Units To Be Exhausted Outside.the Contractor Shall Furnish A Copy Of Their Calculations To Obtain This Air Flow Or Static Pressure If Requested By The Owner.
air Purifying Respirators Equipped With Hepa Filters Will Be Required. A Sufficient Supply Of Filters Shall Be Available In The Clean Change Area. This Requirement May
be Modified By The Assessment Professional If Air Sampling Results Indicate The Need For More Protection.
air Purifying Respirators With Dual High Efficiency (hepa) Filters May Be Utilized During Work Area Preparation Activities. Spectacle Kits And Eyeglasses Must Be Provided For Employees Who Wear Glasses And Who Must Wear Full Face Piece Respirators. Respirators Shall Be Provided That Have Been Tested And Approved By The National
institute Of Occupational Safety And Health For Use In Mold Contaminated Atmospheres.
full Body Disposable Protective Clothing, Including Head, Body And Foot Coverings (unless Using Footwear As Described In Section 2.02 (a)(6) Consisting Of Material Impenetrable By Mold (tyvek Or Equivalent) Shall Be Provided To All Workers In Sizes Adequate To Accommodate Movement Without Tearing.
additional Safety Equipment (e.g., Hard Hats, Eye Protection, Safety Shoes Meeting The Applicable Ansi Standard, Disposable Pvc Gloves) As Necessary, Shall Be Provided To All Workers And Authorized Visitors.
nonskid Footwear Shall Be Provided To All Remediation Workers. Disposable Clothing Shall Be Adequately Sealed To The Footwear To Prevent Body Contamination.
a Sufficient Supply Of Disposable Mops, Rags And Sponges For Work Area Decontamination Shall Be Available.
mobile Radios, Telephones, Etc. As Required By The Project Will Be Provided By The Contractor.
removal/cleaning Equipment:
sufficient Supply Of Scaffolds, Ladders, Lifts And Hand Tools Shall Be Provided As Needed.
sprayers With Pumps Capable Of Providing A Water Stream Or Mist For Dust Control.
rubber Dustpans And Rubber Squeegees Shall Be Provided For Cleanup.
brushes Utilized For Removing Loose Mold Containing Material Shall Have Nylon Or Fiber Bristles, Not Metal.
a Sufficient Supply Of Hepa Filtered Vacuum Systems Shall Be Available During Cleanup.
part 3 Execution
preparation
post Caution Signs At Any Location And Approaches To A Location Where Airborne Concentrations Of Mold May Exceed Ambient Background Levels. Additional Signs May Need To Be Posted Following Construction Of Workplace Enclosure Barriers.
shut Down And Lock Out Electric Power To All Work Areas As Necessary If Wet Conditions Warrant. Provide Temporary Power And Lighting. Ensure Safe Installation (including Ground Faulting) Of Temporary Power Sources And Equipment By Compliance With All Applicable Electrical Code Requirements And Osha Requirements For Temporary Electrical Systems.
shut Down And Lock Out All Heating, Cooling And Air Conditioning System (hvac) Components That Are In, Supply Or Pass Through The Work Area. Seal All Intake And Exhaust Vents In The Work Area With Tape And 6 Mil Polyethylene. Also Seal Any Seams In System Components That Pass Through The Work Area. Remove All Hvac System Filters And Place In Labeled 6 Mil Polyethylene Bags For Staging And Eventual Disposal As Mold Contaminated Waste.
due To Hvac Being Offline During Winter Conditions, Contractor To Provide Temporary Heat To Maintain Indoor Temperature Of 60 Degrees Fahrenheit Throughout Building.
the Contractor Shall Provide Sanitary Facilities For Remediation Personnel Outside Of The Enclosed Work Area And Maintain Them In A Clean And Sanitary Condition Throughout The Project.
seal Off All Windows, Doorways, Elevator Openings, Corridor Entrances, Drains, Ducts, Grills, Grates, Diffusers, Skylights, And Any Other Openings Between The Work Area And Uncontaminated Areas Outside Of The Work Area With 4 Mil Polyethylene Sheeting And Tape.
barrier Walls Will Be Constructed Of 4 Mil Polyethylene Sheeting Extending From The Ceiling To Floor.
workplace Exits
worker Decontamination Enclosure System:
worker Decontamination Enclosure Systems Shall Be Provided At All Locations Where Workers Will Enter Or Exit The Work Area.
worker Decontamination Enclosure Systems Constructed At The Work Site Shall Utilize 6 Mil Opaque White Or Black Polyethylene Sheeting Or Other Acceptable Materials For Privacy. Detailed Descriptions Of Portable, Prefabricated Units, If Used, Must Be
submitted For The Owner's Approval. Plans Must Include Floor Plan With Dimensions, Materials, Size, Thickness, Plumbing, And Electrical Utilities.
the Worker Decontamination Enclosure System Shall Consist Of At Least A Clean Room And An Airlock.
entry And Exit From The Decontamination Enclosure System Chamber Shall Be Through Curtained Doorways Consisting Of Two Sheets Of Overlapping Polyethylene Sheeting. One Sheet Shall Be Secured At The Top And Left Side, The Other Sheet At The Top And Right Side. Both Sheets Shall Have Weights Attached To The Bottom To Ensure That They Hang Straight And Maintain A Seal Over The Doorway When Not In Use.
the Clean Room Shall Be Sized To Adequately Accommodate The Work Crew. Benches Shall Be Provided As Well As Hooks For Hanging Up Street Clothes. Shelves For Storing Respirators Shall Also Be Provided In This Area. Clean Work Clothes: Clean Disposable Clothing, Replacement Filters For Respirators, Towels, And Other Necessary Items Shall Be Provided In Adequate Supply In The Clean Room. A Location For Postings Shall Also Be Provided In This Area. Whenever Possible, A Lockable Door Shall Be Used To Permit Access Into The Clean Room From Outside The Work Area. Lighting, Heat, And Electricity Shall Be Provided As Necessary For Comfort. This Space Shall Not Be Used For Storage Of Tools, Equipment Or Materials, Or As An Office Space.
waste Container Pass Out Airlock:
the Waste Container Pass Out Airlock Shall Be The Same As The Exit Entry Airlock.
emergency Exits:
emergency Exits Shall Be Established And Clearly Marked With Duct Tape Arrows Or Other Effective Designations To Permit Easy Identification From Anywhere Within The Work Area. They Shall Be Secured To Prevent Access From Uncontaminated Areas And Still Permit Emergency Exiting. These Exits Shall Be Properly Sealed With Polyethylene Sheeting Which Can Be Cut To Permit Egress If Needed. These Exits May Be The Worker Decontamination Enclosure, The Waste Pass Out Airlock And/or Other Alternative Exits Satisfactory To Fire Officials.
isolation Of The Workplace
maintenance Of Enclosure Systems:
following Completion Of The Construction Of All Polyethylene Barriers And Decontamination System Enclosures, Allow Overnight Settling To Ensure That Barriers Will Remain Intact And Secured To Walls And Fixtures Before Beginning Actual Remediation Activities.
all Polyethylene Barriers Inside The Workplace, In The Worker Decontamination Enclosure System, In The Waste Container Pass Out Airlock And At Partitions
constructed To Isolate The Work Area From Occupied Areas Shall Be Inspected At Least Twice Daily, Once Prior To The Start Of Each Day's Remediation Activities. Document Inspections And Observations In The Daily Project Log.
damage And Defects In The Enclosure System Are To Be Repaired Immediately Upon Discovery.
negative Pressure To Be Monitored With A Continuous Reading Device. A Record Of This Shall Be Furnished To The Owner. Use Smoke Tubes To Test The Effectiveness Of The Barrier System When Directed By The Owner.
at Any Time During The Remediation Activities After Barriers Have Been Erected, If Visible Material Is Observed Outside Of The Work Area Or If Damage Occurs To Barriers, Work Shall Immediately Stop, Repairs Be Made To Barriers, And Debris/residue Cleaned Up Using Appropriate Hepa Vacuuming And Wet Mopping Procedures.
install And Initiate Operation Of Negative Pressure Ventilation Equipment As Needed To Provide One Air Change In The Work Area Every 15 Minutes Or Produce A Static Pressure Of -0.02 Inches Of Water Column. (see Section 2.02 (a)) Openings Made In The Enclosure System To Accommodate These Units Shall Be Made Airtight With Tape And/or Caulking As Needed. If More Than One Unit Is Installed, They Should Be Turned On One At A Time, Checking The Integrity Of Wall Barriers For Secure Attachment And The Need For Additional Reinforcement. Ensure That Adequate Power Supply Is Available To Satisfy The Requirements Of The Ventilating Units. Negative Pressure Ventilation Units Shall Be Exhausted To The Outside Of The Building Whenever Feasible. Additional Negative Pressure Ventilation Units May Be Exhausted Inside The Work Area To Provide Continuous Air Cleaning. They Shall Not Be Exhausted Into Occupied Areas Of The
building. Twelve-inch Extension Ducting Shall Be Used To Reach From The Work Area To The Outside When Required. Careful Installation, Air Monitoring And Daily Inspections Shall Be Done To Ensure That The Ducting Does Not Release Fibers Into Uncontaminated Building Areas.
once Constructed And Reinforced As Necessary, With Negative Pressure Ventilation Units In Operation As Required, Test Enclosure For Leakage Utilizing Smoke Tubes. Repair Or Reconstruct As Needed.
workplace Entry And Exit Procedures
personnel Entry And Exit:
all Workers And Authorized Personnel Shall Enter The Work Area Through The Worker Decontamination Enclosure System. Workers Shall Not Eat, Chew, Or Smoke Once They Have Entered The Work Area. Eating May Take Place Just Outside The Clean Room. Smoking, At Any Time During The Project, Is Prohibited On The Campus.
all Personnel, Before Entering The Work Area, Shall Read And Be Familiar With All Posted Regulations, Personal Protection Requirements (including Workplace Entry And Exit Procedures) And Emergency Procedures. A Sign Off Sheet Shall Be Used To Acknowledge That These Procedures Have Been Reviewed And Understood By All Personnel Prior To Entry.
all Personnel Shall Proceed First To The Clean Room And Appropriately Don Respiratory Protection And Launderable And/or Disposable Coveralls, Head Covering, And Foot Covering. Hard Hats, Eye Protection, And Gloves Shall Also Be Utilized If Required. Clean Respirators And Protective Clothing Shall Be Provided And Utilized By Each Person For Each Separate Entry Into The Work Area.
personnel Wearing Designated Personal Protective Equipment Shall Proceed From The Clean Room Through The Airlock Into The Main Work Area.
before Leaving The Work Area All Personnel Shall Remove Gross Contamination From The Outside Of Respirators And The Outer Protective Clothing By Brushing And/or Wet Wiping Procedures. Each Person Shall Clean Bottoms Of Protective Footwear Just Prior To Entering The Airlock.
personnel Shall Proceed To The Airlock Where They Remove The Outer Protective
equipment Except Respirators. Deposit Disposable And/or Launderable Clothing Back Into The Work Area Into Appropriately Labeled Containers For Disposal And/or
laundering.
reusable, Contaminated Footwear Shall Be Stored In The Airlock When Not In Use In The Work Area. Upon Completion Of Remediation, It Shall Be Disposed Of As Mold Contaminated Waste. Rubber Boots May Be Decontaminated At The Completion Of The Remediation Project For Reuse.
still Wearing Respirators, Personnel Shall Proceed To The Clean Room, Clean The Outside Of The Respirators And The Exposed Face Area Under Running Water Prior To Removal Of Respirator. Various Types Of Respirators Will Require Slight Modification Of These Procedures.
don Clean Disposable And/or Launderable Clothing If There Will Be Later Reentry Into The Work Area Or Street Clothes If It Is The End Of The Work Shift.
these Procedures Shall Be Posted In The Clean Room And Equipment Room.
waste Container Pass Out Procedures:
mold Contaminated Waste That Has Been Containerized Shall Be Transported Out Of The Work Area Through The Waste Container Pass Out Airlock Or Through The Worker Decontamination Enclosure If A Separate Airlock Has Not Been Construction.
waste Pass Out Procedures Shall Utilize Two Teams Of Workers, An "inside" Team And An "outside" Team.
the Inside Team Wearing Appropriate Protective Clothing And Respirators For Inside The Work Area Shall Clean The Outside, Including Bottoms, Containers (bags, Drums, Or Wrapped Components) Using Hepa Vacuums And Wet Wiping Techniques And
transport Them Into The Waste Container Pass Out Airlock.
the Outside Team, Wearing Appropriately Assigned Respirators, Shall Enter The Airlock From The Outside Of The Work Area, Remove Them From The Airlock To The Outside. No Worker From The Outside Team Shall Further Enter The Work Area Through This Airlock. The Exit From This Airlock Shall Be Secured When Not In Use To Prevent Unauthorized Entry.
personnel Protection Requirements
training:
prior To Commencement Of Remediation Activities, The Contractor Shall Have One Person Designated As A Competent Supervisor. This Person Shall Be On-site At All Times.
special On-site Training On Equipment And Procedures Unique To This Job Site Shall Be Performed As Required.
training In Emergency Response And Evaluation Procedures Shall Be Provided.
respiratory Protection:
all Respiratory Protection Shall Be Provided To Workers In Accordance With The Written Respiratory Protection Program, Which Includes All Items In
osha 29 Cfr 1910.134 (b)(1-11). This Program Shall Be Posted In The Clean Room Of The Worker Decontamination Enclosure System.
workers Shall Be Provided With Personally Issued, Individually Identified Respirators.
respirator Types Shall Be Utilized According To The Following Schedule:
full Face Air Purifying Respirators With Dual Hepa Filters Shall Be Utilized By Workers During Remediation Operations.
full Face Powered Air Purifying Respirators Equipped With Hepa Filters May Be Used During Remediation Activities.
fit Testing:
workers Must Perform Positive And Negative Air Pressure Fit Tests Each Time A Respirator Is Put On, Wherever The Respirator Design So Permits. Powered Air Purifying Respirators Shall Be Tested For Adequate Flow As Specified By The
manufacturer.
workers Shall Be Given A Qualitative Fit Test In Accordance With Procedures Detailed In The Osha Lead Standard (29 Cfr 1910.1025, Appendix D, Qualitative Fit Test Protocols) For All Respirators To Be Used On This Remediation Project. An Appropriate
administered Quantitative Fit Test May Be Substituted For The Qualitative Fit Test.
documentation Of Adequate Respirator Fit Must Be Provided To The Owner.
no One Wearing A Beard Shall Be Permitted To Don A Respirator And Enter The Work Area.
protective Clothing:
disposable Clothing Including Head, Foot, And Full Body Protection Shall Be Provided In Sufficient Quantities And Adequate Sizes For All Workers And Authorized Visitors.
launderable Clothing, If Required, Shall Be Provided In Sufficient Quantities And Adequate Sizes For All Workers And Authorized Visitors.
hard Hats, Protective Eyewear, Gloves, Rubber Boots, And/or Other Footwear Shall Be Provided As Required For Workers And Authorized Visitors. Safety Shoes May Be Required For Some Activities.
commencement Of Work
enclosure Systems Have Been Constructed And Tested.
negative Pressure Ventilation Systems Are Functioning Adequately.
all Pre-remediation Submissions, Notifications, Postings, And Permits Have Been Provided And Are Satisfactory To The Owner.
all Equipment For Remediation, Cleanup, And Disposal Are On Hand.
all Worker Training Is Completed.
contractor Receives Written Permission From The Owner To Commence Remediation.
removal/cleaning Procedures
protection Of Materials Not Being Removed:
materials That Are Not Being Removed Are To Be Protected From Any Damage That May Occur During Work. The Acoustic Ceiling Tile Suspension Grid Is To Be Cleaned Yet Remain In Place And Is Not To Be Damaged During The Removal Of The Tiles.
level One:
clean And Isolate Active Work Areas In Accordance With Section 3.01.
wet All Mold Containing Materials With An Approved Biocide Solution Using Equipment Capable Of Providing A Fine Spray Mist, To Reduce Airborne Concentrations When The Material Is Disturbed. Keep All Removed Material Wet Enough To Prevent Release Until It Can Be Containerized For Disposal.
removal And Cleaning:
all Acoustic Ceiling Tiles, All Carpet Throughout The Entire Building Are To Be Removed And Properly Disposed Of.
non-porous Materials - All Non-porous Surfaces Are To Be Cleaned Using A
detergent Solution Or Solution Of Contractor's Choice That Will Re Move Mold. Hepa Vacuums May Be Used Along With The Solution For Cleaning.
all Materials Need To Be Dried. Examples Of Non-porous Materials Include:
metal
glass
hard Plastics
plumbing Fixtures
all Hvac Diffusers Are To Be Removed, Thoroughly Cleaned (as Detailed Above) And Set Aside Per Owner S Direction To Be Re-installed Later.
semi-porous (e.g. Wood Doors, Unsealed Concrete) All Semi-porous Surfaces Are To Be Cleaned Using A Detergent Solution Or Solution Of Contractor's Choice That Will Remove Mold. This Solution Must Be Approved By Owner. Hepa Vacuums May Be Used Along With The Solution For Cleaning. All Materials Need To Be Dried. Examples Of Semi-porous Materials Include:
wood
concrete
porous Materials - Remove All Porous Materials Where Visible Mold Growth Or Evidence Of Moisture Is Present. The Materials Should Be Removed, Bagged And Discarded. Examples Of Porous Materials Include:
drywall
insulation Of All Types
carpet (all Being Removed, Regardless Of Evidence)
acoustic Ceiling Tiles (all Being Removed, Regardless Of Evidence)
containers (6 Mil Polyethylene Bags) Shall Be Sealed When Full. Bags Shall Not Be Overfilled. They Should Be Securely Sealed To Prevent Accidental Opening And Leakage By Tying Tops Of Bags In An Overhead Knot Or By Taping In
gooseneck Fashion. Do Not Seal Bags With Wire Or Cord. Bags Shall Be Decontaminated On Exterior Surfaces By Wet Cleaning And Hepa Vacuuming.
large Components Removed Intact May Be Wrapped In 2 Layers Of 6 Mil Polyethylene Sheeting Secured With Tape For Transport To The Landfill.
mold Containing Waste With Sharp Edged Components (e.g., Nails, Screws, Metal Lath, Tin Sheeting) Will Tear The Polyethylene Bags And Sheet And Shall Be Reinforces With Extra Bags Or Wrapping.
cleanup Procedure
remove And Containerize All Visible Accumulations Of Mold Containing Material And Mold Contaminated Debris Utilizing Rubber Dust Pans, Rubber Squeegees, Hepa
vacuums, Etc.
remove All Containerized Waste From The Work Area And Waste Container Pass Out Airlock.
decontaminate All Tools And Equipment And Remove At The Appropriate Time In The Cleaning Sequence.
inspect The Work Area For Visible Residue. If Any Accumulation Of Residue Is Observed, It Will Be Assumed To Be Mold And The Work Area Must Be Re-cleaned.
the Work Area Shall Be Cleaned Until It In Compliance With Criteria Agreed Upon By The Contractor And Owner Prior To Initiation Of Remediation Activities.
following The Satisfactory Completion Of Clearance Criteria Remaining Barriers May Be Removed And Properly Disposed Of. A Final Visual Inspection By The Owner Shall Ensure That No Contamination Remains In The Work Area. Unsatisfactory Conditions May Require Additional Cleaning And Air Monitoring (see Section 3.11, Reestablishment Of The Work Area).
clearance Testing
following The Completion Of Cleanup Operations, The Remediation Contractor Shall Notify The Owner (or Industrial Hygiene Consultant Selected By Owner) When The Building Area Is Ready For Clearance Testing. Remediation Contractor Will Not Be Responsible For Performing Clearance Testing. The Owner (via Contracted Industrial Hygienist) Shall Arrange For Collecting Samples.
3.10 Disposal Procedures
general:
as The Work Progresses, To Prevent Exceeding Available Storage Capacity Onsite, Sealed And Labeled Containers Of Mold Containing Waste Shall Be Removed And Stored In The Dumpster On-site Until It Is Transported To The Prearranged Disposal Location.
all Waste Shipment Records Shall Be Delivered To The Owner. A Recommended Record Keeping Format Utilizes The Waste Shipment Record (wsr) Which Includes The Names And Addresses Of The Generator (owner), Contractor, Transporter, And Disposal Site, The Estimated Quantity Of The Mold Waste And The Type Of Containers Used.
transportation To The Landfill:
once Drums, Bags And Wrapped Components Have Been Removed From The Work Area, They Shall Be Loaded Into An Enclosed Truck Or Dumpster For Transportation.
any Debris Or Residue Observed On Containers Or Surfaces Outside Of The Work Area Resulting From Cleanup Or Disposal Activities Shall Be Immediately Cleaned Up Using Hepa Filtered Vacuum Equipment And/or Wet Methods As Appropriate.
large Metal Dumpsters Are Sometimes Used For Mold Waste Disposal. These Should Have Doors Or Tops That Can Be Closed And Locked To Prevent Vandalism Or Other Disturbance Of The Bagged Mold Debris And Wind Dispersion Of Mold Fibers. Bags Shall Be Placed, Not Thrown, Into These Containers To Avoid Splitting.
disposal At The Landfill:
upon Reaching The Landfill, Trucks Are To Approach The Dump Location As Closely As Possible For Unloading Of The Mold Containing Waste.
bags, Drums, And Components Shall Be Inspected As They Are Off Loaded At The Disposal Site. Waste Containers Shall Be Placed On The Ground At The Disposal Site, Not Pushed Or Thrown Out Of The Trucks.
following The Removal Of All Containerized Waste, The Truck Cargo Area Shall Be Decontaminated Using Hepa Vacuums And/or Wet Methods To Meet The No Visible Residue Criteria.
3.11 Re-establishment Of The Work Area And Systems
re-establishment Of The Work Area Shall Only Occur Following The Completion Of Cleanup Procedures And After Clearance Criteria Have Been Met And Documented To The Satisfaction Of The Owner.
the Contractor And Owner Shall Visually Inspect The Work Area For Any Remaining Visible Residue. Evidence Of Contamination Will Necessitate Additional Cleaning Requirements In Accordance With Section 3.07.
following Satisfactory Clearance Of The Work Area, Remaining Polyethylene Barriers May Be Removed And Disposed Of As Mold Contaminated Waste.
at The Discretion Of The Contractor, Mandatory Requirements For Personal Protective Equipment May Be Waived Following The Removal Of All Barriers.
re-secure Mounted Objects Removed From Their Former Positions During Area Preparation Activities.
relocate Objects That Were Removed To Temporary Locations Back To Their Original Positions.
reestablish Hvac, Mechanical And Electrical Systems In Proper Working Order. Remove Contaminated Hvac System Filters And Dispose Of As Mold Contaminated Waste. Decontaminate Filter Assembly Using Hepa Vacuums And Wet Cleaning Techniques. Install New Filters In Hvac Systems. Dispose Of Old Filters.
repair All Areas Of Damage That Occurred Because Of Remediation Activities.
period Of Performance
upon Notice To Proceed, Contractor Shall Have 30 Calendar Days To Complete The Scope Detailed In This Document.
Closing Soon14 Jan 2025
Tender AmountRefer Documents
City Of Bayawan Tender
Philippines
Details: Description Republic Of The Philippines Province Of Negros Oriental City Of Bayawan Bid No.:itb 25-017 Bids And Awards Committee Date:january 09,2025 Invitation To Bid Sealed Bids For Quotation Of Prices Will Be Received For The Purchase Of The Following Supplies, Materials And Equipment Of The Government To Be Opened On The Date, Place, And Time Stated In Instruction To Bidders. Item No. Item Description Qty. Unit Additional Attribute Unit Cost Total Other Supplies And Materials Lot I Feeds 42,930.00 1 Feeds, Grower 50 Kgs/sack 2 Sack 2 Feeds, Finisher 50 Kgs/sack 2 Sack 3 Poultry Feeds Layer Mash, 50 Kgs/sack 18 Sack 4 Feeds , Starter 50 Kgs/sack 2 Sack Lot Ii Drugs And Medicines 3,810.00 5 Multivitamins, + Electrolyte 24 Sachets X 22 Grams Per Box 6 Box Lot Iii Carpentry Tools And Supplies 16,491.50 6 Bronze, Nail # 1 2 Kilo 7 Bronze Nail, Bronze Nail # 1 1/2 3..5 Kilo 8 Bronze Nail, # 2 ..50 Kilo 9 Bronze Nail, # 2 1/2 1..50 Kilo 10 G.i Pipe, # 1-5-40 20ft./length 1 Length 11 Plywood, Marine ,3/4 1 Piece 12 Plywood , Marine ,1/4 2 Piece 13 Plywood, Marine ,3/8 2 Piece 14 S/s Lag Screw, S/s ,5x16x3 2 Piece 15 Lag Screw , S/s ,5x16x2 1/2 2 Piece 16 Sand Paper,#120 1 Pack Lot. V Electrical Supplies And Materials 158,842.00 17 Bulb, Led,(5 Watts) 6 Piece 18 Electric Iron, Dry And Steam (1200w/ 230v Ac/ 60hz) 2 Unit 19 "electric Oven , (2 Layers) Oven Capacity: 49.0 Liters, Oven Accessories: Oven Net, Oven Tray" 1 Unit 0.00 20 Ice Crusher, Electric, Aluminum, 220v 1 Unit 21 "egg Machine , With 24 Hens *cage - 1 Teir Set Up (12 Heads) - Made Of Hot Dipped Galvanize - 6 Doors Total, 18in Per Door, 4 Heads Per Door - H=5ft- W=4.5ft - L-9ft *ready To Lay Hens - 17 To 19 Weeks White Dekalb - Fully Vaccinated With Booster Shots * Feeders- Blue Pvc Feeders * Drinkers- Double Cup & Double Nipple Drinker" 6 Unit 22 Electric Wire, Duplex, Flat Cord, #12, Duplex, Flat Cord, #12 120 Unit Lot. Viii Measuring/observing/testing Devices 15,696.00 23 Weighing Scale, Manual, Flat Form, 10 Kgs. Capacity 9 Unit Lot. Ix Paints, Tools And Supplies 14,574.00 24 Paint Brush, 3in, Pure White Bristle 3 Pieces 25 Lacquer Thinner , 3 Liter/bottle 2 Bottle 26 Epoxy Paint , White 4 Liter/gallon 5 Gallon 27 Marine Epoxy , A/b 4 Liter Per Can 2 Can 28 Marine Epoxy , (a/b) 1 Liter Per Can 2 Can Lot. Xi Power Tools, Equipment And Accessories 135,500.00 29 "marine Engine, Air-cooled Gasoline Engine,(6.5 Hp) Starting System: Recoil System" 2 Unit 30 "marine Engine , Air-cooled Gasoline Engine ,18 Hp Starting System: Recoil System" 1 Unit 31 "marine Engine , Aircooled Gasoline Engine,16 Hp Starting System: Recoil System" 4 Unit 32 Electric Grinder , Wet & Dry,fully Stainless(3hp Grinder Peanut Butter,220v 60hz,heavy Duty) 1 Unit Lot. Xii Appliances 285,710.00 33 Blender , (heavy Duty) 220-240v 3hp/2238 W 1 Unit 34 "chest Freezer, Single Door, 6 Cu. Ft. Solid Top, Grip Handle, Key Lock, Single Wire Basket, Roller Feet, Defrost System: Manual With Warranty" 9 Unit 35 Hand Mixer , (electric Cake Batter) 3 Kls. Capacity Single Whisk. 1 Unit 36 Water Dispenser, Cold (vendo Machine W/coinslot) 220v With Warranty 1 Unit 37 Washing Machine , (twin Tub) 14kgs Capacity With Warranty 2 Unit 38 Stove, Single Burner (stainless Steel Body, Automatic Ignition Flame Controller, Gas Type: Lpg) 51 Unit 39 Stove, Single Burner With Gas Tank 7kgs. 1 Unit Lot. Xiii Metal Works & Fabrication 1,199,520.00 40 Fabricated Negokart, With Bmx Bicycle And Accessories (made Up Of G.i Steel Plate, G.i Pipe, Angle Bar. Body Should Bear The Official Seal Of Lgu-bayawan City, Dole And Dilp. Should Also Feature A Tourist Spot Of Bayawan City. 51 Unit Lot. Xiv Other Machinery And Equipment 29,944.00 41 Chainsaw , 36in. Gasoline Engine, 70 Horsepower, Portable 1 Unit Lot. Xv Other Supplies & Materials 408,053.60 42 Basin Plastic , Plastic ,28 Inches (large) 6 Piece 43 Frying Wok, Stainless Steel Nonstick, 36cm Diameter,10.5 Cm Depth 51 Piece 44 Glass Show Case, (3 Layers) W-24cm, L-64cm, H-51cm, Thickness Of Glass-0.5cm 52 Unit 45 Steel Basin, Stainless ,45cmx15cm 2 Piece 46 Paper Cups , 10oz 4 Pack 47 Paper Cups , 12oz 4 Pack 48 Paper Cup , 16oz 4 Pack 49 Pail, 12l Capacity, Black 2 Piece 50 Plastic Jar, With Cover 500ml, For Peanut Butter 100 Piece 51 Chair, Plastic Stool, White 3 Piece 52 Table, Plastic, Monobloc, Square 1 Piece 53 Hanger, Plastic 6 Dozen 54 Clip Hanger, Plastic 12 Pieces 55 Box, For Storage, Plastic, 120l With 2 Clips, Button Wheels For Easy Moving, Clear, Heavy Duty 3 Box 56 Baking Pan, Round, 6 Inches X 3 Inches, Upper Diameter:6 Inches, Bottom Diameter: 5.5 Inches, Height:3 Inches 5 Pieces 57 Glassine Cup, For Cupcake,10cm, 1000pcs/pack 1 Pack 58 Baking Pan, Rectangular, Aluminum 8x12 Inches 6 Pieces 59 Measuring Cup, Plastic, Transparent,up To 1l Capacity 1 Piece 60 Baking Liner, Parchment Paper, 20mtrs., 20m X 30mm Per Box 5 Box 61 Cupcake Molder, Carbon Steel 12 Holes Tray 3 Set 62 Trapal, , 6 Feet Height,0.4mm Thick 18 Meter 63 Brass Pipe, 3/4 Inches,male 25 Unit 64 Ball Joint, 3/4 X 1, For Pump Boat 1 Piece 65 Stainless Shaft, 3/4x5ft 2 Piece 66 Stainless Shaft, 5/8 X 7ft W/ Thread 1 Piece 67 Stainless Propeller 3/4 X 5ft 2 Piece 68 Stainless Propeller 5/8in X 7 1 Piece 69 Stand Belt, S/s,3/8x2.5 2 Piece 70 Stand Belt, S/s ,3/8x3 2 Piece 71 P.e Hose , 1 1/2 4 Meter 72 Rope, #20 1..5 Roll 73 Rubber Float , Round (patao) 360 Pieces 74 Cooler Box, Styro, 12kls Capacity 6 Pieces 75 Cooler, Plastic With Cover (40kgs. Capacity) 2 Piece 76 Battery, 12 Volts 22 Plates 1 Unit 77 Battery , 12 Volts 17 Plates 3 Unit 78 Iron Board, Foldable, Ironing Board Cover With Foam, 36in Board Length. 2 Piece 79 Aluminum Wok/cawa, Big Size, Diameter 56.5 Cm, Height 19cm 1 Piece 80 Fishing Hook, #58 2 Pack 81 Fishing Hook, #59 4 Pack 82 Fishing Hook, #60 4 Pack 83 Lead Sinker, No. 2 25 Kilo 84 Nylone , Monoline,#45 1 Kilo 85 Nylone , Monoline,#40 1 Kilo 86 Nylone , Monoline ,#30 1 Kilo 87 Nylon , Monoline,#25 1 Kilo 88 Nylone , Monoline,#20 1 Kilo 89 Nylon , Monoline,#15 5 Kilo 90 Nylone , Monoline.#12 1 Kilo 91 Nylone , Monoline,#10 10 Kilo 92 Fishing Net , (pamu) #8 4 Meter 93 Fishing Net , #10 1,500 Meter 94 Fishing Net , #9 1,400 Meter 95 Pamo Net , 210x2x9x100m 3 Roll 96 Pamo Net , 210x2x8x100m 3 Roll 97 Plastic Sando Bag (xl) 50 Pieces Per Pack, (xl) 50 Pieces Per Pack 55 Pack 98 Sando Ecobag, Large, 50 Pieces/pack 55 Pack 99 Brass Pipe, 5/8" X 4 Feet 1 Piece 100 Sando Ecobag, Extra Large, 50 Pieces/pack 10 Pack 101 Cross Joint, 3/4 Ft. X 5/8 Inches, 3/4 Ft. X 5/8 Inches 2 Piece 102 Rudder Assembly Stainless 5/8 Inches X 3 Feet, 5/8 Inches X 3 Feet 2 Piece 103 Rudder Assembly Stainless 5/8 Inches X 3.5 Feet, 5/8 Inches X 3.5 Feet 1 Piece Lot. Xvi Cleaning Equipment And Supplies 223,426.00 104 Bleaching Liquid, 250ml Per Bottle 408 Bottle 105 Bleaching Liquid, 5l Per Bottle 4 Bottle 106 Bleaching Liquid, 3.785l Per Bottle 10 Bottle 107 Bleaching Liquid, Color Safe 3.6l 10 Bottle 108 Body Soap, Pure White With Germ Shield, 60g 408 Piece 109 Body Soap, Fresh Green With Germ Shield, 60g 408 Piece 110 Detergent Bar, 360g 20 Piece 111 Detergent Bar, White, 400g 408 Piece 112 Detergent Powder, Calamansi (single), 57gx6 Sachet 510 Pack 113 Detergent Powder , (whitener) 2 Kilo Per Pack 10 Piece 114 Detergent Powder , (twin Pack) Sunrise Fresh 70g X 6 Sachet 408 Pack 115 Detergent Powder , (all Colors) 2 Kilo Per Pack 10 Pack 116 Fabric Conditioner, Antibac, Sachet, 25ml X 6 340 Pack 117 Fabric Conditioner , Sunrise Fresh, (1l) 10 Piece 118 Hair Conditioner, Standout Straight Sachet, 12ml X 6 170 Pack 119 Hair Conditioner, Damage Control 11ml X 6sachet 170 Pack 120 Hair Shampoo & Conditioner , Complete Repair Avocado Oil & Honey For Damage Hair, 15ml X 6 Sachet 408 Pack 121 Hair Shampoo, Smooth & Manageable 15ml X 12s 408 Pack 122 Sanitary Napkin, Non-wings 8pcs/pack 204 Pack 123 Sanitary Napkin, W/wings 8pcs/pack 170 Pack 124 Toothpaste Cool Menthol Fresh Twin Sachet, 20g, Cool Menthol Fresh Twin Sachet, 20g 408 Piece Lot. Xvii Commercial Lumber 11,254.00 125 Lumber, Gemillina,1x2x18 15 Piece 126 Lumber, Gemillina,2x8x8 1 Piece 127 Good Lumber, 1x2x10 9 Piece 128 Good Lumber, 1x12x16 3 Piece 129 Good Lumber, 1x2x18 3 Piece 130 Good Lumber, 2x2x10 9 Piece 131 Good Lumber, 2x2x8 3 Piece 132 Good Lumber, 2x4x8 2 Piece ***nothing Follows*** Grand Total 2,545,751.10 Place Of Delivery: Fob Bayawan, City Warehouse Form And Amount Of Bid Security: I Hereby Certify That The Above Articles Are Equally Carried In Stock By Me In Quantities Above Stated Except Those Marked "none". Terms And Conditions Specified In The Annex Of This Form Are Herein Accepted. The Quantity Shown And Prices As Quoted Are Hereby Offered. ___________________________ Name Of Business/company Address/contact Number Evaluation: Bids And Awards Committee _________ Virginia D. Sadiasa, Chairman Wilfredo C. Tuale, Member _________ Saturnino T. Dayanan, Vice-chairman Corazon P. Lirazan,member ________ Ernesto N. Dinopol,jr.,member _________ Nefredo Camillo A. Villarubia,member Invitation To Bid The City Of Bayawan, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors/contractors To Bid For The Hereunder Projects: Itb No. Pr No. Project Name Total Abc Of Project Source Of Funds Itb 25-017 300-24-12-011 Delivery Of Other Supplies And Materials For Integrated Livelihood Project.(ccmdo) 2,545,751.10 Trust Fund Lot No. Description Of Lot Total Abc Of Lot Bid Security Cash/mc/bank Gurantee (2% Of Abc) I Feeds 42,930.00 856.60 Ii Drugs And Medicines 3,810.00 76.2 Iii Carpentry Tools And Supplies 16,491.50 329.83 Iv Electrical Supplies And Materials 158,842.00 3,176.84 V Measuring/observing/testing Devices 15,696.00 313.92 Vi Paints, Tools And Supplies 14,574.00 291.48 Vii Power Tools, Equipment And Accessories 135,500.00 2,710.00 Viii Appliances 285,710.00 5,714.2 Ix Metal Works & Fabrication 1,199,520.00 23,990.4 X Other Machinery And Equipment 29,944.00 598.88 Xi Other Supplies & Materials 408,053.60 8,161.072 Xii Cleaning Equipment And Supplies 223,426.00 4,468.52 Xiii Commercial Lumber 11,254.00 225.08 Bid Documents Shall Be Available At The Bac Office, New Bayawan City Hall, Negosyo Center, Lgu Bayawan City Upon Ss Payment Of Prescribed Non-refundable Fee In The Amount Of Php 5,000.00. Bidders Shall Drop Their Technical And Financial Proposals In The Bid Box At The Bac Office, Bayawan City On Or Before The Deadline Of Submission Of Bids As Shown Below. All Particulars Relative To Eligibility Process, Opening And Evaluation Of Bids, Post- Qualification And Award Of Contract Shall Be Governed By The Applicable Provisions Of Ra. 9184. The City Of Bayawan Reserves The Right To Reject Any Or All Bids, To Waive Any Defects Or Formality Therein And To Accept Bids Considered Responsive And Most Advantageous To The Government. The Complete Schedule Of Activities Is Listed Below, As Follows: Activities Schedule Issuance Of Bid Documents January 09, 2025 To January 27, 2025 @ 5:00 P.m. Pre-bid Conference January 16, 2025 @ 9:00 A.m. Deadline/opening Of Bids January 28, 2025 @ 9:00 A.m. Approved: Virginia D. Sadiasa Bac Chairman Geps Publication : January 09,2025 Newspaper : None
Closing Date28 Jan 2025
Tender AmountPHP 2.5 Million (USD 43.8 K)
City Of Bayawan Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Republic Of The Philippines Province Of Negros Oriental City Of Bayawan Bid No.:itb 24-326 Bids And Awards Committee Date:december 27,2024 Invitation To Bid Sealed Bids For Quotation Of Prices Will Be Received For The Purchase Of The Following Supplies, Materials And Equipment Of The Government To Be Opened On The Date, Place, And Time Stated In Instruction To Bidders. Item No. Item Description Qty. Unit Additional Attribute Unit Cost Total Lot I Feeds 42,930.00 1 Feeds, Grower 50 Kgs/sack 2 Sack 2 Feeds, Finisher 50 Kgs/sack 2 Sack 3 Poultry Feeds Layer Mash, 50 Kgs/sack 18 Sack 4 Feeds , Starter 50 Kgs/sack 2 Sack Lot Ii Drugs And Medicines 3,810.00 5 Multivitamins, + Electrolyte 24 Sachets X 22 Grams Per Box 6 Box Lot Iii Carpentry Tools And Supplies 14,877.50 6 Bronze, Nail # 1 2 Kilo 7 Bronze Nail, # 1 1/2 3..5 Kilo 8 Bronze Nail, # 2 ..50 Kilo 9 Bronze Nail, # 2 1/2 1..50 Kilo 10 Plywood, Marine ,3/4 1 Piece 11 Plywood , Marine ,1/4 2 Piece 12 Plywood, Marine ,3/8 2 Piece Lot. Iv Bolt And Screw 220.00 13 S/s Lag Screw, S/s ,5x16x3 2 Piece 14 Lag Screw , S/s ,5x16x2 1/2 2 Piece Lot. V Electrical Supplies And Materials 158,218.00 15 Electric Iron, Dry And Steam (1200w/ 230v Ac/ 60hz) 2 Unit 16 "electric Oven , (2 Layers) Oven Capacity: 49.0 Liters, Oven Accessories: Oven Net, Oven Tray" 1 Unit 0.00 17 Ice Crusher, Electric, Aluminum, 220v 1 Unit 18 "egg Machine , With 24 Hens *cage - 1 Teir Set Up (12 Heads) - Made Of Hot Dipped Galvanize - 6 Doors Total, 18in Per Door, 4 Heads Per Door - H=5ft- W=4.5ft - L-9ft *ready To Lay Hens - 17 To 19 Weeks White Dekalb - Fully Vaccinated With Booster Shots * Feeders- Blue Pvc Feeders * Drinkers- Double Cup & Double Nipple Drinker" 6 Unit 19 Electric Wire, Duplex, Flat Cord, #12, Duplex, Flat Cord, #12 120 Unit Lot. Vi Farm/garden Tools And Accessories 1,160.00 20 Pail, 12l Capacity, Black 2 Piece 21 Basin Plastic , Plastic ,28 Inches (large) 6 Piece Lot. Vii Lighting And Fixtures And Accessories 624.00 22 Bulb, Led,(5 Watts) 6 Piece Lot. Viii Measuring/observing/testing Devices 15,696.00 23 Weighing Scale, Manual, Flat Form, 10 Kgs. Capacity 9 Unit Lot. Ix Paints, Tools And Supplies 14,574.00 24 Paint Brush, 3in, Pure White Bristle 3 Pieces 25 Lacquer Thinner , 3 Liter/bottle 2 Bottle 26 Epoxy Paint , White 4 Liter/gallon 5 Gallon 27 Marine Epoxy , A/b 4 Liter Per Can 2 Can 28 Marine Epoxy , (a/b) 1 Liter Per Can 2 Can Lot. X Paper Materials And Products 980.00 29 Paper Cups , 10oz 4 Pack 30 Paper Cups , 12oz 4 Pack 31 Paper Cup , 16oz 4 Pack Lot. Xi Power Tools, Equipment And Accessories 135,500.00 32 "marine Engine, Air-cooled Gasoline Engine,(6.5 Hp) Starting System: Recoil System" 2 Unit 33 "marine Engine , Air-cooled Gasoline Engine ,18 Hp Starting System: Recoil System" 1 Unit 34 "marine Engine , Aircooled Gasoline Engine,16 Hp Starting System: Recoil System" 4 Unit 35 Electric Grinder , Wet & Dry,fully Stainless(3hp Grinder Peanut Butter,220v 60hz,heavy Duty) 1 Unit Lot. Xii Appliances 186,618.00 36 Blender , (heavy Duty) 220-240v 3hp/2238 W 1 Unit 37 "chest Freezer, Single Door, 6 Cu. Ft. Solid Top, Grip Handle, Key Lock, Single Wire Basket, Roller Feet, Defrost System: Manual With Warranty" 9 Unit 38 Water Dispenser, Cold (vendo Machine W/coinslot) 220v With Warranty 1 Unit 39 Washing Machine , (twin Tub) 14kgs Capacity With Warranty 2 Unit Lot. Xiii Metal Works & Fabrication 1,199,520.00 40 Fabricated Negokart, With Bmx Bicycle And Accessories (made Up Of G.i Steel Plate, G.i Pipe, Angle Bar. Body Should Bear The Official Seal Of Lgu-bayawan City, Dole And Dilp. Should Also Feature A Tourist Spot Of Bayawan City. 51 Unit Lot. Xiv Other Machinery And Equipment 29,944.00 41 Chainsaw , 36in. Gasoline Engine, 70 Horsepower, Portable 1 Unit Lot. Xv Other Supplies & Materials 506,399.60 42 Frying Wok, Stainless Steel Nonstick, 36cm Diameter,10.5 Cm Depth 51 Piece 43 Glass Show Case, (3 Layers) W-24cm, L-64cm, H-51cm, Thickness Of Glass-0.5cm 52 Unit 44 Steel Basin, Stainless ,45cmx15cm 2 Piece 45 Plastic Jar, With Cover 500ml, For Peanut Butter 100 Piece 46 Chair, Plastic Stool, White 3 Piece 47 Table, Plastic, Monobloc, Square 1 Piece 48 Hanger, Plastic 6 Dozen 49 Clip Hanger, Plastic 12 Pieces 50 Box, For Storage, Plastic, 120l With 2 Clips, Button Wheels For Easy Moving, Clear, Heavy Duty 3 Box 51 Baking Pan, Round, 6 Inches X 3 Inches, Upper Diameter:6 Inches, Bottom Diameter: 5.5 Inches, Height:3 Inches 5 Pieces 52 Glassine Cup, For Cupcake,10cm, 1000pcs/pack 1 Pack 53 Baking Pan, Rectangular, Aluminum 8x12 Inches 6 Pieces 54 Measuring Cup, Plastic, Transparent,up To 1l Capacity 1 Piece 55 Baking Liner, Parchment Paper, 20mtrs., 20m X 30mm Per Box 5 Box 56 Cupcake Molder, Carbon Steel 12 Holes Tray 3 Set 57 Trapal, , 6 Feet Height,0.4mm Thick 18 Meter 58 Brass Pipe, 3/4 Inches,male 25 Unit 59 Ball Joint, 3/4 X 1, For Pump Boat 1 Piece 60 Stainless Shaft, 3/4x5ft 2 Piece 61 Stainless Shaft, 5/8 X 7ft W/ Thread 1 Piece 62 Stainless Propeller 3/4 X 5ft 2 Unit 63 Stainless Propeller 5/8in X 7 1 Piece 64 G.i Pipe, # 1-5-40 20ft./length 1 Length 65 Stand Belt, S/s,3/8x2.5 2 Piece 66 Stand Belt, S/s ,3/8x3 2 Piece 67 P.e Hose , 1 1/2 4 Meter 68 Rope, #20 1..5 Roll 69 Rubber Float , Round (patao) 360 Pieces 70 Cooler Box, Styro, 12kls Capacity 6 Piece 71 Cooler, Plastic With Cover (40kgs. Capacity) 2 Piece 72 Battery, 12 Volts 22 Plates 1 Unit 73 Battery , 12 Volts 17 Plates 3 Unit 74 Iron Board, Foldable, Ironing Board Cover With Foam, 36in Board Length. 2 Piece 75 Stove, Single Burner (stainless Steel Body, Automatic Ignition Flame Controller, Gas Type: Lpg) 51 Unit 76 Stove, Single Burner With Gas Tank 7kgs. 1 Set 77 Aluminum Wok/cawa, Big Size, Diameter 56.5 Cm, Height 19cm 1 Piece 78 Fishing Hook, #58 2 Pack 79 Fishing Hook, #59 4 Pack 80 Fishing Hook, #60 4 Pack 81 Lead Sinker, No. 2 25 Kilo 82 Nylone , Monoline,#45 1 Kilo 83 Nylone , Monoline,#40 1 Kilo 84 Nylone , Monoline ,#30 1 Kilo 85 Nylon , Monoline,#25 1 Kilo 86 Nylone , Monoline,#20 1 Kilo 87 Nylon , Monoline,#15 5 Kilo 88 Nylone , Monoline.#12 1 Kilo 89 Nylone , Monoline,#10 10 Kilo 90 Fishing Net , (pamu) #8 4 Meter 91 Fishing Net , #10 1,500 Meter 92 Fishing Net , #9 1,400 Meter 93 Pamo Net , 210x2x9x100m 3 Roll 94 Pamo Net , 210x2x8x100m 3 Roll 95 Hand Mixer , (electric Cake Batter) 3 Kls. Capacity Single Whisk. 1 Unit 96 Plastic Sando Bag (xl) 50 Pieces Per Pack, (xl) 50 Pieces Per Pack 55 Pack 97 Sando Ecobag, Large, 50 Pieces/pack 55 Pack 98 Brass Pipe, 5/8" X 4 Feet 1 Piece 99 Sand Paper,#120 4 Pack 100 Sando Ecobag, Extra Large, 50 Pieces/pack 10 Pack 101 Cross Joint, 3/4 Ft. X 5/8 Inches, 3/4 Ft. X 5/8 Inches 2 Piece 102 Rudder Assembly Stainless 5/8 Inches X 3 Feet, 5/8 Inches X 3 Feet 2 Piece 103 Rudder Assembly Stainless 5/8 Inches X 3.5 Feet, 5/8 Inches X 3.5 Feet 1 Piece Lot. Xvi Cleaning Equipment And Supplies 223,426.00 104 Bleaching Liquid, 250ml Per Bottle 408 Bottle 105 Bleaching Liquid, 5l Per Bottle 4 Bottle 106 Bleaching Liquid, 3.785l Per Bottle 10 Bottle 107 Bleaching Liquid, Color Safe 3.6l 10 Bottle 108 Body Soap, Pure White With Germ Shield, 60g 408 Piece 109 Body Soap, Fresh Green With Germ Shield, 60g 408 Piece 110 Detergent Bar, 360g 20 Piece 111 Detergent Bar, White, 400g 408 Piece 112 Detergent Powder, Calamansi (single), 57gx6 Sachet 510 Pack 113 Detergent Powder , (whitener) 2 Kilo Per Pack 10 Piece 114 Detergent Powder , (twin Pack) Sunrise Fresh 70g X 6 Sachet 408 Pack 115 Detergent Powder , (all Colors) 2 Kilo Per Pack 10 Pack 116 Fabric Conditioner, Antibac, Sachet, 25ml X 6 340 Pack 117 Fabric Conditioner , Sunrise Fresh, (1l) 10 Piece 118 Hair Conditioner, Standout Straight Sachet, 12ml X 6 170 Pack 119 Hair Conditioner, Damage Control 11ml X 6sachet 170 Pack 120 Hair Shampoo & Conditioner , Complete Repair Avocado Oil & Honey For Damage Hair, 15ml X 6 Sachet 408 Pack 121 Hair Shampoo, Smooth & Manageable 15ml X 12s 408 Pack 122 Sanitary Napkin, Non-wings 8pcs/pack 204 Pack 123 Sanitary Napkin, W/wings 8pcs/pack 170 Pack 124 Toothpaste Cool Menthol Fresh Twin Sachet, 20g, Cool Menthol Fresh Twin Sachet, 20g 408 Piece Lot. Xvii Commercial Lumber 11,254.00 125 Lumber, Gemillina,1x2x18 15 Piece 126 Lumber, Gemillina,2x8x8 1 Piece 127 Good Lumber, 1x2x10 9 Piece 128 Good Lumber, 1x12x16 3 Piece 129 Good Lumber, 1x2x18 3 Piece 130 Good Lumber, 2x2x10 9 Piece 131 Good Lumber, 2x2x8 3 Piece 132 Good Lumber, 2x4x8 2 Piece ***nothing Follows*** Grand Total 2,545,751.10 Place Of Delivery: Fob Bayawan, City Warehouse Form And Amount Of Bid Security: I Hereby Certify That The Above Articles Are Equally Carried In Stock By Me In Quantities Above Stated Except Those Marked "none". Terms And Conditions Specified In The Annex Of This Form Are Herein Accepted. The Quantity Shown And Prices As Quoted Are Hereby Offered. ___________________________ Name Of Business/company Address/contact Number Evaluation: Bids And Awards Committee _________ Virginia D. Sadiasa, Chairman Wilfredo C. Tuale, Member _________ Saturnino T. Dayanan, Vice-chairman Corazon P. Lirazan,member ________ Ernesto N. Dinopol,jr.,member _________ Nefredo Camillo A. Villarubia,member Invitation To Bid The City Of Bayawan, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors/contractors To Bid For The Hereunder Projects: Itb No. Pr No. Project Name Total Abc Of Project Source Of Funds Itb 24-326 300-24-12-011 Delivery Of Other Supplies And Materials For Integrated Livelihood Project.(ccmdo) 2,545,751.10 Trust Fund Lot No. Description Of Lot Total Abc Of Lot Bid Security Cash/mc/bank Gurantee (2% Of Abc) I Feeds 42,930.00 856.60 Ii Drugs And Medicines 3,810.00 76.2 Iii Carpentry Tools And Supplies 14,877.00 297.54 Iv Bolt And Screw 220.00 4.40 V Electrical Supplies And Materials 158,218.00 3,164.36 Vi Farm/garden Tools And Accessories 1,160.00 23.20 Vii Lighting And Fixtures And Accessories 624.00 12.48 Viii Measuring/observing/testing Devices 15,696.00 313.92 Ix Paints, Tools And Supplies 14,574.00 291.48 X Paper Materials And Products 980.00 19.6 Xi Power Tools, Equipment And Accessories 135,500.00 2,710.00 Xii Appliances 186,618.00 3,732.36 Xiii Metal Works & Fabrication 1,199,520.00 23,990.40 Xiv Other Machinery And Equipment 29,944.00 598.88 Xv Other Supplies & Materials 506,399.60 10,127.992 Xvi Cleaning Equipment And Supplies 223,426.00 4.468.52 Xvii Commercial Lumber 11,254.00 225.08 Bid Documents Shall Be Available At The Bac Office, New Bayawan City Hall, Negosyo Center, Lgu Bayawan City Upon Ss Payment Of Prescribed Non-refundable Fee In The Amount Of Php 5,000.00. Bidders Shall Drop Their Technical And Financial Proposals In The Bid Box At The Bac Office, Bayawan City On Or Before The Deadline Of Submission Of Bids As Shown Below. All Particulars Relative To Eligibility Process, Opening And Evaluation Of Bids, Post- Qualification And Award Of Contract Shall Be Governed By The Applicable Provisions Of Ra. 9184. The City Of Bayawan Reserves The Right To Reject Any Or All Bids, To Waive Any Defects Or Formality Therein And To Accept Bids Considered Responsive And Most Advantageous To The Government. The Complete Schedule Of Activities Is Listed Below, As Follows: Activities Schedule Issuance Of Bid Documents December 27, 2024 To January 15, 2025 @ 5:00 P.m. Pre-bid Conference January 7, 2025 @ 9:00 A.m. Deadline/opening Of Bids January 16, 2025 @ 9:00 A.m. Approved: Virginia D. Sadiasa Bac Chairman Geps Publication : December 27, 2024 Newspaper : None
Closing Soon16 Jan 2025
Tender AmountPHP 2.5 Million (USD 43.8 K)
City Of Bayawan Tender
Philippines
Details: Description Invitation To Bid The City Of Bayawan, Through Its Bids And Awards Committee (bac), Invites Suppliers / Manufacturers / Distributors / Contractors To Bid For The Hereunder Projects: Lot No. I Tarpaulin Printing 1 4 Lot "labor And Materials ( Tarpaulin Printing ) 4 Sets - 2' X 4' (signage)" Lot No. Iii Sand & Gravel 4 7 Cu.m. Sand, Washed, Mixing/screened 5 8 Cu.m. Gravel, Mixing, Crushed, Screened & Washed, Max. Size 38mm Dia Lot No. V Construction Supplies/materials 16 72 Kg/s Tie Wire, # 16 17 3 Kg/s Nylon, #100 18 5 L.m. Mesh Wire, 3mm Eyehole X 0.90m Width (m) 19 15 Pc/s Blade, Hacksaw, 12mm X 300mm, 18tpi, (excellent Quality) 20 5 Kg/s Nails, Concrete, 75mm 21 6 Kilo/s Nails, Umbrella/roofing, 62mm 22 2 Box/es Nails, Common Wire, 100mm (25kgs/box) 23 1 Box/es Nails, Common Wire, 75mm (25kgs/bx) 24 1 Box/es Nails, Common Wire, 62mm (25kgs/box) 25 1 Box/es Nails, Common Wire, 38mm (25kgs/box) 26 3 Box/es Rod/electrode, Welding, E6013, 1/8" (bx)) (matchless Quality, Iso 9001, 2000 Certified, 20 Kg/box) 27 6 Pc/s Drill Bit, Masonry, 1/8" Dia 28 9 Pc/s Drill Bit, 1/8" Dia, For Steel 29 3 Pc/s Drill Bit, 3/16" Dia, For Steel 30 3 Pc/s Drill Bit, 1/4" Dia, For Steel 31 3 Pc/s Drill Bit, 3/8" Dia, For Steel 32 3 Pc/s Drill Bit, Masonry, 3/16" Dia 33 3 Pc/s Drill Bit, Masonry, 1/4" Dia 34 3 Pc/s Drill Bit, Masonry, 3/8" Dia 35 13 Pc/s Cutting Disc, Masonry/concrete, 100mm 36 10 Pc/s Cutting Disc, 100mm Dia, For Metal 38 5 Can/s Silicon Sealant, (300ml/can), For Polycarbonate 39 2 Can/s Sealant, Elastomeric/roof (1 Lit/can) 40 2 Can/s Solvent Cement, Pvc (500 Cc/can) 41 2 Roll/s Sack Cloth, 2.40m Width (100m/roll), Blue 42 10 Can/s Epoxy All Purpose (a And B), 1/4 Lit/can, Non Conductive, All Purpose Adhesive 43 50 Set/s Lag Screw, 6mm Dia. X 32mm With Expansion Shield 44 200 Set/s Bolt, Fine Threaded, 3.5mm X 25mm, With Nut And Washer 45 1 Sheet/s Steel Plate, G.i., Gauge # 16 X 1.2m X 2.4m 46 20 Pc/s Tiles, Granite, Polished, 0.60m X 0.60m, Color: Jet Black 47 65 Pc/s Tiles, Floor, Ceramic, 40cm X 40cm Non Skid 48 14 Pc/s Staircase Nosing, Brass Ochre (2m/length) 49 6 Pack/s Tile Grout (2kg/pk), Light Beige 50 1 Can/s Acrylic Spray Paint, Flat Black(400cc/can) 51 1 Lit/s Paint, Enamel, Quick Dry (lit), Red 52 10 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, Marking Yellow Or Equivalent 53 5 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, Black 54 12 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, White Or Equivalent 56 1 Gal/s Paint, Epoxy, Silver Finish With Aluminum With Catalyst 57 15 Gal/s Paint, Epoxy, Enamel, Black (gal) 58 4 Gal/s Enamel Paint, Silver Finish Aluminum (gal) 59 3 Can/s Thinner, Lacquer (3.75lit/can) 60 11 Gal/s Reducer/thinner, Epoxy Paint (gal) 61 8 Gal/s Adcoat Rust Converter And Primer 62 6 Gal/s Liquid Tile Paint, Primer White Acrylic Solvent-based Primer 63 6 Gal/s Liquid Tile, Topcoat Gloss White 64 4 Gal/s Liquid Tile, Top Coat Clear 65 5 Can/s Liquid Tile, Solvent Based-tinting Color Venetial Red, 1/4lit Per Can 66 5 Can/s Liquid Tile, Solvent Based-tinting Color Thalo Blue, 1/4lit Per Can 67 5 Can/s Liquid Tile, Solvent Based-tinting Color Thalo Green, 1/4lit Per Can 68 5 Can/s Liquid Tile, Solvent Based-tinting Color Hanza Yellow, 1/4lit Per Can 69 5 Can/s Liquid Tile, Solvent Based-tinting Color Lamp Black, 1/4lit Per Can 70 5 Gal/s Liquid Tile, Reducer Clear Liquid 71 10 Gal/s Plexibond, Cementitious Waterproofing System, Acrylic 72 10 Pc/s Sand Paper, #80, 225mm X 275mm 73 10 Pc/s Sand Paper, #100, 225mm X 275mm 74 10 Pc/s Sand Paper, #120, 225mm X 275mm 75 10 Pc/s Sand Paper, # 180, 225mm X 275mm 76 14 Pc/s Paint Roller W/ Handle, 100mm 77 150 Meter/s Service Drop Wire, # 4 Awg (m) 78 5 Pc/s Service Grip, # 2 79 4 Pc/s Service Grip, Dead End Performed Type, Size # 4awg 80 1 Length/s Pipe, Pvc, 40mm Dia X 3m, W/ Entrance Cap, Clip Type 81 70 Meter/s Thw Wire, # 4 (22mm2), Black (m) 82 70 Meter/s Thw Wire, # 4 (22mm2), White (m) 83 40 Meter/s Thw Wire, # 6 (14mm2), Stranded(m), Green 84 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), Black 85 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), White 86 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), Green 87 6 Roll/box Thw Wire, # 12 (3.5mm2), Stranded (150m/roll/bx), Black 90 1 Length/s Pipe, G.i. 65mm Ø X 6m, Wt=5.20mm , Outside Dia= 73.00, 8.694kg/m, Heavy Gauge 92 1 Pc/s Circuit Breaker, 100a, 2 Pole, Bolt-on, Single Phase W/ Casing, Outdoor Type 93 1 Pc/s Circuit Breaker, 30a, 2 Pole, Bolt-on 94 3 Pc/s Circuit Breaker, 20a, 2 Pole, Bolt-on, Single Phase W/ Casing, Outdoor Type 95 4 Roll/s Royal Cord, # 14 Awg, 2 Wire (75m/roll) 96 7 Length/s Pipe, Pvc, Electrical, 40mm Dia X 3m, Thickwall, Orange 97 200 Length/s Pipe, Pvc, Electrical, 25mm Dia X 3m, Thickwall, Orange 98 150 Length/s Pipe, Pvc, Electrical, 20mm Dia X 3m, Thickwall, Orange 99 3 Pack/s C-clamp/clip, Pvc, 20mm Dia, W/ Concrete Nails (100's/pk) 100 6 Pack/s C-clamp/clip, Pvc, 25mm Dia W/ Concrete Nails (100pcs/pk) 101 3 Pack/s Pipe Connector, Pvc, Electrical, 20mm Dia (100's/pk)) 102 3 Pack/s Pipe Connector, Pvc, Electrical, 25mm Dia (100pcs/pk) 103 10 Pc/s Connector, Split Bolt, # 6 (14mm2), Burndy 104 3 Set/s Magnetic Contactor, 40a 220-240vac Coil W/ Metal. Enclosure 105 2 Pc/s Photo Control (photo Switch), 220v, 6a, Operating Illumination: Turn-on At 31.5 Lux, Turn-off At 125 Lux 106 2 Unit/s Timer, Time Switch, 24hr Back Up 107 50 Roll/s Tape, Electrical, Vinyl, .177mm X 3/4"/19mm X 16m, Flame Retardant, 600v 108 5 Roll/s Tape, Electrical, Rubber, 18mm X 5m, Self Fusing Ethylene Propylene Rubber 109 5 Roll/s Tape, Electrical, Waterproof, 600v 111 29 Set/s Recessed Ground Lamps, Ip67 1w, Ac85-265v Dc 12v (1 Side), Natural White (4000k), 42mm X 70mm 113 8 Set/s Metal Hallide Flood Light Fixture 250w Set With Tubular Metal Hallide Bulb (firefly), Warm White, Model: Flh 121/s/250/fhimh 250dl/t 114 10 Set/s Solar Blinker Arrow Signage Warning Lights, Direction Signs, Size: Length:47"; Height:42", Arrow Sign, Size: Length: 47"; Height:16", Solar Panel Size: 10" X7", Led Color: Red, Ip Grade: Ip54 119 18 Set/s Lamp Post, Steel Tapered, Single Arm,t-6-30' Sb Bracket Type, W/ Base Plate, Anchor Bolt, Nut & Washer, Electroplated Silver Finish, Amco 120 6 Set/s Lamp Post, Steel Tapered, Double Arm, T-6-30' Db Double Arm, Bracket Type, W/ Base Plate, Anchor Bolt, Nut & Washer, Electroplated Silver Finish 122 32 Pc/s Led Fountain Lights, Rgb With Stainless Steel Toughed Glass Cover, Ac 220; Dc 12-24v Dmx 512 Built In Control With Decoder, 9x3w Led Rgb Color Changing 2700-6500k Ip68 Water Proof Grade Junction Box 124 5 Roll Cable Wire; 5c X 16 Twg/1.025mm Premium Multi-conductor Royal Cable Wire (75m/roll) 126 32 Set/s Fountain Nozzle, 1.0" Dn40 Female Thread Flower Column Style Fountain Nozzle Sprinkler Spray Head, Brass 127 1 Unit/s 37.5 Kva Ditribution Transformer, 7620/13200vy - 240/480 Volts Oisc, W/ 2-2½, Taps Above And N.v., Fuse Link, Fuse Cut-out And Accessories 128 2 Meter/s Fuse, Cut-out, 100a, 25kv, Ab Chance 129 1 Set/s Transformer Cluster Hanger, With Complete Accessories 130 1 Pc/s Clamp, Hot Line, #2 - #4/0 Acsr 131 3 Set/s Pull Box, Metal Enclosure, 900mm X 200mm X 150mm, With Cover 132 50 Pc/s Screw, Lag Screw, 10mm Dia X 50mm, W/ Plain Washer And Expansion Shield 133 200 Pc/s Bolt With Nut And Washer, (fine Thread) 3.5mm Dia X 25mm 134 200 Pc/s Bolt With Nut And Washer, (fine Thread) 4.5mm Dia X 25mm 135 5 Pack/s Ubolt Galvanized/ U Bolt With Nut And Washer Inches For Gi Pipe Screw Depot, 1/4 For 3", 1/4" Dia, 10 Pcs Per Pack 139 30 Gal/s Concrete Epoxy, With Low Viscosity For Construction 140 22 Length/s Pipe, Upvc, 20mm Outside Dia, Wt=1.8min, L=3.0m, Blue 141 12 Pc/s Tee, Upvc, 20mm Inside Dia, Blue 142 14 Pc/s Elbow, Upvc, 20mm Inside Dia X 90 Deg. Bend, Plain, Blue 143 4 Pc/s Tee Reducer, Upvc,32mm X 20mm Nominal Dia, Blue 144 3 Pc/s Tee, Upvc, 25mm Inside Dia, Plain, Blue 145 4 Pc/s Adaptor, Upvc, Male, 20mm Dia., Nominal Size, Blue 146 8 Pc/s Adaptor, Upvc, Female, 20mm Dia Nominal Size, Blue 147 4 Pc/s Ball Valve, Pvc, 20mm Outside Dia 148 10 Length/s Pipe, Upvc, 32mm Outside Dia, Wt=2.0min, L=3.0m, Blue 149 1 Pc/s Gate Valve, 25mm Dia, Brass/bronze 150 1 Pc/s Check Valve, 25mm Dia, Brass/bronze 151 2 Pc/s Adaptor, Upvc, Male, 25mm Dia., Nominal Size, Blue 152 8 Length/s Pipe, Upvc, 50mm Outside Dia, Wt=2.30min, L=3.0m, Blue 153 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 90 Deg. Bend, Plain, Blue 154 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 45 Deg. Bend, Plain, Blue 155 2 Pc/s Adaptor, Upvc, Female, 50mm Outside Dia., Blue 156 3 Pc/s Gate Valve, 40mm Dia, Brass/bronze 157 5 Pc/s Check Valve, Horizontal Swing 40mm Dia, Brass/bronze 158 6 Length/s Pipe, Upvc, 50mm Outside Dia, Wt=2.30min, L=3.0m, Blue 159 2 Pc/s Tee, Upvc, 32mm Inside Dia, Blue 160 2 Pc/s Adaptor, Upvc, Female, 50mm Outside Dia., Blue 161 4 Pc/s Elbow, Upvc, 50mm Outside Dia X 90 Deg. Bend, Plain, Blue 162 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 45 Deg. Bend, Plain, Blue 163 4 Length/s Pipe, Pvc, 57.15mm Outside Dia X T=2.54mm X L=3.0m, S-1000, Orange 164 2 Pc/s Elbow, Pvc, 57.15mm Inside Dia X 90 Deg. Bend, S-1000, Orange 165 2 Pc/s Elbow, Pvc, 57.15mm Inside Dia X 45deg Bend, S-1000, Orange 166 8 Length/s Pipe, Pvc, 82.55mm Outside Dia X T=3.75mm X L=3.0m, S-1000, Orange 167 2 Pc/s Pvc Tee, Inside Dia: 82.55mm, S-1000, Orange 168 2 Pc/s Floor Drain, 150mm X 150mm Dia, Stainless 169 8 Length/s Pipe, Pvc, 107.10mm Outside Dia X T=3.81mm X L=3.0m, S-1000, Orange 170 2 Pc/s Elbow, Pvc, 107.10mm Inside Dia X 90 Deg. Bend, S-1000, Orange 171 2 Pc/s Pvc Elbow, Inside Dia: 107.10mm X 45 Deg Bend, S-1000, Orange 172 1 Pc/s Gate Valve, 100mm Dia, Brass/bronze 173 1 Pc/s Gate Valve, 80mm Dia, Brass/bronze, Threaded Type 174 3322.536611 Sq.ft. Brass Metal Etching Engraved Marker 175 5 Pc/s Hat, Hard, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Brown 176 20 Pc/s Hat, Hard, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Yellow 177 20 Pc/s Vest, Reflectorized, Safety, Orange 178 20 Pair/s Raincoat, Jacket W/ Hood & Pants, Size: X-large With Reflectorized Strips 179 15 Pc/s Plastic Road Barriers 180 20 Pc/s Spectacles, Safety Goggles, Clear 181 8 Pair/s Gloves, Welding Leathear Long, 16', Ce Certified En 12477 182 5 Roll/s Caution Tape, Yellow, 3" X 50' 183 5 Roll/s Danger Tape, Red, 3" X 50' 184 15 Pc/s Traffic Cones 28" Tall, 14" X 14" Base With Reflective Collars Lot No. Vi Road Stud Installation 137 1 Set/s Solar Road Stud Installation Machine, Equipped With Running Wheel, Accurate Hole Position With Good Hole Forming Quality, 5.0hp, 220v With 3900w 50/60hz, 570rmp; Height: 800mm; Weight: 200kgs; Pure Copper Self-priming Pump, Manual Electric Starter, Free Adjustment Depth And Bearing Seat Assembly Complete With Coring Bit And Other Accessories ** ** ** Nothing Follows ** ** ** Basis Of Evaluation Per Lot Bid Documents Shall Be Available At The Bac Office, New City Hall, Lgu Bayawan City Upon Payment Of Prescribed Non-refundable Fee In The Amount Of Php 5,000.00 Bidders Shall Drop Their Technical And Financial Proposals In The Bid Box At The Bac Office, Bayawan City On Or Before The Deadline Of Submission Of Bids As Shown Below. All Particulars Relative To Eligibility Process, Opening And Evaluation Of Bids, Postqualification And Award Of Contract Shall Be Governed By The Applicable Provisions Of Ra. 9184. The City Of Bayawan Reserves The Right To Reject Any Or All Bids, To Waive Any Defects Or Formality Therein And To Accept Bids Considered Responsive And Most Advantageous To The Government. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule Issuance Of Bid Documents January 10, 2025 To January 29, 2025 @ 5:00 Pm Pre-bid Conference January 16, 2025 @ 9:00 Am Deadline/opeing Of Bids January 30, 2025 @ 9:00 Am Post Qualification February 4, 2025 @ 9:00 Am Awarding Of Bids February 11, 2025 @ 9:00 Am Approved: (sgd)virginia D. Sadiasa City Civil Registrar Bac Chairman Received By: Name:___________________________ Date:___________________________ Geps Publication : Geps January 10, 2025 Newspaper : None
Closing Date30 Jan 2025
Tender AmountPHP 2.1 Million (USD 37.8 K)
Western Visayas Sanitarium Doh Tender
Healthcare and Medicine
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Department Of Health Western Visayas Sanitarium And General Hospital Santa Barbara, Iloilo Invitation To Bid For Supply, Delivery And Installation Of Various Hospital Equipment Ib No. 2024-12-018-g The Western Visayas Sanitarium, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors To Apply For Eligibility And To Bid For The Hereunder Project: Name Of Project : Supply, Delivery And Installation Of Various Hospital Equipment Location : Western Visayas Sanitarium And General Hospital, Inangayan, Santa Barbara, Iloilo Approved Budget For : Php 34,665,000.00 The Contract (abc) Fund Source : Caf No. 2024-133-gf Delivery Period : Within Ninety (90) Working Days After Receipt Of The Notice To Proceed Line Items Abc: Php 34,665,000.00 Lot 1 No. Description Unit Of Measure Quantity Approved Budget Cost (php) 1 Electrical Machine. Brand New. Product Specifications: Combination Of Electrotherapy And Ultrasound; With 3 Independent Channels And Body Diagram Installed; Power Supply: Ac 100- 240 V, Number Of Channels: 3 Independent (2 For Electrotherapy, 1 For Ultrasound) Electrotherapy; Ten& Ems, Ultrasound Functions; Electrode Pads For Tens & Ems; Us Probe Head: Large And Small. Warranty -1 Year From Delivery And Installation. Unit 1 290,000.00 2 Hand Dynanometer. Brand New. Product Specifications: Hydraulic Adjustable Handle. Strength Can Be Viewed In Pounds Or Kilogram. Can Measure Up To 90kg (200lbs.). Durable Metal Gauge. Warranty –at Least 6 Months Upon Delivery And Installation. Unit 1 55,000.00 3 Parallel Bars. Brand New. Product Specifications: Adjustable And Foldable. Stainless Steel Bars And Steel Base. Height Adjust Within 26''-40''. Width -24''-36". Length Ranges: 7-10 Feet. Warranty -at Least 6 Months Upon Delivery And Installation Unit 1 50,000.00 4 Pulley System. Brand New. Product Specifications: Single Handle/dual Tower. Chest And Floor Height Mounted Handle. Easily Adjustable Handles. Wheelchair Accessible. Warranty –at Least 1 Year Upon Delivery And Installation. Unit 1 150,000.00 5 Pbx, Smart Hybrid. Brand New. Product Specifications: Designed For Telemedicine Use. Genuine And High Quality Brand. Pabx Built-in Extensions 16 Analog. At Least 2 Card Slots And 2 Slots Trunk Extension Card Switch System. Ability To Equip Sub-frame Ns-320; 12-32 Trunk Extensions. Sub-frame To Extend Pbx Ns300. Port Connected To The Main Frame. Dimensions: 40-45 X 35-36 X 86-90 Cms. Warranty –at Least 6 Months From Delivery And Installation * Unit 1 100,000.00 6 Uninterrupted Power Supply. Brand New. Products Specifications: Designed For Telemedicine Operation. 3000va. Output Power Capacity-3000va, Mount: 3u Rack Mountable. Nominal Output Voltage -230v. Dimensions: 20-22 X 19-20 X 5-6 Inches. Warranty –at Least 6 Months Upon Delivery And Installation. * Unit 1 400,000.00 7 Medical Waste Shredder. Brand New. Product Specifications: 20hp Motor Slow-speed And High Torque Dual Shaft Shredders, 5/16″ Wide Cutters, With Bearing Protection And Cleaning Fitters. Features: Efficiently Shred Syringes, Face Masks, Boxed Medical Waste, Pill Bottles, Etc., Available With A Split Cutting Chamber That Allows For Two Different Shred Widths Within One Shredder, The Manner Of In Feed And Output Are Also Divided. Includes Training And Certification, Warranty 1 Year Upon Installation Unit 1 350,000.00 8 Portable Multi-parameter Analyzer Flow Water Quality Testing. Brand New. Product Specifications: Measures Water Quality Parameter For Ph/ec/ise/do/temp. Mv/orp/px/resistivity/tds/sal./do Saturation. Features: Portable Device, Color High Contrast Lcd Touchscreen, Data Storage1000 Sets For Each Parameter, Support For Usb Communication, Ip65 Waterproof, Includes All Necessary Accessories And Consumables, Includes Training And Certification For Use, Warranty For 1 Year Upon Installation Unit 1 200,000.00 9 Water Purification System. Brand New. Product Specifications: 6000 Gdp Reverse Osmosis Machine. Up To 1200 Containers Per Day. Double U.s. Membrane. 2 Tanks 1000ltrs. For Raw & Product Water. At Least 28 Stages Of Water Filtration. To Include Piping Line From Water Station To Specified Areas Within The Health Facility. To Include Necessary. Building/structure For The Water Station. Service Warranty 1 Year After Delivery And Installation. To Include Service And User Training. Including Consumables: 50 Gallons Round Containers, 50 Gallons Slim Containers, 1 Sack Industrial Salt. * Unit 1 350,000.00 10 Anesthesia Machine With Cardiac Monitor. Brand New. Product Specifications: Main Gas Supply -oxygen, Air. Pin Index Supply System: Oxygen, Air. Ventilatior: With At Least Six (6) Ventilation Modes. Machine Must Be Able To Ventilate Patient Using The Preset Settings Provided By The End-user Even Presence Of Driving Gas Is Temporarily Unavailable. Ventilator Must Be Enclosed With Metal Casing To Prevent Entry Of Foreign Items Including Fluid. Ceramic Type Of Inspiratory And Expiratory Valve. Ventilator Must Have High Pressure Valve That Ensures Release Of Excess Pressure When Required. Ventilator Must Be Functional When Machine Is Connected Either Through Direct Power Supply Or Back Up Battery. Breathing System: The Volume Of The Compact Breathing System And Co2 Absorber Must Be 1.7l Excluding Hoses And Breathing Bag. Volume Of Co2 Absorber Reusable Canister Must Be 1.5l. With Bypass Valve Located In Breathing System Allowing Continuous Machine Operation While Changing Co2 Absorber. With Fresh-gas Decoupling Valve That Prevents Direct Entry Of Pressure In The Patient Airway When Pressing The O2 Flush Button, Peep And Pressure Limitation. With Breathing System That Can Be Detached From The Main Unit Without Tools Required. Breathing System Should Be Separated From The Main Unit With Mounting That Can Be Positioned From Any Direction Without Moving The Entire Anesthesia Machine. With Ceramic Type Of Inspiratory And Expiratory Valve. With Sample Gas Return Port. With Pup Off Pressure Release Valve Located At The Apl Valve. With Moisture Reduction System. Hot Steam Sterilization Can Be Carried Out At 134 ° C (273.2 ° F). With Heated Breathing System. Anesthesia Gas Supply Module: Range Of Fresh Gas Flow Indicators: 0.0 To 12.0 L/min. O2 Flush (bypass): At 87 Psi (6 Kpa X 100): Max. 75 L/min At 41 Psi (2.8 Kpa X 100): Min. 25 L/min. With Metering Valve And Dual Flow Tubes For Fresh-gas. With Integrated O2 Monitoring Located In The Screen. Vaporizer: With Two (2) Selectatec Vaporizer Mounting. With One (1) Unit Sevoflurane And One (1) Unit Isoflurane Vaporizer. Vaporizer Must Have No Cloth Component Which Allows Item To Be Functional Immediately Even Transporting It In An Upside Down Position. Oxygen Sensor: With Oxygen Sensor That Measures Percentage Of Oxygen. Flow Sensor: With Constant Temperature Hot-wire Anemometer Flow Sensor. Must Be Located Within The Anesthesia Unit Distal To The Patient Area. Flow Sensor Must Be Reusable. Auxillary Low Flow Oxygen: With Integrated Low Flow Oxygen Supply For Mask And Nasal Cannula Application. Writing Table/drawers/mounting: With At Least 3 Drawers As Storage For Other Accessories. With A Retractable Writing Table That Can Hold At Least 10kgs. Advanced And Safety Features: Functional Even The Battery Is Completely Discharged, All Pneumatic Functions Continue To Be Available (apl Valve, Breathing Pressure Gauge, Cylinder And Pipeline Gauges, Fresh Gas And Agent Delivery, And O2, Air, Flow Meters).manual Or Spontaneous Ventilation Can Be Maintained During Power Failure And Discharged Of Battery. In Case Of No Power And Totally Discharged Battery, Machine Must Be Shifted Automatically From Ventilator Mode To Manual Mode Without Any Switch Or Button Required. Start-up Time Must Be Less Than 15 Seconds. Power Input Data: Power Supply: Rating Non-configurable 100 To 240 Vac, 50/60 Hz, 145 Va. Battery Operation Time: Up To 2 Hours, Minimum Of 45 Minutes. Parameters: Minimum Tidal Volume (vt) Required: 20 Ml. Breathing Frequency (rate): 4 To 60 Bpm (1/min). Inspiratory Pressure: Peep + 5 To 65 Cmh2o. Inspiratory Flow (inspflow): 10 To 75 L/min In Volume And Pressure Control Modes, 10 To 85 L/min In Pressure Support And Simv/ps Modes. Inspiration Pause: 0 To 50 %. Simv Inspiratory Time: 0.3 - 4.0 Sec. Positive End Expiratory Pressure: (peep) 0 To 20 Cmh2o. Inspiration/expiration Ratio: (ti:te) 4:1 To 1:4. Pressure Limiting: 70 Cmh2o. Range Of Fresh Gas Flow Indicators: 0.0 To 12.0 L/min. Pressure Support Level: Peep + 3 To 20 Cmh2o. Min. Frequency For Apnoe-ventilation: (freq. Min.) 3 To 20 Bpm And “off”. Trigger Level: 2 To 15 L/min. Standard Accessories: One (1) Unit O2 Regulator, One (1) Unit Air Regulator, O2, Air Fittings And Hose Clamps, One (1) Unit Adult Anesthesia Circuit With 2l Bag. Biolight M12 Patient Monitor (basic Configuration). Technical Specification: Display/waveforms: Screen Size Display: Not Less Than 12" Color Tft Screen. Screen Navigation: Touch Screen With Quick Volume And Brightness Adjustment. Support Quick Key, Able To Access Specific Functions Or Perform Operations Easily And Quickly. No. Of Waveforms: At Least 7 Waveforms (using Standard Screen Display). Battery: Internal Battery Duration Must Be: ≥ At Least 240 (built In Battery). Can Upgrade Lithium Battery, Battery Power Supply ≥480 Min. Ecg: Ecg Leads: 3/5 Leads, Display Sensitivity: ×0.25, ×0.5, ×1, ×2, ×4,auto Gain, Must Have A Smart Lead Off Feature, Must Have An Ecg Calibration Feature, Must Have An St Segment Analysis And Monitoring. Heart Rate Range Must Be: Adu: 10 To 300 Bpm, Ped/neo: 10 To 350 Bpm, Must Have Two (2) Hr Averaging Method. With Ecg Multi-lead Synchronous Analysis Function, Analysis Of Multiple Cardiac Leads At The Same Time, Can Be Accurately Monitored In The Case Of Individual Lead Interference, With Intelligent Lead Fall Monitoring Function. St-segment Analysis Can Show The St Graphic, Which Help Indicates The St Alarm Status More Faster. Nibp: Nibp Measurements Must Comply With The American National Standard For Electronic Or Automated Sphygmomanometers: - (ansi/aami/iso 81060-2:2009, Ansi/aami Sp10:2002) In Relation To Mean Error And Standard Deviation. Measurement Mode: Manual, Auto, Stat, And Sequence. Sequence Mode Could Support 5 Different Modes. Maximum Measuring Interval In Auto Mode Must. Must Have An Overpressure Protection For Nibp. Temperature: Must Have Dual-channel Body Temperature Monitoring With Difference Display Measurements. Must Support Skin And/or Oral/rectal. If More Than One Temperature Probe Is Used, The Monitor Will Be Capable Of Calculating And Displaying A Delta Reading. Measuring Range: 0~50 ℃. Spo2: Must Be Used In Low Pi (perfusion Index). Resp: Detection Method: Respiratory Rate And Respiratory Waveform Must Be Monitored By Pulse Wave. Trends: Trend Data For All Parameters In Tabular And Graphic Formats Must Be: 180h. Stored Nibp Measurements Must Be: Up To 2400 Groups. Stored Alarm Events Must Be: 3000 Groups And Associated Waveform. Holographic Waveform Must Be 72 Hours. Printer/recorder: Must Support 3-channel Recorder To Realize Thermal Printing; Support Network Printing Function. Network Capability: The Ip Address Of Each Patient Monitor Shall Be User Configurable. Features: -the Monitor Must Provide Electronic Early Warning Scor (ews, Glasgow Coma Scale (gcs), And Oxycrg Screen. -oxycrg Screen Shows Two Trend Curves And A Compression Waveform, Support To Review 48 Hours Trend Curve And Compression Waveform On The Oxycrg Review Screen. -accessories Storage Box, Help Manage Accessories And Prevent Accessories Missing Or Broken Problem. -user Shall Be Able To Freeze The Waveforms On The Screen And Then Review It To Carefully Observe The Patient During This Time. -up To 4 Timers Shall Be Able To Be Configured On Monitor Display To Count Up Or Down The Required Time In Minute And Second With Audio Alarm To Alert User. - The Monitor Shall Provide Following Specific Working Modes: Standby, Intubation, Night, Privacy, And Demo Modes. Accessories Included: 3/5 Lead Ecg Cable, 3/5 Lead Ecg Lead Wires, Adult Spo2 Sensor, Pediatric Spo2 Sensor, Temperature Probe Skin, Temperature Probe Oral/rectal, Nibp Cuff Adult, Nibp Cuff Pedia, Wall Mount / Trolley, One (1) Unit Pediatric Anesthesia Circuit With 1l Bag, Two (2) Units Power Adapter. Includes Avr Machine For Anesthesia Machine. Warranty -2 Years From Delivery, Installation, And Training/orientation. Unit 1 3,300,000.00 11 Cardiac Monitor With Capnograph. Brand New. Product Specifications: Display/waveforms: Screen Size Display: Not Less Than 12" Color Tft Screen. Screen Navigation: Touch Screen With Quickly Volume And Brightness Adjustment By Gestures Operate. Support Quick Key, Can Easily And Quickly Access Some Functions Or Perform Operations. No. Of Waveforms: At Least 7 Waveforms (using Standard Screen Display). Size Must Be: At Least 175mm X 320mm X262mm. With Auto Speech Recognition Module Implements The Voice Interaction With The Patient Monitor. Battery: Internal Battery Duration Must Be: ≥ At Least 240 (built In Battery). Can Up-grade Lithium Battery Power Supply ≥480min. Ecg: 5 Leads Display Sensitivity: ×0.25, ×0.5, ×1, ×2, ×4, Auto Gain. Must Have A Smart Lead Off Feature, Must Have An Ecg Calibration Feature, Must Have An St Segment Analysis And Monitoring. Heart Rate Range Must Be: Adu: 15 To 300 Bpm, Ped/neo: 10 To 350 Bpm. Must Have Two (2) Hr Averaging Method. With Ecg Multi-lead Synchronous Analysis Function, Analysis Of Multiple Cardiac Leads At The Same Time, Can Be Accurately Monitored In The Case Of Individual Lead Interference, With Intelligent Lead Fall Monitoring Function. St-segment Analysis Can Show The St Graphic, Which Help Indicates The St Alarm Status More Faster. Nibp: Nibp Measurements Must Comply With The American. National Standard For Electronic Or Automated. Sphygmomanometers: - (ansi/aami/iso 81060-2:2009, Ansi/aami. Sp10:2002) In Relation To Mean Error And Standard Deviation. Measurement Mode: Manual,auto, Stat, And Sequence,sequence Mode Could Support 5 Different Modes. Maximum Measuring Interval In Auto Mode Must. Must Have A Dual Overpressure Protection For Nibp. Temperature: Must Have Dual-channel Body Temperature Monitoring With Difference Display Measurements. Must Support Skin Or Oral If More Than One Temperature Probe Is Used, The Monitor Will Be Capable Of Calculating And Displaying A Delta Reading. Measuring Range: 0~50 ℃. Spo2: Must Be Used In Low Pi (perfusion Index). Resp: Detection Method: Respiratory Rate And Respiratory Waveform Must Be Monitored By Pulse Wave. Ibp: Support 2-channel Ibp Measurement Range: -50mmhg~+350mmhg. Types Of Measuring Blood Vessels: Arterial Pressure (art), Pulmonary Artery Pressure (pa), Central Venous Pressure (cvp), Right Atrial Pressure (rap), Left Atrial Pressure (lap), Intracranial Pressure (icp); Pulmonary Artery Wedge Pressure (pawp); Cerebral Perfusion Pressure (cpp). The Monitor Will Calculate The Ppv Based On Any Arterial Pressure Value Between Heartbeats. Etco2: Measuring Range: Etco 2 0 To 150 Mmhg. Fico: 3 To 50 Mmhg. Awrr: 0 To 150 Rpm (mainstream). Trends: Trend Data For All Parameters In Tabular And Graphic Formats Must Be: 180h. Stored Nibp Measurements Must Be: Up To 2400 Groups. Stored Alarm Events Must Be: 3000 Groups And Associated Waveform. Holographic Waveform Must Be 72 Hours Printer/recorder: Must Support 3-channel Recorder To Realize Thermal Printing; Support Network Printing Function Network Capability: The Ip Address Of Each Patient Monitor Shall Be User Configurable. The Upper/lower Limits Of Alarms Can Be Configured Via Networking From The Central. The Alarms At Bedside Can Be Paused Or Muted Via Networking From The Central. Features: -the Monitor Must Provide Electronic Early Warning Scor (ews), Glasgow Coma Scale (gcs ), And Oxycrg Screen. -oxycrg Screen Shows Two Trend Curves And A Compression Waveform, Support To Review 48 Hours Trend Curve And Compression Waveform On The Oxycrg Review Screen -accessories Storage Box, Help Manage Accessories And Prevent Accessories Missing Or Broken Problem -all-in-one Monitoring Adult, Children, And Newborn Patients. -user Shall Be Able To Freeze The Waveforms On The Screen And Then Review It To Carefully Observe The Patient During This Time. -up To 4 Timers Shall Be Able To Be Configured On Monitor Display To Count Up Or Down The Required Time In Minute And Second With Audio Alarm To Alert User. - The Monitor Shall Provide Following Specific Working Modes: Standby, Intubation, Night, Privacy, And Demo Modes. Warranty -1 Year From Delivery And Installation. Unit 2 500,000.00 12 Ceasarian Instrument Set. Brand New. Product Specifications: Made Of Heavy Duty Stainless Steel. Includes The Following Items: 1 Pc. Scalpel Handle #3 With Measure 125mm, 1 Pc. Scalpel Handle #4 135mm, 1 Pc. Tc Metzenbaum Scissors Cvd 180mm, 1 Pc. Lexer Scissors Narr Str 165mm, 1 Pc. Mayo-lexer Scissors Cvd 165mm, 1 Pc. Lister Bandage Scissors Hvy 180mm, 1 Pc. Standard Forceps Serr 160mm, 1 Pc. Standard Tissue Forceps 1x2 160mm, 5 Pcs. Lorna Towel Clamp Non-perf 130mm, 6 Pcs. Halsted-mosquito Forceps Delstr125mm, 6 Pcs. Halsted-mosquito Forceps Del Cvd125mm, 2 Pcs. Kelly Forceps Del Str 140mm, 6 Pcs Moynihan Hemostatic Forceps, Crv, 150mm, 1 Pc. Tc Mayo-hegar Ndlholderhvyserr150mm, 1 Pc. Tc Hegar Needle Holder Hvy-serr 205mm, 1 Pc. Us-army Retrac.26x15/43x15-23x15/40x15, 1 Pc. Richardson-eastman Bt471rbt472r, 6 Pcs. Boys-allis Forceps 5x6 155mm, 2 Pcs. Kidney Tray Stainless Steel 250mm, 1 Pc. Bottom For 3/4 Container Height:135 Mm, 1 Pc. Primeline Pro 3/4 Lid Red, 1 Pc. 3/4 Size Perf Basket 406x253x76mm, 1 Pc. Silicone Basket Liner 3/4 Size, 1 Pc.mayo Safety Pin F/ring-hdl Inst 140mm, 1 Pc. Ident. Label Up To 13 Letters Red. Warranty –at Least Eat 1 Year From Delivery. Set 2 1,520,000.00 13 Chemical Analyzer. Brand New. Product Specifications: Combined Instrument With Two Complementary Technologies: Raman Spectroscopy And Colorimetric Detection Confirmatory Testing: One Instrument Capable Of Confirmatory Testing Using Two Technologies Including 1) Swgdrug Category A Technique For Presumptive Testing, And 2) Swgdrug Category C Technique For Confirmatory Testing Safety Of Features For Measuring Energetic Samples: Trace Detection Testing For Energetics Without Need For Opening The Container Nor Inducing Laser Light To The Sample, Scan Delay Timer: 15 Sec – 10 Min Sample Size: Able To Detect / Identify Samples From 1 Microgram Traces To Large Bulk Samples Materials Covered: Common Raman Substances, Explosives, Narcotics, Cwas, Tics, Tims, Precursors, Common Chemicals, Fluorescent Materials Not Covered By 785nm Raman: E.g. Colored Materials, Heroin, Colored Mdma Pills, Oils, Npss, Etc., Low Concentration Materials Not Covered By Any Raman Instruments: Lsd, Thc, Magic Mushrooms, Gunpowder, Etc. Raman Excitation Wavelength: 1064nm Minimizes Fluorescence Effects: Allows For Direct Analysis Of Colored/impure Chemicals Through Colored Packaging. Spectral Wavelength Range 200 – 2500 Cm-1 Portability Power: Small Handheld Device, Optimized For One Handed Operation. , 18.5cm-20cm (l) X 15cm-20cm (w) X 7.9cm-10cm (h), 3.65lbs-5lbs (1.65 Kg-2.27kg)., Quantity 2 Lithium Ion Rechargeable Batteries With Battery Life Of More Than 6 Hours Per Charge Per Battery. Cr123a Rechargable Batteries Can Be Used. Including Spare 2 Lithium-ion Battery. Ruggedness Decontamination: Us Mil-std 810g Designed Rugged., Ip 68 Rated For Use In Varying Environmental Conditions And For Complete Decontamination. Operational Temperature Range: Unit Can Be Operated In -20°c To +50°c Temperatures., Withstands Temperature Fluctuations And Humidity Fluctuations. Rapid Start-up Rapid Results: 60 Seconds From Power On To Analysis., Analysis Results In Less Than One Minute. Operational Mode Options: Raman Analysis And Colorimetric Analysis Oraman: • Auto-collect Adjusts Raman Settings Automatically Optimizes Use For Routine Operations • Advanced User Adjustable Raman Settings For Advanced Operators And Custom Library Build: • Laser Power Level 30-490 Mw Adjustable In 5 Mw Increments Exposure Time 5ms To 30s In Increments • Custom Applications Optimize Raman Analysis Parameters Specific To Material Type Ocolorimetrics: • Pouches Including Both Swipes And Colorimetric Chemicals In One Pouch • Pouches For Explosives And Narcotics • General Pouches For Detecting A Wide Range Of Explosives Or Narcotics • Specific Pouches For One Explosive/narcotic Substance Or Substance Group Easy Raman Operation: • Scans In Direct Contact And Through Translucent Plastic Or Glass Containers. • Universal Sample Holder For Analysis Of Samples In Varying Forms And Packaging. • Smartphone Like Touch-screen Interface Or Large Button Activation. • User Prompted Step-by-step Onscreen Analysis Activation. • Typically, 4 Button Presses To Receive Analysis Result. • Onboard System Status Monitoring And Calibration. Reduces Down-time And Necessity For Re-calibration At A Service Depot Analytical Performance: • Liquids, Solids, Powders, Pastes, Gels, Invisible Traces. • Colored Substances And Substances Found In Colored Translucent Packaging. These Types Of Substances Are Most Often Encountered In Real-world Samples. • Comparative Spectral Analysis Overlay Easily Performed Onboard. • User Adjustable Focus Ensures Analysis Of Material And Not The Packaging. • 4c Software Automatically Monitors Results For Combinations Of Precursors Used In Threat, Drug Manufacturing, And Other Recipes. Users Receive Onscreen Alert To Potential Threat Or Clandestine Drug Manufacturing Activity. Library: Raman: • Over 12,000 Substances. • Resq Library Includes The Latest Explosives, Precursors, Cwas, Tics/tims, Narcotics And Psychotropic Drugs, Steroids, Cutting Agents, Pharmaceuticals, Diluents And Pesticides. • Easily Expandable To Add Emerging Threats And Other Substances. • Fleet Management And Library Transfer To Units In The Field. • 4c Library With Explosive, Drug Manufacturing And Other Types Of Threat Manufacturing Recipes. • Library Updates Provided More Than Once A Year Colorimetrics: • General Narcotics Pouches: Multi Drug Test Incl. Fentanyl, Special Opiate Pouch, Cannabinoids • General Explosives Pouches: Chlorates/perchlorates, General Explosives • Specific Pouches: Cocaine, Ephedrine, Heroin, Ketamine, Lsd, Meth/mdma, Mushrooms, Opiates, Pcp, Thc, Ghb Evidence Documentation Traceability: • Onboard 5mp Camera Captures Image Of Sample And Surroundings, As Well As Colorimetric Swab. • Image(s) Stored Along With Analysis Results In Tamper-resistant File. All Analysis Results Are Traceable And Include Unique Date, Time And Serial Number Stamp. • Ability To Activate Password Protect Operator Log-in. Record Of User Associated Activity Stored Onboard And Cannot Be Deleted. Data Access And Transfer Reporting: • View Results In Real Time On Cell Phone Or Tablet, Computer Or Laptop (pc, Ios, Android, Linux) Via Wifi (can Be Disabled). • Exportable Data In Numerous File Formats. • Data Access And Transfer On Computer Or Laptop Via Usb And Wifi (can Be Disabled). • Easy Report Generation. Customer Support Package: • 24/7/ 365 Days Reachback Service For The Life Of The Unit. • Library Updates Provided For The Life Of The Unit. • Software Updates Provided For The Life Of The Unit. • Support: Online, Phone, Email, And In Some Cases Text Message For The Life Of The Unit Cql Complete Package: • Rugged Shipping Case With Custom Foam Insert. • Qty 2 Rechargeable Lithium-ion Batteries. • Cr123a Battery Cartridge (does Not Include Cr123a Batteries). • External Battery Charger. • Ac Power Supply. • Adjustable Base Adaptor. • Universal Sample Holder. • Certified Benzonitrile Performance Verification And Calibration Standard. • Flash Drive Containing User Manual And Supporting Documentation. • Quick Start Guide. • Usb-c To Usb-a Data Transfer Cable. • 1064nm Laser Test Card. • Including Hand Strap And Wrist Strap. . Training: • Comprehensive Onsite Training For An Unlimited Number Of Users. Add-on Accessories And Software: • Periscope Adaptor. • Vial Holder. • Bottle Adaptor. • Integrated Quickdetect Automated Colorimetrics • Detect Trace Quantities Of Non-visible Residues Left On Surfaces: • Explosives And Explosive Precursors • Narcotics Standard Requirements: • Bidder’s Certificate That Will Provide Manual In English Language (2 Copies Of Operator's/user's Manual And 2 Copies Of Service/technical And Maintenance Manual) Upon Delivery. • Brochure/sales Literature. Training Requirements: • Bidder’s Certificate That Will Conduct Free Technical Training And Product Demo For The End-user/s And In-house Biomed On Equipment Operation And On Maintenance Of Equipment. • After Sales Service: Bidder’s Certificate That Parts Shall Be Available At The Authorized Philippine Service Center/s For A Period Of Five (5) Years After The Warranty Period. • Certification From Local Distributor On The Availability Of Service Technicians And/or Biomedical Engineers In Case Of Equipment Breakdown. Preventive Maintenance - • Bidder’s Certificate Free Quarterly Preventive Maintenance During The Warranty Period With Preventive Maintenance Plan. Warranty Certificate: • Warranty Certificate Minimum Of Five (5) Years For Service And Three (3) Years For Parts. The Warranty Period Shall Commence From The Date Of Acceptance By The End-user After Testing And Commissioning. • Calibration: With Certificate Of Calibration Upon Delivery. The Bidder Must Be Iso 9001 And The Manufacturer Should Be Iso 13485 Certified Unit 1 6,900,000.00 14 Common Bile Duct Exploration Supplement Set. Brand New. Product Specifications: Made Of Heavy Duty Stainless Steel. Includes The Following Items: 1 Pc. Randall Kidney-stone Frcpsslt-cvd225mm, 1 Pc. Randall Kidney-stone Forceps Cvd225mm, 1 Pc. Randall Kidney-stone Frcpshvy-cvd225mm, 1 Pc. Randall Kidney-stone Frcps U-cvd225mm, 1 Pc. Bakes Bile-duct Dilator 1mm, Bakes Bile-duct Dilator 2mm, 1 Pc. Bakes Bile-duct Dilator 3mm, 1 Pc. Bakes Bile-duct Dilator 4mm, 1 Pc. Bakes Bile-duct Dilator 5mm, 1 Pc. Bakes Bile-duct Dilator 6mm, 1 Pc. Bakes Bile-duct Dilator 7mm, 1 Pc. Bakes Bile-duct Dilator 8mm, 1 Pc. Bakes Bile-duct Dilator 9mm, 1 Pc. Bakes Bile-duct Dilator 1mm, 1 Pc. Randall Kidney-stone Forcepscvd190mm, 1 Pc. Randall Kidney-stone Fcpshvy-cvd190mm, 1 Pc. Bottom For 1/2 Container Height:135mm, 1 Pc. Prime Line Pro 1/2 Lid Green, 1 Pc. 1/2 Size Perf Basket 243x253x76mm, 1 Pc. Identification Label Green. Set 1 590,000.00 15 Defibrillator. Brand New. Product Specifications: General Features: 7-10 Inch Lcd Display, Maximum Of 3 Waveforms. High Contrast Display Mode For Bright Environments. Ambulance-ready, Rugged Casting: Ip44, Impact Test Of 0.75m. Output Energy: 1-360j. Charge Times Of <3s T O200j, <7s To 360j. Auto-volt With Smart Charging. Lithium-ion Battery Supports To 6 Hours Monitoring/200 Shocks @360j/ 4.5 Hours Pacing, With Built-in Led Power Level Indicator. Lightweight At 4-5kg., Full Configuration, Main Unit. Automatically Switch Defibrillator Energy, Cpr Prompts, And Alarm Limits Depending On Patient Type. Display Ecg During Aed Mode. Ecg Recovery Within 2.5s Or Less. Contact Status Can Be Checked Through Paddle And Monitor, Impedance Value Can Be Checked In Monitor. Auto-testing Includes Maximum Energy Discharge Test. Parameters: 3/5 Lead Ecg, Pacer. Includes: Thermal Recorder, External Paddle Kits, Ecg Cable And Lead Wires, Ecg Electrode, Multifunction Electrode Pad. Printer Paper, Electrode Gel, Power Cord, Lithium-ion Battery. Unit 5 1,500,000.00 16 Dish Sterilizer. Brand New. Product Specifications: − High Light Led Display, − With Special Boiler Temperature Drainage Settings, − Washing (non-recycling) Parameters Can Be Set Free And With Control Memory Function, − Can Meet Different Washing Demand, − Self - Research Internal Water Softener, − Double Construction Design For Top Cover, − Power: 380v/50hz, − Basket Dimension : 500x500mm, − Washing Ability : At Least 60 Basket / H, − Rinse Water Quantity : 3 L/h, − Inlet Height :400-430mm, − Machine Dimension : 800-850x800-820x1450-1500mm, − Rated Power : 14.75kw, − Gross Weight : 140-150, − Net Weight : 100-110, − Packing Size : 890-900x900-910x1630-1700mm. Warranty Period- Within 1 Year Upon Delivery And Installation To Cover Parts (excluding Wearable Parts) And Service With Preventive Maintenance Every 6 Months Within 2 Years Period. Provides Orientation And Training To End-user Representative.* Unit 1 500,000.00 17 Electrocardiography Machine (ecg) Brand New. Product Specifications. High Resolution Lcd Touch Screen, 320-330x240-250vivid Waveform Display. 12 Leads Ecg Resolution Thermal Printer. Built-in Rechargeable Li-ion Battery, Ac/dc Power Supply. Anti-defibrillator And Pace Maker Detection. Complete Digital Filtering, Resisting Baseline Drift, Automatic Baseline Adjustment. Automatic Ecg Measurement And Interpretation. Large Patient Data Storage; 150 Cases, Equipped With Usb Port For Data Transfer. Three (30 Printing Formats (auto, Manual And Rhythm) Selectable. 1/2/3 Channel Ecg Waveform And Rhythm Leads Record Out. Lead Status Diagram Display. Unit 4 200,000.00 18 Electrosurgical Dessicator Machine. Brand New. Product Specifications: Use For Removal Of Lesions, Warts, Skin Tags, And Other Blemishes Easily With Minimally-invasive Treatment. For Superficial Treatments, Safe To Use Around The Eye And Nose Area. Includes Re-usable Pen And Tips. Unit Specifications: Depth:4-5 Inches, Width:8-9 Inches, Height:7-8 Inches, Weight:6-8 Pounds, Output Power -low At 0-20watts (1/10 Watt Increments Up To 10 Watts), High At 0-35 Watts, Bipolar: 0-35 Watts. Offers Hand-or-foot Activated Operation. Autoclavable, Reusable Hand Control Pencil With Power Adjustment Buttons. Pencils Are Designed With Non-spinning Hex Collar For Multi-positional Fall-safe Blade Locking. Equipped With Mobile Stand. Includes Consumables.warranty-6 Months From Delivery And Installation. Set 1 100,000.00 19 Fetal Maternal Monitoring System: Brand New. Product Specifications: Foldable Screen. Probe Rack And Wall Mounting Rack. Handle For Easy Carrying. User-friendly Gui With 3 Display Modes. Four (4) Optional Color Background. Capable Of 24 Hours Ctg Storage. Fast Print For Store Traces. "smart Notes" Annotation. Signals Overlap Verification. Real-time And Offline Data Transmission To Pc. 10-12 Inch Color Touch Screen. Excellent Algorithm. 12-crystal And 1 Mhz Water-proof Transducer For Accurate Detection. Configuration: Dual-fhr, Toco, Fm, Afm, Mecg, Nibp, Mspo2, Temp. Includes: 3 Each Belt, 1 Each Event Marker, 1 Bottle Ultrasound Gel, 1 Ea. Fhr Transducer, Purple, 1 Each Transducer, Yellow, 1 Each Spo2 Sensor, Adult, 1 Each Temperature Probe, Skin, 1 Each Toco Probe, 1 Each Nibp Cuff, Adult, 1 Each Nibp Tube, Adult. Unit 3 1,110,000.00 20 Infusion Pump. Brand New. Product Specifications: Mechanism: Peristaltic Pump, Operating Mode: Flow Rate Mode, Drip Rate Mode(optional), Preset Volume: 1-9999 Ml, Flow Rate Range: 1 – 600 Ml/h, Increment: 1, 10, 100 (ml/h), Accuracy: ± 5%, Kvo Rate: 1 Ml/h, Bolus Rate: 600 Ml/h, Drop Rate Range: 1 – 400 Drop/min With Optional Drip Sensor, Screen: 2.7 Inches B/w Lcd, Information: Flow Rate, Preset Volume, Accumulated Infusion Volume, Completion, Occlusion, Air Bubble, Bed No, Ac Power Indicator, Battery Capacity, Battery Charge Indicator, Iv Set, Etc., Status Indicator: Stop, Run, Bolus, Kvo, Alarm Type: Air Bubble, Finish, Occlusion, No Ac Power, Low Battery, Battery Empty, Reminder To Operate, Communication Error (err1), Operation Error (err2), Drops Error (err3), Handle Open (err4), Air Bubble Level: 1-3 Levels Adjustable, Universal Compatibility, Turn On/off, Occlusion Alarm Pressure Range: 3 Levels: 60kpa, 100kpa, 140kpa (±20kpa), Battery Type: Lithium Polymer, Battery Life: Up To 4 Hours Continuous Operation 25 Ml/h Flow Rate, With Delivery And Installation, Provision Of Trainings Of Staff With Certificates, And Manual. Unit 4 320,000.00 21 Laboratory Oven. Brand New. Product Specifications: Working Temperature Range At Least 5 Above Ambient Temperature To +300 °c; Setting Accuracy Temperature Up To 99.9 °c: 0.1 / From 100 °c: 0.5; Setting Temperature Range +20 To +300°c; Temperature Sensor 1 Pt100 Sensor Din Class A In 4-wire-circuit. Control Cockpit Single Display. Adaptive Multifunctional Digital Pid-microprocessor Controller With High-definition Tft-colour Display; Timer Digital Backwards Counter With Target Time Setting, Adjustable From 1 Minute To 99 Days; Adjustable Parameters: Temperature (celsius Or Fahrenheit), Air Flap Position, Programme Time; Ventilation: Natural Convection, Vent Connection With Restrictor Flap; Works Calibration Certificate : Calibration At +160°c; Door Fully Insulated Stainless Steel Door With 2-point Locking (compression Door Lock); Internals 1 Stainless Steel Grid(s), Electro Polished; Stainless Steel Interior; Interior Easy-to-clean Interior, Made Of Stainless Steel, Reinforced By Deep Drawn Ribbing With Integrated And Protected Large-area Heating On Four Sides; Volume 32 L; Dimensions W(a) X H(b) X D(c): 400 X 320 X 250 Mm; Max. Number Of Internals: 3; Max. Loading Of Chamber 60 Kg; Max. Loading Per Internal 20 Kg; With Free Power Back-up System, With Free Installation And Demonstration. Unit 1 130,000.00 22 Newborn Hearing Screening Test Equipment. Brand New. Product Specifications: • Capable Of Screening And Diagnostic Testing With Te And / Or Dpoae. • Fast Automatic Test With Pass / Refer And Graphical Test Result Display. • Direct Evaluation Via Value And Bar Diagram. • Up To 12 Frequencies Displayed Within The Device, Dp Up To 12 Khz. • 5 Dp / 2 Te Protocols With User Customizable Parameters (diagnostic Version). • High Noise Immunity For Operation In Normal Clinical Environment. • Lightweight, Small Ear Probe. • Environmentally Friendly Due To Long Life, Rechargeable Battery. • Bluetooth Communication To Optional Printer And Pc • Evaluation Of Results In Pc. Screener With At Least 4 Frequency Dpoae Testing Protocols. • Qualified Protocols Built Into The Device. • 4 Dpoae Test Frequencies Reported. • Integration To State Tracking Systems, Hi-track Or Oz. Diagnostic With Up To 12 Frequency Dpoae Testing Protocols. • 1.5 To 12 Khz Frequency Range With Up To 12 Test Frequencies Reported. • Customizable Test Protocols Teoae Available As An Upgradeable Option. Measurement Type: Distortion Product Otoacoustic Emissions (dpoae) Transient Evoked Otoacoustic Emissions (teoae). Frequency Range: Screener Version: Dpoae: 2.0 Khz To 5.0 Khz Teoae: 1.5 Khz To 4.0 Khz. Diagnostic Version: Dpoae: 1.5 Khz To 12.0 Khz Teoae: 0.7 Khz To 4.0 Khz. Stimulus Intensity Range: Dpoae: 40 Db Spl To 70 Db Spl Teoae: 83 Db Spl Peak Equivalent (±3 Db). Microphone System Noise: -20 Db Spl @ 2 Khz (1 Hz Bandwidth)/ -13 Db Spl @ 1 Khz (1 Hz Bandwidth). Dimensions And Weight (unit): 2.5 To 3” W X 1.2 To 1.8” D X 5.5 To 6.5” H 6.2 To 6.8 Oz. Power Supply: Lithium-ion Rechargeable. Battery Life: 1000 Tests Per Charge, Minimum 15 Hours On-time. Connectors/ Communications: Integrated Usb Communication Capability For Battery Charging And Communication With Pc-based Database Programs Or An Optional Printer. Hdmi Connector For Connection To The Micro-probe. Integrated Bluetooth Class 2 + Edr With Spp. Protocol For Communication With Optional Printer. Standard Accessories: Micro-probe, Box Of Single Use Ear Tip And Ear Tip Remover, Package Of Probe Tubes, Micro-usb Power Supply For Charging Lithium Ion-battery, Pc Database Software With Manual, Micro B To A Usb Cable For Pc Communicator/charging, Protective Carrying Case, Data Management Tool That Provides The Ability To Transfer Patient. Oae Test Data From The Testing Device To A Pc For The Purposes Of Viewing, Archiving, Managing And Printing Oae Reports. Using The Database Also Gives You The Means To Create Letter Sized, Detailed Reports That Can Be Easily Filed Or Faxed. You Can Also Create A “paperless” Office By Saving The Test Results As A Pdf For Electronic Filing Or Email. Dpoae: 40 Db Spl To 70 Db Spl Teoae: 83 Db Spl Peak Equivalent (±3 Db). Includes Ups. Warranty –at Least 1 Year After Delivery And Installation. Unit 1 1,000,000.00 23 Operating Room Lights. Brand New. Product Specifications: Dual Head- Ceiling Type. Major Operating Room Light Multi-color. Merging Of Light Fields, Light Intensity Control. Comfortable Display Of Key-pad On Major Lighting Head. Back Light Key Pad Display. Depth And Merging Light Field Should Be Operated At The Sterilizable Handle. Cool Light Temperature Increasing In Head Area: 0.5 ºc. 360° Continuous Rotation Around All Major Joints. Anti-bacterial Coating Head. - Light Head Diameter: 66cm. Ideal Laminar Flow Ceiling System. With Endo Mode: Must Be Color Green Light. Main Light Head. Electronic Light Intensity Control At Lamp Head. - Light Intensity At 1 Meter Distance: 160,000 Lux. Colour Rendering Index Ra At Kelvin: 98 (for Better Quality Image Of Skin, Blood And Tissues). Colour Rendering Index R9 At Kelvin: 99 (for Better Quality Image Of Skin, Blood And Tissues). Focusable Light Field Size: 19-30 Cm. Colour Temperature: 3,750, 4,000, 4,250, 4,500, 4,750 K. - Adjusting The Shadow Activating Via The Touch Panel. - Maximum Of Four Groups Of Lenses Are Dimmed Simultaneously. Shadow Management System. Number Of Led’s: 99 On Lamp Head. Life Span Of Leds: > 60,000 H. Working Distance: 70-160 Cm. Light Intensity Control (standard): 5% - 100%. Outstanding Depth Illumination: 70, 100, 130 Cm. Laser Pointer On Head (main Light Head Only). Lf-index Leenemann: 26. Lf-index Oostlander: 28. Input Voltage: Single Phase 110 ~ 230 Vac Free Volt. Total Power Consumption: 82 - 92watts. Adjustable Brakes At The Horizontal Arm. Light Head Weights: 18.5 Kg. Protection Type Lamp Head: Iec60529. - Aluminum Housing. Satellite Head. Electronic Light Intensity Control At Lamp Head. - Light Intensity At 1 Meter Distance: 140,000 Lux. Colour Rendering Index Ra At Kelvin: 98 (for Better Quality Image Of Skin, Blood And Tissues). Colour Rendering Index R9 At Kelvin: 99 (for Better Quality Image Of Skin, Blood And Tissues). Focusable Light Field Size: 18-30 Cm. Colour Temperature: 3,750, 4,000, 4,250, 4,500, 4,750 K. Number Of Led’s: 69 On Lamp Head. Life Span Of Leds: > 60,000 H. Working Distance: 70-160 Cm. Light Intensity Control (standard): 5% - 100%. Outstanding Depth Illumination: 70, 100, 130 Cm. Input Voltage: Single Phase 110 ~ 230 Vac Free Volt. Total Power Consumption: 82-92 Watts. Adjustable Brakes At The Horizontal Arm. Light Head Weights: 17.9 Kg Minimum. - Aluminum Housing. Protection Type Lamp Head: Iec60529. Standard Accessories: - Sterilized Handle: 2 Pcs/ Lamp Head, - Ceiling Anchorage Ring With Screws, - Spring Arm, - Ceiling Cover, Including Installation Of Brackets To Embed Overhead Ceiling- User Manual, - Ups. Warranty Of Two (2) Years For Parts And Labor With Free Preventive Maintenance Every Quarter Within Warranty Period Five (5) Years Warranty For Led Bulb Only. Unit 1 2,500,000.00 24 Operating Room Table (motorized). Brand New. Product Specifications: Total Length: 2000-2100 Mm. Width Including Side Rails: 600-630 Mm. Mattress Width: 550-570 Mm. Total Weight: 200-210 Kg. Safe Working Load (swl): Up To 250 Kg. Height Adjustment Range: From 595 Up To 1005 Mm. Castors: Four Ø 120-125 Mm Central Locking Twin Castors. Head Section: -58° ... +37°, 135 Mm. Back Section: -10° ... +70°. Leg Section: -80° ... +10°. Lateral Tilt: 20° / 20°. Trendelenburg/anti-trendelenburg: 30° / 20°. Sliding Tabletop For C-arm Function: 300-320 Mm. Flex / Reflex: 220° / 120°. Electrical System: 24 Vdc, Battery Operated, 100 - 240 Vac, 50/60 Hz. Controls: Hand Control And Integrated Control Panel On The Column. Memory Positions: Four Programmable Positions. Visco-elastic Mattresses. Radio Lucent Tabletop For X-ray. Accessories For General Surgery: 1. Arm Rest, 2. Anesthesia Frame With Clamp And, 3. Attachment Clamp. Transport And Storage Conditions: Temperature 7 10° C + 50° C. Relative Humidity 10 %, 85 %. Air Pressure 700 Hpa, 1060 Hpa. Operating Condition: Temperature +10° C, + 40° C. Relative Humidity 30 %, 75 %. Air Pressure 700 Hpa 1060 Hpa. Side Rail Accessories: 25 X 10mm. Warranty-1 Year From Delivery And Installation. Certificate Of Parts Available In The Next 5 Years. Includes Training To End-user. Includes Product Manual. Unit 2 5,500,000.00 25 Radiant Warmer With Phototherapy Units. Brand New. Product Specifications: Fixed Height Radiant Warmer, Mounted On A Column. The Unit Is Supported By A T-shaped Sturdy And Stable Wheeled Base. Bases Is Provided With A Minimum Three (3) Anti-static Swivel Casters. At Least Two (2) Of The Casters Are Equipped With Brakes. The Base Is Equipped With A Side Handle/rail For Easy Positioning. The Design Of The Base Is Suitable To Be Fitted Over Standard Cradles, Cribs, And Bassinets. Overhead Radiant Heater At A Fixed Height Of 1.80-2.0m. Radiant Heating Is Achieved By Quartz/ceramic Elements, Placed In A Parabolic Reflector. The Radiator Is Equipped With A Safety Grid. The Unit Support Three (3) Modes: Pre-heating, Manual And Servo Mode. The Unit Allows For Instant Switching Been The Different Operating Modes. The Minimum Skin Temperature Setting Range Is 32°c To 37°c. The Resolution Of The Temperature Is: ± 0.5°c Or Better. In Manual And Pre-heating Modes Heating Settings Allow For A Range Of 0 – 100%. Led Spotlight(s) For Examination Are Integrated In The Overhead Radiant Heater, The Angle Of The Overhead Light Is Adjustable. Warm-up Time < 30 Min To 25°c. Power Requirements: 1 Ph, 100 - 240 Volts - 50/60 Hz 900 To 1300va (with Ups And Avr). Display Features: The Display Panel Is Integrated In The Column For Visualizing Working Parameters And Alarms. The Display Indicates: - The Current Active Mode: Pre-heating, Manual Or Servo, - The Current Heating Power In Percentages, - The Current Pre-set Temperature, - The Current Actual Skin Temperature, - The Current Air Temperature. The Unit Is Equipped With A Self-check Feature. Alarm And Safety Features: Alarms Are Audible And Visible. Alarms Indicating: - Sensor Disconnection Or Malfunction. - Power Failure. - Skin Temperature, After Stabilizing, Varying Beyond 0.5° To 1°c From Set-point. - 10 To 15 Minutes After Manual Mode Has Been Engaged An Audible Alarm Will Sound. In Addition, The Unit Will Either Reduce Or Cut The Power To The Heater. In Skin Mode, When The Temperature Exceeds 39°c, The Unit Will Cut The Power To The Heater. Supplied With: Instructions For Assembly, Use And Maintenance In English: 1 X Installed And 2 X Spare Reusable Skin Temperature Sensors, Including Connection Cable And Plug. 1 X Spare Quartz/ceramic Heating Element Or The Same With Installed Heating Element. 2 X Spare Examination Light Bulbs. 1 X Set Of Spare Fuses, If Applicable. Accessories: A Durable Light Weight Cradle/crib And Mattress. Oxygen Regulator Including A Pressure Gauge, Flow Meter, Humidifier Bottle And All Required Tubing. Integrated Weighing Scale. Electrically Operated, Slow Suction Unit Including A Vacuum Regulator, Vacuum Gauge And Autoclavable Collection Jar. Electrical Height Adjustment. T-piece Resuscitator. Integrated Phototherapy Unit. Led Phototherapy Unit 36cm: 620-2800μw/c㎡. Led Phototherapy Unit 50cm: 400-1620μw/c㎡. Estimated Life Span: Eight Years. Includes Avr. Unit 3 600,000.00 26 Refrigerator (biological). Brand New. Product Specifications: External Dimension: W = 700-750 Mm D = 730-750 Mm H = 2000-2100 Mm. Inside Dimension: Useful Space On Top W = 600-620 Mm D = 550-570 Mm H = 500-550 Mm. Useful Space At The Bottom W = 590-610 Mm D = 540-560 Mm H = 500-550 Mm. Capacity: 600 L Temperature Range: Top 2°c To 20°c Bottom 2°c To 20°c. Optional: Other Temperature Ranges. Housing Galvanized Sheet Steel With High Quality White Coating, Antibacterial Coated. With 4 Feet, Height Adjustable. Optional: Set Of 4 Casters, 2 With Brakes. Interior Space Inner Case Of Galvanized Sheet Steel With High Quality White Coating, Antibacterial Coated. Cleaning Friendly By Rounded Corners, Slippery Surface In The Interior, Meets Highest Hygiene Requirements Insulation High Density Foamed-in-place Polyurethane, With A Thickness Of 60 Mm. Cfc-free. Circulation Air Cooling For Rapid And Uniform Temperature Control, Reducing Temperature Gradients To A Minimum. When The Door Is ""open"" The Circulating Fan Is Switched Off Automatically By A Micro Switch In Order To Prevent Warmer Ambient Air Being Drawn In. Door 2 Pcs. Three-layer Thermally Insulating Glass Door (arranged On Above The Other), Supplied As Standard With Right Hand Hinge, Also Available With Left Hand Hinge At No Extra Cost. Grease Resistant Magnetic Seal. Optional: With Door Lock. Interior Fittings 4 Pcs. Grating-type Shelves (dim.: 530x550 Mm), White Coated. Interior Lighting With Automatic On/off Micro Switch. Optional: Stainless Steel Shelves Or Stainless-steel Drawer Compartments, With 3 Lengthwise Dividers With Telescopic-type Guides On Rollers With Stops, Drawer Dimensions: 500x480x77 Mm (wxdxh) Usable With Between The Lengthwise Dividers: 106 Mm (lengthwise Dividers Easily Removable). Working Range 1 From 2°c To 20°c (assuming The Ambient Temperature Is Approximately 4°c Above The Set Point). Temperature Accuracy +/- 1,8°c After Stabilization (with 50% Of Loading). Acoustics Signal When The Set Value Is Undercut Or Exceeded Potential-free Connection Socket For Extern Alarm Refrigerating Unit 2 Pcs. Fully Hermetically Sealed, Forced Ventilation, Fitted On Vibration – Absorbing Mounts (ambient Temperature Max. 32°c), Low Noise (48dba/1m), Energy Saving Compressor With High Quality Vaporization System. Refrigerant: R 290 Or Equivalent Defrost Automatically With Thermal And Time Limit. Condensate Evaporation In Heated Tray. During The Defrost Period, The Temperature Inside The Cabinet (only The Air Temperature – Not The Stored Goods) Will Arise For A Short Time. Electrical Date: Power Supply220-230 V/50 Hz/single Phase Optional: 60 Hz. Power Input 2x 0,20 Kw. Fuse 16a. Power Cable: 2x 1,5 M. Packing Details (palletized) Dimensions: Approx. 85x98x224 Cm. Net Weight: 150-170 Kg. Gross Weight: 180-200 Kg. Include Avr. Unit 1 100,000.00 27 Rigid Video Procto-sigmoidoscope. Brand New. Product Specifications: Plastic Obturator. Video Camera. Stainless Steel Tube. Handle Of Polyacetal (delrin), Usb Male Connector. Analogue To Digital Converter Nozzle For Gas. Instrumentation Channel. Silicone Washer. Includes Universal Fiber Optic Light Source Machine And Tube Connector From The Proctoscope To The Light Source Machine. Warranty -6 Months From Delivery And Installation. Set 1 50,000.00 28 Stretcher, Transport Type. Brand New. Product Specifications: Hydraulic Stretcher. Numbers Of Function: Five-function. Certification: Ce, Fda, Iso13485. Size: 2000-2100 Mm (l)*770-800mm (w)*600-610/900-920mm (h). Height:600mm-930mm. Lowest Position-floor To Platform-580mm. Highest Position-floor To Platform-905mm. Side Rail Height Above Mattress Platform-340 To 360mm. Maximum Back Rest-0-80 Degrees. Maximum Knee Rest-0-30 Degrees. Maximum Trendelenburg Reverse Tr-0-16 Degrees. Mattress Size -1850-1880 X 650-670 X 80-90mm. Loading Capacity -up To 200 Kg. Side Rails: Collapsible Aluminum Alloy Side Rails. Bed Platform: X-ray Transparent. Specification: Ce, Fda, Iso. Other Features: 1. Central Brake System: Equipped With Four Brake Pedals On All Sides Of The Bed Make The Brakes At The Optimal Position Effectively. 2. Multi-function Instrument Support: The Instrument Support Can Put The Monitor And Can Also Be Used As A Headboard To Prevent Accidental Slippage Of The Patient. 3. Push Handle: Reducing The Workload And Preventing The Injuries. 4. High Quality Mattress: The European Standard Waterproof Cloth With The Smooth Surface Of The Mattress, Easy To Clean And Not Misplaced. 5. Large Diameter Wheel: Using The Imported 8-inch Silent Caster Make It Flexible And Durable. 6. The Fifth Wheel: The Fifth Wheel Can Provide A Smaller Radius Of Gyration. The Telescopic Collapse Design Can Slide Smoothly Even On The Rough Surface Or Obstacles Such As The Elevator Sill, Reducing Effectively The Damage Caused By Transport To Patients. 7. Plastic Coated Side Rails: The Side Rails With Stainless Steel Column Guardrail Covers Almost Entire Length Of Bed. 8. High-strength Carbon Steel Structure And Spray Procedure: The High Quality Carbon Steel And Robot Welding Guarantee The Mechanical Strength. The Spray Surface Treatment Is Easy To Clean And Guarantees A Longer Life. 9. Rapid Lifting Hydraulics: The Imported Dual-pressure Lifting System Can Be Used To Quickly Lift The Bed Or The Push Handle For 2 Seconds In An Emergency, And The Bed Will Automatically Locate The Height To Form A Special Body Position Of The Patient. 10. X-ray Imaging: Equipped With X-ray Material Bed Surface And X Ray Cassette Holder, The Whole Body Can Be X-rayed. 11. With Oxygen Cylinder Holder. Warranty -1 Year From Delivery And Installation. Unit 18 5,400,000.00 29 Suction Machine. (heavy Duty). Brand New. Product Specifications: Floor, Standing Type. Oil-less Piston Suction Motor. Double Anti-overflow Protection (mechanical Float And Electronic Sensor). Flow Rate: 40-50 Liter Per Minute. Water Displacement. Vacuum -700-800mmhg. Includes 2x3 Liters Polycarbonate Collection Jar. Attach/detach Abs Plastic Cover Jar. Anti-bacterial And Hydrophobic Filter. Patented Anti-vibration System. Dimensions: 300-400mm X 380-420mm X 800-850mm (lxwxh). Weight -15-25 Kg. Equipped With Foot Switch. Power -250w. Power Requirement -ac 200, 50-60hz. Silicone Hose. Operation And Service Manual Included. Warranty Of 6 Months From Delivery And Installation. Includes Orientation And Training Of End-user Staff. Unit 2 600,000.00 30 Syringe Pump. Brand New. Product Specifications: With Delivery And Installation, Provision Of Trainings Of Staff With Certificates, And Manual. Applicable Syringes (universal Compatibility To Various Brands): 10ml, 20ml, 30ml, 50ml/60ml, Accuracy: ±2% (mechanical ±1%). Flow Rate: 10ml: 0.1 Ml/h -300ml/h, 20ml: 0.1 Ml/h -600ml/h, 30ml: 0.1 Ml/h -900ml/h, 50ml: 0.1 Ml/h -1500ml/h. Bolus Rate: 10ml: 100-300ml/h (default 300ml), 20ml: 100-600ml/h (default 600ml), 30ml: 100-900ml/h (default 900ml), 50ml: 100-1500ml/h (default 1500ml). Purge Rate: 10ml: 300ml, 20ml: 600ml, 30ml: 900ml, 50 Ml: 1500ml. Volume To Be Infused: 0.1ml~1000ml. Injection Increment: 0.1ml. Infusion Mode: Rate Mode, Time Mode. Time Mode: Volume Limit: 0.1~999.9ml. Pre-set Time: 1min To 99h99min. Remaining Time: **h **min. Occlusion Pressure: 3 Adjustable Occlusion Pressure Settings: Low, Middle And High. Alarm Function: Infusion Completion, Near Completion, Empty, Occlusion, Low Battery, Syringe Disengaged, Incorrect Installation Of Syringe Plunger, No Ac Power Supply, Low Battery, Battery Exhausted, Malfunction Etc. Battery: Rechargeable Lithium Polymer Battery, 7.4v, 2100mah, Can Operate For More Than 3 Hours After Fully Charged At 25ml/h. Unit 5 300,000.00 Total 34,665,000.00 Note: Winning Bidder Shall Conduct Product Demonstration/end-user’s Training Of The Actual Unit And Issue Training Certificate To The End-user And Medical Equipment Technician Of Wvsgh. The Bidder’s Single Largest Completed Contract Similar To The Contract To Be Bid Should Have Been Completed Within 3 Years From The Date Of The Deadline Of Submission And Receipt Of Bids, Award For This Contract Should Have Been Awarded By A Hospital Or Health Facility And Not By Another Supplier, Except For Line Items With Asterisk (*) Which Have Been Awarded By A Non-health Facility. Likewise, The Contract Price Of The Slcc Should Be At Least 50% Of The Sum Of The Abc Of The Line Items Joined. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. The Complete Schedule Of Activities Is As Follows: Bac Activities Schedule Availability Of Bidding Documents December 12, 2024 At 8:00 Am To 4:00 Pm And Up To Before 9:00 Am Of January 7, 2025, At The Procurement/bac Office, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Pre Bid Conference December 20, 2024 (thursday), 9:00 Am At The 3rd Floor, Im Conference Room, New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Opening Of Bids January 7, 2025 (tuesday), 9:00 Am At The 3rd Floor, Im Conference Room, New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Bid Documents May Be Acquired By Interested Bidders On The Dates And Address Above And Upon Payment Of Applicable Fee For The Bidding Documents In The Amount Of: Php 25,000.00 Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac/procurement Office On Or Before 9:00 Am Of January 7, 2025. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Wvs.doh.gov.ph , Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Western Visayas Sanitarium And General Hospital Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Mr. Jasond Rex A. Huyaban/jessie H. Jarbadan Bac Secretariat Western Visayas Sanitarium And General Hospital Sta. Barbara, Iloilo Tel. No.: (033) 332-4778 Loc. 119 Email: Wvsbac.procurement@gmail.com Website: Wvs.doh.gov.ph Renia Grace G. Salapare, Md, Fpafp, Mpa Bac Chairperson
Closing Soon17 Jan 2025
Tender AmountPHP 36.6 Million (USD 631.7 K)
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n743.49|wve|7176052147|benjamin.t.spangler.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a
|n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.t.spangler.civ@us.navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|333996|1250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x||
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286.
3. The Following Proposed Delivery Schedule Applies:
submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery.
Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 365 Days After Effective Date Of The Resulting Contract.
4. Any Contract Awarded As A Result Of This Solicitation Will Be "dx" Rated Order; "dx" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;ry-166400 0ubg9 H D
rw-166262 0ubg9 C B;
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-c-24679 | | | |880506|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;pump Head Assembly, Item 4, Must Be In Accordance With Curtis Wright Electro Mechanical Corporation Drawings Ry-166400 And Rw-166262, Consisting Of Items 4.1 Through 4.7, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;head Seal, Item 4.1;
material - ;mil-c-24679 Alloy C71500 And Meeting The Mechanical Properties Of General Note 18 On Drawing Ry-166400;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Dye Penetrant Inspection
item - ;head Seal, Item 4.1;
performance - T9074-as-gib-010/271
acceptance - Mil-c-24679
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.4 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.4.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.4.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.4.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.5 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.6 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.7 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be
submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.9 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.9.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.9.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.9.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.10 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.11 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.11.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.12 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.13 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.13.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.13.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.13.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.13.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.13.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.14 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.14.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.14.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.15 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.15.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.15.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.15.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.15.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.15.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.16 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.16.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.16.2 Inspection For Completeness And Proper Type.
3.16.3 Verification Of Material Quality Received.
3.16.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.16.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.16.6 Identification And Protection From Improper Use Or Disposition.
3.16.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.16.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.16.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.17 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.17.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.18 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.18.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.18.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.18.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.18.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.19 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.19.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.19.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.19.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.19.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.19.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.20 Material Handling - The Written Material Control Process Must Include The Following:
3.20.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.20.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.20.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.20.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.20.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.20.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.21 Receiving Inspection -
3.21.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.21.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.22 Discrepancy Reporting -
3.22.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.23 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.23.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.23.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.23.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.23.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.24 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.24.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.24.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.24.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The
contract.
3.24.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.24.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.24.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.24.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.24.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.24.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.24.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.24.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.24.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.25 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Soon13 Jan 2025
Tender AmountRefer Documents
DEPARTMENT OF EDUCATION SCHOOLS DIVISION OF EASTERN SAMAR Tender
Education And Training Services
Philippines
Details: Description Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 10- Arts And Crafts Support Service Area: Skills Development) 1. The Deped Schools Division Of Eastern Samar, Through The General Appropriation Act Of 2024 Intends To Apply The Sum Of ₱ 597,951.44 Being The Abc To Payments Under The Contract For Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 10- Arts And Crafts Support Service Area: Skills Development) Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Deped Schools Division Of Eastern Samar Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 4. Prospective Bidders May Obtain Further Information From Deped Schools Division Office Of Eastern Samar And Inspect The Bidding Documents At The Address Given Below During Monday-friday, 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Php 1,000.00. It May Also Be Downloaded From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Nonrefundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped Schools Division Of Eastern Samar Will Hold A Pre-bid Conference On January 13, 2025, 10:00am At The Bac Office, Deped Schools Division Of Eastern Samar Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 27, 2025, 9:00am Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 27, 2025, 10:00am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Only The Proprietor Or Authorized Representative May Be Allowed To Purchase Bidding Documents. Letter Of Intent (loi), Special Power Of Attorney (spa) (for Authorized Representative), And Drl (document Request List From Philgeps) Are Required Upon Purchase. 11. The Deped Schools Division Of Eastern Samar Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Items, Specifications, Quantity Of Delivery, And Abc: Sewing Machine Singer,15ch 179 Sewmaster, Automatic Bobbin Winder, Variable Stitch Length Control, Forward And Reverse Function, Numbered Dial Tension, Threadle Or Motor Options, Drop Feed Knob 5 Piece Utility Shelf, 1713s Utility Shelf 2 Pieces Table, Folding Table Ft-02 1200mm L X 400mm D X 750mm Ht., Structure: Melamine 3 Pieces Chairs, Cod Armchair Backrest Wood Horn Chair, 43x48x74, Material: High Quality Iron Wood, Max:150kg 6 Pieces Storage Cabinet, Dimension: 48*30*83cm, Material: Plastic, 3 Pieces Cork Bulletin Board, Wooden Frame, 30x40cm 1 Piece Glue Gun, Mitsushi Mit-gl40 40w, 100-240v, Hot Melt Glue Gun 2 Pieces Acrylic Color, Faber Castell, 12ml, 12 Colors 3 Pieces Scissors, Maped Reflex 3d Vivo Scissors, 16cm 4 Pieces Cutters, Ida Wallpaper Blade Cutter, Length 15cm, Width: 15cm 3 Pieces Watercolors, Prang 16 Watercolor Set 3 Sets Art Paper (multiple Colors), Avia Colors Assorted Colored Paper, 250 Sheets, 80 Gsm, Size: 8.5" X 11" 3 Reams Paint Brushes, Deli 73885 Brush Set 3 Pieces Yarn, Color, Dmc Natura Happy Cotton, 100% Cotton Yarnfor Crochet, Knitting And Yarn Crafts, Thickness: Light (8 Ply), Weight: 20 Grams, Length:43 Meters 10 Pieces Glue, Elmer's Glue, White 225 Grams 5 Pieces Colored Pencils, Staedtler Colored Pencil 136 C36 Luna Permanent 36 Colors 3 Sets Colored Pens, Faber-castell Coloring Pen, 12 Colors 3 Sets Sewing Pins, 40 Pieces 3 Pieces Sewing Needles, 16 Pcs Set Hand Sewing Needle, Size: S: 4cm (8pcs), M:4.5cm (6pcs)* L:5cm (2pcs), Mateial;stainless 10 Pieces Rotary Cutter, 45mm Fabric Rotary Cutter, Length:45m, Material:stainless Steel Blade+abs Handle, Color: Orange. Length: 165mm, Blade Diameter:45mm, Suitable For:leather Fabric Vinl Fiber Paper 2 Pieces Tape Measure, Deli 79650 Measuring Tape 150cm/60 Inches (1.5m*7mm) 10 Pieces Crochet Hooks, 100pcs Crochet Hook Set,perfect Round Point, Material: Plastic+metal, Size:18*13*3cm, Hook Size: 2mm,2.5mm,3.0mm,3.5mm,4.0mm,4.5mm,5.00mm,5.5mm,6.0mm,6.5mm 2 Pieces Knitting Needles, Sizes: 4,5,6 And 8 2 Pieces Crochet Thread, 5 Ply Monaco 100% Mercerized Cotton, Assorted Colors, Length:105 Meters, 50 Grams 20 Pieces Sewing Thread, Apple Spun Polyester Sewing Thread, Assorted Colors, 100 Meters, Polyester Material, 10pcs/box 2 Boxes Convertible Drawing And Drafting Table, Size: 24”x36” ▪color:raw Sienna / Brown ▪weight: 10-11kg 1 Piece Studio/painting Easel, Sizes: 85" - 120" Tall 2 Pieces Table/desk Painting Easel, Could Be An H Or An A Easel Type, For A Easel 38" To 75", For H Easel 84" To 96" 5 Pieces Manual And/or Electric Pencil Sharpener, Pencil Sharpener Hand Crank Manual Mechanical Pencil Sharpener,aluminum Alloy Knife Structure,cutting Outer Diameter Of 6.5-8mm Pencil 4 Pieces Wooden Mannequin, With Stand 11.5/14/21/30cm Wooden Human Mannequin Model Artist Movable Limbs Doll 2 Pieces Transparent Edge T-square, Hardwood Blade Dimensions: 30x13.5x0.2 Inches Weight: 14.4 Ounces Color: Wood Size: 36’’ 2 Pieces Carpentry Tools, Tool Set Includes: 1 – 9” Plastic Torpedo Level 1- Magnetic Bit Holder 1” Cr-v Bits Nut Drivers: 3/16”,1/4”,9/32”,5/16”, 11/32”,3/8” 10ft/3m Tape Measure 150mm Mini Saw 7” Locking Pliers 7-12” Diagonal Cutting Pliers 8” Long Nose Pliers 8” Adjustable Wrench 8” Water Pump Pliers Zinc-alloy Utility Knife Utility Knife Blade Black Cable Ties 160oz Claw Hammer Combination Wrench: ¼”, 5/16”, 3/8”, 7/16”. ½”, 9/16” Precision Screwdrivers:ph1, Ph0, Slotted:1/4, 2.0, 2.4, 3.0mm Metric Hex Keys: 1.5, 2, 2.5, 3, 4,5,5.5, 6mm Sae Hex Keys: 1/16”, 5/65”, 3/32”, 1/8”, 5/32”, 3/16”, 7/32”, ¼” 16” Zipper Tool Bag Item Weight; 8.8 Pounds 17.7x9x9 Inches 2 Sets T50 Staple Gun, Size: 7x9x3 Inches 5/16” Staples 3 Pieces Slop Sink, Size: 30.2x18.4x10.0inch Color: 30”m Style: Single Bowl Material: Stainless Steel Thickness: 3.0-1.2mm 1 Piece Roofing Square Dual Marking Right Angle Picture Framing Carpenter Ruler, Steel 90 Degrees Roofing Square Measuring Size: 20x 30cm/8x12” Rustproof Size: 30x20.5x 20.5 Weight: 0.16kg 3 Pieces Professional Compound Mitre Box & Saw, Adjustable Angle 20x8x9 Inches Miter Box 22 Inches Back Saw 2 Pieces Drawing Lamp, Overall Dimensions: 1.5 “w X 3.5 “d X 29.5 “h Long, Bendable Neck 21” (53 Cm) 28 Led Bulbs Stainless Steel Wattage: 1 Can Be Mounted To Table, Desk Or Easel Usb Plug 2 Pieces Artists Taboret Made Of Beechwood. Measures 35-1/2"h X 17-1/2"w X 14-1/2"d 1 Piece Open Shelves Utility Rack, 72" Height X 48" Width X 18" Depth Five Adjustable Shelves 4,000 Lb. Capacity Steel Frame Particle Board For Shelves Rivet Lock Design With Nuts And Bolts 2 Pieces Chisel Rack For Wood Carving, 3/4″ Thick, And 2 Pieces 3/8″ Tall Plywood Number Of Slots May Vary 2 Pieces Corner Clamp, Maximum Clamping Range 7.5cm, Generally 4 Right-angle Clamp All Together To Use. Material: Aluminum Type: 4 -inch 20.00 X 10.00 X 10.00 8 Pieces Decorative Realistic Artificial Fruits, Assorted Plastic Fruits And/or Eco-friendly Foam Material 2 Sets Geometric Shapes Set, 8-12 Shapes/forms Wood And/or Non-toxic Plastic Shapes Include Sphere, Square, Cylinder, Round Cylinder, Cone, Cube, Hexagonal Prism, Triangular Prism, Square Based Pyramid, Octagonal Prism, Pentagonal Prism, And 1/2 Sphere 2 Sets Geometric Designer Templates, Scale: 0-20 Cm/0-24 Cm Size : 8-1/4" X 5.1" (l*w) Plastic And/or Steel Material 4 Pieces Stack Rack, Dimension: 30 In H X 21 In W X 17 In L At Least 6 Shelves May Be Wooden Or Metal Materials Devised With Rollers To Roll The Rack In Any Location 4 Pieces Picture Frame And Miter Clamp, Weight: 2.5 Pounds Dimensions: 23.9 X 9 X 1.6 Inches Wood Material 4 Pieces Heat Gun, Power: 2,000 Watts Temperature: 50 / 380 / 570 Celcius Steps: 3 Steps Air Flow: 500 / 300 / 500 L/min 4 Pcs Nozzles (air Blast, Reducing, Reflector, Paint Scraper) 1 Pc Scraper 4 Pieces Hot Plate Single Electric Stove, Power:1000w Non-stick Coating Auto-thermostat Various Heat Operations Operating On/off Indicator Light 2 Pieces Tape Dispenser, Weight: 1 Kg Hard Durable Plastic Material 2 Pieces Multi-function Three-hole Puncher, 11.75 X 2.75 X 2.75 Inches High Quality Metal Construction With Clip-in Rings 2 Pieces Metric Scale, 30 Centimeters In Length Scale: 1:1, 1:10, 1:2, 1:20, 1:5, 1:50, 1:100, 1:200, 1:500, 1:1000, 1:1250 And 1:2500 4 Pieces Steel Tape Measure, Tape Rule With First 6 Feet Reinforced With Bladearmor Coating For Maximum Durability 11-inch Tape Standout; 16-inch And 19.2-inch Stud Center Markings Simplify Framing Jobs Mylar Polyester Film Extends The Life Of The Entire Blade Heat-treated Spring Provides Long Life And Smooth Blade Recoil Stanley's Limited Lifetime ; Measures 1-1/4-inch-by-25-feet 3 Pieces Heavy Duty Circular Saw, Corded Or Cordless Adjustable Depth Diameter: 4 1/2 In. With Electric Brake Maximum Cutting Depth At 45 Degrees: 1 In. Maximum Cutting Depth At 90 Degrees: 1-9/16 In. Maximum Speed: 4500 Rpm Spindle Lock 20 Volt 5.5 Lb. 4 Pieces Abrasive Disc Cutter Machine, Electric Powered 18.5” H X 12.2” W X 21.25” D 2200w 14” Blade Diameter 15 Amps Motor (3600 Rpm) Cutting Capacity Of 4.5” At 90˚ And 45˚ 2 Pieces Manual Canvas Pliers, Specifically Designed For Electrical And Mechanical Works 3 Pcs. In 1 Set 1 Combination Plier 6" 1 Cutter Plier 6" 1 Long Nose 6" Offers Comfortable Hand Grip 3 Set Jet-bow Compass Set, Set Includes 6" Speed Compass With Inter-changeable Pen, Pencil, Divider Parts, And Replaceable Needle Points. 4½" Bow Compass With Inter-changeable Pen, Pencil, And Divider Parts. 6" Beam Bar And Slide Coupling For Circles Up To 28" In Diameter And 6" Friction Divider With Self Centering Gear Head And Replaceable Needle Points. Set Also Includes Mechanical Lead Holder, Slip Handle For Spare Ruling Pen, Lead Pointer, Center Tack, And Screwdriver. Packaged In See-through, Hard Plastic Case. 2 Sets Human Head Model, Plastic, Life-size Anatomical Cast With Removable Jaw And 3 Removable Lower Teeth Type: Skull Model Material: Pvc Dimension: App.21x15x19cm/8.27x5.91x7.48in Color: As The Picture Shown Quantity: 1 Set 1 Set Screw Drivers Set, Philips Or Slotted Sl 3/16 In. X 3 In. (x2), 3/16 In. X 6 In., Sl 1/4 In. 1.5 In., Sl 1/4 In. X 4 In. (x2), Sl 1/4 In. X 6 In. Ph1 X 4 In. (x 2), Ph2 X 1.5 In., Ph2 X 4 In. (x2) 2 Offset Screwdrivers 6 Precision Screwdrivers: Ph0, Ph1, Sl 1.4 Mm, Sl 2 Mm, Sl 2.4 Mm, Sl 3 Mm 2 Sets Pliers And Grip Set, 10 Piece Tray Set Includes 1 Each Of The Following: 10r, 10wr, 7wr, 7r, 7cr, 6ln, 9ln, 5wr, 6r, 11r Weight: 11.80 Lb 28.00 X 11.80 X 1.30 Inches 2 Sets Artist Stool With Wheels, Height Adjustable & 360° Swivel Soft Pu Leather Cushion Detachable Design Dimension: Seat Diameter: 16.2" Seat Height: 25.6"-35.8" Full Height: 37.4"-47.6" Max Weight Capacity: 300lbs 6 Pieces Screen Print Squeegee, Material: Natural Rubber, Wood, Stainless Hardness: 70 Durometer Length: 25cm/10" Width: 10cm/3.9" Thickness: 2.3cm/0.9'' 8 Pieces Mixing Paint Palette, Material: Stainless Color: Silver Size: Approx 6.75" X 5.5"compact 12 Pieces Carving Chisels For Wood, Material: 45# Steel And Wood Color: Wood Color + Silver Quantity: 12 Pcs Total Weight : 892 Kg Wooden Handle Length Of Each Chisel: 95mm/3.74” Total Length Pf Each Chisel: 20.5mm / 8.07” Size: 1x V-straight Parting Tool: 14.6mm / 0.57” 1x Round Nose Chisel: 7.8 / 0.31 1x Skew Wood Turning Chisel: 7.8mm / 0.31” 1x Bent Chisel: 7.8mm / 0.31” 1x Wood Chisel: 7.8mm / 0.31” 1x Skew Wood Turning Chisel: 8mm / 0.31” 1x Pointed Wood Chisel: 8mm / 0.31” 2x Straight Chisel: 7.8mm 13.7mm”/ 0.31” 0.54” 3x Straight Gouge: 12.8” 16.1mm 11.7mm/ 0.50” 0.63” 0.46” 2 Sets Files Set For Jeweler, Wood Carving, Craft Metal And Glass Stone, 10 Pcs / Set 5x180mm Stone Precision Needle Files Tool Woodworking Carving The Craft Metal Rasp Wood Hand Tools Material: Metal Color: Gray/ Silver Model: Needle Files Size : 14.5x1x1 Weight: 0.05 Kg 2 Sets Heavy Duty Multi-purpose Bench Vise, Jaw Width: 5", Opening: 4-1/4" Durable Cast Steel Construction Head Swivel 360 Degree Full 360-degree Rotational Jaws Unique "v" Jaws Provide 4 Point Holding Power 2 Pieces Anvil, Weight: 55 Lbs. (sculpture) 9 Lbs. (jewelry Works) Metalsmith, Jewelers Forming Tool, Essential For Jewelry Repair, Shaping, Flattening, Hardening Metals Material: Iron Surface Size: (l X W X H): Approx. 6 X 3.3 X 9cm/2.36 X 1.3 X 3.54inch, Height: Approx. 5.5cm/2.17inch 1 Piece Welding Protective Suite, Made Of High-quality Denim Material, It Can Be Worn Many Times, It Will Not Fade For A Long Time. Unique And Comfortable Design, Wear-resistance And Dirty Resistance. Reinforced And Stitched The Crotch, Cuffs, Pockets To Prevent Accidental Tearing. The Highly Elastic Cuffs Make It Comfortable And Convenient To Wear. Size: 170 Height: 168-173cm Waist: 76-84cm/29.9-33 Inches Weight: 57.5-135kg 5 Pieces Welding Apron, Features: Material: Constructed With Artificial Cow Suede Which Is Not Only Durable But Also Flexible, And The Apron Offer Puncture Resistance, Tear Resistance And Cut Resistance. Size: (approx) (lxw) 90x60cm/35.4x23.6inch, Long Full Coverage Apron Protects You Until The Knee When You Are Working. Friendly: The Straps On The Waist Can Be Adjusted To Fit Your Body Better. They Are Designed To Hang Over The Shoulder Which Means That Weight Is Distributed Evenly Over The Shoulders. Never Suffer Neck And Back Pain Again. Pockets: 6 Pockets For Tools And Work Accessories, Include One Cell Phone Pocket And One Pencil Pocket. You Can Put Everything You Need Close To Hand In It Instead Of Constantly Search For Them. The Cell Phone Pocket Is Deep To Prevent The Phone From Falling Out. Application: Not Only For Woodworking And Welding But Also Useful For Many Other Work And Home Tasks Like Bbq And Gardening, Unique Gift Apron For Men, Women, Mothers, Fathers. Specifications: Material: Artificial Cow Suede Color: Yellow Size: (approx) (lxw) 90x60cm/35.4x23.6inch Package Included: 1 Pc X Apron 5 Pieces Welding Hood Caps, Flame Retardant Cloth Full Protection This Welding Hood Offers An Essential Mix Of Durability, Comfort And Protection. The Hood Features A Mesh Lining To Allow Sweat Vapour To Quickly Evaporate The Presoftened, Lightweight, Air Cushioned Fabric For Maximum Comfort. This Hood Can Protect Your Neck, Face And Head From Welding Fire Flash, Splash Very Well. Wear-resistant, Fire-retardant, Spark-proof, Double Protection Of Personal Safety And Sweat Absorption Specification: - Long :approx. 45cm/ 17.72inch - Shoulder Width: Approx. 43cm/16.93inch(xl) 5 Pieces Welding Gloves 10.5" Welding Leather Gloves Hgvc01 *winland* Product Description • Size: 10.5" • Use For Driver, Machining Operator Etc. • All Applications Which Require A High Level Of Anti-skid And Abrasion-resistant • Applying Universally To The Transporting And Cargo Handling Workers, Recycling Work, And Horticulture Workers, Drivers And Etc. • Cow Split Leather Gloves • Full Palm, Full Lining • Made With Top Quality Material For Industrial And Commercial Use 5 Pieces Welding Protective Visitor Glasses, Protective Visitor Glasses: Anti-fog With Uv Protection Glasses Product Name:safety Eyewear Glasses Color:clear, Dark Grey Feature:protective Glasses Lens Color:clear, Dark Grey Style:work Safety Glasses Package:blister Size: 17*17*7cm 5 Pieces Welding Helmet, Ingco Auto Darkening Welding Helmet Ahm009 Viewing Area:90×35mm Cartridge Size:110×90×10mm Arc Sensor:2 Light State:din 4 Dark State:fixed Shade 10 Shade Control:unadjustable Power On/off:fully Automatic Sensitivity Control:unadjustable,auto Uv/ir Protection:din 16 Power Supply:solar Cells. Re-chargeable Battery .no Battery Change Required Switching Time:1/5000s,from Light To Dark Dark To Light:0.15-0.45s Auto Low Amperage Tig:≥20amps(dc), ≥20amps(ac) Operating Tep:-5°c~+55°c Storing Tep:-20°c~+70°c 5 Pieces Welding Mask, Product Details Of Heavy Duty Welding Mask (108x50x3mm) Movable Glass Impacted Resistant Shell Anti Wear Moveable Type Glass Packing: Polybag With Color Sticker 5 Pieces Hard Hat, Hard Safety Helmet With Chin Strap Color: Blue, Orange, White, Yellow Material: Acrylonitrile Butadiene Styrene (abs) Shell, With Six Point Adjustable Ratchet Suspension For Shock Absorbing And Elastic Chinstrap Tough, Lightweight, Durable With Six Point Adjustable Ratchet Suspension For Shock Absorbing And Elastic Chinstrap. A Hard Hat Is A Type Of Helmet Predominantly Used In Workplace Environments Such As Industrial Or Construction Sites To Protect The Head From Injury Due To Falling Objects, Impact With Other Objects, Debris, Rain, And Electric Shock. Durable, Lightweight And Comfortable 12 Pieces Compact Electric Kilns, Degree F (max): 2300°f Cone: 6 Firebrick: 3" Volt: 240 / 208 Watt: 3,600 Ampere: 15 Recommended Breaker (amp): 20 Receptacle: 6-20 Size Interior (wide X High X Deep): 13.5 X 13.25" Size Exterior Including Stand (wide X High X Deep): 22 X 28 X 25.5" Volume (cu Ft.): 1.22 1 Piece Heat Press Transfer Machine, Electric Powered 21.2 X 20.2 X 19.2 In. 220v 1800w 0-400˚f (0-220˚c) 0-999 Sec. 1 Piece Rubber Mallet, Rubber Hammerhead Fiberglass Handle Packing: Color Label Weight: 32oz 4 Pieces Ball Peen Hammer, Material: Fiberglass Handle & Steel Head Size: 16 Ounce Weight: 3.7 Pound 4 Pieces Cutting Mat, Flexible Cutting Mat A2 Size (24 X 18 Inch) Self-healing 5 Layered Double Sided With Marked Pattern And Grids (green) Material: Polyvinyl Chloride Color: Green Item Dimensions: 15 X 15 X 15 Centimeters Shape: Hexagonal Weight: 200 Grams 6 Pieces Heavy Duty Extension Wire, Heavy Duty Extension Power Strip With Safety Switch Protection Socket 4 Meters, Extension 3 Pieces 36” Smart Led Tv, Width 96.74cm, Gross Weight: 10.8 Kg, Net Weight 7.9kg, Height 57.18, Length 7.99cm, Screen Size: 43-inch, Tv Resolution: Full Hd 2 Piece Laptop Computer, Laptop Screen Size: 15 Inches, Graphics Chipset: Integrated, Storage Capacity:512gb, Storage Type: Ssd, Ports/interface: Usb 2.0, Usb 3.0, Vga, Processor Type: Intel Core I7, Number Of Cores: Dual-core, Os:windows, Weight:3 Kg, Battery Capacity 4910mah, Cpu Frequency: 2.9ghz 1 Piece Photo Printer, Wireless Photo All-in-one With Auto Duplex Printing Print, Scan, Copy Auto Duplex Printing Wireless, Wireless Pictbridge, Mopria, Airprint, Direct Wireless Recommended Monthly Print Volume: 30 - 100 Pages Operating System: Win 8 / Win 7 / Vista / Xp, Mac Os X 10.7.5 And Later Borderless Printing: A4 / Letter / 4 X 6" / 5 X 7" / 8 X 10") Standard Paper Input (front Tray): 100 Sheets (a4/ Ltr) / 20 Sheets ( 4 X 6 “ ) Paper Weight: 64 To 105 G/m2 Up To 300 G/m2 Dimension (w X D X H): 449 X 304 X 152 Mm Weight: 5.4 Kg Interface / Connectivity: Usb 2.0 Hi-speed / Wireless Lan /wireless Pictbridge, Direct Wireless Scanner Type: Flatbed 1 Piece Portable Sound System With Microphone, Led Lights 2 Wireless Microphone Wired Microphone / Guitar / Line In Mic Priority Over Voice On/off Line Out Remote Control Usb / Bluetooth / Nfc / Fm Capabilities Frequency Response: 50hz-20khz Power System: Ac Adaptor / 12vdc In / Internal Rechargeable Battery 100v-240v, 60hz Power Supply Adaptor 1 Set 50” Led Tv, Height: 64.42 Cm, Width:111.68cm, Length:5.99cm, Gross Weight:16kg. Screen Size: 50-inch Led, Net Weight: 11.6kg, Tv Resolution: 4k Ultra Hd, Connectivity: Wireless Lan Built-in (wi-fi), Hdmi Ports: 3, Usb Ports:1 2 Piece Soft Box With Stand, 2 Pcs Studio Lighting Softbox 50*70cm, 2 Pcs 2m Light Stand, 2 Pcs 45w Light Bulb, Photography Kit 100-240v, Maximum Height: 200cm/78", Collapsible Height:65cm/32" 2 Pieces Display Panel Board, Product Weight:8kg, Choose Type:fabric,number Of Panels:4,type: Pole And Panel,graphic Type: Loop Nylon, 900x600mm Or 1000x700mm 6 X 900mm Poles 25 Mm Diameter With Clips Weight Approx 11-14kg 1 Piece Magnetic Whiteboard, Size:4x8 (48x96 Inches) Feet, Aluminum Frame,with Sliding Whiteboard Marker/eraser Tray,protective Plastic Rubber Corners 1 Piece Chalkboard, Length: 60.5", Height: 36.5",unit Weight: 24.00 Lbs Per Unit Color: Black Duro-slate Over ¼”hardboard Backing, Full Length Chalk Tray 1 Piece Offline Mini Compressor, 220v 60hz, Type: Single Cylinder Piston Compressor With Air Tank, Power: 1/6hp, Speed: 1700r.p.m, Air Output Per Min/lit.:20-23l/min, Auto Stop, Start At 3bar (43 Psi) Stop At 4bar (57psi), Working Pressure:0-4 Bar, Air Tank:3.0l, Suitable For Airbrush With Nozzle 0.2mm-1.0mm, Weight: 5kg, Dimension: 31x13x31cm 1 Pieces Styrofoam Cutter, Material:plastic, Size:approx. 190x90mm, Power: 2xc Size Battery (not Included), Feature: Electric Wire Needle Shap, Stainless Steel Wire, Hardness And Diameter Of 0.19mm 1 Piece Potter’s Wheel/electric Potter’s Wheel, Detachable Abs Basin, Advanced High-quality Brushless Motor, Rotary Speed:0-300 Rpm, Pottery Wheel: 25cm, Pottery Forming Machine:350w,electric Pottery Wheel With Foot Pedal And Detachable Basin, Rated Voltage: Ac 110v, Wheel Diameter: 25cm (9.8"), Speed: 0-300r/min, Working Noise:,60 Db, Gross Weight: 14kg (31.1 Lb), Package Dimensions (lxwxh) 53x42x35cm (20.8"x16.53"x13.78") 2 Pieces Weather-proof Safety Box Circuit Breaker, Metal Enclosure Panel Box, Weatherproof, Height:300mm, Depth:150mm, Door: 0.8mm, Body: 0.8mm, Plate: 0.8mm, Metal Body,width:400mm 1 Piece Fire Blanket, 120x99x4cm (l X W X H) Woven Glass Fiber 2 Pieces Exhaust Fan, Size: 12" 9" 6" Rpm: 1350, 1320, 1290 Finish: Power Coated 2 Pieces Medicine Cabinet, Stainless 20x26x5 Inch Single Door Medicine Cabinet 1 Piece Smoke Detector, 120 Volts Ionization Sensor, Clamshell Packaging 1 Piece Disposal Bins, 50 Cubic Movable Bins 2 Pieces Abc = 597,951.44
Closing Date28 Jan 2025
Tender AmountPHP 597.9 K (USD 10.3 K)
Municipality Of Mapanas, Northern Samar Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Bidding Documents Procurement Of Infrastructure Projects Name Of Project: Rehabilitation Of Farm-to-market Road At Brgy. E. Laodenio Barangay E. Laodenio, Mapanas Northern Samar Contract Reference No. 2025-01-06 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 7 Section Iii. Bid Data Sheet 35 Section Iv. General Conditions Of Contract 38 Section V. Special Conditions Of Contract 70 Section Vi. Specifications 72 Section Vii. Drawings 75 Section Viii. Bill Of Quantities Error! Bookmark Not Defined. Section Ix. Bidding Forms 77 Section X. Foreign-assisted Projects Error! Bookmark Not Defined. Section I. Invitation To Bid Bid Notice Abstract Invitation To Bid (itb) Republic Of The Philippines Province Of Northern Samar Municipality Of Mapanas Invitation To Bid For Project: Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar The Lgu- Mapanas, Northern Samar, Through The Lgsf-sbdp Of Fy 2024 Intends To Apply The Sum Of Four Million Nine Hundred Ninety Nine Thousand Seven Hundred Seventy Nine Pesos 12/100 Only (p4,999,779.12) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For : Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar B.5 Project Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 Is B.9 Mobilization/demobilization 1.00 Is Part C Earthworks 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (for Reblocking At Intermittent Section) 1409.00 Sq.m. 102(2)b Surplus Common Excavation 420.00 Cu.m. 105(1) Subgrade Preparation (common Material) 1680.00 Sq.m. Part D Subbase And Base Course 200(1) Aggregate Subbase Course 267.50 Cu.m. 201(1) Aggregate Base Course 336.00 Cu.m. Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Conventional Method, 200mm Thk. 1400.00 Sq.m. Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From January 3-20, 2025, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 5. The Lgu- Mapana, Northern Samar Will Hold A Pre-bid Conference On January 10, 2025 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 6. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of January 21, 2025 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 7. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 8. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas, Northern Samar Mobile # 09778033758 Section Ii. Instructions To Bidders 1. The Bids Must Be Delivered On Or Before January 15, 2025 At 9:00 A.m And Failure To Submit The Bid Proposal May Ground For Disqualification Of The Bid. 2. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar B.5 Project Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 Is B.9 Mobilization/demobilization 1.00 Is Part C Earthworks 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (for Reblocking At Intermittent Section) 1409.00 Sq.m. 102(2)b Surplus Common Excavation 420.00 Cu.m. 105(1) Subgrade Preparation (common Material) 1680.00 Sq.m. Part D Subbase And Base Course 200(1) Aggregate Subbase Course 267.50 Cu.m. 201(1) Aggregate Base Course 336.00 Cu.m. Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Conventional Method, 200mm Thk. 1400.00 Sq.m. Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 3. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From January 3-20, 2025, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 4. The Lgu- Mapanas, Northern Samar Will Hold A Pre-bid Conference On January 10, 2025 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 5. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of January 21, 2025 At Bac Office, Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 6. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas N. Samar Mobile # 09778033758 Table Of Contents A. General 11 1. Scope Of Bid 11 2. Source Of Funds 11 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 4. Conflict Of Interest 12 5. Eligible Bidders 14 6. Bidder’s Responsibilities 15 7. Origin Of Goods And Services 17 8. Subcontracts 17 B. Contents Of Bidding Documents 17 9. Pre-bid Conference 17 10. Clarification And Amendment Of Bidding Documents 18 C. Preparation Of Bids 18 11. Language Of Bids 18 12. Documents Comprising The Bid: Eligibility And Technical Components 18 13. Documents Comprising The Bid: Financial Component 21 14. Alternative Bids 21 15. Bid Prices 22 16. Bid Currencies 22 17. Bid Validity 23 18. Bid Security 23 19. Format And Signing Of Bids 25 20. Sealing And Marking Of Bids 26 D. Submission And Opening Of Bids 26 21. Deadline For Submission Of Bids 26 22. Late Bids 26 23. Modification And Withdrawal Of Bids 27 24. Opening And Preliminary Examination Of Bids 27 E. Evaluation And Comparison Of Bids 28 25. Process To Be Confidential 28 26. Clarification Of Bids 29 27. Detailed Evaluation And Comparison Of Bids 29 28. Post Qualification 30 29. Reservation Clause 31 F. Award Of Contract 32 30. Contract Award 32 31. Signing Of The Contract 33 32. Performance Security 33 33. Notice To Proceed 34 A. General 1. Scope Of Bid 1.1. The Procuring Entity As Defined In The Bds, Invites Bids For The Construction Of Works, As Described In Section Vi. Specifications. The Name And Identification Number Of The Contract Is Provided In The Bds. 1.2. The Successful Bidder Will Be Expected To Complete The Works By The Intended Completion Date Specified In Scc Clause 1.16. 2. Source Of Funds The Procuring Entity Has A Budget Or Has Applied For Or Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract For The Works. 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 3.1. Unless Otherwise Specified In The Bds, The Procuring Entity, As Well As Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. In Pursuance Of This Policy, The Funding Source: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows: (i) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Procuring Entity, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019; (ii) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition; (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels; And (iv) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Collusive Practice; And/or Threatening, Harassing Or Intimidating Any Party To Prevent It From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Corrupt Or Fraudulent Practices In Competing For The Contract; And (c) Will Declare A Firm Ineligible, Either Indefinitely Or For A Stated Period Of Time, To Be Awarded Contract Funded By The Funding Source If It At Any Time Determines That The Firm Has Engaged In Corrupt Or Fraudulent Practices In Competing Or, Or In Executing, A Contract Funded By The Funding Source. 3.2. Further, The Procuring Entity Will Seek To Impose The Maximum Civil, Administrative, And/or Criminal Penalties Available Under The Applicable Laws On Individuals And Organizations Deemed To Be Involved In Any Of The Practices Mentioned In Itb Clause 3.1(a). 3.3. Furthermore, The Funding Source And The Procuring Entity Reserve The Right To Inspect And Audit Records And Accounts Of A Contractor In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 34. 4. Conflict Of Interest 4.1. All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (g) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; (f) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid; Or (g) A Bidder Who Lends, Or Temporary Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 4.2. In Accordance With Section 47 Of The Irr Of Ra 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), Members Of The Technical Working Group (twg), Members Of The Bac Secretariat, The Head Of The Project Management Office (pmo) Or The End-user Unit, And The Project Consultants, By Consanguinity Or Affinity Up To The Third Civil Degree. On The Part Of The Bidder, This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And (d) If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate. Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 5. Eligible Bidders 5.1. Unless Otherwise Indicated In The Bds, The Following Persons Shall Be Eligible To Participate In This Bidding: (a) Duly Licensed Filipino Citizens/sole Proprietorships; (b) Partnerships Duly Organized Under The Laws Of The Philippines And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; (c) Corporations Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Outstanding Capital Stock Belongs To Citizens Of The Philippines; (d) Cooperatives Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; And (e) Persons/entities Forming Themselves Into A Jv, I.e., A Group Of Two (2) Or More Persons/entities That Intend To Be Jointly And Severally Responsible Or Liable For A Particular Contract: Provided, However, That, In Accordance With Letter Of Instructions No. 630, Filipino Ownership Or Interest Of The Joint Venture Concerned Shall Be At Least Seventy Five Percent (75%): Provided, Further, That Joint Ventures In Which Filipino Ownership Or Interest Is Less Than Seventy Five Percent (75%) May Be Eligible Where The Structures To Be Built Require The Application Of Techniques And/or Technologies Which Are Not Adequately Possessed By A Person/entity Meeting The Seventy Five Percent (75%) Filipino Ownership Requirement: Provided, Finally, That In The Latter Case, Filipino Ownership Or Interest Shall Not Be Less Than Twenty Five Percent (25%). For This Purpose Filipino Ownership Or Interest Shall Be Based On The Contributions Of Each Of The Members Of The Joint Venture As Specified In Their Jva. 5.2. The Procuring Entity May Also Invite Foreign Bidders When Provided For Under Any Treaty Or International Or Executive Agreement As Specified In The Bds. 5.3. Government Corporate Entities May Be Eligible To Participate Only If They Can Establish That They (a) Are Legally And Financially Autonomous, (b) Operate Under Commercial Law, And (c) Are Not Dependent Agencies Of The Gop Or The Procuring Entity. 5.4. (a) Unless Otherwise Provided In The Bds, The Bidder Must Have Completed, Within Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted To Current Prices Using The National Statistics Office Consumer Price Index. (b) For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bds. For This Purpose, Contracts Similar To The Project Shall Be Those Described In Thebds, And Completed Within The Period Stated In The Invitation To Bid And Itb Clause 12.1(a)(iii). 5.5. The Bidder Must Submit A Computation Of Its Net Financial Contracting Capacity (nfcc) Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Its Favor If Awarded The Contract For This Project (clc). The Nfcc, Computed Using The Following Formula, Must Be At Least Equal To The Abc To Be Bid: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project. Where: K = 10 For A Contract Duration Of One Year Or Less, 15 For A Contract Duration Of More Than One Year Up To Two Years, And 20 For A Contract Duration Of More Than Two Years. The Clc Must Be At Least Equal To Ten Percent (10%) Of The Abc For This Project. If Issued By A Foreign Bank, It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank. In The Case Of Local Government Units (lgus), The Bidder May Also Submit Clc From Other Banks Certified By The Bangko Sentral Ng Pilipinas (bsp) As Authorized To Issue Such Financial Instrument. 6. Bidder’s Responsibilities 6.1. The Bidder Or Its Duly Authorized Representative Shall Submit A Sworn Statement In The Form Prescribed In Section Ix. Bidding Forms As Required In Itb Clause 12.1(b)(iii). 6.2. The Bidder Is Responsible For The Following: (a) Having Taken Steps To Carefully Examine All Of The Bidding Documents; (b) Having Acknowledged All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; (c) Having Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; (d) Having Complied With Its Responsibility To Inquire Or Secure Supplemental/bid Bulletin/s As Provided Under Itb Clause 10.3. (e) Ensuring That It Is Not “blacklisted” Or Barred From Bidding By The Gop Or Any Of Its Agencies, Offices, Corporations, Or Lgus, Including Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Gppb; (f) Ensuring That Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; (g) Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative/s To Verify All The Documents Submitted; (h) Ensuring That The Signatory Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The Bidder In The Bidding, With The Duly Notarized Secretary’s Certificate Attesting To Such Fact, If The Bidder Is A Corporation, Partnership, Cooperative, Or Joint Venture; (i) Complying With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Republic Act 3019; And (j) Complying With Existing Labor Laws And Standards, If Applicable. Failure To Observe Any Of The Above Responsibilities Shall Be At The Risk Of The Bidder Concerned. 6.3. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contract Works And The Conditions For This Project And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 6.4. It Shall Be The Sole Responsibility Of The Prospective Bidder To Determine And To Satisfy Itself By Such Means As It Considers Necessary Or Desirable As To All Matters Pertaining To This Project, Including: (a) The Location And The Nature Of The Contract, Project, Or Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work. 6.5. The Procuring Entity Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions By The Prospective Or Eligible Bidder Out Of The Data Furnished By The Procuring Entity. 6.6. Before Submitting Their Bids, The Bidders Are Deemed To Have Become Familiar With All Existing Laws, Decrees, Ordinances, Acts And Regulations Of The Philippines Which May Affect The Contract In Any Way. 6.7. The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs, Regardless Of The Conduct Or Outcome Of The Bidding Process. 6.8. Bidders Should Note That The Procuring Entity Will Only Accept Bids Only From Those That Have Paid The Nonrefundable Fee For The Bidding Documents At The Office Indicated In The Invitation To Bid. 7. Origin Of Goods And Services There Is No Restriction On The Origin Of Goods, Or Contracting Of Works Or Services Other Than Those Prohibited By A Decision Of The United Nations Security Council Taken Under Chapter Vii Of The Charter Of The United Nations. 8. Subcontracts 8.1. Unless Otherwise Specified In The Bds, The Bidder May Subcontract Portions Of The Works To An Extent As May Be Approved By The Procuring Entity And Stated In The Bds. However, Subcontracting Of Any Portion Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From The Contract For This Project. 8.2. Subcontractors Must Submit The Documentary Requirements Under Itb Clause 12 And Comply With The Eligibility Criteria Specified In The Bds. In The Event That Any Subcontractor Is Found By The Procuring Entity To Be Ineligible, The Subcontracting Of Such Portion Of The Works Shall Be Disallowed. 8.3. The Bidder May Identify The Subcontractor To Whom A Portion Of The Works Will Be Subcontracted At Any Stage Of The Bidding Process Or During Contract Implementation. If The Bidder Opts To Disclose The Name Of The Subcontractor During Bid Submission, The Bidder Shall Include The Required Documents As Part Of The Technical Component Of Its Bid. B. Contents Of Bidding Documents 9. Pre-bid Conference 9.1. (a) If So Specified In The Bds, A Pre-bid Conference Shall Be Held At The Venue And On The Date Indicated Therein, To Clarify And Address The Bidders’ Questions On The Technical And Financial Components Of This Project. (b) The Pre-bid Conference Shall Be Held At Least Twelve (12) Calendar Days Before The Deadline For The Submission Of And Receipt Of Bids. If The Procuring Entity Determines That, By Reason Of The Method, Nature, Or Complexity Of The Contract To Be Bid, Or When International Participation Will Be More Advantageous To The Gop, A Longer Period For The Preparation Of Bids Is Necessary, The Pre-bid Conference Shall Be Held At Least Thirty (30) Calendar Days Before The Deadline For The Submission And Receipt Of Bids, As Specified In The Bds. 9.2. Bidders Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. Non-attendance Of The Bidder Will In No Way Prejudice Its Bid; However, The Bidder Is Expected To Know The Changes And/or Amendments To The Bidding Documents As Recorded In The Minutes Of The Pre-bid Conference And The Supplemental/bid Bulletin. 9.3. Any Statement Made At The Pre-bid Conference Shall Not Modify The Terms Of The Bidding Documents Unless Such Statement Is Specifically Identified In Writing As An Amendment Thereto And Issued As A Supplemental/bid Bulletin. 10. Clarification And Amendment Of Bidding Documents 10.1. Bidders Who Have Purchased The Bidding Documents May Request For Clarification(s) On Any Part Of The Bidding Documents Or For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.2. Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. 10.3. Any Supplemental/bid Bulletin Issued By The Bac Shall Also Be Posted On The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Concerned, If Available. Unless, Otherwise Provided In The Bds, It Shall Be The Responsibility Of All Bidders Who Secure The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Bac. However, Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids In Accordance With Itb Clause 23. C. Preparation Of Bids 11. Language Of Bids The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation In English Certified By The Appropriate Embassy Or Consulate In The Philippines, In Which Case The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 12. Documents Comprising The Bid: Eligibility And Technical Components 12.1. Unless Otherwise Indicated In The Bds, The First Envelope Shall Contain The Following Eligibility And Technical Documents: (a) Eligibility Documents – Class "a" Documents: (i) Registration Certificate From The Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives, Or Any Proof Of Such Registration As Stated In The Bds; (ii) Mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located; (iii) Statement Of All Its Ongoing And Completed Government And Private Contracts Within Ten (10) Years From The Submission Of Bids, Including Contracts Awarded But Not Yet Started, If Any. The Statement Shall Include, For Each Contract, The Following: (iii.1) Name Of The Contract; (iii.2) Date Of The Contract; (iii.3) Contract Duration; (iii.4) Owner’s Name And Address; (iii.5) Nature Of Work; (iii.6) Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (iii.7) Total Contract Value At Award; (iii.8) Date Of Completion Or Estimated Completion Time; (iii.9) Total Contract Value At Completion, If Applicable; (iii.10) Percentages Of Planned And Actual Accomplishments, If Applicable; (iii.11) Value Of Outstanding Works, If Applicable; (iii.12) The Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (iii.13) The Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; (iv) Unless Otherwise Provided In The Bds, Valid Philippine Contractors Accreditation Board (pcab) License And Registration For The Type And Cost Of The Contract For This Project; (v) Audited Financial Statements, Showing, Among Others, The Prospective Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; (vi) Nfcc Computation Or Clc In Accordance With Itb Clause 5.5; And Class "b" Document: (vii) If Applicable, Valid Joint Venture Agreement (jva) Or, In Lieu Thereof, Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid. (b) Technical Documents – (i) Bid Security As Prescribed In Itb Clause 18. If The Bidder Opts To Submit The Bid Security In The Form Of: (i.1) A Bank Draft/guarantee Or An Irrevocable Letter Of Credit Issued By A Foreign Bank, It Shall Be Accompanied By A Confirmation From A Universal Or Commercial Bank; Or (i.2) A Surety Bond Accompanied By A Certification Coming From An Authorized Insurance Commission That A Surety Or Insurance Company Is Authorized To Issue Such Instrument; (ii) Project Requirements, Which Shall Include The Following: (ii.1) Organizational Chart For The Contract To Be Bid; (ii.2) List Of Contractor’s Personnel (viz, Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; And (ii.3) List Of Contractor’s Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project; And (iii) Sworn Statement In Accordance With Section 25.2(b)(iv) Of The Irr Of Ra 9184 And Using The Form Prescribed In Section Ix. Bidding Forms. 13. Documents Comprising The Bid: Financial Component 13.1. Unless Otherwise Stated In The Bds, The Financial Component Of The Bid Shall Contain The Following: (a) Financial Bid Form In Accordance With The Form Prescribed In Section Ix. Bidding Forms; And (b) Any Other Document Related To The Financial Component Of The Bid As Stated In The Bds. 13.2. (a) Unless Indicated In The Bds, All Bids That Exceed The Abc Shall Not Be Accepted. (b) Unless Otherwise Indicated In The Bds, For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Following Conditions Are Met: (i) Bidding Documents Are Obtainable Free Of Charge On A Freely Accessible Website. If Payment Of Bidding Documents Is Required By The Procuring Entity, Payment Could Be Made Upon The Submission Of Bids. (ii) The Procuring Entity Has Procedures In Place To Ensure That The Abc Is Based On Recent Estimates Made By The Engineer Or The Responsible Unit Of The Procuring Entity And That The Estimates Are Based On Adequate Detailed Engineering (in The Case Of Works) And Reflect The Quality, Supervision And Risk And Inflationary Factors, As Well As Prevailing Market Prices, Associated With The Types Of Works Or Goods To Be Procured. (iii) The Procuring Entity Has Trained Cost Estimators On Estimating Prices And Analyzing Bid Variances. In The Case Of Infrastructure Projects, The Procuring Entity Must Also Have Trained Quantity Surveyors. (iv) The Procuring Entity Has Established A System To Monitor And Report Bid Prices Relative To Abc And Engineer’s/procuring Entity’s Estimate. (v) The Procuring Entity Has Established A Monitoring And Evaluation System For Contract Implementation To Provide A Feedback On Actual Total Costs Of Goods And Works. 14. Alternative Bids 14.1. Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 14.2. Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 14.3. Each Bidder Shall Submit Only One Bid, Either Individually Or As A Partner In A Jv. A Bidder Who Submits Or Participates In More Than One Bid (other Than As A Subcontractor If A Subcontractor Is Permitted To Participate In More Than One Bid) Will Cause All The Proposals With The Bidder’s Participation To Be Disqualified. This Shall Be Without Prejudice To Any Applicable Criminal, Civil And Administrative Penalties That May Be Imposed Upon The Persons And Entities Concerned. 15. Bid Prices 15.1. The Contract Shall Be For The Whole Works, As Described In Itb Clause 1.1, Based On The Priced Bill Of Quantities Submitted By The Bidder. 15.2. The Bidder Shall Fill In Rates And Prices For All Items Of The Works Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 15.3. All Duties, Taxes, And Other Levies Payable By The Contractor Under The Contract, Or For Any Other Cause, Prior To The Deadline For Submission Of Bids, Shall Be Included In The Rates, Prices, And Total Bid Price Submitted By The Bidder. 15.4. All Bid Prices For The Given Scope Of Work In The Contract As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Specified In Gcc Clause 48. Price Escalation May Be Allowed In Extraordinary Circumstances As May Be Determined By The National Economic And Development Authority In Accordance With The Civil Code Of The Philippines, And Upon The Recommendation Of The Procuring Entity. Furthermore, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 16. Bid Currencies 16.1. All Bid Prices Shall Be Quoted In Philippine Pesos Unless Otherwise Provided In The Bds. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate Prevailing On The Day Of The Bid Opening. 16.2. If So Allowed In Accordance With Itb Clause 16.1, The Procuring Entity For Purposes Of Bid Evaluation And Comparing The Bid Prices Will Convert The Amounts In Various Currencies In Which The Bid Price Is Expressed To Philippine Pesos At The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 16.3. Unless Otherwise Specified In The Bds, Payment Of The Contract Price Shall Be Made In Philippine Pesos. 17. Bid Validity 17.1. Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. 17.2. In Exceptional Circumstances, Prior To The Expiration Of The Bid Validity Period, The Procuring Entity May Request Bidders To Extend The Period Of Validity Of Their Bids. The Request And The Responses Shall Be Made In Writing. The Bid Security Described In Itb Clause 18 Should Also Be Extended Corresponding To The Extension Of The Bid Validity Period At The Least. A Bidder May Refuse The Request Without Forfeiting Its Bid Security, But His Bid Shall No Longer Be Considered For Further Evaluation And Award. A Bidder Granting The Request Shall Not Be Required Or Permitted To Modify Its Bid. 18. Bid Security 18.1. The Bid Security In The Amount Stated In The Bds Shall Be Equal To The Percentage Of The Abc In Accordance With The Following Schedule: Form Of Bid Security Amount Of Bid Security (equal To Percentage Of The Abc) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Two Percent (2%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Five Percent (5%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security For Biddings Conducted By Local Government Units, The Bidder May Also Submit Bid Securities In The Form Of Cashier’s/manager’s Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Such Financial Statement. 18.2. The Bid Security Should Be Valid For The Period Specified In The Bds. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 18.3. No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed Or Declared As Post-disqualified, Upon Submission Of A Written Waiver Of Their Right To File A Motion For Reconsideration And/or Protest. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In Itb Clause 18.2. 18.4. Upon Signing And Execution Of The Contract, Pursuant To Itb Clause 31, And The Posting Of The Performance Security, Pursuant To Itb Clause 32, The Successful Bidder’s Bid Security Will Be Discharged, But In No Case Later Than The Bid Security Validity Period As Indicated In Itb Clause 18.2. 18.5. The Bid Security May Be Forfeited: (a) If A Bidder: (i) Withdraws Its Bid During The Period Of Bid Validity Specified In Itb Clause 17; (ii) Does Not Accept The Correction Of Errors Pursuant To Itb Clause 27.3(b); (iii) Fails To Submit The Requirements Within The Prescribed Period, Or A Finding Against Their Veracity, As Stated In Itb Clause 28.2; (iv) Submission Of Eligibility Requirements Containing False Information Or Falsified Documents; (v) Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding; (vi) Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding; (vii) Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid; (viii) Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time; (ix) Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification; (x) Any Documented Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor; (xi) Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared Successful; Or (xii) All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons. (b) If The Successful Bidder: (i) Fails To Sign The Contract In Accordance With Itb Clause 31; (ii) Fails To Furnish Performance Security In Accordance With Itb Clause 32. 19. Format And Signing Of Bids 19.1. Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Appropriate Forms Provided In Section Ix. Bidding Forms On Or Before The Deadline Specified In The Itb Clause 21 In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements Under Itb Clause 12.1, And The Second Shall Contain The Financial Component Of The Bid. 19.2. Forms As Mentioned In Itb Clause 19.1 Must Be Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 19.3. The Bidder Shall Prepare An Original Of The First And Second Envelopes As Described In Itb Clauses 12 And 13. In Addition, The Bidder Shall Submit Copies Of The First And Second Envelopes. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 19.4. The Bid, Except For Unamended Printed Literature, Shall Be Signed, And Each And Every Page Thereof Shall Be Initialed, By The Duly Authorized Representative/s Of The Bidder. 19.5. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder. 20. Sealing And Marking Of Bids 20.1. Bidders Shall Enclose Their Original Eligibility And Technical Documents Described In Itb Clause 12, In One Sealed Envelope Marked “original - Technical Component”, And The Original Of Their Financial Component In Another Sealed Envelope Marked “original - Financial Component”, Sealing Them All In An Outer Envelope Marked “original Bid”. 20.2. Each Copy Of The First And Second Envelopes Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Technical Component” And “copy No. ___ – Financial Component” And The Outer Envelope As “copy No. ___”, Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 20.3. The Original And The Number Of Copies Of The Bid As Indicated In The Bds Shall Be Typed Or Written In Indelible Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. 20.4. All Envelopes Shall: (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac Identified In Itb Clause 10.1; (d) Bear The Specific Identification Of This Bidding Process Indicated In The Invitation To Bid; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, In Accordance With Itb Clause 21. 20.5. If Bids Are Not Sealed And Marked As Required, The Procuring Entity Will Assume No Responsibility For The Misplacement Or Premature Opening Of The Bid. D. Submission And Opening Of Bids 21. Deadline For Submission Of Bids Bids Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Bds. 22. Late Bids Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 21, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity. 23. Modification And Withdrawal Of Bids 23.1. The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 23.2. A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. 23.3. Bids Requested To Be Withdrawn In Accordance With Itb Clause 23.1 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract. 23.4. No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Financial Bid Form. Withdrawal Of A Bid During This Interval Shall Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To Itb Clause 18.5, And The Imposition Of Administrative, Civil, And Criminal Sanctions As Prescribed By Ra 9184 And Its Irr. 24. Opening And Preliminary Examination Of Bids 24.1. The Bac Shall Open The First Bid Envelopes Of Bidders In Public As Specified In The Bds To Determine Each Bidder’s Compliance With The Documents Prescribed In Itb Clause 12. For This Purpose, The Bac Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion. If A Bidder Submits The Required Document, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Bids That Fail To Include Any Requirement Or Are Incomplete Or Patently Insufficient Shall Be Considered As “failed”. Otherwise, The Bac Shall Rate The Said First Bid Envelope As “passed”. 24.2. Unless Otherwise Specified In The Bds, Immediately After Determining Compliance With The Requirements In The First Envelope, The Bac Shall Forthwith Open The Second Bid Envelope Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed”. The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc Unless Otherwise Provided In Itb Clause 13.1(b), The Bac Shall Rate The Bid Concerned As “failed”. Only Bids That Are Determined To Contain All The Bid Requirements For Both Components Shall Be Rated “passed” And Shall Immediately Be Considered For Evaluation And Comparison. 24.3. Letters Of Withdrawal Shall Be Read Out And Recorded During Bid Opening, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance, The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For The Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Authorization Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions. 24.4. If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Itb Clause 12.1(a), Items (i) To (vi). 24.5. In The Case Of An Eligible Foreign Bidder As Described In Itb Clause 5, The Class “a” Documents Enumerated In Itb Clause 12.1(a) May Be Substituted With The Appropriate Equivalent Documents, If Any, Issued By The Country Of The Foreign Bidder Concerned. 24.6. Each Partner Of A Joint Venture Agreement Shall Likewise Submit The Documents Required In Itb Clauses 12.1(a)(i) And 12.1(a)(ii). Submission Of Documents Required Under Itb Clauses 12.1(a)(iii) To 12.1(a)(vi) By Any Of The Joint Venture Partners Constitutes Compliance. 24.7. A Bidder Determined As “failed” Has Three (3) Calendar Days Upon Written Notice Or, If Present At The Time Of Bid Opening, Upon Verbal Notification Within Which To File A Request For Reconsideration With The Bac: Provided, However, That The Request For Reconsideration Shall Not Be Granted If It Is Established That The Finding Of Failure Is Due To The Fault Of The Bidder Concerned: Provided, Further, That The Bac Shall Decide On The Request For Reconsideration Within Seven (7) Calendar Days From Receipt Thereof. If A Failed Bidder Signifies His Intent To File A Request For Reconsideration, The Bac Shall Keep The Bid Envelopes Of The Said Failed Bidder Unopened And/or Duly Sealed Until Such Time That The Request For Reconsideration Or Protest Has Been Resolved. E. Evaluation And Comparison Of Bids 25. Process To Be Confidential 25.1. Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award, Unless N The Case Of Itb Clause 26. 25.2. Any Effort By A Bidder To Influence The Procuring Entity In The Procuring Entity’s Decision In Respect Of Bid Evaluation, Bid Comparison Or Contract Award Will Result In The Rejection Of The Bidder’s Bid. 26. Clarification Of Bids To Assist In The Evaluation, Comparison And Post-qualification Of The Bids, The Procuring Entity May Ask In Writing Any Bidder For A Clarification Of Its Bid. All Responses To Requests For Clarification Shall Be In Writing. Any Clarification Submitted By A Bidder In Respect To Its Bid And That Is Not In Response To A Request By The Procuring Entity Shall Not Be Considered 27. Detailed Evaluation And Comparison Of Bids 27.1. The Procuring Entity Will Undertake The Detailed Evaluation And Comparison Of Bids Which Have Passed The Opening And Preliminary Examination Of Bids, Pursuant To Itb Clause 24, In Order To Determine The Lowest Calculated Bid. 27.2. In Evaluating The Bids To Get The Lowest Calculated Bid, The Procuring Entity Shall Undertake The Following: (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 27.3. The Procuring Entity's Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary “pass/fail” Criterion. The Bac Shall Consider The Following In The Evaluation Of Bids: (a) Completeness Of The Bid. Unless The Itb Specifically Allows Partial Bids, Bids Not Addressing Or Providing All Of The Required Items In The Schedule Of Requirements Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Procuring Entity; And (b) Arithmetical Corrections. Consider Computational Errors And Omissions To Enable Proper Comparison Of All Eligible Bids. It May Also Consider Bid Modifications If Expressly Allowed In The Bds. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 27.4. Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered, Unless Otherwise Indicated In The Bds. 27.5. The Procuring Entity’s Evaluation Of Bids Shall Only Be Based On The Bid Price Quoted In The Financial Bid Form 27.6. Bids Shall Be Evaluated On An Equal Footing To Ensure Fair Competition. For This Purpose, All Bidders Shall Be Required To Include In Their Bids The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 28. Post Qualification 28.1. The Procuring Entity Shall Determine To Its Satisfaction Whether The Bidder That Is Evaluated As Having Submitted The Lowest Calculated Bid (lcb) Complies With And Is Responsive To All The Requirements And Conditions Specified In Itb Clauses 5, 12, And 13. 28.2. Within A Non-extendible Period Of Three (3) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lcb, The Bidder Shall Submit The Following Documentary Requirements: (a) Tax Clearance Per Executive Order 398, Series Of 2005; (b) Latest Income And Business Tax Returns In The Form Specified In The Bds; (c) Certificate Of Philgeps Registration; And (d) Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. Failure Of The Bidder Declared As Lcb To Duly Submit The Requirements Under This Clause Or A Finding Against The Veracity Of Such, Shall Be Ground For Forfeiture Of The Bid Security And Disqualification Of The Bidder For Award. 28.3. The Determination Shall Be Based Upon An Examination Of The Documentary Evidence Of The Bidder’s Qualifications Submitted Pursuant To Itb Clauses 12 And 13, As Well As Other Information As The Procuring Entity Deems Necessary And Appropriate, Using A Non-discretionary “pass/fail” Criterion. 28.4. If The Bac Determines That The Bidder With The Lowest Calculated Bid Passes All The Criteria For Post-qualification, It Shall Declare The Said Bid As The Lowest Calculated Responsive Bid, And Recommend To The Head Of The Procuring Entity The Award Of Contract To The Said Bidder At Its Submitted Price Or Its Calculated Bid Price, Whichever Is Lower, Subject To Itb Clause 30.3. 28.5. A Negative Determination Shall Result In Rejection Of The Bidder’s Bid, In Which Event The Procuring Entity Shall Proceed To The Next Lowest Calculated Bid To Make A Similar Determination Of That Bidder’s Capabilities To Perform Satisfactorily. If The Second Bidder, However, Fails The Post Qualification, The Procedure For Post Qualification Shall Be Repeated For The Bidder With The Next Lowest Calculated Bid, And So On Until The Lowest Calculated And Responsive Bid Is Determined For Contract Award. 28.6. Within A Period Not Exceeding Seven (7) Calendar Days From The Date Of Receipt Of The Recommendation Of The Bac, The Head Of The Procuring Entity Shall Approve Or Disapprove The Said Recommendation. In The Case Of Government Owned And Government-owned And/or -controlled Corporations (goccs) And Government Financial Institutions (gfis), The Period Provided Herein Shall Be Fifteen (15) Calendar Days. 29. Reservation Clause 29.1. Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 29.2. Based On The Following Grounds, The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding At Any Time Prior To The Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability, And Make No Assurance That A Contract Shall Be Entered Into As A Result Of The Bidding: (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Procuring Entity’s Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Government As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 29.3. In Addition, The Procuring Entity May Likewise Declare A Failure Of Bidding When: (a) No Bids Are Received; (b) All Prospective Bidders Are Declared Ineligible; (c) All Bids Fail To Comply With All The Bid Requirements Or Fail Post-qualification; Or (d) The Bidder With The Lowest Calculated Responsive Bid Refuses, Without Justifiable Cause To Accept The Award Of Contract, And No Award Is Made. F. Award Of Contract 30. Contract Award 30.1. Subject To Itb Clause 28, The Procuring Entity Shall Award The Contract To The Bidder Whose Bid Has Been Determined To Be The Lowest Calculated And Responsive Bid (lcrb). 30.2. Prior To The Expiration Of The Period Of Bid Validity, The Procuring Entity Shall Notify The Successful Bidder In Writing That Its Bid Has Been Accepted, Through A Notice Of Award Received Personally Or Sent By Registered Mail Or Electronically, Receipt Of Which Must Be Confirmed In Writing Within Two (2) Days By The Lcrb And Submitted Personally Or Sent By Registered Mail Or Electronically To The Procuring Entity. 30.3. Notwithstanding The Issuance Of The Notice Of Award, Award Of Contract Shall Be Subject To The Following Conditions: (a) Submission Of The Following Documents Within The Prescribed Period From Receipt By The Bidder Of The Notice That It Has The Lowest Calculated And Responsive Bid: (i) Valid Jva, If Applicable, Within Ten (10) Calendar Days; (ii) Valid Pcab License And Registration For The Type And Cost Of The Contract To Be Bid For Foreign Bidders, Within Thirty (30) Calendar Days, If Allowed Under A Treaty Or International Or Executive Agreement Mentioned In Itb Clause 12.1(a)(iv); (b) Posting Of The Performance Security In Accordance With Itb Clause 32; (c) Signing Of The Contract As Provided In Itb Clause 31; And (d) Approval By Higher Authority, If Required. 31. Signing Of The Contract 31.1. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Contract Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 31.2. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award, The Successful Bidder Shall Post The Required Performance Security, Sign And Date The Contract And Return It To The Procuring Entity. 31.3. The Procuring Entity Shall Enter Into Contract With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 31.4. The Following Documents Shall Form Part Of The Contract: (a) Contract Agreement; (b) Bidding Documents; (c) Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted; (d) Performance Security; (e) Credit Line In Accordance With Itb Clause 5.5, If Applicable; (f) Notice Of Award Of Contract; And (g) Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. 32. Performance Security 32.1. To Guarantee The Faithful Performance By The Winning Bidder Of Its Obligations Under The Contract, It Shall Post A Performance Security Within A Maximum Period Of Ten (10) Calendar Days From The Receipt Of The Notice Of Award From The Procuring Entity And In No Case Later Than The Signing Of The Contract. 32.2. The Performance Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity In An Amount Equal To The Percentage Of The Total Contract Price As Stated In The Bds In Accordance With The Following Schedule: 33. 33.1. Form Of Performance Security Amount Of Performance Security (equal To Percentage Of The Total Contract Price) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Ten Percent (10%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Thirty Percent (30%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security 33.2. Failure Of The Successful Bidder To Comply With The Above-mentioned Requirement Shall Constitute Sufficient Ground For The Annulment Of The Award And Forfeiture Of The Bid Security, In Which Event The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lowest Calculated And Responsive Bid Is Identified And Selected For Contract Award. However If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 34. Notice To Proceed 34.1. Within Three (3) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed To The Bidder. 34.2. The Contract Effectivity Date Shall Be Provided In The Notice To Proceed By The Procuring Entity, Which Date Shall Not Be Later Than Seven (7) Calendar Days From The Issuance Of The Notice To Proceed. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is Lgu- Mapanas, Northern Samar. The Name Of The Contract Is Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar The Identification Number Of The Contract Is Pr No-2025-01-06___ 2 The Funding Source Is: Lgsf-sbdp For Fy 2024. The Name Of The Project Is: Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar 3.1 No Further Instructions. 5.1 No Further Instructions. 5.2 Bidding Is Restricted To Eligible Bidders As Defined In Itb Clause 5.1. 5.4 For This Purpose, Similar Contracts Shall Refer To Bidder’s Annual Turnover From All Works Average Over The Last Three Years Shall Be Equal To 50% Of The Estimated Cost Of The Contract Being Procured. The Bidder Must Have Completed, Within The Past Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Eighty Percent (80%) Of The Abc. 8.1 “subcontracting Is Not Allowed.” 8.2 “not Applicable”. 9.1 The Procuring Entity Will Hold A Pre-bid Conference For This Project On January 10, 2025 At 10:00 A.m. At Executive Conference 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar. 10.1 The Procuring Entity’s Address Is: The Municipality Of Mapanas, Province Of Northern Samar Ma. Teresa L. Minguez Lgu-bac Chairperson Tel. No. 09778033758 10.3 No Further Instructions. 12.1 Not Applicable 12.1(a)(i) “no Other Acceptable Proof Of Registration Is Recognized.” 12.1(a)(iv) No Further Instructions. 13.1 “no Additional Requirements” 13.1(b) The Abc Is Php4,999,779.12 Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. 14.2 “no Further Instructions.” 15.4 No Further Instruction. 16.1 The Bid Prices Shall Be Quoted In Philippine Pesos. 17.1 Bids Will Be Valid Until 90 Calendar Days After The Bid Submission Deadline Date As Prescribed By The Procuring Entity) 18.1 The Bid Security Shall Be In The Following Amount: 1. The Amount Of 99,995.58 If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of P249,989.00 If Bid Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. 18.2 The Bid Security Shall Be Valid Twenty Eight Days Beyond The Validity Period Of The Bid. 20.3 Each Bidder Shall Submit One Original And One Copy Of The First And Second Components Of Its Bid. 21 The Address For Submission Of Bids Is Ma. Teresa L. Minguez Lgu-bac Chairperson Bac Office @ Mpdo, 1st Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar The Deadline For Submission Of Bids Is 9:00 A.m. On January 21, 2025. 22 The Place Of Bid Opening Is Executive Conference Room, 2nd Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar. The Date And Time Of Bid Opening Is January 15, 2025 At Exactly 10:00 A.m. 24.2 No Further Instructions. 27.3(b) Bid Modification Is Not Allowed. 27.4 No Further Instructions. 28.2(b) Bidders Have Option To Submit Manually Filed Tax Returns Or Tax Returns Filed Through The Electronic Filing And Payments System (efps). Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 28.2(d) List Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It. 1. Taxpayer’s Identification Number 2. Vat Registration 3. Philippine Contractors Accreditation Board (pcab) License The Requirements Are Applicable Only In A Case Where The Lowest Calculated Bid (lcb) Is Submitted By A Domestic Bidder, And If The Lowest Calculated Bid (lcb) Is Submitted By A Foreign Bidder, This Requirements Are Not Applicable 31.4(g) List Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Department Of Labor And Employment, And Pert/cpm. 32.2 The Performance Security Shall Be In The Following Amount: 1. The Amount Of 10% Of Contract If Performance Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of 30% Of Contract If Performance Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. Section Iv. General Conditions Of Contract Table Of Contents 1. Definitions 41 2. Interpretation 43 3. Governing Language And Law 43 4. Communications 43 5. Possession Of Site 43 6. The Contractor’s Obligations 44 7. Performance Security 45 8. Subcontracting 46 9. Liquidated Damages 46 10. Site Investigation Reports 47 11. The Procuring Entity, Licenses And Permits 47 12. Contractor’s Risk And Warranty Security 47 13. Liability Of The Contractor 49 14. Procuring Entity’s Risk 49 15. Insurance 49 16. Termination For Default Of Contractor 51 17. Termination For Default Of Procuring Entity 51 18. Termination For Other Causes 52 19. Procedures For Termination Of Contracts 53 20. Force Majeure, Release From Performance 56 21. Resolution Of Disputes 56 22. Suspension Of Loan, Credit, Grant, Or Appropriation 57 23. Procuring Entity’s Representative’s Decisions 57 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 57 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 58 26. Extension Of The Intended Completion Date 58 27. Right To Vary 58 28. Contractors Right To Claim 59 29. Dayworks 59 30. Early Warning 59 31. Program Of Work 59 32. Management Conferences 60 33. Bill Of Quantities 60 34. Instructions, Inspections And Audits 61 35. Identifying Defects 61 36. Cost Of Repairs 61 37. Correction Of Defects 61 38. Uncorrected Defects 62 39. Advance Payment 62 40. Progress Payments 62 41. Payment Certificates 63 42. Retention 63 43. Variation Orders 64 44. Contract Completion 66 45. Suspension Of Work 66 46. Payment On Termination 67 47. Extension Of Contract Time 67 48. Price Adjustment 68 49. Completion 68 50. Taking Over 69 51. Operating And Maintenance Manuals 69 1. Definitions For Purposes Of This Clause, Boldface Type Is Used To Identify Defined Terms. 1.1. The Arbiter Is The Person Appointed Jointly By The Procuring Entity And The Contractor To Resolve Disputes In The First Instance, As Provided For In Gcc Clause 21. 1.2. Bill Of Quantities Refers To A List Of The Specific Items Of The Work And Their Corresponding Unit Prices, Lump Sums, And/or Provisional Sums. 1.3. The Completion Date Is The Date Of Completion Of The Works As Certified By The Procuring Entity’s Representative, In Accordance With Gcc Clause 49. 1.4. The Contract Is The Contract Between The Procuring Entity And The Contractor To Execute, Complete, And Maintain The Works. 1.5. The Contract Price Is The Price Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Procuring Entity To The Contractor For The Execution Of The Works In Accordance With This Contract. 1.6. Contract Time Extension Is The Allowable Period For The Contractor To Complete The Works In Addition To The Original Completion Date Stated In This Contract. 1.7. The Contractor Is The Juridical Entity Whose Proposal Has Been Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. 1.8. The Contractor’s Bid Is The Signed Offer Or Proposal Submitted By The Contractor To The Procuring Entity In Response To The Bidding Documents. 1.9. Days Are Calendar Days; Months Are Calendar Months. 1.10. Dayworks Are Varied Work Inputs Subject To Payment On A Time Basis For The Contractor’s Employees And Equipment, In Addition To Payments For Associated Materials And Plant. 1.11. A Defect Is Any Part Of The Works Not Completed In Accordance With The Contract. 1.12. The Defects Liability Certificate Is The Certificate Issued By Procuring Entity’s Representative Upon Correction Of Defects By The Contractor. 1.13. The Defects Liability Period Is The One Year Period Between Contract Completion And Final Acceptance Within Which The Contractor Assumes The Responsibility To Undertake The Repair Of Any Damage To The Works At His Own Expense. 1.14. Drawings Are Graphical Presentations Of The Works. They Include All Supplementary Details, Shop Drawings, Calculations, And Other Information Provided Or Approved For The Execution Of This Contract. 1.15. Equipment Refers To All Facilities, Supplies, Appliances, Materials Or Things Required For The Execution And Completion Of The Work Provided By The Contractor And Which Shall Not Form Or Are Not Intended To Form Part Of The Permanent Works. 1.16. The Intended Completion Date Refers To The Date Specified In The Scc When The Contractor Is Expected To Have Completed The Works. The Intended Completion Date May Be Revised Only By The Procuring Entity’s Representative By Issuing An Extension Of Time Or An Acceleration Order. 1.17. Materials Are All Supplies, Including Consumables, Used By The Contractor For Incorporation In The Works. 1.18. The Notice To Proceed Is A Written Notice Issued By The Procuring Entity Or The Procuring Entity’s Representative To The Contractor Requiring The Latter To Begin The Commencement Of The Work Not Later Than A Specified Or Determinable Date. 1.19. Permanent Works All Permanent Structures And All Other Project Features And Facilities Required To Be Constructed And Completed In Accordance With This Contract Which Shall Be Delivered To The Procuring Entity And Which Shall Remain At The Site After The Removal Of All Temporary Works. 1.20. Plant Refers To The Machinery, Apparatus, And The Like Intended To Form An Integral Part Of The Permanent Works. 1.21. The Procuring Entity Is The Party Who Employs The Contractor To Carry Out The Works Stated In The Scc. 1.22. The Procuring Entity’s Representative Refers To The Head Of The Procuring Entity Or His Duly Authorized Representative, Identified In The Scc, Who Shall Be Responsible For Supervising The Execution Of The Works And Administering This Contract. 1.23. The Site Is The Place Provided By The Procuring Entity Where The Works Shall Be Executed And Any Other Place Or Places Which May Be Designated In The Scc, Or Notified To The Contractor By The Procuring Entity’s Representative As Forming Part Of The Site. 1.24. Site Investigation Reports Are Those That Were Included In The Bidding Documents And Are Factual And Interpretative Reports About The Surface And Subsurface Conditions At The Site. 1.25. Slippage Is A Delay In Work Execution Occurring When Actual Accomplishment Falls Below The Target As Measured By The Difference Between The Scheduled And Actual Accomplishment Of The Work By The Contractor As Established From The Work Schedule. This Is Actually Described As A Percentage Of The Whole Works. 1.26. Specifications Means The Description Of Works To Be Done And The Qualities Of Materials To Be Used, The Equipment To Be Installed And The Mode Of Construction. 1.27. The Start Date, As Specified In The Scc, Is The Date When The Contractor Is Obliged To Commence Execution Of The Works. It Does Not Necessarily Coincide With Any Of The Site Possession Dates. 1.28. A Subcontractor Is Any Person Or Organization To Whom A Part Of The Works Has Been Subcontracted By The Contractor, As Allowed By The Procuring Entity, But Not Any Assignee Of Such Person. 1.29. Temporary Works Are Works Designed, Constructed, Installed, And Removed By The Contractor That Are Needed For Construction Or Installation Of The Permanent Works. 1.30. Work(s)refer To The Permanent Works And Temporary Works To Be Executed By The Contractor In Accordance With This Contract, Including (i) The Furnishing Of All Labor, Materials, Equipment And Others Incidental, Necessary Or Convenient To The Complete Execution Of The Works; (ii) The Passing Of Any Tests Before Acceptance By The Procuring Entity’s Representative; (iii) And The Carrying Out Of All Duties And Obligations Of The Contractor Imposed By This Contract As Described In The Scc. 2. Interpretation 2.1. In Interpreting The Conditions Of Contract, Singular Also Means Plural, Male Also Means Female Or Neuter, And The Other Way Around. Headings Have No Significance. Words Have Their Normal Meaning Under The Language Of This Contract Unless Specifically Defined. The Procuring Entity’s Representative Will Provide Instructions Clarifying Queries About The Conditions Of Contract. 2.2. If Sectional Completion Is Specified In The Scc, References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Governing Language And Law 3.1. This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Which Are Exchanged By The Parties Shall Be Written In English. 3.2. This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4. Communications Communications Between Parties That Are Referred To In The Conditions Shall Be Effective Only When In Writing. A Notice Shall Be Effective Only When It Is Received By The Concerned Party. 5. Possession Of Site 5.1. On The Date Specified In The Scc, The Procuring Entity Shall Grant The Contractor Possession Of So Much Of The Site As May Be Required To Enable It To Proceed With The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 5.2. If Possession Of A Portion Is Not Given By The Date Stated In The Scc Clause 5.1, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contact Time To Address Such Delay Shall Be In Accordance With Gcc Clause 47. 5.3. The Contractor Shall Bear All Costs And Charges For Special Or Temporary Right-of-way Required By It In Connection With Access To The Site. The Contractor Shall Also Provide At His Own Cost Any Additional Facilities Outside The Site Required By It For Purposes Of The Works. 5.4. The Contractor Shall Allow The Procuring Entity’s Representative And Any Person Authorized By The Procuring Entity’s Representative Access To The Site And To Any Place Where Work In Connection With This Contract Is Being Carried Out Or Is Intended To Be Carried Out. 6. The Contractor’s Obligations 6.1. The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Contractor's Equipment, Which May Be Required. All Materials And Plant On Site Shall Be Deemed To Be The Property Of The Procuring Entity. 6.2. The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Program Of Work Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Complete Them By The Intended Completion Date. 6.3. The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. 6.4. The Contractor Shall Carry Out All Instructions Of The Procuring Entity’s Representative That Comply With The Applicable Laws Where The Site Is Located. 6.5. The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel, As Referred To In The Scc, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 6.6. If The Procuring Entity’s Representative Asks The Contractor To Remove A Member Of The Contractor’s Staff Or Work Force, For Justifiable Cause, The Contractor Shall Ensure That The Person Leaves The Site Within Seven (7) Days And Has No Further Connection With The Work In This Contract. 6.7. During Contract Implementation, The Contractor And His Subcontractors Shall Abide At All Times By All Labor Laws, Including Child Labor Related Enactments, And Other Relevant Rules. 6.8. The Contractor Shall Submit To The Procuring Entity For Consent The Name And Particulars Of The Person Authorized To Receive Instructions On Behalf Of The Contractor. 6.9. The Contractor Shall Cooperate And Share The Site With Other Contractors, Public Authorities, Utilities, And The Procuring Entity Between The Dates Given In The Schedule Of Other Contractors Particularly When They Shall Require Access To The Site. The Contractor Shall Also Provide Facilities And Services For Them During This Period. The Procuring Entity May Modify The Schedule Of Other Contractors, And Shall Notify The Contractor Of Any Such Modification Thereto. 6.10. Should Anything Of Historical Or Other Interest Or Of Significant Value Be Unexpectedly Discovered On The Site, It Shall Be The Property Of The Procuring Entity. The Contractor Shall Notify The Procuring Entity’s Representative Of Such Discoveries And Carry Out The Procuring Entity’s Representative’s Instructions In Dealing With Them. 7. Performance Security 7.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Contractor Shall Furnish The Performance Security In Any The Forms Prescribed In Itb Clause 32.2. 7.2. The Performance Security Posted In Favor Of The Procuring Entity Shall Be Forfeited In The Event It Is Established That The Contractor Is In Default In Any Of Its Obligations Under The Contract. 7.3. The Performance Security Shall Remain Valid Until Issuance By The Procuring Entity Of The Certificate Of Final Acceptance. 7.4. The Performance Security May Be Released By The Procuring Entity And Returned To The Contractor After The Issuance Of The Certificate Of Final Acceptance Subject To The Following Conditions: (a) There Are No Pending Claims Against The Contractor Or The Surety Company Filed By The Procuring Entity; (b) The Contractor Has No Pending Claims For Labor And Materials Filed Against It; And (c) Other Terms Specified In The Scc. 7.5. The Contractor Shall Post An Additional Performance Security Following The Amount And Form Specified In Itb Clause 32.2 To Cover Any Cumulative Increase Of More Than Ten Percent (10%) Over The Original Value Of The Contract As A Result Of Amendments To Order Or Change Orders, Extra Work Orders And Supplemental Agreements, As The Case May Be. The Contractor Shall Cause The Extension Of The Validity Of The Performance Security To Cover Approved Contract Time Extensions. 7.6. In Case Of A Reduction In The Contract Value Or For Partially Completed Works Under The Contract Which Are Usable And Accepted By The Procuring Entity The Use Of Which, In The Judgment Of The Implementing Agency Or The Procuring Entity, Will Not Affect The Structural Integrity Of The Entire Project, The Procuring Entity Shall Allow A Proportional Reduction In The Original Performance Security, Provided That Any Such Reduction Is More Than Ten Percent (10%) And That The Aggregate Of Such Reductions Is Not More Than Fifty Percent (50%) Of The Original Performance Security. 7.7. Unless Otherwise Indicated In The Scc, The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Act 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 8. Subcontracting 8.1. Unless Otherwise Indicated In The Scc, The Contractor Cannot Subcontract Works More Than The Percentage Specified In Itb Clause 8.1. 8.2. Subcontracting Of Any Portion Of The Works Does Not Relieve The Contractor Of Any Liability Or Obligation Under This Contract. The Contractor Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 8.3. Subcontractors Disclosed And Identified During The Bidding May Be Changed During The Implementation Of This Contract, Subject To Compliance With The Required Qualifications And The Approval Of The Procuring Entity. 9. Liquidated Damages 9.1. The Contractor Shall Pay Liquidated Damages To The Procuring Entity For Each Day That The Completion Date Is Later Than The Intended Completion Date. The Applicable Liquidated Damages Is At Least One-tenth (1/10) Of A Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Total Amount Of Liquidated Damages Shall Not Exceed Ten Percent (10%) Of The Amount Of The Contract. The Procuring Entity May Deduct Liquidated Damages From Payments Due To The Contractor. Payment Of Liquidated Damages Shall Not Affect The Contractor. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of This Contract, The Procuring Entity Shall Rescind This Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 9.2. If The Intended Completion Date Is Extended After Liquidated Damages Have Been Paid, The Engineer Of The Procuring Entity Shall Correct Any Overpayment Of Liquidated Damages By The Contractor By Adjusting The Next Payment Certificate. The Contractor Shall Be Paid Interest On The Overpayment, Calculated From The Date Of Payment To The Date Of Repayment, At The Rates Specified In Gcc Clause 40.3. 10. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 11. The Procuring Entity, Licenses And Permits The Procuring Entity Shall, If Requested By The Contractor, Assist Him In Applying For Permits, Licenses Or Approvals, Which Are Required For The Works. 12. Contractor’s Risk And Warranty Security 12.1. The Contractor Shall Assume Full Responsibility For The Works From The Time Project Construction Commenced Up To Final Acceptance By The Procuring Entity And Shall Be Held Responsible For Any Damage Or Destruction Of The Works Except Those Occasioned By Force Majeure. The Contractor Shall Be Fully Responsible For The Safety, Protection, Security, And Convenience Of His Personnel, Third Parties, And The Public At Large, As Well As The Works, Equipment, Installation, And The Like To Be Affected By His Construction Work. 12.2. The Defects Liability Period For Infrastructure Projects Shall Be One Year From Contract Completion Up To Final Acceptance By The Procuring Entity. During This Period, The Contractor Shall Undertake The Repair Works, At His Own Expense, Of Any Damage To The Works On Account Of The Use Of Materials Of Inferior Quality Within Ninety (90) Days From The Time The Head Of The Procuring Entity Has Issued An Order To Undertake Repair. In Case Of Failure Or Refusal To Comply With This Mandate, The Procuring Entity Shall Undertake Such Repair Works And Shall Be Entitled To Full Reimbursement Of Expenses Incurred Therein Upon Demand. 12.3. Unless Otherwise Indicated In The Scc, In Case The Contractor Fails To Comply With The Preceding Paragraph, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 12.4. After Final Acceptance Of The Works By The Procuring Entity, The Contractor Shall Be Held Responsible For “structural Defects”, I.e., Major Faults/flaws/deficiencies In One Or More Key Structural Elements Of The Project Which May Lead To Structural Failure Of The Completed Elements Or Structure, Or “structural Failures”, I.e., Where One Or More Key Structural Elements In An Infrastructure Facility Fails Or Collapses, Thereby Rendering The Facility Or Part Thereof Incapable Of Withstanding The Design Loads, And/or Endangering The Safety Of The Users Or The General Public: (a) Contractor – Where Structural Defects/failures Arise Due To Faults Attributable To Improper Construction, Use Of Inferior Quality/substandard Materials, And Any Violation Of The Contract Plans And Specifications, The Contractor Shall Be Held Liable; (b) Consultants – Where Structural Defects/failures Arise Due To Faulty And/or Inadequate Design And Specifications As Well As Construction Supervision, Then The Consultant Who Prepared The Design Or Undertook Construction Supervision For The Project Shall Be Held Liable; (c) Procuring Entity’s Representatives/project Manager/construction Managers And Supervisors – The Project Owner’s Representative(s), Project Manager, Construction Manager, And Supervisor(s) Shall Be Held Liable In Cases Where The Structural Defects/failures Are Due To His/their Willful Intervention In Altering The Designs And Other Specifications; Negligence Or Omission In Not Approving Or Acting On Proposed Changes To Noted Defects Or Deficiencies In The Design And/or Specifications; And The Use Of Substandard Construction Materials In The Project; (d) Third Parties - Third Parties Shall Be Held Liable In Cases Where Structural Defects/failures Are Caused By Work Undertaken By Them Such As Leaking Pipes, Diggings Or Excavations, Underground Cables And Electrical Wires, Underground Tunnel, Mining Shaft And The Like, In Which Case The Applicable Warranty To Such Structure Should Be Levied To Third Parties For Their Construction Or Restoration Works. (e) Users - In Cases Where Structural Defects/failures Are Due To Abuse/misuse By The End User Of The Constructed Facility And/or Non–compliance By A User With The Technical Design Limits And/or Intended Purpose Of The Same, Then The User Concerned Shall Be Held Liable. 12.5. The Warranty Against Structural Defects/failures, Except Those Occasioned On Force Majeure, Shall Cover The Period Specified In The Scc Reckoned From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. 12.6. The Contractor Shall Be Required To Put Up A Warranty Security In The Form Of Cash, Bank Guarantee, Letter Of Credit, Gsis Or Surety Bond Callable On Demand, In Accordance With The Following Schedule: Form Of Warranty Minimum Amount In Percentage (%) Of Total Contract Price (a) Cash Or Letter Of Credit Issued By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Five Percent (5%) (b) Bank Guarantee Confirmed By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Ten Percent (10%) (c) Surety Bond Callable Upon Demand Issued By Gsis Or Any Surety Or Insurance Company Duly Certified By The Insurance Commission Thirty Percent (30%) 12.7. The Warranty Security Shall Be Stated In Philippine Pesos And Shall Remain Effective For One Year From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity, And Returned Only After The Lapse Of Said One Year Period. 12.8. In Case Of Structural Defects/failure Occurring During The Applicable Warranty Period Provided In Gcc Clause 12.5, The Procuring Entity Shall Undertake The Necessary Restoration Or Reconstruction Works And Shall Be Entitled To Full Reimbursement By The Parties Found To Be Liable For Expenses Incurred Therein Upon Demand, Without Prejudice To The Filing Of Appropriate Administrative, Civil, And/or Criminal Charges Against The Responsible Persons As Well As The Forfeiture Of The Warranty Security Posted In Favor Of The Procuring Entity. 13. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. 14. Procuring Entity’s Risk 14.1. From The Start Date Until The Certificate Of Final Acceptance Has Been Issued, The Following Are Risks Of The Procuring Entity: (a) The Risk Of Personal Injury, Death, Or Loss Of Or Damage To Property (excluding The Works, Plant, Materials, And Equipment), Which Are Due To: (i) Any Type Of Use Or Occupation Of The Site Authorized By The Procuring Entity After The Official Acceptance Of The Works; Or (ii) Negligence, Breach Of Statutory Duty, Or Interference With Any Legal Right By The Procuring Entity Or By Any Person Employed By Or Contracted To Him Except The Contractor. (b) The Risk Of Damage To The Works, Plant, Materials, And Equipment To The Extent That It Is Due To A Fault Of The Procuring Entity Or In The Procuring Entity’s Design, Or Due To War Or Radioactive Contamination Directly Affecting The Country Where The Works Are To Be Executed. 15. Insurance 15.1. The Contractor Shall, Under His Name And At His Own Expense, Obtain And Maintain, For The Duration Of This Contract, The Following Insurance Coverage: (a) Contractor’s All Risk Insurance; (b) Transportation To The Project Site Of Equipment, Machinery, And Supplies Owned By The Contractor; (c) Personal Injury Or Death Of Contractor’s Employees; And (d) Comprehensive Insurance For Third Party Liability To Contractor’s Direct Or Indirect Act Or Omission Causing Damage To Third Persons. 15.2. The Contractor Shall Provide Evidence To The Procuring Entity’s Representative That The Insurances Required Under This Contract Have Been Effected And Shall, Within A Reasonable Time, Provide Copies Of The Insurance Policies To The Procuring Entity’s Representative. Such Evidence And Such Policies Shall Be Provided To The Procuring Entity’s Through The Procuring Entity’s Representative. 15.3. The Contractor Shall Notify The Insurers Of Changes In The Nature, Extent, Or Program For The Execution Of The Works And Ensure The Adequacy Of The Insurances At All Times In Accordance With The Terms Of This Contract And Shall Produce To The Procuring Entity’s Representative The Insurance Policies In Force Including The Receipts For Payment Of The Current Premiums. The Above Insurance Policies Shall Be Obtained From Any Reputable Insurance Company Approved By The Procuring Entity’s Representative. 15.4. If The Contractor Fails To Obtain And Keep In Force The Insurances Referred To Herein Or Any Other Insurance Which He May Be Required To Obtain Under The Terms Of This Contract, The Procuring Entity May Obtain And Keep In Force Any Such Insurances And Pay Such Premiums As May Be Necessary For The Purpose. From Time To Time, The Procuring Entity May Deduct The Amount It Shall Pay For Said Premiums Including Twenty Five Percent (25%) Therein From Any Monies Due, Or Which May Become Due, To The Contractor, Without Prejudice To The Procuring Entity Exercising Its Right To Impose Other Sanctions Against The Contractor Pursuant To The Provisions Of This Contract. 15.5. In The Event The Contractor Fails To Observe The Above Safeguards, The Procuring Entity May, At The Contractor’s Expense, Take Whatever Measure Is Deemed Necessary For Its Protection And That Of The Contractor’s Personnel And Third Parties, And/or Order The Interruption Of Dangerous Works. In Addition, The Procuring Entity May Refuse To Make The Payments Under Gcc Clause 40 Until The Contractor Complies With This Clause. 15.6. The Contractor Shall Immediately Replace The Insurance Policy Obtained As Required In This Contract, Without Need Of The Procuring Entity’s Demand, With A New Policy Issued By A New Insurance Company Acceptable To The Procuring Entity For Any Of The Following Grounds: (a) The Issuer Of The Insurance Policy To Be Replaced Has: (i) Become Bankrupt; (ii) Been Placed Under Receivership Or Under A Management Committee; (iii) Been Sued For Suspension Of Payment; Or (iv) Been Suspended By The Insurance Commission And Its License To Engage In Business Or Its Authority To Issue Insurance Policies Cancelled; Or (v) Where Reasonable Grounds Exist That The Insurer May Not Be Able, Fully And Promptly, To Fulfill Its Obligation Under The Insurance Policy. 16. Termination For Default Of Contractor 16.1. The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attend Its Implementation: 16.2. Due To The Contractor’s Fault And While The Project Is On-going, It Has Incurred Negative Slippage Of Fifteen Percent (15%) Or More In Accordance With Presidential Decree 1870, Regardless Of Whether Or Not Previous Warnings And Notices Have Been Issued For The Contractor To Improve His Performance; 16.3. Due To Its Own Fault And After This Contract Time Has Expired, The Contractor Incurs Delay In The Completion Of The Work After This Contract Has Expired; Or 16.4. The Contractor: (a) Abandons The Contract Works, Refuses Or Fails To Comply With A Valid Instruction Of The Procuring Entity Or Fails To Proceed Expeditiously And Without Delay Despite A Written Notice By The Procuring Entity; (b) Does Not Actually Have On The Project Site The Minimum Essential Equipment Listed On The Bid Necessary To Prosecute The Works In Accordance With The Approved Program Of Work And Equipment Deployment Schedule As Required For The Project; (c) Does Not Execute The Works In Accordance With This Contract Or Persistently Or Flagrantly Neglects To Carry Out Its Obligations Under This Contract; (d) Neglects Or Refuses To Remove Materials Or To Perform A New Work That Has Been Rejected As Defective Or Unsuitable; Or (e) Sub-lets Any Part Of This Contract Without Approval By The Procuring Entity. 16.5. All Materials On The Site, Plant, Equipment, And Works Shall Be Deemed To Be The Property Of The Procuring Entity If This Contract Is Rescinded Because Of The Contractor’s Default. 17. Termination For Default Of Procuring Entity The Contractor May Terminate This Contract With The Procuring Entity If The Works Are Completely Stopped For A Continuous Period Of At Least Sixty (60) Calendar Days Through No Fault Of Its Own, Due To Any Of The Following Reasons: (a) Failure Of The Procuring Entity To Deliver, Within A Reasonable Time, Supplies, Materials, Right-of-way, Or Other Items It Is Obligated To Furnish Under The Terms Of This Contract; Or (b) The Prosecution Of The Work Is Disrupted By The Adverse Peace And Order Situation, As Certified By The Armed Forces Of The Philippines Provincial Commander And Approved By The Secretary Of National Defense. 18. Termination For Other Causes 18.1. The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate This Contract For The Convenience Of The Procuring Entity If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 18.2. The Procuring Entity Or The Contractor May Terminate This Contract If The Other Party Causes A Fundamental Breach Of This Contract. 18.3. Fundamental Breaches Of Contract Shall Include, But Shall Not Be Limited To, The Following: (a) The Contractor Stops Work For Twenty Eight (28) Days When No Stoppage Of Work Is Shown On The Current Program Of Work And The Stoppage Has Not Been Authorized By The Procuring Entity’s Representative; (b) The Procuring Entity’s Representative Instructs The Contractor To Delay The Progress Of The Works, And The Instruction Is Not Withdrawn Within Twenty Eight (28) Days; (c) The Procuring Entity Shall Terminate This Contract If The Contractor Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Contractor, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Contractor. In The Case Of The Contractor's Insolvency, Any Contractor's Equipment Which The Procuring Entity Instructs In The Notice Is To Be Used Until The Completion Of The Works; (d) A Payment Certified By The Procuring Entity’s Representative Is Not Paid By The Procuring Entity To The Contractor Within Eighty Four (84) Days From The Date Of The Procuring Entity’s Representative’s Certificate; (e) The Procuring Entity’s Representative Gives Notice That Failure To Correct A Particular Defect Is A Fundamental Breach Of Contract And The Contractor Fails To Correct It Within A Reasonable Period Of Time Determined By The Procuring Entity’s Representative; (f) The Contractor Does Not Maintain A Security, Which Is Required; (g) The Contractor Has Delayed The Completion Of The Works By The Number Of Days For Which The Maximum Amount Of Liquidated Damages Can Be Paid, As Defined In The Gcc Clause 9; And (h) In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To, The Following: (i) Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Defined In Itb Clause 3.1(a), Unless Otherwise Specified In The Scc; (ii) Drawing Up Or Using Forged Documents; (iii) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (iv) Any Other Act Analogous To The Foregoing. 18.4. The Funding Source Or The Procuring Entity, As Appropriate, Will Seek To Impose The Maximum Civil, Administrative And/or Criminal Penalties Available Under The Applicable Law On Individuals And Organizations Deemed To Be Involved With Corrupt, Fraudulent, Or Coercive Practices. 18.5. When Persons From Either Party To This Contract Gives Notice Of A Fundamental Breach To The Procuring Entity’s Representative In Order To Terminate The Existing Contract For A Cause Other Than Those Listed Under Gcc Clause 18.3, The Procuring Entity’s Representative Shall Decide Whether The Breach Is Fundamental Or Not. 18.6. If This Contract Is Terminated, The Contractor Shall Stop Work Immediately, Make The Site Safe And Secure, And Leave The Site As Soon As Reasonably Possible. 19. Procedures For Termination Of Contracts 19.1. The Following Provisions Shall Govern The Procedures For The Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Procuring Entity Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Procuring Entity, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Contractor Conveying The Termination Of This Contract. The Notice Shall State: (i) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (ii) The Extent Of Termination, Whether In Whole Or In Part; (iii) An Instruction To The Contractor To Show Cause As To Why This Contract Should Not Be Terminated; And (iv) Special Instructions Of The Procuring Entity, If Any. The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report; (c) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Contractor Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why The Contract Should Not Be Terminated. If The Contractor Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating The Contract; (d) The Procuring Entity May, At Anytime Before Receipt Of The Bidder’s Verified Position Paper Described In Item (c) Above Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Contractor’s Receipt Of The Notice; (e) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Contractor Of Its Decision And, Unless Otherwise Provided In The Said Notice, This Contract Is Deemed Terminated From Receipt Of The Contractor Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; And (f) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity. 19.2. Pursuant To Section 69(f) Of Ra 9184 And Without Prejudice To The Imposition Of Additional Administrative Sanctions As The Internal Rules Of The Agency May Provide And/or Further Criminal Prosecution As Provided By Applicable Laws, The Procuring Entity Shall Impose On Contractors After The Termination Of The Contract The Penalty Of Suspension For One (1) Year For The First Offense, Suspension For Two (2) Years For The Second Offense From Participating In The Public Bidding Process, For Violations Committed During The Contract Implementation Stage, Which Include But Not Limited To The Following: (a) Failure Of The Contractor, Due Solely To His Fault Or Negligence, To Mobilize And Start Work Or Performance Within The Specified Period In The Notice To Proceed (“ntp”); (b) Failure By The Contractor To Fully And Faithfully Comply With Its Contractual Obligations Without Valid Cause, Or Failure By The Contractor To Comply With Any Written Lawful Instruction Of The Procuring Entity Or Its Representative(s) Pursuant To The Implementation Of The Contract. For The Procurement Of Infrastructure Projects Or Consultancy Contracts, Lawful Instructions Include But Are Not Limited To The Following: (i) Employment Of Competent Technical Personnel, Competent Engineers And/or Work Supervisors; (ii) Provision Of Warning Signs And Barricades In Accordance With Approved Plans And Specifications And Contract Provisions; (iii) Stockpiling In Proper Places Of All Materials And Removal From The Project Site Of Waste And Excess Materials, Including Broken Pavement And Excavated Debris In Accordance With Approved Plans And Specifications And Contract Provisions; (iv) Deployment Of Committed Equipment, Facilities, Support Staff And Manpower; And (v) Renewal Of The Effectivity Dates Of The Performance Security After Its Expiration During The Course Of Contract Implementation. (c) Assignment And Subcontracting Of The Contract Or Any Part Thereof Or Substitution Of Key Personnel Named In The Proposal Without Prior Written Approval By The Procuring Entity. (d) Poor Performance By The Contractor Or Unsatisfactory Quality And/or Progress Of Work Arising From His Fault Or Negligence As Reflected In The Constructor's Performance Evaluation System (“cpes”) Rating Sheet. In The Absence Of The Cpes Rating Sheet, The Existing Performance Monitoring System Of The Procuring Entity Shall Be Applied. Any Of The Following Acts By The Contractor Shall Be Construed As Poor Performance: (i) Negative Slippage Of 15% And Above Within The Critical Path Of The Project Due Entirely To The Fault Or Negligence Of The Contractor; And (ii) Quality Of Materials And Workmanship Not Complying With The Approved Specifications Arising From The Contractor's Fault Or Negligence. (e) Willful Or Deliberate Abandonment Or Non-performance Of The Project Or Contract By The Contractor Resulting To Substantial Breach Thereof Without Lawful And/or Just Cause. In Addition To The Penalty Of Suspension, The Performance Security Posted By The Contractor Shall Also Be Forfeited. 20. Force Majeure, Release From Performance 20.1. For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 20.2. If This Contract Is Discontinued By An Outbreak Of War Or By Any Other Event Entirely Outside The Control Of Either The Procuring Entity Or The Contractor, The Procuring Entity’s Representative Shall Certify That This Contract Has Been Discontinued. The Contractor Shall Make The Site Safe And Stop Work As Quickly As Possible After Receiving This Certificate And Shall Be Paid For All Works Carried Out Before Receiving It And For Any Work Carried Out Afterwards To Which A Commitment Was Made. 20.3. If The Event Continues For A Period Of Eighty Four (84) Days, Either Party May Then Give Notice Of Termination, Which Shall Take Effect Twenty Eight (28) Days After The Giving Of The Notice. 20.4. After Termination, The Contractor Shall Be Entitled To Payment Of The Unpaid Balance Of The Value Of The Works Executed And Of The Materials And Plant Reasonably Delivered To The Site, Adjusted By The Following: (a) Any Sum To Which The Contractor Is Entitled Under Gcc Clause 28; (b) The Cost Of His Suspension And Demobilization; (c) Any Sum To Which The Procuring Entity Is Entitled. 20.5. The Net Balance Due Shall Be Paid Or Repaid Within A Reasonable Time Period From The Time Of The Notice Of Termination. 21. Resolution Of Disputes 21.1. If Any Dispute Or Difference Of Any Kind Whatsoever Shall Arise Between The Parties In Connection With The Implementation Of The Contract Covered By The Act And This Irr, The Parties Shall Make Every Effort To Resolve Amicably Such Dispute Or Difference By Mutual Consultation. 21.2. If The Contractor Believes That A Decision Taken By The Procuring Entity’s Representative Was Either Outside The Authority Given To The Procuring Entity’s Representative By This Contract Or That The Decision Was Wrongly Taken, The Decision Shall Be Referred To The Arbiter Indicated In The Scc Within Fourteen (14) Days Of The Notification Of The Procuring Entity’s Representative’s Decision. 21.3. Any And All Disputes Arising From The Implementation Of This Contract Covered By The R.a. 9184 And Its Irr Shall Be Submitted To Arbitration In The Philippines According To The Provisions Of Republic Act No. 876, Otherwise Known As The “ Arbitration Law” And Republic Act 9285, Otherwise Known As The “alternative Dispute Resolution Act Of 2004”: Provided, However, That, Disputes That Are Within The Competence Of The Construction Industry Arbitration Commission To Resolve Shall Be Referred Thereto. The Process Of Arbitration Shall Be Incorporated As A Provision In This Contract That Will Be Executed Pursuant To The Provisions Of The Act And Its Irr: Provided, Further, That, By Mutual Agreement, The Parties May Agree In Writing To Resort To Other Alternative Modes Of Dispute Resolution. 22. Suspension Of Loan, Credit, Grant, Or Appropriation In The Event That The Funding Source Suspends The Loan, Credit, Grant, Or Appropriation To The Procuring Entity, From Which Part Of The Payments To The Contractor Are Being Made: (a) The Procuring Entity Is Obligated To Notify The Contractor Of Such Suspension Within Seven (7) Days Of Having Received The Suspension Notice. (b) If The Contractor Has Not Received Sums Due It For Work Already Done Within Forty Five (45) Days From The Time The Contractor’s Claim For Payment Has Been Certified By The Procuring Entity’s Representative, The Contractor May Immediately Issue A Suspension Of Work Notice In Accordance With Gcc Clause 45.2. 23. Procuring Entity’s Representative’s Decisions 23.1. Except Where Otherwise Specifically Stated, The Procuring Entity’s Representative Will Decide Contractual Matters Between The Procuring Entity And The Contractor In The Role Representing The Procuring Entity. 23.2. The Procuring Entity’s Representative May Delegate Any Of His Duties And Responsibilities To Other People, Except To The Arbiter, After Notifying The Contractor, And May Cancel Any Delegation After Notifying The Contractor. 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 24.1. All Drawings Prepared By The Contractor For The Execution Of The Temporary Works, Are Subject To Prior Approval By The Procuring Entity’s Representative Before Its Use. 24.2. The Contractor Shall Be Responsible For Design Of Temporary Works. 24.3. The Procuring Entity’s Representative’s Approval Shall Not Alter The Contractor’s Responsibility For Design Of The Temporary Works. 24.4. The Contractor Shall Obtain Approval Of Third Parties To The Design Of The Temporary Works, When Required By The Procuring Entity. 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 25.1. When The Procuring Entity Wants The Contractor To Finish Before The Intended Completion Date, The Procuring Entity’s Representative Will Obtain Priced Proposals For Achieving The Necessary Acceleration From The Contractor. If The Procuring Entity Accepts These Proposals, The Intended Completion Date Will Be Adjusted Accordingly And Confirmed By Both The Procuring Entity And The Contractor. 25.2. If The Contractor’s Financial Proposals For An Acceleration Are Accepted By The Procuring Entity, They Are Incorporated In The Contract Price And Treated As A Variation. 26. Extension Of The Intended Completion Date 26.1. The Procuring Entity’s Representative Shall Extend The Intended Completion Date If A Variation Is Issued Which Makes It Impossible For The Intended Completion Date To Be Achieved By The Contractor Without Taking Steps To Accelerate The Remaining Work, Which Would Cause The Contractor To Incur Additional Costs. No Payment Shall Be Made For Any Event Which May Warrant The Extension Of The Intended Completion Date. 26.2. The Procuring Entity’s Representative Shall Decide Whether And By How Much To Extend The Intended Completion Date Within Twenty One (21) Days Of The Contractor Asking The Procuring Entity’s Representative For A Decision Thereto After Fully Submitting All Supporting Information. If The Contractor Has Failed To Give Early Warning Of A Delay Or Has Failed To Cooperate In Dealing With A Delay, The Delay By This Failure Shall Not Be Considered In Assessing The New Intended Completion Date. 27. Right To Vary 27.1. The Procuring Entity’s Representative With The Prior Approval Of The Procuring Entity May Instruct Variations, Up To A Maximum Cumulative Amount Of Ten Percent (10%) Of The Original Contract Cost. 27.2. Variations Shall Be Valued As Follows: (a) At A Lump Sum Price Agreed Between The Parties; (b) Where Appropriate, At Rates In This Contract; (c) In The Absence Of Appropriate Rates, The Rates In This Contract Shall Be Used As The Basis For Valuation; Or Failing Which (d) At Appropriate New Rates, Equal To Or Lower Than Current Industry Rates And To Be Agreed Upon By Both Parties And Approved By The Head Of The Procuring Entity. 28. Contractor's Right To Claim If The Contractor Incurs Cost As A Result Of Any Of The Events Under Gcc Clause 13, The Contractor Shall Be Entitled To The Amount Of Such Cost. If As A Result Of Any Of The Said Events, It Is Necessary To Change The Works, This Shall Be Dealt With As A Variation. 29. Dayworks 29.1. Subject To Gcc Clause 43 On Variation Order, And If Applicable As Indicated In The Scc, The Day Works Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 29.2. All Work To Be Paid For As Day Works Shall Be Recorded By The Contractor On Forms Approved By The Procuring Entity’s Representative. Each Completed Form Shall Be Verified And Signed By The Procuring Entity’s Representative Within Two Days Of The Work Being Done. 29.3. The Contractor Shall Be Paid For Day Works Subject To Obtaining Signed Dayworks Forms. 30. Early Warning 30.1. The Contractor Shall Warn The Procuring Entity’s Representative At The Earliest Opportunity Of Specific Likely Future Events Or Circumstances That May Adversely Affect The Quality Of The Work, Increase The Contract Price, Or Delay The Execution Of The Works. The Procuring Entity’s Representative May Require The Contractor To Provide An Estimate Of The Expected Effect Of The Future Event Or Circumstance On The Contract Price And Completion Date. The Estimate Shall Be Provided By The Contractor As Soon As Reasonably Possible. 30.2. The Contractor Shall Cooperate With The Procuring Entity’s Representative In Making And Considering Proposals For How The Effect Of Such An Event Or Circumstance Can Be Avoided Or Reduced By Anyone Involved In The Work And In Carrying Out Any Resulting Instruction Of The Procuring Entity’s Representative. 31. Program Of Work 31.1. Within The Time Stated In The Scc, The Contractor Shall Submit To The Procuring Entity’s Representative For Approval A Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. 31.2. An Update Of The Program Of Work Shall The Show The Actual Progress Achieved On Each Activity And The Effect Of The Progress Achieved On The Timing Of The Remaining Work, Including Any Changes To The Sequence Of The Activities. 31.3. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 31.4. The Procuring Entity’s Representative’s Approval Of The Program Of Work Shall Not Alter The Contractor’s Obligations. The Contractor May Revise The Program Of Work And Submit It To The Procuring Entity’s Representative Again At Any Time. A Revised Program Of Work Shall Show The Effect Of Any Approved Variations. 31.5. When The Program Of Work Is Updated, The Contractor Shall Provide The Procuring Entity’s Representative With An Updated Cash Flow Forecast. The Cash Flow Forecast Shall Include Different Currencies, As Defined In The Contract, Converted As Necessary Using The Contract Exchange Rates. 31.6. All Variations Shall Be Included In Updated Program Of Work Produced By The Contractor. 32. Management Conferences 32.1. Either The Procuring Entity’s Representative Or The Contractor May Require The Other To Attend A Management Conference. The Management Conference Shall Review The Plans For Remaining Work And Deal With Matters Raised In Accordance With The Early Warning Procedure. 32.2. The Procuring Entity’s Representative Shall Record The Business Of Management Conferences And Provide Copies Of The Record To Those Attending The Conference And To The Procuring Entity . The Responsibility Of The Parties For Actions To Be Taken Shall Be Decided By The Procuring Entity’s Representative Either At The Management Conference Or After The Management Conference And Stated In Writing To All Who Attended The Conference. 33. Bill Of Quantities 33.1. The Bill Of Quantities Shall Contain Items Of Work For The Construction, Installation, Testing, And Commissioning Of Work To Be Done By The Contractor. 33.2. The Bill Of Quantities Is Used To Calculate The Contract Price. The Contractor Is Paid For The Quantity Of The Work Done At The Rate In The Bill Of Quantities For Each Item. 33.3. If The Final Quantity Of Any Work Done Differs From The Quantity In The Bill Of Quantities For The Particular Item And Is Not More Than Twenty Five Percent (25%) Of The Original Quantity, Provided The Aggregate Changes For All Items Do Not Exceed Ten Percent (10%) Of The Contract Price, The Procuring Entity’s Representative Shall Make The Necessary Adjustments To Allow For The Changes Subject To Applicable Laws, Rules, And Regulations. 33.4. If Requested By The Procuring Entity’s Representative, The Contractor Shall Provide The Procuring Entity’s Representative With A Detailed Cost Breakdown Of Any Rate In The Bill Of Quantities. 34. Instructions, Inspections And Audits 34.1. The Procuring Entity’s Personnel Shall At All Reasonable Times During Construction Of The Work Be Entitled To Examine, Inspect, Measure And Test The Materials And Workmanship, And To Check The Progress Of The Construction. 34.2. If The Procuring Entity’s Representative Instructs The Contractor To Carry Out A Test Not Specified In The Specification To Check Whether Any Work Has A Defect And The Test Shows That It Does, The Contractor Shall Pay For The Test And Any Samples. If There Is No Defect, The Test Shall Be A Compensation Event. 34.3. The Contractor Shall Permit The Funding Source Named In The Scc To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source. 35. Identifying Defects The Procuring Entity’s Representative Shall Check The Contractor’s Work And Notify The Contractor Of Any Defects That Are Found. Such Checking Shall Not Affect The Contractor’s Responsibilities. The Procuring Entity’s Representative May Instruct The Contractor To Search Uncover Defects And Test Any Work That The Procuring Entity’s Representative Considers Below Standards And Defective. 36. Cost Of Repairs Loss Or Damage To The Works Or Materials To Be Incorporated In The Works Between The Start Date And The End Of The Defects Liability Periods Shall Be Remedied By The Contractor At The Contractor’s Cost If The Loss Or Damage Arises From The Contractor’s Acts Or Omissions. 37. Correction Of Defects 37.1. The Procuring Entity’s Representative Shall Give Notice To The Contractor Of Any Defects Before The End Of The Defects Liability Period, Which Isone (1) Year From Project Completion Up To Final Acceptance By The Procuring Entity’s. 37.2. Every Time Notice Of A Defect Is Given, The Contractor Shall Correct The Notified Defect Within The Length Of Time Specified In The Procuring Entity’s Representative’s Notice. 37.3. The Contractor Shall Correct The Defects Which He Notices Himself Before The End Of The Defects Liability Period. 37.4. The Procuring Entity Shall Certify That All Defects Have Been Corrected. If The Procuring Entity Considers That Correction Of A Defect Is Not Essential, He Can Request The Contractor To Submit A Quotation For The Corresponding Reduction In The Contract Price. If The Procuring Entity Accepts The Quotation, The Corresponding Change In The Scc Is A Variation. 38. Uncorrected Defects 38.1. The Procuring Entity Shall Give The Contractor At Least Fourteen (14) Days Notice Of His Intention To Use A Third Party To Correct A Defect. If The Contractor Does Not Correct The Defect Himself Within The Period, The Procuring Entity May Have The Defect Corrected By The Third Party. The Cost Of The Correction Will Be Deducted From The Contract Price. 38.2. The Use Of A Third Party To Correct Defects That Are Uncorrected By The Contractor Will In No Way Relieve The Contractor Of Its Liabilities And Warranties Under The Contract. 39. Advance Payment 39.1. The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum Or, At The Most Two, Installments According To A Schedule Specified In The Scc. 39.2. The Advance Payment Shall Be Made Only Upon The Submission To And Acceptance By The Procuring Entity Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Procuring Entity. 39.3. The Advance Payment Shall Be Repaid By The Contractor By An Amount Equal To The Percentage Of The Total Contract Price Used For The Advance Payment. 39.4. The Contractor May Reduce His Standby Letter Of Credit Or Guarantee Instrument By The Amounts Refunded By The Monthly Certificates In The Advance Payment. 39.5. The Procuring Entity Will Provide An Advance Payment On The Contract Price As Stipulated In The Conditions Of Contract, Subject To The Maximum Amount Stated In Scc Clause 39.1. 40. Progress Payments 40.1. The Contractor May Submit A Request For Payment For Work Accomplished. Such Request For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 40.2. The Procuring Entity Shall Deduct The Following From The Certified Gross Amounts To Be Paid To The Contractor As Progress Payment: (a) Cumulative Value Of The Work Previously Certified And Paid For. (b) Portion Of The Advance Payment To Be Recouped For The Month. (c) Retention Money In Accordance With The Condition Of Contract. (d) Amount To Cover Third Party Liabilities. (e) Amount To Cover Uncorrected Discovered Defects In The Works. 40.3. Payments Shall Be Adjusted By Deducting There From The Amounts For Advance Payments And Retention. The Procuring Entity Shall Pay The Contractor The Amounts Certified By The Procuring Entity’s Representative Within Twenty Eight (28) Days From The Date Each Certificate Was Issued. No Payment Of Interest For Delayed Payments And Adjustments Shall Be Made By The Procuring Entity. 40.4. The First Progress Payment May Be Paid By The Procuring Entity To The Contractor Provided That At Least Twenty Percent (20%) Of The Work Has Been Accomplished As Certified By The Procuring Entity’s Representative. 40.5. Items Of The Works For Which A Price Of “0” (zero) Has Been Entered Will Not Be Paid For By The Procuring Entity And Shall Be Deemed Covered By Other Rates And Prices In The Contract. 41. Payment Certificates 41.1. The Contractor Shall Submit To The Procuring Entity’s Representative Monthly Statements Of The Estimated Value Of The Work Executed Less The Cumulative Amount Certified Previously. 41.2. The Procuring Entity’s Representative Shall Check The Contractor’s Monthly Statement And Certify The Amount To Be Paid To The Contractor. 41.3. The Value Of Work Executed Shall: (a) Be Determined By The Procuring Entity’s Representative; (b) Comprise The Value Of The Quantities Of The Items In The Bill Of Quantities Completed; And (c) Include The Valuations Of Approved Variations. 41.4. The Procuring Entity’s Representative May Exclude Any Item Certified In A Previous Certificate Or Reduce The Proportion Of Any Item Previously Certified In Any Certificate In The Light Of Later Information. 42. Retention 42.1. The Procuring Entity Shall Retain From Each Payment Due To The Contractor An Amount Equal To A Percentage Thereof Using The Rate As Specified In Itb Sub-clause 42.2. 42.2. Progress Payments Are Subject To Retention Of Ten Percent (10%), Referred To As The “retention Money.” Such Retention Shall Be Based On The Total Amount Due To The Contractor Prior To Any Deduction And Shall Be Retained From Every Progress Payment Until Fifty Percent (50%) Of The Value Of Works, As Determined By The Procuring Entity, Are Completed. If, After Fifty Percent (50%) Completion, The Work Is Satisfactorily Done And On Schedule, No Additional Retention Shall Be Made; Otherwise, The Ten Percent (10%) Retention Shall Again Be Imposed Using The Rate Specified Therefore. 42.3. The Total “retention Money” Shall Be Due For Release Upon Final Acceptance Of The Works. The Contractor May, However, Request The Substitution Of The Retention Money For Each Progress Billing With Irrevocable Standby Letters Of Credit From A Commercial Bank, Bank Guarantees Or Surety Bonds Callable On Demand, Of Amounts Equivalent To The Retention Money Substituted For And Acceptable To The Procuring Entity, Provided That The Project Is On Schedule And Is Satisfactorily Undertaken. Otherwise, The Ten (10%) Percent Retention Shall Be Made. Said Irrevocable Standby Letters Of Credit, Bank Guarantees And/or Surety Bonds, To Be Posted In Favor Of The Government Shall Be Valid For A Duration To Be Determined By The Concerned Implementing Office/agency Or Procuring Entity And Will Answer For The Purpose For Which The Ten (10%) Percent Retention Is Intended, I.e., To Cover Uncorrected Discovered Defects And Third Party Liabilities. 42.4. On Completion Of The Whole Works, The Contractor May Substitute Retention Money With An “on Demand” Bank Guarantee In A Form Acceptable To The Procuring Entity. 43. Variation Orders 43.1. Variation Orders May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities, Including The Introduction Of New Work Items That Are Not Included In The Original Contract Or Reclassification Of Work Items That Are Either Due To Change Of Plans, Design Or Alignment To Suit Actual Field Conditions Resulting In Disparity Between The Preconstruction Plans Used For Purposes Of Bidding And The “as Staked Plans” Or Construction Drawings Prepared After A Joint Survey By The Contractor And The Procuring Entity After Award Of The Contract, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. The Addition/deletion Of Works Should Be Within The General Scope Of The Project As Bid And Awarded. The Scope Of Works Shall Not Be Reduced So As To Accommodate A Positive Variation Order. A Variation Order May Either Be In The Form Of A Change Order Or Extra Work Order. 43.2. A Change Order May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities Of Original Work Items In The Contract. 43.3. An Extra Work Order May Be Issued By The Procuring Entity To Cover The Introduction Of New Work Necessary For The Completion, Improvement Or Protection Of The Project Which Were Not Included As Items Of Work In The Original Contract, Such As, Where There Are Subsurface Or Latent Physical Conditions At The Site Differing Materially From Those Indicated In The Contract, Or Where There Are Duly Unknown Physical Conditions At The Site Of An Unusual Nature Differing Materially From Those Ordinarily Encountered And Generally Recognized As Inherent In The Work Or Character Provided For In The Contract. 43.4. Any Cumulative Variation Order Beyond Ten Percent (10%) Shall Be Subject Of Another Contract To Be Bid Out If The Works Are Separable From The Original Contract. In Exceptional Cases Where It Is Urgently Necessary To Complete The Original Scope Of Work, The Head Of The Procuring Entity May Authorize A Positive Variation Order Go Beyond Ten Percent (10%) But Not More Than Twenty Percent (20%) Of The Original Contract Price, Subject To The Guidelines To Be Determined By The Gppb: Provided, However, That Appropriate Sanctions Shall Be Imposed On The Designer, Consultant Or Official Responsible For The Original Detailed Engineering Design Which Failed To Consider The Variation Order Beyond Ten Percent (10%). 43.5. In Claiming For Any Variation Order, The Contractor Shall, Within Seven (7) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Condition(s) Leading To The Extra Cost, And Within Twenty-eight (28) Calendar Days Deliver A Written Communication Giving Full And Detailed Particulars Of Any Extra Cost In Order That It May Be Investigated At That Time. Failure To Provide Either Of Such Notices In The Time Stipulated Shall Constitute A Waiver By The Contractor For Any Claim. The Preparation And Submission Of Variation Orders Are As Follows: (a) If The Procuring Entity’s Representative/project Engineer Believes That A Change Order Or Extra Work Order Should Be Issued, He Shall Prepare The Proposed Order Accompanied With The Notices Submitted By The Contractor, The Plans Therefore, His Computations As To The Quantities Of The Additional Works Involved Per Item Indicating The Specific Stations Where Such Works Are Needed, The Date Of His Inspections And Investigations Thereon, And The Log Book Thereof, And A Detailed Estimate Of The Unit Cost Of Such Items Of Work, Together With His Justifications For The Need Of Such Change Order Or Extra Work Order, And Shall Submit The Same To The Head Of The Procuring Entity For Approval. (b) The Head Of The Procuring Entity Or His Duly Authorized Representative, Upon Receipt Of The Proposed Change Order Or Extra Work Order Shall Immediately Instruct The Technical Staff Of The Procuring Entity’s To Conduct An On-the-spot Investigation To Verify The Need For The Work To Be Prosecuted. A Report Of Such Verification Shall Be Submitted Directly To The Head Of The Procuring Entity Or His Duly Authorized Representative. (c) The, Head Of The Procuring Entity Or His Duly Authorized Representative, After Being Satisfied That Such Change Order Or Extra Work Order Is Justified And Necessary, Shall Review The Estimated Quantities And Prices And Forward The Proposal With The Supporting Documentation To The Head Of Procuring Entity For Consideration. (d) If, After Review Of The Plans, Quantities And Estimated Unit Cost Of The Items Of Work Involved, The Proper Office Of The Procuring Entity Empowered To Review And Evaluate Change Orders Or Extra Work Orders Recommends Approval Thereof, Head Of The Procuring Entity Or His Duly Authorized Representative, Believing The Change Order Or Extra Work Order To Be In Order, Shall Approve The Same. (e) The Timeframe For The Processing Of Variation Orders From The Preparation Up To The Approval By The Head Of The Procuring Entity Concerned Shall Not Exceed Thirty (30) Calendar Days. 44. Contract Completion Once The Project Reaches An Accomplishment Of Ninety Five (95%) Of The Total Contract Amount, The Procuring Entity May Create An Inspectorate Team To Make Preliminary Inspection And Submit A Punch-list To The Contractor In Preparation For The Final Turnover Of The Project. Said Punch-list Will Contain, Among Others, The Remaining Works, Work Deficiencies For Necessary Corrections, And The Specific Duration/time To Fully Complete The Project Considering The Approved Remaining Contract Time. This, However, Shall Not Preclude The Claim Of The Procuring Entity For Liquidated Damages. 45. Suspension Of Work 45.1. The Procuring Entity Shall Have The Authority To Suspend The Work Wholly Or Partly By Written Order For Such Period As May Be Deemed Necessary, Due To Force Majeure Or Any Fortuitous Events Or For Failure On The Part Of The Contractor To Correct Bad Conditions Which Are Unsafe For Workers Or For The General Public, To Carry Out Valid Orders Given By The Procuring Entity Or To Perform Any Provisions Of The Contract, Or Due To Adjustment Of Plans To Suit Field Conditions As Found Necessary During Construction. The Contractor Shall Immediately Comply With Such Order To Suspend The Work Wholly Or Partly. 45.2. The Contractor Or Its Duly Authorized Representative Shall Have The Right To Suspend Work Operation On Any Or All Projects/activities Along The Critical Path Of Activities After Fifteen (15) Calendar Days From Date Of Receipt Of Written Notice From The Contractor To The District Engineer/regional Director/consultant Or Equivalent Official, As The Case May Be, Due To The Following: (a) There Exist Right-of-way Problems Which Prohibit The Contractor From Performing Work In Accordance With The Approved Construction Schedule. (b) Requisite Construction Plans Which Must Be Owner-furnished Are Not Issued To The Contractor Precluding Any Work Called For By Such Plans. (c) Peace And Order Conditions Make It Extremely Dangerous, If Not Possible, To Work. However, This Condition Must Be Certified In Writing By The Philippine National Police (pnp) Station Which Has Responsibility Over The Affected Area And Confirmed By The Department Of Interior And Local Government (dilg) Regional Director. (d) There Is Failure On The Part Of The Procuring Entity To Deliver Government-furnished Materials And Equipment As Stipulated In The Contract. (e) Delay In The Payment Of Contractor’s Claim For Progress Billing Beyond Forty-five (45) Calendar Days From The Time The Contractor’s Claim Has Been Certified To By The Procuring Entity’s Authorized Representative That The Documents Are Complete Unless There Are Justifiable Reasons Thereof Which Shall Be Communicated In Writing To The Contractor. 45.3. In Case Of Total Suspension, Or Suspension Of Activities Along The Critical Path, Which Is Not Due To Any Fault Of The Contractor, The Elapsed Time Between The Effective Order Of Suspending Operation And The Order To Resume Work Shall Be Allowed The Contractor By Adjusting The Contract Time Accordingly. 46. Payment On Termination 46.1. If The Contract Is Terminated Because Of A Fundamental Breach Of Contract By The Contractor, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done And Materials Ordered Less Advance Payments Received Up To The Date Of The Issue Of The Certificate And Less The Percentage To Apply To The Value Of The Work Not Completed, As Indicated In The Scc. Additional Liquidated Damages Shall Not Apply. If The Total Amount Due To The Procuring Entity Exceeds Any Payment Due To The Contractor, The Difference Shall Be A Debt Payable To The Procuring Entity. 46.2. If The Contract Is Terminated For The Procuring Entity’s Convenience Or Because Of A Fundamental Breach Of Contract By The Procuring Entity, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done, Materials Ordered, The Reasonable Cost Of Removal Of Equipment, Repatriation Of The Contractor’s Personnel Employed Solely On The Works, And The Contractor’s Costs Of Protecting And Securing The Works, And Less Advance Payments Received Up To The Date Of The Certificate. 46.3. The Net Balance Due Shall Be Paid Or Repaid Within Twenty Eight (28) Days From The Notice Of Termination. 46.4. If The Contractor Has Terminated The Contract Under Gcc Clauses 17 Or 18, The Procuring Entity Shall Promptly Return The Performance Security To The Contractor. 47. Extension Of Contract Time 47.1. Should The Amount Of Additional Work Of Any Kind Or Other Special Circumstances Of Any Kind Whatsoever Occur Such As To Fairly Entitle The Contractor To An Extension Of Contract Time, The Procuring Entity Shall Determine The Amount Of Such Extension; Provided That The Procuring Entity Is Not Bound To Take Into Account Any Claim For An Extension Of Time Unless The Contractor Has, Prior To The Expiration Of The Contract Time And Within Thirty (30) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Claim Have Arisen, Delivered To The Procuring Entity Notices In Order That It Could Have Investigated Them At That Time. Failure To Provide Such Notice Shall Constitute A Waiver By The Contractor Of Any Claim. Upon Receipt Of Full And Detailed Particulars, The Procuring Entity Shall Examine The Facts And Extent Of The Delay And Shall Extend The Contract Time Completing The Contract Work When, In The Procuring Entity’s Opinion, The Findings Of Facts Justify An Extension. 47.2. No Extension Of Contract Time Shall Be Granted The Contractor Due To (a) Ordinary Unfavorable Weather Conditions And (b) Inexcusable Failure Or Negligence Of Contractor To Provide The Required Equipment, Supplies Or Materials. 47.3. Extension Of Contract Time May Be Granted Only When The Affected Activities Fall Within The Critical Path Of The Pert/cpm Network. 47.4. No Extension Of Contract Time Shall Be Granted When The Reason Given To Support The Request For Extension Was Already Considered In The Determination Of The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection. 47.5. Extension Of Contract Time Shall Be Granted For Rainy/unworkable Days Considered Unfavorable For The Prosecution Of The Works At The Site, Based On The Actual Conditions Obtained At The Site, In Excess Of The Number Of Rainy/unworkable Days Pre-determined By The Procuring Entity In Relation To The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection, And/or For Equivalent Period Of Delay Due To Major Calamities Such As Exceptionally Destructive Typhoons, Floods And Earthquakes, And Epidemics, And For Causes Such As Non-delivery On Time Of Materials, Working Drawings, Or Written Information To Be Furnished By The Procuring Entity, Non-acquisition Of Permit To Enter Private Properties Within The Right-of-way Resulting In Complete Paralyzation Of Construction Activities, And Other Meritorious Causes As Determined By The Procuring Entity’s Representative And Approved By The Head Of The Procuring Entity. Shortage Of Construction Materials, General Labor Strikes, And Peace And Order Problems That Disrupt Construction Operations Through No Fault Of The Contractor May Be Considered As Additional Grounds For Extension Of Contract Time Provided They Are Publicly Felt And Certified By Appropriate Government Agencies Such As Dti, Dole, Dilg, And Dnd, Among Others. The Written Consent Of Bondsmen Must Be Attached To Any Request Of The Contractor For Extension Of Contract Time And Submitted To The Procuring Entity For Consideration And The Validity Of The Performance Security Shall Be Correspondingly Extended. 48. Price Adjustment Except For Extraordinary Circumstances As Determined By Neda And Approved By The Gppb, No Price Adjustment Shall Be Allowed. Nevertheless, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 49. Completion The Contractor Shall Request The Procuring Entity’s Representative To Issue A Certificate Of Completion Of The Works, And The Procuring Entity’s Representative Will Do So Upon Deciding That The Work Is Completed. 50. Taking Over The Procuring Entity Shall Take Over The Site And The Works Within Seven (7) Days From The Date The Procuring Entity’s Representative Issues A Certificate Of Completion. 51. Operating And Maintenance Manuals 51.1. If “as Built” Drawings And/or Operating And Maintenance Manuals Are Required, The Contractor Shall Supply Them By The Dates Stated In The Scc. 51.2. If The Contractor Does Not Supply The Drawings And/or Manuals By The Dates Stated In The Scc, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative Shall Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Gcc Clause 1.16 The Intended Completion Date Is 120 Cd From Ntp. 1.21 The Procuring Entity Is Lgu- Mapanas, Northern Samar. 1.22 The Procuring Entity’s Representative Is Atty. Ronn Michael L. Tejano Municipal Mayor Municipality Of Mapanas Province Of Northern Samar 1.23 The Site Is Located At Mapanas, Northern Samar. 1.27 The Start Date Is: Upon Receipt Of Notice To Proceed. 1.30 The Works Consist Of: Item No. Scope Of Work Quantity Unit Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar B.5 Project Billboard/sign Board 1.00 Each B.5 B.7(2) Occupational Safety And Health Program 1.00 Is B.7(2) B.9 Mobilization/demobilization 1.00 Is B.9 Part C Earthworks Part C 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (for Reblocking At Intermittent Section) 1409.00 Sq.m. 101(3)a.2 102(2)b Surplus Common Excavation 420.00 Cu.m. 102(2)b 105(1) Subgrade Preparation (common Material) 1680.00 Sq.m. 105(1) Part D Subbase And Base Course Part D 200(1) Aggregate Subbase Course 267.50 Cu.m. 200(1) 201(1) Aggregate Base Course 336.00 Cu.m. 201(1) Part E Surface Courses Part E 311(1)a.2 Pcc Pavement (plain) Conventional Method, 200mm Thk. 1400.00 Sq.m. 311(1)a.2 2.2 Note: The Items To Follow 5.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor Upon The Issuance Of Notice To Proceed. 6.5 The Contractor Shall Employ The Following Key Personnel: Key Personnel Number Civil Engineer 1 Construction Foreman 1 Labor Workers 3 7.4(c) “no Further Instructions”. 7.7 No Further Instructions. 8.1 No Further Instructions. 10 The Site Investigation Reports Are: None 12.3 No Further Instructions. 12.5 In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. 13 “no Additional Provision.” 18.3(h)(i) No Further Instructions. 21.2 The Arbiter Is: Construction Industry Arbitration Commission 29.1 No Day Works Are Applicable To The Contract. 31.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 15days Of Delivery Of The Letter Of Acceptance. 31.3 The Period Between Program Of Work Updates Is 15days. The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is P 1,000.00. 34.3 The Funding Source Is Coming From Nia 39.1 The Amount Of The Advance Payment Is 15% Of The Contract Price (lump Sum) And Shall Be Release Once Upon Presentation Of The Following Documents As Required: 1. Letter Request For Advance Payment From The Contractor 2. Bank Guarantee For Advance Payment 40.1 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Included For Payment. 51.1 The Date By Which Operating And Maintenance Manuals Are Required Is Not Applicable. The Date By Which “as Built” Drawings Are Required Is 20 Days Upon Completion Of The Subproject. 51.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is P1,000.00. Section Vi. Specifications Project Name: Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar Location : Brgy. E. Laodenio, Mapanas, Northern Samar Item No. Description Qty. Unit. B.5 Project Billboard/signboard 1.00 Each Labor A. Construction Foreman 4.00 1 B. Skilled Laborer 4.00 1 C. Unskilled Laborer 4.00 2 F.1 Name And Specification Materials A. Tarpaulin (8’x8’) 1.00 Pc B. Coco Lumber 84.00 Bd.ft. C. Plywood Marine (0.0125mx1.2mx2.44m) 2.00 Pc D. Assorted Common Wire Nail 0.50 Kg B.7(2) Occupational Safety And Health Program 1.00 L.s A. Safety Practitioner (part Time) 23.00 1 B. B. Health Personnel (full Time) 90.00 1 B.1 Name And Capacity C. Equipment D. A. Safety Shoes 79.00 Man-day E. B. Safety Helmet 79.00 Man-day F. C. Safety/working Gloves 79.00 Man-day G. D. Safety Vest 79.00 Man-day H. E. Rubber Boots 79.00 Man-day F. Rain Coats (30% Of The Duration) Optional 24.00 Man-day B.9 Mobiilization/demobilization 1.00 L.s Name And Capacity Equipment A. Dump Truck (12 Cu. Yd.) 16.00 2 B. Payloader (1.5 Cu.m.), Lx80-2c 16.00 1 C. Bulldozer, D6h Series Ii Psds/dd 16.00 1 D. Backhoe W/ Breaker (0.80 Cu.m.) 16.00 1 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (for Reblocking At Intermittent Section 1,409.00 Sq.m. A.1 Labor A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Backhoe W/ Breaker (0.80 Cu.m) 1.00 1 B. Payloader (1.50), Lx80 Cu.m. 1.00 1 C. Dump Truck (12 Cu. Yd.) 0.50 1 D. Concrete Saw (7.5 Hp), 14”blade Dia 0.50 1 Minor Tools (10% Of Labor Cost) F.1 Name And Specification A. Concrete Saw (diamond Blade 14” Dia) 0.00015 Pc 102(2)b Surplus Common Excavation 420.00 Cu.m. A.1 Labor A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 B.1 Name And Capacity Equipment A. Bulldozer, D6h Series Ii Psds/dd 1.00 1 B. Payloader (1.5 Cu.m.) 1.00 1 C. Payloader (1.5 Cu.m.) 0.30 1 D. Dump Truck (12 Cu.yd.) 1.00 3 E. Back Hoe (0.80 Cu.m) 1.00 1 105(1) Subgrade Preparation (common Material) 1,680.00 Sq.m. Labor A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 B.1 Name And Capacity Equipment A. Motorized Road Grader, G710a 1.00 1 B. Vibratory Roller (10 M.t), Sd100dc 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 200(1) Aggregate Subbase Course Labor A. Construction Foreman 1.00 1 B. Unskilled 1.00 2 B.1 Name And Capacity Equipment A. Motorized Road Grader, G710a 1.00 1 B. Vibratory Roller (10 M.t.), Sd 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 Name And Specification Materials A. Aggregate Subbase Course (w/ 15% Shrinkage Factor) 1.15 Cu.m. 201 (1) Aggregate Base Course 336.00 Cu.m. Labor A. Construction Foreman 1.00 1 B. Unskilled 1.00 2 B.1 Name And Capacity Equipment A. Motorized Road Grader, G710a 1.00 1 B. Vibratory Roller (10 M.t.), Sd100dc 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 F.1 Name And Specification Materials A. Aggregate Base Course (w/ 15% Shrinkage Factor) 1.15 Cu.m. 311(1)a.2 Pcc Pavement (palin)-conventional Method, 200mm Thk. 1,400.00 Sq.m. A.1 Labor A. Construction Foreman 1.00 1 B. Skilled Laborer 1.00 4 C. Unskilled Laborer 1.00 12 B.1 Name And Capacity Equipment A. Transit Mixer (5-6 Cu.yd) 1.00 4 B. Concrete Vibrator 1.00 2 C. Concrete Batch (30 Cu.m.) 1.00 1 D. Payloader (1.50 Cu.m)lx80-2c 1.00 1 E. Concrete Screeder (5.5 Hp) 1.00 1 F. Water Truck/pump (16000l) 1.00 1 G. Concrete Saw, Blade 0/ 14” (7.5 Hp) 1.00 1 H. Bar Cutter, Single Phase 0.10 1 I. Joint Sealer Machine 0.25 1 F.1 Name And Specification Materials A. Reinforcing Steel Bar, Grade 40 0.39 Kg. B. Curing Compound 0.29 Lit C. Asphalt Sealant 0.12 Lit. D. Steel Forms (rental) 0.46 I.m. E. Sand 0.1100 Cu.m F. Gravel 0.20 Cu.m G. Portland Cement Type 1 1.90 Bag H. Concrete Saw (diamond Blade 14”) 0.00015 Pc I. Pipe Sleeve, 2” Dia 0.0086 I.m. J. Greasse/tar 0.0056 Lit. Section Vii. Drawings Bill Of Quantities Item No. Scope Of Work Quantity Unit Unit Cost Total Amount 1.) Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar B.5 Project Billboard/sign Board 1.00 Each 10,959.69 10,959.69 B.7(2) Occupational Safety And Health Program 1.00 Is 75,925.63 75,925.63 B.9 Mobilization/demobilization 1.00 Is 38,991.04 38,991.04 Part C Earthworks 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (for Reblocking At Intermittent Section) 1409.00 Sq.m. 238.30 335,764.70 102(2)b Surplus Common Excavation 420.00 Cu.m. 204.24 85,780.80 105(1) Subgrade Preparation (common Material) 1680.00 Sq.m. 21.14 35,515.20 Part D Subbase And Base Course 200(1) Aggregate Subbase Course 267.50 Cu.m. 1,632.38 436,661.66 201(1) Aggregate Base Course 336.00 Cu.m. 2,843.65 955,466.40 Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Conventional Method, 200mm Thk. 1400.00 Sq.m. 2,160.51 3,024,714.00 Total 4,999,779.12 Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form 79 Form Of Contract Agreement 81 Omnibus Sworn Statement 83 Bid Form Date: Iaeb No: To: Lgu-mapanas Northern Samar Address: Mapanas Northern Samar We, The Undersigned, Declare That: We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar (a) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered In Item (d) Below Is: [insert Information]; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (b) Our Bid Shall Be Valid For A Period Of 120 Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (c) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract; (d) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries: [insert Information]; (e) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (f) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (g) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (h) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Form Of Contract Agreement This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity](hereinafter Called The “entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents Shall Be Attached, Deemed To Form, And Be Read And Construed As Part Of This Agreement, To Wit: (a) General And Special Conditions Of Contract; (b) Drawings/plans; (c) Specifications; (d) Invitation To Apply For Eligibility And To Bid; (e) Instructions To Bidders; (f) Bid Data Sheet; (g) Addenda And/or Supplemental/bid Bulletins, If Any; (h) Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes; (i) Eligibility Requirements, Documents And/or Statements; (j) Performance Security; (k) Credit Line Issued By A Licensed Bank, If Any; (l) Notice Of Award Of Contract And The Bidder’s Conforme Thereto; (m) Other Contract Documents That May Be Required By Existing Laws And/or The Entity. 3. In Consideration Of The Payments To Be Made By The Entity To The Contractor As Hereinafter Mentioned, The Contractor Hereby Covenants With The Entity To Execute And Complete The Works And Remedy Any Defects Therein In Conformity With The Provisions Of This Contract In All Respects. 4. The Entity Hereby Covenants To Pay The Contractor In Consideration Of The Execution And Completion Of The Works And The Remedying Of Defects Wherein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of This Contract At The Times And In The Manner Prescribed By This Contract. In Witness Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Contractor). Binding Signature Of Procuring Entity ________________________________________________ Binding Signature Of Contractor _____________________________________________ [addendum Showing The Corrections, If Any, Made During The Bid Evaluation Should Be Attached With This Agreement] Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Bidding For [name Of The Project] Of The [name Of The Procuring Entity]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The [name Of Bidder] In The Bidding As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate Issued By The Corporation Or The Members Of The Joint Venture)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: I Am Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [jurat] * This Form Will Not Apply For Wb Funded Projects.
Closing Date21 Jan 2025
Tender AmountPHP 4.9 Million (USD 86.1 K)
7051-7060 of 7066 active Tenders