Plywood Tenders

Plywood Tenders

Department Of Agriculture Tender

Automobiles and Auto Parts
Corrigendum : Closing Date Modified
Philippines
Closing Date9 Jan 2025
Tender AmountPHP 13.2 Million (USD 227.4 K)
Details: Description Section I. Invitation To Bid Da8-goods-2025-12 (id No. Bt-25-goods-saad-44982-0006) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Saad -2025 Current Fund Intends To Apply The Sum Of Thirteen Million Two Hundred Two Thousand Four Hundred Sixty Pesos Only (p13,202,460.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For “supply And Delivery Of Farm Supplies And Equipment”. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Agriculture-regional Field Office No. 8, Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Sixty (60) Calendar Days From Receipt Of Ntp. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Line Item Qty Uom Item Description Unit Cost Total Cost 1 1260 Pair Rain Boots - Black Color, Rubber, Non-slip, Light Weight, 14" Height 500 630,000.00 Size/qty: #7 - 315 Pcs; #8 -315 Pcs; #9 - 315 Pcs; #10 - 315 Pcs 2 24 Unit Digital Weighing Scale - 10 Kg Capacity; Dual Display (weight And Price); Heavy Duty 5,000.00 120,000.00 3 65600 Pc Egg Tray - 30 Eggs Capacity; Carton Material 15 984,000.00 4 51 Pc Egg Weighing Scale - 100g Capacity; Manual With 6-7 Egg Classification (pewee/pullets, Small, Medium, Large, X-large, Jumbo); White Color; Made In Japan; Heavy Duty (see Attached Sample Photo) 4,500.00 229,500.00 5 3123 Pc Empty Sacks - White Color; Clean; Brand New; Thick; Good Quality 20 62,460.00 6 260 Roll Fine Net - 1.5m X 90 Yards; White Color; Mesh; High Quality 3,000.00 780,000.00 7 3032 Kilo Nylon - Clear String; 3mm Thickness 500 1,516,000.00 8 1800 Pc Plastic Crates - 24" X 16" X 12" In Size, Heavy Duty 700 1,260,000.00 9 450 Pc Plastic Matting - 1ft X 3ft; Non-elevated; Black Color; Heavy Duty (see Attached Sample Photo) 100 45,000.00 10 364 Roll Plastic Mulch - 1.2 Width X 400m; 25 Microns Thickness 4,000.00 1,456,000.00 11 735 Pc Pruning Shear - Rubber Handle; Sharp Blade; Comfortable To Grip; Rust Proof; Good Quality 400 294,000.00 12 10 Pc Hand Push Cart Trolley - Folding Platform; Can Hold Up To 300 Kg; Easy To Maneuver; Heavy Duty (see Attached Sample Photo) 6,600.00 66,000.00 13 2900 Kilo Tie Wire - No. 18; Good Quality 150 435,000.00 14 1 Roll Trapal - 100m/roll; Orange/blue Color; Thick, Good Quality 5,000.00 5,000.00 15 182 Roll Uv Film - 110" X .005" X 150m; Polyethylene; 150 Micron Thickness 16,000.00 2,912,000.00 16 10 Unit Digital Platform Weighing Scale - 1 Ton Capacity Floor Scale; Stainless Steel; Heavy Duty (see Attached Sample Photo) 30,000.00 300,000.00 17 10 Unit Weighing Scale - 60 Kg Capacity Table Scale; Stainless Steel Flat Plate; Mechanical Dial Type; Heavy Duty 3,500.00 35,000.00 18 262 Pc Heavy Duty Brood Light - White Brooder Bulb 100 Watts With Hood And Wiring; With Control Temperature; On/off Switch; Atleast 10" Adjustable Reflector (see Attached Sample Photo) 2,000.00 524,000.00 19 3 Unit Heavy Duty Blender (commercial Type) - 2l Capacity; Stainless Steel Blade; Glass Pitcher; W/ Atleast 3 Speed & Powerful Motor; W/ 1 Yr Service Warranty 2,200.00 6,600.00 20 10 Pc Butchers Table - Combination Of Stainless Steel And 3/4 Plywood Material Of Table Top And Stainless Steel Leg; 6 X 3 Size; High Quality 14,200.00 142,000.00 21 114 Set Canopy Tent - 3 X 6m Size; Retractable And Adjustable Height; Any Color; Durable 4,600.00 524,400.00 22 3 Unit Electric Hand Mixer - W/ Atleast 7 Speed; Hook/beater; Heavy Duty; W/ 1 Yr Service Warranty 2,000.00 6,000.00 23 4 Pc Wok/carajay - 60" Diameter; Stainless; With Double Handle; Thick And Heavy Duty 3,000.00 12,000.00 24 1 Unit Cast Iron Stove With Set Of Lpg Tank & Accessories (see Attached Sample Photo) 12,500.00 12,500.00 Stove: W/ 2 Burner Rings; 2 Adjustable Gas Valves, Min; Large Size; Heavy Weight Design Tank & Content: 11 Kg Orange Cylinder Tank Accessories: Regulator And Heavy Duty Rubber Hose (2m) With Clamps 25 500 Pack Stand Up Resealable Pouch - Brown Color; 18 X 11cm Size; 100pcs/pack (see Attached Sample Photo) 250 125,000.00 26 12 Unit Glass Top Chest Freezer (inverter) With Avr - 60,000.00 720,000.00 Specification: A. Atleast 11cu.ft B. Sliding Glass Top C. With Inverter Technology D. With Wire Basket E. With Safety Key Lock F. With 1 Year Warranty On Parts And Services; And 5 Years On Compressor G. With Atleast 3000 Va (volt-ampere) Capacity Of Avr (automatic Voltage Regulator) Terms And Conditions: A During The Opening Of Bids, Bidder Shall Submit: 1 Notarized Affidavit Of Stock Sufficiency From The Source (at Least 50% On-hand And The Remaining 50% Within The Delivery Period); B The Winning Bidder Shall: 1 Deliver Genuine, Good Condition And Brand New Items; 2 Inform The End-user At Least Seven (7) Working Days Before The Scheduled Date Of Delivery; 3 Deliver Items Within Sixty (60) Calendar Days Based On The Schedule Of Delivery And Designated Drop-off Points (separate Attachment); 4 Conform Upon Notice To Any Changes In The Delivery Schedule Due To Unforeseen Circumstances; 5 Abide With The Right Of The Da To Reject And Request Replacement Of Non-compliant To Specifications; C Any Delay Of Delivery Of Item Shall Be Subject To Liquidation Damages Equivalent To 1/10 Of 1% Of The Contract Price Per Day Of Delay Of The Undelivered Items; D Payment Shall Be Made After Complete Delivery, Inspection, Acceptance And Submission Of All Necesarry Documents Requred For The Process Of Payment; E Winning Bidder Shall Submit A Snapshot Of Lbp Savings Account To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The Irr Of Ra 9184. 5. Prospective Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 17, 2024 To January 02, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee, Pursuant To The Latest Guidelines Issued By The Gppb. The Cost Of The Bidding Documents Shall Correspond To The Total Abc Of The Selected Item/s On Which The Supplier Intends To Bid, With A Range As Indicated In The Table Below. Approved Budget For The Contract Maximum Cost Of Bidding Documents (in Philippine Peso) 500,000 And Below 500.00 More Than 500,000 Up To 1 Million 1,000.00 More Than 1 Million Up To 5 Million 5,000.00 More Than 5 Million Up To 10 Million 10,000.00 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 17, 2024, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City And Through Face To Face Or Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 02, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 10. Bid Opening Shall Be On January 02, 2024, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend Either Physically Or Through Video Conferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee

City Of Bais Tender

Civil And Construction...+3Construction Material, Pipe Line Project, Water Storage And Supply
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 345.6 K (USD 5.9 K)
Details: Description Republic Of The Philippines City Of Bais -o0o- Bids And Awards Committee Invitation To Apply For Eligibility And To Bid The City Government Of Bais Invites Interested Bidders To Apply For Eligibility And To Bid For Repair And Maintenance-infrastructure Assets (f) Artesian Wells, Reservoirs, Pumping Station & Conduit, City Engineer’s Office, Viz: Item Approved Budget For The Contract (abc) Pr No. 51-25 Php 345,600.00 1 90 Pcs. 2" X 2" X 12' G. Melina 2 20 Kls. Common Wire Nails # 4" 3 15 Kls. Common Wire Nails # 3" 4 15 Kls. Common Wire Nails # 2" 5 10 Kls. Common Wire Nails # 1" 6 20 Shts. 1/4" X 4 X 8' Mar. Plywood 7 150 Bags Portland Cement 8 50 Cu.m Sand (fine Aggregates) 9 20 Cu.m Gravel (coarse Aggregates 37.5mm) 10 90 Lngth 10mm Ø X 6.0m Def. Bar 11 90 Kls. G.i Tie Wire, No. 16 12 20 Pcs. Hacksaw Blade 13 20 Lngth 1 1/4" Ø X 20' G.i Pipe (s-40) 14 10 Lngth 1/2" Ø X 20' G.i Pipe (s-40) 15 3 Pcs. Foot Valve 1 1/4" Ø 16 5 Pcs. Foot Valve 1" Ø 17 60 Pcs. Tapelon Tape 3/4" Ø 18 20 Pcs. G.i Coupling 1 1/4" Ø 19 20 Pcs. G.i Coupling 1/2" Ø 20 10 Pcs. G.i Tee 1 1/4" Ø 21 4 Pcs. Jetmatic Pump 22 3 Pcs. Cylinder Pump 1 1/4" Ø 23 4 Pcs. Chek Valve 1 1/4" Ø 24 3 Ltrs. Solvent Cement 25 5 Rolls 1/2" Ø X 300m/roll Polyethylene Pipe The Approved Budget For The Contract Is To Be Taken From Gen. Fund 2025. Partial Bids Are Allowed, However, Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. In Order To Qualify, Bidders Should Conform To The Eligibility Criteria As Prescribed Under Sec. 23 And 25 Of The Revised Irr-a Of R.a. 9184. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary "pass/fail" Criteria As Specified In The Revised Irr-a Of R.a. 9184. As Such Non-submission Of Any Of The Required Documents Will Result In The Disqualification Of The Bidder. Due To Covid-19 Pandemic And Quarantine Regulations Of Every Provinces, Presence Of The Bidders Is Not Necessary. The Bids And Awards Committee (bac) Allows The Submission Of Bids Through Electronic Means And Submission Through Courier Services. The Following Documents Are Required For Submission: A. Eligibility Documents Including Technical Documents (1st Envelope): 1. Registration Certificate From Dti For Sole Proprietorship, Sec For Corporation Or Cda For Cooperative. 2. Valid And Current Mayor's Permit Where The Principal Place Of Business Of The Bidder Is Located. 3. Bir Registration Certificate With Taxpayer’s Identification Number. 4. Statement Of The Bidder Of All Its Ongoing And Completed Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid, Within The Relevant Period Where Applicable. The Statement Shall Be Supported With A Copy Of The Contracts/purchase Or Job Orders; And End-users Acceptance Or Delivery Receipt Duly Acknowledged. The Bidder Must Have Completed Within A Period Of Five (5) Years From The Date Of Submission And Receipt Of Bids, A Single Contract That Is Similar To The Contract To Be Bid Whose Value Must Be At Least Fifty (50%) Percent Of The Abc. However, In The Case Of Expendable Supplies, Said Single Contract Must Be At Least Twenty Five (25%) Percent Of The Abc, Or; The Bidder Should Have Completed At Least Two (2) Similar Contracts And The Aggregate Contract Amounts Should Be Equivalent To At Least The Percentage Of The Abc As Required Above. 5. Certificate Of Product Registration (cpr) From Food And Drug Administration (fda). (for Medicine Only)* 6. Certificate Of Good Manufacturing Practice From Fda. (for Medicine Only)* 7. Batch Release Certificate From Fda. (for Medicine Only)* 8. If The Supplier Is Not The Manufacturer, Certification From The Manufacturer That The Supplier Is An Authorized Distributor/dealer Of The Product(s)/item(s). (for Medicine Only)* 9. License To Operate (fda). (for Medicine Or Medical Supplies/equipment)* 10. Certificate Of Accreditation From Bureau Of Local Government Finance (blgf) (for Accountable Forms Only)* 11. Audited Financial Statements, Showing, Among Others, The Bidder's Total And Current Assets And Liabilities, Stamped "received" By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission. 12. The Bidder's Updated Computation For Its Net Financial Contracting Capacity (nfcc) Bearing The Date Thereof Must At Least Be Equal To The Abc To Be Bid, Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Favor Of The Bidder If Awarded The Contract To Be Bid (cl) Must At Least Be Equal To Ten Percent (10%) Of The Abc To Be Bid.* 13. Valid Joint Venture Agreement (jva), In Case Venture Is Already In Existence. 14. All Bids Must Be Accompanied By Bid Security In Any Or Combination Of The Acceptable Forms (below):* Form Of Bid Security Amount Of Bid Security A) Cash, Cashier's/manager's Check, Bank Draft/guarantee Confirmed By A Universal Or Commercial Bank. Two Percent (2%) B) Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank; Provided, However, That It Shall Be Confirmed Or Authenticated By A Commercial Or Universal Bank'; If Issued By A Foreign Bank. C) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security. Five Percent (5%) D) Bid Securing Declaration Prospective Bidder May Also Submit Bid Securities In The Form Of Cashier's/manager's Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Financial Statement. Bids And Bid Securities Shall Be Valid For A Reasonable Period As Determined By The Head Of The Procuring Entity, But In No Case Shall Exceed 120 Calendar Days From The Date Of The Opening Of Bids. 15. Production/delivery Schedule.* 16. Manpower Requirements* 17. After-sales Service/parts (if Applicable) 18. Sworn Statement By The Prospective Bidder Or Its Duly Authorized Representative As To The Following: A) It Is Not Blacklisted Or Barred From Bidding By The Gop Or Any Of Its Agencies; Office Corporations, Or Lgu's, Including Foreign Government/foreign Or International Financing Institutions Whose Blacklisting Rules Have Been Recognized By The Gppb; B) Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statement And Information Provided Therein Are True And Correct; C) It Is Authorizing The Head Of Procuring Entity Or The Duly Authorized Representative/s To Verify All Documents Submitted; D) Authority Of The Signatory; E) Affidavit Of Disclosure Of No Relationship; F) Certification On Bidder's Responsibilities; G) It Comply With Existing Labor Laws And Standards, In The Case Of Procurement Of Services; H) It Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Activity, And I) In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. 19. Technical Specifications With Brochures, If Applicable.* 20. Certificate Of Philgeps Registration* 21. Tax Clearance* 22. Latest Income And Business Tax Returns (quarterly/monthly); (optional/required Upon Post-qualification)** Note:*required Documents To Be Submitted By Pre-qualified Suppliers/bidders Per Bac Resolution No. 74-g Dated July 30, 2019. **optional Submission During The Opening Of Bids But Mandatory Requirement Upon Post-qualification Per Bac Resolution No. 58-d Dated August 4, 2020. B. Financial Documents: (2nd Envelope) (a) Bid Prices In The Bill Of Quantities Failure To Submit The Above Requirements On Time Or A Finding Against The Veracity Of Such Shall Be Ground For The Forfeiture Of The Bid Security And Disqualify The Bidder For Award. Performance Security And Warranty Shall Be Governed By The Provisions Of Secs. 39 And 62, Respectively, Of The Revised Irr-a Of R.a. 9184. Bid Documents Can Be Obtained Upon Payment Of Non-refundable Fee Equivalent To The Total Amount Of The Abc Of The Items In Which Interested Bidders Intend To Bid, In Accordance With The Guidelines On The Sale Of Bidding Documents, Appendix 25 Of The Revised Irr Of R.a. 9184: Approved Budget For The Contract (abc) Maximum Cost Of Bidding Documents (in Philippine Peso) 500,000 And Below 500.00 More Than 500,000 Up To 1 Million 1,000.00 More Than 1 Million Up To 5 Million 5,000.00 More Than 5 Million Up To 10 Million 10,000.00 More Than 10 Million Up To 50 Million 25,000.00 More Than 50 Million Up To 500 Million 50,000.00 More Than 500 Million 75,000.00 Bid Documents Can Be Obtained At The Bac Secretariat, Office Of The Bids And Awards Committee, This City, Tel. No. (035) 402-8047, Anytime During Office Hours; And Can Also Be Inquired For Further Information Or Particulars. All Other Particulars Relative To The Procurement Process Shall Be Governed By The Revised Implementing Rules And Regulations Of R.a. 9184 Otherwise Known As The Government Procurement Reform Act. Eligibility Requirements Including Technical Documents And Financial Documents Shall Be Submitted Together Each In Separate Sealed Envelopes Duly Marked As Such On February 18, 2025 At The City Budget Office, 2nd Floor, City Hall Annex Building, This City, At 2:00 Pm At Which Date, Place, And Time Said Envelopes Shall Be Opened In The Presence Of The Members Of The Bac, The Attending Bidders, The Observers, Or Their Duly Authorized Representative. Late And Unsealed Bids Shall Not Be Accepted. The City Government Of Bais Reserves The Right To Accept Or Reject Any Bid, And To Annul The Bidding Process And Reject All Bids At Anytime Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. (sgd.) Mr. Rene C. Llera, Lpt Sao /oic-cbo Chair, Bids And Awards Committee

DEPARTMENT OF EDUCATION SCHOOLS DIVISION OF EASTERN SAMAR Tender

Education And Training Services
Philippines
Closing Date28 Jan 2025
Tender AmountPHP 310.1 K (USD 5.2 K)
Details: Description Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 2- Support Service Area: Speech Therapy And Language Area) 1. The Deped Schools Division Of Eastern Samar, Through The General Appropriation Act Of 2024 Intends To Apply The Sum Of ₱ 310,183.00 Being The Abc To Payments Under The Contract For Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 2- Support Service Area: Speech Therapy And Language Area) Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Deped Schools Division Of Eastern Samar Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 4. Prospective Bidders May Obtain Further Information From Deped Schools Division Office Of Eastern Samar And Inspect The Bidding Documents At The Address Given Below During Monday-friday, 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Php 500.00. It May Also Be Downloaded From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Nonrefundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped Schools Division Of Eastern Samar Will Hold A Pre-bid Conference On January 13, 2025, 10:00am At The Bac Office, Deped Schools Division Of Eastern Samar Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 27, 2025, 9:00am Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 27, 2025, 10:00am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Only The Proprietor Or Authorized Representative May Be Allowed To Purchase Bidding Documents. Letter Of Intent (loi), Special Power Of Attorney (spa) (for Authorized Representative), And Drl (document Request List From Philgeps) Are Required Upon Purchase. 11. The Deped Schools Division Of Eastern Samar Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Items, Specifications, Quantity Of Delivery, And Abc: Cabinet, Open Shelves 4x6 Ft 2 Set Sofa, Seating Capacity 2 Velvet: 100 % Polyester Frame Material Manufactured Wood Leg Material Manufactured Wood Seat Fill Material Foam Seat Construction Mdf Back Fill Material Foam Tufted Cushions Square Arm 1 Set Wooden Cubicle Partition, 4 Panel Divider (l 70.25 Inches X H70.25 Inches X T0.75 Inches) 4 Set Mirror, Aluminum Frame (thickness 1/4 Inch X 4 X 8 Ft) 1 Set Filing Cabinet, Vertical Filing Cabinet In 2, 3 And 4 Drawers With Plastic Divider And Central Lock Heavy Duty Construction Assembles In Minutes Power Coated Finish Anti-tilt Mechanism Quiet Closing 3 Sectional Railings For Smooth Actions Central Locking System 1 Unit Book Shelves, Plywood Construction Cladded W/ High Pressured Laminate W/ Box 3880mm L X 400mm W X 1800mm H 2 Piece Small Table With Chairs, Kindergarden Table Heavy Duty Metal Legs 60cm X 120 Cm X 55 Cm Ht Php 2,500.00 Blue Color Rectangular Table 24x48 Php 2000 Chairs 34cm D X 35 Cm L X 28 Cm Ht X 52 Cm Total Ht. Php 400 .00 (4 Chairs) 1 Set White Board, Aluminum Frame, 4 X 8 Ft. Wall Mounted 1 Piece Table, Lockable Pu Casters Dia 65mm -18mm Thickness E1grade Mdf With Marble Color Pvc Veneer -powder Coated Aluminum Frame -class 3 Gas Lift Height Adjustable Range: 77-106cm -max Loading Capacity: 60kg -tabletop With I Pad Holders 2 Unit Floor Mats, Dimension: 1mx1mx24mm Material: Rubber Colors: Blue, Red, Orange, Yellow, Green, Brown, Grey, Black, Maroon 20 Piece Phonics Phones, Pack Of 16: Perfect For Classrooms. You Get 16 Whisper Phones For Classroom Reading. 4 From Each Color. Comes In Red, Purple, Green, & Pink. Our Phonic Phone Is A Great Addition To Your Phonic Manipulative Materials, Speech Therapy Toys For Kids Package Dimensions: 8.9 X 8.9 X 4.1 Inches Item Weight: 8.8 Ounces 1 Set Communication Boards, Book And Cards Specification: Binder Features Two Interior Storage Pockets For Loose Materials, Color Black, And It Measures 9x7.5 Convenient To Travel And Put In Your Child's Backpack Or Carry In Hand. Binder Comes With 5 Different Colorful 10 Mil Poly Dividers, 3 Hard Strips (hook) Attached On Each Side To Hold 30 Cards. Each Card Measures 1.5 X 1.5. Inch Mounted With 1/2-inch Soft Dot (loop), And Round Corner Cut Safe For Little Hands From Scratching And Poking. 3 Set Augmentative Communication Systems, Pocket Go-talk 5-level Communication Device Five Message Buttons At 2.2cm X 3.8cm (7/8” X 1 1/2”) Five Recording Levels 4.16 Minutes Total Recording Time (10 Seconds Per Message) Dial Controlled Volume Button Excellent Sound Quality Two Aa Batteries Included Low Power Consumption Record And Level Lock Capable 7.6cm X 13.6cm X 3.8cm 212 Grams (7.5 Oz) 4 Unit Call Lights, With Many Colors: Red, Blue, Green Or Mix Different Color For Different Service Type It Can Work With 30 Transmitter In Max. With Separate Output Power Supply: Dc5v The Prompting Sound Can Be Turned On/off Dimension: 78*78*60mm Color: White 2 Unit Dry Erase Sleeves, Premium Materials: Dry Erase Pockets Are Durable And Durable, Which Can Withstand Lots Of Student Wear And Tear. Fantastic Idea: You Print Of The Alphabet And Kids Can Use A Dry Erase Marker To Trace The Letters. Oversize: The Width And Length Is 10 Inch * 13 Inch. The Large Size Makes It Easy To Slip Papers In And Out. Saving Money: Dry Erase Sleeves Save Money On Having To Re-purchase Workbooks For Each Child, And You Would Not Have To Print Much Paper No Residue: They Write And Wipe Off Well After The Kids Use Them. Moreover, Dry Erase Pockets Sleeves Are Definitely Long Lasting. 5 Set Wind Up Toys, Powered By A Metal Spring That Is Tightened By Turning It, Classical Funny Simple Games, Non-toxic And Odor-free. Perfect Gift For Kids Party Favors, Goodie Bags, Classroom Rewards, Stocking Stuffers, Easter Egg Stuffers. Clockwork Toy, Each Character Does A Different Trick Such As Swimming In Water, Flipping, Sliding, Spinning, Walking, Shaking Head Or Tail And Many More To Be Discovered. Wind-up Toys Measure About 2 Inch, Including Dinosaur, Egg, Cat, Bird, Caterpillar, Beetle And Car Etc. Package Content: 16 No Duplicate Wind Up Toys (contents And Color May Vary). Every One Of Them Has A Windup Mechanism. 1 Set Wordless Picture Books, Language: ‎ English Hardcover: ‎ 32 Pages Reading Age: ‎ 4 - 6 Years Item Weight: ‎ 1.28 Pounds Dimensions: ‎ 10.25 X 0.5 X 12 Inches 5 Piece File Folders, File 2 Rings 2" Thick Or 3" Thick From Cover To Cover Front, Inside And Back Cover Are All Same Cover Size: Long 14"l X 11"w X 3" Thick Color(s): Black, Blue, Green, Red 10 Piece Articulation Cards, 7 Illustrated Card Decks (448 Cards, 3¼" X 4¼") – Each Deck Of 32 Picture-word Card Pairs Targets A Specific Speech Sound - P, B, T, D, M, J, Includes Storage Tins In A Metal Tote, Master Word Lists, 50 Smiley Face Tokens, And Game Ideas Card Set 1, Card Set 2 And Card Set 3 3 Set Audio Voice Recorder, Dimensions (w X H X D) 38.3 X 114.1 X 19.3 Mm Weight 74gg Colour Black Recording Format: Dss Digital Speech Standard Digital Speech Standardmp3 Standard Playing: 35 Hr Built-in Microphone Yes Pc Connectivity Yes Expandable Memory Yes Features Frequency Response: 50 - 20000hz Connections: Usb Display: Yes Battery Type: Alkaline Aaa 2 Unit Basic Vocabulary Board, Each Unit Comes With: Flashcards Smash Mat Trace And Color Cut And Glue Flipbook Black And White Versions Of All Activities! 2 Set Kidney-shape Table With Learner's Chair, Key Features Includes Four Stacking Chairs And One 36" X 72" Kidney-shaped Activity Table The 16" Seat Height Is Recommended For Fourth Through Sixth Grade Table Tabletop Material: 1 1/8" Thick Particleboard W/ Melamine Finish Edge Band Material: 3mm Pvc Leg Material: Powder-coated Tubular Steel Height: 21" - 30" Adjustable In 1" Increments Width: 36" Length: 72" Assembly Required Warranty: 10 Years Lead Time: Supply Chain Issues Are Effecting Lead Times. Need It Quickly? Please Call (877) 839-3330 To Confirm Shipping Timelines. Shipping Method: Ground Weight: 102.00 Pounds Table Height Adjusts From 21" - 30" Available In Several Color Combinations Chairs Suggested Grade Level: 4th - 6th Seat Material: Polypropylene Frame Material: 18-gauge Tubular Steel Frame Finish: Chrome Seat Height: 16" Fully Assembled Warranty: 10 Years 1 Set Abc = 310,183.00

Western Visayas Sanitarium Doh Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date28 Feb 2025
Tender AmountPHP 16.6 Million (USD 287 K)
Details: Description Republic Of The Philippines Department Of Health Western Visayas Sanitarium And General Hospital Santa Barbara, Iloilo Invitation To Bid For Completion Of Bucas Center Ib No. 2025-02-003-i The Western Visayas Sanitarium And General Hospital, Through Its Bids And Awards Committee (bac), Invites Contractors/bidders To Apply For Eligibility And To Bid For The Hereunder Projects: Name Of Project : Completion Of Bucas Center Location : Western Visayas Sanitarium And General Hospital Approved Budget For : Php 16,611,396.22 The Contract (abc) Fund Source : Caf No. 2025-008-gf Dated January 24, 2025 Contract Duration : 120 Calendar Days Description Quantity Amount Conversion Of Center For Infectious Diseases To Bucas Center 1 Cont. Job General Provisions 1. Mobilization/demobilization 1 Lot 2. Temporary Facilities 1 Lot 3. Project Bill Board 1 Lot 4. Safety And Health Program 1 Lot 5. Occupancy Permit 1 Lot Architectural Works Third Floor Interior 1. Masonry 330 Sq.m 2. Plastering 778.80 Sq.m 3. Dry Wall Partition 193 Sq.m 4. Ceiling (aluminum Panel & Fiber Cement Board) 734 Sq.m 5. Tile (floor, Toilets & Balcony) 866 Sq.m 6. Water Proofing (toilets & Balcony) 120 Sq.m 7. Doors, Windows & Glass Partitions 1 Lot • D1 - 80cmx210cm Flush Door, 6mm Thick Marine Plywood On 2"x3" Solid Hard Wood Frame & 2"x6" Solid Hard Wood Jamb, With Stainless Heavy Duty Lever Type Door Knob ,4-stainless Ball Bearing Hinges 4"x4", Door Stopper, 6mm Thick Viewing Glass, Complete Accessories 9 Set • D2 - 160cmx210cm Double Glass Door, 12mm Thick Clear Glass On Aluminum Frame With 1m Long Stainless Handle Both Sides, Complete Accessories 4 Set • D3 - 80cmx210cm Steel Door With Louver, With Stainless Heavy Duty Lever Type Door Knob ,stainless Heavy Duty Hinges, Door Stopper, Complete Accessories 1 Set • D4 - 70cmx210cm Pvc Door With Louver, With Stainless Heavy Duty Lever Type Door Knob, Complete Accessories 6 Set • D5 - 90cmx210cm Glass Door, 12mm Thick Clear Glass On Aluminum Frame With 1m Long Stainless Handle Both Sides, Complete Accessories 1 Set • W1 (1m X 0.4m) - 6mm Thick Clear Awning Window 2 Set • Glass Partition 1(2.625m X 12.16m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With Double Glass Door 12mm Thick Clear Glass. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Glass Partition 2 (2.625m X 9.85m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With 2 - Glass Door 12mm Thick Clear Glass, Sliding Transaction. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Glass Partition 3 (2.625m X 8.105m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With 2 - Glass Door 12mm Thick Clear Glass, Sliding Transaction. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Glass Partition 4 (5.8m X 1.5m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame 1 Set • Glass Partition 5 (4.8m X 1.5m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame 1 Set • Glass Partition 6 (2.625m X 10.35m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With Double Glass Door 12mm Thick Clear Glass. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Glass Partition 7 (2.625m X 7.265m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With Double Glass Door 12mm Thick Clear Glass, Sliding Transaction. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Glass Partition 8 (2.625m X 5.765m) (2.625m X 1.86m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With Double Glass Door 12mm Thick Clear Glass, Sliding Transaction. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Half Partition 1 - 6mm Thick Clear Fix Glass On 2" X 4" Aluminum Frame (2.45m X 0.565m) 1 Set • Half Partition 2 - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame (1.8m X 0.565m)(3.6m X 0.565m) 1 Set • Half Partition 3 - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame (2.36m X 0.565m)(0.55m X 0.565m)(3.225m X 0.565m) 1 Set • Half Partition 4 - 6mm Thick Clear Fix Glass On 2" X 4" Aluminum Frame (1.485m X 0.565m) 1 Set Painting (walls, Column, Ceiling & Doors)(follow Unified Color As Of Doh Ao 2022-0006) 1447 Sq.m Acrylic Signages (rooms & Directional Signs) 1 Lot Planted Column 0.91 Cu.m Beam (lintel Beam & Roof Beam) 4 Cu.m Furnitures (office Table/cubicles, Head Office Table, Office Chair, Steel Filing Open Rack & Aluminum Portable Stage Platform) 1 Lot Office Table/cubicles, Single (60cm X 120cm) 33 Set Head Office Table (80cm X 160cm) 7 Set Office Chair, Heavy Duty 40 Set Steel Filing Open Rack (6-layer Heavy Duty, Adjustable) 35 Set Aluminum Portable/detachable Stage Platform (2.5m X 8m) 20 Sq.m Sanitary & Plumbing Works Third Floor Interior 1. Installation Of Sanitary Ventilation Line 1 Lot 2. Installation Of Ppr Water Line For Lavatory & Shower 1 Lot 3. Installation Of Ppr Water Line For Water Closet 1 Lot 4. Installation Of Toilet Fixtures & Lavatory With Counter 1 Lot Lavatory With Simi-pedestal 6 Set Water Closet 6 Set 4" Stainless Floor Drain 10 Set Counter Top Lavatory On Concrete Counter Tile Finish 3 Set Mechanical Works Third Floor Interior 1. Air-conditioning System (inverter) 1 Lot 2. Fire Protection System 1 Lot Electrical Works Third Floor Interior 1 Lot 1. Roughing-ins 2. Wires And Cables 3. Lighting Fixtures 4. Wiring Devices 5. Distribution Panels And Circuit Breakers Electromechanical System Third Floor 1. Fire Detection And Alarm System 1 Lot Roughing-ins Wires And Cables Devices 2. Telephone, Lan & Cctv System 1 Lot Roughing-ins Wires And Cables Devices 3. Public Address And Background Music System 1 Lot Roughing-ins Wires And Cables Devices The Bidder’s Single Largest Completed Contract Similar To The Contract To Be Bid Should Have Been Completed Within 5 Years From The Date Of The Deadline Of Submission And Receipt Of Bids. Likewise, The Contract Price Of The Slcc Should Be At Least 50% Of The Abc. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. Interested Bidders May Join The Pre-bid Conference And Opening Of Bids Virtually Via Google Meet In The Link Provided: Meet.google.com/deb-mcrk-wqm. The Complete Schedule Of Activities Is As Follows: Bac Activities Schedule Availability Of Bidding Documents February 6, 2025 At 8:00 Am To 4:00 Pm And Up To Before 9:00 Am Of February 28, 2025, At The Procurement/bac Office, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Pre Bid Conference February 14, 2025 (friday), 9:00 Am At The Engineering Office, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Opening Of Bids February 28, 2025 (friday) 9:00 Am At The Im Conference Room, 3rd Floor New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Bid Documents May Be Acquired By Interested Bidders On The Dates And Address Above And Upon Payment Of Applicable Fee For The Bidding Documents In The Amount Of Php 25,000.00: Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac/procurement Office On Or Before 9:00 Am Of February 28, 2025. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Wvs.doh.gov.ph, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Western Visayas Sanitarium And General Hospital Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Jasond Rex A. Huyaban/jessie H. Jarbadan Ao V/procurement Unit Head / Bac Secretariat Western Visayas Sanitarium And General Hospital Sta. Barbara, Iloilo Tel. No.: (033) 332-4778 Loc. 119 Email: Wvsbac.procurement@gmail.com Website: Wvs.doh.gov.ph Dr. Renia Grace G. Salapare, Fpafp, Mpa Bac Chairperson

Department Of Education Division Of San Juan City Tender

Civil And Construction...+2Building Construction, Construction Material
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 500 K (USD 8.6 K)
Details: Description Name Of Project: Conversion Of Two Rooms Into Medical And Dental Facilities Approved Budget For The Contract: Five Hundred Thousand Pesos Only (php 500,000.00) Location: Schools Division Office, San Juan City Completion Period: 30 Calendar Days Interested Suppliers Are Required To Submit Their Quotation/s Together With The Following Documentary Requirements: 1. Philgeps Registration Number Or Philgeps Certificate Of Registration (platinum); 2. Sec/dti/cda Certificate Of Registration; 3. Valid And Current Mayor’s/business Permit 2025; 4. Tax Clearance Certificate / Bir Certificate Of Registration; 5. Original And Notarized Omnibus Sworn Statement (oss). Award Of Contract Shall Be Made To The Lowest Calculated And Most Responsive Quotation, Which Complies With The Minimum Description As Stated Above And Other Terms And Conditions Stated In The Price Quotation Form In “annex B” And In The Technical Specifications Which Lists The Details Of The Requirements, As Indicated In “annex A". Submission Of Quotation And Eligibility Documents Is On Or Before 9:00 A.m. Of February 18, 2025, At The Records Unit, Ground Floor, Department Of Education – Schools Division Of San Juan City, Pinaglabanan St. San Juan City. Open Submission May Be Submitted Manually. Angelita P. Cornejo Chairperson, Bids And Awards Committee   Annex A General Instructions To Suppliers: 1. This Request For Quotation (rfq) Form Is Deped's Standard Rfq To Be Used When Deped Solicits Quotations For The Procurement Of Goods And Services. It Is A Standard Template That Suppliers Must Follow In Order To Prepare And Submit Their Quotations For Consideration By Deped. 2. This Rfq Is Composed Of One (1) Lot. Suppliers Shall Submit Their Quote For One (1) Lot. 3. Suppliers Must Fill Out The Spaces With The Necessary And Correct Information Including The Offered Brand, Model, Make And Specifications, As Well As The Total Price Of The Item Or The Items In The Lot. They Shall Likewise Indicate The Total Price Of The Said Lot. 4. Prices Must Be Quoted In Philippine Peso And Must Include The Unit Price And Total Price, Inclusive Of All Taxes, Duties And/or Levies To Be Paid And Other Incidental Costs To The Delivery Site/s If The Contract Is Awarded. 5. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. 6. The Rfq Form Must Be Duly Signed And Accomplished And Typewritten Or Written In Indelible Ink. Any Correction Made To The Prices, Rates Or To Any Information Shall Be Rewritten In Indelible Ink And Initialed By The Person Signing The Rfq Form. 7. Suppliers Shall Accomplish, Provide Correct And Accurate Information And Submit Request For Quotation (rfq) Form/ Abstract (annex “b”) Otherwise, Non- Submission Of Which Shall Result To Automatic Disqualification Of Proposal. 8. Documentary Requirements Must Be Properly Labeled. Bidders Must Personally Submit Their Sealed Quotation At The Records Unit, Ground Floor, Department Of Education – San Juan City Pinaglabanan St., San Juan City. 9. Program Of Works Are Indicated In “annex C”. 10. For Inquiries, Please Refer To Leovigilda G. Gempisao, Head, Bac Secretariat, Sdo-san Juan City. Contact No.: 02 8250 4528 Loc. No. 1018. Department Of Education National Capital Region Schools Division Office San Juan City Annex B (price Quotation Form) Bids And Awards Committee February 12, 2025 Closing Date February 18, 2025 Project Title: Conversion Of Two Rooms Into Medical And Dental Facilities The Bids And Award Committee Angelita P. Cornejo Bac-chairperson Department Of Education – San Juan City Pinaglabanan St. San Juan City Madam: Having Examined The Subject Request For Quotation (rfq) Including The Technical Specifications, I/we, The Undersigned Offer To Supply And Deliver The Following Items (with Our Unit Prices And Total Price): I.d. No Description Unit Qty Unit Cost Total Cost Grand Total Material Labor Material Labor General Requirements Mobilization/temporary Structures, Utilities And Safety And Health Lot 1.00 Safety And Health Lot 1.00 Sub-total 1.0000 Glass Works 6mm Thick Anneal Clear Glass On 1 3/4" X 3" Rectangular Tubular Framing With Snap-on-base And Cover Moldings, With Frosted Film Enclosure, Complete With Accessories And Fittings Sq.m 23.25 Sliding Door On Aluminum Frame With Frosted Film Enclosure, Complete With Accessories And Fittings Sq.m 3.78 Sub-total 2.0000 Carpentry Works Office Table And Overhang Cabinets Plywood 3/4" X 4' X 8' Pc 19.00 Formica Laminate, 6mm Pc 22.00 Edge Band Laminate Roll 7.00 Cwn, Assorted Kg 2.00 Clear Sliding Glass Sq.ft 23.22 Drawer Guide, Full Extension Pcs 10.00 Cabinet Lock Set 5.00 Panel Door With Glass Panes (0.90m X 2.10m) On 150mm Set 2.00 Flush Door Set 2.00 Sub-total 4.0000 Masonry Works Sq.m 1.69 Chb 4" Thk Pc 22.00 Portland Cement Bag 1.00 Washed Sand Cu.m 1.00 10mm X 6m Rsb Kg 3.00 G.i. Tie Wire Kg 1.00 Plastering Sq.m 3.38 Portland Cement Bag 2.00 Washed Sand Cu.m 1.00 Sub-total 5.0000 Plumbing Works Lavatory, Including Fittings And Accessories Set 1.00 Faucet, Lavatory Set 1.00 Water Closet 1.6gpf With Accessories Set 1.00 Water Closet Flange Set 1.00 Handheld Bidet Pc 1.00 Mirror Sq.ft 7.13 Double Bowl Kitchen Sink, Complete With Accessories And Fittings Set 1.00 Faucet, Sink Set 1.00 Waterline/plumbing Works Lot 1.00 Sub-total 6.0000 Painting Works Masonry Painting Sq.m 104.69 Neutralizer Gal 3.00 Latex, Flat Gal 9.00 Masonry Putty Gal 6.00 Latex, Semi Gloss Gal 9.00 Acri Color Gal 1.00 Steel Surface Sq.m 17.82 Primer, Epoxy Gal 1.00 Enamel, Quick Dry Gal 1.00 Paint Thinner Gal 1.00 Sub-total 10.0000 Electrical Works Roughing-ins Electrical Conduit Upvc, 20mmø Pcs 5.00 Utility Box, 2" X 4" G.i. Pcs 5.00 Wires And Fixtures 3.5mm2 Thhn Wire, Stranded M 50.00 Duplex Convenience Outlet, Grounding Type, 16a, 250v Set 5.00 2 Gang Wall Switches In One Switch Plate (16 Amp, 230v) Set 2.00 1-36w, 230v, 60hz, T5 Led Lighting Fixture, (box Type) Set 6.00 Sub-total 14.0000 Tile Works Chipping Works Sq.m 7.01 Wall Sq.m 4.76 14.0120 Glazed Wall Tiles 60cm X 60cm Pc 14.00 14.0300 Tile Adhesive 25kg/bag Bag 1.00 14.0400 Tile Trim 6mm Pc 3.00 14.0500 Tile Grout 5kg/bag Bag 1.00 Flooring Sq.m 2.25 Unglazed Floor Tiles 60cm X 60cm Pc 7.00 Tile Adhesive 25kg/bag Bag 1.00 Tile Grout 5kg/bag Bag 1.00 Sub-total 7.0000 Miscellaneous Works Demolition Of Existing Wall Sq.m 4.41 Removal And Reinstallation Of Existing Partition Lot 1.00 Installation Of Dental Chair Including Accessories And Fittings Lot 1.00 Sintra Board Signage (dental Clinic) Set 4.00 Flame Retardant Hospital Curtain Set 1.00 Curved Curtain Runners/tracks M 2.50 Black-out Pleated Blinds Including Accessories Set 1.00 Sub-total I Direct Cost Ii Indirect Cost 22% Of (i-gen.req.) Iii Tax 5% Of (i + Ii) Iv Total Construction Cost (i + Ii + Iii) The Above-quoted Prices Are Inclusive Of All Costs And Applicable Taxes. Prepared By: ____________________________ Supplier’s Representative _________________________ Contact Number _________________________ Name Of Company Annex C Program Of Works Division: Sdo San Juan Date: School I.d: - Budget Allocation Php Region: Ncy Engineering And Administrative Overhead: Php Division: City Of San Juan Approved Budget For Contract: Php Project Title: Completion Period: 30 Calendar Days Project : Conversion Of Two Rooms Into Medical And Dental Clinics Minimum Required Manpower: General Foreman Carpenter Helper Labor Plan: Minimum Required Equipment: Location: Hand Tools Pinaglabanan St., San Juan City M.m Power Tools Item I.d. Item Description % Of Total Unit Quantity Total Cost Remarks Sdo Dental Clinic General Requirements Lot 1.00 1.0000 Glass Works Sq.m 27.03 2.0000 Carpentry Works Lot 1.00 4.0000 Masonry Works Sq.m 1.69 5.0000 Plumbing Works Lot 1.00 6.0000 Painting Works Sq.m 122.51 10.0000 Electrical Works Lot 1.00 14.0000 Tile Works Sq.m 7.01 7.0000 Miscellaneous Works Lot 1.00 Sub-total Ii. Indirect Cost 22% Of (1) Overhead Expenses (8%) Contingencies (3%) Miscellaneous (1%) Contractor’s Profit (10%) Sub-total Iii. Tax 5% Of (i+ii) Sub-total Iv. Total Construction Cost (i + Ii + Iii) Prepared: ____________________________ Authorized Representative Terms And Condition 1. Bidders Shall Provide Correct And Accurate Information In This Form. 2. Price Quotation/s Must Be Valid For A Period Of Thirty (30) Calendar Days From The Date Of Submission. 3. Price Quotation/s To Be Denominated In Philippine Peso Shall Include All Taxes, Duties, And/or Levies Payable. 4. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 5. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Scope Of Works And Other Terms And Conditions Stated Herein. 6. The Quotation Of A Contractor Shall Include An Affidavit Of Site Inspection. 7. The Winning Contractor Is Hereby Required To Provide Within Ten (10) Calendar Days Upon Receipt Of The Notice Of Award (noa) The Performance Security In The Form And The Amount Stipulated In Section 39.2 Of The Irr Of Ra 9184. 8. Progress Payments Are Subject To Retention Of Ten Percent (10%) Referred To As The “retention Money” Which Shall Due For Release Upon Final Acceptance Of The Works. 9. The Contract Duration Is (15) Calendar Days, To Be Reckoned From The Date Of Receipt Of The Notice To Proceed. 10. Current Year Mayor’s/business Permit, Philgeps Registration Number, Income/business Tax Returns, Pcab License And Omnibus Sworn Statement Shall Be Attached Upon Submission Of The Quotation. 11. Mode Of Payment A. 50% Progress Payment - Upon Submission Of Statement Of Work Accomplished (swa) B. Final Billing 12. The Sdo-san Juan Shall Have The Right To Inspect The Refurbishment Of Bulletin Corners ( 2nd To 4th Floor ) To Confirm Their Conformity To The Technical Specifications & Satisfaction The Scope Of Work. 13. Liquidated Damages Equivalent To One Tenth Of One Percent (0.001%) Of The Contract Price Shall Be Imposed Per Day Of Delay. The Sdo-san Juan Shall Rescind The Contract One The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. The Above-quoted Prices Are Inclusive Of All Costs And Applicable Taxes. Very Truly Yours, ___________________________________ Name/signature Of Representative ____________________________________ Name Of Company

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Date20 Feb 2025
Tender AmountPHP 1.4 Million (USD 25.9 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1 Ls 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Hours 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days D. Working Gloves 1.00 Set E. First Aid Kit B. Manpower: Number Of Days 14.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees B. Manpower: C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 43.41 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 43.41 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 39.57 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 39.57 M3 Embankment From Structure Excavation Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 3.81 M3 Dpwh Standard Output Per Day (opd)= 1.20 M3 3.81 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 "structural Concrete (footing, Slab On Fill)" Quantity 15.03 M3 Dpwh Standard Output Per Day (opd)= 0.357 M3 15.03 M3 " Structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 "structural Concrete (footing Tie Beam, Wall Footing)" Quantity 2.56 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.56 M3 " Structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 "structural Concrete (columns)" Quantity 5.42 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 5.42 M3 " Structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 3.90 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 3.90 M3 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c6 "structural Concrete (suspended Slab)" Quantity 2.09 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.09 M3 " Structural Concrete (suspended Slab)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 3,947.39 Kg Dpwh Standard Output Per Day (opd)= 143.44 Kg 3947.39 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 56.65 M2 Dpwh Standard Output Per Day (opd)= 3.24 M2 56.65 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 188.21 M2 Dpwh Standard Output Per Day (opd)= 3.825 M2 188.21 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1016(1)a Waterproofing Cement Base Quantity 12.54 M2 Dpwh Standard Output Per Day (opd)= 1.875 M2 12.54 M2 Waterproofing Cement Base Direct Cost: A. Materials: 1.05 M2 A. Cement-based Waterproofing B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 507.84 Kg Dpwh Standard Output Per Day (opd)= 85.00 Kg 507.84 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 3.00 B. Unskilled Laborer C. Equipment And Water: 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purlins Quantity 200.46 Kg Dpwh Standard Output Per Day (opd)= 90.45 Kg 200.46 Kg Structural Steel Purlins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 48.00 M2 Dpwh Standard Output Per Day (opd)= 2.769 M2 48.00 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings) Quantity 54.76 M Dpwh Standard Output Per Day (opd)= 10.00 M 54.76 M Fabricated Metal Roofing Accessory (flashings) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 7.76 M Dpwh Standard Output Per Day (opd)= 11.80 M 7.76 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) "reflective Insulation" Quantity 50.00 M2 Dpwh Standard Output Per Day (opd)= 5.56 M2 50.00 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1.00 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 200.00 M A.3.5 Mm2 Electric Wire Thhn 160.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 1.00 Set D. Single-gang Switch 4.00 Set E. Two-gang Switch 2.00 Set F. Three-gang Switch 13.00 Set G. Duplex Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Day (opd)= 1 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 2.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (8) Sewer Line Work Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 Ls Sewer Line Work Direct Cost: A. Materials: 7.00 Lengths A. 50 Mm Ø Pvc Pipe,series 1000 3.00 Lengths B. 100 Mm Ø Pvc Pipe, Series 1000 8.00 Pcs C. Pvc 45 Deg. (3mm Bend X 50mm) 2.00 Pcs D. Pvc 45 Deg. (3mm Bend X 101mm) 2.00 Pcs E. Pvc 87.5 Deg. (6mm Bend X 101mm) 1.00 Pcs F. Pvc 45 Deg. Single Branch, Wye (101mm X 101mm) 1.00 Pcs G. Pvc 87.5 Deg. Single Branch, Seep, Tee (101mm X 50mm) 6.00 Pcs H. Pvc Coupling (50mm D) 2.00 Pcs I. Pvc Coupling3 (101mm D) 1.00 Pcs J. Pvc P-trap W/ Plug & Sealing Rings (50mm) 1.00 Pcs K. Pvc P-trap W/ Plug & Sealing Rings (101mm) 2.00 Pcs L. Pvc Cleanout W/ Plug & Sealing Rings (101mm) M. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 10.00 1.00 A. Construction Foreman 10.00 1.00 B. Skilled Laborer 10.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (9) Storm Drainage And Downspout Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Storm Drainage And Downspout Direct Cost: A. Materials: 8.00 Lengths A. 75 Mm Ø Pvc Pipe,series 1000 9.00 Ea B. Pvc 45 Deg. (3mm Bend X 76mm) 5.00 Ea C. Pvc Coupling (76mm D) D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 8.00 1.00 A. Construction Foreman 8.00 1.00 B. Skilled Laborer 8.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1002(6) Cold Waterline Pipes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Cold Waterline Pipes And Fittings Direct Cost: A. Materials: 5.00 Lengths A.13 Mm Ø X 4.00 M (ppr) Pipe, Pn 20 5.00 Pcs B.13 Mm Ø Ppr Elbow - Threaded 10.00 Pcs C.13 Mm Ø Ppr Elbow 10.00 Pcs D.13 Mm Ø Ppr Coupling 2.00 Pcs E.13 Mm Ø Gate Valve 2.00 Pcs F.13 Mm Ø Ppr Union 5.00 Pcs G.13 Mm Ø Ppr Tee H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 6.65 1.00 A. Construction Foreman 6.65 1.00 B. Skilled Laborer 6.65 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 58.55 M2 Dpwh Standard Output Per Day (opd)= 2.00 M2 58.55 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Date20 Feb 2025
Tender AmountPHP 1.4 Million (USD 25.9 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. B.7(2) Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set D. First Aid Kit B. Manpower: Number Of Days 14.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances B. Manpower: - Building Permit Processing Fees C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 43.41 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 43.41 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 39.57 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 39.57 M3 Embankment From Structure Excavation Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 3.81 M3 Dpwh Standard Output Per Day (opd)= 1.20 M3 3.81 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: 1.05 M3 A. Plate Compactor (5 Hp) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 "structural Concrete (footing, Slab On Fill)" Quantity 15.03 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 15.03 M3 " Structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 "structural Concrete (footing Tie Beam, Wall Footing)" Quantity 2.56 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.56 M3 " Structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 "structural Concrete (columns)" Quantity 5.42 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 5.42 M3 " Structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 3.90 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 3.90 M3 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c6 "structural Concrete (suspended Slab)" Quantity 2.09 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.09 M3 " Structural Concrete (suspended Slab)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 3,947.39 Kg Dpwh Standard Output Per Day (opd)= 143.44 Kg 3947.39 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 56.65 M2 Dpwh Standard Output Per Day (opd)= 3.24 M2 56.65 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 188.21 M2 Dpwh Standard Output Per Day (opd)= 3.825 M2 188.21 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1016(1)a Waterproofing Cement Base Quantity 12.54 M2 Dpwh Standard Output Per Day (opd)= 1.875 M2 12.54 M2 Waterproofing Cement Base Direct Cost: A. Materials: 1.05 M2 A. Cement-based Waterproofing B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 507.84 Kg Dpwh Standard Output Per Day (opd)= 85.00 Kg 507.84 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days Fabrication 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 3.00 B. Unskilled Laborer C. Equipment And Water: 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purtins Quantity 200.46 Kg Dpwh Standard Output Per Day (opd)= 90.45 Kg 200.46 Kg Structural Steel Purtins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 48.00 M2 Dpwh Standard Output Per Day (opd)= 2.769 M2 48.00 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings) Quantity 54.76 M Dpwh Standard Output Per Day (opd)= 10.00 M 54.76 M Fabricated Metal Roofing Accessory (flashings) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 7.76 M Dpwh Standard Output Per Day (opd)= 11.80 M 7.76 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) "reflective Insulation" Quantity 50.00 M2 Dpwh Standard Output Per Day (opd)= 50.00 M2 50.00 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1.00 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 200.00 M A.3.5 Mm2 Electric Wire Thhn 160.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 1.00 Set D. Single-gang Switch 4.00 Set E. Two-gang Switch 2.00 Set F. Three-gang Switch 13.00 Set G. Duplex Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Day (opd)= 1 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 2.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (8) Sewer Line Work Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 Ls Sewer Line Work Direct Cost: A. Materials: 7.00 Lengths A. 50 Mm Ø Pvc Pipe,series 1000 3.00 Lengths B. 100 Mm Ø Pvc Pipe, Series 1000 8.00 Pcs C. Pvc 45 Deg. (3mm Bend X 50mm) 2.00 Pcs D. Pvc 45 Deg. (3mm Bend X 101mm) 2.00 Pcs E. Pvc 87.5 Deg. (6mm Bend X 101mm) 1.00 Pcs F. Pvc 45 Deg. Single Branch, Wye (101mm X 101mm) 1.00 Pcs G. Pvc 87.5 Deg. Single Branch, Seep, Tee (101mm X 50mm) 6.00 Pcs H. Pvc Coupling (50mm D) 2.00 Pcs I. Pvc Coupling3 (101mm D) 1.00 Pcs J. Pvc P-trap W/ Plug & Sealing Rings (50mm) 1.00 Pcs K. Pvc P-trap W/ Plug & Sealing Rings (101mm) 2.00 Pcs L. Pvc Cleanout W/ Plug & Sealing Rings (101mm) M. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 10.00 1.00 A. Construction Foreman 10.00 1.00 B. Skilled Laborer 10.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (9) Storm Drainage And Downspout Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Storm Drainage And Downspout Direct Cost: A. Materials: 8.00 Lengths A. 75 Mm Ø Pvc Pipe,series 1000 9.00 Ea B. Pvc 45 Deg. (3mm Bend X 76mm) 5.00 Ea C. Pvc Coupling (76mm D) D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 8.00 1.00 A. Construction Foreman 8.00 1.00 B. Skilled Laborer 8.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1002(6) Cold Waterline Pipes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Cold Waterline Pipes And Fittings Direct Cost: A. Materials: 5.00 Lengths A.13 Mm Ø X 4.00 M (ppr) Pipe, Pn 20 5.00 Pcs B.13 Mm Ø Ppr Elbow - Threaded 10.00 Pcs C.13 Mm Ø Ppr Elbow 10.00 Pcs D.13 Mm Ø Ppr Coupling 2.00 Pcs E.13 Mm Ø Gate Valve 2.00 Pcs F.13 Mm Ø Ppr Union 5.00 Pcs G.13 Mm Ø Ppr Tee H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 6.65 1.00 A. Construction Foreman 6.65 1.00 B. Skilled Laborer 6.65 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 58.55 M2 Dpwh Standard Output Per Day (opd)= 2.00 M2 58.55 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

National Irrigation Administration Tender

Civil And Construction...+1Construction Material
Philippines
Closing Date20 Jan 2025
Tender AmountPHP 3 Million (USD 52.8 K)
Details: Description Invitation To Bid For Supply & Delivery Of Construction Materials For San Jose Cis The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2025 National Expenditure Program (nep) For General Appropriation Act (gaa) 2025 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-epa-restocis2025-017 (goods) Project Name : San Jose Cis Contract Location : Dipolog City, Zamboanga Del Norte Scope Of Works : Supply & Delivery Of Construction Materials Approved Budget For The Contract (abc) : Php 3,097,845.33 Contract Duration : 60 Calendar Days Amount Of Bidding Documents : Php 5,000.00 The Nia – Ro9 Bac Is Conducting An Early Procurement Activity (epa) On Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 25% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : December 21, 2024 – January 20, 2025 At 8:30 Am Pre-bid Conference : January 8, 2025 At 9:00 Am Submission Of Bids : January 20, 2025 At 8:30 Am Opening Of Bids : January 20, 2025 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting December 21, 2024 – January 20, 2025. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 08 January 2025 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 20 January 2025 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/juh-znyf-mbg Opening Of Bids : Https://meet.google.com/kwm-bvjs-ems Item No. Description Quantity Unit Total Delivered, Weeks/months 1 10mm Ø Rsb 602.00 Pcs 602.00 1st Month 2 Common Tei Wire (ctw) #16 25.00 Kg 25.00 1st Month 3 Portland Cement (40kg/bag) 300.00 Bags 525.00 1st Month 225.00 2nd Month 4 Find Aggregates 28.00 Cu.m. 28.00 1st Month 5 Coarse Aggregates 3/4'' 58.00 Cu.m. 58.00 1st Month 6 Coco Lumber 1,425.00 Bd.ft 1,425.00 1st Month 7 1/2'' Marine Plywood 72.00 Sheets 72.00 1st Month 8 Common Wire Nails (cwn) #2 38.00 Kg 38.00 1st Month 9 Common Wire Nails (cwn) #3 76.00 Kg 76.00 1st Month 10 Latex Paint Primer 28.00 Ltrs 28.00 1st Month 11 Gloss Latex Paint Assorted Colors 56.00 Ltrs 56.00 1st Month 12 Enamel Paint 5.00 Ltrs 5.00 1st Month 13 Paint Thinner 0.25 Gal 0.25 1st Month 14 Skim Coat (25kg/bags) 25.00 Bags 25.00 2nd Month 15 Paint Tray 3.00 Pcs 3.00 2nd Month 16 Paint Roller With Handle # 9" 5.00 Pcs 5.00 2nd Month 17 Paint Brush #4 5.00 Pcs 5.00 2nd Month 18 Paint Brush #2 3.00 Pcs 3.00 2nd Month 19 Paint Brush #1/2 3.00 Pcs 3.00 2nd Month 20 Cctv Camera, Hd Dvr (4 Channel), Hd Camera 4 Pcs (2.0mega Pixel) Free Wire Per Camera (20meters), 19 Inches Monetor Aoc And 1tb Hdd Storage & Complete Accessories 1.00 Set 1.00 1st Month 21 Bnc Male/female 1.00 Pcs 1.00 1st Month 22 Power Supply 1.00 Pcs 1.00 1st Month 23 Ups 650va 1.00 Pcs 1.00 1st Month 24 Avr 1.00 Pcs 1.00 1st Month 25 Junction Box 4.00 Pcs 4.00 1st Month 26 Co-axial Wire 250.00 M 250.00 1st Month 27 G.i. Pipe:'50mm Dia. X 6m Length (schedule 40) 22.00 Pcs 22.00 1st Month 28 Inter-linked: 'hot Dip Zinc Galvanize Inter-linked, D: 5ftx10m, Hole Size: 5cm X 5cm, Wire Diameter: 3.3mm) 4.00 Roll 4.00 1st Month 29 Galvanize Barbed: 'wire 30cm Dia. 3.00 Roll 3.00 1st Month 30 Welding Rod #3016 25.00 Kg 25.00 1st Month 31 Cutt-off Wheel: '4" Cutt-off Wheel 5.00 Pcs 5.00 1st Month 32 Disk;'4" Grinding Disk 2.00 Pcs 2.00 1st Month 33 Cylindrical Hinge Heavy Duty: 4" 6.00 Pcs 6.00 1st Month 34 6"ø X 6m Upvc Blue Pipes W/ Complete Accessories 170.00 Pcs 271.00 1st Month 101.00 2nd Month 35 6"ø Upvc Blue Pipes Elbow 45˚w/ Accessories 5.00 Pcs 5.00 1st Month 36 6"ø Upvc Blue Pipes Elbow 90˚ W/ Accessories 11.00 Pcs 11.00 1st Month 37 Pipe Cement Solvent 200cc 20.00 Can 20.00 1st Month 38 3"ø X 6m Upvc Blue Pipes W/ Complete Accessories 100.00 Pcs 167.00 1st Month 67.00 2nd Month 39 3"ø Upvc Blue Pipes Elbow 45˚w/ Accessories 5.00 Pcs 5.00 1st Month 40 3"ø Upvc Blue Pipes Elbow 90˚ W/ Accessories 5.00 Pcs 5.00 1st Month 41 6'' Ø Flange Type Gate Valve 5.00 Pcs 5.00 1st Month 42 20 Mm Ø X 4'' Bolt & Washer 96.00 Set 96.00 1st Month 43 Conventional Boot Wall Opening 8.00 Pcs 8.00 1st Month 44 6'' Ø Ductile Iron Restrain Flange Connector 8.00 Unit 8.00 1st Month 45 6'' Ø Flange Type Ductile Iron Tee 2.00 Unit 2.00 1st Month 46 6''ø To 2''ø Pe Compression Saddle Clamp 2.00 Pcs 2.00 1st Month 47 2'' Ø Hdpe Pipe 6.00 M 6.00 1st Month 48 90 ̊ 2'' Ø Hdpe Compression Elbow 12.00 Pcs 12.00 1st Month 49 2'' Ø Hdpe Compression Tee 2.00 Pcs 2.00 1st Month 50 Hdpe Tee Reducer (2'' Ø To 0.50'' Ø) 4.00 Pcs 4.00 1st Month 51 90 ̊ 1/2'' Ø Gi Elbow 8.00 Pcs 8.00 1st Month 52 1/2'' Ø Gate Valve 8.00 Pcs 8.00 1st Month 53 1/2'' Ø Pipe Nipple (150cm L) 8.00 Pcs 8.00 1st Month 54 1/2'' Ø Polyethylene 400.00 M 800.00 1st Month 400.00 2nd Month 55 2''x2''x0.25''x 6m L Bar 2.00 Pcs 2.00 1st Month 56 2''x0.25''x6m Flat Bar 1.00 Pcs 1.00 1st Month 57 0.045'' Diamond Plate Steel Iron 2.00 Sheets 2.00 1st Month 58 4'' Heavy Duty Metal Hinge 9.00 Pcs 9.00 1st Month 59 Plastic Canvass 100.00 M 100.00 1st Month 60 Nylon #100 2.00 Kg 2.00 1st Month 61 Rubber Boots 30.00 Pair 30.00 1st Month 62 Working Gloves 30.00 Pair 30.00 1st Month 63 Safety Helmet/hard Hat 30.00 Pcs 30.00 1st Month

National Irrigation Administration Tender

Civil And Construction...+1Construction Material
Philippines
Closing Date3 Feb 2025
Tender AmountPHP 3 Million (USD 52.4 K)
Details: Description Invitation To Bid For Supply & Delivery Of Construction Materials For San Jose Cis (lot 1) The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2025 National Expenditure Program (nep) For General Appropriation Act (gaa) 2025 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-restocis2025-024 (goods) Project Name : San Jose Cis Contract Location : Dipolog City, Zamboanga Del Norte Scope Of Works : Supply & Delivery Of Construction Materials Approved Budget For The Contract (abc) : Php 3,066,095.33 Contract Duration : 60 Calendar Days Amount Of Bidding Documents : Php 5,000.00 The Nia – Ro9 Bac Is Conducting A Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 25% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : January 15 – February 3, 2025 At 8:30 Am Pre-bid Conference : January 22, 2025 At 9:00 Am Submission Of Bids : February 3, 2025 At 8:30 Am Opening Of Bids : February 3, 2025 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting January 15 – February 3, 2025. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 22 January 2025 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 03 February 2025 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/efs-insc-spc Opening Of Bids : Https://meet.google.com/uym-rhqx-qzk Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item No. Description Quantity Unit Total Delivered, Weeks/months 1 10mm Ø Rsb 602.00 Pcs 602.00 1st Month 2 Common Tei Wire (ctw) #16 25.00 Kg 25.00 1st Month 3 Portland Cement (40kg/bag) 300.00 Bags 525.00 1st Month 225.00 2nd Month 4 Find Aggregates 28.00 Cu.m. 28.00 1st Month 5 Coarse Aggregates 3/4'' 58.00 Cu.m. 58.00 1st Month 6 Coco Lumber 1,425.00 Bd.ft 1,425.00 1st Month 7 1/2'' Marine Plywood 72.00 Sheets 72.00 1st Month 8 Common Wire Nails (cwn) #2 38.00 Kg 38.00 1st Month 9 Common Wire Nails (cwn) #3 76.00 Kg 76.00 1st Month 10 Latex Paint Primer 28.00 Ltrs 28.00 1st Month 11 Gloss Latex Paint Assorted Colors 56.00 Ltrs 56.00 1st Month 12 Enamel Paint 5.00 Ltrs 5.00 1st Month 13 Paint Thinner 0.25 Gal 0.25 1st Month 14 Skim Coat (25kg/bags) 25.00 Bags 25.00 2nd Month 15 Paint Tray 3.00 Pcs 3.00 2nd Month 16 Paint Roller With Handle # 9" 5.00 Pcs 5.00 2nd Month 17 Paint Brush #4 5.00 Pcs 5.00 2nd Month 18 Paint Brush #2 3.00 Pcs 3.00 2nd Month 19 Paint Brush #1/2 3.00 Pcs 3.00 2nd Month 20 Bnc Male/female 1.00 Pcs 1.00 1st Month 21 Junction Box 4.00 Pcs 4.00 1st Month 22 Co-axial Wire 250.00 M 250.00 1st Month 23 G.i. Pipe:'50mm Dia. X 6m Length (schedule 40) 22.00 Pcs 22.00 1st Month 24 Inter-linked: 'hot Dip Zinc Galvanize Inter-linked, D: 5ftx10m, Hole Size: 5cm X 5cm, Wire Diameter: 3.3mm) 4.00 Roll 4.00 1st Month 25 Galvanize Barbed: 'wire 30cm Dia. 3.00 Roll 3.00 1st Month 26 Welding Rod #3016 25.00 Kg 25.00 1st Month 27 Cutt-off Wheel: '4" Cutt-off Wheel 5.00 Pcs 5.00 1st Month 28 Disk;'4" Grinding Disk 2.00 Pcs 2.00 1st Month 29 Cylindrical Hinge Heavy Duty: 4" 6.00 Pcs 6.00 1st Month 30 6"ø X 6m Upvc Blue Pipes W/ Complete Accessories 170.00 Pcs 271.00 1st Month 101.00 2nd Month 31 6"ø Upvc Blue Pipes Elbow 45˚w/ Accessories 5.00 Pcs 5.00 1st Month 32 6"ø Upvc Blue Pipes Elbow 90˚ W/ Accessories 11.00 Pcs 11.00 1st Month 33 Pipe Cement Solvent 200cc 20.00 Can 20.00 1st Month 34 3"ø X 6m Upvc Blue Pipes W/ Complete Accessories 100.00 Pcs 167.00 1st Month 67.00 2nd Month 35 3"ø Upvc Blue Pipes Elbow 45˚w/ Accessories 5.00 Pcs 5.00 1st Month 36 3"ø Upvc Blue Pipes Elbow 90˚ W/ Accessories 5.00 Pcs 5.00 1st Month 37 6'' Ø Flange Type Gate Valve 5.00 Pcs 5.00 1st Month 38 20 Mm Ø X 4'' Bolt & Washer 96.00 Set 96.00 1st Month 39 Conventional Boot Wall Opening 8.00 Pcs 8.00 1st Month 40 6'' Ø Ductile Iron Restrain Flange Connector 8.00 Unit 8.00 1st Month 41 6'' Ø Flange Type Ductile Iron Tee 2.00 Unit 2.00 1st Month 42 6''ø To 2''ø Pe Compression Saddle Clamp 2.00 Pcs 2.00 1st Month 43 2'' Ø Hdpe Pipe 6.00 M 6.00 1st Month 44 90 ̊ 2'' Ø Hdpe Compression Elbow 12.00 Pcs 12.00 1st Month 45 2'' Ø Hdpe Compression Tee 2.00 Pcs 2.00 1st Month 46 Hdpe Tee Reducer (2'' Ø To 0.50'' Ø) 4.00 Pcs 4.00 1st Month 47 90 ̊ 1/2'' Ø Gi Elbow 8.00 Pcs 8.00 1st Month 48 1/2'' Ø Gate Valve 8.00 Pcs 8.00 1st Month 49 1/2'' Ø Pipe Nipple (150cm L) 8.00 Pcs 8.00 1st Month 50 1/2'' Ø Polyethylene 400.00 M 800.00 1st Month 400.00 2nd Month 51 2''x2''x0.25''x 6m L Bar 2.00 Pcs 2.00 1st Month 52 2''x0.25''x6m Flat Bar 1.00 Pcs 1.00 1st Month 53 0.045'' Diamond Plate Steel Iron 2.00 Sheets 2.00 1st Month 54 4'' Heavy Duty Metal Hinge 9.00 Pcs 9.00 1st Month 55 Plastic Canvass 100.00 M 100.00 1st Month 56 Nylon #100 2.00 Kg 2.00 1st Month 57 Rubber Boots 30.00 Pair 30.00 1st Month 58 Working Gloves 30.00 Pair 30.00 1st Month 59 Safety Helmet/hard Hat 30.00 Pcs 30.00 1st Month

Municipality Of Sta cruz, Davao Del Sur Tender

Civil And Construction...+1Construction Material
Philippines
Closing Date26 Feb 2025
Tender AmountPHP 591.3 K (USD 10.2 K)
Details: Description Republic Of The Philippines Province Of Davao Del Sur Municipality Of Santa Cruz -ooo- Bids And Awards Committee Invitation To Bid For The Procurement Of 1 Lot Electrical And Hardware Materials For The Repair And Maintenance (school Building And Other Facilities) Of Anastacio Canda Elementary School, Zone I , Sta. Cruz, Davao Del Sur (itb No. 11-goods-2025) 1. The Local Government Unit Of Sta. Cruz, Davao Del Sur, Through The Special Educational Funds For The 2025 Intends To Apply The Total Sum Of Five Hundred Ninety One Thousand Three Hundred Sixty Eight And 95/100 (591,368.95) Pesos Being The Total Abc To Payments Under The Contract For The Procuremnet Of 1 Lot Electrical And Hardware Materials For The Repair And Maintenance (school Building And Other Facilities) Of Anastacio Canda Elementary School, Zone I , Sta. Cruz, Davao Del Sur. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Item No. Qty. Unit Of Issue Item Description Cost Per Item Approved Budget For The Item 1 Lot Construction And Hardware Materials For The Repair And Maintenance (school Building And Other Facilities) Anastacio Canda Elementary School 1 33 Bgs Portland Cement (40 Kgs.) 260.00 8,580.00 2 6.5 M³ Course Sand 1,500.00 9,750.00 3 348 Pcs Chb #4 18.00 6,264.00 4 20 M³ Mountain Mix 1,200.00 24,000.00 5 10 Lngth 4"ø Pvc Pipe S-1000 1,120.00 11,200.00 6 14 Shts 2.5m X 1.1m Rib Type Roofing ( Roofing) 1,000.00 14,000.00 7 200 Bdft 2" X 3" X 10' Purlins 35.00 7,000.00 8 534 Bdft 2" X 4" X 10' Coco Lumber(truss And Column) 35.00 18,690.00 9 587 Bdft 2" X 2" X 10' Coco Lumber (bracing) 35.00 20,545.00 10 14 Lengths 1 X 1 X 1.2mm Tubular (handwashing) 250.00 3,500.00 11 60 Mtrs Trapal (walling, Door) 175.00 10,500.00 12 4 Kls Umbrella Nails 120.00 480.00 13 10 Kls #4 Cwn 120.00 1,200.00 14 10 Kls #3 Cwn 120.00 1,200.00 15 10 Kls #2 1/2 Cwn 120.00 1,200.00 16 10 Kls #1 1/2 Cwn 120.00 1,200.00 17 20 Rolls Lugpet 390.00 7,800.00 18 2 Pcs Gun Tacker With (staple Refill) 750.00 1,500.00 19 24 Pcs Hinges 70.00 1,680.00 20 24 Set Single Gang Switch 55.00 1,320.00 21 12 Pcs Plastic Switch Box 91.00 1,092.00 22 80 Mtrs Pdx Wire # 14 54.00 4,320.00 23 12 Pcs Pvc J-box W/ Cover 39.00 468.00 24 2 Pcs Pvc Receptacle 2 X 2 58.00 116.00 25 2 Pcs Led Bulb 7w, 230v 312.00 624.00 26 2 Pcs Heavy Duty Male Plug 78.00 156.00 27 2 Roll Electrical Tape Big 91.00 182.00 28 4 Lgths 1"ø Ppr Pipe 1,300.00 5,200.00 29 12 Lgths 1/2"ø Ppr Pipe 500.00 6,000.00 30 32 Pcs 1"ø X 1/2"ø Ppr Tee 150.00 4,800.00 31 20 Pcs 1/2"ø Ppr Elbow 70.00 1,400.00 32 4 Pcs 1/2"ø Ppr Tee 220.00 880.00 33 36 Pcs 1/2"ø Ppr Elbow W/ Female Thread Adaptor 215.00 7,740.00 34 4 Pcs Teplon 45.00 180.00 35 12 Pcs Ordinary Faucet 150.00 1,800.00 36 24 Lgths Faucet With Shower Combination 750.00 18,000.00 37 12 Pcs Ordinary Kitchen Sink 550.00 6,600.00 38 12 Lgths 2''ø Pvc Pipe S-1ooo 400.00 4,800.00 39 10 Pcs 2''ø Pvc Elbow S-1000 75.00 750.00 40 12 Pcs 2''ø Pvc Tee S-1000 85.00 1,020.00 41 2 Can Solvent Cement 150.00 300.00 42 1 Unit Cb Enclosure Single Nema 3r W/ 30a Cb Bolt-on Type 1,120.00 1,120.00 43 1 Box Pdx Wire 14 4,000.00 4,000.00 44 1 Box Staple Wire ¾ 75.00 75.00 45 1 Roll Electrical Tape Big 75.00 75.00 46 1 Pcs. Pvc J-box W/cover & Screws 43.00 43.00 47 5 Pcs. Screw Insulator Big 85.00 425.00 48 1 Lengt Pvc Pipe ¾ Pns14 160.00 160.00 49 5 Length Pvc Pipe ½ Pns14 115.00 575.00 50 5 Pcs. Pvc Clamp ¾ 6.00 30.00 51 15 Pcs. Pvc Clamp ½ 5.00 75.00 52 1 Unit Stainless Pressurize Tank 82 Gal. 18,850.00 18,850.00 53 1 Unit Water Pump, Shallow,2hp,220v 27,000.00 27,000.00 54 1 Pcs. Pressure Switch (heavy Duty) 1,020.00 1,020.00 55 1 Pcs. Pressure Gauge 100psi 300.00 300.00 56 2 Pcs. Union Patente ¾ 130.00 260.00 57 2 Pcs. Union Patente 1 137.00 274.00 58 4 Pcs G.i. Elbow ¾ X 90 68.00 272.00 59 2 Pcs. G.i. Elbow 1x90 72.00 144.00 60 1 Pc. Check Valve 1 Spring Type (b-b) 663.00 663.00 61 1 Pc. Check Valve ¾ Spring Type (b-b) 600.00 600.00 62 1 Pc. Ball Valve 1 923.00 923.00 63 1 Pc. Ball Valve ¾ 850.00 850.00 64 2 Lengths Ppr Pipe ¾ 850.00 1,700.00 65 1 Pc. G.i. Tee ¾ 70.00 70.00 66 1 Pc G.i. Plug ¾ 28.00 28.00 67 1 Pc. G.i. Plug 1 32.00 32.00 68 4 Pcs G.i. Nipple 1x3 65.00 260.00 69 4 Pcs G.i. Nipple 1x4 46.00 184.00 70 4 Pcs G.i. Nipple 1x6 111.00 444.00 71 3 Pcs G.i. Nipple 1x12 172.00 516.00 72 4 Pcs G.i. Nipple 3/4x3 30.00 120.00 73 4 Pcs G.i. Nipple 3/4x4 38.00 152.00 74 4 Pcs G.i. Nipple 3/4x6 45.00 180.00 75 2 Pcs Bushing Reducer 1 X 3/4 60.00 120.00 76 1 Pc Bushing Reducer 1x ½ 46.00 46.00 77 1 Pc. Bushing Reducer ½ X ¼ 50.00 50.00 78 1 Pc. G.i. Tee ¼ X ¼ 85.00 85.00 79 3 Pcs. G.i. Nipple ¼ X3 45.00 135.00 80 1 Pc G.i. Nipple ¼ X2 33.00 33.00 81 2 Pcs G.i. Elbow ¼ X 90 65.00 130.00 82 15 Rolls Teflon ¾ 63.00 945.00 83 1 Pc. P.e. Male Adaptor 3/4 85.00 85.00 84 120 Mts. P.e. Pipe 1 Sdr 11 85.00 10,200.00 85 100 Mts P.e. Pipe ½ Sdr 11 35.00 3,500.00 86 4 Pcs P.e. Connector 1 150.00 600.00 87 10 Pcs. P.e. Connector ½ 90.00 900.00 88 4 Pcs P.e. End Cap ½ 46.00 184.00 89 5 Pcs. P.e. Coupling Reducer 1x1/2 137.00 685.00 90 2 Pcs P.e. Elbow 1x90 163.00 326.00 91 2 Pcs. P.e. Tee 1x1 234.00 468.00 92 10 Pcs. P.e. Coupling ½ 85.00 850.00 93 10 Pcs P.e. Elbow ½ 90.00 900.00 94 10 Pcs. Led Capsulized Bulb Outdoor Type 600.00 6,000.00 95 10 Pcs. Porcelain Lamp Receptacle 300.00 3,000.00 96 1 Boxes Pdx Wire 14 4,166.00 4,166.00 97 1 Rolls Electrical Tape Big 75.00 75.00 98 9 Unit Semi-integrated 30w Solar Streetlight Specifications: 150-180lm/w, With 18v, 50w Monocrystalline Solar Panel, W/ Prepainted Arm And Bracket Cct: 3000-6500k, Ip Rating: Ip65, Battery: 12.8v Cct: 3000-6500k, Ip Rating: Ip65, Battery: 12.8v 20,800.00 187,200.00 99 9 Pcs. 2"ø G.i Pipe S-40 2,900.00 26,100.00 100 45 Lnght Drb 12mmx6m 310.00 13,950.00 101 27 Lnght Drb 10mmx6m 240.00 6,480.00 102 18 Pcs. Tie Wire#16 105.00 1,890.00 103 9 Pcs. 1/2" Thk Ord. Plywood 720.00 6,480.00 104 9 Kls #3 Cwn 120.00 1,080.00 105 9 Kls #2 1/2 Cwn 120.00 1,080.00 106 299.97 Bdft 2" X 2" X 10' Coco Lumber 35.00 10,498.95 107 27 Kls 6013 Electrode 280.00 7,560.00 108 4.5 C.m. Coarse Sand 1,500.00 6,750.00 109 36 Bags Portland Cement (40 Kgs.) 260.00 9,360.00 Total 591,368.95 2. The Local Government Unit Of Sta. Cruz, Davao Del Sur Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Three (3) Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Two Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bac Secretariat Office At 2nd Floor, Left Wing, New Municipal Hall Building, Escandor Road, Municipality Of Sta. Cruz, Davao Del Sur And Inspect The Bidding Documents At The Address During Weekdays Starting From 8:00 O’clock In The Morning To 5:00 O’clock In The Afternoon. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On February 19, 2025 From The Given Address Below And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of One Thousand (1000.00) Pesos. 6. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before 9:30 O’clock In The Morning February 26, 2025. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 8. Bid Opening Shall Be On 9:40 O’clock In The Morning Of February 26, 2025 At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 9. The Local Government Of Unit Of Sta. Cruz, Davao Del Sur Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Ommi Kharsom L. Buat Bac Secretariat Left Win, 2nd Level, New Municipal Hall Local Government Center, Zone Iii, Sta. Cruz, Davao Del Sur. 09107650089 - E-mail Address:bac5stacruz@gmail.com Engr. Ray R. Sealana Bac Chairperson, Masso
2261-2270 of 2295 archived Tenders