- Home/
- Philippines/
- Province Of Ifugao/
- Overview
Province Of Ifugao Tender
Province Of Ifugao Tender
Costs
Summary
Rfq No. 11- 2024-svp(44 Single Projects +5 Pckages With 12 Projects= 50 Contracts) , Construction Projects ,province Of Ifugao
Description
Description Republic Of The Philippines Province Of Ifugao Bids And Awards Committee - Infra 3rd Floor Peo Bldg., Capitol Compound Lagawe, Ifugao Email: Bacinfraifugao21@gmail.com Request For Quotation (small Value Procurement) Rfq No. 11- 2024-svp Bid Opening: August 13, 2024 Quotations Must Be Received By The Procuring Entity Not Later Than 1:00 P.m. Of August 13, 2024 To : Address : Date : August 6, 2024 Subject : Request For Quotations 1) The Provincial Local Government Unit Of Ifugao Have Allocated The Following Funds Listed Below And Intends To Apply The Funds To Payments Under The Following Contracts For Which This Request Is Issued: Name Of Contract Location Source Of Fund Brief Description/major Works 1 Improvement Of Damag Fmr, Aguinaldo, Ifugao Damag, Aguinaldo 2024-20% Df Po No. 2024-08r Grouted Riprap & Structure Excavation 2 Rehabilitation Of Tinboan-colocol, Bunhian Water System Bunhian, Aguinalo 2024-20% Df Polyethylene (pe) Plastic Pipe & Pipeline Trench Excavation 3 Rehabilitation Of Mungayang-butac, Awayan Cis Mongayang, Aguinaldo 2024-20% Df Lined Canal & Removal Of Structure/obstruction 4 Construction Of Lower Butayan-nuntor-og, Chalalo Pathway Chalalo, Aguinaldo 2024-20% Df Pccp & Structure Excavation 5 Construction Of Majlong River Control, Aguinaldo Majlong, Aguinaldo 2024-20% Df (po No. 2024-06r) Grouted Riprap & Clearing And Grubbing 6 Completion Of Guihob Proper, Butac Hanging Bridge Butac, Aguinaldo 2024-20% Df Grouted Riprap & Welded Structural Steel 7 Construction Of San Quintin Multi-purpose Building' San Quintin, Alfonso Lista 2024-20% Df Reinforcing Steel & Structural Concrete 8 Improvement Of Sto. Domingo-namillangan Fmr Sto. Domingo, Alfonso Lista 2024-5% Cf Grouted Riprap & Structure Excavation 9 Construction Of Catubangan, Killing To Malalupa Road Overflow (balajo Portion) Kiling, Alfonso Lista 2024-20% Df Grouted Riprap & Pipe Culverts 10 Improvement Of Tupaan-heldangan-cawayan-wanitan-badbad And Dimpapan, Antipolo Cis Antipolo, Asipulo 2024-20% Df Structural Concrete & Wires/cables 11 Construction/ Concreting Of Natcak Footbridge Camandag, Asipulo 2024-20% Df Structural Concrete & Reinforcing Steel 12 Construction Of Aagang, Duli, Camandag Multipurpose Building Camandag, Asipulo 2024-20% Df Roof Frame & Reinforcing Steel 13 Construction Of Tattawang-liwang, Poitan Pathway With Foothbridge Poitan, Banaue 2024-20% Df Pccp & Grouted Riprap 14 Continuation Of Montabiong-bannao-nattum Road Bannao-banaue 2024-20% Df Surplus Common Excavation& Surplus Rock Excavation 15 Finishing Of Kinakin Multi-purpose Hall Kinakin, Banaue 2024-20% Df Glazed Tiles & Unglazed Tiles 16 Rehabilitation Of Iyacop, Tam-an Pathway Tam-an, Banaue 2024-5% Cf Grouted Riprap & Structure Excavation 17 Continuation Of Gohang Multi-purpose Hall Gohang, Banaue 2024-20% Df Reinforcing Steel & Septic Vault 18 Continuation Of Poitan Multi-purpose Hall Poitan, Banaue 2024-20% Df Structural Concrete & Reinforcing Steel 19 Construction Of Iplong, Anaba Footbridge Anaba, Banaue 2024-20% Df Structure Excavation & Grouted Riprap 20 Construction Of Balawis Tramline Balawis, Banaue 2024-20% Df Structural Concrete & Reinforcing Steel 21 Construction Of Bae, Poitan Communal Latrine Poitan, Banaue 2024-20% Df Structural Concrete & Structural Steel 22 Opening Of Chunak-nattom, Banao Fmr Bannao, Banaue 2024-20% Df Surplus Common Excavation& Surplus Rock Excavation 23 Construction Of Cababuyan 0-ong Small Gardeners Building Cababuyan, Hingyon 2024-20% Df Reinforcing Steel & Structural Concrete 24 Improvement Of Bitu-anao (section Ibaliw), Anao Road Anao, Hingyon 2024-20% Df Grouted Riprap & Embankment From Structure Excavation 25 Improvement Of Baang To Inchugi Pathway From Daycare Center Baang, Hungduan 2024-20% Df Pccp & Grouted Riprap 26 Improvement Of Namul-o, Abatan Water System Abatan, Hungduan 2024-20% Df Polyethylene (pe) Plastic Pipe & Reinforced Concrete 27 Roofing Of Evacuation Center Poblacion, Hungduan 2024-5% Cf Structural Steel & Painting Works 28 Roofing Of Evacuation Center Poblacion, Hungduan 2024-20% Df Prepainted Metal Sheet & Structural Steel 29 Construction Of Bullagu, Baguinge Farmer's Multipurpose Building Baguinge, Kiangan 2024-20% Df Reinforcing Steel & Structural Concrete 30 Construction Of The Flood Control At Buy-uh, Dalligan Kiangan Dalligan, Kiangan 2023-20% Df/ Po No. 2024-06r Grouted Riprap & Embankment From Structure Excavation 31 Construction Of Uritang-tang-il, Nagacadan Cis Nagacadan, Kiangan 2024-20% Df Lined Canal & Structure Excavation 32 Construction Of Barangay Hall Compound's Comfort Room, Hucab, Kiangan Hucab, Kiangan 2024-20% Df Septic Vault & Septic Tiles 33 Construction Of Pali-iyon Slope Protection Duit, Kiangan 2024-5% Cf Grouted Riprap & Pccp 34 Water Supply System (halfway House) Baguinge, Kiangan 2023 Capital Outlay Structural Steel & Elevated Tank (stainless) 35 Improvement Of Poblacion North Multi-purpose Hall With Gymnasium And Bleachers Poblacion North, Lagawe 2024-20% Df Fence & Structural Steel 36 Rockquary Pathway Shed Construction, Poblacion North Poblacion North, Lagawe 2024-20% Df Metal Railing & Structural Steel 37 Improvement Of The Montabiong Barangay Health Station Montabiong, Lagawe 2024-20% Df Corrugated Metal Railing Roofing & Chb Non Load Bearing 38 Construction Of Madonglaan To Wadwad, Poblacion West Road Opening Cudog, Lagawe 2024-20% Df Grouted Riprap & Pipe Culverts 39 Water System At The Provincial Government Livelihood Facility (pglf-lamut) Mabato-bato, Lamut 2024-20% Df Water Pumping System & Structural Concrete 40 Construction Of Sitio Licha, Bimpal Drainage Canal Bimpal, Lamut 2024-20% Df Pipe Culverts & Pccp 41 Completion Of Bongan Multi-purpose Gym Bleachers Bongan, Mayoyao 2024-20% Df Structural Concrete & Reinforcing Steel 42 Rehabilitation Of Tignalop-halajud, Mayoyao Mayoyao Proper, Mayoyao 2024-20% Df Grouted Riprap & Structure Concrete 43 Construction Of Buninan Tramline Buninan, Mayoyao 2024-20% Df Structural Concrete & Reinforcing Steel 44 Construction Of Palintaang, Colili, Tukukan Fmr Tukukan, Tinoc 2024-20% Df Pccp & Aggregate Basecourse 45 Package 86-2024-svp Improvement Of Bunhian Day Care Center Aguinaldo, Ifugao 2024-20% Df Metal Railing & Structural Excavation Rehabilitation Of Abetog, Awayan Cis 46 Package 87-2024-svp Improvement Of Kay'ap-liwo-pidol, Cawayan Fmr Asipulo, Ifugao 2024-20% Df Roadway Excavation & Pccp Improvement Of Kamading To Allulog, Pula Pathway 47 Package 88-2024-svp Construction Of Duntugan, Gohang Canal Gutter Banaue, Ifugao 2024-20% Df Concrete Curb And Gutter & Pccp Construction Of Naggor, Anaba Foothpath 48 Package 89-2024-svp Rehabilitation Of Water System At Panalngan-paypayan, Bocos Bocos, Banaue 2021-20% Df Galvanized Iron Water Pipe&grouted Riprap Construction Of Paypayan, Bocos Water System 2024-20% Df 49 Package 90-2024-svp Improvement Of Huhjab-chulunog, Liwo Cis Mayoyao, Ifugao 2024-20%df Lined Canal & Grouted Riprap Rehabilitation Of Cha-it, Epeng Cis 50 Package 82-2024-svp Construction Of Umalbong Daycare Center Umalbong, Hingyon 2024-20% Df Ceiling & Residential Casement Construction Of Umalbong Daycare Center 2) Name Of Contract Abc Contract Duration (cd) Cost Of Bid Documents 1 Improvement Of Damag Fmr, Aguinaldo, Ifugao 199,940.40 35 500.00 2 Rehabilitation Of Tinboan-colocol, Bunhian Water System 147,350.27 31 500.00 3 Rehabilitation Of Mungayang-butac, Awayan Cis 498,548.02 53 500.00 4 Construction Of Lower Butayan-nuntor-og, Chalalo Pathway 97,768.95 36 500.00 5 Construction Of Majlong River Control, Aguinaldo 196,647.40 30 500.00 6 Completion Of Guihob Proper, Butac Hanging Bridge 495,769.79 36 500.00 7 Construction Of San Quintin Multi-purpose Building' 486,171.42 57 500.00 8 Improvement Of Sto. Domingo-namillangan Fmr 996,623.83 80 1,000.00 9 Construction Of Catubangan, Killing To Malalupa Road Overflow (balajo Portion) 489,025.55 84 500.00 10 Improvement Of Tupaan-heldangan-cawayan-wanitan-badbad And Dimpapan, Antipolo Cis 493,390.71 77 500.00 11 Construction/ Concreting Of Natcak Footbridge 248,999.01 60 500.00 12 Construction Of Aagang, Duli, Camandag Multipurpose Building 99,751.87 66 500.00 13 Construction Of Tattawang-liwang, Poitan Pathway With Foothbridge 496,227.89 56 500.00 14 Continuation Of Montabiong-bannao-nattum Road 198,664.52 21 500.00 15 Finishing Of Kinakin Multi-purpose Hall 488,702.85 50 500.00 16 Rehabilitation Of Iyacop, Tam-an Pathway 99,041.34 42 500.00 17 Continuation Of Gohang Multi-purpose Hall 491,124.69 84 500.00 18 Continuation Of Poitan Multi-purpose Hall 487,854.62 61 500.00 19 Construction Of Iplong, Anaba Footbridge 99,402.17 32.5 500.00 20 Construction Of Balawis Tramline 147,787.00 43 500.00 21 Construction Of Bae, Poitan Communal Latrine 99,817.44 43 500.00 22 Opening Of Chunak-nattom, Banao Fmr 496,163.56 28 500.00 23 Construction Of Cababuyan 0-ong Small Gardeners Building 498,503.03 108 500.00 24 Improvement Of Bitu-anao (section Ibaliw), Anao Road 197,130.46 34 500.00 25 Improvement Of Baang To Inchugi Pathway From Daycare Center 495,215.52 74 500.00 26 Improvement Of Namul-o, Abatan Water System 296,127.94 62 500.00 27 Roofing Of Evacuation Center 498,244.31 51 500.00 28 Roofing Of Evacuation Center 499,458.93 51 500.00 29 Construction Of Bullagu, Baguinge Farmer's Multipurpose Building 149,388.57 49 500.00 30 Construction Of The Flood Control At Buy-uh, Dalligan Kiangan 490,418.88 50 500.00 31 Construction Of Uritang-tang-il, Nagacadan Cis 489,854.84 30 500.00 32 Construction Of Barangay Hall Compound's Comfort Room, Hucab, Kiangan 499,047.08 72 500.00 33 Construction Of Pali-iyon Slope Protection 494,195.36 32 500.00 34 Water Supply System (halfway House) 298,766.05 56 500.00 35 Improvement Of Poblacion North Multi-purpose Hall With Gymnasium And Bleachers 749,722.43 65 1,000.00 36 Rockquary Pathway Shed Construction, Poblacion North 196,117.28 32 500.00 37 Improvement Of The Montabiong Barangay Health Station 199,577.89 56 500.00 38 Construction Of Madonglaan To Wadwad, Poblacion West Road Opening 495,786.44 42 500.00 39 Water System At The Provincial Government Livelihood Facility (pglf-lamut) 198,197.90 30 500.00 40 Construction Of Sitio Licha, Bimpal Drainage Canal 391,122.39 63 500.00 41 Completion Of Bongan Multi-purpose Gym Bleachers 493,567.22 43 500.00 42 Rehabilitation Of Tignalop-halajud, Mayoyao 493,513.85 54 500.00 43 Construction Of Buninan Tramline 148,324.45 32 500.00 44 Construction Of Palintaang, Colili, Tukukan Fmr 196,211.38 36 500.00 45 Package 86-2024-svp Improvement Of Bunhian Day Care Center 148,344.33 50 500.00 Rehabilitation Of Abetog, Awayan Cis 98,449.49 246,793.82 46 Package 87-2024-svp Improvement Of Kay'ap-liwo-pidol, Cawayan Fmr 199,048.47 65 500.00 Improvement Of Kamading To Allulog, Pula Pathway 147,662.74 346,711.21 47 Package 88-2024-svp Construction Of Duntugan, Gohang Canal Gutter 97,420.70 49 500.00 Construction Of Naggor, Anaba Foothpath 99,724.51 197,145.21 48 Package 89-2024-svp Rehabilitation Of Water System At Panalngan-paypayan, Bocos 297,589.00 40 500.00 Construction Of Paypayan, Bocos Water System 297,589.00 49 Package 90-2024-svp Improvement Of Huhjab-chulunog, Liwo Cis 99,233.16 49 500.00 Rehabilitation Of Cha-it, Epeng Cis 97,954.18 197,187.34 50 Package 82-2024-svp Construction Of Umalbong Daycare Center 686,755.57 72 1,000.00 Construction Of Umalbong Daycare Center 686,755.57 3) The Bill Of Quantities Provides A Concise Description Of The Item And The Quantity Required Along With The Construction Schedule. A Set Of Technical Specifications And Drawings Are Attached. 4) Prices Indicated In The Bill Of Quantities Shall Include Unit Prices And The Total Price Under The Contract. 5) Prices Quoted Shall Be Fixed. Quotation Submitted With An Adjustable Price Will Be Treated As Non-responsive And Will Be Rejected. Quotations For Each Project Shall Not Exceed The Abc. 6) Quotation Must Be Hand-carried To The Address Indicated In Paragraph 15, Complete With The Following Requirements Duly Accomplished And Signed And/or Initialed. 6.1) Proof Of Invitation (rfq) 6.2) Lump Quotation Form (document 1a) 6.3) Bill Of Quantities (document 1b) 6.4) Detailed Bid Quotation (document 1c) 6.5) Drawings/ Plans (document 2) 6.6) Technical Specifications (document 3) 6.7) Scope Of Works (document 4) 6.8) Schedule Of Construction (document 5) 6.9) Instruction In Submitting Quotations (isq) (document 6) 6.10) Site Visit Certificate (document 7) 6.11) Omnibus Sworn Statement (document 8) 7) Quotation, As Well As Correspondence And Documents Related Thereto, Shall Be Written In The English Language. 8) A Complete Set Of Quotation Documents In English May Be Purchased By Interested Bidders Upon Presentation Of The Proof Of Invitation By The Provincial Local Government Unit (plgu) And Payment Of A Non-refundable Fee Of The Corresponding Amount Stated In Paragraph 2 Except For Instances When Bidding Documents Fees May Be Refunded To The Bidder. Purchasing/ Issuance Of Bid Documents Is Available During Office Hours From August 6, 2024 To August 13, 2024 Until 1:00 P.m. The Bidding Documents Shall Be Received Personally By The Bidder Or His Authorized Representative During Office Hours At The Bac-infra Office, 3rd Floor, Peo Building, Capitol Compound, Lagawe, Ifugao. 9) Quotations Must Be Received By The Procuring Entity Not Later Than 1:00 P.m. Of August 13, 2024. 10) Validity Of Quotations Should Be A Period Of One Hundred Twenty (120) Calendar Days After The Date Of The Deadline For Submission Of Quotations. 11) The Plgu Supplied Construction Schedule Should Confirm That The Works Will Be Completed Within The Period Stated In The Schedule Of Requirements And In The Quantities Specified In The Bill Of Quantities. 12) It Is The Intent Of The Procuring Entity To Evaluate Quotations And Recommend Award The Contract To The Bidder That Submitted The Lowest Calculated Responsive Quotation For Such Work. 13) The Method And Conditions Of Payment To The Contractor Under This Contract Shall Be Made Upon 100% Work Accomplishment. 14) The Procuring Entity Shall Inspect And/or Test The Works To Confirm Their Conformity To The Contract Specifications. If Any Of The Works Inspected Or Tested Failed To Conform To The Specifications, The Procuring Entity May Reject The Work(s) And The Contractor Shall Replace/remedy The Work(s) To Meet The Specifications Required. 15) Clarification On This Request For Quotations Must Be Addressed To The Procuring Entity In Writing Or By Email At The Address Below Not Later Than Five (5) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. The Procuring Entity Shall Respond In Writing Not Later Than Three (3) Days Prior To The Deadline For The Submission Of Quotations. The Chairperson Bids And Awards Committee - Infra 3rd Floor, Peo Building, Capitol Compound Lagawe, Ifugao 16) The Duly Authorized Representative Shall, At All Times, Present And Submit A Special Power Of Attorney Or Spa To The Bac Secretariat Upon The Submission Of The Bidding Documents, Otherwise Said Bidding Documents Shall Not Be Accepted. 17) The Provincial Government Of Ifugao Reserves The Right To Accept Or Reject Any Or All Bids, To Annul The Bidding Process At Any Time Prior To Contract Award, Waive Minor Defects And Accepts The Bid Most Advantageous To The Provincial Government Without Thereby Incurring Any Liability To Affected Bidder Or Bidders. Carmelita B. Buyuccan Bac Chairperson
Contact
Tender Id
bbc33a0f-dfee-364a-be31-ae51e8670d56Tender No
11120397Tender Authority
Province Of Ifugao ViewPurchaser Address
-Website
notices.ps-philgeps.gov.ph