Pumps Tenders

Pumps Tenders

DEPT OF THE NAVY USA Tender

Civil And Construction...+2Others, Pipe Line Project
United States
Details: Notice Type: Sources Sought solicitation No: N4008525r2522 response Date: 11/1/2024 2:00 Pm Eastern Time classification Code: Y naics Code: 236220 magnitude Of Construction: Between $25,000,000 And $100,000,000 this Is A Sources Sought Notice Only. This Is Not A Request For Proposal Or Invitation For Bid. There Will Not Be A Solicitation, Specifications Or Drawings Available At This Time. the Naval Facilities Engineering Command, Mid-atlantic Is Seeking Eligible Small Businesses, Hub Zone Small Businesses, Small Disadvantaged Businesses, Veteran-owned Small Businesses, Service-disabled Veteran-owned Small Businesses, And Women-owned Small Businesses Capable Of Performing Design-bid-build, For The P502 Replace Mcas Beaufort Fuel Pier, Marine Corps Air Station Beaufort, South Carolina. this Project Will Replace A Circa 1957 Pier With A New Fuel Pier That Meets Mil-hdbk- 1025/department Of Defense (dod) Unified Facilities Criteria (ufc) 2-000-05n, Facility Planning Criteria For Navy/marine Corps Shore Installations, Ccn 151-40, Ufc 4-150-02, Dockside Utilities For Ship Service, Ufc 3-201-01 Civil Engineering, Updated Sept 2020, And Ufc 4-152-01 Design: Piers And Wharves. Construction Will Include A Single Deck Fueling Pier Approximately 40 Linear Feet (lf) Wide And 169 Lf Long With A Pile Supported Concrete Approach That Is Approximately 25 Lf Wide And 200 Lf Long, With A Minimum 20 Lf Wide (inside Curb-to-curb) Vehicle One-way Travel Lane. The Piping Will Be Protected By Curbing On Either Side And Will Also Provide Containment In The Event Of A Leak. connecting The Pier And Approach Is A Section Of The Pier Which Measures Approximately 40 Lf Wide By 63 Lf Long, Creating A Pier Resembling A T Shape. the New Facility Will Be Constructed Concurrently With Demolition Of The Existing Facility, Allowing Ability To Maintain Existing Operations. Once Completed, The New Facility Will Also Serve As A Berthing/mooring Pier For Barges And At The Height Required Due To Slr. Primary Facilities Include New Concrete Piles, Decking, Storage Shed, Mooring Dolphins And Fuel Piping To/from The Loading Arm. Providing New Pier With Fueling Arm So That The Facility Will Have Two Defueling Options Instead Of Just One. This Added Redundancy Will Prove Advantageous In Case Of Maintenance On Either Defueling Access Point. Access To The Existing Small Support Crafts Will Be Maintained Throughout Construction, And The Approach Will Be In Almost The Same Footprint As Original, To Maintain Fuel Services, Temporary Lines May Be Required Or Existing Lines Supported In Place During Demolition And Construction. the Fuel Pier Site Is Located In The 100-year Flood Plain. The 2018 Marine Corp Air Station Beaufort (mcas Be) Fuel Pier Analysis Concluded That Equipment Could Be Negatively Affected By Floodwaters Elevated To Two-feet Above The High-water Level Of A Projected 100-year Flood. The Recommended Elevation Was To Be 11.4 Feet. in Sept 2020, The Ufc 3-201-01 Civil Engineering Was Updated For New Requirements, And Was Used In The 2021 Mcas Be Sea Level Rise (slr) Modeling Report. The Report Has Shown The Projected Slr Elevation In Coordination With The Updated Ufc 3-201-01 Civil Engineering, Ufc 3-460-01 Design: Petroleum Fuel Facilities, And Ufc 4-152-01 Design: Piers And Wharves. The Navfac Slr Subject Matter Expert (sme) Advised That P502 Will Fall Within Subcategory 3b: (high Risk, Essential Facilities) From Table 2-1 For Design Flood Elevation In Ufc 3-201-01. The Slr Sme Further Recommended Following The Department Of Defense Regional Sea Level (drsl) Database Approach, To Determine The Pier Deck Elevation. The Second Approach Outlined By Ufc 3-201-01 Is The Drsl Approach That Bases The Design Flood Elevation On The Drsl 2065 High Slr Scenario. Based On The Drsl Approach, The Bottom Of The Deck Would Need To Be At An Elevation Of 14.66 Feet Above Current Sea Level. this Project Includes The Realignment And Elevation Of Quilali Road To The Extent Required In Order To Provide Proper Access And Slope To The New Pier Deck Height. The New Road Will Be Elevated And Extended To Allow For Gradual Grading, With Sloped Embankments And Riprap Revetment On The Waterside To Prevent Erosion. [navfac Structural Engineer] tie-ins To Existing Infrastructure Such As Pump Stations And Storage Tanks Will Be Needed. additional Items Include Flexible Connections Where The Trestle Ties Into The Bulkhead/roadway. There Will Be Around A 6% Slope Along Quilali Road To Accompany The Adjusted Height Of The Pier. There Needs To Be An Elevation Difference Less Than 6.4 Ft From The Shore To The Deck Of The New Wharf. Elevate Parts Of Quilali Road Eight Percent To Support Smooth Transition Of Trucks/mobile Cranes From Trestle To Wharf, And Having A Floating Wharf For Defueling In Accordance With Ufc 4-152-01 Design: Piers And Wharves. [2021 Slr Modeling Report.] the Existing Small Boat Facility Will Have A Gangway Added From The Newly Constructed Pier Along With Connections To A New Water Line. The Length Of The Gangway May Need To Be Altered To Avoid Becoming Too Steep After The Increase In Pier Height Requirement. In Addition, Breasting Platforms May Need To Be Elevated And According To Exwc Report From 2018 Marine Corp Air Station Beaufort (mcas Be) Fuel Pier Analysis The Small Boat Facility May Need To Be Replaced Due To Structural Deficiencies And Maintenance Issues. operations And Maintenance Support Information (omsi) Is Included In This Project. facilities Will Be Designed To Meet Or Exceed The Useful Service Life Specified In The Dod Unified Facility Criteria. Facilities Will Incorporate Features That Provide The Lowest Practical Life Cycle Cost Solutions Satisfying The Facility Requirements With The Goal Of Maximizing Energy Efficiency. supporting Facilities Include Utilities And Connections (lighting, Power, And Potable Water Lines), Minor Site Civil Work (riprap, Fill, Etc.) And Site Demolition. Site Demolition Will Include Removing The Existing Decking, Beams, Vertical Piles, Utility Lines, Fuel Piping, Potable Water Piping, And Mooring. Existing Equipment Such As Oil Booms, Etc. Will Be Reused If Available And In Good Condition. Along With The Utilities, The Assumption Is That A Fire Protection Would Be Required In The Form Of A Stand-pipe System. this Project Will Provide Anti-terrorism/ Force Protection (at/fp) Features And Comply With At/fp Regulations And Physical Security Mitigation In Accordance With Ufc 4-020-01 Dod Security Engineering Facilities Planning Manual. special Costs Include Post Construction Contract Award Services (pcas), Geospatial Surveying & Mapping, And Cybersecurity Commissioning. facility-related Control Systems Include Cybersecurity Features In Accordance With Current Dod Criteria. dod And Department Of The Navy Principles For High Performance And Sustainable Building Requirements Will Be Included In The Design And Construction Of The Project In Accordance With Federal Laws And Executive Orders. Low Impact Development Will Be Included In The design And Construction Of This Project As Appropriate. facilities Will Be Designed To Meet Or Exceed The Useful Service Life Specified In Dod unified Facility Criteria. Facilities Will Incorporate Features That Provide The Lowest practical Life Cycle Cost Solutions Satisfying The Facility Requirements With The Goal Of maximizing Energy Efficiency. the Appropriate Northern American Industry Classification System (naics) Code For This Procurement Is 236220 – Commercial And Institutional Building Construction, And The Small Business Size Standard Is $45,000,000. In Accordance With Dfars 236.204, The Magnitude Of Construction For This Project Is Between $25,000,000 And $100,000,000. The Contract Will Include Far Clause 52.219-14 Limitations On Subcontracting, Which States That “the Concern Will Perform At Least 15 Percent Of The Cost Of The Contract, Not Including The Cost Of Materials, With Its Own Employees.” This Office Anticipates Award Of A Contract For These Services By Nov 2025. it Is Requested That Interested Small Businesses Submit To The Contracting Officer A Capabilities Package, To Include The Sources Sought Contractor Information Form, Sources Sought Project Information Form And Sources Sought Project Matrix, Provided As Attachments To This Notice. the Sources Sought Project Information Form And Sources Sought Project Matrix Shall Be Used To Document A Minimum Of One (1) Fuel Transfer Facility And Up To A Maximum Of Five (5) Relevant Construction Projects Completed In The Past Ten (10) Years That Best Demonstrate Experience On Projects That Are Similar In Size, Scope And Complexity To The Project Described Herein. a Relevant Project Is Further Defined As: size: Final Construction Cost Of $10 Million Or Greater. Total Construction Area Of More Than 5,000 Square Feet. scope: Prime And/or Subcontractor With Construction Of Municipal, Governmental, Industrial Fuel Transfer Facility With Reinforced Concrete Pile Supported Waterfront Structure Experience. Fuel Facilities Will Include Fuel Transfer Equipment. complexity: While Also Meeting The Scope Requirements Set Out Above, The Following Complexity Requirements Shall Be Met Collectively By The Projects Submitted, I.e. Each Submitted Project Does Not Require Demonstrated Experience With All Of The Following Components, But Collectively, Experience With All Of The Complexity Elements Below Must Be Established Throughout The Submitted Relevant Projects. Each Project Submitted Must Demonstrate Experience Constructing A New Reinforced Concrete Pile Supported Structure In A Waterfront Environment: dod, Commercial, Or Municipal Fuel Transfer Facility; dod, Commercial, Or Municipal Waterfront Reinforced Concrete Pier. ensure That The Project Description Clearly Identifies Whether The Project Is New Construction Or Repair/renovation, Addresses How The Project Meets The Scope And Complexity Requirements As Delineated Above, And Provides The Final Construction Cost. please Note That If You Are Responding As An 8(a) Mentor-protégé, You Must Indicate The Percentage Of Work To Be Performed By The Protégé. a Copy Of The Sba Letter Stating That Your 8(a) Mentor-protégé Agreement Has Been Approved Would Be Required With Your Proposal, If Requested. this Notice Is A Market Research Tool Being Used To Determine The Availability And Adequacy Of Potential Small Business Sources Prior To Determining The Method Of Acquisition And Ultimate Issuance Of A Solicitation. upon Review Of Industry Response To This Sources Sought Notice, The Government Will Determine Whether Set-aside Procurement In Lieu Of Full And Open Competition Is In The Government’s Best Interest. Large Business Submittals Will Not Be Considered. The Government Is Not Obligated To And Will Not Pay For Any Information Received From Potential Sources As A Result Of This Notice. the Information Provided In This Notice Is Subject To Change And In No Way Binds The Government To Solicit For Or Award A Contract. The Government Will Not Provide Debriefs On The Results Of This Research, But Feedback Regarding The Decision To Set Aside Or Not Set Aside The Procurement Will Be Accomplished Via Pre-solicitation Synopsis Or Solicitation For These Services, As Applicable. all Information Submitted Will Be Held In A Confidential Manner And Will Only Be Used For The Purpose Intended. Points Of Contact Listed May Be Contacted For The Purpose Of Verifying Performance. responses Are Due Nlt 01 Nov 2024, 2:00 Pm Est. the Package Shall Be Sent Via Electronic Mail To Scott Schulz At Scott.c.schulz.civ@us.navy.mil. attachments Are Limited To A Total Of 5mb.
Closing Soon1 Nov 2024
Tender AmountRefer Documents 

National Irrigation Administration Tender

Civil And Construction...+1Irrigation Work
Philippines
Details: Description Section I. Invitation To Bid Invitation To Bid For Construction Of Canalization And Canal Structures For Dipolog Nis The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2025 National Expenditure Program (nep) For General Appropriation Act (gaa) 2025 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-epa-repairnis2025-004 (infra) Project Name : Construction Of Canalization And Canal Structures For Dipolog Nis Contract Location : Dipolog, Zamboanga Del Norte Scope Of Works : Construction Of Canalization And Canal Structures (sta. 0 + 713.13 – Sta. 1 + 497.80) Dc Approved Budget For The Contract (abc) : Php 13,050,977.75 Contract Duration : 180 Calendar Days Amount Of Bidding Documents : Php 25,000.00 The Nia – Ro9 Bac Is Conducting An Early Procurement Activity (epa) On Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : October 28 – November 20, 2024 At 8:30 Am Pre-bid Conference : November 8, 2024 At 9:00 Am Submission Of Bids : November 20, 2024 At 8:30 Am Opening Of Bids : November 20, 2024 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting October 28 – November 20, 2024. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 08 November 2024 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 20 November 2024 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below. The Nia – Ro9 Bac Additional Guidelines Is The Conduct Of Site Inspection To Be Scheduled During Pre-bid Conference. • The Certificate Of Site Inspection Shall Be Issued And Signed By The Nia R9 Authorized Representative After The Activity, Which Shall Be Required To Include In The Bid Tender (technical Component). Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/unk-ujzz-kkq Opening Of Bids : Https://meet.google.com/gdi-fdbf-gij Any Requests For Additional Information Concerning This Bidding Shall Be Directed To The Following: Marietta M. Cortes Bac Secretariat Head, Nia-regional Office Regional Center Ix, Balintawak, Pagadian City, Zambo. Sur Niaregion9bac@gmail.com 09630884373 – Office Number Date Posted: August 1, 2024 (sgd) Antonio B. Gujeling Bac Chairperson 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Completed For The Past Five (5) Years. • Irrigation & Flood Control To Be Eligible To Bid For The Contract, Bidders Must Have Done A Single Largest Completed Contract (slcc) Containing A Category Of Work Which Is The Same As Or Similar To The Major Category Of Works, And Who’s Total Slcc Cost Is At Least 50% Of The Approved Budget For The Contract (abc) To Be Bid. The Above Slcc Must Be Supported By A Copy Of The Contract, Certificate Of Completion, And Owner’s Certificate Of Final Acceptance (1-year After The Issuance Of The Certificate Of Completion) Issued By The Project Owner Other Than The Contractor Or A Final Rating Of At Least Satisfactory In The Constructors Performance Evaluation System (cpes). In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Interested Bidders Shall Have At Least Or Any Equivalent To Pcab Size Range “small B” Category: C & D (per Pcab Board Resolution No. 201, Series Of 2017) 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel Relevant Experience General Experience Number Project Engineer 5 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 5 Years 1 Office Engineer 3 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 3 Years 1 Materials Engineer 1 3 Years Shall Be An Accredited Material Engineer Of Dpwh. Shall Render Service To The Project As Required. 3 Years 1 Foreman 5 Years Experienced In Irrigation Structures. Shall Render Fulltime Service To The Project Until Completion. 5 Years 1 Safety & Health Officer (so2) 3 Years Shall Have At Least 3 Years’ Experience In Construction Industry. Completed Cosh Training And Shall Render Fulltime Service To The Project Until Completion. 3 Years 1 Geodetic Engineer 3 Years Licensed Geodetic Engineer. Shall Render Service To The Project As Required. 3 Years 1 The Contractor May Assign Other Support Personnel From Those Listed For The Optimal Performance Of The Project Construction Team. The Support Personnel Shall Undertake The Required Day-to-day Site Or Office-related Activities Of The Contractor. Full Time Services Mean, The Personnel Involved Shall Render Minimum Of Eight (8) Hours A Day Or Forty (40) Hour A Week And Shall Be Available Upon Request Of The Procuring Entity. 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity No. Of Units Backhoe 0.45-1 Cu.m 2 Dumptruck 10 Cu.m 2 Concrete Mixer 1 – Bagger 2 Water Pump 4” Ø 2 Concrete Vibrator 5 Hp 2 Plate Compactor 5 Hp 1 Survey Instrument 1 Initial Equipment Requirement Upon Mobilization: Equipment Capacity No. Of Units Backhoe 0.45-1 Cu.m 1 Dumptruck 10 Cu.m 1 Survey Instrument 1 The Proof Of Ownership Of Equipment Requirements Are Copies Of Current Lto Official Receipt (or) And Certificate Of Registration (cr) Of The Equipment Which Should Be Attached Together With The Affidavit Of Ownership. In Case Of Leased Equipment, A Lease Contract And Affidavit Of Commitment Or Certificate Of Availability Of Equipment Should Be Submitted With The Lessor/owner As The Pledger Of The Equipment, Stating Therein That The Equipment Will Be Available For The Whole Duration Of The Project. For Purchase Agreement, The Description Of The Equipment To Be Purchased Such As Brand/model, Type Of Equipment, Motor No., Body No. And The Capacity Must Be Indicated In The Document, Otherwise, The Bac Will Not Honor The Purchase Agreement And The Bidder Will Be Declared As Non-complying. Likewise, List Of Contractor’s Major Equipment Units Pledged To Be Used For The Project Must Be Supported By Proof Of Ownership If It Is Owned, Lease Agreement If It Is Being Leased And Purchase Agreement If To Be Purchased. A Certification Of Availability Of Equipment For The Duration Of The Project Must Also Be Provided By The Equipment Owner And/or Lessor/vendor. The Bidder Should Also Specify In The Submitted Bid The Location Of The Equipment Where It Can Be Inspected. If Any Piece Of Equipment Is Not In The Specified Location, Then The Bidder Shall Be Post-disqualified. Item No. Description Qty Unit A. Canalization Common Excavation (mechanized) 904.74 Cu.m Common Backfill (mechanized) With Compaction 3,886.80 Cu.m Class B Concrete, 16.56 Mpa 354.24 Cu.m Reinforcing Steel Bars, All Sizes (supply, Delivery & Installation) 20,203.73 Kg Gravel Bedding 266.79 Cu.m B. Canal Structures Structure Excavation (mechanized) 150.40 Cu.m Structure Backfill (mechanized) 230.05 Cu.m Class A Concrete, 20.76 Mpa 18.78 Cu.m Reinforcing Steel Bars, All Sizes (supply, Delivery & Installation) 954.03 Kg C. Project Billboard 1 Ls D. Temporary Works, Mobilization And Demobilization 1 Ls E. Occupational Construction Safety And Health Program 1 Ls
Closing Date20 Nov 2024
Tender AmountPHP 13 Million (USD 225.3 K)

Stadt Elsterwerda Tender

Electrical Goods and Equipments...+1Electrical and Electronics
Germany
Details: Lot 6 Heating installation 1 piece air/water heat pump 15 kW incl. buffer tank 1 piece hot water tank 290 litres 85 m copper pipes, DN 12-32; incl. insulation 12 pieces fittings + pumps 35 m² underfloor heating 60 m² industrial surface heating 1 piece heating circuit distributor Fbh 3 pieces geothermal probes with drilling, brine distributor, brine pipes, incl. earthworks 4 m drainage channel incl. Cover lot 7 Electrical installation 3 pcs direct measurements 1 pc feed-in emergency power system 1 pc sub-distribution boards with built-in components 35 pcs installation devices 45 m cable routes 600 m cables/lines up to 5x6 mm² 20 pcs interior lights of different designs 3 pcs exterior lights (mounted lights) 17 pcs safety lights 120 m earthing cables 95 m lightning protection cables 1 pc smoke alarm system 1 pc computer system for 12 ports
Closing Date14 Nov 2024
Tender AmountRefer Documents 

Department Of Education Tender

Machinery and Tools
Corrigendum : Closing Date Modified
Philippines
Details: Description To: All Prospective Proponents 1. The Department Of Education, Through Its Bids And Awards Committee (bac) Iv, Requests Price Quotation For The Project Supply And Delivery Of Automotive Tools With A Total Approved Budget For The Contract (abc) Of Philippine Pesos Three Hundred Four Thousand Five Hundred Six And 01/100 (php304,506.01). Lot Description Qty. Unit Price Ceiling (php) Total Price Ceiling (php) 1 Scan Tool / Intelligent Tester 1 Set 74,506.67 74,506.67 2 Coil Spring Compressor (portable) 3 Pcs 2,199.67 6,599.00 3 Air Compressor 1 Unit 154,064.33 223,400.34 Impact Wrench (hydraulic) 2 Pcs Portable Impact Wrench 1 Pc Floor Jack (crocodile Type) 5 Tons 2 Pcs Floor Jack (crocodile Type) 3 Tons 2 Pcs Jack Stands 3 Pairs Socket Wrench 2 Set Combination Wrench 3 Set Screwdriver 3 Set Allen Wrench (t-handle) 2 Set Torque Wrench 3 Set Mechanical Pliers 3 Set Circlip /snap Ring Plier Set 2 Set Electricians Tool Kit Set 3 Set Impact Deep Socket Wrench Set 3 Set Description And Details Of The Project Are Provided In The Project Reference, Hereto Attached As Appendix “a”. 2. Said Quotation Shall Be Received On Or Before 10:00 A.m. On November 04, 2024 By Courier Or By Hand-delivery At The Address Given Below: Bids And Awards Committee Iv Rm. M-512, 5th Floor, Mabini Bldg. Deped Complex, Meralco Avenue, Pasig City, Philippines Depedcentral.bacsecretariat@deped.gov.ph 3. The Successful Proponent Must Be Able To Meet The Following Requirements: 3.1. The Terms And Conditions Provided As Item V Of The Project Reference As May Be Applicable, As Well As The Provisions Of The Irr Of R.a. 9184 Are Deemed To Be Read Into This Project. 3.2. The Schedule Of Requirements, As Indicated In Item Vi Of The Project Reference; And 3.3. The Technical Specifications Which Lists The Details Of The Requirements As Indicated In Item Vii Of The Project Reference. Supplier’s Business Name: Tin: Address: Telephone No.: Fax No.: E-mail: Authorized Representative’s Signature Over Printed Name And Designation: Date: 4. The Proponent Is Required To Submit A Financial Proposal Indicating Its Price For The Required Lot. The Approved Budget For The Contract Philippine Pesos Three Hundred Four Thousand Five Hundred Six And 01/100 (php304,506.01). For Purposes Of The Evaluation, Comparison And Ranking Of Bids/offers, The Proponent Who Submitted The Single / Lowest Calculated Responsive Quotation Shall Be Awarded The Contract After Evaluation By The Bids And Awards Committee (bac) Iv. 5. The Quotation Shall Be Enclosed In A Sealed Envelope And Addressed To The Bac Secretariat At The Address Given Above. The Envelope Should Have The Rfq Number Boldly And Conspicuously Identified. 5.1. It Is The Exclusive Responsibility Of The Proponent To Ensure That The Sealed Envelope Containing The Quotation Reaches The Above Address Before The Time And Date Indicated In Item No. 2. If Being Delivered By Hand, The Quotation Must Be Delivered At The Above Address During Official Working Hours. Delivery To Any Other Person Or Office Will Be At The Risk Of The Proponent And Will Not Constitute Timely Delivery. Quotations Received After The Aforementioned Closing Time Or Deadline May Be Rejected. 5.2. Based On The Above-stated Provisions, The Proponent's Quotation Sent By Email Will Not Be Accepted And Will Be Considered As Rejected. 6. The Quotation Should Be Valid For Thirty (30) Calendar Days From The Due Date Indicated Above. 7. Deped Reserves The Right To Request Any Additional Information That It Deems Necessary In Order To Make Any Decision On Any Quotation. 8. Any Quotation Not Supported By The Information Requested In This Rfq Or Requested During Evaluation, Or Is Patently Non-complying With The Rfq Requirements May Not Be Considered. 9. Deped Reserves The Right To Accept Or Reject Any Quotation, To Annul The Procurement Process, Or Not To Award The Contract Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. Submission Of Quotation In Response To This Request Shall Be Construed As Commitment To Undertake The Services In Accordance With The Terms And Conditions, Specifications, And Schedule Of Implementation Set Forth In This Rfq. Asec. Malcolm S. Garma Bac Iv Chairperson Received Copy: ___________________________________________________ Remarks: _______________________ Project Reference I. Project Title: Supply And Delivery Of Automotive Tools Ii. Project Owner: Department Of Education – Administrative Service – General Services Division (as-gsd) Iii. Objective: To Procure The Project Supply And Delivery Of Automotive Tools The Most Effective And Prompt Manner, Primarily Considering Time And Resource Constraints. Iv. Eligibility, Technical And Financial Requirements/ Documents: The Proponent With The Single / Lowest Calculated Quotation (scq Or Lcq) Shall Submit The Requirements Indicated Below Within Five (5) Calendar Days From Receipt Of Notice From The Bac, Which Documents Shall Be Validated To Determine If The Proponent Is Technically, Legally And Financially Capable Prior To The Award: (i) Mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Is Located; (ii) Philgeps Registration Number; (iii) Duly Notarized Omnibus Sworn Statement (see Attached Annex “a”) • If A Partnership, Corporation, Cooperative, Or Joint Venture, Please Provide Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate As Stated In Item No. 2 Of The Attached Omnibus Sworn Statement); (iv) Income Tax Returns (annual Income Tax Returns Of The Preceding Tax Year); (v) Business Tax Returns (value Added Tax Or Percentage Tax Returns Covering The Previous Six Months); In Addition, The Supplier With The Scb Or Lcb Shall Submit The Samples Indicated Below Within Five (5) Calendar Days From Receipt Of Notice From The Bac. (i) One (1) Sample Each Of 17 Items Shall Be Provided By The Winning Supplier During Post-qualification. To Facilitate Post-qualification, The Proponent At Its Option May Submit In Advance, I.e., Together With Its Quotation, The Above Requirements And Other Documents As May Be Required. Non-submission Of Any Of The Documents Shall Be A Ground For Post-disqualification. In The Case Of A Joint Venture, Or If The Parties Intend To Enter Into A Joint Venture, The Requirements Are As Indicated In The Revised Implementing Rules And Regulations Of Republic Act No. 9184. V. Terms And Conditions Of Contract: A. Instructions 1. The Proponent Shall Be Responsible For Sourcing Its Goods/equipment, And Shall Make The Deliveries In Accordance With The Schedule, And Specifications Of The Award. Failure Of The Proponent To Comply With This Provision Shall Be Ground For Cancellation Of The Award Issued To The Proponent. 2. The Proponent Shall Pick-up The Contract Or Purchase Order (po), And Notice To Proceed (ntp) Issued In Its Favor Within Three (3) Calendar Days From The Date Of Receipt Of Notice To That Effect. A Fax Transmission Or Electronic Mail Shall Constitute An Official Notice To The Proponent. Thereafter, If The Contract Or Po Remains Unclaimed, The Contract Or Po Shall Be Cancelled. To Avoid Delay In The Delivery Of The Requesting Agency’s Requirements, All Defaulting Proponent Shall Be Precluded From Proposing Or Submitting Substitute Quotation(s) Or Item(s). 3. The Proponent Who Accepted A Contract Or Po, And Ntp But Failed To Deliver The Required Goods Within The Time Called For In The Contract Or Po Shall Be Disqualified From Participating In Deped Or Any Of Deped Units’ Future Procurement Activities. This Is Without Prejudice To The Imposition Of Other Sanctions Prescribed Under R.a. 9184 And Its Revised Irr Against The Proponent. 4. Rejected Deliveries Shall Be Construed As Non-delivery, And Shall Be Replaced By The Proponent Subject To Liquidated Damages For Delayed Deliveries. 5. All Duties, Excise, And Other Taxes And Revenue Charges Shall Be Paid By The Proponent. 6. All Transactions Are Subject To Applicable Withholding Taxes Per Relevant Revenue Regulations Of The Bureau Of Internal Revenue (bir) Withholding Of Credible Value Added Tax And/or Expanded Value Added Tax Per Revenue Regulation(s) Of The Bir. B. Delivery And Documents The Goods Shall Be Delivered At Deped Complex, Meralco Ave., Pasig City. Risk And Title To The Goods Will Pass From The Proponent To Deped Upon Receipt And Final Acceptance Of The Goods At Their Final Destination. The Goods Must Conform To And Comply With The Standards Mentioned In The Schedule Of Requirements, As Indicated In Annex “b” And Technical Specifications As Indicated In Annex “c”. Upon Delivery Of The Goods To The Delivery Site, The Proponent Shall Notify Deped Through As-gsd And Present The Following Documents: I. Original And 4 Copies Of The Proponent’s Invoice Showing Goods’ Description, Quantity, Unit Price, And Total Amount; Ii. Original And Four Copies Of The Proponent‘s Warranty Certificate, Where Applicable; Iii. Original (white Copy) And Scanned Copy Stored In Cd/dvd/flash Drive Of The Pre-numbered Inspection And Acceptance Report (iar) And Delivery Receipt (dr) Detailing The Number And Description Of Items Received And Duly Signed And Dated By The Authorized Receiving Personnel (arp). For This Purpose, The Deped’s Representative At The Project Site Shall Be Mr. Idan Ray D. Magbanua, And The Designated Inspectorate Team. Packaging As May Be Applicable For Goods To Be Delivered And As May Be Indicated In The Contract Or Po, The Proponent Shall Provide Such Packaging As Is Required To Prevent Damage Or Deterioration During Transit To Their Final Destination. The Packaging Shall Be Well Protected From Damage During Transport. It Should Be Reinforced With Impact-resistant Material And It Should Be Well-packed. Incidental Services The Proponent Shall Provide Orientation To The End-user On The Properly Use/handling Of The Supplied Goods. Transportation Transport Of The Goods Shall Be Arranged By The Proponent, And Related Costs Shall Be Included In The Contract/po Price. Deped Accepts No Liability For The Damage Of Goods During Transit. Risk And Title To The Goods Will Not Pass To Deped Until Its Receipt And Final Acceptance At The Final Destination, Through Its Authorized Receiving Personnel. C. Schedule Of Payment The Proponent May Submit A Request For Payment Based The Following: (i) Cumulative Quantities Of Items Delivered Based On The Schedule Of Deliveries And Other Relevant Terms And Conditions Of The Contract; (ii) Duly Signed Delivery Receipt(s); (iii) Inspection And Acceptance Report(s), Including Certification By The Proponent, As Approved By The Duly Authorized Deped Representative, That The Items Have Been Delivered And/or Properly Installed And Commissioned In Accordance With The Contract. Other Delivery Documents As May Be Subsequently Prescribed By Deped Shall Be Provided By The Proponent. One Hundred Percent (100%) Of The Contract/po Price Shall Be Paid To The Proponent Within 60 Calendar Days, Subject To Existing Government Disbursement Procedure, Upon Delivery And Acceptance Of Goods By The Duly Authorized Deped Representative, And Receipt Of The Billing Statement Of Account. (note: The Supplier Must Furnish A Copy Of The Above-mentioned Documents To The End-user [(as-gsd)] And The Contract Management Division Of The Procurement Management Service, Central Office.) Payments Shall Be Subject To The “warranty” Provision In The Form Of Either Retention Money In An Amount Equivalent To At Least 1% Of The Payment, Or A Special Bank Guarantee In The Amount Equal To At Least 1% Of The Contract Price Required In Section 62 Of Ra 9184 And Its Irr. Release Of The Retention Money Shall Be At The Expiration Of The Warranty Period, Or The Remaining Amount In Case It Has Been Utilized Pursuant To The Warranty Provision. D. Inspections Inspection Or Pre-delivery Inspection (pdi), Where Applicable For Goods To Be Delivered, Shall Be Conducted By Deped Through The Duly Designated Inspectorate Team. The Inspection Or Pdi Shall Be Made Upon Notice To The Deped Of The Readiness Of The Goods For Inspection. The Proponent Shall Coordinate With Deped, Through The Procurement Management Service-contract Management Division (procms-cmd), On The Conduct Of Inspection Or Pre-delivery Inspection (pdi). Any Request For Inspection Or Pdi Shall Be Done In Writing, And Contain The Following Information: A. Project Title And Contract/po Number; B. Specific Goods For Inspection; C. Quantity Of Goods For Inspection; D. Venue/address Of Inspection Site; And E. Proposed Schedule Of Inspection Which Must Be At Least Three (3) Calendar Days From The Submission Of The Request. The Request For Inspection Or Pdi Shall Be Addressed To Procms-cmd, And Must Be Submitted Through Email At Procms.cmd@deped.gov.ph. Prior To And For Purposes Of Inspection, The Proponent Shall Ensure Convenient Access To The Goods For Inspection. The Proponent Shall Assign Personnel To Undertake The Handling, Unpacking, Assembly, Commissioning, Dissassembly, Repacking, Resealing And Sorting Of The Goods Prior To, During And After The Inspection. Deped Shall Have The Right To Visit And Inspect The Proponent’s Premises Covered By The Contract/po, At Any Time Or Stage Of Contract Implementation, To Monitor And Assess The Proponent’s Capacity To Discharge Its Contractual Obligations. Goods With Defects Or Non-compliant With The Required Technical Specifications Upon Delivery Shall Be Rejected, Orally Or In Writing, By Deped And Replaced By The Proponent In Accordance With The Warranty Provision. The Replacement Goods For This Reason Shall Be Subject To Re-inspection. Goods Are Considered Defective When They Are Unfit For The Use For Which It Is Intended Or Its Fitness For Such Use Is Diminished To Such An Extent That, Had Deped Been Aware Thereof, It Would Not Have Acquired It Or Would Have Given A Lower Price For It. Defects In The Goods Can Either Be Patent Or Latent. A Patent Defect Is One That Is Apparent To The Buyer Or Normal Observation. It Is An Apparent Or Obvious Defect. On The Other Hand, A Latent Defect Is One That Is Not Apparent To The Buyer By Reasonable Observation. A Latent Defect Is Hidden Or One That Is Not Immediately Determinable. E. Warranty Six Months Comprehensive Warranty For The Goods Will Be Applied. The Said Warranty Period Shall Reckon From The Date Of Issuance Of The Certificate Of Final Acceptance By The Deped That The Delivered Goods Have Been Duly Inspected And Accepted (i.e. Final Acceptance). The Obligation For The Warranty Shall Be Covered By Special Bank Guarantee In The Amount Equivalent To One Percent (1%) Of The Total Contract Price. Replacement And/or Repair Of The Goods May Be Requested Within The Warranty Period. Replacement And/or Repair Shall Be Made Immediately Upon Claim Or Request Therefor. In Case The Proponent Opts For Retention Money, The Amount Shall Only Be Released After The Lapse Of The Entire Warranty Period, Unless During The Remainder Of The Warranty Period, The Retention Money Is Substituted With A Special Bank Guarantee As Prescribed Above. The Special Bank Guarantee Shall Not Contain Any Deletion, Crossing-out, Expunction, Or Any Form Of Correction. Otherwise, Deped May Reject Such Security If Any Such Intercalation, Superimposition Or Alteration Affects Any Materials Information Or Feature Of The Document. Vi. Schedule Of Requirements As Indicated In Annex ”b”. Vii. Technical Specifications As Indicated In Annex “c”. Viii. General Instructions To Suppliers 1. This Request For Quotation (rfq) Form Is Deped’s Standard Rfq To Be Used When Deped Solicits Quotations For The Procurement Of Goods And Services. It Is A Standard Template That Suppliers Must Follow In Order To Prepare And Submit Their Quotations For Consideration By Deped. 2. This Rfq Is Composed Of Three (3) Lots. Prospective Proponents Shall Submit Their Quote For Three (3) Lots. Quotation That Exceeds The Abc For The Said Lot Shall Be Rejected. 3. The Proponent Must Fill Up The Spaces With The Required And Correct Information Including The Offered Brand, Model, Make And Specifications, As Well As The Total Price Of The Item Or The Items In The Lot. They Shall Likewise Indicate The Total Price Of The Said Lot. 4. Prices Must Be Quoted In Philippine Peso And Must Include The Unit Price And Total Price, Inclusive Of All Taxes, Duties And/or Levies To Be Paid And Other Incidental Costs To The Delivery Site/s If The Contract Is Awarded. 5. Award Of Contract Shall Be Made To The Single/lowest Quotation Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. The Rfq Form Must Be Duly Signed And Accomplished, Either Typewritten Or Written In Indelible Ink. Any Correction Made To The Prices, Rates Or To Any Information Shall Be Rewritten In Indelible Ink And Initialed By The Person Signing The Rfq Form. 6. The Proponent Shall Accomplish, Provide Correct And Accurate Information And Submit, Together With The Request For Quotation (rfq), The Following Attached Documents: (i) Schedule Of Requirements (annex “b”); (ii) Technical Specifications (annex “c”); And (iii) Financial Proposal (annex “d”) Otherwise, Non- Submission Of Which Shall Result To Automatic Disqualification Of Proposal. The Proponent Should Not Need To Fill Out The Attached Purchase Order (po) Under Annex "e". 7. The Proponent Requiring Any Clarifications Of The Request For Quotation Document May Refer To: Asec. Malcolm S. Garma Bids And Awards Committee Iv Department Of Education Room M-511, 5thfloor, Mabini Bldg., Deped Complex, Meralco Avenue, Pasig City Tel Nos. 8633-9343 / 8636-6542 Depedcentral.bacsecretariat@deped.gov.ph Look For: Ms. Mailyn B. Almodiel (project In Charge) Ix. Financial Proposal Quotation Form As Indicated In Annex “d”. Annex “a” Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] Republic Of The Philippines) City/municipality Of ____________________________________) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Its Association Or Relation With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End- User Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examine All Of The Bidding Documents; B. Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of __________, 20____ At ______________, Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Rules On Notarial Practice] Annex “b” Schedule Of Requirements Supply And Delivery Of Automotive Tools Lot Description Quantity Delivery Period 1 Scan Tool / Intelligent Tester 1 Set Fifteen (15) Calendar Days’ Period Upon The Receipt Of Notice To Proceed 2 Coil Spring Compressor 3 Pcs 3 Air Compressor 1 Unit Impact Wrench Hydraulic 2 Pcs Impact Wrench Portable 1 Pc Floor Jack (3 Tons) 2 Pcs Floor Jack (5 Tons) 2 Pcs Jack Stands 3 Pairs Socket Wrench 2 Set Combination Wrench 3 Set Screwdriver Set 3 Set Set Of Allen Wrench (t-handle) 2 Set Adjustable Torque Wrench Handle 3 Pcs Mechanical Pliers 3 Set Circlip Pliers 2 Set Electricians Tool Kit Set 3 Set Impact Deep Socket Wrench Set 3 Set A. Delivery Schedule Complete Delivery Of The Goods Shall Be Made Within Fifteen (15) Calendar Days’ Period Upon The Receipt Of Notice To Proceed (ntp) B. Project Site Goods Shall Be Delivered To Administrative Service- General Service Divisions, Department Of Education, Deped Complex, Meralco Avenue, Pasig City. C. Delivery And Receiving Instructions The Supplier Shall Observe The Following Instructions: 1) Goods As Specified In This Schedule Of Requirements And/or Technical Specifications Shall Be Delivered Only To The Address Indicated Herein. 2) The Proponent Shall Notify The Indicated Authorized Receiving Personnel At The Project Site At The Scheduled Date Of Delivery At Least Three (3) Working Days In Advance And Shall Ensure That The Authorized Receiving Personnel Of The Deped Is Present During The Date And Time Of Delivery. 3) The Proponent Shall Make Delivery Or Deliveries To The Project Site On Regular Working Days, During Office Hours From 8:00 A.m. To 2:00 P.m. The Authorized Receiving Personnel Reserves The Right To Refuse To Receive/accept Delivered Goods Made Before 8:00 A.m. To 2:00 P.m., And On Non-working Days. 4) The Proponent Shall Coordinate With Deped Bureau Of Learning Resources – Office Of The Director For Purposes Of Inspection And Acceptance. 5) During The Delivery, Delivery Receipts Must Be Signed By Mr. Albert Alano, Chief Of Asset Management Division Or His Authorized Representative. D. Evaluation Of Quotations Quotations Shall Be Compared And Evaluated On The Basis Of The Following Criteria: 1) Completeness Of Submission 2) Compliance With Technical Specifications 3) Price-lowest Unit Cost Statement Of Compliance After Having Carefully Read And Accepted Your Request For Quotation And Its Terms And Conditions, I/we Quote You On The Item/s At Price Noted In The Rfq. The Quotation Shall Be Binding Upon Us For Thirty (30) Calendar Days Reckoned From Last Day Of Submission Indicated In The Submission Requirements. The Corresponding Award On Contract Shall Be Accepted By Us At Any Time Before Expiration Of This Period. The Deped- Bids And Awards Committee Iv Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. _____________________________________________________________________________ Name And Signature Of Provider’s Authorized Representative Annex “c” Technical Specifications General Requirements/specifications: To Provide The Necessary Supplies Automotive Tools For The Preventive Maintenance And Emergency Repair Of Service Vehicles Of The Department. Detailed Technical Specifications Lot Description Quantity Statement Of Compliance (state Comply Or Not Comply) Bidder’s Actual Offer 1 Scan Tool / Intelligent Tester Functional: To Interface With, Diagnose, And Reprogram Vehicle Control Modules. Performance: -retrieves Module Information From Body Chasis, Powertrain, Information & Communication -quickly Detect And Display Faults And Trouble Code. - Covers Domestic/ Asian / European Vehicle Manufactures. -the Unique Dedicated Services Section Includes All Reset, Epb, Abs/ Srs And Sas Services. -automatic System And Software Updates. Design: -atleast 8 Inch Full-color Led Screen Display. -atleast 1024x600 Resolution. Brand New 1 Set 2 Coil Spring Compressor Functional: Using On All Vehicles Equipped With Macpherson Struts To Rapidly Compress The Coil Spring For Replacement Of Shock Absorber, Spring Set, Repair Bent Struts And Damaged Spindles. Performance: - Compress Spring At 10mm Increments - 1/2-inch Drive Ratchet Design: -double-ended Jaws With Safety Hooks. - Forged Steel Brand New 3 Pcs 3 Air Compressor Functional: Putting Atmospheric Air Under High Pressure, “compressing” The Air And Converting Its Potential Energy Into Kinetic Energy That It Stores In An Air Tank For Use. Performance - Belt Driven - Maximum Pressure: 115 Psi - Tank Capacity: Maximum Of 155 Liters - Displacement: 16.3 Cubic Feet Per Minute (cfm) Design: - Single Phase - Rubberized Wheel With Handle Brand New 1 Unit Impact Wrench Hydraulic Functional: Tightening Or Loosening Nuts Quickly. They Are Essentially Small Handheld Electric Or Pneumatic Motors That Can Rotate Socket Wrenches At High Speed. Performance: - 1/2" Square Drive - Air Pressure: Maximum Of 90 Psi - Load Speed: Maximum Of 7,000 Rpm - Twin Hammer Mechanism Design - 1/4" Hose Inlet - 3/8" Air Hose - Weight: At Least 5.7 Lbs - Length: At Least 7.3" Brand New 2 Pcs Impact Wrench Portable Functional: Tightening Or Loosening Nuts Quickly. They Are Essentially Small Handheld Electric Or Pneumatic Motors That Can Rotate Socket Wrenches At High Speed. Design: - Cordless And Rechargeable - Brushless - Rubberized Soft Grip - 4.9 Lbs Weight Inclusion: - 40volts Lithium-ion (li-ion) Battery W/ 1 Spare Battery - Charger Environmental Interface: Power Saving Brand New 1 Pc Floor Jack (3 Tons) Functional: Has Horizontal Pistons And A Long Arm Which Provides The Vertical Motion For Lifting. Performance: - Max Lifting Capacity Of 3 Tons - Double Pump - Lifting Height: Up To 500mm Or 1.6 Ft. - Weight: Up To 35 Kgs Design: -hydraulic - Low Profile - Steel Material Brand New 2 Pcs Floor Jack (5 Tons) Functional: Has Horizontal Pistons And A Long Arm Which Provides The Vertical Motion For Lifting. Performance: - Max Lifting Capacity Of 5 Tons -double Pump - Lifting Height: Up To 500mm Or 1.6 Ft. - Weight: 45 Kgs Design: -hydraulic - Low Profile - Steel Material Brand New 2 Pcs Jack Stands Functional: A Jack Stand Is A Metal Height-adjustable Mechanical Device That Is Used To Support The Weight Of A Lifted Vehicle. Most Commonly, They Are Placed Underneath The Car As A Safety Net To Protect Against A Vehicle Falling On A Body Part. Performance: - Quickly And Safely Lock The Position With The Included Locking Pin. - Circular Base Pads Allow For Maximum Stability And Safety. - Includes 2 Jack Stands. Design: - Made From High-grade Steel - With Four Steel Feet - 3 Tons Per Pair - With A Rubber Top Post Brand New 3 Pairs Socket Wrench Functional: Socket Wrenches Are Widely Used Hand Tools For Easy Tightening And Loosening Of Common Fasteners, Typically Nuts And Bolts. Performance: They Work The Same Way As Standard Spanners And Wrenches, But Their Ratcheting Design Allows The User To Apply Torque More Easily, With Less Strain And Fatigue. Design: - Hexagon Head - Chromium-vanadium Steel / Alloyed Steel Included The Following: - 1pcs 1/4" Drive Ratchet Wrench,45t - 13pcs 1/4" Drive Socket: 4mm To 14mm - 1pcs 1/4" Drive Universal Joint - 2pcs 1/4" Drive Extension Bar 50mm 100mm - 1pcs 1/4" 114mm Sliding T Bar - 1pcs 1/4" 150mm Flexible Extension Bar - 1pcs 1/2" Drive Ratchet Wrench,45t - 18pcs 1/2" Drive Socket - 8mm To 32mm - 1pcs 1/2" Drive Universal Joint - 2pcs 1/2" Drive Extension Bar 125mm 250mm - 1pcs 1/2" 250mm Sliding T Bar - 2pcs Spark Plug Socket 16mm 21mm Brand New 2 Set Combination Wrench Functional: Combination Wrenches Have A Closed Loop On One Side (box-end) For Hexagonal Or Square Nuts, While The Other End Is An Open U-shape (open-end) Performance: These Wrenches Are Often Used For Nuts That Are Hard To Loosen. The Closed End Can Loosen The Nut, While The Open End Is Then Used To Unscrew It Fully. Design: - Flexible Ratchet Spanner - Chromium-vanadium Steel / Alloyed Steel - Sizes 8mm To 19mm Brand New 3 Set Screw Driver Set Functional: A Screwdriver Is A Simple And Common Tool Used To Install Or Remove Screws. Performance: Screwdrivers Perform Simple Functions In A Simple Design And Come In Several Types Depending On The Shape Of The Screw. Design: - Bi-material Handle - Magnetic Tip Holds Screws Securely -black Chrome Plating And Nickel-coated Tips - Chromium-vanadium Steel / Alloyed Steel - Philips Screwdriver: Ph1 X 3 In., 1pc Ph2 X 4 In, And 1pc Ph3 X 6 In - Slotted Or Flathead Screwdriver: 1pc Sl3/16 In X 4 In, 1pc Sl1/4 In X 4 In, And 1pc Sl5/16 In X 6 In - Robertson Head/ Square Screwdriver: 1pc Sq1 X 3 In And 1pc Sq2 X 4 In Brand New 3 Set Set Of Allen Wrench (t-handle) Functional: Hex Keys, Commonly Known As Allen Keys/wrenches In The Uk And Various Other Countries, Are A Very Simple Hand Tool Of The General Spanner And Socket Family. Performance: Used For Tightening And Loosening Hexagonal Bolts And Other Compatible Fasteners. Quantity: At Least 8pcs Per Set Of T-handle Torx/hex Wrench Design: - Sizes:2x75mm To10x200mm Or 2 To 10 Metric - Chromium-vanadium Steel / Alloyed Steel Brand New 2 Set Adjustable Torque Wrench Handle Functional: It Is A Fundamental Element In General Mechanics, Tire Changing Operations And Industrial Maintenance & Repair Industries, To Ensure Customers' Safety. Performance: Used To Control And Apply A Specific Torque To A Fastener Such As A Bolt Or A Nut. - 1/2" Drive - Torque Range: 40 To 200 N.m - Forward And Reverse Torque Capability - High Accuracy With A Control Mechanism -click Torque Wrench - Heavy Duty Design: - Chromium-vanadium Steel / Alloyed Steel - Society Automotive Engineers (sae)/metric Scales For Foot-pound And Newton-meter Applications. - 10-100 Ft-lbs Torque - Locking Trigger - Length: 30.2 Inches Brand New 3 Pcs Mechanical Pliers Functional: Slip-joint Pliers Have Grooved Jaws, And The Pivot Hole In One Member Is Elongated So That The Member Can Pivot In Either Of Two Positions In Order To Grasp Objects Of Different Size In The Most Effective Way. Performance: Hand-operated Tool For Holding And Gripping Small Articles Or For Bending And Cutting Wire. Design: Material: Plastic, Chromium-vanadium Steel Product Dimensions: 34l X 25.9w Centimetres Handle Material: Plastic, Steel Item Weight: 3 Pounds Grip Type: Non-slip Inclusion: - 1pc 8" High Leverage Combination Pliers - 1pc 7" High Leverage Diagonal Cutting Pliers - 1pc 8" High Leverage Long Nose Pliers - 1pc 10" Pump Plierss Brand New 3 Set Circlip Pliers Functional: There Are Two Types Of Pliers. On External Pliers The Head Opens When The Handle Is Squeezed And The Circlip Is Pushed Out. Performance: Circlip Pliers Are Special Pliers For Installing Or Removing Circlips On Shafts Or Insides Bores. Design: - 2pcs 180° - 2pcs 90° - Carbon Steel - Size:7"/180mm Brand New 2 Set Electricians Tool Kit Set Functional: Electrical Tools Are Tools Used To Work On An Electrical System. Performance: These Can Include A Wide Range Of Tools Such As Wire And Cable Cutters, Wire Strippers, Coaxial Compression Tools, Telephony Tools, Wire Cutter/strippers, Cable Tie Tools, Accessories, And Even More. Design: Electrician Tools Set Include: Digital Multimeter With Alkaline Battery - 6" Adjustable Wrench - 6" Long Nose Plier - 6" Diagonal Cutting Pliers - 7" Combination Plier - 6" Wire Stripper - 5.5 Mm Slotted Screwdriver - Snap-off Blade Knife - 3m/10'' Steel Measuring Tape - Flashlight - 4''x45m Pvc Insulating Tape - Tweezers 125mm - 5 5" Electrician's Scissors Brand New 3 Set Impact Deep Socket Wrench Set Functional: They Provide Added Accessibility In Limited Spaces And In Hard-to-reach Places All While Retaining Their Ability To Tighten Or Loosen. Performance: Deep Impact Sockets Are Made To Be Used With Impact Tools. - 1/2" Drive Design: - Sizes:10mm To 24mm - Length: 78mm - Heat Treatment - Chromium-vanadium Steel / Alloyed Steel Brand New 3 Set Statement Of Compliance I Hereby Commit To Provide The Above Specified Requirements In Compliance With The Technical Specifications For The Project: Supply And Delivery Of Automotive Tools ___________________________________________________________ Name And Signature Of Authorized Representative Supplier’s Business Name: Tin: Address: Telephone No.: Fax No.: E-mail: Authorized Representative’s Signature Over Printed Name And Designation: Date:
Closing Soon4 Nov 2024
Tender AmountPHP 304.5 K (USD 5.2 K)

Department Of Public Works And Highways Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Regional Office Ii Dalan Na Pavvurulun, Rgc, Carig Sur, Tuguegarao City, Cagayan Invitation To Bid For 24b00126 : Department Of Health - Fy 2024 Health Facilities Enhancement Program (hfep) - Rural Health Units (rural Health Unit): 1. Completion/ Equipping Of Super Health Centers Echague Super Health Center Echague, Isabela - 2. Completion/ Equipping Of Super Health Centers San Mateo Super Health Center San Mateo, Isabela - 3. Completion/ Equipping Of Super Health Centers San Isidro Super Health Center San Isidro, Isabela 1. The Dpwh Regional Office Ii, Through The Ra 11975 (gaa Fy 2024) Intends To Apply The Sum Of ₱17,910,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract 24b00126: Department Of Health - Fy 2024 Health Facilities Enhancement Program (hfep) - Rural Health Units (rural Health Unit): 1. Completion/ Equipping Of Super Health Centers Echague Super Health Center Echague, Isabela - 2. Completion/ Equipping Of Super Health Centers San Mateo Super Health Center San Mateo, Isabela - 3. Completion/ Equipping Of Super Health Centers San Isidro Super Health Center San Isidro, Isabela. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Project Name Abc 1 Completion/ Equipping Of Super Health Centers Echague Super Health Center Echague, Isabela ₱ 5,970,000.00 2 Completion/ Equipping Of Super Health Centers San Mateo Super Health Center San Mateo, Isabela ₱ 5,970,000.00 3 Completion/ Equipping Of Super Health Centers San Isidro Super Health Center San Isidro, Isabela ₱ 5,970,000.00 Total Abc ₱ 17,910,000.00 Note: 1. The Bidder Must Bid All Projects Provided That The Bid Amount Per Project Must Not Exceed Its Corresponding Abc. 2. The Bidder Must Include In Its Financial Document The Respective Bill Of Quantities And Detailed Estimates Per Project. 1. The Dpwh Regional Office Ii Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: Name Of Contract : Department Of Health - Fy 2024 Health Facilities Enhancement Program (hfep) - Rural Health Units (rural Health Unit): 1. Completion/ Equipping Of Super Health Centers Echague Super Health Center Echague, Isabela - 2. Completion/ Equipping Of Super Health Centers San Mateo Super Health Center San Mateo, Isabela - 3. Completion/ Equipping Of Super Health Centers San Isidro Super Health Center San Isidro, Isabela Contract Id No. : 24b00126 Location : Isabela Brief Project Description : Construction Of Patient's Waiting Area, Powerhouse, Ambulance Bay, Placenta Vault, Sharps And Needles Vault And Catch Basin, Improvement Of Ramp, Installation Of Sewer Lines, Storm Drainage, And Water Line System, Electrical Works, Fire Alarm And Air Conditioning Unit, Construction Of Cabinets Scope Of Works : Other General Requirement • Permits And Clearances • Project Billboard / Signboard • Occupational Safety And Health Program • Mobilization/demobilization Earthworks • Removal Of Structures And Obstruction • Excavation (surplus Common, Structure) • Embankment (from Structure Excavation And Borrow) • Gravel Fill • Subgrade Preparation Subbase And Base Course • Aggregate Subbase Course Surface Courses • Pccp – 0.15 M Thick, 14 Day Concrete Plain And Reinforced Concrete Works • Structural Concrete, 3000 Psi, Class A, 28 Days • Reinforcing Steel (deformed) Grade (40 & 60) • Formworks And Falseworks Finishing And Other Civil Works • Soil Poisoning • Catch Basin • Sewer Line Works • Storm Drainage And Downspout • Sanitary/plumbing Fixtures • Cold Water Lines • Ceiling (aluminum Metal Cladding) • Ceiling (4.5mm Thick Ficem Board, Prepainted Metal Panel) On Metal Frame • Wall • Carpentry And Joinery Works • Finishing Hardware • Fire Rated Fire Exit Steel Door • Steel Doors And Frames • Aluminum Glass Windows (sliding, Awning & Fixed) Type • Roll-up Door (steel) • Special Performance Glass Or Processed Glass - 10mm Thk • Fabricated Metal Roofing Accessory, 0.60 Mm, (flashing And Gutters) • Waterproofing, Liquid • (glazed, Unglazed & Granite) Tiles • Vinyl Tiles (anti-bacterial) • Cement (plaster, Broom, Floor) Finish • Stamped Concrete • Non -slip Finish • Decorative Stones • Painting Works, (masonry/concrete, Wood, Steel) • Metal Deck Panel • Pvc Doors And Frames • Reflective Insulation • Chb Non-load Bearing (including Reinforcing Steel) (100mm & 150mm) • Louver Block • Metal Structure Accessories, (turnbuckle, Bolts And Rods, Sagrods, Cross Bracing & Steel Plates) • Structural Steel (purlins) • Stainless Steel Railing Electrical Works • Rigid Polyvinyl Chloride Pipes (pvc/upvc) – (20, 25, 65 & 90) Mm Dia. • Conduits, Boxes & Fittings (conduit Works/conduit Rough-in) • Electric Wire (2.0, 3.5, 5.5, 14.0, 30.0, 80.0, 125.0) Mm² Tw/thhn/thwn - Stranded) • Single Pole Wall Switch On One Switch Plate • Duplex (2 Single Pole Wall Switches On One Switch Plate) • Triplex (3 Single Pole Wall Switches On One Switch Plate) • Single Convenience Outlet/receptacle, Grounding Type (gt) • Duplex Convenience Outlets/receptacles (gt) • Heavy Duty Convenience Outlet/receptacle, Grounding Type • Wires And Wiring Devices • Panelboard With Main & Branch Breakers • Pole Mounted Power Transformer (oisc) With Complete Accessories, Single Or Three Phase, Pole Type Or Flatform • Generator Single Or Three Phase Stand-by • Lighting Fixtures • Rc Pole Mechanical Works • Exhaust Fan, (wall Mounted) • Water Tank, Stainless • (ventilating, Water Pumping, Fire Alarm & Air Conditioning) System Approved Budget For The Contract (abc) : ₱17,910,000.00 Contract Duration : 85 Calendar Days Inclusive Of 6 Unworkable/rainy Days, 19 Sundays And Holidays 2. The Major Category Of Work For The Project Is Bicwoplc - Buildings: Construction-without Piles-low Rise-concrete Frame(1 To 5 Storey ). 3. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Size Range Of At Least Small B For Buildings. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Pursuant To Gppb Resolution No. 15- 2021 Dated October 14, 2021, Prospective Bidders Shall Submit In Their First Envelope The Updated Philgeps Certificate Of Platinum Registration And Membership In Accordance With Sections 23.3, 24.4.3 And 54 Of Republic Act 9184 (ra9184), All Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Supporting The Veracity, Authenticity And Validity Of The Certificate Shall Remain Current And Updated, And That Failure By The Prospective Bidder To Update Its Philgeps Certificate Of Platinum Registration And Membership With The Current And Updated Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Shall Result In The Automatic Suspension Of The Validity Of Its Certificate Of Platinum Registration And Membership Until Such Time That All Of The Expired Class “a” Eligibility Documents Has Been Updated. 5. Bidders Are Required To Update Their Existing Philgeps Registration (platinum) In The Dpwh Civil Works Registry Prior To The Scheduled Receipt And Opening Of Bids. 6. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 7. Interested Bidders May Obtain Further Information From The Dpwh Regional Office Ii And Inspect The Bidding Documents At Procurement Staff, 4th Floor, Dpwh Regional Office No. Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan During Weekdays From 8:00 A.m. To 5:00 P.m.. 8. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 15 - November 05, 2024, From The Address Given Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty Five Thousand Pesos Only (₱25,000.00). Pursuant To Section 17. 5 Of The 2016 Revised Irr Of Ra 9184, Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of Ra 9184 And Its Irr. 9. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 10. The Dpwh Regional Office Ii Will Hold A Pre-bid Conference On October 22, 2024, 10:00 Am At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan, And/or Through Webcasting Via Youtube Channel (dpwh Regional Office Ii Procurement Livestream) Which Shall Be Open To Prospective Bidders. Prospective Bidders Are Encouraged To Send Their Technical Personnel To Attend The Pre-bid Conference. 11. Bid Submission May Be Done Manually Or Electronically. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds Clause 17. 12. Bids Must Be Duly Received By The Bac Secretariat For Manual Submission At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan Or At Electronicbids_r2@dpwh.gov.ph For Electronic Submission And Receipt Of Bids On Or Before November 05, 2024 At 10:00 Am. Late Bids Shall Not Be Accepted. 13. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Bds Clause 15.1. 14. Bid Opening Shall Be On November 05, 2024, Immediately After The Deadline For The Submission Of Bid At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 15. The Dpwh Regional Office Ii Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra 9184, Updated As Of July 19, 2024, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 16. You May Visit The Following Websites; For Downloading Bidding Documents: Dpwh Website: Www.dpwh.gov.ph Philgeps Website: Www.philgeps.gov.ph Livestreaming Website: Https://www.youtube.com/@dpwh.ro.2 For Online Bid Submission: Electronicbids_r2@dpwh.gov.ph 17. For Further Information, Please Refer To: Hilario Y. Casem Engineer Iv Head, Procurement Staff Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Contact No.: 0935-176-0624 Email Address: Casem.hilario@dpwh.gov.ph Bernard T. Calabazaron Chief, Qah Division Bac Chairperson Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Calabazaron.bernard@dpwh.gov.ph Date Of Posting: Dpwh And Philgeps Websites: October 15-21, 2024 Conspicuous Place (procurement Bulletin Board): October 15-21, 2024
Closing Soon5 Nov 2024
Tender AmountPHP 17.9 Million (USD 309.2 K)

Bureau Of Fisheries And Aquatic Resources Region Viii Tender

Laboratory Equipment and Services
Corrigendum : Tender Amount Updated
Philippines
Details: Description Please Quote Your Lowest Price Inclusive Of Vat On The Following Item/s Or Lot/s Listed Below, Subject To The Terms And Conditions Of This Rfq, And Submit Your Quotation Duly Signed By Your Representative Not Later Than November 11, 2024, At Bids And Awards Committee Of Bfar 8, 3rd Floor Mrgp Commercial Bldg, Marasbaras, Tacloban City. For More Information Please Call The Bac Secretariat At Telephone Nos.: 888-0381 (local 1003) Or Browse The Philgeps Website. Item/job Description: Lot 1 1 Alcohol Lamp (250ml) 4 Piece 600.00 2 Aluminum Foil, 300m X 12inches 300 Meters Food Grade Foil / High-quality 2 Roll 800.00 3 Bacto Agar (500g/pack) 1 Pack 15,000.00 4 Calibrated Pipette Dropper Non-toxic Clear Disposable Transfer Pipettes, 1-2ml Capacity, 100pcs/pack 2 Pack 400.00 5 Cotton, 80g 4 Piece 480.00 6 Glass Beaker (1l Capacity) 4 Piece 2,000.00 7 Glass Beaker (500 Ml Capacity) 20 Piece 7,000.00 8 Glass Cover 2 Box 200.00 9 Glass Pasteur Pipette (0.225mm; 200pcs/box) 2 Box 5,000.00 10 Glass Slide 2 Box 200.00 11 Graduated Cylinder (100ml) 4 Piece 600.00 12 Graduated Cylinder (500ml) 4 Piece 720.00 13 Haemacytometer 2 Unit 6,000.00 14 Inoculating Loop 4 Piece 480.00 15 Measuring Cup (10ml Capacity), 50pcs/set 2 Set 400.00 16 Measuring Pipette (10ml Capacity) 200 Piece 3,000.00 17 Petri Dish W/ Cover 20 Piece 8,000.00 18 Pipette Bulb, Small 20 Piece 2,000.00 19 Plastic Beaker W/ Handle (1l Capacity) 4 Piece 240.00 20 Sedgeweck Rafter Chamber 2 Unit 40,000.00 21 Stirring Rod 10 Piece 500.00 22 Test Tube Rack 4 Piece 1,200.00 23 Test Tubes (30ml Capacity) 40 Piece 6,000.00 24 Alcohol 70% Solution (500 Ml) 20 Bottle 2,620.00 25 Anti-bacterial Liquid Handwash/soap, 500ml 10 Bottle 2,880.00 26 Anti-bacterial Scrub Sponge Heavy Duty, 100x75x30mm 20 Piece 1,080.00 27 Biodegradable Garbage Bag, L, 10pcs/roll 20 Roll 1,260.00 28 Dextrose Empty Glass Bottle 1000ml 15 Piece 12,000.00 29 Digital Weighing Gram Scale (up To 500 G) 1 Unit 357.00 30 Dishwashing Liquid (big),500ml/bot-lemon Scent, Branded 10 Bottle 2,050.00 31 First Class Towel (100% Cotton, 29"l X 13.5"w) 10 Piece 2,650.00 32 Gloves, Cotton, For Heavy Duty Use 22 Piece 1,276.00 33 Gloves, Surgical Gloves, Lightly-powder Nitrile Examination Gloves, 100/box Fully-textured, Ambidextrous, For Medical Use, Non-latex, Non-sterile, Medium 3 Box 945.00 34 Laboratory White Gown (sizes: S, M, L, & Xl ) 5 Piece 2,075.00 35 Permanent Marker, 12 Pcs/box 2 Box 600.00 36 Tally Counter 4 Digital Number Clicker Hand Held Manual Counting 5 Piece 500.00 37 Tissue Paper (bathroom Tissue Paper, Extra Jumbo, 3ply, Size:100mmx98mm,9rolls/pack) 10 Pack 3,560.00 Lot 3 1 2.5 Micron Filter Net 2 Roll 3,600.00 2 3.0 Micron Filter Net 1 Roll 2,000.00 3 30 Microns Nylon Filter Net (white) 1 Roll 2,500.00 4 40 Microns Nylon Filter Net (white) 1 Roll 3,000.00 5 Air Control Valve (t Connector), White, Plastic 50 Piece 4,150.00 6 Air Control Valve (y Connector), White, Plastic 50 Piece 4,150.00 7 Air Hose, Silicone, Flexible, Transparent (4/6mm, 100m/roll) 10 Roll 11,500.00 8 Air Stone (cylindrical, Gray) 50 Piece 5,000.00 9 Balloon Stick, 100pc/pack 2 Pack 400.00 10 Cable Tie, Nylon, 7.6x300mm, 100pcs Per Pack 1 Pack 400.00 11 Drum Blue, 200 Liters Capacity 10 Piece 25,000.00 12 Elbow 1" 10 Piece 600.00 13 End Cap 1" 10 Piece 500.00 14 End Cap 2" 2 Piece 240.00 15 Female Adaptor 1" 2 Piece 160.00 16 Filter Bag, 5 Micros, L= 22cm, W=14cm 10 Piece 9,200.00 17 Fry Bag (100pcs/pack) 52 Pack 87,100.00 18 Pala - Spade Type, Durable 2 Piece 1,092.00 19 Plankton Net (45-60 Microns) 5 Yard 20,000.00 20 Pointed Bolo/"sundang", Heavy Duty 2 Piece 2,300.00 21 Pvc Pipe 1" (blue) 15 Piece 3,000.00 22 Pvc Pipe 2" (blue) 3 Piece 780.00 23 Pvc Tee 2" 1 Piece 208.00 24 Rubber Bond #18, 450 Grams 4 Box 1,784.00 25 Tee 1" 10 Piece 850.00 26 Tee Reducer 2"x1" 1 Piece 150.00 27 White Boots Rubber Upper And Outsole, Waterproof, Round Toe, Wet Weather Gear, Sizes Variation: 7 & 8 5 Piece 2,590.00 28 Wood Paint, White (finisher) 1 Gallon 1,000.00 29 Wood Paint, White (primer) 1 Gallon 1,000.00 Lot 4 1 2-burner Stove, Heavy Duty, With Lpg Gas And Accessories 1 Unit 8,625.00 2 Electromagnet Air Pump; Acv- Portable Aerator 20v-240v, 200 Watts Specifications: Frequency-50/60 Hz, Current: 1.40/0.83am, Pressure: 0.033 Mpa, Airflow: 0.135m Squared/min 8 Unit 63,944.00 3 Flashlight , Rechargeable And Waterproof, Heavy Duty 2 Piece 6,624.00 4 "gasoline Marine Engine 16 Hp Ignition System: Digital Cdi With Variable Timing; Starting System: Recoil/electric; Engine Type: Air-cooled 4 Stroke Ohv; Bore X Stroke: 88 X 64mm; Displacement: 389 Cm3; Net Power Output: 13.1 Hp (9.8kw) @ 4000 Rmp; Fuel Tank Capacity: 6-8 Liters Note: Gear Reduction Type High Torque" 1 Unit 36,455.00 5 Grass Cutter, Heavy Duty, Branded 2 Unit 13,754.00 6 Lateral Steel Cabinet (3-drawer, Heavy Duty) 2 Unit 28,550.00 7 Ring Blower, 2hp 4 Unit 100,000.00 8 Solar Light 200-250 Watts, Heavy-duty 8 Unit 23,000.00 9 Air Blower, 0.5hp 4 Unit 48,000.00 10 Fiberglass Extension Ladders, 16ft 2 Unit 40,000.00 11 Weighing Scale (digital), 1kg Capacity 2 Unit 6,000.00 12 Extension Wheel 15 Meters (rain Proof) 2 Unit 20,000.00 13 Gasoline Power Spray, 7hp (heavy Duty) 2 Unit 27,600.00 14 Medical Oxygen Tank (bigger Size) With Refill - 42 Liters 2 Tank 25,482.00 15 Transect Line, Open Reel Fiberglass Measuring Tape (100m), Heavy Duty 1 Unit 5,040.00 Lot 5 1 Basin 3.5 Liters, 11in. / 9.5in. X 28cm, White 10 Piece 600.00 2 Basin 5.5 Liters, 13in. / 11 X 33cm, White 10 Piece 700.00 3 Carboy 10l Capacity, Transparent 15 Piece 12,750.00 4 Ceramic Bowl 8", Heavy Duty 10 Piece 500.00 5 Ceramic Plate 1 Dozen 1,500.00 6 Cooking Ware Set 1 Set 4,000.00 7 Multi-storage Box (120 L Capacity, Heavy Duty) 10 Piece 14,700.00 8 Pail 10 Liters, 26x27cm, White 10 Piece 1,700.00 9 Plastic Garbage Bin (foot Operated), 410w X 440d X 598h (mm) 4 Piece 2,992.00 10 Plastic Water Dipper 1.6l, White 10 Piece 1,000.00 11 Shucking Knife 5 Pint 1,685.00 12 Spoon And Fork (original Stainless Steel/non-corrosive) 2 Dozen 1,744.00 13 Sublimation Coated White Mug, 11oz 10 Piece 1,150.00 14 Thick Clear Drinking Glass,6pcs/set 4 Set 1,128.00 15 Toilet Cleaner (multipurpose Toilet Bowl Cleaner Solution) 500ml 10 Bottle 1,750.00 16 Tray Crates, Plastic, Blue, Heavy Duty (32.5x5.x36cm, 3kg Product Weight) 50 Piece 56,950.00 Terms And Conditions: 1. That The Winning Bidder Shall Deliver The Items In Good Quality And Compliant To Type Of Specification Indicated In The Purchase Request. The End-user May Reject The Items Which Are Non-comformant To The Said Specifications. 2. That Winning Bidder Shall Deliver The Items At Bfar-provincial Fisheries Office, Brgy. Guindapunan, Catbalogan City, Samar. 3. That The Winning Bidder Shall Deliver The Items Within 30 Days From Receipt Of Purchase Order. 4. That The Payment Shall Be Made After The Items Are Completely Delivered, Inspected And Accepted By Authorized Bfar 8 Representative. Bidders Must Submit The Following Documents: 1.) Philgeps Registration Number 2.) Mayor's Permit 3.) Request For Quotation (rfq) 4.) Income Tax Return** 5.) Omnibus Sworn Statement (oss)* *for Single Proprietorship – Special Power Of Attorney, In Case The Person Signing This Request For Quotation Is Not The Business Owner, In Its Original And Duly Notarized Form. *for Corporation – Board Resolution/secretary’s Certificate, In Its Original And Duly Notarized Form. *for One Person Corporation (opc) – President’s Certificate/secretary’s Certificate, In Its Original And Duly Notarized Form. **for Quotations Exceeding P500,000.00 Based On The Abc Of Respective Lots
Closing Date11 Nov 2024
Tender AmountPHP 886.8 K (USD 15.3 K)

City Of Valencia Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Local Government Of Valencia Catarata Street, Poblacion, Valencia City, Bukidnon, Philippines Philippine Access (088) 828-5430 Contract Reference No. 50-2024 10/23/2024 Invitation To Bid For The Construction Of Cdrrm Emergency Operations Center Building At Barangay Poblacion, Valencia City, Bukidnon 1. The City Government Of Valencia Through Its Annual Appropriations Intends To Apply The Sum Of Eighteen Million Six Hundred Forty-one Thousand Three Hundred Twenty-three Pesos And 99/100 (php 18,641,323.99) Being The Approved Budget Of The Contract (abc) To Payments Under The Contract For The Construction Of Cdrrm Emergency Operations Center Building At Barangay Poblacion, Valencia City, Bukidnon. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Valencia Now Invites Bids For The Construction Of Cdrrm Emergency Operations Center Building At Barangay Poblacion, Valencia City, Bukidnon. Particulars Describes As Follows: Item No. Qty Unit Description Specifications Unit Cost Total Cost 1 Lot Construction Of Emergency Operations Center (eoc): Scope; A.) Application Of Permits And Clearances, B.) Fabrication And Installation Of Project Billboard And Signboard, C.) Occupational Safety And Health Program, D.) Project Mobilization And Demobilization, E.) Clearing And Grubbing, F.) Removal Of Trees, G.) Structure Excavation, Embankment And Gravel Fill Of Concrete Structures, H.) Construction Of Reinforced Concrete Structures With Metal Reinforcement Such As Footing, Wall Footing, Columns, Beams, Floor Slab And Roof Deck, I.) Fabrication And Installation Of Formworks And Falseworks, J.) Laying Of 100mm Chb With Cement Plaster Finish, K.) Installation Of Doors And Windows, L.) Installation Of Spandrel Ceiling With Metal Frame, M.) Installation Of Unglazed Tiles, N.) See Attached Plan And Specifications Php18,641,323.99 Application Of Waterproofing Cement Base, 0.)painting Of Steel Structures, P.) Fabrication And Installation Of Structural Steel Roof Framing, Metal Roofing Sheet And Accessories, Q.) Fabrication And Installation Of Fascia Frame And Board, R.) Installation Of Sanitary Pipes And Fittings, Water Supply Pipes And Fittings (including Water Pump And 2 Stainless Steel Water Tank) And Storm Drainage And Downspout, S.) Installation Of Electrical Conduits And Boxes, Wires And Wiring Devices, Panel Boards And Lighting Fixtures (which Also Include Wirings And Devices For The Preparation Of All Air Conditioners), T.) Installation Of Fire Alarm System, Network Cabling, Closed-circuit Television (cctv) And Fire Extinguisher As Per Approved Pow, Plans, And Specifications. Other General Requirements B. 3 (1) 1.00 L.s. Permits And Clearances B. 5 (1) 1.00 Ea. Project Billboard / Signboard B. 7 (1) 1.00 L.s. Occupational Safety And Health Program B. 9 (1) 1.00 L.s. Mobilization / Demobilization B. 7 (1) 1.00 L.s. Occupational Safety And Health Program Earthwork 800 (1) 880.90 Sq.m Clearing And Grubbing 800 (3) A2 5.00 Ea. Individual Removal Of Trees (301 - 500 Mm Dia., Small) 803 (1) A 392.39 Cu.m. Structure Excavation (common Soil) 804 (1) A 280.00 Cu.m. Embankment From Structure Excavation(common Soil) 804 (2) A 89.55 Cu.m. Embankment From Borrow(common Soil) 804 (7) 69.38 Cu.m. Gravel Fill Plain And Reinforced Concrete Work 900 (1) C 445.85 Cu.m. Structural Concrete (3000psi, Class A, 28 Days) 902 (1) A1 73,156.86 Kg. Reinforcing Steel (deformed, Grade 40) 903 (2) 2,330.70 Sq.m. Formworks And Falseworks Finishings And Other Civil Works C.1 Masonry Works 1046 (2) A1 1,292.92 Sq.m. Chb Non Load Bearing (including Reinforcing Steel, 100mm) C.2 Fabricated Materials 1006 (5) 3.00 Set Fire Rated Fire Exit Steel Door 1007 (1) B 33.18 Sq.m. Aluminum Framed Glass Door (swing Type) 1008 (1) A 44.21 Sq.m. Aluminum Glass Windows (sliding Type) 1008 (1) C 61.94 Sq.m. Aluminum Glass Windows (awning Type) 1008 (1) D 124.65 Sq.m. Aluminum Glass Windows (fixed Type) 1010 (2) B 40.32 Sq.m. Doors (wooden Panel) C.3 Finishing Works 1003 (1) E2 167.45 Sq.m. Ceiling (prepainted Metal Panel On Metal Frame)-spandrel 1003 (11) A1 30.65 M Fascia Board (9mm Thk. Fiber Cement Board) 1018 (2) 223.73 Sq.m. Unglazed Tiles 1021 (1) A 13.64 Sq.m. Cement Floor Finish (plain Non-skid) 1027 (1) 3,121.67 Sq.m. Cement Plaster Finish 1016 (1) A 275.64 Sq.m. Waterproofing Cement Base C.4 Painting Works 1032 (1) C 19.03 Sq.m. Painting Works (steel) C.5 Roof Framing And Roofing Works 1013 (2) F 45.00 L.m. Fabricated Metal Roofing Accessory - End Capping, 0.4mm Thk. 1013 (2) B1 17.00 L.m. Fabricated Metal Roofing Accessory - Gutter, 0.4mm Thk. 1014 (1) B2 233.10 Sq.m. Prepainted Metal Sheets (rib Type, Long Span, Above 0.427 Mm) 1047 (6) 358.69 Kg Structural Steel 1047 (8) B 1,638.34 Kg. Structural Steel (purlins) 1047 (4) 88.00 Kg. Metal Structure Accessories (cross Bracing) 1047 (6) 85.60 Kg. Metal Structure Accessories (steel Plates) 1047 (4) A 18.04 Kg. Metal Structure Accessories (bolts) 1047 (5) B 72.71 Kg. Metal Structure Accessories (sagrods) - 12mmø 1047 (8) A 1,416.80 Kgs Structural Steel (trusses) C.6 Plumbing Works 1001 (5) B 6.00 Ea. Catch Basin (chb) 1001 (8) 1.00 L.s. Sewer Line Works 1001 (9) 1.00 L.s. Storm Drainage And Downspout 1001 (11) 1.00 L.s. Septic Vault (concrete) 1002 (4) 1.00 L.s. Plumbing Fixtures 1002 (24) 1.00 L.s. Cold Water Lines 1002 (26) 0.00 L.s. Cistern 1002 (27) 1.00 L.s. Plumbing Works Electrical Work 1100 (10) 1.00 L.s. Conduits, Boxes & Fittings (conduit Works/conduit Rough-in) 1101 (33) 1.00 L.s. Wires And Wiring Devices 1102 (2) B 1.00 L.s. Panel Board With Main/branch Breakers 1109 (1) 1.00 L.s. Grounding System 1111 1.00 L.s. Miscellaneous Electrical/civil Works 1103 (1) 1.00 L.s Lighting Fixture And Lamps Mechanical Work 1208 (1) 1.00 L.s Fire Alarm System (fdas) 1106 (1) 1.00 L.s. Closed-circuit Television (cctv) 1105 (20) 1.00 L.s. Network Cabling 1202 (6) A1 1.00 Set Fire Extinguisher (10 Lbs., Abc With Bracket) Php18,641,323.99 Required Number Of Days For Completion Is 290 Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Within 10 Years From The Date Of Submission And Receipt Of The Bid Hereof. The Description Of An "eligible Bidder" Is Contained In The Bidding Documents, Particularly In Section Ii. Instructions To Bidders. 3. No Time Extension Shall Be Granted Unless On Fortuitous Event, Acts Of Nature Or Any Natural Calamities. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary "pass/fail" Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act". Bidding Is Restricted To Filipino Citizens, Sole Proprietorship, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 5. Interested Bidders May Obtain Further Information From Josafat L. Caipang, Head Of Lgu-valencia City Bac Secretariat And Inspect The Bidding Documents At Address Given Below From Mondays-fridays 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders On October 24, 2024 To Opening Date From The Address Below And Upon Payment Of Non-refundable Fee For The Bidding Documents In The Amount Twenty-five Thousand Pesos (php 25,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) Provided That The Bidders Shall Pay The Non-refundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Site Inspection Is Required From Every Interested Bidder And Site Inspection Certificate Shall Form Part Of The Bid Documents. No Site Inspection Certificate Shall Mean Automatic Disqualification. Site Inspection Schedule Is On October 30, 2024 At 10:00 O’clock In The Morning, Assembly Area At Bac Office. 6. The City Government Of Valencia Will Hold Its Pre-bid Conference On November 4, 2024 (1:30 Pm) At The Bac Office, City Hall Compound, City Of Valencia, Bukidnon Which Shall Be Open To All Interested Bidders. 7. Only Project Engineers, Materials Engineer And The Like Are Required To Attend The Pre-bid Conference. In The Absence Of The Same, The Representative Must Present To The Bac An Authorization Letter Signed By The Owner. 8. Interested Contractor Are Required To Include In Their Technical Bid Proposal The Duly Signed List Of Contractor's Equipment Units, Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project. 9. Prospective Bidders Who Were Not Able To Purchase Bid Documents Prior To The Bid Opening Shall Not Be Opened And Will Be Disqualified. 10. Bids Must Be Delivered To The Address Below On Or Before (1:00 Pm) November 18, 2024. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Representative Who Chooses To Attend At The Address Below. Bid Opening Shall Be On (1:30 Pm) November 18, 2024 At Bac Office, City Hall Compound, City Of Valencia, Bukidnon. Late Bids Shall Not Be Accepted. The Clock In The Bac Office Shall Serve As The Time Reference, And Shall Be The Basis For The Official Time Received Of The Bidding Documents Submitted In The Office. 11. The City Government Of Valencia Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of The Bid. 12. The Head Of The Procuring Entity (hope) Reserves The Right To Accept Or Reject Any Or All Bids To Annul The Bidding Process, At Any Time Prior To Contract Award Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. All Correspondence Shall Be Addressed To The Bac Secretariat, Attention: Mr. Abe P. Gillaco, Mpa, Bac Chairman. 14. For Further Information, Please Refer To: Lgu Valencia City-josafat L. Caipang Admin Office, 8709 Catarata St., Poblacion, Valencia City, Bukidnon Tel. No. (088) 828-5430 (sgd) Abe P. Gillaco, Mpa Bac Chairman
Closing Date18 Nov 2024
Tender AmountPHP 18.6 Million (USD 321.8 K)

National Irrigation Administration Tender

Civil And Construction...+1Irrigation Work
Philippines
Details: Description Section I. Invitation To Bid Invitation To Bid For Construction Of Intake, Canalization And Canal Structures For San Isidro Cis The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2025 National Expenditure Program (nep) For General Appropriation Act (gaa) 2025 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-epa-restocis2025-005 (infra) Project Name : Construction Of Intake, Canalization And Canal Structures For San Isidro Cis Contract Location : Sergio Osmeña, Zamboanga Del Norte Scope Of Works : Construction Of Intake, Canalization And Canal Structures (sta. 2 + 415.64 - Sta. 2 + 563.88) Mc (sta. 0 + 000 - Sta. 0 + 150) Lat. C Approved Budget For The Contract (abc) : Php 9,569,923.44 Contract Duration : 150 Calendar Days Amount Of Bidding Documents : Php 10,000.00 The Nia – Ro9 Bac Is Conducting An Early Procurement Activity (epa) On Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : October 28 – November 20, 2024 At 8:30 Am Pre-bid Conference : November 8, 2024 At 9:00 Am Submission Of Bids : November 20, 2024 At 8:30 Am Opening Of Bids : November 20, 2024 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting October 28 – November 20, 2024. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 08 November 2024 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 20 November 2024 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below. The Nia – Ro9 Bac Additional Guidelines Is The Conduct Of Site Inspection To Be Scheduled During Pre-bid Conference. • The Certificate Of Site Inspection Shall Be Issued And Signed By The Nia R9 Authorized Representative After The Activity, Which Shall Be Required To Include In The Bid Tender (technical Component). Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/unk-ujzz-kkq Opening Of Bids : Https://meet.google.com/gdi-fdbf-gij Any Requests For Additional Information Concerning This Bidding Shall Be Directed To The Following: Marietta M. Cortes Bac Secretariat Head, Nia-regional Office Regional Center Ix, Balintawak, Pagadian City, Zambo. Sur Niaregion9bac@gmail.com 09630884373 – Office Number Date Posted: August 1, 2024 (sgd) Antonio B. Gujeling Bac Chairperson 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Completed For The Past Five (5) Years. • Irrigation & Flood Control To Be Eligible To Bid For The Contract, Bidders Must Have Done A Single Largest Completed Contract (slcc) Containing A Category Of Work Which Is The Same As Or Similar To The Major Category Of Works, And Who’s Total Slcc Cost Is At Least 50% Of The Approved Budget For The Contract (abc) To Be Bid. The Above Slcc Must Be Supported By A Copy Of The Contract, Certificate Of Completion, And Owner’s Certificate Of Final Acceptance (1-year After The Issuance Of The Certificate Of Completion) Issued By The Project Owner Other Than The Contractor Or A Final Rating Of At Least Satisfactory In The Constructors Performance Evaluation System (cpes). In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Interested Bidders Shall Have At Least Or Any Equivalent To Pcab Size Range “small B” Category: C & D (per Pcab Board Resolution No. 201, Series Of 2017) 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel Relevant Experience General Experience Number Project Engineer 5 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 5 Years 1 Office Engineer 3 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 3 Years 1 Materials Engineer 1 3 Years Shall Be An Accredited Material Engineer Of Dpwh. Shall Render Service To The Project As Required. 3 Years 1 Foreman 5 Years Experienced In Irrigation Structures. Shall Render Fulltime Service To The Project Until Completion. 5 Years 1 Safety & Health Officer (so2) 3 Years Shall Have At Least 3 Years’ Experience In Construction Industry. Completed Cosh Training And Shall Render Fulltime Service To The Project Until Completion. 3 Years 1 Geodetic Engineer 3 Years Licensed Geodetic Engineer. Shall Render Service To The Project As Required. 3 Years 1 The Contractor May Assign Other Support Personnel From Those Listed For The Optimal Performance Of The Project Construction Team. The Support Personnel Shall Undertake The Required Day-to-day Site Or Office-related Activities Of The Contractor. Full Time Services Mean, The Personnel Involved Shall Render Minimum Of Eight (8) Hours A Day Or Forty (40) Hour A Week And Shall Be Available Upon Request Of The Procuring Entity. 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity No. Of Units Backhoe 0.45-1 Cu.m 1 Dumptruck 10 Cu.m 1 Concrete Mixer 1 – Bagger 2 Water Pump 4” Ø 2 Concrete Vibrator 5 Hp 2 Plate Compactor 5 Hp 1 Survey Instrument 1 Initial Equipment Requirement Upon Mobilization: Equipment Capacity No. Of Units Backhoe 0.45-1 Cu.m 1 Dumptruck 10 Cu.m 1 Survey Instrument 1 The Proof Of Ownership Of Equipment Requirements Are Copies Of Current Lto Official Receipt (or) And Certificate Of Registration (cr) Of The Equipment Which Should Be Attached Together With The Affidavit Of Ownership. In Case Of Leased Equipment, A Lease Contract And Affidavit Of Commitment Or Certificate Of Availability Of Equipment Should Be Submitted With The Lessor/owner As The Pledger Of The Equipment, Stating Therein That The Equipment Will Be Available For The Whole Duration Of The Project. For Purchase Agreement, The Description Of The Equipment To Be Purchased Such As Brand/model, Type Of Equipment, Motor No., Body No. And The Capacity Must Be Indicated In The Document, Otherwise, The Bac Will Not Honor The Purchase Agreement And The Bidder Will Be Declared As Non-complying. Likewise, List Of Contractor’s Major Equipment Units Pledged To Be Used For The Project Must Be Supported By Proof Of Ownership If It Is Owned, Lease Agreement If It Is Being Leased And Purchase Agreement If To Be Purchased. A Certification Of Availability Of Equipment For The Duration Of The Project Must Also Be Provided By The Equipment Owner And/or Lessor/vendor. The Bidder Should Also Specify In The Submitted Bid The Location Of The Equipment Where It Can Be Inspected. If Any Piece Of Equipment Is Not In The Specified Location, Then The Bidder Shall Be Post-disqualified. Item No. Description Qty Unit A. Canalization Common Excavation (mechanized) 235 Cu.m Common Backfill (mechanized) 532 Cu.m Reinforcing Steel Bars, All Sizes (supply, Delivery & Installation) 2,612.66 Kg Class B Concrete, 16.56 Mpa 67.87 Cu.m Gravel Bedding 35.46 Cu.m Concrete Demolition 37.13 Cu.m B. Diversion Works (intake Structure) Structure Excavation (mechanized) 313.30 Cu.m Class A Concrete, 20.76 Mpa 88.34 Cu.m Reinforcing Steel Bars, All Sizes (supply, Delivery & Installation) 4,437.26 Kg Structure Backfill 159.60 Cu.m Cofferdamming & Care Of River 1 Ls Concrete Demolition 35 Cu.m Grouted Riprap 92.20 Cu.m Selected Earthfill (with Compaction) 285.44 Cu.m C. Canal Structures Structure Excavation (mechanized) 55.02 Cu.m Structure Backfill (mechanized) 22.48 Cu.m Reinforcing Steel Bars, All Sizes (supply, Delivery & Installation) 1,990.05 Kg Class A Concrete, 20.76 Mpa 21.10 Cu.m D. Project Billboard 1 Ls E. Temporary Works, Mobilization And Demobilization 1 Ls F. Occupational Construction Safety And Health Programs 1 Ls
Closing Date20 Nov 2024
Tender AmountPHP 9.5 Million (USD 165.2 K)

DEPT OF THE NAVY USA Tender

Electrical Goods and Equipments...+2Machinery and Tools, Electrical and Electronics
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n712.20|aeb|7176054614|macayla.n.welsh.civ@us.navy.mil| Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| Inspection Of Supplies--fixed-price (aug 1996)|2||| Wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving ||tbd|n00104|tbd|tbd|see Schedule|tbd|see Schedule||tbd|||||| Navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| Equal Opportunity (sep 2016)|2||| Buy American --free Trade Agreements--balance Of Payments Program - Basic (feb2024))|11|x||||||||||| Option For Increased Quantity (mar 1989)|1|365 Days| Alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| Buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|x||||| Annual Representations And Certifications (feb 2024)|13|335311|750 (# Of Employees)|||||||||||| Notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| The Purpose Of This Amendment Is To: Extend The Offer Due Date The Offer Due Date Is Extended To 29 Nov 2024. All Other Terms And Conditions Remain The Same. Poc: Macayla Welsh Poc Email: Macayla.n.welsh.civ@us.navy.mil \ All Freight Is Fob Origin. This Rfq Is For A Buy. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. Do Not Include The Cost For Shipping Material. Freight Is Fob Origin. Government Source Inspection And Acceptance Is Required. Please Provide The Following Information: Unit Price:__________ Firm Total Price:__________ Firm Procurement Turnaround Time (ptat) :__________ Inspection & Acceptance Cage, If Not At Source:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________ Required Shipping Procedure Is Military Packaging And Bar Coding. Important Traceability Notice 1. If You Are Not The Manufacturer Of The Material You Are Offering, You Must State Who The Manufacturer Is (name & Cage Code) And Provide Traceability Information, If Requested, Prior To Receiving An Award. The Evidence Must Be Submitted Within 2 Days, Or As Otherwise Specified, Or The Offer May Not Be Considered. 2. By Submitting A Quotation Or Offer, The Contractor Agrees That, When The Contractor Is Not The Manufacturer Of The Item, It Is Confirming That It Currently Has Or Will Obtain Before Award And Shall Retain Documented Evidence (supply Chain Traceability Documentation) That The Item Is From The Approved Manufacturer And Conforms To The Technical Requirements. The Retention Period Is Five Years After Final Payment Under This Contract. 3. At A Minimum, The Supply Chain Traceability Documentation For The Item Shall Include: Basic Item Description, Part Number And/or National Stock Number, Manufacturing Source, Manufacturing Source's Commercial And Government Entity (cage) Code, And Clear Identification Of The Name And Location Of All Supply Chain Intermediaries Between The Manufacturer To The Contractor To Item(s) Acceptance By The Government. The Documentation Should Also Include, Where Available, The Manufacturer's Batch Identification For The Time(s), Such As Date Codes Lot Codes, Or Serial Numbers As Date Codes Lot Codes, Or Serial Numbers. 4. Examples Of Traceability Information/documentation: The Invoice Received By The Offeror From The Approved Source Ie. Oem Or From An Authorized Dealer/distributor For The Approved Source. Or A Letter/official Email From The Oem Confirming Offeror Is Authorized To Resell Their Items. Or The Packing Slip That Accompanied The Shipment To The Offeror/ Contractor From The Approved Source, Or From An Authorized Dealer/distributor For The Approved Source. Any Questions Should Be Directed To The Poc For This Solicitation. The Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit Price Specified. The Contracting Officer May Exercise The Option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract, Unless The Parties Otherwise Agree. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cable And Conduit A . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order, However, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.3 ;requests For Additional Government-owned Documents Should Be Submitted In Writing To The Contract Officer Responsible For The Applicable Order. Release Of Drawings Or Other Documents Will Be Approved And Handled By The Technical Community For The System.; Drawing Data=fvls-1619r2 |53711| 1|1n |d|0001 | 1|49998|0035570 Drawing Data=fvls-1619r2-004 |53711| -|1n |d|0001 | -|49998|3167742 Drawing Data=fvls-1813 |53711| |1n |d|0001 | |49998|0081843 Drawing Data=fvls-1824 |53711| |1n |d|0001 | |49998|0180800 Drawing Data=fvls-1892r1 |53711| |1n |d|0001 | |49998|0042008 Drawing Data=fvls-1892r1 Nor 1 |53711| -|1n |d|0001 | -|49998|1974331 Drawing Data=fvls-19070 Nor 5 |53711| -|1n |d|0001 | -|49998|0312152 Drawing Data=fvls-1908r1 Nor 2 |53711| -|1n |d|0001 | -|49998|1893991 Drawing Data=fvls-1923r1 |53711| |1n |d|0001 | |49998|0141132 Drawing Data=fvls-1923r1 Nor 3 |53711| -|1n |d|0001 | -|49998|0064998 Drawing Data=fvls-1944 Nor 4 |53711| -|1n |d|0001 | -|49998|0927618 Drawing Data=fvls-1947r1 |53711| |1n |d|0001 | |49998|0094907 Drawing Data=fvls-1947r1 Nor 6 |53711| -|1n |d|0001 | -|49998|0149218 Drawing Data=fvls-1970 |53711| |1n |d|0001 | |49998|0080735 Drawing Data=fvls-1980r1 |53711| |1n |d|0001 | |49998|0035494 Drawing Data=fvls-1980r1 Nor 7 |53711| -|1n |d|0001 | -|49998|0027142 Drawing Data=fvls-1981r1 |53711| |1n |d|0001 | |49998|0185792 Drawing Data=fvls-1981r1 Nor 8 |53711| -|1n |d|0001 | -|49998|0842959 Drawing Data=fvls-2026r1 Nor 9 |53711| -|1n |d|0001 | -|49998|1302259 Drawing Data=fvls-2030 |53711| |1n |d|0001 | |49998|0036840 Drawing Data=fvls-2034 |53711| |1n |d|0001 | |49998|0039474 Drawing Data=fvls-2054 |53711| |1n |d|0001 | |49998|0073203 Drawing Data=fvls-2061r1 Nor10 |53711| -|1n |d|0001 | -|49998|1018327 Drawing Data=fvls-2085 Nor 2 |53711| -|1n |d|0001 | -|49998|0066152 Drawing Data=fvls-2152 Nor 11 |53711| -|1n |d|0001 | -|49998|1238537 Drawing Data=fvls-395 |53711| |1n |d|0001 | |49998|0060019 Drawing Data=fvls-8566r4 |53711| |1n |d|0001 | |49998|0019082 Drawing Data=fvls2-2165-006 |53711| -|1n |d|0001 | -|49998|0727450 Drawing Data=fvls2-2166-006 |53711| -|1n |d|0001 | -|49998|0981347 Drawing Data=fvls2-2188r1 Nor 7 |53711| 7|1n |d|0001 | 7|49998|0214592 Drawing Data=fvls2-2213r1 |53711| |1n |d|0001 | |49998|0013841 Drawing Data=fvls2-2213r1 Nor 12 |53711| -|1n |d|0001 | -|49998|0876007 Drawing Data=fvls2-2266 |53711| |1n |d|0001 | |49998|0065037 Drawing Data=fvls2-2294 |53711| |1n |d|0001 | |49998|0031042 Drawing Data=mvls2-1263-002 |53711| -|1n |d|0001 | -|49998|0624478 Drawing Data=mvls2-1341-003 |53711| -|1n |a|0001 | -|49998|0815765 Drawing Data=mvls2-1939 R1 Nor 5 |53711| 5|1n |d|0001 | 5|49998|0053832 Drawing Data=mvls2-2133 |53711| |1n |d|0001 | |49998|0220621 Drawing Data=mvls2-3277 Nor 6 |53711| 6|1n |d|0001 | 6|49998|0084446 Drawing Data=nphd2-3006r1 Nor 8 |53711| 8|1n |d|0001 | 8|49998|0589065 Drawing Data=nphd2-3007 Nor4 |53711| 4|1n |d|0001 | 4|49998|0066333 Drawing Data=nswc-0787 |53711| -|1n |d|0001 | -|49998|0037657 Drawing Data=nswc-0796-005 |53711| -|1n |d|0001 | -|49998|0811730 Drawing Data=nswc-0806 |53711| -|1n |d|0001 | -|49998|0036267 Drawing Data=nswc-0892 Nor3 |53711| 3|1n |d|0001 | 3|49998|0040914 Drawing Data=nswc2-1552 |53711| |1n |d|0001 | |49998|0014684 Drawing Data=nswc2-1558r1 |53711| |1n |d|0001 | |49998|0015009 Drawing Data=ws19179 |53711| E| |d|0001 | E|49998|5663412 Drawing Data=ws19179 |53711| E| |d|0001.a | B|49998|0019525 Drawing Data=ws19179 |53711| E| |d|0002 | E|49998|0034440 Drawing Data=ws19179 |53711| E| |d|0003 | E|49998|0026528 Drawing Data=ws19179 |53711| E| |d|0004 | E|49998|0028216 Drawing Data=ws19179 |53711| E| |d|0005 | E|49998|0048490 Drawing Data=ws19179 |53711| E| |d|0006 | E|49998|0049626 Drawing Data=ws19179 |53711| E| |d|0007 | E|49998|0027931 Drawing Data=ws19179 |53711| E| |d|0008 | E|49998|0043460 Drawing Data=ws19179 |53711| E| |d|0009 | E|49998|0030041 Drawing Data=ws19179 |53711| E| |d|0010 | E|49998|0036722 Drawing Data=ws19179 |53711| E| |d|0011 | E|49998|0037320 Drawing Data=ws19179 |53711| E| |d|0012 | E|49998|0024707 Drawing Data=ws19179 |53711| E| |d|0013 | E|49998|0015178 Drawing Data=ws19179 |53711| E| |d|0014 | E|49998|0028376 Drawing Data=ws19179 |53711| E| |d|0015 | E|49998|0026390 Drawing Data=ws19179 |53711| E| |d|0016 | E|49998|0017952 Drawing Data=ws19179 |53711| E| |d|0017 | E|49998|0026422 Drawing Data=ws19179 |53711| E| |d|0018 | E|49998|0026310 Drawing Data=ws19179 |53711| E| |d|0019 | E|49998|0016079 Drawing Data=ws19179 |53711| E| |d|0020 | E|49998|0015728 Drawing Data=ws19179 |53711| E| |d|0021 | E|49998|0017880 Drawing Data=ws19179 |53711| E| |d|0022 | E|49998|0038330 Drawing Data=ws19179 |53711| E| |d|0022.a | D|49998|0012235 Drawing Data=ws19179 |53711| E| |d|0023 | E|49998|0021392 Drawing Data=ws19179 |53711| E| |d|0024 | E|49998|0023792 Drawing Data=ws19179 |53711| E| |d|0025 | E|49998|0017278 Drawing Data=ws19179 |53711| E| |d|0026 | E|49998|0035092 Drawing Data=ws19179 |53711| E| |d|0027 | E|49998|0041731 Drawing Data=ws19179 |53711| E| |d|0028 | E|49998|0040508 Drawing Data=ws19179 |53711| E| |d|0029 | E|49998|0032601 Drawing Data=ws19179 |53711| E| |d|0030 | E|49998|0047045 Drawing Data=ws19179 |53711| E| |d|0031 | E|49998|0044768 Drawing Data=ws19179 |53711| E| |d|0032 | E|49998|0017729 Drawing Data=ws19179 |53711| E| |d|0033 | E|49998|0017804 Drawing Data=ws19179 |53711| E| |d|0034 | E|49998|0042357 Drawing Data=ws19179 |53711| E| |d|0035 | E|49998|0041415 Drawing Data=ws19179 |53711| E| |d|0036 | E|49998|0043029 Drawing Data=ws19179 |53711| E| |d|0037 | E|49998|0035294 Drawing Data=ws19179 |53711| E| |d|0038 | E|49998|0036277 Drawing Data=ws19179 |53711| E| |d|0039 | E|49998|0044466 Drawing Data=ws19179 |53711| E| |d|0040 | E|49998|0045003 Drawing Data=ws19179 |53711| E| |d|0041 | E|49998|0042869 Drawing Data=ws19179 |53711| E| |d|0042 | E|49998|0028357 Drawing Data=ws19179 |53711| E| |d|0043 | E|49998|0025686 Drawing Data=ws19179 |53711| E| |d|0044 | E|49998|0044684 Drawing Data=ws19179 |53711| E| |d|0045 | E|49998|0022406 Drawing Data=ws19179 |53711| E| |d|0046 | E|49998|0014697 Drawing Data=ws19179 |53711| E| |d|0047 | E|49998|0026351 Drawing Data=ws19179 |53711| E| |d|0048 | E|49998|0034753 Drawing Data=ws19179 |53711| E| |d|0049 | E|49998|0020625 Drawing Data=ws19179 |53711| E| |d|0050 | E|49998|0020446 Drawing Data=ws19179 |53711| E| |d|0051 | E|49998|0048145 Drawing Data=ws19179 |53711| E| |d|0052 | E|49998|0033821 Drawing Data=ws19179 |53711| E| |d|0053 | E|49998|0035373 Drawing Data=ws19179 |53711| E| |d|0054 | E|49998|0033669 Drawing Data=ws19179 |53711| E| |d|0055 | E|49998|0040759 Drawing Data=ws19179 |53711| E| |d|0056 | E|49998|0017341 Drawing Data=ws19179 |53711| E| |d|0056.a | D|49998|0034642 Drawing Data=ws19179 |53711| E| |d|0056.b | D|49998|0021179 Drawing Data=ws19179 |53711| E| |d|0057 | B|49998|0039979 Drawing Data=ws19179 |53711| E| |d|0058 | D|49998|0034665 Drawing Data=ws19179 |53711| E| |d|0059 | B|49998|0028297 Drawing Data=ws19179 |53711| E| |d|0060 | B|49998|0020809 Drawing Data=ws19179 |53711|32|1n |d|0001 | 1|49998|0201033 Drawing Data=ws19202 |53711| -| |d|0001 | -|49998|0024346 Drawing Data=ws19202 |53711| -| |d|0002 | -|49998|0021258 Drawing Data=ws19202 |53711| -| |d|0003 | -|49998|0027412 Drawing Data=ws19202 |53711| -| |d|0004 | -|49998|0008682 Drawing Data=ws19202 |53711| 3|1n |d|0001 | 2|49998|0026254 Drawing Data=ws19202 |53711| 3|1n |d|0002 | 2|49998|0027038 Drawing Data=ws19202 |53711| 3|1n |d|0003 | 2|49998|0035029 Drawing Data=ws20203 |53711| -| |d|0001 | -|00028|0000000 Drawing Data=ws20203 |53711| 2|1n |d|0001 | 1|49998|2394129 Drawing Data=ws20211 |53711| -| |d|0001 | -|49998|0032152 Drawing Data=ws20211 |53711| -| |d|0002 | -|49998|0026736 Drawing Data=ws20211 |53711| -| |d|0003 | -|49998|0037700 Drawing Data=ws20211 |53711| -| |d|0004 | -|49998|0041700 Drawing Data=ws20211 |53711| -| |d|0005 | -|49998|0037085 Drawing Data=ws20211 |53711| -| |d|0006 | -|49998|0022084 Drawing Data=ws20211 |53711| -| |d|0007 | -|49998|0036063 Drawing Data=ws20211 |53711| -| |d|0008 | -|49998|0029210 Drawing Data=ws20211 |53711| -| |d|0009 | -|49998|0042354 Drawing Data=ws20211 |53711| 1|1n |d|0001 | 1|49998|0039489 Drawing Data=ws20211 |53711| 1|1n |d|0002 | |49998|0032695 Drawing Data=ws20211 |53711| 1|1n |d|0003 | |49998|0041755 Drawing Data=ws20211 |53711| 1|1n |d|0004 | |49998|0038695 Drawing Data=ws20211 |53711| 1|1n |d|0006 | |49998|0032619 Drawing Data=001 |53711| -|1n |d|0001 | -|49998|0327052 Drawing Data=002 |53711| -|1n |d|0001 | -|49998|1113277 Drawing Data=003 |53711| -|1n |d|0001 | -|49998|1223370 Drawing Data=004 |53711| -|1n |d|0001 | -|49998|0970316 Drawing Data=005 |53711| -|1n |d|0001 | -|49998|1092269 Drawing Data=006 |53711| -|1n |d|0001 | -|49998|0855386 Drawing Data=007 |53711| -|1n |d|0001 | -|49998|0923349 Drawing Data=008 |53711| -|1n |d|0001 | -|49998|1496313 Drawing Data=009 |53711| -|1n |d|0001 | -|49998|1533921 Drawing Data=5223346 |53711| D| |d|0001 | D|49998|0425482 Drawing Data=5223347 |53711| A| |d|0001 | A|49998|0115064 Drawing Data=5223348 |53711| B| |d|0001 | B|49998|0190623 Drawing Data=5497160 |53711| 5|1n |d|0001 | 4|49998|0043277 Drawing Data=5497160 |53711| 5|1n |d|0002 | 4|49998|0021238 Drawing Data=5497459 |53711| B| |d|0001 | B|49998|0374398 Drawing Data=5599684 |53711| -| |d|0001 | -|49998|0078587 Drawing Data=6387506 |53711| A| |d|0001 | A|49998|0302352 Drawing Data=6387507 |53711| A| |d|0001 | A|49998|0206941 Drawing Data=6387507 |53711| A| |d|0002 | -|49998|0088120 Drawing Data=6387574 |53711| -| |d|0001 | -|49998|0058419 Drawing Data=6661684 |53711| A| |d|0001 | A|49998|0078510 Drawing Data=6912309 |53711| B| |d|0001 | B|49998|0302669 Drawing Data=6912309 |53711| B| |d|0002 | B|49998|0162477 Drawing Data=6912309 |53711| B| |d|0003 | A|49998|0307098 Drawing Data=6912309 |53711| B| |d|0004 | A|49998|0174466 Drawing Data=6912309 |53711| B| |d|0005 | B|49998|0174167 Drawing Data=6912309 |53711| B| |d|0006 | B|49998|0157237 Drawing Data=6912309-49 |53711| B|pl |d|0001 | B|49998|0015738 Drawing Data=6912309-49 |53711| B|pl |d|0002 | B|49998|0036741 Drawing Data=6912309-49 |53711| B|pl |d|0003 | B|49998|0018209 Drawing Data=6912310 |53711| A| |d|0001 | A|49998|0132688 Drawing Data=6912311 |53711| A| |d|0001 | A|49998|0090511 Drawing Data=6912312 |53711| A| |d|0001 | A|49998|0095322 Drawing Data=6912356 |53711| B| |f|0001 | A|49998|0087923 Drawing Data=7017171 |53711| A| |d|0001 | A|49998|0641984 Drawing Data=7017189 |53711| -| |d|0001 | -|49998|2712942 Drawing Data=7116158 |53711| -| |d|0001 | -|49998|0082815 Drawing Data=7251146 |53711| -| |d|0001 | -|49998|0031155 Drawing Data=7251146 |53711| -| |d|0002 | -|49998|0029696 Drawing Data=7251146 |53711| -| |d|0003 | -|49998|0031989 Drawing Data=8240214 |53711| -| |d|0001 | -|49998|0825181 Document Ref Data=mil-std-130 | | |n |121116|a| |01| Document Ref Data=iso9001 | | | |010417|a| | | 3. Requirements 3.1 Design, Manufacture, And Performance - Except As Modified Herein, The Cable And Conduit A Furnished Under This Contract/purchase Order Shall Meet The Design, Manufacture, And Performance Requirements Specified On Drawing ;6912309, Part Number 6912309-89; Cage ;53711; . 3.2 First Article Approval (contractor Testing) - First Article Test (fat) And Approval Is Required. 3.3 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required. 3.4 Production Lot Approval (contractor Testing) - Production Lot Test And Approval Is Required. 3.5 Marking - This Item Shall Be Physically Identified In Accordance With Mil-std-130. 3.6 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973, Paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original And Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.6.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until Another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted, The Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor. 3.7 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material Will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The Contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting Officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of Contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are Located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A Polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The Requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A Component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface Ship Atmosphere. 3.8 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; . 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, The Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The Specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 First Article Test/inspection (contractor) - The Contractor Shall Conduct ;non-destructive; First Article Test/inspection On ;one; Unit(s) In Accordance With Requirements ;for Acceptance Of Material Called Out In Drawings; . 4.3 First Article Compatibility Test (government) - Upon Satisfactory Completion Of The First Article Test/inspection By The Contractor, ;one; Unit(s) Shall Be Shipped To ;nswc-phd, Mk41 Vls Group; For Compatibility Test To Assure Satisfactory, Form, Fit And Function Within The Applicable End Item Or System. Government First Article Compatibility Test Shall Consist Of ;destructive; Testing. If The Testing Is Nondestructive, The First Article Sample ;will; Be Returned.// 4.4 Inspection System Requirements - The Supplier Shall Provide And Maintain An Inspection/quality System Acceptable To The Government. The Inspection System Requirements For This Contract/purchase Order Shall Be In Accordance With Mil-i-45208. Suppliers Certified To Perform Under Iso 9001 Or Iso 9002 Are Granted Permission To Utilize The One Desired In Lieu Of Mil-i-45208. 4.5 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During The Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies. 4.6 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any Inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.7 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.8 ;first Article Test/inspection Report- The Contractor Shall Prepare And Submit A Report In Accordance With The Contract Data Requirements List (dd Form 1423) The Report Shall Be Approved Prior To Production.; 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ A. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. B. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035 D. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For Certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. E. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navsup-wss Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: Commanding Officer Navsup-wss Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Commanding Officer Navsup-wss Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. Manufacturing Sources Interested In Becoming Qualified For Support Of Future Requirements For This Item Should Submit Their Interest In Writing To The Contract Officer, To Include A Summary Of The Company's Applicable Capabilities. This Will Be Forwarded To The Appropriate Point Of Contact At Nswc, Phd For Evaluation. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of This Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information Contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: A... Approved For Public Release; Distribution Is Unlimited. B... Distribution Authorized To Us Governments Agencies Only. C... Distribution Authorized To Us Government Agencies And Their Contractors. D... Distribution Authorized To Dod And Dod Contractors Only. E... Distribution Authorized To Dod Components Only. F... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. X... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. This Item Is Currently Coded As A Non-aviation Critical Safety Item (csi). Critical Features That Dcma Will Need To Evaluate Are Identified In The Limited Inspection (section 3.3 Of Ws 20211), And Full Inspection Iaw The Ws Is Required As Part Of The First Article Test. Date Of First Submission=asreq Block 12 - Submit For Approval Prior To Production. Block 14a - The Deliverable Item Specified As Information Copy Shall Be Boldly Marked As "information Only". Block 14 - Port Hueneme Division, Naval Surface Warfare Center, ;mk 41 Vls Engineering Activity ; ,port Hueneme, Ca 93043-5007. Date Of First Submission=045 Dac Block 12 - Submit For Approval Prior To Production. Block 14a - The Deliverable Item Specified As Information Copy Shall Be Boldly Marked As "information Only". Block 14 - Port Hueneme Division, Naval Surface Warfare Center, ;mk 41 Vls Engineering Activity ; ,port Hueneme, Ca 93043-5007. Date Of First Submission=asreq 100% Inspection Is Required Date Of First Submission=asreq ;government Compatibility Testing To Be Completed 45 Days From Receipt Of Fat Unit / Test Report From Contractor.; Date Of First Submission=asreq Request For Waiver- Prior Submission Based On Past Successful Delivery Of Material On Contracts
Closing Date29 Nov 2024
Tender AmountRefer Documents 

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Regional Office Iv-a Canlubang Interchange, Brgy. Mayapa, Calamba, Laguna Invitation To Bid 1. The Department Of Public Works And Highways (dpwh) Regional Office No. Iv-a Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 1. Name Of Contract : Fy2024 Dpwh Infrastructure Program Sustainable Infrastructure Projects Alleviating Gaps (sipag), Major/strategic Public Buildings/facilities Structural And Resilience Program Construction Of Tagaytay Tourist (iconic Tower) Phase 6, Barangay Kaybagal South, Tagaytay City Contract Id No. : 24d00295 Contract Location : Cavite Province Scope Of Works : Structural - Concrete Beams And Girders From Ts-1 To Ts-6 - Suspended Slabs From Ts-1 To Ts-6 - Shear Wall - Retaining Wall - Stairs From Ts-1 To Ts-6 Approved Budget For The Contract : ₱144,750,000.00 Source Of Funds : Fy 2024 Ra 11975 Regular 2024 Current Contract Duration : 300 C.d. Size Range : Medium A License Category : B Cost Of Bidding Documents : ₱50,000.00 2. Name Of Contract : Fy2024 Dpwh Infrastructure Program Basic Infrastructure Program (bip), Multi-purpose Buildings/facilities To Support Social Services Construction Of Multi-purpose Facilities, Brgy. Kaybagal South, Tagaytay City, Cavite (phase 9) Contract Id No. : 24d00296 Contract Location : Cavite Province Scope Of Works : Structural - All Reinforced Concrete Columns - Stairs From Second Floor To Ts-1 Plumbing - Sanitary And Waterline Rough-ins From Lower Ground Floor To Ts-6 Electrical - Conduits, Boxes, And Fittings Rough-ins - Wires And Wiring Devices Mechanical - Fire Protection Sleeving Works Approved Budget For The Contract : ₱99,000,000.00 Source Of Funds : Fy 2024 Ra 11975 Regular 2024 Current Contract Duration : 300 C.d. Size Range : Medium A License Category : B Cost Of Bidding Documents : ₱50,000.00 3. Name Of Contract : Fy2024 Dpwh Infrastructure Program Convergence And Special Support Program Basic Infrastructure Program (bip), Multi-purpose Buildings / Facilities To Support Social Services Construction Of Multi-purpose Facilities, Brgy. Kaybagal South, Tagaytay City, Cavite, (phase 5) Contract Id No. : 24d00297 Contract Location : Cavite Province Scope Of Works : Structural - Foundation Works - Concrete Beams And Girders From Foundation To Mall Roof - Suspended Slabs From Lower Ground Floor To Mall Roof - Shear Wall - Retaining Wall - Stairs From Lower Ground Floor To Mall Roof Approved Budget For The Contract : ₱495,000,000.00 Source Of Funds : Fy 2024 Ra 11975 Regular 2024 Current Contract Duration : 300 C.d. Size Range : Large B License Category : Aaaa And Aaa Cost Of Bidding Documents : ₱50,000.00 4. Name Of Contract : Structural Improvement Of Public Buildings And Construction Of Evacuation Centers Region Iv-a, Atimonan, Quezon Contract Id No. : 24d00298 Contract Location : Quezon Province Scope Of Works : The Construction Project Entails The Development Of A Permanent Evacuation Center/multi-purpose Covered Court, Incorporating Various Facilities And Features Including A Laundry & Drying Area, Material Recovery Facility, Cistern Tank, Mess Hall Equipped With A Kitchen, Administrative Office, Storage Area, And A Play Area Accompanied By A Breastfeeding Room. Additionally, The Project Will Integrate A Conjugal Space, Distinct Male & Female Toilet And Bath Facilities With Accommodations For Persons With Disabilities (pwd), A Clinic, And A Prayer Room. Moreover, The Project Will Be Enhanced With A Fire Protection System And A Generator Set, Complete With A Dedicated Generator Room, Painting Works Are Not Included. Approved Budget For The Contract : ₱41,495,000.00 Source Of Funds : Fy 2024 Ra 11975 Regular 2024 Current Contract Duration : 300 C.d. Size Range : Medium A License Category : B Cost Of Bidding Documents : ₱25,000.00 5. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Construction/ Improvement Of Access Roads Leading To Seaports (kalsada Tungo Sa Paliparan, Riles At Daungan Program - Katuparan) Access Road Leading To Calatagan Port, Calatagan, Batangas Contract Id No. : 25d00052 Contract Location : Batangas Province Scope Of Works : Road Opening And Construction Of Roads For 2 Lanes And 4 Lanes Carriageway Including Construction Of Gabions Slope Protection, Rcpc Drainage Structure And Miscellaneous Structures. Approved Budget For The Contract : ₱175,038,455.00 Net Length : Gravel : 6.77 Lane Km Concrete : 6.77 Lane Km; Slope Protection = 4,230 Sq.m. Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 C.d. Size Range : Medium B License Category : A Cost Of Bidding Documents : ₱50,000.00 6. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Construction/improvement Of Various Infrastructures In Support Of National Security (tatag Ng Imprastraktura Para Sa Kapayapaan At Seguridad Program - Tikas) Construction Of New Cavite Naval Hospital (level 1), Naval Station Pascual Ledesma, Cavite City, Cavite, Phase Ii Contract Id No. : 25d00066 Contract Location : Cavite Province Scope Of Works : Genset Building (2-units) Structural - Foundation Works: All Isolated Footings And Slab-on-grade - All Concrete Beams And Concrete Columns - All Suspended Slabs For Roof Deck Architectural - Waterproofing (roof Deck) - Fiber Cement - Ceiling - Cement Floor Finish - 150mm Chb Walls - Louver Type Walls - Wall Plaster Finish - Painting Works (masonry) - Steel Doors And Frames Electrical - Panel Board With Main & Branch Breaker - Wires And Wiring Devices - Lighting Fixtures And Lamps - Conduit, Boxes, Fittings (conduit Works / Conduit Rough-ins) - Grounding System - Wirings - Generators Elevated Water Tank Structural - Foundation Works: All Isolated Footings And Slab-on-grade - All Concrete Beams And Concrete Columns - All Suspended Slabs For Roof Decks - Structural Steel For Ladder And Support Architectural - Waterproofing (roof Decks) - Cement Floor Finish - Fiber-cement Ceiling - 150mm Chb Walls - Wall Plaster Finish - Painting Works - Steel Doors Plumbing - Plumbing Line Works - Cold Water Lines - Water Tank - Pumping System Electrical - Panel Board With Main & Branch Breakers - Lighting Fixtures And Lamps - Wires And Wiring Devices - Wirings - Conduit, Boxes, Fittings (conduit Works / Conduit Rough-ins) - Grounding Systems Sewage Treatment Plant Structural - Foundation Works: All Isolated Footings And Slab-on-grade - All Concrete Beams And Concrete Columns - Roof Truss, Purlins, And Sagrods - Stp Walls, Mat Foundation, And Slab - Wall Fence Architectural - Cement Floor Finish - Fiber Cement Ceiling - 150mm Chb Walls - Cement Plaster Finish - Painting Works - Louver Doors And Windows - Roofing Works - Railings Plumbing - Sewage Treatment Plant (stp) – Dynamic Sequential Batch Reactor Electrical - Grounding System - Lighting Fixtures And Lamps - Conduit, Boxes And Fittings (conduit Works / Conduit Rough-ins) Mechanical Airconditioning Units For Auxiliary Buildings - Out-patient Department - Dietary - Laundry And Linen - Engineering And Maintenance - Central Waste Storage - Property And Supply - Cadaver Holding Area Plumbing Septic Tanks For Auxiliary Buildings - Out-patient Department - Doctors And Nurses Quarters - Dietary - Laundry And Linen - Engineering And Maintenance - Cadaver Holding Area Structural Steel Stairs For Auxiliary Buildings - Out-patient Department Main Building Plumbing - Plumbing Line Works Electrical - Wirings - Conduit, Boxes, Fittings (conduit Works / Conduit Rough-ins) Mechanical - Ventilation Works Approved Budget For The Contract : ₱96,500,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 C.d. Size Range : Medium A License Category : B Cost Of Bidding Documents : ₱50,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. For Item Nos. 5 & 6 The Bac Is Conducting The Public Bidding For This Contract Pursuant To Gppb Circular 06-2019 Dated July 17, 2019 (guidelines On The Implementation Of Early Procurement Activities) In Relation To The Provisions Of The Republic Act 9184 And Its Implementing Rules And Regulations (irr). The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh) Regional Office No. Iv-a, And Inspect The Bidding Documents At The Address Given Below During Weekdays From 8am – 2pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Starting On October 30, 2024 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents (amount Indicated On The Above Table). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh) Regional Office No. Iv-a, Will Hold A Pre-bid Conference On November 06, 2024 @ 10:00 A.m. At Bidding Room, Dpwh Regional Office No. Iv-a, Canlubang Interchange, Brgy. Mayapa, City Of Calamba, Laguna And Through Video Conferencing Via Zoom And Live – Streamed On Youtube Https://www.youtube.com/channel/ucbiu3eadzp_ckg02rjmipfg Which Shall Be Open To Prospective Bidders. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_r4a@dpwh.gov.ph For Electronic Submission On Or Before November 19, 2024 @ 10:00 A.m. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On November 19, 2024 @ 10:00 A.m. At Bidding Room, Dpwh Regional Office No. Iv-a, Canlubang Interchange, Brgy. Mayapa, City Of Calamba, Laguna Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above Or Through Video Conferencing Via Zoom Which Shall Also Be Live – Streamed On Youtube Https://www.youtube.com/channel/ucbiu3eadzp_ckg02rjmipfg. Late Bids Shall Not Be Accepted. 10. If At The Time Of The Post – Qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b) (ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Rirr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject To Be Bid. 11. The Department Of Public Works And Highways (dpwh) Regional Office No. Iv-a, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Atty. Cheryll C. Antonio - David Bac, Vice Chairperson Chief, Administrative Officer Administrative Division Telephone No. (02) (049) 34810220 Email Address: R4a.procurement@gmail.com Alex B. Virtudazo Bac Secretariat Head Telephone No. (02) (049) 34810215 / 34810225 Email Address: R4a.procurement@gmail.com Department Of Public Works And Highways Regional Office No. Iv-a Canlubang Interchange, Brgy. Mayapa, City Of Calamba, Laguna 13. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph. For Online Bid Submission At Electronicbids_r4a@dpwh.gov.ph. October 29, 2024 Approved By: Sgd Atty. Cheryll C. Antonio - David Chief, Administrative Officer Administrative Division Bac Vice Chairperson
Closing Date19 Nov 2024
Tender AmountPHP 175 Million (USD 3 Million)
6661-6670 of 6689 active Tenders