- Home/
- Philippines/
- Province Of Ifugao/
- Overview
Province Of Ifugao Tender
Province Of Ifugao Tender
Costs
Summary
Request For Quotation No. 01-2025-svp , Construction Projects ,province Of Ifugao
Description
Description Republic Of The Philippines Province Of Ifugao Bids And Awards Committee - Infra 3rd Floor Peo Bldg., Capitol Compound Lagawe, Ifugao Email: Bacinfraifugao21@gmail.com Request For Quotation (small Value Procurement) Rfq No. 01- 2025-svp Bid Opening: January 28, 2025 Quotations Must Be Received By The Procuring Entity Not Later Than 1:00 P.m. Of January 28, 2025 To : Address : Date : January 23, 2025 Subject : Request For Quotations 1) The Provincial Local Government Unit Of Ifugao Have Allocated The Following Funds Listed Below And Intends To Apply The Funds To Payments Under The Following Contracts For Which This Request Is Issued: Name Of Contract Location Source Of Fund Brief Description/major Works 1 Improvement Of Jacmal, Mph Ground Jacmal, Aguinaldo 2025-20% Df Structural Concrete (slab On Fill) 2 Construction Of Flood Control At Manaot Nambasal, Monggayang Monggayang, Aguinaldo 2023-20% Df Grouted Riprap (class A) 3 Improvement Of Bunhian, Mph Ground (continuation) Bunhian, Aguinaldo 2025-20% Df Grouted Riprap (class A) & Chb Non Load Bearing 4 Concreting Of Purok 3, San Jose, Barangay Road San Jose, Alfonso Lista 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) 5 Construction Of Baggu-wittig, Nungawa Slope Protection Asipulo, Ifugao 2025-20% Df Grouted Riprap (class A) & Pccp (unreinforced 0.20m Thick, 14 Days) 6 Opening Of Takkadang-simmuna, Antipolo Farm To Market Road Antipolo, Asipulo 2025-20% Df Surplus Common Excavation 7 Concreting Of Namal Fmr (baltic Section) Namal, Asipulo 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) 8 Improvement Of Liwon-indalmogan, Liwon Access Road (nakupliliwan-nunhipukan Section) Liwon, Asipulo 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) 9 Opening Of Proper Namal-sitio Ihid Road Namal, Asipulo 2025-20% Df Surplus Common Excavation & Surplus Rock Excavation (soft) 10 Improvement Of Nunteg Panubtuban Road Panubtuban, Asipulo 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) 11 Construction Of Tam-an, Slope Protection Infront Of Rtc Public Cr Tam-an, Banaue 2025-20% Df Grouted Riprap (class A) & Structure Excavation (common Soil) 12 Concreting Of Pathway With Railings At Tam-an, Banaue Tam-an, Banaue 2025-20% Df Metal Railing & Pccp (unreinforced 0.20m Thick, 14 Days) 13 Construction Of Kayang-mabulod, Kinakin Pathway Kinakin, Banaue 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) 14 Construction/extension Of Multi-purpose Hall, Banao Banao, Banaue 2022-20% Df Reinforcing Steel (deformed Grade 40) & Structural Concrete (footings, Class A, 28 Days) 15 Improvement Of Hapao Entrance To Ifsu Road Hapao, Hungduan 2025-20% Df Grouted Riprap (class A) & Structure Excavation (common Soil) 16 Construction Of Railings Along Hapao To Municipal Hospital Road Hapao, Hungduan 2025-20% Df Railings & Strucural Concrete, Footings (class A, 28 Days) 17 Construction Of Tuplac, Road Riprap Tuplac, Kiangan 2025-20% Df Grouted Riprap (class A) 18 Improvement Of Anapawon-halong, Dalligan Road Dalligan, Kiangan 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Embankment From Borrow (common Soil) 19 Improvement Of Baguinge-bullago Road Baguinge, Kiangan 2025-20% Df Grouted Riprap (class A) 20 Concreting Of Bullod, Pindongan Road Pindongan, Kiangan 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 21 Construction Of Banting-logab Dalligan Pathway Dalligan, Kiangan 2024-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Grouted Riprap (class A) 22 Rehabilitation Of Nagacadan Multi-purpose Building Protection Wall With Railing Installation Nagacadan, Kiangan 2025-20% Df Grouted Riprap (class A) & Metal Railings 23 Improvement Of Dugong Ambabag, Kiangan Road Ambabag, Kiangan 2025-20% Df Grouted Riprap (class A) 24 Continuation Of Tukdade, Labbanon Pathway Pindongan Pindongan, Kiangan 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) 25 Construction Of Olagon-tang-il, Nagacadan Pathway Nagacadan, Kiangan 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) 26 Continuation Of Alimit Munggayang Canal Lining Mungayang, Kiangan 2025-20% Df Lined Canal (rectangular, Concrete, Reinforced) 27 Riprap Of Nagacadan School Gym Ground Nagacadan, Kiangan 2025-20% Df Grouted Riprap (class A) 28 Concreting Of Proper Olilicon Road Olilicon, Lagawe 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 29 Improvement Of Rock Quarry To Poblacion East Road Poblacion East, Lagawe 2025-20% Df Pccp (thick=0.20m) & Grouted Riprap (class A) 30 Installation Of Montabiong To Banao Electrification Montabiong, Lagawe 2025-20% Df Wire Tensioning & Pole Mounted Power Transformer (oisc) With Complete Accessories 31 Continuation Of Ampali, Caba Flood Control Caba, Lagawe 2025-20% Df Grouted Riprap (class A) 32 Continuation Of Guingiyan, Burnay Road Riprap Burnay, Lagawe 2025-20% Df Grouted Riprap (class A) & Embankment (from Borrow) 33 Continuation Of Ampali, Caba River Control Caba, Lagawe 2025-20% Df Grouted Riprap (class A) 34 Electrification Of Sitio Dagman, Montabiong, Lagawe Montabiong, Lagawe Sb No. 02-2024 Pole Erection & Wire Tensioning 35 Improvement Of Olilicon Fmr Olilicon, Lagawe 2025-20% Df Pccp (thick=0.20m) & Aggregate Base Course 36 Improvement Of Dugong-ifsu (liton Section) Road Poblacion West, Lagawe 2025-20% Df Grouted Riprap (class A) & Structure Excavation (common Soil) 37 Improvement Of Umilag Road (balonglong Section) Umilag, Lamut 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 38 Concreting Of Malabago, Mabato-bato Road Mabato-bato, Lamut 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 39 Concreting Of Landing-mawanini, Hapid Road Hapid, Lamut 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 40 Continuation Of Purok 3, Mabato-bato Canal Lining Mabato-bato, Lamut 2025-20% Df Lined Canal (rectangular Chb) & Reinfrocing Steel (grade 40) 41 Concreting Of Bulao, Pugol Road Pugol, Lamut 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Pipe Culverts (610 Mm Dia,. Class Ii, Rcpc) 42 Concreting Of Tanap-lawig Elementary School Road Lawig, Lamut 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) 43 Improvement Of Purok 3, Sanafe Road Sanafe, Lamut 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 44 Concreting Of Ilap-litta, Barangay Bimpal Road Bimpal, Lamut 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 45 Road Concreting At Umilag Road Umilag, Lamut 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 46 Construction/riprapping Of Buninan Mph Buninan, Mayoyao 2024-20% Df Grouted Riprap (class A) 47 Continuation Of Bad-angan To Alatbang Pathway Bato-alatbang, Mayoyao 2024-sb #5 Pccp (unreinforced 0.20m Thick, 14 Days) & Riprap (class A) 48 Ifugao Traditional Painting, Aduyongan, Mayoyao Aduyongan, Mayoyao 2024-20% Df Painting Works (masonry/concrete) & Cement Plaster Finish (mural Sculpture) 49 Construction Of Bongan, Fmr Bongan, Mayoyao 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Lined Canal (concrete) 50 Improvement Of Pnp Mayoyao Ground And Protection Wall (riprap) Bato-alatbang, Mayoyao Sb No. 5-2024 Reinforcing Steel (deformed Grade 40) & Structural Concrete (footings And Slab On Fill) Class A, 28 Days) 51 Continuation Of Tulaed Water System Tulaed, Mayoyao 2024-20% Df Plyethelene (pe) Pipes, 19-50mm & Structural Concrete (class A, 28 Days) 52 Improvement Of Abab-ba-huyoc 2, Tukucan Fmr Tinoc, Ifugao 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 53 Improvement Of Ap-apid Palabayan To Proper Main Road Ap-apid, Tinoc 2025-20% Df Grouted Riprap (class A) 54 Improvement Of Kallaban, Tukucan Fmr Tinoc, Ifugao 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 55 Improvement Of Mulmog-ngabngab, Ap-apid, Tinoc Road Ap-apid, Tinoc 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 56 Improvement Of Tawang-gumhang-impugong-amgaday Section, Gumhang Fmr Gumhang, Tinoc 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 57 Improvement Neh-eh To Bawi, Gumhang, Tinoc Fmr Gumhang, Tinoc 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 58 Concreting Of Tabuyan Calem Lanah, Poblacion Fmr Poblacion, Tinoc 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Aggregate Base Course 59 Package 01-2025-svp Improvement Of Kinakin Pathway Banaue, Ifugao 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) & Metal Railing (schedule 40) Continuation Of Pun Ulahan, San Fernando, Pathway Pccp (unreinforced 0.20m Thick, 14 Days) 60 Package 02-2025-svp Concreting Of Patyay, Magulon To School Pathway Mayoyao, Ifugao 2025-20% Df Pccp (unreinforced 0.20m Thick, 14 Days) Rehabilitation And Concreting Of Maga, Mayoyao Pathway 2025-5% Cf Pccp (unreinforced 0.20m Thick, 14 Days) & Riprap (class A) 2) Name Of Contract Abc Contract Duration (cd) Cost Of Bid Documents 1 Improvement Of Jacmal, Mph Ground 488,856.11 50 500.00 2 Construction Of Flood Control At Manaot Nambasal, Monggayang 486,238.03 55 500.00 3 Improvement Of Bunhian, Mph Ground (continuation) 490,335.50 72 500.00 4 Concreting Of Purok 3, San Jose, Barangay Road 489,230.51 50 500.00 5 Construction Of Baggu-wittig, Nungawa Slope Protection 489,333.63 41 500.00 6 Opening Of Takkadang-simmuna, Antipolo Farm To Market Road 489,453.60 33 500.00 7 Concreting Of Namal Fmr (baltic Section) 489,946.86 45 500.00 8 Improvement Of Liwon-indalmogan, Liwon Access Road (nakupliliwan-nunhipukan Section) 490,194.08 42 500.00 9 Opening Of Proper Namal-sitio Ihid Road 245,177.46 31 500.00 10 Improvement Of Nunteg Panubtuban Road 195,749.81 36 500.00 11 Construction Of Tam-an, Slope Protection Infront Of Rtc Public Cr 492,638.90 56 500.00 12 Concreting Of Pathway With Railings At Tam-an, Banaue 148,277.59 42 500.00 13 Construction Of Kayang-mabulod, Kinakin Pathway 489,198.18 63 500.00 14 Construction/extension Of Multi-purpose Hall, Banao 495,665.79 63 500.00 15 Improvement Of Hapao Entrance To Ifsu Road 192,712.97 49 500.00 16 Construction Of Railings Along Hapao To Municipal Hospital Road 93,612.76 42 500.00 17 Construction Of Tuplac, Road Riprap 491,023.50 62 500.00 18 Improvement Of Anapawon-halong, Dalligan Road 491,074.93 53 500.00 19 Improvement Of Baguinge-bullago Road 491,844.17 50 500.00 20 Concreting Of Bullod, Pindongan Road 491,636.16 49 500.00 21 Construction Of Banting-logab Dalligan Pathway 489,269.35 62 500.00 22 Rehabilitation Of Nagacadan Multi-purpose Building Protection Wall With Railing Installation 98,489.09 28 500.00 23 Improvement Of Dugong Ambabag, Kiangan Road 194,600.51 48 500.00 24 Continuation Of Tukdade, Labbanon Pathway Pindongan 148,899.49 35 500.00 25 Construction Of Olagon-tang-il, Nagacadan Pathway 98,076.69 31 500.00 26 Continuation Of Alimit Munggayang Canal Lining 199,638.87 34 500.00 27 Riprap Of Nagacadan School Gym Ground 198,205.86 36 500.00 28 Concreting Of Proper Olilicon Road 489,373.81 50 500.00 29 Improvement Of Rock Quarry To Poblacion East Road 584,347.01 68 1,000.00 30 Installation Of Montabiong To Banao Electrification 499,983.56 63 500.00 31 Continuation Of Ampali, Caba Flood Control 494,613.76 30 500.00 32 Continuation Of Guingiyan, Burnay Road Riprap 492,387.84 39 500.00 33 Continuation Of Ampali, Caba River Control 493,686.70 30 500.00 34 Electrification Of Sitio Dagman, Montabiong, Lagawe 242,683.32 46 500.00 35 Improvement Of Olilicon Fmr 199,290.90 33 500.00 36 Improvement Of Dugong-ifsu (liton Section) Road 196,136.51 35 500.00 37 Improvement Of Umilag Road (balonglong Section) 493,559.15 56 500.00 38 Concreting Of Malabago, Mabato-bato Road 994,236.85 52 1,000.00 39 Concreting Of Landing-mawanini, Hapid Road 492,439.39 55 500.00 40 Continuation Of Purok 3, Mabato-bato Canal Lining 488,520.83 55 500.00 41 Concreting Of Bulao, Pugol Road 493,148.98 50 500.00 42 Concreting Of Tanap-lawig Elementary School Road 494,525.88 51 500.00 43 Improvement Of Purok 3, Sanafe Road 490,348.93 35 500.00 44 Concreting Of Ilap-litta, Barangay Bimpal Road 192,080.84 40 500.00 45 Road Concreting At Umilag Road 194,101.83 40 500.00 46 Construction/riprapping Of Buninan Mph 490,662.21 45 500.00 47 Continuation Of Bad-angan To Alatbang Pathway 147,028.42 44 500.00 48 Ifugao Traditional Painting, Aduyongan, Mayoyao 291,310.31 68 500.00 49 Construction Of Bongan, Fmr 488,874.67 65 500.00 50 Improvement Of Pnp Mayoyao Ground And Protection Wall (riprap) 490,123.54 84 500.00 51 Continuation Of Tulaed Water System 491,624.29 45 500.00 52 Improvement Of Abab-ba-huyoc 2, Tukucan Fmr 496,623.23 60 500.00 53 Improvement Of Ap-apid Palabayan To Proper Main Road 495,200.43 56 500.00 54 Improvement Of Kallaban, Tukucan Fmr 195,324.60 40 500.00 55 Improvement Of Mulmog-ngabngab, Ap-apid, Tinoc Road 246,782.16 33 500.00 56 Improvement Of Tawang-gumhang-impugong-amgaday Section, Gumhang Fmr 492,840.59 48 500.00 57 Improvement Neh-eh To Bawi, Gumhang, Tinoc Fmr 249,405.48 32 500.00 58 Concreting Of Tabuyan Calem Lanah, Poblacion Fmr 480,675.36 49 500.00 59 Package 01-2025-svp Improvement Of Kinakin Pathway 99,757.89 56 500.00 Continuation Of Pun Ulahan, San Fernando, Pathway 98,723.80 198,481.69 60 Package 02-2025-svp Concreting Of Patyay, Magulon To School Pathway 97,160.35 64 500.00 Rehabilitation And Concreting Of Maga, Mayoyao Pathway 97,125.72 194,286.07 3) The Bill Of Quantities Provides A Concise Description Of The Item And The Quantity Required Along With The Construction Schedule. A Set Of Technical Specifications And Drawings Are Attached. 4) Prices Indicated In The Bill Of Quantities Shall Include Unit Prices And The Total Price Under The Contract. 5) Prices Quoted Shall Be Fixed. Quotation Submitted With An Adjustable Price Will Be Treated As Non-responsive And Will Be Rejected. Quotations For Each Project Shall Not Exceed The Abc. 6) Quotation Must Be Hand-carried To The Address Indicated In Paragraph 15, Complete With The Following Requirements Duly Accomplished And Signed And/or Initialed. 6.1) Proof Of Invitation (rfq) 6.2) Lump Quotation Form (document 1a) 6.3) Bill Of Quantities (document 1b) 6.4) Detailed Bid Quotation (document 1c) 6.5) Drawings/ Plans (document 2) 6.6) Technical Specifications (document 3) 6.7) Scope Of Works (document 4) 6.8) Schedule Of Construction (document 5) 6.9) Instruction In Submitting Quotations (isq) (document 6) 6.10) Site Visit Certificate (document 7) 6.11) Omnibus Sworn Statement (document 8) 7) Quotation, As Well As Correspondence And Documents Related Thereto, Shall Be Written In The English Language. 8) A Complete Set Of Quotation Documents In English May Be Purchased By Interested Bidders Upon Presentation Of The Proof Of Invitation By The Provincial Local Government Unit (plgu) And Payment Of A Non-refundable Fee Of The Corresponding Amount Stated In Paragraph 2 Except For Instances When Bidding Documents Fees May Be Refunded To The Bidder. Purchasing/ Issuance Of Bid Documents Is Available During Office Hours From January 23, 2025 To January 28, 2025 Until 1:00 P.m. The Bidding Documents Shall Be Received Personally By The Bidder Or His Authorized Representative During Office Hours At The Bac-infra Office, 3rd Floor, Peo Building, Capitol Compound, Lagawe, Ifugao. 9) Quotations Must Be Received By The Procuring Entity Not Later Than 1:00 P.m. Of January 28, 2025. 10) Validity Of Quotations Should Be A Period Of One Hundred Twenty (120) Calendar Days After The Date Of The Deadline For Submission Of Quotations. 11) The Plgu Supplied Construction Schedule Should Confirm That The Works Will Be Completed Within The Period Stated In The Schedule Of Requirements And In The Quantities Specified In The Bill Of Quantities. 12) It Is The Intent Of The Procuring Entity To Evaluate Quotations And Recommend Award The Contract To The Bidder That Submitted The Lowest Calculated Responsive Quotation For Such Work. 13) The Method And Conditions Of Payment To The Contractor Under This Contract Shall Be Made Upon 100% Work Accomplishment. 14) The Procuring Entity Shall Inspect And/or Test The Works To Confirm Their Conformity To The Contract Specifications. If Any Of The Works Inspected Or Tested Failed To Conform To The Specifications, The Procuring Entity May Reject The Work(s) And The Contractor Shall Replace/remedy The Work(s) To Meet The Specifications Required. 15) Clarification On This Request For Quotations Must Be Addressed To The Procuring Entity In Writing Or By Email At The Address Below Not Later Than Five (5) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. The Procuring Entity Shall Respond In Writing Not Later Than Three (3) Days Prior To The Deadline For The Submission Of Quotations. The Chairperson Bids And Awards Committee - Infra 3rd Floor, Peo Building, Capitol Compound Lagawe, Ifugao 16) The Duly Authorized Representative Shall, At All Times, Present And Submit A Special Power Of Attorney Or Spa To The Bac Secretariat Upon The Submission Of The Bidding Documents, Otherwise Said Bidding Documents Shall Not Be Accepted. 17) The Provincial Government Of Ifugao Reserves The Right To Accept Or Reject Any Or All Bids, To Annul The Bidding Process At Any Time Prior To Contract Award, Waive Minor Defects And Accepts The Bid Most Advantageous To The Provincial Government Without Thereby Incurring Any Liability To Affected Bidder Or Bidders. Carmelita B. Buyuccan Bac Chairperson
Contact
Tender Id
7579008c-57de-3c69-8b6e-d67038909ac6Tender No
11684953Tender Authority
Province Of Ifugao ViewPurchaser Address
-Website
notices.ps-philgeps.gov.ph