Tenders of Offizielle Bezeichnung

Tenders of Offizielle Bezeichnung

Offizielle Bezeichnung Tender

Germany
Closing Date27 Sep 2024
Tender AmountRefer Documents 
Contract notice – Sector Directive, standard arrangement Open procedure (supplies) Supply of battery-electric ground power devices Supply of 8 battery-electric ground power devices. The devices will be called off when the contract is awarded, the contract to be concluded ends after the last partial quantity has been delivered.

Offizielle Bezeichnung Tender

Germany
Closing Date7 Oct 2024
Tender AmountRefer Documents 
Contract notice – general guideline, standard regulation, open procedure (construction work) shell construction and demolition work – Waldschule, Obertshausen. The detailed work can be found in the contract document.

Offizielle Bezeichnung Tender

Germany
Closing Date7 Oct 2024
Tender AmountRefer Documents 
Contract notice – general guideline, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (services) Extension of the Karl-Gärtner School, Wiesbaden; Object planning of outdoor facilities / Lph 2 - 9 Basics: The Karl-Gärtner School at Wilhelm-Dietz-Strasse 5 is located on the outskirts north of Delkenheim, on a bend in the Wickerbach in a natural landscape with old trees. The ... More basics: The Karl-Gärtner School at Wilhelm-Dietz-Strasse 5 is located on the outskirts north of Delkenheim, on a bend in the Wickerbach in a natural landscape with old trees. The school property of the Karl-Gärtner School (plot no. 1/6) has a size of 21,178 m². The school complex, which is a listed cultural monument in accordance with Section 2 Paragraph 1 of the Hdschg, was built in two phases between 1963 and 1967 by the architect Daniel Jourdan. The loosely grouped one- and two-storey, flat-roofed pavilions in reinforced concrete construction with reddish-brown clinker bricks are connected to one another via walkways and spatially enclose the school yard. The school complex consists of a main building (old building) with an adjoining administration wing and cafeteria, a toilet building, a classroom wing (new building), a pavilion building, a school gym, a youth traffic school including a workshop (see attachments). The demolition of the school gym and the construction of a new double sports hall with a club extension as well as the restructuring of the administration are currently being planned. Subject of the service to be commissioned: Object planning of outdoor facilities in accordance with Hoai 2013, in the 2021 version, Part 3, Section 2, §§ 38-40, service phases 2-9 basic services. In addition, the special services from Appendix 11 to Section 39 Paragraph 4, Section 40 Paragraph 5 in accordance with the partial service table as an appendix to the draft contract (appendix 02d). The basic services of service phases 2 - 9 are remunerated on the basis of Hoai 2021. It is permissible to fall below the minimum rates or exceed the maximum rates. These are to be stated as a percentage and explained in the cover letter if necessary. Further detailed information about the services to be commissioned can be found in the attached task and service description and associated appendices (appendix 02a). Other planning services are not the subject of this tendering procedure. The special services are remunerated at a flat rate based on the offer you have submitted. Options: A step-by-step service call-up (options) will take place, subject to the committee resolutions on the further implementation of the project and the decision of the Ag in the further course of the project: Stage I: Lph 2-5, Stage II: Lph 6-9 With the award of the contract in this tendering procedure, the following services will initially be called up: Stage I: Lph 2-5 The contractor has no right to call up individual and/or all stages and cannot derive any further claims (e.g. for damages or fee increases) from non-calling. Schedule for service provision: Start of service provision: Immediately after completion of the procedure approx. November/December 2024 Completion of service phase 3: approx. March 2025 (= provision of documents for the plausibility check) Completion of plausibility check: approx. June 2025 Start of construction: approx. February 2026 Completion ready for occupancy: approx. July 2027

Offizielle Bezeichnung Tender

Germany
Closing Date1 Oct 2024
Tender AmountRefer Documents 
Auftragsbekanntmachung – Allgemeine Richtlinie, Standardregelung Offenes Verfahren (lieferungen) Cryo-coolers (cryogenic Stopping Cell) Production, Test And Delivery Of 16 Cryo Coolers Of Equal. The Construction Drawings Of All Four Different Types Are Finished And Approved. The Complete Scope Is Shown Within The Detailed Specificatio ... Mehrproduction, Test And Delivery Of 16 Cryo Coolers Of Equal. The Construction Drawings Of All Four Different Types Are Finished And Approved. The Complete Scope Is Shown Within The Detailed Specification.

Offizielle Bezeichnung Tender

Germany
Closing Date1 Oct 2024
Tender AmountRefer Documents 
Contract notice - General guideline, standard rule Open procedure (services) Lot 1 (hls): Technical equipment, system groups 1, 2 and 3. Project description: The city of Groß-Gerau would like to expand the currently 2-stream "Mühlbach" daycare center with a new building in order to increase its capacity. The neighboring property is to be used for the outdoor facilities in the future and an extension is to be built on the area of the current outdoor facility. There is a canal on the property which cannot be built over, which means that the possible building window is not very flexible. Preliminary planning has already been drawn up, but this can only be assessed as proof of principle of feasibility. In order to shorten the local construction time, the work is to be carried out using modular construction (preferably wood hybrid or wood construction), which is why it is to be carried out by commissioning a general contractor. A planning team is now to be found in several tendering procedures which will implement the project across all performance phases and also take over the interfaces with the general contractor. +++ Scope of services for lot 1 (hls): Technical equipment for phases 1-9 in accordance with Sections 53 ff. Hoai, system groups 1, 2 and 3, with adapted performance profile due to general contractor award (see attachments for details). +++ A phased contract is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: The following eligible costs are currently roughly assumed in accordance with the Hoai: Kg 300: approx. €1,349,000 net, Kg 410 to 430: approx. €225,000 net, Kg 440 to 450: approx. €156,000 net. Lot 2 (elt): technical equipment, system groups 4 and 5. Project description: The city of Groß-Gerau would like to expand the currently 2-stream "Mühlbach" daycare center with a new building in order to increase its capacity. The neighboring property is to be used for the outdoor facilities in the future and an extension is to be built on the area of the current outdoor facility. A canal runs across the property which cannot be built over, which means that the possible building window is not very flexible. Preliminary planning has already been drawn up, but this is only to be viewed as proof of principle of feasibility. In order to shorten the local construction time, the implementation is to take place using modular construction (preferably wood hybrid or wood construction), which is why the execution is to be carried out under contract from a general contractor. A planning team is now to be found in several tendering procedures which will implement the project across all performance phases and also take over the interfaces with the general contractor. +++ Scope of services for lot 2 (elt): Technical equipment for Lph 1-9 in accordance with Sections 53 ff. Hoai, system groups 4 and 5, with adapted performance profile due to general contractor award (see attachments for details). +++ A phased commissioning is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: Currently, based on the project study, the following eligible costs are roughly assumed in accordance with Hoai: Kg 300: approx. 1,349,000 €, Kg 410 to 430: approx. 225,000 €, Kg 440 to 450: approx. 156,000 €.

Offizielle Bezeichnung Tender

Germany
Closing Date1 Oct 2024
Tender AmountRefer Documents 
9,980.00 m² (filling, priming, double coat of wall) Ceiling coating Approx. 560.00 m² (filling, priming, double coat of ceiling) Coating of steel frames Approx. 117.00 pcs Coating of steel stair railings Approx. 305.00 m Coating of steel doors Approx. 115.00 M² Pipeline coating Approx. 1,050.00 M PU wall coating Approx. 500.00 M²

Offizielle Bezeichnung Tender

Germany
Closing Date2 Oct 2024
Tender AmountRefer Documents 
Contract notice – general guideline, standard rule open procedure (construction work) Kasseler Verkehrs-gesellschaft Aktiengesellschaft – civil engineering work, renovation of the Königstor rectifier substation Since extensive reconstruction and renovation measures are planned for the buildings and areas at the Königstor group location in the near future and therefore installation at a permanent location on the site is not possible, the rectifier substation is to be erected as a temporary solution in a container. Part of this tendering procedure are the civil engineering work required to implement the project, as well as concrete, reinforced concrete and steel construction work for the support or to make the container accessible. To connect the rails (current return) to the new rectifier substation, a cross-over into the existing line on the KVV site is planned. The following services are to be provided: soil excavation approx. 200 m³, paving and slab work approx. 165 m², concrete work foundations and supports approx. 12 m³, supply and installation of empty cable pipes approx. 150.00 m, drainage, installation of 6-part trench, associated demolition, steel construction and drainage work and the installation of cable shafts, the total scope of the civil engineering and road construction work is shown in the attached site plan. Pure cable laying, connection or cable pulling work are not part of this tendering process.

Offizielle Bezeichnung Tender

Germany
Closing Date1 Oct 2024
Tender AmountRefer Documents 
Contract notice - General guideline, standard regulation Restricted procedure (services) Engineering services Bw 028, Deutschherrnbrücke, repair of pedestrian bridge: - Lph. 1 - 9 in accordance with § 43 Hoai plus various special services - Lph. 1 - 6 in accordance with § 51 Hoai plus various special services (gradual ... Mehrbw 028, Deutschherrnbrücke, repair of pedestrian bridge: - Lph. 1 - 9 in accordance with § 43 Hoai plus various special services - Lph. 1 - 6 in accordance with § 51 Hoai plus various special services (gradual commissioning, thus partly optional services)

Offizielle Bezeichnung Tender

Germany
Closing Date1 Oct 2024
Tender AmountRefer Documents 
Contract notice - General guideline, standard rule Open procedure (services) Lot 1 (hls): Technical equipment, plant groups 1, 2 and 3. Project description: The city of Groß-Gerau would like to clear a still-developed plot of land and then build a new daycare center for children aged 3-6 on it. The currently existing border development cannot be retained. A feasibility study was already drawn up in 2023, which confirmed that the implementation was positive. The new building is to be built using modular construction and therefore commissioned by a general contractor. Now, in several tendering procedures, a planning team is to be found which will implement the project across all performance phases and also take over the interfaces with the general contractor. The existing study is to be understood as a fundamental review of feasibility; no concrete planning or coordination was carried out. +++ Scope of services for lot 1 (hls): Technical equipment for phases 1-9 in accordance with Sections 53 ff. of the Hoai, system groups 1, 2 and 3, with adapted scope of services due to general contract award (see attachments for details). +++ A phased contract is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: Based on the project study, the following eligible costs are currently roughly assumed in accordance with Hoai: Kg 300: approx. €2.4 million, Kg 410 to 430: approx. €480,000, Kg 440 to 460: approx. €330,000. Lot 2 (elt): Technical equipment, system groups 4, 5 and 6. Project description: The city of Groß-Gerau would like to clear a plot of land that is still being built on and then redevelop it with a daycare center for children aged 3-6. The current border development cannot be retained. A feasibility study was already drawn up in 2023, which confirmed the implementation positively. The new building is to be built using modular construction and is therefore to be commissioned by a general contractor. Now, in several tendering procedures, a planning team is to be found which will implement the project across all performance phases and also take over the interfaces with the general contractor. The existing study is to be understood as a fundamental review of feasibility; no concrete planning or coordination was carried out. +++ Scope of services for lot 2 (elt): Technical equipment for phases 1-9 in accordance with Sections 53 ff. Hoai, system groups 4, 5 and 6, with adapted performance profile due to general contractor award (see attachments for details). +++ A phased contract is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: Based on the project study, the following eligible costs are currently assumed in accordance with the Hoai: Kg 300: approx. €2.4 million, Kg 410 to 430: approx. €480,000, Kg 440 to 460: approx. €330,000.

Offizielle Bezeichnung Tender

Germany
Closing Date2 Oct 2024
Tender AmountRefer Documents 
Contract notice - general guideline, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (supplies) Setup S3 Storage Ekom21 is the largest municipal IT service provider in Hesse and is one of the three largest BSI-certified municipal IT service providers in Germany. The approximately 500 mi ... MoreEkom21 is the largest municipal IT service provider in Hesse and is one of the three largest BSI-certified municipal IT service providers in Germany. The approximately 500 members in Hesse and other customers nationwide include around 29,000 end users from municipal administrations and other public institutions, such as districts, cities, municipalities, municipally owned companies, special purpose associations, institutions, hospitals and homes. In the public sector, Ekom21 looks after numerous state associations, ministries and regional councils. Ekom21 maintains its central data center at the Kassel location. As part of this procurement, a new storage architecture is to be set up in order to better support the increased demands of IT processes and new services. The subject of the negotiation procedure includes the provision and implementation of storage systems and the associated switches. The system will be deployed in Kassel. The procurement aims to implement a high-performance and future-proof storage solution that meets the growing requirements.
301-310 of 362 archived Tenders