Pumps Tenders

Pumps Tenders

Department Of Military Affairs Tender

Goods
GEM
India
Closing Soon20 Jan 2025
Tender AmountRefer Documents 
Details: Es6031d-5050814000 Washer Copper , Es6031d5050835000 Waser Copper , Es6031d-7405071000 Oil Seal , Es6031d-7407706000 Gasket , Es6031d7426505000 O Ring Rubber , Es6031d-7432412000 Set Of Oil Seal 19by30 By 7 For Aroto G 15sp Ffp , Es6031d-7903109000 Outside Spring , Es6031d7508411000 Gasket 138by138by2mm , Es6031d7526719000 Barring Gear Air Outlet Connect , Es6031d-7530404000 Flexmaster Conn Pipe 60 3mm Od , Es6031d-7551901000 Air Cooler Outlet Conn Hose , Es6031d-7551942000 Governor Speed Setting Air Inlet Connection , Es6031d-7902906000 Exhaust Valve Seat , Es6031d-7904628000 O Ring , Es6031d79046115000 Plunger Spring , Es6031d-7904625000 Fuel Pump Filter , Es6031d-7908821000 Oval Joint , Es6031d-7915237000 Loctite , Es6031d-7909304000 Banjo Bolt , Es6031d-8019205000 Piston Ring Compression , Es6031d-50037125000 Self Locking Nut , Es6031d-5050810000 Copper Washer 12 By 18 , Es6031d-5054005012 Spring Dowel Pin , Es6031d7426963000 Bearing Bush , Es6031d-7425134000 Gasket , Es6031d-7432641000 Bush Dia 22 By 26 14 , Es6031d-7527134000 Flexmaster Conn Gm 1006 038 Pipe 48 3 Od , Es6031d-7902934000 Nut , Es6031d7904115000 Ring D164 3 5d 6 531 60c7 , Es6031d7531208000 Round Joint , Es6031d-7550311000 Thermostat Element 74 By 82 Deg C , Es6031d7902107000 Con Rod Small End Bush , Es6031d7904004000 Washer , Es6031d-7904006000 Piston Ring , Es6031d-7904608000 Barrel Cap , Es6031d7904404000 Spring , Es6031d-7905012000 Ball Bearing , Es6031d-7913508000 Intermediate Pinion , Es6031d7248022000 Joint , Es6031d-7230642000 Gasket

City Of Dasmarinas Tender

Others
Corrigendum : Tender Amount Updated
Philippines
Closing Date29 Jan 2025
Tender AmountPHP 35.7 Million (USD 611.8 K)
Details: Description Security Services For 11 Months (february 1, 2025 – December 31, 2025) 119 Security Guards W/ 12hour Shift Each Locations: 1. Warehouse -amuntay………………………………. 3 Guards 2. Bahay Kalinga………………………………. 6 Guards 3. Central Market………………………………. 4 Guards 4. City Hall………………………………. 4 Guards 5. Dasca Building………………………………. 2 Guards 6. People Power Monument (dasca) ………………………………. 2 Guards 7. Aklatang Panlungsod……………………………….2 Guards 8. Dump Site………………………………. 4 Guards 9. Footbridge Gov. Mangubat Avenue (stoplight) ……………………………….2 Guards 10. Footbridge Fcie……………………………….2 Guards 11. Footbridge Golden City……………………………….2 Guards 12. Footbridge Kadiwa………………………………. 2 Guards 13. Footbridge New Era……………………………….2 Guards 14. Footbridge Robinson's Aguinaldo Highway………………………………. 2 Guards 15. Footbridge Robinson's Governor's Drive………………………………. 2 Guards 16. Footbridge Sm Pala-pala………………………………. 2 Guards 17. Footbridge Via Verde……………………………….2 Guards 18. Footbridge Waltermart……………………………….2 Guards 19. Former Guzman College……………………………….2 Guards 20. Impounding Center……………………………….4 Guards 21. Dc Park (kadiwa) ………………………………. 2 Guards 22. Motorpool………………………………. 2 Guards 23. Pagamutan Ng Dasmariñas………………………………. 17 Guards 24. Panteon De Dasmariñas………………………………. 2 Guards 25. City Slaughter House………………………………. 4 Guards 26. Footbridge #2 Kadiwa………………………………. 2 Guards 27. Helping Foundation……………………………….2 Guards 28. Dihs Main Tent………………………………. 2 Guards 29. Promenade Des Dasmariñas………………………………. 9 Guards 30. San Esteban Medical Clinic………………………………. 2 Guards 31. Kolehiyo Ng Lungsod Ng Dasmariñas……………………………….2 Guards 32. Pumping Station (langkaan Ii) ……………………………….2 Guards 33. Molecular Lab (langkaan Ii) ……………………………….2 Guards 34. Langkaan Isolation Facility………………………………. 4 Guards 35. Socio Civic Center …………………………………………… 2 Guards 36. Dasmacares Dialysis Center ………………………………… 1 Guard 37. Kld Building 2 ……………………………………………………….. 2 Guards 38. Socio Economic Building ……………………………………….. 7 Guards Prospective Bidders Should Be Compliant W/ The Following: 1. With Compliance W/ Mandatory Government Remittances Such As: Sss, Philhealth And Pag-ibig 2. Should Have A Dole Certificate Of No Pending Case. 3. Should Have A Pcsucia National License For Security Agency. Note: Please Be Informed That The City Government Of Dasmariñas Is Only Accepting Cash Or Manager’s Check Issued By A Universal Or Commercial Bank Equivalent To 2% Of The Approved Budget For The Contract (abc) As The Only Form Of Bid Security.

DEFENSE LOGISTICS AGENCY USA Tender

Energy, Oil and Gas
Corrigendum : Closing Date Modified
United States
Closing Date31 Jan 2025
Tender AmountRefer Documents 
Details: This Sources Sought Notice Spe605-24-rfi-1012 Is For Information Only And Shall Not Be Construed As A Solicitation, Nor As An Obligation On The Part Of Defense Logistics Agency Energy (dla-energy). The Purpose Of This Sources Sought Notice Is To Identify Qualified Businesses That Are Interested And Capable Of Providing For The Direct Delivery Of Fuel To Various Locations In Greece. This Sources Sought Notice Is For Planning Purposes Only. Requests For Solicitation Will Not Be Responded To And No Contracts Shall Be Awarded Based On The Responses Received. In Responding To This Notice Please Provide Your Company Name, Shall Have An Active Entity Profile In Sam.gov And Unique Entity Id/cage Code, Email Address, Phone Number, And Name/location Of Fuel Supplier. This Acquisition Is Not Set-aside For Small Businesses And Will Be Issued Under Full And Open Competition. description in Accordance With Far Part 10, Dla Energy Is Conducting Market Research To Identify Interested Vendors Capable Of Providing Fuel Products To Dla Energy's Customers Located In Greece. The Resultant Contract Type Will Be A Fixed-price With Economic Price Adjustment Contract. delivery Address: various Locations In Greece scope And Timeframe: products To Be Solicited May Include: 1. Product 1: Ulg - 9130-01-527-5763 {gasoline, Prem (ulg)}, Estimated Quantity 180,000 Us Gallons. 2. Product 2: Sfd - 9140-01-556-9156 {diesel Fuel, 10 Ppm Sulf (sfd)}, Estimated Quantity 223,000 Us Gallons. 3. Product 3: Jp8 - 9130-01-031-5816 {turbine Fuel, Aviation (jp8)}, Estimated Quantity 105,000 Us Gallons. delivery Modes May Include Tanker Truck, Tank Wagon, And Tank Wagon W/pump. the Proposed Period Of Performance Will Be Period Of Performance: Three (3) Year Period. the Anticipated Period Of Performance Is From Date Of Award To April 30, 2028 offers Must Be Submitted In Us Dollars Per Us Gallon all Responsible Offerors Must Be Registered In Sam.gov all Documentation And Statements Received In Response To This Source Sought Shall Become the Property Of The U.s. Government. if Your Company Is Interested And Capable Of Providing The Fuel Products Specified Above, Please Submit A Response Via E-mail To The Contracting Office At Dlaenergyfepcb@dla.mil And Greece2025@dla.mil No Later Than 1200 Hours (noon), Fort Belvoir, Virginia Time, October 14, 2024.

DEPT OF THE ARMY USA Tender

Transportation and Logistics
United States
Closing Date31 Jan 2025
Tender AmountRefer Documents 
Details: Description Of Intent: this Posting Is A Market Survey Requesting Information Supporting The Product Manager Petroleum And Water Systems (pdm Paws) Chemical Biological Radiological Nuclear (cbrn) Water Hauler Program. market Survey this Is A Market Survey Requesting Information In Support Of The Performance Requirement Described Below. No Contract Will Be Awarded From This Announcement. This Is Not A Request For Proposal (rfp) Or An Announcement Of A Forthcoming Solicitation. Also, It Is Not A Request Seeking Contractors Interested In Being Placed On A Solicitation Mailing List. Response To This Questionnaire Is Voluntary And No Reimbursement Will Be Made For Any Costs Associated With Providing Information In Response To This Market Survey And Any Follow-on Information Requests. Data Submitted In Response To This Market Survey Will Not Be Returned. No Solicitation Document Exists At This Time, And Calls Requesting A Solicitation Will Not Be Answered. the Purpose Of This Questionnaire Is To Obtain Information On Existing Industry Capability To Satisfy U.s. Army Requirements For A Cbrn Water Hauler. the Cbrn Water Hauler Program Is A Subprogram To The Unit Water Pod System (camel Ii). It Will Replace The Tank And Pump Unit (tpu). The Cbrn Water Hauler Will Be Procured Using The Camel Ii Platform. The Intent Of The Cbrn Water Hauler Is To Integrate The Camel Ii Water Pod With The M1083 5-ton Medium Tactical Vehicle (mtv) To Provide The Army The Ability To Carry Non-potable Bulk Water For Decontamination Operations In Large Scale Combat Operations. to Respond To This Survey, Interested Parties Are Required To Review Documents Marked Distribution D – Export Controlled. Parties Interested In Obtaining The Documents Must Be Certified In The Joint Certification Program (jcp) And Have An Active System For Award Management (sam) Account, And The Data Custodian Requesting The Information Must Be Registered In Sam.gov To Request Access To The Technical Data. The Data Custodian For The Interested Party Shall Request Access Directly From The Contract Specialist Debi Sacker, Army Contracting Command - Detroit Arsenal (acc-dta), At Deborah.d.sacker.civ@army.mil. The Data Custodian Must Provide The Organization's Name, Unique Entity Id (uei), And Cage Code In The Email. Upon Approval, The Government Will Provide Document Access To The Data Custodian Via The Dod Safe Site. These Documents Include (1) The Level 3 Product Level Technical Data Package (tdp) For The Camel Ii, (2) The Requirements Section Of The Camel Ii Purchase Description - Atpd 2398, And (3) The Known Configuration Changes And Anticipated Camel Ii Tdp Updates To Meet The Cbrn Water Hauler Requirements.

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Drainage Work
United States
Closing Date28 Jan 2025
Tender AmountRefer Documents 
Details: 12/11/24 - Amendment 0001 Issued To Provide Details For A Site Visit. w912p825b0001 - Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana this Solicitation Will Be Issued As Unrestricted. The Naics Code For This Procurement Is 237990. The Magnitude Of Construction Is Between $25,000,000 And $100,000,000. description And Magnitude Of Work: The Work Consists Of Clearing And Grubbing; Construction Of New Diversion Channel; Construction Of Temporary Channel; Construction Of New Pump Station; Demolition And Installation Of New Roadway; Removal Of Existing Bridge; Construction Of Highway Bridge; Pile Installation; Construction Of Access Roads And Culverts; Preload Installation And Removal; Removal And Disposal Of Residential Structures; Maintaining Storm Water Management During Construction; Traffic Control And Coordination; Asphalt Paving, Placing High Performance Turf Reinforcement Mats; Surfacing, Riprap And Scour Protection; Stone Bedding, Turf Establishment; Hydroseeding, Geotextile Placement, Road Relocation, Installation Of Precast, Prestressed Concrete Pile, Pile Load Testing, Fencing And Gates, Dewatering, And Other Related Incidental Work. this Solicitation Will Be Issued As An Invitation For Bid (ifb). The Resulting Contract Shall Be Firm Fixed Price (ffp). when Posted, The Solicitation Will Be Available Free Of Charge By Electronic Posting Only And May Be Found On The System Of Award Management System (sam) Website, Https://sam.gov. Paper Copies Of The Solicitation Will Not Be Issued. Therefore, Telephone And Fax Requests For This Solicitation Will Not Be Honored. Project Files Are Portable Document Format (pdf) Files And Can Be Viewed, Navigated, Or Printed Using Adobe Acrobat Reader. Contractors Must Register At The Sam Website At Https://www.sam.gov To Download The Solicitation For This Project. If/when Issued, Amendments Will Be Posted To The Above-referenced Website For Electronic Downloading. This Will Be The Only Method Of Distributing Amendments Before Closing; Therefore, The Bidders Must Check The Website Periodically For Any Amendments To The Solicitation. bidders Shall Maintain An Active Registration In The System For Award Management (sam) Database At Https://www.sam.gov To Be Eligible For A Government Contract Award. If A Bidder Is Not Actively And Successfully Registered In The Sam Database At The Time Of Award, The Government Reserves The Right To Award To The Next Prospective Bidder. Bidders Are Also Encouraged To Post Notices Of Prospective Subcontracting Opportunities On The Small Business Administration's Subnet, At Http://web.sba.gov/subnet. the Contract Specialist For This Solicitation Is Lauren A. Gandolfi At (504)862-2466 (lauren.a.gandolfi@usace.army.mil).

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Electrical and Electronics...+1Electrical Works
United States
Closing Date23 Jan 2025
Tender AmountRefer Documents 
Details: Sources Sought Synopsis the Department Of Veterans Affairs Is Issuing This Sources Sought Synopsis As A Means Of Conducting Market Research To Identify Parties Having An Interest In And The Resources To Support A Requirement For Hvac Repair Services At The Tomah Vamc Located At 500 E Veterans St, Tomah, Wi 54660. The Result Of This Market Research Will Contribute To Determining The Method Of Procurement. The Applicable North American Industry Classification System (naics) Code Assigned To This Procurement Is 238220 - Plumbing, Heating, And Air-conditioning Contractors. there Is No Solicitation At This Time. This Request For Capability Information Does Not Constitute A Request For Proposals; Submission Of Any Information In Response To This Market Survey Is Purely Voluntary; The Government Assumes No Financial Responsibility For Any Costs Incurred. requirements: vendor Will Provide Labor, Materials, Travel, And Equipment Necessary To Repair Two (2) Outdoor Hvac Units. The Units Have Been Diagnosed By A Daikin Certified Technician Which Indicated The Primary Compressor Needs To Be Replaced In Each Unit. One (1) Unit Will Need The Contactor Replaced. Both Units Are Daikin Heat Pump Models Reyq120pbtj. if Your Organization Has The Potential Capacity To Perform These Contract Services, Please Provide The Following Information: 1) Organization Name, Address, Email Address, Web Site Address If Applicable, Telephone Number, And Size And Type Of Ownership For The Organization; And 2) Tailored Capability Statements Addressing The Particulars Of This Effort And Documentation Supporting Claims Of Organizational And Staff Capability. If Significant Subcontracting Or Teaming Is Anticipated In Order To Deliver Technical Capability, Organizations Should Address The Administrative And Management Structure Of Such Arrangements. the Government Will Evaluate Market Information To Ascertain Potential Market Capacity To Provide Services Consistent In Scope And Scale With Those Described In This Notice And Otherwise Anticipated. based On The Responses To This Sources Sought Notice/market Research, This Requirement May Be Set-aside For Small Businesses, Sole Sourced Or Procured Through Full And Open Competition. Telephone Inquiries Will Not Be Accepted Or Acknowledged, And No Feedback Or Evaluations Will Be Provided To Companies Regarding Their Submissions. submission Instructions: Interested Parties Who Consider Themselves Qualified To Perform The Above-listed Services Are Invited To Submit A Response To This Sources Sought Notice By 3:00 Pm Local Time (central) On January 23rd, 2025. All Responses Under This Sources Sought Notice Must Be Emailed To Robert.ruska@va.gov.

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date22 Jan 2025
Tender AmountRefer Documents 
Description: Contact Information|4|n713.32|gg1|717-605-1313|kara.k.hale2.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00104|tbd|tbd|w25g1u|see Schedule|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|333914|750 #of Employees|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||| this Solicitation Is Issued Pursuant To Emergency Acquisition Flexibilities (eaf). Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^ all Freight Is Fob Origin. this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. the Government Is Seeking A Repair Turnaround Time (rtat) Of: 180 Days government Source Inspection (gsi) Is Required. please Note Freight Is Handled By Navy Cav Or Proxy Cav As Stated In Navsupwssfa24 Or Navsupwssfa25. your Quote Should Include The Following Information: Quote Amount And Rtat o Unit Price:__________ o Total Price:__________ o Repair Turnaround Time (rtat): _______ Days if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This Contract. Check One: Firm-fixed-price ___ Estimated ___ Nte ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location o Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As "awardee Cage": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As "awardee Cage":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________ important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Pump Unit,centrifug . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Pump Unit,centrifug Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;96046 777h440 ; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.

DEPT OF THE NAVY USA Tender

Machinery and Tools
United States
Closing Soon15 Jan 2025
Tender AmountRefer Documents 
Description: Contact Information|4|n7m1.12|hf0|7176054147|alexander.s.craft.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|combo||tbd|n00104|tbd|tbd|see Schedule|see Schedule|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| option For Increased Quantity (mar 1989)|1|180 Days From Date Of Award| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| annual Representations And Certifications (may 2024)|13|333914|750|x|x|||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^ all Freight Is Fob Origin. this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. the Government Is Seeking A Repair Turnaround Time (rtat) Of: 220 Days government Source Inspection (gsi) Is Required. please Note Freight Is Handled By Navy Cav Or Proxy Cav As Stated In Navsupwssfa24 Or Navsupwssfa25. your Quote Should Include The Following Information: Quote Amount And Rtat Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This contract. Check One: Firm-fixed-price ___ Estimated ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As ""awardee Cage"": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As ""awardee Cage"":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________ the Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit Price Specified. The Contracting Officer May Exercise The option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract, Unless The Parties Otherwise Agree. important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A price Reduction Is Required Due To Inexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A ""reconciliation Modification"" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Pump Unit . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Pump Unit Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;10941 01n-0-98-027; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.

National Irrigation Administration Tender

Civil And Construction...+1Irrigation Work
Philippines
Closing Soon20 Jan 2025
Tender AmountPHP 9.8 Million (USD 169.3 K)
Details: Description Invitation To Bid For Construction Of Solar Powered Irrigation Project, Construction Of Reinforced Concrete Tanks And Installation Of Pipelines For Upper Masaba Sip The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2025 National Expenditure Program (nep) For General Appropriation Act (gaa) 2025 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-epa-sip2025-015 (infra) Project Name : Upper Masaba Sip Contract Location : Quiniput, Zamboanga City Scope Of Works : Construction Of Solar Powered Irrigation Project, Construction Of Reinforced Concrete Tanks And Installation Of Pipelines For Upper Masaba Sip Approved Budget For The Contract (abc) : Php 9,894,609.41 Contract Duration : 168 Calendar Days Amount Of Bidding Documents : Php 10,000.00 The Nia – Ro9 Bac Is Conducting An Early Procurement Activity (epa) On Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : December 21, 2024 – January 20, 2025 At 8:30 Am Pre-bid Conference : January 8, 2025 At 9:00 Am Submission Of Bids : January 20, 2025 At 8:30 Am Opening Of Bids : January 20, 2025 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting December 21, 2024 – January 20, 2025. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 08 January 2025 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 20 January 2025 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below. The Nia – Ro9 Bac Additional Guidelines Is The Conduct Of Site Inspection To Be Scheduled During Pre-bid Conference. • The Certificate Of Site Inspection Shall Be Issued And Signed By The Nia R9 Authorized Representative After The Activity, Which Shall Be Required To Include In The Bid Tender (technical Component). Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/hev-uxfp-utg Opening Of Bids : Https://meet.google.com/bkn-midq-rvv 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Completed For The Past Five (5) Years. • Irrigation And Flood Control With Experience In Solar Powered Pumps To Be Eligible To Bid For The Contract, Bidders Must Have Done A Single Largest Completed Contract (slcc) Containing A Category Of Work Which Is The Same As Or Similar To The Major Category Of Works, And Who’s Total Slcc Cost Is At Least 50% Of The Approved Budget For The Contract (abc) To Be Bid. The Above Slcc Must Be Supported By A Copy Of The Contract, Certificate Of Completion, And Owner’s Certificate Of Final Acceptance (1-year After The Issuance Of The Certificate Of Completion) Issued By The Project Owner Other Than The Contractor Or A Final Rating Of At Least Satisfactory In The Constructors Performance Evaluation System (cpes). In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Interested Bidders Shall Have At Least Or Any Equivalent To Pcab Size Range “small B” Category: C & D (per Pcab Board Resolution No. 201, Series Of 2017) 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel Relevant Experience General Experience Number Project Engineer 5 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 5 Years 1 Office Engineer 3 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 3 Years 1 Materials Engineer 1 3 Years Shall Be An Accredited Material Engineer Of Dpwh. Shall Render Service To The Project As Required. 3 Years 1 Foreman 5 Years Experienced In Irrigation Structures. Shall Render Fulltime Service To The Project Until Completion. 5 Years 1 Safety & Health Officer (so2) 3 Years Shall Have At Least 3 Years’ Experience In Construction Industry. Completed Cosh Training And Shall Render Fulltime Service To The Project Until Completion. 3 Years 1 Geodetic Engineer 3 Years Licensed Geodetic Engineer. Shall Render Service To The Project As Required. 3 Years 1 Electrical Engineer 3 Years A Licensed Electrical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 3 Years 1 Mechanical Engineer 3 Years A Licensed Mechanical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 3 Years 1 The Contractor May Assign Other Support Personnel From Those Listed For The Optimal Performance Of The Project Construction Team. The Support Personnel Shall Undertake The Required Day-to-day Site Or Office-related Activities Of The Contractor. Full Time Services Mean, The Personnel Involved Shall Render Minimum Of Eight (8) Hours A Day Or Forty (40) Hour A Week And Shall Be Available Upon Request Of The Procuring Entity. 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity No. Of Units Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 1 Generator Set 15kva 1 Welding Machine 300a 1 Dumptruck 6 Cu.m 1 Concrete Mixer 1 – Bagger 1 Butt Fusion Machine Up To 6” Diameter 1 Survey Instrument 1 Set Initial Equipment Requirement Upon Mobilization: Equipment Capacity No. Of Units Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 1 Dumptruck 6 Cu.m 1 Survey Instrument 1 Set The Proof Of Ownership Of Equipment Requirements Are Copies Of Current Lto Official Receipt (or) And Certificate Of Registration (cr) Of The Equipment Which Should Be Attached Together With The Affidavit Of Ownership. In Case Of Leased Equipment, A Lease Contract And Affidavit Of Commitment Or Certificate Of Availability Of Equipment Should Be Submitted With The Lessor/owner As The Pledger Of The Equipment, Stating Therein That The Equipment Will Be Available For The Whole Duration Of The Project. For Purchase Agreement, The Description Of The Equipment To Be Purchased Such As Brand/model, Type Of Equipment, Motor No., Body No. And The Capacity Must Be Indicated In The Document, Otherwise, The Bac Will Not Honor The Purchase Agreement And The Bidder Will Be Declared As Non-complying. Likewise, List Of Contractor’s Major Equipment Units Pledged To Be Used For The Project Must Be Supported By Proof Of Ownership If It Is Owned, Lease Agreement If It Is Being Leased And Purchase Agreement If To Be Purchased. A Certification Of Availability Of Equipment For The Duration Of The Project Must Also Be Provided By The Equipment Owner And/or Lessor/vendor. The Bidder Should Also Specify In The Submitted Bid The Location Of The Equipment Where It Can Be Inspected. If Any Piece Of Equipment Is Not In The Specified Location, Then The Bidder Shall Be Post-disqualified. Item No. Description Qty Unit I Temporary Works & Mobilization/demobilization Mobilization/demobilization 1.00 Ls Temporary Facilities 1.00 Ls Project Billboard 1.00 Ls Ii Construction Safety & Health 1.00 Ls Iii Construction Of Solar Pump Irrigation System Well Drilling, Development And Testing W/ 6" Casing (until Good Aquifer Is Reached.) 1.00 Lot Solar Module Mounting Structure 1.00 Lot Solar Power Controller Housing (4x2 Meters) 1.00 Lot Perimeter Fence 1.00 Lot Delivery And Installation Of Lightning Arrester 1.00 Lot Pv Modules-solar Panels 600 Watts (please See Attached Plans.) 1.00 Lot 5hp Hybrid Ac/dc Submersible Water Pump Power: 5.5hp/4000w Voltage (ac): 85v-280v Voltage (dc): 80v-550v Max. Flow: 19m³/h Max. Head: 135m Outlet: 2" Body Diameter: 3 3/4" 1.00 Lot Hybrid Dc/ac Controller (11kw) 1.00 Lot Delivery & Installattion Of Cabling & Accessories For Solar Pump System 1.00 Lot Cctv Security System 1.00 Lot Construction Of Reinforced Concrete Tank Common Excavation (manual) 91.14 Cu.m 3000 Psi Concrete 66.87 Cu.m Rsb (cutting, Bending & Placing Of Rebars) 5,969.76 Kg Rc Tank Accessories (gate Valve, Pipes, Etc) 3.00 Ls Common Backfill (manual) 118.47 Cu.m Installation Of Water Distribution Pipe W/ Appurtenant Structures Common Excavation (manual) 266.64 Cu.m 4" Ø Hdpe Pipe Sdr 11 (w/ Free Delivery, Connectors& Fittings) 590.00 Ln.m 3" Ø Hdpe Pipe Sdr 11 (w/ Free Delivery, Connectors& Fittings) 570.00 Ln.m Air Release Valve Installation With Accessories 3.00 Ls Water Top Stand 4.00 Set Common Backfill (manual) 134.23 Cu.m

National Irrigation Administration Tender

Civil And Construction...+1Irrigation Work
Philippines
Closing Date28 Jan 2025
Tender AmountPHP 7.8 Million (USD 133.8 K)
Details: Description 1. The National Irrigation Administration-regional Office 12 South Cotabato-sarangani Irrigation Management Office (nia-12 Scsimo), Through The Gaa Fund Cy 2025 (nep) Intends To Apply The Sum Of P 7,820,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Cy 2025 Lake Sebu Cis-resto Cis: Construction Of Protection Works @ Right Side, U/s Sta. 0+000-0+013.50, 13.50 Meters & Right Side, D/s Sta. 0+000-0+013.50 Meters, Protection Works @ Left Side, U/s Station 0+000-0+002.50-2.50 Meters & D/s Station 0+000-0+002.5-2.50 Meters , 1 Unit Solar Powered Pump Irrigation With Complete Facility & Accessories And Temporary Facility. (nia12 -scsimo -infra -2025-009). Bids Received In Excess Of The Abc Shall Be Automatically Rejected During Bid Opening. 2. The Nia-12 Scsimo Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From National Irrigation Administration-south Cotabato-sarangani Irrigation Management Office And Inspect The Bidding Documents At The Address Given Below From 8am-5pm On Working Days. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 8-january 28, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of P 10,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Will Be Presented In Person Or Through Electronic Means. 6. The National Irrigation Administration-south Cotabato-sarangani Irrigation Management Office Will Hold A Pre-bid Conference On January 14, 2025 @ 9:30 Am At Nia Rox11 Conference Room, National Highway, City Of Koronadal. Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Before January 28, 2025 @ 9:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On January 28, 2025 @ 9:30 Am At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. Other Information: Contractor’s Size Range (minimum): Small B, Irrigation & Flood Control Valid Pcab Classification: General Engineering 2, License Category C & D B. Key Personnel With Corresponding Work Experience: 1 – Amo/project Manager 1 – Project Engineer Completed At Least One (1) Similar Project 1 – Safety Officer 3 Duly Accredited By The Department Of Labor And Employment 1 – Material Engineer Accredited By Dpwh 1 – Electrical Engineer/electronic Engineer/technician, Completed At Least One (1) Similar Project 1 – Project Foreman, Completed At Least One (1) Similar Project C. Minimum Equipment Requirement: 2 Units – Dump Truck 4 – 8 Cu.m 1 Unit – Cargo Truck, 5-10 Tons 1 Unit – Backhoe (crawler Mounted, 0.80-1.0 Cu.m.) 1 Unit – Backhoe W/ Attached Vibro Hammer, 4500 Kg.m, 120 Kn-m, 60 Ton 2 Units – Concrete Mixer (1 Bagger), 7.5hp 1 Unit – Concrete Vibrator, Max 2’’ Dia 5hp 1 Unit – Water Pump (4” Dia), 8-10hp 1 Unit – Vibratory Compactor (walk Behind), 1 Ton 1 Unit – Welding Machine, 20-400amp 1 Unit – Generator Set, 11-15kw 1 Unit – Level Survey Instrument 10. The National Irrigation Administration-south Cotabato Sarangani Irrigation Management Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Engr. Ronnie B. Tabaosares Bac Chairperson 9506/gensan Drive, Brgy. Concepcion Koronadal City, South Cotabato Tel. No. 083-228-1054
6481-6490 of 6665 active Tenders