Tenders of Offizielle Bezeichnung
Tenders of Offizielle Bezeichnung
Offizielle Bezeichnung Tender
Germany
Closing Date7 Oct 2024
Tender AmountRefer Documents
Contract notice - general guideline, standard regulation open procedure (construction work) Mkk: Stadtschule Schlüchtern Wdvs Wdvs, external plaster and paint: O Miwo insulation approx. 14cm; plaster; paint: approx. 350 m² O Miwo insulation approx. 8cm; plaster; paint: approx. 40 m² O Plaster; paint on external wall timber frame construction: approx. 100 m ... Mehrwdvs, external plaster and paint: O Miwo insulation approx. 14cm; plaster; paint: approx. 350 m² O Miwo insulation approx. 8cm; plaster; paint: approx. 40 m² O Plaster; paint on external wall timber frame construction: approx. 100 m²
Offizielle Bezeichnung Tender
Germany
Closing Date7 Oct 2024
Tender AmountRefer Documents
Contract notice – general guideline, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (services) Extension of the Karl-Gärtner School, Wiesbaden; specialist planning of technical equipment Alg 1-3 / Lph 2 - 9 Basics: The Karl-Gärtner School at Wilhelm-Dietz-Strasse 5 is located on the outskirts north of Delkenheim, on a bend in the Wickerbach in a natural landscape with old trees. The ... More basics: The Karl-Gärtner School at Wilhelm-Dietz-Strasse 5 is located on the outskirts north of Delkenheim, on a bend in the Wickerbach in a natural landscape with old trees. The school property of the Karl-Gärtner School (plot no. 1/6) has a size of 21,178 m². The school complex, which is a listed cultural monument in accordance with Section 2 Paragraph 1 of the Hdschg, was built in two phases between 1963 and 1967 by the architect Daniel Jourdan. The loosely grouped one- and two-storey, flat-roofed pavilions in reinforced concrete construction with reddish-brown clinker bricks are connected to one another via walkways and spatially enclose the school yard. The school complex consists of a main building (old building) with an adjoining administration wing and cafeteria, a toilet building, a classroom wing (new building), a pavilion building, a school gym, a youth traffic school including a workshop (see attachments). The demolition of the school gym and the construction of a new double sports hall with a club extension as well as the restructuring of the administration are currently being planned. Subject of the service to be commissioned: Specialist planning services for technical equipment for system groups 1, 2 and 3, in accordance with Hoai 2013, in the 2021 version, Part 4, Section 2, §§ 53-56, service phases 2-9. Service phase 2 in partial services. Service phase 3-9 in basic services. In addition, the special services from Appendix 15 to Section 55 Paragraph 3, Section 56 Paragraph 3 in accordance with the partial service table as an appendix to the draft contract (appendix 02d). Further planning services are not the subject of this tendering procedure. The basic services will be remunerated on the basis of Hoai 2013, in the 2021 version, if regulated there. It is permissible to fall below the minimum rates or exceed the maximum rates. These must be stated as a percentage and explained in the cover letter if necessary. Further detailed information about the services to be commissioned can be found in the attached description of tasks and services and the associated appendices (appendix 02a). The special services will be remunerated at a lump sum based on the offer you submit. It is planned to award the execution work to individual trades. Options: The services will be called up in stages (options), subject to the committee resolutions on the further implementation of the project and the decision of the contracting authority in the further course of the project: Stage I: Lph 2-5, Stage II: Lph 6-9 With the award of the contract in this tendering procedure, the following services will initially be called up: Stage I: Lph 2-5 The contractor has no right to call up individual and/or all stages and cannot derive any further claims (e.g. for damages or an increase in fees) from non-calling up. Schedule of service provision: Start of service provision: Immediately after completion of the procedure Approx. November/December 2024 Completion of service phase 3: Approx. March 2025 (= provision of documents for the plausibility check) Completion of plausibility check: Approx. June 2025 Start of construction: Approx. February 2026 Completion ready for occupancy: Approx. July 2027
Offizielle Bezeichnung Tender
Germany
Closing Date7 Oct 2024
Tender AmountRefer Documents
Contract notice - general guidelines, standard rules Open procedure (services) Award of guard and security services Rhein-Main landfill park Wicker In summary, the contractor is to provide the following services in particular: Guard and security services on the Flörsheim-Wicker landfill site, including operation of the barrier system and irregular patrols on the landfill site (approx. 12 checkpoints): - From Monday to Friday with patrols mainly at night, - On Saturdays, Sundays and public holidays with patrols during the day and at night. Services in connection with the patrols and special incidents on the landfill site. For a full description of the procurement, reference is made to the service description in Section C of the tender documents.
Offizielle Bezeichnung Tender
Germany
Closing Date9 Oct 2024
Tender AmountNA
Contract notice - General guideline, standard regulation Open procedure (deliveries) Chassis The experience from the severe weather disaster in 2021 in Rhineland-Palatinate and North Rhine-Westphalia has shown that the demands on our vehicles have increased significantly. Due to climate change, such extreme weather conditions are to be expected more and more frequently (see Saarland 2024). In order to be able to ensure the protection and supply of our emergency services, but also the affected population, in such extreme weather conditions at all times, the procurement of a second all-terrain equipment logistics vehicle is necessary. Lot 1 includes the delivery of a suitable chassis. Structure The experience from the severe weather disaster in 2021 in Rhineland-Palatinate and North Rhine-Westphalia has shown that the demands on our vehicles have increased significantly. Due to climate change, such extreme weather conditions are to be expected more and more frequently (see Saarland 2024). In order to be able to ensure the protection and supply of our emergency services, but also of the affected population, at all times in such extreme weather conditions, the procurement of a second off-road equipment vehicle logistics is necessary. Lot 2 includes the design and delivery of a suitable structure.
Offizielle Bezeichnung Tender
Chemical Products
Germany
Closing Date10 Oct 2024
Tender AmountNA
Contract notice – General guideline, standard scheme Open procedure (supplies) Lot 1 - 120-240 L procurement of waste and recycling containers in the period 2025 - 2027 Lot 2 - 770-1100 L procurement of waste and recycling containers in the period 2025 - 2027
Offizielle Bezeichnung Tender
Civil And Construction...+1Civil Works Others
Germany
Closing Date10 Oct 2024
Tender AmountNA
Contract notice – General guideline, standard rule Open procedure (construction work) Ewb_new extension 50 m swimming pool Wiesenbad Eschborn The Eschborn magistrate intends to build a new extension with a 50 m swimming pool for the Wiesenbad in Eschborn. The city council approved the plans for the additional swimming pool presented by the magistrate in September 2018 by a majority. Eight 50-meter-long lanes will be built as well as a separate entrance hall for the new extension. The swimming pool will have a flexible lifting floor. In addition, the swimming pool will be equipped with sliding doors which can be opened towards the outdoor pool in summer. The costs for this measure amount to around €15.7 million gross. Access to the site is via the existing access routes from the main road. The work will take place while the swimming pool is in operation. Metalwork: 1,000 Psch construction site setup; 1,000 pcs preparation of the static calculation for the ventilation enclosure; 1,000 Psch execution drawings; outside area; 1,000 pcs manhole cover for the insertion shaft; 1,000 pcs wall cover; 1,000 pcs railing for the insertion shaft; 1,000 pcs manhole cover for the exhaust air shaft; 1,000 pcs wall cover; 1,000 pcs manhole cover for the emergency exit; 1,000 pcs floor emergency exit; 1,000 pcs vertical ladder 2.70; 1,000 pcs railing 1 ramp, L = 2.40 m; 1,000 pcs railing 2 ramps, L = 2.40 m/ horizontal; 34,000 m railing 3 ramp; interior area; 1,000 pcs steel staircase 1; 1,000 pcs steel staircase 2; 17,000 m handrail inside; 1,000 m handrail inside filling bars; ventilation enclosure; supporting structure; 900,000 kg structural steel for frame constructions; 200,000 kg structural steel (round) for wall bracing; 200,000 kg structural steel (round) for roof bracing; 120,000 m cold-formed Z-purlins, ready for installation; 60,000 m cold-formed eaves bars; roof covering; 155,000 m² roof covering made of sandwich roof elements; 60,000 m support profile in the eaves area; 60,000 m gutter inlet sheet; 60,000 m of eaves privacy protection profile, supply and professionally install; 7,000 m of verge profile for roof panels, supply and professionally install; 60,000 m of roof enclosure connection to rising component; wall cladding; 178,000 m² of sheet steel wall panels, insulation 100 mm, exterior, B1; 7,000 m of beveled cut of wall cladding at the verge in 60,000 m of cutting of wall cladding eaves; 60,000 m of drip profile in the base; 9,000 m of angle profiles for external corners; 36,000 m of butt joint of wall panels on supports of frame structures; 67,000 m of cover profile all around; 200,000 m of permanently elastic pre-compressed sealing tape; 2,000 pieces of openings 500 x 400 mm; 2,000 pieces breakthroughs 500 x 900 mm; 2,000 pieces openings 600 x 1200 mm; 2,000 m lintel profile opening; 2,000 pieces At/sz/bxh 635 x 1260 mm / wall panels 100 mm/dk; roof drainage; 60,000 pieces hanging gutter / round / Tizn / Z 333; 4,000 pieces gutter expansion compensation pieces; 3,000 pieces gutter end piece / Tizn / Z 333; 2,000 pieces gutter mounting socket, / Tizn / Dn100; 10,000 pieces downpipe / Tizn / Dn 100; 4,000 pieces downpipe bend / Tizn / Dn 100; sun terrace; supporting structure; 8,500,000 kg of structural steel for roof construction; 1,000,000 kg of structural steel for wall construction; 550,000 kg of structural steel (round) for wall trusses; 200,000 kg of structural steel (round) for roof trusses; 13,000 pcs of cantilever beam connections Hea 220;
Offizielle Bezeichnung Tender
Germany
Closing Date10 Oct 2024
Tender AmountRefer Documents
Contract notice - general guideline, standard rule, open procedure (services) Provision of engineering surveys for the replacement building of the Sandrosenschule, 35519 Rockenberg The replacement building of the Sandrosenschule is required due to a lack of expansion capacity at the two previous locations in Rockenberg and Oppershofen. For this reason, a new school building is to be built at a new location in the Rockenberg/Wetteraukreis district. The plot of land intended for the construction of the elementary school is in the "Burgweg" development plan area. The available plot of land is 17,022 m². After determining the space requirements, the space program was drawn up. A elementary school with a gym and outdoor facilities is to be planned. The new school building has 8 classrooms, 4 group rooms, 1 specialist room with an adjoining room, a library and the rooms required for the all-day area. A cafeteria including a cafeteria kitchen with the corresponding ancillary rooms (storage, staff rooms, etc.) is to be planned. In addition to the school area, an administration area with the corresponding office rooms, the teacher's room and the necessary ancillary rooms will also be implemented. The access and technical areas as well as storage rooms must also be taken into account. A gym with a play area of approx. 200 m² plus an equipment room and the necessary ancillary rooms is also to be planned. Estimated costs for the entire construction project: Kg 300 net €4,777,411.76 (replacement building and gymnasium) Kg 400 net €3,184,941.18 (replacement building and gymnasium) Kg 500 net €672,268.91 Construction or execution time: Service provision: Immediately after the order is placed. 11/2024 Start of construction expected 04/2025 or 01/2026 Commissioning expected 1st quarter 2028
Offizielle Bezeichnung Tender
Germany
Closing Date10 Oct 2024
Tender AmountRefer Documents
Contract notice - General guideline, standard regulation Open procedure (supplies) Network area Weilburg Electricity supply to properties in the state of Hesse. Spot market contract 1 year Network area Groß-gerau Electricity supply to properties in the state of Hesse. Spot market contract 1 year Network area Eswe Stromlie ... Additional electricity supply to properties in the state of Hesse. Spot market contract 1 year Network area Groß-gerau Electricity supply to properties in the state of Hesse. Spot market contract 1 year Network area Eswe Electricity supply to properties in the state of Hesse. Spot market contract 1 year Network area Syna Electricity supply to properties in the state of Hesse. Spot market contract 1 year Network area Mainova Electricity supply to properties in the state of Hesse. Spot market contract 1 year
Offizielle Bezeichnung Tender
Germany
Closing Date1 Oct 2024
Tender AmountRefer Documents
Contract notice - General guideline, standard regulation Open procedure (construction work) Interior plastering, drywall, wallpapering and painting work_bs Kirchhain Renovation of workshop building Interior plastering work L. Ba Interior plaster on new masonry Approx. 95 m² Interior plaster in damp rooms Approx. 70 m² Drywall work L. Ba Plasterboard stud walls 15 cm Approx. 295 m² Plasterboard stud walls 25cm Approx. 37 m² G ... More Interior plastering work L. Ba Interior plaster on new masonry Approx. 95 m² Interior plaster in damp rooms Approx. 70 m² Drywall work L. Ba Plasterboard stud walls 15 cm Approx. 295 m² Plasterboard stud walls 25cm Approx. 37 m² Plasterboard pre-wall installations Approx. 13 m² Fire protection ceiling F30 hallway Approx. 380 m² Wallpapering work L. Ba Non-woven wallpaper on masonry Approx. 140 m² Non-woven wallpaper on plasterboard wall Approx. 610 M² painting work Ll. Ba painting wall surfaces clinker brickwork approx. 1,635 M² painting wall surfaces non-woven wallpaper approx. 750 M² drywall work Ll. Ba plasterboard stud walls 15 cm approx. 240 M² plasterboard pre-wall installations approx. 43 M² fire protection ceiling F30 hallway approx. 130 M² wallpapering work Ll. Ba non-woven wallpaper on plasterboard wall approx. 480 M² painting work Ll. Ba painting wall surfaces clinker brickwork approx. 1,220 M² painting wall surfaces non-woven wallpaper approx. 480 M²
251-260 of 362 archived Tenders