Tenders of Offizielle Bezeichnung

Tenders of Offizielle Bezeichnung

Sorry!
No Active
Tenders of Offizielle Bezeichnung
found
Check archived
Tenders of Offizielle Bezeichnung

Offizielle Bezeichnung Tender

Others...+1Civil And Construction
Germany
Closing Date16 Jan 2025
Tender AmountRefer Documents 
Contract notice – general guidelines, standard rules, open procedure (construction work) Replacement building for the Erich Kästner School in Marburg, scaffolding work for the new building The school complex of the Erich Kästner School in Marburg-Cappel currently consists of several buildings. The formal language of the individual buildings, some of which are interconnected by connecting corridors and buildings, is typical for the construction period. The overall picture is amorphous. An overall design concept cannot be recognized. The heterogeneous overall picture means that the school lacks an “address”, a clearly defined entrance. The space available no longer covers demand. Parts of the afternoon care had to be relocated to the community center. The implementation of contemporary educational concepts is not possible in the existing floor plan structures. In addition, the existing buildings B and K have significant deficiencies such as a lack of accessibility, functional and organizational deficits, static deficiencies, inadequate fire protection and the need for energy-related renovation. Based on the above points, it was decided to demolish buildings B and K and replace them with a new building, which would also include the additional rooms for care and the cafeteria. In addition to eliminating the above deficiencies, the new building will also give the school a recognizable "address" with a well-placed main entrance. Buildings A, G, F, H and I will remain. Building A houses the administration, the teachers' room and 3 therapy rooms. The rooms in building G are used as specialist classes for music and crafts. Buildings H and I are used by the special needs school. Building A will have a small extension with technical rooms and additional storage space. The existing building G will have an emergency staircase as a second escape route with access to the room on the ground floor that is currently used as a common room. Project description extension Building B, which is currently adjacent to building A, will be demolished. Part of the basement of building B will remain standing and will serve as the floor slab for a new single-storey extension to the existing building A. Static additions must be made to the shell at the demolition edges of the remaining basement. The new extension is planned to be built using timber construction, with timber frame walls (partially insulated) and a roof structure with roof beams, timber formwork and foil sealing. The outer walls will have a suspended, ventilated timber cladding. In the area where building B is to be demolished, the existing gable roof of building A must be supplemented with timber rafters and tile covering. The newly planned extension will include a technical room for the new house connection for the electrical supply to the Erich Kästner School area, as well as a technical room for the heating supply to building A. A storage room will also be created for the school's play equipment. Project description New building The new school building consists of two rectangular structures, slightly offset from one another, which are connected at the junction by a central entrance hall. Due to the topography, the southern structure is 3-storey, with a ground-level connection to the lower schoolyard, and the northern structure is 2-storey, with a connection to the upper schoolyard. The entrance hall is the central access element of the building. Access is via the entrances from the lower and upper schoolyard. The open, spacious staircase leads to the respective floors, and the elevator, which is also connected to the entrance hall, ensures barrier-free access to all floors. The clear concept of the open entrance hall offers good visual connections to all areas and thus enables good orientation in the building. The entrance hall is not just a circulation area, but a central communication zone or meeting point for students, and invites people to linger, especially with the staircase on the ground floor, which has been widened to form seating steps. The ground floor area extends only under the southern building. In this area, on the slope side, there is a central toilet core as well as storage and technical rooms. Facing the schoolyard is the large dining room with an attached kitchen and the necessary ancillary rooms. The kitchen has its own delivery from the south. The dining room has generous glazing facing the schoolyard and a large opening to the entrance hall. This opening can be closed using a mobile partition wall, or opened to the entrance hall if required, thus enabling this area to be used in a variety of ways. The dining room on the ground floor is to be made available to Cappel residents and clubs for parties or other external events outside of school hours. The classrooms are on the two upper floors. Each floor of each building contains a cluster, a so-called "learning house". The classrooms and differentiation rooms of the clusters are grouped around a central middle zone, which serves both as access and as an extended teaching area. This middle zone is structured and furnished in such a way that it can be used for teaching purposes for individual or group work, but also for supervision. Appropriate openings between the classrooms and the middle zone provide views and thus ensure that the children are well supervised. Each cluster also has a small teacher's base, so that the clusters are self-contained, "self-sufficient" learning houses with which the student community can identify and which strengthens the group feeling. On each floor, at the intersection between the two clusters, there are central toilets that can be reached in a short distance from the learning houses. Erich-Kästner-Schule replacement building, scaffolding work trade. The service includes all preparatory work - Approx. 250 sqm protection of the floor areas under the scaffolding - Approx. 2,200 sqm 1 scaffolding EN 12810, load class 4, W09 - Approx. 155,500 sqm/week. Use of scaffolding - Approx. 3 pcs. bridging L 500 cm - Approx. 1,000 m extension of scaffolding, scaffolding widening W 0.3 m - Approx. 3 pcs. staircase H up to 13 m - Approx. 3 pcs. staircase H up to 10 m

Offizielle Bezeichnung Tender

Electrical Goods and Equipments...+1Electrical and Electronics
Germany
Closing Date16 Jan 2025
Tender AmountRefer Documents 
Contract notice – General guideline, standard regulation, open procedure (construction work) PV system VE 151 PV system with substructure and battery storage; Delivery and installation of an energy system consisting of a PV system, inverters and battery pack for the building construction area (g ... Multipv system VE 151 PV system with substructure and battery storage; delivery and installation of an energy system consisting of a PV system, inverters and battery pack for the building construction area (catering and technical building) of the Wetzlar natural outdoor pool. The LV includes all electrical work for the energy system with the interface to the building's electrical system. The construction project envisages the conversion of the Domblick outdoor pool in Wetzlar into a natural outdoor pool. The previous chlorine pool with its functional buildings has already been demolished for this purpose. Together with the new natural outdoor pool, the surrounding areas will be turned into a park with the new R7 long-distance cycle path. In addition, the site will receive a new building complex with the sanitary facilities for the outdoor pool, as well as a restaurant for general use. The building construction will take place at the same time as the construction of the outdoor pool and has intersections in terms of water technology and outdoor facilities. PV system VE 151 PV system with substructure and battery storage; delivery and assembly of an energy system consisting of a PV system, inverters and battery pack for the structural engineering area (catering and technical building) of the Wetzlar natural outdoor pool. The LV includes all electrical work for the energy system with the interface to the building's electrical system. The construction project envisages the conversion of the Domblick outdoor pool in Wetzlar into a natural outdoor pool. The previous chlorine pool with its functional buildings has already been demolished for this purpose. Together with the new natural outdoor pool, the surrounding areas will be turned into a park with the new R7 long-distance cycle path. The site will also receive a new building complex with the sanitary facilities for the outdoor pool and a catering area for general use. The structural engineering will take place at the same time as the construction of the outdoor pool and has intersections in terms of water technology and outdoor facilities.

Offizielle Bezeichnung Tender

Civil And Construction...+1Civil Works Others
Germany
Closing Date20 Jan 2025
Tender AmountRefer Documents 
Contract notice – general guideline, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (services) Groß-Gerau district, structural extension of the Albert Schweitzer School in Mörfelden-Walldorf, specialist planning HLS Groß-Gerau district, structural extension of the Albert Schweitzer School in Mörfelden-Walldorf, specialist planning HLS ... Groß-Gerau multi-district, structural extension of the Albert Schweitzer School in Mörfelden-Walldorf, specialist planning HLS Groß-Gerau district, structural extension of the Albert Schweitzer School in Mörfelden-Walldorf, specialist planning HLS for a two-storey new building with learning clusters and a cafeteria/auditorium in modular construction. Project funding for new building with funding from the noise protection program. Billing until 12/2026. Rough cost estimate without Kg 700 is €6,817,000.00 net. Specialist planning HLS for the demolition of a single-storey toilet facility and extension to an existing all-day building. Demolition of a single-storey toilet facility, extension to existing all-day building. Rough cost estimate without Kg 700 is €495,000.00 net. Extension of the heat generation system and heat distribution for the entire property. Costs of the extension of the heat generation system are €106,000.00 net.

Offizielle Bezeichnung Tender

Software and IT Solutions
Germany
Closing Date20 Jan 2025
Tender AmountRefer Documents 
Contract notice – general guideline, standard regulation Open procedure (services) System for time recording, personnel deployment planning and access control (Hessian judiciary) Creation and operation of a system for time recording, access control and personnel deployment planning including provision of hardware, software and services for the creation, implementation and support of the system. System for time recording, personnel deployment planning and access control (Hessian judiciary) The procurement of the following goods or services is intended: -procurement of licenses and, if applicable. Required hardware for the expansion and modernization of the existing system for the prison system to all departments of the Hessian judiciary with around 90 new departments and 16,000 employees, plus the additional requirement of access control -upgrading the existing flexitime recording hardware to a third-generation RFID-based transponder system that corresponds to the state of the art (either by retrofitting existing hardware plus new procurement or completely new procurement) plus the provision of suitable time recording media (preferably key fobs) -services for modeling the systemic rules required for time recording, personnel deployment planning and access control, which meet the legal requirements (collective bargaining and civil service law, in particular in the area of rotating shifts and shift allowances) -installation and commissioning of an executable system on virtualized servers provided by the contractor, connection of external interfaces, in particular to SAP -support service for the migration of old data or The deployment of the system in newly connected departments. The existing system in the correctional facilities is to be replaced by the newly modelled system (migration rollout) or introduced into the departments that are not yet equipped (regular rollout) -Implementation of advanced training events in the form of multiplier training with regard to the administration, use and maintenance of the system to be set up, as well as the provision of corresponding training material -Provision of downstream support for the systems (maintenance contract) Basically, two broad fields of application can be distinguished: 1. Shift and rotating shift operation In some of the managed departments, rotating shift and shift operation prevails permanently, so that the (decentralized) personnel deployment planning within a wide variety of employee groups must be able to be mapped in a wide variety of shift models. This also includes the need to determine and calculate irregular salaries and shift/rotating shift allowances for both civil servants and employees, and to transfer these to external systems such as SAP. 2. Flextime / administration The majority of the staff to be managed carry out administrative activities and are on flexitime. The system to be established must be able to accept time recording bookings both via stationary time recording devices and via web interfaces. The option for workflow-based applications for holidays and other absences should also be available. Finally, the system should be able to address access control elements such as doors, barriers, etc. and allow or deny access based on authorization concepts. For both use cases, the processing of internal department data should be carried out decentrally, i.e. in the location concerned itself, so that correction bookings or even duty scheduling itself can be carried out decentrally. At the same time, it should still be possible for higher-level authorities to view and intervene in the decentralized data. A suitable, web-based interface should be available for employees to view their own time recording data. Accessibility must be guaranteed in all components of the application. Existing data from existing legacy systems should be adopted wherever possible; the project therefore also includes installation, structure and data modeling of the application fields described above and subsequent support within the framework of a maintenance and care contract. The points presented here represent the project in general overview. The detailed requirements description (file: "requirements description") is attached as an appendix to the service description and must be observed.

Offizielle Bezeichnung Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Germany
Closing Date20 Jan 2025
Tender AmountRefer Documents 
Contract notice – General guideline, standard regulation Open procedure (construction work) Primary school Iss Masonry work Primary school Iss New primary school building Earthwork, sewerage, masonry, concrete work Approx. 3,200.00m² net floor area