Pumps Tenders
Pumps Tenders
BARANGAY CAMPAO ORIENTAL JETAFE BOHOL Tender
Civil And Construction...+1Water Storage And Supply
Philippines
Details: Description Republic Of The Philippines Province Of Bohol Municipality Of Getafe Bids And Awards Committee ________________________________________ Invitation To Bid ( 1st Public Bidding) The Barangay Campao Oriental, Municipality Of Getafe, Province Of Bohol Through Its Bids And Awards Committee (bac), Invites Contractors To Bid For The Hereunder Listed Project: Name Of Project : Construction Of Water System Approved Budget For The Contract : P 360,000.00 Prospective Bidders Should Have Experience In Undertaking A Similar Project Within The Last Five (5) Years With An Amount Of At Least 50% Of The Proposed Project For Bidding .the Eligibility Check/screening As Well As The Preliminary Examination Of Bids Shall Use A Non-discretionary “pass/fail” Criteria. Post Qualification Of The Lowest Calculated Bid Shall Be Conducted. All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation Of Bids, Post-qualification And Award Of Contract Shall Be Governed By The Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The Government Procurement Reform Act.” The Complete Schedule Of Activities Is Listed As Follows: Activities Schedule 1. Issuance Of Bid Documents January 08, 2025 To January 15 , 2025 Campao Oriental, Barangay Hall 2. Pre-bid Conference January 15, 2025 3. Eligibility Checking January 15, 2025 4. Opening Of Bids January 15, 2025 @ 10:00 A.m. Barangay Hall, Campao Oriental, Getafe, Bohol. Bid Documents Will Be Available Only To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 500.00 To The Barangay Treasurer. The Barangay Campao Oriental Of Getafe, Bohol Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Mary Jane G. Pogoy Bac Chairman Republic Of The Philippines Province Of Bohol Municipality Of Getafe Office Of The Municipal Engineer Program Of Work Name Of Project: Construction Of Water System Location: Campao Oriental, Getafe, Bohol Appropriation: P 360,000.00 Date Prepared: November 26, 2024 A. Bill Of Materials And Cost Of Estimates Item No. Quantity Unit Description Unit Price Amount 1 80 Ft. Drilling Of 6" Diameter Borehole At 80 Ft Depth 1,900.00 152,000.00 2 80 Ft. Installation Of Pvc Casing, Gravel Packing And Concrete Sealing 317.43 25,394.40 3 1 Lot Installation Of Pump And Accessories 182,606.00 182,606.00 Xxxxx B. Total Estimated Cost Of Materials P 360,000.40 C. Total Cost Of Labor D. Transportation And Handling E. Total Estimated Cost Of Project P 360,000.40 Prepared And Reviewed By: Engr. Amadeus T. Masecampo Municipal Engineer Requested By: Marilyn Anabieza Joseph C. Diacor Barangay Treasurer Barangay Captain
Closing Soon15 Jan 2025
Tender AmountPHP 360 K (USD 6.2 K)
Municipality Of Talavera, Nueva Ecija Tender
Automobiles and Auto Parts
Philippines
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipality Of Talavera Invitation To Apply For Eligibility And To Bid Goods 2025 - 04 The Municipal Government Unit Of Talavera, Through Its Bids And Awards Committee (bac), Invites Contractors For Suppliers For Public Bidding Of Goods To Apply For Eligibility And If Found Eligible, To Bid For The Hereunder Contract/project: Name Of Projects Location Brief Description Approved Budget For The Contract (abc) Contract Duration Price Of Bid Documents Purchase Of Parts For The Repair & Maintenance Of Motor Vehicle & Heavy Equipment Municipality Of Talavera Tires/battery/steering Pump/bearing/compressor/hose/hydraulic Hose 964,677.00 90 Days 1,000.00 Prospective Bidders Should Passes A Valid License Applicable To The Contract, Have Completed A Similar Contract Both Design And Construction, With A Value At Least 50% Of The Abc, And Have Key Personnel (for Construction & Design Profession) And Equipment, (listed In The Bidding Documents) Available For The Prosecution Of The Contract. The Bac Will Use Non-discretionary “pass/fail” Criteria In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. The Bid Evaluation Procedure To Be Adopted Shall Be In Accordance With The Gprb Resolution No. 22-2007 Dated September 8, 2007. The Bac Will Conduct Post-qualification Of The Lowest Calculated Bid. All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation Of Bids, Post-qualification And Award Of Contract Shall Be Governed By The Pertinent Provision Of R.a 9184 And Its Implementing Rules And Regulations (irr) And Gprb Resolution No. 22-2007 Dated September 8, 2007. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule Issuance Of Bid Documents December 23, 2024 - January 15, 2025 Deadline For Submission Of Bid And Opening Of Bids January 15, 2025 (10:00 A.m.) ` Bid Opening Shall Be Conducted At The Municipal Engineering Office, Municipal Compound, Pag-asa, Talavera Nueva Ecija. Pursuant To The Iatf Guidelines And Strict Implementation Of The Minimum Health Standard And Safety Protocol. The Bac Will Issue To Prospective Bidders Eligibility Forms At Bac Office, Engineering Office, Municipal Building, Talavera, Nueva Ecija Upon Their Submission Of A Loi. Prospective Bidders Shall Submit The Eligibility Requirements To The Bac At The Said Address. They May Also Obtain The Results Of The Eligibility Check By The Bac At The Same Address. The Bac Will Issue Bidding Documents Only To The Bidders Declared By The Bac To Be Eligible For The Bidding Upon Payment Of A Non-refundable Amount Of Bidding Documents Stated In The Implementing Rules And Regulation Of R.a. 9184 To The Municipal Treasurer’s Office Of Talavera. The Award Shall Be Made After Bid Evaluation & Post Qualification Of The Lowest Calculated Bids. The Lgu - Talavera Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of Their Bids. Contact Person: Marvin Dc. Marcial Approved By: Bac Secretariat (sgd) Alfredo S. Atraje Bac Chairman Noted: (sgd) Hon. Nerito S. Santos Jr. Municipal Mayor
Closing Soon15 Jan 2025
Tender AmountPHP 964.6 K (USD 16.6 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Healthcare and Medicine
United States
Details: Va Capital Health Care Network (visn 5)
rental Of Negative Pressure Wound Therapy Systems (npwt) Bpa
statement Of Work
title Of Project: Rental Of Negative Pressure Wound Therapy (npwt) Systems.
background: The Va Capital Health Care Network (visn 5) Has A Reoccurring Need For The Rental Negative Pressure Wound Therapy (npwt) Systems For The Purpose Of Inpatient Wound Care. Visn 5 Is Seeking A Blanket Purchase Agreement (bpa) To Supply Rentals Of The Npwt Systems At Each Location Within The Network.
locations:
va Baltimore Medical Center 10 N. Greene Street, Baltimore, Md 21201
va Loch Raven Medical Center 3900 Loch Raven Blvd, Loch Raven, Md 21090
va Perry Point Medical Center 59 Avenue D, Perry Point, Md 21902
va Beckley Medical Center 200 Veterans Avenue, Beckley, Wv 25801
va Huntington Medical Center 1540 Spring Valley Drive, Huntington, Wv 25704
va Clarksburg Medical Center 1 Medical Center Drive, Clarksburg, Wv 26301
va Martinsburg Medical Center 510 Butler Avenue, Martinsburg, Wv 25405
va Washington Dc Medical Center 50 Irving Street, Northwest, Washington, Dc 20422
scope Of Work: The Contractor Shall Provide All Resources Necessary To Accomplish The Deliverables Described In The Statement Of Work (sow) Except As May Otherwise Be Specified.
period Of Performance:
base: April 1st, 2025 March 31st. 2026
op1: April 1st, 2026 March 31st, 2027
op2: April 1st, 2027 March 31st, 2028
op3: April 1st, 2028 March 31st, 2029
op4: April 1st, 2029 March 31st, 2030
type Of Contract: Firm Fixed Price.
place Of Performance: All Visn 5 Medical Center Locations.
deliverables: The Following Item(s) Will Be Delivered And Maintained At All Visn 5 Locations In Accordance With The Facility S Needs.
product Description: V.a.c. Ulta Therapy Unit, Daily Rental
Part # Ultdev01/us.p
ordering Procedures: Orders Will Be Placed By Either Telephone Or In The Contractor Provided Web-based Portal.
the Following Information Will Be Provided To The Contractor:
(1) The Required Products,
(2) The Required Delivery Date,
(3) The Term Of The Rental Order, And
(4) The Location And Intended Use Of The Products,
(5) Payment Information
delivery Locations:
va Baltimore Medical Center 10 N. Greene Street, Baltimore, Md 21201
va Loch Raven Medical Center 3900 Loch Raven Blvd, Loch Raven, Md 21090
va Perry Point Medical Center 59 Avenue D, Perry Point, Md 21902
va Beckley Medical Center 200 Veterans Avenue, Beckley, Wv 25801
va Huntington Medical Center 1540 Spring Valley Drive, Huntington, Wv 25704
va Clarksburg Medical Center 1 Medical Center Drive, Clarksburg, Wv 26301
va Martinsburg Medical Center 510 Butler Avenue, Martinsburg, Wv 25405
va Washington Dc Medical Center 50 Irving Street, Northwest, Washington, Dc 20422
delivery Requirements:
contractor Shall Deliver Units Within 24 Hours For Orders Placed By Either Telephone Or Contractor Provided Web-based Portal. All Npwt Systems Must Be Inspected For Safety By Qualified Contractor Personnel Prior To Placement At The Medical Center. Operator Manuals Shall Be Provided To Users.
bench Stock: The Contractor Shall Place The Requested Number Of Units In The Designated Department Specified By Each Location. To Be Determined At The Task Order Level.
upon A Npwt System Being Taken Out Of Service By Telephone Or In The Contractor Provided Web-based Portal, The Contractor Shall Deliver A Replacement Pump To The Designated Department Specified For Each Site. The Vendor Will Pick Up The Used Pump For Cleaning And Preventative Maintenance.
schedule Of Returns: The Requesting Facility Will Work With The Contractor For The Removal Of The Equipment. Pickup And/or Return Shipping Of Contractor-owned Equipment Shall Be At No Cost To The Ordering Facility (i.e. At The Expense Of The Contractor).
the Contractor Will Remove The Equipment Within 24 Hours Of The Date Of Notification By The Ordering Facility.
training/in-service: The Contractor Shall Provide Training At No Additional Cost To All Staff At The Va Medical Center Using The Equipment. This Training Shall Be Conducted On-site And Will Be Provided On Multiple Shifts And As Often As Necessary To Ensure That All Va Medical Center Personnel Are Competent In The Proper Use Of The Equipment. Further, If Any Upgrade To The Equipment Should Occur During The Pop The Vendor Will Conduct The Same Training Prior To Full Implementation. In Addition, All Personnel Designated By The Cor To Utilize The Contractor Web-based Portal Shall Be Trained In The Same Manner As The Equipment Stated Above.
invoicing: Invoicing Will Be In Accordance With The Federal Supply Schedule Contract (36f79723d0119).
ensure That The Following Is Included On All Invoices:
duration Of Rental Equipment
invoice Number
name Of Requestor
phone Number Of Requestor
date Of Request
location
part Number Of Unit
serial Number
unit Price
total Price
purchase Order
account Number
vendor Contact Information
bill To Address
ship To Address
order Number
payment: All Payments Made Under The Contract Will Be Made Monthly, In Arrears, Upon Submission Of A Properly Prepared Invoice For The Services Furnished In The Previous Month. No Advance Payments Will Be Authorized. Contractor Shall Submit An Electronic Invoice Via Tungsten.
tungsten Support Phone: 1-877-489-6135
website: Http://www.tungsten-network.com/uk/en/
department Of Veterans Affairs
financial Service Center Phone: 1-877-353-9791
email: Vafscched@va.gov
payments Under This Contract Will Be Made In Accordance Far 52.232-34, Payment By Electronic Funds Transfer Other Than Central Contractor Registration.
this Notice Of Intent Is Not A Solicitation Nor Is It A Request For Proposal. However, Interested Parties That Believe They Can Satisfy The Requirement Listed Above Must Clearly Identify Their Capability To Do So In Writing By Friday, January 10th, 2025 At 12 Pm Est Time. Responses Should Be Sent To Phillip G Duba At Phillip.duba@va.gov And Charles Cameron At Charles.cameron3@va.gov. Information Submitted In Response To This Notice Will Be Used Solely To Determine Whether Competitive Procedures Could Be Used For This Acquisition. A Determination Not To Open The Requirement To Competition Based Upon Responses To This Notice Is Solely Within The Discretion Of The Government.
Closing Soon10 Jan 2025
Tender AmountRefer Documents
Mariano Marcos Memorial Hospital And Medical Center Tender
Healthcare and Medicine
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid For The Supply, Delivery, Installation, Testing And Commissioning Of Various Hospital Equipment For Bucas Centers 1. The Mariano Marcos Memorial Hospital And Medical Center, Through The 2025 General Appropriation Act Intends To Apply The Sum Of ₱ 58,625,000.00 Being The Abc To Payments Under The Contract For Supply, Delivery, Installation, Testing And Commissioning Of Various Hospital Equipment For Bucas Centers. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Item Code Quantity Item/description Approved Budget For The Contract Price Of Bid Documents Bc 1 2 Units Anesthesia Machine With Ventilator And Integrated Cardiac Monitors 9,400,000.00 10,000.00 Bc 2 2 Units Autoclave (at Least 75l Capacity) 1,200,000.00 5,000.00 Bc 3 2 Units Cardiac Monitor 900,000.00 5,000.00 Bc 4 2 Units Cautery Machine 1,690,000.00 5,000.00 Bc 5 2 Units Defibrillator 1,200,000.00 5,000.00 Bc 6 2 Units Ecg Machine 330,000.00 500.00 Bc 7 6 Units Emergency Cart 600,000.00 1,000.00 Bc 8 2 Units Fiberoptic Laryngoscope Set With Complete Accessories 130,000.00 500.00 Bc 9 1 Unit Incubator 250,000.00 500.00 Bc 10 1 Unit Infant T-piece Resuscitator, Neonate 200,000.00 500.00 Bc 11 5 Units Infusion Pump 775,000.00 1,000.00 Bc 12 5 Units Mechanical Hospital Bed 375,000.00 500.00 Bc 13 2 Units Mobile Digital Radiography System To 14x17 Detector (glass Free) And 10x12 Detector 31,200,000.00 25,000.00 Bc 14 2 Units Or Light, Led, Portable 600,000.00 1,000.00 Bc 15 1 Unit Phototherapy Overhead 750,000.00 1,000.00 Bc 16 2 Units Portable Ultrasound Machine 7,000,000.00 10,000.00 Bc 17 2 Units Stretcher Bed 740,000.00 1,000.00 Bc 18 5 Units Suction Machine, Heavy Duty 1,135,000.00 5,000.00 Bc 19 1 Unit Syringe Pump 150,000.00 500.00 2. The Mariano Marcos Memorial Hospital And Medical Center Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By 60 Calendar Days. Bidders Should Have Completed, Within 2 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Mariano Marcos Memorial Hospital And Medical Center And Inspect The Bidding Documents At The Address Given Below During 8:00 A.m. – 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 12, 2024 To January 7, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees, It Will Be Presented In Person, By Facsimile, Or Through Electronic Means. 6. The Mariano Marcos Memorial Hospital And Medical Center Will Hold A Pre-bid Conference On December 23, 2024, 2:00 P.m. Through Videoconferencing Via Cisco Webex, And Meeting Information As Follows, Which Shall Be Open To Prospective Bidders. Meeting Number: 2510 915 7362 Meeting Password: Bac12232024 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 07, 2025, 1:30 P.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 07, 2025, 2:00 P.m. At The Function Hall, 5th Floor Surgical Annex Building Of Mariano Marcos Memorial Hospital And Medical Center And/or Via Cisco Webex. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Mariano Marcos Memorial Hospital And Medical Center Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Kristine Angelie A. Almazan, Mba Administrative Officer Iii Oic Head, Procurement Section Mariano Marcos Memorial Hospital And Medical Center Brgy. 6 San Julian, City Of Batac, Ilocos Norte Contact Nos: (077) 600 8000 Local 2105 E-mail Address: Mmmhmcpcmcommunications@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Mmmhmc And Philgeps Website December 12, 2024 Louie A. Guerrero, Md, Fpcr Bac Chairperson
Closing Soon17 Jan 2025
Tender AmountPHP 58.6 Million (USD 1 Million)
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|taylor Fasching, N741.9|gd0|see Email|taylor.m.fasching.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750 Employees||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
the Purpose Of This Amendment Is The Following:
the Closing Date For Quotes Is Hereby Extended To 07 February 2025.
all Other Terms And Conditions Remain The Same.
all Freight Is Fob Origin.
the Resultant Award Of This Buy Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
government Source Inspection Is Required.
Unit Price:__________ Firm
Total Price:__________ Firm
Procurement Turnaround Time (ptat) :__________
Awardee Cage: __________
Inspection & Acceptance Cage, If Not At Source:__________
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Selector Set .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Selector Set Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;78062 20405-410;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
Closing Date7 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n741.6|gdh|n/a|tyreese.c.smith.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving ||tbd|n00104|tbd|tbd|w25g1u|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750 Emp||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
all Freight Is Fob Origin.
any Resulting Contract Will Be In Accordance To The Terms And Conditions Of Thebasic Ordering Agreement #n0010424gz901
the Resultant Award Of This Buy Solicitation Will Be Issued Bilaterally, Requiring The Contractors Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
government Source Inspection Is Required.
Unit Price:__________ Firm
Total Price:__________ Firm
Procurement Turnaround Time (ptat) :__________
Awardee Cage: __________
Inspection & Acceptance Cage, If Not At Source:__________
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Actuator,electro-me .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Actuator,electro-me Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;78062 52041-001;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
Closing Date30 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n741.6|gdh|n/a|tyreese.c.smith.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving ||tbd|n00104|tbd|tbd|w62g2t|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750 Emp||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
all Freight Is Fob Origin.
any Resulting Contract Will Be In Accordance To The Terms And Conditions Of Thebasic Ordering Agreement #n0010424gz901
the Resultant Award Of This Buy Solicitation Will Be Issued Bilaterally, Requiring The Contractors Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
government Source Inspection Is Required.
Unit Price:__________ Firm
Total Price:__________ Firm
Procurement Turnaround Time (ptat) :__________
Awardee Cage: __________
Inspection & Acceptance Cage, If Not At Source:__________
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Slide,sleeve Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Slide,sleeve Assemb Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;78062 20478-410;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
Closing Date27 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n741.6|gdh|n/a|tyreese.c.smith.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving ||tbd|n00104|tbd|tbd|w25g1u|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750 Emp||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
all Freight Is Fob Origin.
any Resulting Contract Will Be In Accordance To The Terms And Conditions Of Thebasic Ordering Agreement #n0010424gz901
the Resultant Award Of This Buy Solicitation Will Be Issued Bilaterally, Requiring The Contractors Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
government Source Inspection Is Required.
Unit Price:__________ Firm
Total Price:__________ Firm
Procurement Turnaround Time (ptat) :__________
Awardee Cage: __________
Inspection & Acceptance Cage, If Not At Source:__________
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Valve,linear,direct .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Valve,linear,direct Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;78062 21349-001;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
Closing Date30 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|taylor Fasching, N741.9|gd0|see Email|taylor.m.fasching.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750 Employees||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Purpose Of This Amendment Is The Following:
the Closing Date For Quotes Is Hereby Extended To 07 February 2025.
all Other Terms And Conditions Remain The Same.
all Freight Is Fob Origin.
the Resultant Award Of This Buy Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
government Source Inspection Is Required.
Unit Price:__________ Firm
Total Price:__________ Firm
Procurement Turnaround Time (ptat) :__________
Awardee Cage: __________
Inspection & Acceptance Cage, If Not At Source:__________
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Valve,linear,direct .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Valve,linear,direct Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;78062 20423-003;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
Closing Date7 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n741.6|gdh|n/a|tyreese.c.smith.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00104|tbd|tbd|w25g1u|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750 Emp||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
all Freight Is Fob Origin.
any Resulting Contract Will Be In Accordance To The Terms And Conditions Of Thebasic Ordering Agreement #n0010424gz901
the Resultant Award Of This Buy Solicitation Will Be Issued Bilaterally, Requiring The Contractors Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
government Source Inspection Is Required.
unit Price:__________ Firm
total Price:__________ Firm
procurement Turnaround Time (ptat) :__________
awardee Cage: __________
inspection & Acceptance Cage, If Not At Source:__________
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Valve,linear,direct .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Valve,linear,direct Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;78062 21319-002;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
Closing Date30 Jan 2025
Tender AmountRefer Documents
7041-7050 of 7196 active Tenders