Tenders of Offizielle Bezeichnung
Tenders of Offizielle Bezeichnung
Offizielle Bezeichnung Tender
Germany
Contract notice – Sector Directive, standard arrangements Negotiated procedure with prior publication of a call for competition/negotiated procedure (services) Planning services for conversion and extension work in the workshop area Comprehensive planning services etc. for conversion and extension work in the workshop area on the company premises at Sandershäuser Straße 23 in Kassel.
Closing Date8 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
Contract notice - General guideline, standard regulation Open procedure (services) Event area cleaning Organisation and implementation of cleaning before, during and after the Hessentag 2025 (from June 13th to June 22nd, 2025) in Bad Vilbel Waste management Organisation and implementation of cleaning before ... Multiorganisation and implementation of cleaning before, during and after the Hessentag 2025 (from June 13th to June 22nd, 2025) in Bad Vilbel Waste management Organisation and implementation of cleaning before, during and after the Hessentag 2025 (from June 13th to June 22nd, 2025) in Bad Vilbel
Closing Date8 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
Contract notice – general guideline, standard rule open procedure (construction work) Kasseler Verkehrs-gesellschaft Aktiengesellschaft – civil engineering work, renovation of the Königstor rectifier substation Since extensive reconstruction and renovation measures are planned for the buildings and areas at the Königstor group location in the near future and therefore installation at a permanent location on the site is not possible, the rectifier substation is to be erected as a temporary solution in a container. Part of this tendering procedure are the civil engineering work required to implement the project, as well as concrete, reinforced concrete and steel construction work for the support or to make the container accessible. To connect the rails (current return) to the new rectifier substation, a cross-over into the existing line on the KVV site is planned. The following services are to be provided: soil excavation approx. 200 m³, paving and slab work approx. 165 m², concrete work foundations and supports approx. 12 m³, supply and installation of empty cable pipes approx. 150.00 m, drainage, installation of 6-part trench, associated demolition, steel construction and drainage work and the installation of cable shafts, the total scope of the civil engineering and road construction work is shown in the attached site plan. Pure cable laying, connection or cable pulling work are not part of this tendering process.
Closing Date2 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
Auftragsbekanntmachung – Allgemeine Richtlinie, Standardregelung Offenes Verfahren (lieferungen) Cryo-coolers (cryogenic Stopping Cell) Production, Test And Delivery Of 16 Cryo Coolers Of Equal. The Construction Drawings Of All Four Different Types Are Finished And Approved. The Complete Scope Is Shown Within The Detailed Specificatio ... Mehrproduction, Test And Delivery Of 16 Cryo Coolers Of Equal. The Construction Drawings Of All Four Different Types Are Finished And Approved. The Complete Scope Is Shown Within The Detailed Specification.
Closing Date1 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
Contract notice - General guideline, standard rule Open procedure (services) Lot 1 (hls): Technical equipment, system groups 1, 2 and 3. Project description: The city of Groß-Gerau would like to expand the currently 2-stream "Mühlbach" daycare center with a new building in order to increase its capacity. The neighboring property is to be used for the outdoor facilities in the future and an extension is to be built on the area of the current outdoor facility. There is a canal on the property which cannot be built over, which means that the possible building window is not very flexible. Preliminary planning has already been drawn up, but this can only be assessed as proof of principle of feasibility. In order to shorten the local construction time, the work is to be carried out using modular construction (preferably wood hybrid or wood construction), which is why it is to be carried out by commissioning a general contractor. A planning team is now to be found in several tendering procedures which will implement the project across all performance phases and also take over the interfaces with the general contractor. +++ Scope of services for lot 1 (hls): Technical equipment for phases 1-9 in accordance with Sections 53 ff. Hoai, system groups 1, 2 and 3, with adapted performance profile due to general contractor award (see attachments for details). +++ A phased contract is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: The following eligible costs are currently roughly assumed in accordance with the Hoai: Kg 300: approx. €1,349,000 net, Kg 410 to 430: approx. €225,000 net, Kg 440 to 450: approx. €156,000 net. Lot 2 (elt): technical equipment, system groups 4 and 5. Project description: The city of Groß-Gerau would like to expand the currently 2-stream "Mühlbach" daycare center with a new building in order to increase its capacity. The neighboring property is to be used for the outdoor facilities in the future and an extension is to be built on the area of the current outdoor facility. A canal runs across the property which cannot be built over, which means that the possible building window is not very flexible. Preliminary planning has already been drawn up, but this is only to be viewed as proof of principle of feasibility. In order to shorten the local construction time, the implementation is to take place using modular construction (preferably wood hybrid or wood construction), which is why the execution is to be carried out under contract from a general contractor. A planning team is now to be found in several tendering procedures which will implement the project across all performance phases and also take over the interfaces with the general contractor. +++ Scope of services for lot 2 (elt): Technical equipment for Lph 1-9 in accordance with Sections 53 ff. Hoai, system groups 4 and 5, with adapted performance profile due to general contractor award (see attachments for details). +++ A phased commissioning is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: Currently, based on the project study, the following eligible costs are roughly assumed in accordance with Hoai: Kg 300: approx. 1,349,000 €, Kg 410 to 430: approx. 225,000 €, Kg 440 to 450: approx. 156,000 €.
Closing Date1 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
9,980.00 m² (filling, priming, double coat of wall) Ceiling coating Approx. 560.00 m² (filling, priming, double coat of ceiling) Coating of steel frames Approx. 117.00 pcs Coating of steel stair railings Approx. 305.00 m Coating of steel doors Approx. 115.00 M² Pipeline coating Approx. 1,050.00 M PU wall coating Approx. 500.00 M²
Closing Date1 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
Contract notice – general guidelines, standard rules, open procedure (construction work) Veste Otzberg – carpentry work, new building Veste Otzberg, Otzberg-hering, complete renovation of Veste Otzberg Here: carpentry work (timber frame construction/standard buildings) (work in a listed area! – Special feature: restricted access!) ... Moreveste Otzberg, Otzberg-hering, complete renovation of Veste Otzberg Here: carpentry work (timber frame construction/standard buildings) (work in a listed area! – Special feature: restricted access!) The service being put out to tender involves the following partial services of the overall service: – timber frame construction, outbuilding Tech. 12 – timber frame construction, outbuilding Tech. 13 - Timber frame construction of commercial buildings 10 and 11 (kiosk and new toilet) - Timber frame construction of commander's house (within a historic building) - Keep (facade and roof work on the initial building) The LV includes, among other things: - Approx. 13m³ KVH timber - Approx. 5m³ BSH timber (industrial quality) - Approx. 1m³ BSH timber (select quality) - Approx. 620m joinery/installation - Approx. 226m² wall elements in timber frame construction - Approx. 174m² mineral insulation for walls and DWD facade panels - Approx. 100m² mineral roof insulation including variable vapor barrier. - Approx. 19m² roof boarding OSB3 - 22mm - Approx. 100m² roof boarding S10 - 24mm - Approx. 32m² laminated veneer lumber panels (for several parts of the building) - Approx. 280m² facade boarding: open, vertical larch wood battens, battens of different widths and depths, on base battens, including door and gate cladding. - Approx. 21m² HPL facade cladding, including ceiling soffits - Approx. 35m² wall elements, timber frame construction inside the building - Approx. 12m² ceiling element, timber frame construction inside the building
Closing Date2 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
Contract notice - general guideline, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (supplies) Setup S3 Storage Ekom21 is the largest municipal IT service provider in Hesse and is one of the three largest BSI-certified municipal IT service providers in Germany. The approximately 500 mi ... MoreEkom21 is the largest municipal IT service provider in Hesse and is one of the three largest BSI-certified municipal IT service providers in Germany. The approximately 500 members in Hesse and other customers nationwide include around 29,000 end users from municipal administrations and other public institutions, such as districts, cities, municipalities, municipally owned companies, special purpose associations, institutions, hospitals and homes. In the public sector, Ekom21 looks after numerous state associations, ministries and regional councils. Ekom21 maintains its central data center at the Kassel location. As part of this procurement, a new storage architecture is to be set up in order to better support the increased demands of IT processes and new services. The subject of the negotiation procedure includes the provision and implementation of storage systems and the associated switches. The system will be deployed in Kassel. The procurement aims to implement a high-performance and future-proof storage solution that meets the growing requirements.
Closing Date2 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
Contract notice - General guideline, standard rule Open procedure (services) Lot 1 (hls): Technical equipment, plant groups 1, 2 and 3. Project description: The city of Groß-Gerau would like to clear a still-developed plot of land and then build a new daycare center for children aged 3-6 on it. The currently existing border development cannot be retained. A feasibility study was already drawn up in 2023, which confirmed that the implementation was positive. The new building is to be built using modular construction and therefore commissioned by a general contractor. Now, in several tendering procedures, a planning team is to be found which will implement the project across all performance phases and also take over the interfaces with the general contractor. The existing study is to be understood as a fundamental review of feasibility; no concrete planning or coordination was carried out. +++ Scope of services for lot 1 (hls): Technical equipment for phases 1-9 in accordance with Sections 53 ff. of the Hoai, system groups 1, 2 and 3, with adapted scope of services due to general contract award (see attachments for details). +++ A phased contract is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: Based on the project study, the following eligible costs are currently roughly assumed in accordance with Hoai: Kg 300: approx. €2.4 million, Kg 410 to 430: approx. €480,000, Kg 440 to 460: approx. €330,000. Lot 2 (elt): Technical equipment, system groups 4, 5 and 6. Project description: The city of Groß-Gerau would like to clear a plot of land that is still being built on and then redevelop it with a daycare center for children aged 3-6. The current border development cannot be retained. A feasibility study was already drawn up in 2023, which confirmed the implementation positively. The new building is to be built using modular construction and is therefore to be commissioned by a general contractor. Now, in several tendering procedures, a planning team is to be found which will implement the project across all performance phases and also take over the interfaces with the general contractor. The existing study is to be understood as a fundamental review of feasibility; no concrete planning or coordination was carried out. +++ Scope of services for lot 2 (elt): Technical equipment for phases 1-9 in accordance with Sections 53 ff. Hoai, system groups 4, 5 and 6, with adapted performance profile due to general contractor award (see attachments for details). +++ A phased contract is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: Based on the project study, the following eligible costs are currently assumed in accordance with the Hoai: Kg 300: approx. €2.4 million, Kg 410 to 430: approx. €480,000, Kg 440 to 460: approx. €330,000.
Closing Date1 Oct 2024
Tender AmountRefer Documents
311-320 of 362 archived Tenders