- Home/
- Philippines/
- Province Of Ifugao/
- Overview
Province Of Ifugao Tender
Province Of Ifugao Tender
Costs
Summary
Rfq No. 02-2025-svp , Construction Projects ,province Of Ifugao
Description
Description Republic Of The Philippines Province Of Ifugao Bids And Awards Committee - Infra 3rd Floor Peo Bldg., Capitol Compound Lagawe, Ifugao Email: Bacinfraifugao21@gmail.com Request For Quotation (small Value Procurement) Rfq No. 02- 2025-svp Bid Opening: February 04, 2025 Quotations Must Be Received By The Procuring Entity Not Later Than 1:00 P.m. Of February 04, 2025 To : Address : Date : January 29, 2025 Subject : Request For Quotations 1) The Provincial Local Government Unit Of Ifugao Have Allocated The Following Funds Listed Below And Intends To Apply The Funds To Payments Under The Following Contracts For Which This Request Is Issued: Name Of Contract Location Source Of Fund Brief Description/major Works 1 Concreting Of Purok 3 To Purok 4, Namillangan Road Namillangan, Alfonso Lista 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 2 Concreting Of Bangar Fmr Bangar, Alfonso Lista 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 3 Construction Of Calimag Mp Building Calimag, Alfonso Lista 2024-20% Df Structural Steel & Residental Casement (steel) 4 Concreting Of San Jose Fmr San Jose, Alfonso Lista 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 5 Riprapping Of Toribio, Bangar Farm To Market Road Bangar, Alfonso Lista 2025-20% Df Grouted Riprap (class A) 6 Installation Of Solar Streetlights At Santa Maria, Alfonso Lista Sta. Maria, Alfonso Lista 2025-20% Df Solar Led Street Light 7 Installation Of Potia Solar Street Light Potia, Alfonso Lista 2025-20% Df Solar Led Street Light 8 Installation Of Namillangan Street Lights Namillangan, Alfonso Lista 2025-20% Df Solar Led Street Light 9 Improvement Of Panligan, Haliap Fmr Haliap, Asipulo 2025-20% Df Surplus Common Excavation & Surplus Rock Excavation (hard) 10 Rehabilitation Of Drainage Canal At Poblacion, Banaue Poblacion, Banaue 2025-5% Ldrrmf Lined Canal (rectangular, Concrete) 11 Installation Of Banaue Solar Light Bocos, Banaue 2025-20% Df Solar Led Street Light 12 Installation Of Brgy. Amganad Solar Lights Amganad, Banaue 2025-20% Df Solar Led Street Light 13 Installation Of Viewpoint Solar Street Light Viewpoint, Banaue 2025-20% Df Solar Led Street Light 14 Construction Of Duntugan Gohang Canal Gohang, Banaue 2025-20% Df Lined Canal (rectangular, Concrete) 15 Improvement Of Iyacop Canal Tam-an, Banaue 2025-20% Df Lined Canal (rectangular, Concrete) 16 Opening Of Pacdal-tiniging, Bangtinon Fmr Bangtinon, Hingyon 2025-20% Df Grouted Riprap (class A) 17 Construction Of Sitio Nangbawan-tinwon, O-ong Pathway O-ong, Hingyon 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 18 Continuation Of Upper Pitawan Marker Tramline O-ong, Hingyon 2024-20% Df Grouted Riprap (class A) 19 Concreting Of Sitio Humalophop, Mompolia Access Road Mompolia, Hingyon 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 20 Ground Improvement Of Mompolia, Senior Citizen Building Mompolia, Hingyon 2025-20% Df Grouted Riprap (class A) 21 Installation Of Cababuyan North, Street Light Cababuyan North, Hingyon 2025-20% Df Solar Led Street Light 22 Installation Of Northern Cababuyan, Hingyon Solar Street Lights Cababuyan North, Hingyon 2025-20% Df Solar Led Street Light 23 Riprap Of Bitu Es Eroded Slope Bitu, Hingyon 2025-20% Df Grouted Riprap (class A) 24 Continuation Of Waoy, Hapao Drainage Canal With Riprap Hapao, Hungduan 2025-5% Cf Grouted Riprap (class A) 25 Rehabilitation Of Gode, Bangbang Cis Bangbang, Hungduan 2025-5% Cf Lined Canal (rectangular, Concrete) 26 Improvement Of Nagacadan Road Nagacadan, Kiangan 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) & Grouted Riprap (class A) 27 Construction Of Sitio Rukdade-indapay, Pindongan Pathway Pindongan, Kiangan 2025-20% Df Grouted Riprap (class A) & Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 28 Construction Of Alah, Baguinge Footbridge Baguinge, Kiangan 2025-20% Df Grouted Riprap (class A) & Welded Structural Steel (railings) 29 Rehabilitation Of Alimit, Hucab Communal Irrigation System Hucab, Kiangan 2025-20% Df Grouted Riprap (class A) & Lined Canal (rectangular, Concrete, Reinforced) 30 Construction Of Sitio Dadi-duhhug, Mungayang Waterway Along Provincial Road Mungayang, Kiangan 2025-20% Df Lined Canal (rectangular, Concrete, Reinforced) 31 Concreting Of Awa-anguniit, Julongan Fmr Julongan, Kiangan 2025-20% Df Grouted Riprap (class A) 32 Riprapping And Construction Of Sitio Ungbol, Pindongan Paraphet Pindongan, Kiangan 2025-20% Df Grouted Riprap (class A) 33 Concreting Of Kaggun, Boliwong Road Riprap Continuation Boliwong, Lagawe 2025-20% Df Grouted Riprap (class A) 34 Improvement Of Sitio Pukot, Tungngod Road Tungngod, Lagawe 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 35 Improvement Of Longya Tupaya, Lagawe Road Tupaya, Lagawe 2025-20% Df Grouted Riprap (class A) 36 Concreting Of Balingaw-agwat, Ponghal Fmr Ponghal, Lagawe 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 37 Construction Of Banga Elementary School Pathway Banga, Lagawe 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 38 Construction Of Halog, Nayon Lamut Flood Control Nayon, Lamut 2025-20% Df Grouted Riprap (class A) 39 Concreting Of Banting (espejo Village, Phase 2) Mabatobato Road Mabatobato, Lamut 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 40 Improvement Of Pugol Road Pugol, Lamut 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 41 Riprapping Of Purok 1, Mongilit, Ambasa Road Ambasa, Lamut 2025-20% Df Grouted Riprap (class A) 42 Concreting Of Purok Magsaysay, Lawig Road Lawig, Lamut 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 43 Construction Of Sitio Monggonga-ac, Magulon, Lamut Road Magulon, Lamut 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 44 Construction Of Nabanngan, Payawan Fmr (junction Section) Payawan, Lamut 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 45 Concreting Of Sitio Ilap-binong Fmr Bimpal, Lamut 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 46 Concreting Of Sitio Turod-buyo Panopdopan Fmr Panopdopan, Lamut 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 47 Riprapping Of Sitio Tanap Umilag Fmr Umilag, Lamut 2025-20% Df Grouted Riprap (class A) 48 Improvement Of Bulao, Sanafe Dcc Ground Sanafe, Lamut 2025-20% Df Grouted Riprap (class A) & Embankment From Structure Excavation (common Soil) 49 Improvement Of Bannit, Nunhabatan Road Lamut, Ifugao Supplemental Budget No. 5 Grouted Riprap (class A) & Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) 50 Riprapping Of Barangay Palaad, Mayoyao Slope Protection Palaad, Mayoyao 2025-20% Df Grouted Riprap (class A) 51 Construction Of Maano, Maga Footbridge Maga, Mayoyao 2025-20% Df Structural Concrete (20.68 Mpa, Class A, 28 Days) & Reinforcing Steel (grade 40) 52 Riprap Of Ayangan Multi-purpose Ground Ayangan, Mayoyao 2025-20% Df Grouted Riprap (class A) & Embankment (from Borrow) 53 Construction Of Palaad Barangay Hall Slope Protection Palaad, Mayoyao 2025-20% Df Grouted Riprap (class A) 54 Concreting Of Bonwang, Palaad Cis Palaad, Mayoyao 2024-sb #5 Grouted Riprap (class A) & Structural Concrete Class A 55 Improvement Of Ababa Mansuyusoy, Tukucan Fmr Tinoc, Ifugao 2025-20% Df Grouted Riprap (class A) 56 Improvement Of Kalem-lanah, Poblacion Road Poblacion, Tinoc 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) & Grouted Riprap (class A) 57 Package 03-2025-svp Concreting Of Purok 1, Killing Road Alfonso Lista, Ifugao 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) Construction Of Pinto Multi-purpose Pavement 58 Package 04-2025-svp Construction Of Pinugo Slope Protection Banaue, Ifugao 2025-20% Df Grouted Riprap (class A) Construction Of Liwang Slope 59 Package 05-2025-svp Construction Of Booh To Baan, Batad Pathway Banaue, Ifugao 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) Improvement And Leveling Of Bukung-piwong Kinakin Pathway 60 Package 06-2025-svp Improvement Of Kadkad Abatan Pathway Hungduan, Ifugao 2025-20% Df Portland Cement Concrete Pavement (unreiforced 0.20m Thick, 14 Days) Improvement Of Awa Abatan Pathway 2) Name Of Contract Abc Contract Duration (cd) Cost Of Bid Documents 1 Concreting Of Purok 3 To Purok 4, Namillangan Road 488,782.75 45 500.00 2 Concreting Of Bangar Fmr 146,634.88 30 500.00 3 Construction Of Calimag Mp Building 199,496.72 53 500.00 4 Concreting Of San Jose Fmr 146,793.83 30 500.00 5 Riprapping Of Toribio, Bangar Farm To Market Road 98,575.57 30 500.00 6 Installation Of Solar Streetlights At Santa Maria, Alfonso Lista 193,428.23 63 500.00 7 Installation Of Potia Solar Street Light 99,484.80 63 500.00 8 Installation Of Namillangan Street Lights 193,164.61 63 500.00 9 Improvement Of Panligan, Haliap Fmr 489,741.50 40 500.00 10 Rehabilitation Of Drainage Canal At Poblacion, Banaue 147,120.97 42 500.00 11 Installation Of Banaue Solar Light 145,492.80 63 500.00 12 Installation Of Brgy. Amganad Solar Lights 193,858.38 63 500.00 13 Installation Of Viewpoint Solar Street Light 99,905.74 56 500.00 14 Construction Of Duntugan Gohang Canal 147,707.20 49 500.00 15 Improvement Of Iyacop Canal 147,476.64 44 500.00 16 Opening Of Pacdal-tiniging, Bangtinon Fmr 494,450.39 42 500.00 17 Construction Of Sitio Nangbawan-tinwon, O-ong Pathway 197,408.29 40 500.00 18 Continuation Of Upper Pitawan Marker Tramline 97,193.52 42 500.00 19 Concreting Of Sitio Humalophop, Mompolia Access Road 297,650.80 52 500.00 20 Ground Improvement Of Mompolia, Senior Citizen Building 491,856.41 52 500.00 21 Installation Of Cababuyan North, Street Light 489,242.63 63 500.00 22 Installation Of Northern Cababuyan, Hingyon Solar Street Lights 199,718.70 56 500.00 23 Riprap Of Bitu Es Eroded Slope 198,792.39 30 500.00 24 Continuation Of Waoy, Hapao Drainage Canal With Riprap 495,991.20 76 500.00 25 Rehabilitation Of Gode, Bangbang Cis 148,430.63 35 500.00 26 Improvement Of Nagacadan Road 498,178.18 56 500.00 27 Construction Of Sitio Rukdade-indapay, Pindongan Pathway 145,381.93 31 500.00 28 Construction Of Alah, Baguinge Footbridge 145,765.50 38 500.00 29 Rehabilitation Of Alimit, Hucab Communal Irrigation System 392,286.08 46 500.00 30 Construction Of Sitio Dadi-duhhug, Mungayang Waterway Along Provincial Road 487,910.05 51 500.00 31 Concreting Of Awa-anguniit, Julongan Fmr 489,798.19 58 500.00 32 Riprapping And Construction Of Sitio Ungbol, Pindongan Paraphet 190,156.07 32 500.00 33 Concreting Of Kaggun, Boliwong Road Riprap Continuation 489,757.98 50 500.00 34 Improvement Of Sitio Pukot, Tungngod Road 147,913.97 42 500.00 35 Improvement Of Longya Tupaya, Lagawe Road 198,051.21 28 500.00 36 Concreting Of Balingaw-agwat, Ponghal Fmr 194,785.64 42 500.00 37 Construction Of Banga Elementary School Pathway 148,260.29 35 500.00 38 Construction Of Halog, Nayon Lamut Flood Control 587,695.17 56 1,000.00 39 Concreting Of Banting (espejo Village, Phase 2) Mabatobato Road 148,410.56 28 500.00 40 Improvement Of Pugol Road 199,795.09 30 500.00 41 Riprapping Of Purok 1, Mongilit, Ambasa Road 197,262.27 42 500.00 42 Concreting Of Purok Magsaysay, Lawig Road 194,766.82 40 500.00 43 Construction Of Sitio Monggonga-ac, Magulon, Lamut Road 198,928.87 56 500.00 44 Construction Of Nabanngan, Payawan Fmr (junction Section) 496,849.19 54 500.00 45 Concreting Of Sitio Ilap-binong Fmr 147,897.33 37 500.00 46 Concreting Of Sitio Turod-buyo Panopdopan Fmr 195,778.46 39 500.00 47 Riprapping Of Sitio Tanap Umilag Fmr 196,168.67 28 500.00 48 Improvement Of Bulao, Sanafe Dcc Ground 149,327.73 49 500.00 49 Improvement Of Bannit, Nunhabatan Road 294,725.97 35 500.00 50 Riprapping Of Barangay Palaad, Mayoyao Slope Protection 491,316.99 56 500.00 51 Construction Of Maano, Maga Footbridge 486,810.22 101 500.00 52 Riprap Of Ayangan Multi-purpose Ground 196,505.93 45 500.00 53 Construction Of Palaad Barangay Hall Slope Protection 97,894.99 35 500.00 54 Concreting Of Bonwang, Palaad Cis 194,040.55 47 500.00 55 Improvement Of Ababa Mansuyusoy, Tukucan Fmr 485,273.01 51 500.00 56 Improvement Of Kalem-lanah, Poblacion Road 969,702.03 58 1,000.00 57 Package 03-2025-svp Concreting Of Purok 1, Killing Road 99,714.85 84 500.00 Construction Of Pinto Multi-purpose Pavement 99,342.15 199,057.00 58 Package 04-2025-svp Construction Of Pinugo Slope Protection 99,141.37 56 500.00 Construction Of Liwang Slope 147,776.96 246,918.33 59 Package 05-2025-svp Construction Of Booh To Baan, Batad Pathway 98,541.75 56 500.00 Improvement And Leveling Of Bukung-piwong Kinakin Pathway 98,630.85 197,172.60 60 Package 06-2025-svp Improvement Of Kadkad Abatan Pathway 92,447.88 40 500.00 Improvement Of Awa Abatan Pathway 91,984.38 184,432.26 3) The Bill Of Quantities Provides A Concise Description Of The Item And The Quantity Required Along With The Construction Schedule. A Set Of Technical Specifications And Drawings Are Attached. 4) Prices Indicated In The Bill Of Quantities Shall Include Unit Prices And The Total Price Under The Contract. 5) Prices Quoted Shall Be Fixed. Quotation Submitted With An Adjustable Price Will Be Treated As Non-responsive And Will Be Rejected. Quotations For Each Project Shall Not Exceed The Abc. 6) Quotation Must Be Hand-carried To The Address Indicated In Paragraph 15, Complete With The Following Requirements Duly Accomplished And Signed And/or Initialed. 6.1) Proof Of Invitation (rfq) 6.2) Lump Quotation Form (document 1a) 6.3) Bill Of Quantities (document 1b) 6.4) Detailed Bid Quotation (document 1c) 6.5) Drawings/ Plans (document 2) 6.6) Technical Specifications (document 3) 6.7) Scope Of Works (document 4) 6.8) Schedule Of Construction (document 5) 6.9) Instruction In Submitting Quotations (isq) (document 6) 6.10) Site Visit Certificate (document 7) 6.11) Omnibus Sworn Statement (document 8) 7) Quotation, As Well As Correspondence And Documents Related Thereto, Shall Be Written In The English Language. 8) A Complete Set Of Quotation Documents In English May Be Purchased By Interested Bidders Upon Presentation Of The Proof Of Invitation By The Provincial Local Government Unit (plgu) And Payment Of A Non-refundable Fee Of The Corresponding Amount Stated In Paragraph 2 Except For Instances When Bidding Documents Fees May Be Refunded To The Bidder. Purchasing/ Issuance Of Bid Documents Is Available During Office Hours From January 29, 2025 To February 04, 2025 Until 1:00 P.m. The Bidding Documents Shall Be Received Personally By The Bidder Or His Authorized Representative During Office Hours At The Bac-infra Office, 3rd Floor, Peo Building, Capitol Compound, Lagawe, Ifugao. 9) Quotations Must Be Received By The Procuring Entity Not Later Than 1:00 P.m. Of January 28, 2025. 10) Validity Of Quotations Should Be A Period Of One Hundred Twenty (120) Calendar Days After The Date Of The Deadline For Submission Of Quotations. 11) The Plgu Supplied Construction Schedule Should Confirm That The Works Will Be Completed Within The Period Stated In The Schedule Of Requirements And In The Quantities Specified In The Bill Of Quantities. 12) It Is The Intent Of The Procuring Entity To Evaluate Quotations And Recommend Award The Contract To The Bidder That Submitted The Lowest Calculated Responsive Quotation For Such Work. 13) The Method And Conditions Of Payment To The Contractor Under This Contract Shall Be Made Upon 100% Work Accomplishment. 14) The Procuring Entity Shall Inspect And/or Test The Works To Confirm Their Conformity To The Contract Specifications. If Any Of The Works Inspected Or Tested Failed To Conform To The Specifications, The Procuring Entity May Reject The Work(s) And The Contractor Shall Replace/remedy The Work(s) To Meet The Specifications Required. 15) Clarification On This Request For Quotations Must Be Addressed To The Procuring Entity In Writing Or By Email At The Address Below Not Later Than Five (5) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. The Procuring Entity Shall Respond In Writing Not Later Than Three (3) Days Prior To The Deadline For The Submission Of Quotations. The Chairperson Bids And Awards Committee - Infra 3rd Floor, Peo Building, Capitol Compound Lagawe, Ifugao 16) The Duly Authorized Representative Shall, At All Times, Present And Submit A Special Power Of Attorney Or Spa To The Bac Secretariat Upon The Submission Of The Bidding Documents, Otherwise Said Bidding Documents Shall Not Be Accepted. 17) The Provincial Government Of Ifugao Reserves The Right To Accept Or Reject Any Or All Bids, To Annul The Bidding Process At Any Time Prior To Contract Award, Waive Minor Defects And Accepts The Bid Most Advantageous To The Provincial Government Without Thereby Incurring Any Liability To Affected Bidder Or Bidders. Carmelita B. Buyuccan Bac Chairperson
Contact
Tender Id
610783ed-a1cd-3566-94c6-8ea4d937825eTender No
11702164Tender Authority
Province Of Ifugao ViewPurchaser Address
-Website
notices.ps-philgeps.gov.ph