Tenders of Offizielle Bezeichnung

Tenders of Offizielle Bezeichnung

Offizielle Bezeichnung Tender

Textile, Apparel and Footwear
Germany
Closing Date20 Jan 2025
Tender AmountRefer Documents 
Contract notice – general guideline, standard rule open procedure (construction work) General renovation of the Heppenheim district hospital – disposal of hazardous substances, gutting, demolition of component G. Disposal of hazardous substances, demolition work and excavation pit for component G of the general renovation of the K... Multi-general renovation of the Heppenheim district hospital – disposal of hazardous substances, gutting, demolition of component G. Disposal of hazardous substances, demolition work and excavation pit for component G of the general renovation of the Heppenheim district hospital. General renovation of the Heppenheim district hospital – disposal of hazardous substances, gutting, demolition of component G. Disposal of hazardous substances, demolition work and excavation pit for component G of the general renovation of the Heppenheim district hospital.

Offizielle Bezeichnung Tender

Others
Germany
Closing Date20 Jan 2025
Tender AmountRefer Documents 
Contract notice - general guideline, standard regulation, open procedure (construction work) Air conditioning systems DIN 18379 Air conditioning systems (DIN 18 379); Air conditioning systems DIN 18379 Installation of the ventilation technology in the building for toilets and adjoining rooms, lecture halls and small ... Multi-room air conditioning systems DIN 18379 Air conditioning systems (DIN 18 379); Air conditioning systems DIN 18379 Installation of the ventilation technology in the building for toilets and adjoining rooms, lecture halls and small laboratory areas. The listed building is being completely renovated and an extension is being added. The dismantling and pollutant remediation of the existing building has already taken place. Execution of ventilation installation consisting of air conditioning systems in the basement and on the roof including duct network, fire dampers and air outlets. The ventilation of the interior ancillary rooms and toilet areas is carried out by two air conditioning systems with heat recovery and heaters, each with approx. 1,000 m³/h, and smaller individual fans. The ventilation of the lecture hall is carried out by an air conditioning system with heat recovery and heating and cooling functions with approx. 4,000 m³/h. The laboratory areas are mechanically ventilated by two air conditioning systems with heat recovery and heating and cooling functions with approx. 5,500 m³/h and 6,80 m³/h. In addition, two special exhaust fans with approx. 1,000 m³/h and 1,500 m³/h with the associated plastic duct network are planned.

Offizielle Bezeichnung Tender

Others...+1Civil And Construction
Germany
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Contract notice – General guideline, standard regulation Open procedure (supplies) Karl-kübel- School, Bensheim - New building furniture - Scientific teaching materials and teaching equipment, Natural sciences department Karl-kübel- School, Bensheim - New building furniture - Scientific teaching materials and teaching equipment, Natural sciences department Karl-kübel- School, Bensheim - New building furniture - Scientific teaching materials and teaching equipment, Natural sciences department

Offizielle Bezeichnung Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Germany
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Contract notice – General guideline, standard regulation Open procedure (services) Line bundle "206: Wehretal / Kappel", line bundle "209: Sontra" Lot 1: Line bundle "206: Wehretal / Waldkappel" Line 200: Eschwege - Wehretal - Waldkappel - Hessisch Lichtenau ( - Kassel) Line 2 ... Multi-line bundle "206: Wehretal / Kappel", line bundle "209: Sontra" Lot 1: Line bundle "206: Wehretal / Waldkappel" Line 200: Eschwege - Wehretal - Waldkappel - Hessisch Lichtenau ( - Kassel) Line 221: (eschwege - ) Waldkappel - Hetzerode - Eltmannsee Line 224: Waldkappel - Sontra - Stadthosbach - Waldkappel Line 290: Eschwege - Hoher Meißner - Hessisch Lichtenau The services in bus transport can be provided from the start of operations Scheduled services are provided with 10 vehicles (7 standard solo buses category A, 3 standard articulated buses category A) and in an average calendar year with rounded 1,018,023 Nkm (commercial vehicle kilometers) and rounded 25,207 scheduled hours per year. From the start of operations, branch traffic services can be provided with 2 vehicles (car and/or van) and an estimated 36,375 occupied kilometers per year. Lot 2: Line bundle “209: Sontra” Line 251: Sontra - Cornberg Line 252: Sontra - Blankenbach Line 260: Sontra - Nentershausen - Obersuhl (- Gerstungen) From the start of operations, the bus services can be provided according to schedule with 5 vehicles (4 standard solo buses category A, 1 minibus category A) and in an average calendar year with rounded 304,649 Nkm (commercial vehicle kilometers) and rounded 7,941 scheduled hours per year. Line bundle "206: Wehretal / Waldkappel" Line 200: Eschwege - Wehretal - Waldkappel - Hessisch Lichtenau ( - Kassel) Line 221: (eschwege - ) Waldkappel - Hetzerode - Eltmannsee Line 224: Waldkappel - Sontra - Stadthosbach - Waldkappel Line 290: Eschwege - Hoher Meißner - Hessisch Lichtenau From the start of operations, bus services can be provided according to schedule with 10 vehicles (7 standard solo buses category A, 3 standard articulated buses category A") and in an average calendar year with rounded 1,018,023 Nkm (commercial vehicle kilometers) and rounded 25,207 scheduled hours per year. From the start of operations, branch traffic services can be provided with 2 vehicles (car and/or van) and an estimated 36,375 occupied kilometers per year. Line bundle "209: Sontra" Line 251: Sontra - Cornberg Line 252: Sontra - Blankenbach Line 260: Sontra - Nentershausen - Obersuhl (- Gerstungen) From the start of operations, bus traffic services can be provided with 5 vehicles (4 standard solo buses category A, 1 minibus category A) and in an average calendar year with rounded 304,649 Nkm (commercial vehicle kilometers) and rounded 7,941 scheduled hours per year.

Offizielle Bezeichnung Tender

Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
Germany
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Contract notice – general guideline, standard regulation, open procedure (services) Scm - School Campus Mitte Heidelberg - TGA MSR; new building Willy - Hellpach School and Campus House; specialist planning services for technical building equipment of system group 8 in accordance with Section 55 Hoai The City of Heidelberg is striving to restructure the Heidelberg educational location Campus Mitte. In this context, the new construction of the main building and renovation of the stilt structure of the Willy-Hellpach School and the new construction of the Campus House are to be realized. The basic services for the technical building equipment of system group 8 for the measurement, control and regulation technology in accordance with Section 55 Hoai with service phases 1-9 and classification in fee zone III as well as special services have been put out to tender. The city of Heidelberg attaches particular importance to observing the energy concept and the requirements contained therein for structural and technical energy standards. SCM - School Campus Mitte Heidelberg - TGA MSR; New Willy - Hellpach School and Campus House; Specialist planning services for technical building equipment for system group 8 in accordance with Section 55 Hoai The Willy-Hellpach School in Heidelberg is a commercial vocational school consisting of a business high school and a business vocational school (full-time schools) and two vocational schools for business and administration and health services (part-time schools) with a total of around 1,400 students. Together with the new construction of a campus house and associated outdoor facilities, the new construction of the Willy-Hellpach School represents a central component of the restructuring of the Heidelberg educational location Campus Mitte. As part of the energy concept of the city of Heidelberg and the goals it contains for climate-friendly urban development, there are high demands on structural and technical energy standards. The basis for the services to be commissioned is the result of the architectural competition announced EU-wide in 2022 and concluded in July 2023. In accordance with the energy concept of the city of Heidelberg and the goals contained therein for sustainable and climate-friendly urban development, the construction of the new buildings is planned as a wood/wood hybrid construction in the passive house standard. The basic services for the technical building equipment of system group 8 for the measurement, control and regulation technology according to Section 55 Hoai with service phases 1-9 and classification in fee zone III as well as special services have been put out to tender. The overall project consists of the following components: (1) renovation of the stilt structure, (2) new construction of the main building of the Willy-Hellpach School and (3) new construction of the campus house. The city of Heidelberg plans to commission the object and specialist planners for service phases 1-3 of all components. The subsequent implementation of the project is expected to take place in construction phases; Accordingly, the planning services for performance phases 4 ff. are to be commissioned in stages/sections. The cost framework for the renovation of the stilt structure of the Willy-Hellpach School amounts to approximately EUR 6 million gross (kg 300+400). The new construction of the main building is calculated at approximately EUR 24.8 million gross (kg 300+400) and the new construction of the campus building at approximately EUR 12 million gross (kg 300+400). The costs of system group 8 amount to approximately EUR 0.26 million gross for component 1, EUR 0.82 million gross for component 2 and EUR 0.4 million gross for component 3. The planning services are to begin immediately after the order is placed. The planning period for performance phases 1-3 is estimated at 12 months. The successful bidder is expected to provide conceptually competent advice as well as a special professional commitment in all performance phases.

Offizielle Bezeichnung Tender

Others...+2Civil And Construction, Civil Works Others
Germany
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Contract notice – General guideline, standard rule Open procedure (construction work) Preliminary measure – roofing work Roofing work Preliminary measure – roofing work General project description The Julius-Leber-Schule, vocational school for business, administration and ... More Preliminary measure – roofing work Roofing work Preliminary measure – roofing work General project description The Julius-Leber-Schule, vocational school for business, administration and health at Seilerstrasse 32 in 60313 Frankfurt am Main will be renovated and converted from 2024 to 2027. The construction work will be carried out in three construction phases while the school is in operation. 1st phase: canopy + attic (roof terrace), 6th + 5th + 4th floors, 3rd floor south 2nd phase: 3rd + 2nd + 1st. Og, Eg South 3rd Ba: Eg+kg Estimated completion time for the entire project: 1st Ba Approx. end of February 2025 – June 2026 2nd Ba Approx. July 2026 – July 2027 3rd Ba Approx. August 2027 – end of May 2028 The roofing work is part of the 1st Ba and is expected to be carried out from May 2025 to November 2025. The following specifications regarding working hours must be strictly adhered to during execution: During school hours Monday - Friday: Noisy work starting from 2:00 p.m. to 8:00 p.m., work inside the building from 2:00 p.m. to 11:00 p.m. Saturday: Noisy work from 7:00 a.m. to 8:00 p.m. (optional) During the holiday period Monday - Saturday: 7:00 a.m. to 8:00 p.m. (noise-intensive work) The school complex consists of three independent, interconnected building sections: - Building section 1 School, main building, built in 1955 - Building section 2 Pavilion (film room) and service residential building, built in 1955 - Building section 3 Sports hall, built in 1981 Urban location of the property: The school is in Frankfurt's inner city area. The property borders on the Friedberger Anlage public green space to the north and the busy Seilerstrasse to the south. Building class: The 7-storey existing building (school) and the sports hall are classified as building class 5 in accordance with Section 2 Paragraph 3 No. 5 Hbo, the pavilion/film hall is classified as building class 2 in accordance with Section 2 Paragraph 3 No. 2 Hbo. School, main building: BGF 10,700 m²; Bri 36,800 m³ Pavilion (film room): BGF 510 m²; Bri 2,200 m³ Basement, playground roof: BGF 260 m²; Bri 770 m³ Sports hall: BGF 1,860 m²; Bri 12,970 m³ BGF total: 13,330 m²; Bri total: 52,740 m³ Scope of roofing work: Canopy: demolition of existing. Roof construction, multi-layer bitumen sheets, including fittings, approx. 1,000 m² demolition of roof gutters, 8 pieces demolition existing. Roof edge profiles and finishes (ridge, eaves, verge), zinc sheet, multi-part, approx. 160 m roof sealing and plumbing work: roof surface - flying roof, substrate preparation (pumice boards with lightweight concrete leveling layer), approx. 1,000 m² 1st roof sealing membrane, elastomer bitumen, welded, approx. 1,000 m² top layer, polymer bitumen, slated, welded, proof of "hard roofing", approx. 1,000 m² repair work on defective areas, pumice boards and leveling layer, approx. 1,000 m² pumice boards, suction protection subsequently on support flange, with head/foot plate, approx. 200 pcs. roof hatch windows, 60x80 cm, installation, 1 pc. ventilator elements, titanium zinc sheet, approx. 35 pcs. sealing of Roof penetrations, e.g. rope safety system, lightning protection, ventilator, gutter drain/gully, etc., approx. 70 pieces. Roof edge cladding ridge, eaves, verge, titanium zinc, multi-part, including aluminum substructure, approx. 160 m. Other: rung ladder with extendable exit and entry aid, permanently installed, L = approx. 4.50 m. Fall protection, safety devices and drive-over rope safety system, stainless steel, L = approx. 95 m. Roof terrace: Note: Demolition of roof terrace structure up to the top of the roof ceiling (stb. ribbed ceiling) by the customer by a pollutant remediation company. Demolition of existing. One-piece roof gutter, approx. 7 pieces of roof sealing and plumbing work: roof surface-roof terrace, substrate preparation, approx. 900 m² vapor barrier, elastomer bitumen, welded on, approx. 900 m² thermal insulation, Pu 023 Daa Dh, glued, approx. 900 m² slope insulation, Pu 023 Daa Dh, glued, approx. 220 m² 1st roof sealing membrane, underlay membrane, top elastomer bitumen, cold self-adhesive, approx. 900 m² top layer polymer bitumen, slated, welded on, proof of "hard roofing", approx. 900 m² existing gutter, substrate preparation, approx. 190 m² vapor barrier, elastomer bitumen, welded on, approx. 190 m² thermal insulation, Pu 023 Daa Dh, glued, approx. 190 m² 1. Roof sealing membrane underlayment membrane, top elastomer bitumen, cold self-adhesive, approx. 225 m² concrete gutter sealing with liquid sealing, development length = approx. 1.10 m, approx. 225 m² gutter drain/gully, stainless steel, approx. 7 pcs. sealing of penetrations with liquid sealing, parapet railing posts etc., approx. 130 pcs. parapet cover, titanium zinc, width = approx. 80 cm, incl. Uk, approx. 180 m terrace covering: separating layer made of reinforced PE film, 1-layer, approx. 900 m² surface drainage, drainage/filter layer with fleece, diameter = 16 mm, approx. 900 m² drain gravel strip, height adjustable up to 150 mm, approx. 170 m bedding, chippings/gravel mixture, 2/5 mm, D = approx. 4 cm, approx. 900 m² terrace covering, concrete slabs, 40/40/4 cm, R12, approx. 900 m² floor recesses for railing posts etc., approx. 130 pieces.

Offizielle Bezeichnung Tender

Others...+2Civil And Construction, Construction Material
Germany
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Contract notice – general guidelines, standard rules Open procedure (deliveries) Groß-Gerau district, interim container facility, Martin-Niemöller-Schule IGs, Riedstadt, 1st-3rd phase Construction of an expandable/expandable container facility / Lots 1-3 1st phase 3-storey classroom container facility 1st phase Consisting of 2 classrooms, a group room, building services room, cleaning room, toilet facility and a storage room on the ground floor 2nd phase 3-storey classroom container facility 2nd construction phase Consisting of 2 classrooms and a multi-purpose room, as an extension of the 1st construction phase on the ground floor. 3. Ba 3-storey classroom container facility, 3rd construction phase consisting of 2 classrooms. The relocation of the exit door in the east, as well as the relocation of the platform, the steps, the ramp and the canopy in front of the east exit must also be taken into account.

Offizielle Bezeichnung Tender

Others...+3Civil And Construction, Consultancy Services, Civil And Architectural Services
Germany
Closing Date20 Jan 2025
Tender AmountRefer Documents 
Contract notice - General guideline, standard regulation Open procedure (services) Development planning for residential area Development planning for residential area Hochfeld, 65399 Kiedrich Development planning for residential area Traffic system, sewerage system, water supply, if necessary, rainwater retention basin ... Multiple development planning for residential area Development planning for residential area Hochfeld, 65399 Kiedrich Development planning for residential area Traffic system, sewerage system, water supply, if necessary, rainwater retention basin as earthen basin and mixed water retention basin

Offizielle Bezeichnung Tender

Others
Germany
Closing Date20 Jan 2025
Tender AmountRefer Documents 
Contract notice – general guidelines, standard rules Open procedure (deliveries) Dialysis machines Procurement of 27 dialysis machines Dialysis machines In this procedure, a total of 27 dialysis machines are to be delivered and put into operation by the client for the Agaplesion Markus Hospital, Wilhelm-Epstein-Strasse 4, 60431 Frankfurt am Main. The dialysis machines will be called off in stages: in QI 2025 – 9 machines, in Q II 2025 – 10 machines and in Q II 2026 – 8 machines. Delivery is to take place 4 weeks after the call is made. The specific performance requirements are set out in the specification.

Offizielle Bezeichnung Tender

Civil And Construction...+1Civil Works Others
Germany
Closing Date20 Jan 2025
Tender AmountRefer Documents 
Contract notice – General guidelines, standard rules Open procedure (construction work) Stainless steel pool Stainless steel pool Stainless steel pool Conversion and renovation of the Bad Camberg outdoor swimming pool: Main dimensions of the stainless steel pool: - Stainless steel for 1 diving pool Approx. 300 m² water surface Approx. 122 m² pool head ... Multi-stainless steel pool Stainless steel pool Stainless steel pool Conversion and renovation of the Bad Camberg outdoor swimming pool: Main dimensions of the stainless steel pool: - Stainless steel for 1 diving pool Approx. 300 m² water surface Approx. 122 m² pool head made of stainless steel Approx. 50 linear meters -Stainless steel for 1 swimmers' pool Approx. 570 m² water surface Approx. 420 m² pool head made of stainless steel Approx. 90 linear meters -Stainless steel for 1 non-swimmers' pool Approx. 450 m² water surface Approx. 400 m² pool head made of stainless steel Approx. 95 linear meters. -stainless steel For 1 children's paddling pool Approx. 80 m² water surface Approx. 75 m² pool head made of stainless steel Approx. 25 linear meters 1 x diving tower system 1 m 1 x diving tower system 3 m 1 x climbing wall 10 x attractions
261-270 of 285 archived Tenders