Philippine Economic Zone Authority Tender
Philippine Economic Zone Authority - PEZA Tender
Costs
Summary
Supply And Delivery Of Survey Equipment , Engineering And Laboratory Testing Equipment ,philippine Economic Zone Authority - Baguio City Ecozone
Description
Description Republic Of The Philippines Philippine Economic Zone Authority Baguio City Economic Zone Bids And Awards Committee Loakan Road, Baguio City 2600 Request For Quotations The Philippine Economic Zone Authority – Baguio City Economic Zone (peza-bcez) Through Its Bids And Awards Committee (bac), Invites All Interested Suppliers/bidders To Offer Their Lowest Government Price For The Following Project: Mode Of Procurement : Small Value Procurement Reference No. : Bcezproc2025-11 Name Of Project : Supply And Delivery Of Survey Equipment Total Approved Budget For The Contract (abc) : Php 990,000.00 Location/place Of Delivery : Peza- Bcez Loakan Road, Baguio City Specifications: : See Attached Annex “a” Deadline Of Submission : January 31, 2025, 10:00 Am Delivery Period : Within Seven (7) Calendar Days Upon Receipt Of Purchase Order Interested Bidders/suppliers Are Required To Submit Their Duly Accomplished Price Quotation Forms (annex “a”) On Or Before The Specified Deadline To The Bac Secretariat, Located At The 1/f Peza-bcez Administration Bldg., Loakan Road, Baguio City. Submissions May Be Made Either As Open Or Sealed Quotations. For Open Quotations, Submissions Shall Be Sent Via Email To Bcezbacsec@peza.gov.ph Or Thru Facsimile At (074) 447- 3330/ 447-4154. Please Note That Electronic Submissions Sent To Any Other Email Address Other Than The One Specified Will Not Be Accepted. Consistent With Appendix A Of The Rules (annex “h” Of The Ra 9184 2016 Implementing Rules And Regulations), The Bcez-bac Requires That The Necessary Documentary Requirements Shall Be Submitted By The Lowest/single Calculated Bidder Prior Issuance Of The Notice Of Award: Awarding Of The Contract Will Be Done As One Lot. Further, Award Of Contract Shall Be Made To The Bidder Who Made The Lowest Calculated Quotation Which Complies With The Minimum Technical Specifications (annex A) And General Terms And Conditions (annex B). For Awarded Infrastructure Projects, The Winning Bidder/s Are Required To Submit A Safety & Health Program Approved By Dole Prior To The Issuance Of The Notice Of Award. For Further Inquiries, You May Contact The Peza-bcez Bac Secretariat At Telephone Numbers (074) 447-4155/3333 Or Via Email At Bcezbacsec@peza.gov.ph. The Peza-bcez Bac Reserves The Right To Reject Any Or All Bids, Waive Any Informality In The Bids Received, To Accept Or Reject Any Item/s Of Any Bid And To Make An Award To The Bidder Whose Proposal Is Most Advantageous To The Government. The Peza Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Expenses Incurred In The Preparation Of Their Price Quotations/proposals.annex A Price Quotation Form Reference No. Bcezproc2025-11 The Chairperson Bids And Awards Committee Philippine Economic Zone Authority Baguio City Economic Zone Loakan Road, Baguio City Thru : Bac Secretariat Peza-bcez Dear Sir/madam: After Having Carefully Read And Accepted The Terms And Conditions Of This Request For Quotation (rfq) And Followed The Instructions To Bidders Specified In Annex B, We Wish To Submit Our Quotation/s For The Following Items: ** Please Note That It Is Required To Specify The Brand, Or Model, Or Technical Specifications Of The Product/item. For Items Without Brands (e.g. Sand, Gravel, Nails, Walis Tambo, Etc… ), Please Write The Word “comply”. Item No. Total Abc (in Php) Unit Qty. Peza-bcez Specifications Bidder’s Offer (tech. Spec/ Model No., If Applicable) Unit Price (php) Total Price (php) ₱990,000.00 Lot 1 Supply And Delivery Of Survey Equipment (rtk) Part A. Supply And Delivery Of Global Navigation Satellite System (gnss) Real Time Kinematics (rtk) 1 Set 1 Gnss Rtk Set With Case, Manual, And Complete Accessories - 1 Pc. Base - 1 Pc. Rover - 1 Pc. Android Rtk Controller - 1 Pc. Carbon Fiber Pole - 1 Pc. Tribrach - 1 Pc. Heavy Tripod - 1 Pc. Clip Tripod - 1 Pc. Pole Battery - 2 Pcs. Charger - 2 Pcs. Antenna - 2 Pcs. Two - Way Radio Part B. Rover Specification Gnss Performance - Gps: L1c/a, L2c, L2p, L5 - Glonass: L1, L2 - Bds: B1, B1c, B2, B2a, B2b, B3 - Galileo: E1, E5a, E5b, E6 - Qzss: L1, L2, L5, L6 - Sbas: Waas, Egnos, Msas, Gagan, Sdcm - Minimum Of 1408 Tracking Channels - Cold Start: <60s - Hot Start: <15s - Positioning Output Rate: 1hz - 50hz - Signal Reacquisition: <1s - Rtk Initialization Time: <5s - Initialization Reliability: >99.99% - Time Accuracy: 20ns 3 Of 6 Bcezproc2025-11 Positioning Accuracy Code Differential H: 0.25m To 0.40m Rms V: 0.50m To 0.80m Rms Static H: 2.5mm + 0.5ppm Rms V: 5mm + 0.5ppm Rms Rtk H: 8mm + 1ppm Rms V: 15mm + 1ppm Rms Network Rtk H: 8mm + 0.5ppm Rms V: 15mm + 0.5ppm Rms Physical Material Magnesium Alloy Dimensions ɸ 120mm - 140mm X 80mm - 100mm Weight Less Than 1kg Operating Temperature -20℃ ~ +60℃ Storage Temperature -20℃ ~ +70℃ Protection / Dustproof / Waterproof Ip67, Protected From 30min Immersion To Depth Of 1m From Water Shock/drop Survive A 2m Pole Drop Onto Concrete Humidity 95% Non-condensation 1 Electrical And Communications Power Supply 9~24v Dc External Power Input Battery Built-in 7000mah-7.4v Liion Battery Battery Life Rover Mode: Min. Of 12hours Base Mode: Min. Of 7hours Static Mode: Min. Of 15hours I/o Interface 1 X Lemo Port 1 X Usb Type-c Port 1 X Sim Card Slot, Nano Sim 1 X Uhf Antenna Interface Internal Uhf 1w - 5w Transmit Power Protocols Trimtalk, Alphatalk, South, Satel Cellular Network 4g Modem, Supports Tdd - Lte / Fdd - Lte / Wcdma Wifi 802.11 B/g Bluetooth Capable Differential Data Format Rtcm2x, Rtcm3x, Cmr Sensor Accuracy <2.5cm Tilt Compensation At Least 60° 4 Of 6 Bcezproc2025-11 Camera Front Camera 2mp Downward Camera 5mp Fov At Least 70° Laser Laser Measurement ±1cm + 5mm/m Data Storage Memory At Least 32gb User Interaction Operating System Linux Os Buttons Power Key Indicators 1 X Power Indicator 1 X Bluetooth Indicator 1 X Satellite Indicator 1 X Data Link Indicator Voice Intelligent Voice Prompts Part C. Inclusion - Delivery Of Equipment Within 7 Calendar Days - Initial Set-up And Tuning (ready To Use) - 2 - Years (24 Months) Warranty For The Whole Unit (except For Accessories) - Technical Support And Services: Diagnosis, Repair, Corrections, Calibrations, Availability Of Spare Parts (subject To Labor Charges) - 1 - 3 Days Training - Familiarization Of Gnss Rtk (operation Of Equipment) - Field, Autocad, And Civil 3d - Civil 3d 2021 Tutorial - Importing Of Survey Points - Defining Scale Of The Drawing Base On The Title Block 20" X 30" - Defining The Size And Text Height Of The Point Marker And Point Label - Surface Generation (contour Data And Contour Interval) - Editing Of Surface - Contour Labeling - Spot Elevation - Object Viewer (3d Terrain View) - Alignment , Profile, And Cross Sections - Volume Computation (cut And Fill) - Geolocation (on Line Map) - Google Earth (kml/kmz File) - Autocad Tutorial - Lot Data Computations In Ms Word Format - Lot Descriptions - Lmb Approval Plan - Lra Plan - Sketch Plan On Standard Format - Automatic Sketch Plan On Bond Paper Size, Mostly Used In Loan Application, Advance Copy Of Plan For Your Client. - Traverse Computations - Field Notes Inside And Setting Computation - Importing Of Csv File (rtk) 5 Of 6 Bcezproc2025-11 Note To The Bidder: Kindly Ensure The Submission Of The Following Documents Along With Your Quotation: 1. Valid And Current Mayor’s Permit Or Proof Of Schedule For Renewal. 2. Philgeps Registration Number **inclusive Of Vat/ Applicable Taxes, Fees, And Charges** X X X Nothing Follows X X X __________________________________________ ____________ Printed Name And Signature Of Authorized Representative Date Bidder/supplier’s Information: Company Name Address: Tel/fax No. Email Address: ________________________________ Name And Signature Of Canvasser 6 Of 6 Bcezproc2025-11 Annex B General Terms And Conditions 1. Price Validity. Price Validity Shall Be Thirty (30) Calendar Days From The Deadline Of Submission Of Quotation; 2. Price Escalation. All Prices For The Given Scope Of Work In The Contract As Awarded Shall Be Considered Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation; 3. Alternative Bids. Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding; 4. Taxes. Prices Shall Be Inclusive Of Applicable Taxes (vat Or Percentage). Total Price Quoted Is Subject To Withholding Tax And Payable Through Check; 5. Delivery Period: Seven (7) Calendar Days Upon Receipt Of Purchase Order. 6. Delivery Terms: For Goods Supplied From Abroad, The Delivery Terms Applicable To The Contract Are Ddp Delivered To Baguio City Economic Zone, Baguio City, While For Goods Supplied From Within The Philippines, The Delivery Terms Applicable To The Contract Are Delivered To Baguio City Economic Zone, Baguio City. “risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At The Final Destination.” 7. Incidental Charges And Services. The Cost Of Transportation, Insurance, And Other Cost, Including Packaging And Documentation Incidental To Delivery Of The Goods And/or Services Shall Be Included In The Price Quoted By The Bidder. An Additional Or Separate Delivery Charge In The Bid Shall Be Treated As Non-responsive And Shall Be Rejected. 8. Term Of Payment. Payment Shall Be Charged Account. Cash On Delivery (cod) Shall Not Be Allowed, Unless Specified In The Quotation And Accepted During Bid Evaluation. Most Importantly, No Payment Shall Be Made Until Full Delivery Of Item/s And/or Services Is/are Completed And The Same Is/are Inspected And Satisfactorily Accepted By Peza-bcez. 9. Performance Security. For Procurement Of Goods And/or Services, Peza May Require The Submission Of A Performance Security Depending On The Nature Of The Procurement Project. However, For Infrastructure Projects, Submission Of A Performance Security Is Required By Peza. The Amount Of The Performance Security Shall Not Be Less Than The Required Percentage Of The Total Contract As Provided Under Section 39 Rule Xi Of The 2016 Revised Irr Of Ra 9184. 10. Warranty And Retention Money. Supplier/contractor Warrants That All Goods/services To Be Provided Are Of Acceptable Industry Standard. Whenever Applicable, The Obligation For The Warranty Shall Be Covered By Either Retention Money In An Amount Equivalent To At Least One Percent (1%) Of Every Progress Payment, Or A Special Bank Guarantee Equivalent To At Least One Percent (1%) But Not To Exceed Five Percent (5%) Of The Total Contract Price. The Said Amounts Shall Only Be Released After The Lapse Of The Prescribed Warranty Period Or, In The Case Of Expendable Supplies, After Consumption Thereof; Provided, However, That The Supplies Delivered Are Free From Patent And Latent Defects And All The Conditions Imposed Under The Contract Have Been Fully Met. (gppb Resolution No. 30-2017 Dated 30 May 2017) 11. Liquidated Damages. Delay In The Delivery Shall Be Subject To Liquidated Damages By Way Of Penalty At 1/10 Of 1% Of Each Day Of Delay Reckoned From The Day After The Last Day Of The Delivery Period Or The Agreed Date Of Delivery, Whichever Is Applicable. 12. Alteration Or Technical Specifications And Terms And Conditions. Altering And/or Amending The Technical Specifications And Terms And Condition(s) May Be Considered Non-responsive/ Non-compliant. Instructions To Bidders: A) Completely Fill Out The Price Quotation Form (annex B), Technical Specification/brand (if Applicable), Unit/ Total Price And Supplier/bidder’s Information. Do Not Forget To Sign The Price Quotation Form (annex A). Whenever Applicable, Original Brochures Or Certificates Of The Items Offered Showing Its Performance Characteristics Or Specifications, Shall Be Attached And Submitted Together With The Price Quotation Form. B) If Applicable, An Ocular Inspection, In Coordination With The End-user And Bcez-bac, Shall Be Conducted By The Interested Bidder Of The Premises/area Subject Of Herein Procurement Process
Contact
Tender Id
201ddd85-466e-345c-a5e3-5028b129bab2Tender No
11698357Tender Authority
Philippine Economic Zone Authority ViewPurchaser Address
-Website
http://www.peza.gov.ph/