Tenders of Offizielle Bezeichnung

Tenders of Offizielle Bezeichnung

Offizielle Bezeichnung Tender

Others...+2Civil And Construction, Civil Works Others
Germany
Closing Soon28 Jan 2025
Tender AmountRefer Documents 
Contract notice – General guideline, standard regulation Open procedure (construction work) Interior doors and carpentry work_bs Kirchhain Renovation of workshop building Interior doors and carpentry work L. Ba Aluminum interior door elements 5. Pcs. Standard door elements 15. Pcs. Soundproof door elements 28. Pcs. Fireproof door elements 3. Pcs. Interior window elements 13. Pcs. WC partition wall systems 2. Pcs. Interior doors and carpentry work Ll. Ba aluminum interior door elements 2. piece soundproof door elements 23. piece fireproof door elements 1. piece interior window elements 15. piece interior doors and joinery_bs Kirchhain renovation of workshop building interior doors and joinery L. Ba aluminum interior door elements 5. piece standard door elements 15. piece soundproof door elements 28. piece fireproof door elements 3. piece interior window elements 13. piece toilet partition wall systems 2. piece interior doors and joinery Ll. Ba aluminum interior door elements 2. piece soundproof door elements 23. piece fireproof door elements 1. piece interior window elements 15. piece

Offizielle Bezeichnung Tender

Civil And Construction...+1Road Construction
Germany
Closing Date13 Feb 2025
Tender AmountRefer Documents 
Contract notice – general guidelines, standard rules Open procedure (construction work) K 165, 166, 167 - Ge Der Od Lich - St. Muschenheim K 165, 166, 167 - Ge Der Od Lich - St. Muschenheim K 165, 166, 167 - Ge Der Od Lich - St. Muschenheim Type and scope of work: Road construction, concrete work, sidewalks, water supply, sewer construction. Community measure: No award of individual titles possible. Be, Br, Vs, sidewalks, street lighting - Ag Stadt Lich: Construction site setup and clearing, traffic safety, approx. 6,850 m² asphalt removal, approx. 3,900 m³ excavated soil, approx. 2,200 m³ coarse gravel, approx. 2,370 m³ frost protection material, approx. 30 pieces of street drains, approx. 300 m² asphalt superstructure, approx. 60 m gutter stones, approx. 3,500 m curbs, approx. 6,600 m² concrete paving stones, approx. 2,600 m empty pipes, approx. 11 pieces of masts for street lighting, other services / ancillary work. Road construction - Ag Landkreis Gießen: Approx. 8,500 m² asphalt removal, approx. 6,200 m³ excavated soil, approx. 3,000 m³ coarse gravel, approx. 2,000 m³ frost protection material, approx. 45 pieces of road drains, approx. 9,000 m² asphalt surface, approx. 2,650 m gutter stones, other services / ancillary work. Sewer construction - Ag Stadtwerke Lich: Approx. 90 m² asphalt construction, Approx. 100 m² concrete paving, Approx. 9,240 m³ soil excavation, Approx. 2,500 m³ soil preparation, Approx. 2,750 m³ bedding material, Approx. 4,250 m³ soil material, Approx. 1,560 m³ frost protection material, Approx. 515 m³ coarse gravel, Approx. 10,600 m² shoring, Approx. 7 pieces of open groundwater management, Approx. 2 pieces of groundwater lowering, Approx. 1,600 m sewer demolition concrete/reinforced concrete and GRP Dn 250 to Dn 1000, Approx. 190 m sewer backfilling, Approx. 39 pieces of shaft demolition concrete/reinforced concrete, Approx. 1,600 m sewer reinforced concrete Dn 300-1000, Approx. 37 pieces of prefabricated concrete/reinforced concrete shafts, Approx. 1,660 m of connecting lines, Approx. 135 pieces of connecting lines, Approx. 3 pieces of road drains, Approx. 190 m² of asphalt superstructure, Approx. 10 m of gutter stones, Approx. 20 m of curbs, Other services/ancillary work. Water supply - Ag Stadtwerke Lich: Approx. 10 m² concrete paving stones, approx. 2,600 m³ excavated soil, approx. 540 m³ soil preparation, approx. 1,100 m³ bedding material, approx. 670 m³ soil material, approx. 720 m³ frost protection material, approx. 4,300 m² shoring, approx. 170 m pipeline expansion, approx. 3,000 m emergency water supply, approx. 1,230 m water pipe Dn 80 - 200, approx. 13 underground hydrants, approx. 100 drilling fittings, approx. 740 m house connection lines, core drilling, wall penetrations, other services / ancillary work.

Offizielle Bezeichnung Tender

Others
Germany
Closing Date26 Feb 2025
Tender AmountRefer Documents 
Concession notice – standard regulation (services) Food supply for the Carlo-Mierendorff-School with hot delivery to the Gos Preungesheim (upper secondary school of the Carlo-Mierendorff-School) and to the Goethe-Gymnasium Food supply for the Carlo-Mierendorff-School (mixed kitchen) with hot delivery to the Gos Preungesheim (upper secondary school of the Carlo-Mierendorff-School) and to the Goethe-Gymnasium Food supply for the Carlo-Mierendorff-School (mixed kitchen) with hot delivery to the Gos Preungesheim (upper secondary school of the Carlo-Mierendorff-School) and to the Goethe-Gymnasium Food supply for the Carlo-Mierendorff-School with hot delivery to the Gos Preungesheim (upper secondary school of the Carlo-Mierendorff-School) and to the Goethe-Gymnasium Food supply for the Carlo-Mierendorff-School (mixed kitchen) with Warm delivery to the Gos Preungesheim (upper secondary school of the Carlo-Mierendorff-School) and to the Goethe-Gymnasium

Offizielle Bezeichnung Tender

Civil And Construction...+2Others, Civil Works Others
Germany
Closing Soon29 Jan 2025
Tender AmountRefer Documents 
Contract notice - General guideline, standard regulation Open procedure (construction work) Grunelius-outsourcing-provision of a gymnasium Provision of a prefabricated gymnasium including outbuildings and foundations Grunelius-outsourcing-provision of a gymnasium 1,000 Psch Site equipment ... More Grunelius-outsourcing-provision of a gymnasium Provision of a prefabricated gymnasium including outbuildings and foundations Grunelius-outsourcing-provision of a gymnasium 1,000 Psch Site equipment assembly/dismantling 1,000 pcs Temporary sports hall 30 x 18 x 6m 1,000 Psch Foundation for the previously described sports hall 1,000 Psch Additional equipment skylight window 1,000 Psch Additional equipment room acoustics 2,000 pcs Additional equipment escape doors 1,000 pcs Additional equipment connecting door 1,000 pcs Additional equipment door to equipment room 500,000 m2 Additional equipment sports floor 1,000 pcs Additional equipment handball goals including floor panels 1,000 pcs Additional system horizontal bar system including ground sleeves 2,000 pcs Additional equipment wall mounting for soft floor mats 1,000 pcs Additional equipment hall heating 1,000 pcs Additional equipment hall lighting 1,000 pcs Additional equipment lightning protection system 4,000 pcs Changing room container 1,000 pcs Changing room container - teachers 1,000 pcs Toilet container - girls and pumi 1,000 pcs Toilet container - boys 4,000 pcs Container for connecting corridor - long 1,000 pcs Container for connecting corridor - short 1,000 pcs Container as gymnastics room 1,000 pcs Container for gymnastics equipment 2,000 pcs Additional equipment clean-walking area 2,000 pcs Additional equipment external door, double-winged 1,000 pcs Additional equipment locking system (20 cylinders) 3,000 pcs Additional equipment fire extinguisher 1,000 pcs Additional equipment room signage 1,000 Psch Additional equipment house alarm system 1,000 Psch Additional equipment break light 1,000 Psch Additional equipment security lighting 1,000 Psch Additional equipment outdoor light 1,000 St Additional equipment: Line for emergency telephone

Offizielle Bezeichnung Tender

Others
Germany
Closing Date5 Feb 2025
Tender AmountRefer Documents 
Contract notice - general guideline, standard regulation, open procedure (deliveries) Procurement of Autodesk single-user 3-year licenses. GSI GmbH intends to procure single-user 3-year licenses from Autodesk as the lead buyer for the following authorized users of the Hermann von Helmholtz Association of German Research Centers EV, abbreviated to HGF. Procurement of Autodesk single-user 3-year licenses The users authorized to use this framework agreement are: - GSI Helmholtz Center for Heavy Ion Research GmbH, Darmstadt with the branch offices: Helmholtz Institute Mainz (HIM) and Helmholtz Institute Jena (HJ) - Fair Facility for Antiproton and Ion Research in Europe GmbH, Darmstadt - German Aerospace Center (DLR), Cologne - Max-Delbrück Center for Molecular Medicine in the Helmholtz Association, Berlin For reasons of compatibility and dependencies on third-party software, software products from Autodesk are essential. However, the cumulative, maximum call-up volume in pieces(pcs) as the upper limit of this framework agreement per license type is as follows: Autodesk Product Design and Manufacturing Collection: 380 pieces Autodesk AutoCAD Incl. Specialized Toolsets: 90 pcs Autodesk Inventor: 100 pcs Autodesk Navisworks Manage: 10 pcs Autodesk Autocad Lt: 20 pcs Autodesk Aec Collection: 50 pcs Autodesk Fusion 360: 80 pcs Autodesk Vault Pro: 10 pcs Autodesk Recap Pro: 10 pcs Autodesk 3ds Max: 10 pcs

Offizielle Bezeichnung Tender

Others
Germany
Closing Date5 Feb 2025
Tender AmountRefer Documents 
Contract notice - general guideline, standard rule, open procedure (construction work) Timber construction, windows, sun protection, facade cladding, scaffolding Manufacture of timber construction, windows, sun protection, facade cladding, scaffolding. Timber construction, windows, sun protection, facade cladding, scaffolding ... Multi-timber construction, windows, sun protection, facade cladding, scaffolding Manufacture of timber construction, windows, sun protection, facade cladding, scaffolding. Timber construction, windows, sun protection, facade cladding, scaffolding Timber construction, window, sun protection, facade, scaffolding work. The service is part of the construction project "Arheilgen district school - renovation and extension of buildings B and C" of the Science City of Darmstadt, represented by the property management company of the Science City of Darmstadt (ida).

Offizielle Bezeichnung Tender

Germany
Closing Date24 Feb 2025
Tender AmountRefer Documents 
Contract notice - General guideline, standard regulation Open procedure (construction work) Rlt Rlt Rlt 1 x central ventilation unit, outdoor installation 7,300 cbm/h, 1 x central ventilation unit, indoor installation 2,070 cbm/h, 1 x central ventilation unit, indoor installation 1,500 cbm/h, 2 x central ventilation ... Mehrrlt Rlt Rlt 1 x central ventilation unit, outdoor installation 7,300 cbm/h, 1 x central ventilation unit, indoor installation 2,070 cbm/h, 1 x central ventilation unit, indoor installation 1,500 cbm/h, 2 x central ventilation units, indoor installation 1,300 cbm/h, 1 x roof fan, kitchen exhaust air 4,300 cbm/h, 1 x roof fan 540 cbm/h, 480 m² ventilation duct and fitting, 504 m Spiral folded pipe Dn 100-400, 66 M flexible pipe Dn 100-125, 7 x variable square volume flow controllers, 25 x variable round volume flow controllers Dn 250, 63 x constant volume flow controllers Dn 100-315, 4 x fire dampers with motor, 2 x weather protection grilles, 72 x ventilation valve Dn 100-125, 27 x ventilation grilles 225x125 - 825x225, 16 displacement air outlets semicircular-quarter-round-rectangular, 4 x swirl outlet, 55 m² aluminum-laminated insulation, 130 m² weatherproof insulation, 70 m² synthetic rubber insulation

Offizielle Bezeichnung Tender

Others
Germany
Closing Soon27 Jan 2025
Tender AmountRefer Documents 
Contract notice – general guideline, standard regulation Open procedure (services) Programming, hosting, maintenance and care of Typo3 projects in two lots Procurement of programming, hosting, maintenance and care of existing as well as new Typo3 projects to be created in two lots Services for 11 existing Typo3 websites for the HMSI The Hessian Ministry for Labor, Integration, Youth and Social Affairs (HMSI) is the client for Lot 1 and is responsible within the Hessian state government for the policy areas of anti-discrimination, work, securing skilled workers, flight and integration, women, children and young people, people with disabilities and social affairs. The ministries' extensive public relations work uses the possibilities of the Internet on the one hand via the presence of the Hessian state government and supplements this, thematically controlled, on the other hand via an independent thematic portal, the Social Network Hesse (www.sozialnetz.de). The social network is a presentation platform for various websites that prepare and present selected topics from the social sector in a target group-specific manner. The social network is not only the umbrella of these target group-specific websites, but also hosts them. A total of around 55 independent thematic appearances are currently being managed. After the re-establishment of the Hessian state government (beginning of 2024) and the associated division of the Hessian Ministry for Social Affairs and Integration into the Hmsi and Hmfg departments, it was decided that the Social Network Hesse web platform would remain with the Hmsi. The websites that thematically belong to the Hmfg are to continue to be operated on the same technical basis, but in the future will be set up as their own Typo3 platform. The services include: 1. Care, maintenance, further development and operation of the client's existing Typo3 websites under Typo3 (version 11) and a Drupal instance that contains a login-protected project ("team room"), including the necessary security updates and other minor updates and, upon separate request, major updates. 2. Creation of new Typo3 websites for the client in the existing instances or as a new instance, as well as their subsequent care/maintenance and operation. 3. Expansion and updating of the existing database Adressen-in-hessen.de. The specifications and the desired functions are described in detail in the document "anlage_adressen-in-hessen_los1". Services for 37 existing Typo3 websites and new development for the HMFG The Hessian Ministry for Family, Senior Citizens, Sports, Health and Care (HMFG) is the client for Lot 2 and is responsible for the policy areas of family, senior citizens, sports, health and care within the Hessian state government. The ministries' extensive public relations work uses the possibilities of the Internet on the one hand via the presence of the Hessian state government and supplements this, thematically controlled, and on the other hand via an independent thematic portal, the Social Network Hesse (www.sozialnetz.de). The Social Network is a presentation platform for various websites that prepare and present selected topics from the social sector in a target group-specific manner. The Social Network is not only the umbrella of these target group-specific websites, but also hosts them. A total of around 55 independent thematic presences are currently being managed. Following the re-establishment of the Hessian state government (beginning of 2024) and the associated division of the Hessian Ministry for Social Affairs and Integration into the Hmsi and Hmfg departments, it was decided that the Sozialnetz Hessen web platform would remain with the Hmsi. The websites that thematically belong to the Hmfg are to continue to be operated on the same technical basis, but will be set up as their own Typo3 platform in the future. The services include: 1. Care, maintenance, further development and operation of the existing Typo3 websites (see point 2 Scope / volume of the tender) under Typo3 (version 11) of the client, including the necessary security updates and other minor updates and, upon separate request, major updates. 2. Creation of new Typo3 websites for the client in the existing instances or as a new instance, as well as their subsequent care / maintenance and operation. 3. Invitation to submit a bid for the programming of a new website as a standard design. The specifications and the desired functions are presented in detail in the zip folder "Programming_standarddesign". The zip folder can be downloaded using the link (stored in the document "tender specifications"). This project is to be the first project to be implemented by the contractor after the contract has been awarded.

Offizielle Bezeichnung Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Germany
Closing Date13 Feb 2025
Tender AmountRefer Documents 
Contract notice - general guideline, standard rule Open procedure (services) ZKJF GmbH - Lot-based award of primary school care services as part of the Hessian state program "Pact for All-Day Care" from the 2025/2026 school year. The subject of the award procedure is the lot ... MoreZKJF GmbH - Lot-based award of primary school care services as part of the Hessian state program "Pact for All-Day Care" from the 2025/2026 school year. The subject of the award procedure is the lot-based award of primary school care services as part of the Hessian state program "Pact for All-Day Care" from the 2025/2026 school year at thirteen different primary schools in the Main-Kinzig district. Lot 1: Biebertal Primary School Biebergemünd-bieber - Address: Biebertalstraße 12, 63599 Biebergemünd - Start of service: August 1st, 2025 - Number of students: 110 - Students to be supervised: 110 + Of which 90 in Module 1 + Of which 20 in Module 2 - Rooms: The primary school consists of two main buildings and a gymnasium. Around the building there is a spacious outdoor area with a playground and meadows. The total size of the school grounds, including the built-up areas, is 15,030 square meters. The area is not fenced. In the lower building on the ground floor there is the school administration, a teachers' room and a meeting room, as well as the staff toilets. On the 1st floor there are a total of 4 classrooms, a small multifunctional room with games and a larger multifunctional room with the option for exercise and a kitchenette. In the upper building there are a total of 6 classrooms, a workshop, a library and a small meeting room. The support association currently has two classrooms available for the care facility. Other rooms can be used for doing homework. All rooms used across grades and subjects (e.g. library or workshop) are available. As the upper building is in dire need of renovation, the school will be building a new building in the next few years. Plans for this already exist and are currently being revised. There is no specific date for the start of construction yet. This new building complex will include a cafeteria and multi-purpose rooms that can be used as part of the all-day program. A temporary spatial solution must be found for the start on August 1, 2025, as the school does not currently have a cafeteria with a serving kitchen. The support association has set up a room in the school with furniture and toys for the care facility, which is used exclusively for care. There is also a small kitchenette here. Water is heated by an electric boiler. Since the start of the last school year, the childcare service has used a second classroom for lunch and homework support. As part of the all-day pact, the school authority is planning to set up and use as many as four classrooms as possible in a multifunctional manner. One room (or two rooms if necessary) must be converted into a serving kitchen and temporary cafeteria for lunch at short notice. The upcoming new building will mean that some work will be carried out using mobile serving equipment. The primary school gym can also be used for afternoon activities. As it is currently also frequently used by the gymnastics club, clear agreements between all those involved and, if necessary, a reorganization of the times of use are necessary. - Further information can be found in the Biebertal Biebergemünd-Bieber primary school's concept for implementing the all-day pact (appendix II.2.a of the service description). Lot 2: Wilhelm-hauff-schule Flörsbachtal-lohrhaupten - Address: Gartenstraße 28, 63639 Flörsbachtal - Start of service: August 1st, 2025 - Number of students: 82 - Students to be supervised: 30 + of which 25 in module 1 + of which 5 in module 2 - Rooms: The school has sufficient and varied space. Grades 1-4 are housed in building I. Since there have been two classes in year 2 since last school year, there is an additional classroom in building III. The workshop, which is used by all classes, is also located in building III. The religious studies room is in the basement. Since two classes are expected to start in year 1 in the 2025/2026 school year, the religious studies room will move. In the administration building there is an auditorium on the first floor, which is used for parties and celebrations, as well as a school kitchen. The music room is on the first floor. For all parties and celebrations in the auditorium, this means that there are short distances when it comes to transporting instruments, etc. On the ground floor of the administration building there is a reading corner, which is very popular with the students. The school has a paved schoolyard on three levels. There are painted hopscotch games on the third level, a table tennis table on the lower level, a games cupboard in the entrance area in which all the available play equipment is stored, and mobile equipment that is stored in the teaching materials room (ground floor), movable soccer goals, a reading corner in the entrance area with lounge furniture for "lounging" and/or as a place of retreat, a beanbag in the reading corner, a mobile bookshelf in the reading corner, a "green" classroom with an awning on the former gymnastics lawn. The following rooms will be made available for all-day care in the 2025/2026 school year: 1. School kitchen with adjoining, former preparation room as a dining room; the corresponding furniture is not yet available. 2. The existing support association rooms will be included. The rooms for doing homework are known to the students. This room is currently equipped with 14 chairs and corresponding tables. There is also a room opposite for playing and relaxing (= rest area). 3. The schoolyard can be used as a place to play and exercise. The playground games are in the entrance area of the administration. The gym is available to the students and all clubs. Based on current knowledge, it should be possible to use the hall for the all-day offer. 4. There is a cooperation with the local library, which supplies the students with books every week - a selection of books is also available in the book corner. 5. The classrooms in building I can be used as needed. 6. The school premises are not barrier-free. 7. There are no rooms for special education and care for pupils with physical disabilities, for example. 8. The parents' room, the teachers' room or the DAZ room are available for meetings and administrative work by the care provider. 9. The Nawi room in building 3 is available for experiments and projects. In the future, corresponding working groups could take place here. - Further information can be found in the Wilhelm-Hauff-Schule Flörsbachtal-Lohrhaupten concept for implementing the pact for all-day schooling (appendix II.2.b of the service description). Lot 3: School at the village square Freigericht-Altenmittlau - Address: Kegelbahnstraße 59, 63579 Freigericht-Altenmittlau - Start of service: August 1st, 2025 - Number of students: 80 - Students to be supervised: 50 + of which 35 in module 1 + of which 15 in module 2 - Rooms: The school comprises three parts of the building: On the ground floor of the new building there are three classrooms, the student toilets and the technical room. On the first floor there is another classroom, the computer room, administration wing (teachers' room, school management office, caretaker's office and secretary's office) and the teachers' toilets. On the second floor/top floor there are two former classrooms that are used as a school kitchen and music room (choir, guitar and flute course, music club). These rooms were formerly used as care rooms and were renovated by the support association and the caretaker after the move to the old building. Directly past the administration wing is the passage to the attached community hall/gymnasium, which is mainly used for school sports. There are also changing rooms and other toilet facilities there. The gymnasium is currently available for sports activities on 2 afternoons (Zumba courses on Wednesdays, sports club on Thursdays). In the old building (110 years old) the windows were renovated/replaced 2 years ago so that the rooms can still be used. On the ground floor, after the extensive renovation last year, there is a former classroom that serves as a play and care room, the new school kitchen/canteen (former workshop), a laundry/cleaning room and student toilets. On the first floor you will find the lavishly expanded student library, which extends over 2 rooms (wall opening). It also houses the care office and, in the future, the office of the all-day coordinator. Two further rooms are connected by a hole in the wall and are available for educational homework supervision, free learning times and afternoons. On the 2nd floor/attic there are table/chair storage rooms and an attic that is not used. - Further information can be found in the concept of the school at Dorfplatz Freigericht-Altenmittlau for the implementation of the pact for all-day schooling (appendix II.2.c of the service description). Lot 4: Igelsgrundschule Gelnhausen Höchst - Address: Schulstraße 11, 63571 Gelnhausen - Start of service: August 1st, 2025 - Number of pupils: 161 - Pupils to be supervised: 120 + of which 90 in module 1 + of which 30 in module 2 - Rooms: There are currently two separate rooms in the classroom wing available for school supervision. In addition, other multifunctional rooms are used for learning, play and relaxation phases. There is a kitchen with seating for eating meals. The school library also serves as a quiet room and the auditorium is used by children to play together when the weather is bad. Homework support and support group work takes place in classrooms, as these promote a learning atmosphere by being equipped with tables and chairs. The study groups take place in the multifunctional rooms and also in the playground, in the gym or in the garden area. However, the current space is not sufficient for around 90 students. The kitchen is not designed for such a high number of students. In particular, there is no cafeteria. The concept and use of the rooms is to be re-planned and urgently required structural renovation measures are to be implemented as quickly as possible. These are currently planned for 2026. - Further information can be found in the concept of the Igelsgrundschule Gelnhausen Höchst for the implementation of the pact for the whole day (appendix II.2.d of the service description). Lot 5: Herzbergschule Roth Gelnhausen Roth - Address: Rathausstraße 1, 63571 Gelnhausen - Start of service: August 1st, 2025 - Number of students: 84 - Students to be supervised: 55 + of which 35 in module 1 + of which 20 in module 2 - Rooms: The space situation at the Herzbergschule is severely restricted by its location in the middle of town and the right of use of the clubs in the town hall. Nevertheless, an attempt was made to use the little space as best as possible, which in turn leads to increased staff deployment, especially during the full day. The division of the school into two buildings means that double supervision is necessary. The distribution of the number of children according to the number of seats available in the rooms is also a factor. The current spatial conditions can only be reconciled with the school development goals of the Herzbergschule to a limited extent. The existing conditions were optimized together with the school authority. The buildings are separated by a traffic-calmed street. The two buildings, some of which are listed buildings, contain 5 classrooms ranging in size from 49m² to 56m² with ergonomic furniture. There is a multifunctional room (54m²) for the preparatory course, the intensive course, ethics lessons, work time and study groups. There is also a care room (50m²) with a kitchenette and a PC workstation, a PC room, the school library, the secretary's office, the teachers' room and a consultation room. Depending on the weather, the municipal playground and the neighboring village square are used as the schoolyard. The public village square is on the Mkk property, but due to its dual use it can only be included in the Herzbergschule's educational concept to a limited extent. The school relies on flexible, mobile equipment, but the limited storage options mean that the capacity is exhausted. Thanks to the cooperation with the Roth Music Association and TV Roth, their club rooms can be used to counteract the ever-increasing lack of space. The music association room is used as a music room and as an alternative for supervision when it rains. It is not possible to design the room to be child-friendly. The TV Roth club room is available for dance groups and the pre-holiday parties that take place four times a year. For sports lessons, the Willi Bechtold Hall is within walking distance. Unfortunately, the city of Gelnhausen rents out the room at regular intervals, which means that it is not used at all. The teachers' room was redesigned in 2017 and offers limited opportunities for preparing for or following up on lessons. Specialist teachers without a classroom do not have the opportunity to store their own materials in the teachers' room. The staff meeting of the teaching team takes place in the care room on the children's furniture. The furniture does not meet the requirements of ergonomics in the workplace. The serving kitchen and the administrative computer of the all-day coordinator are also located in this room. Due to the age of the school building and the former town hall, the buildings do not have spacious hallway areas. In this respect, there is no possibility of expanding the space available. Since the school does not have a large room for the whole school community, all events have to take place outdoors and are therefore always dependent on the weather. - Further information can be found in the Herzbergschule Roth Gelnhausen Roth concept for implementing the pact for all-day schooling (appendix II.2.e of the service description). Lot 6: School at the Hofgut Mittel-gründau - Address: Hofweg 1, 63584 Gründau - Start of service: August 1st, 2025 - Number of students: 86 - Students to be cared for: 35 + Of which 25 in Module 1 + Of which 10 in Module 2 - Rooms: The school's existing rooms, including the multifunctional rooms and the container building, are used for all-day care. The outdoor area with the play equipment also offers space for exercise and play. The school at the Hofgut has four classrooms, two multifunctional rooms and an outdoor area with play equipment. One multifunctional room is currently used as an additional classroom due to the high number of students in class 4, as well as an inclusion room for the individual instruction of a child with a focus on learning. The other multifunctional room serves as a school library, PC and media room, as well as a room for remedial teaching and school social work. One of the classrooms is a little larger and has a separate outside door that faces the schoolyard playground and the current care building. Due to its location and size, it is ideally suited as one of the future rooms for homework supervision and other all-day activities. Like the classrooms, the multifunctional rooms have digital whiteboards and some work tables with chairs. Another room serves as a materials and workshop room. The administration (school management and secretariat) use two connected office rooms. The school itself has no cafeteria, dining rooms or suitable kitchen for lunch. There is only a fitted kitchen in the teachers' room. The municipality's container building, which is currently used by the "villa Krake" care center, is also possibly available. It could possibly continue to be used as a care and leisure center if the necessary renovation work on the kitchen were carried out in a timely manner. Long-term planning for the construction of a needs-based cafeteria with a kitchen and other rooms on the school premises or the adjacent municipal property is being developed in cooperation with the municipality and the district. In the near future, there will probably be minor adjustments and extensions to the furniture and equipment in the school rooms and the care rooms. In order to be able to use the classrooms both as teaching rooms and as care rooms for homework and other activities, multifunctional furniture, rollable shelves, rollable room divider shelves and, above all, additional height-adjustable seating are essential. - Further information can be found in the concept of the school at Hofgut Mittel-Gründau for the implementation of the pact for all-day schooling (appendix II.2.f of the service description). Lot 7: Geisbergschule Linsengericht Eidengesäß - Address: Schulstraße 29, 63589 Linsengericht - Start of service: August 1st, 2025 - Number of students: 227 - Students to be supervised: 110 + 80 of them in module 1 + 30 of them in module 2 - Rooms: The Geisbergschule is spread over three wings with the administration rooms, the teachers' room, the specialist rooms and the classrooms, all of which are connected to each other but are accessible via different entrances from the upper and lower schoolyard. There are currently 10 classes belonging to the Geisbergschule. The teachers' room is used jointly by the staff of the Geisbergschule and the Brentanoschule. In addition to a first aid room and three administrative rooms, there is a relaxation room that was newly furnished in the 2023/24 school year as part of the project week. The school has additional specialist rooms: a movement room, a multi-purpose room (music/meeting room), a kitchen, a workshop, a network room and a school library. All specialist rooms are shared with the speech therapy school and are regularly and actively used by both schools during morning lessons. The seven speech therapy classes of the Brentano School with a total of 54 pupils are represented at the Geisberg School and are therefore primarily housed in the classrooms in the wing on the upper school yard. Due to the almost daily presence of the speech therapists, an additional support room is primarily used by the Brentano School. Time overlaps between the speech therapy lessons at the speech therapy school and the preparatory course at the Geisberg School recently made it necessary for the latter to take place in a room next to the workshop. The supervision of the pupils before and after lessons currently takes place in an extension with adjacent containers on the upper school yard. There are four rooms in the care center, the fourth of which was built on as a residential container. The kitchen and dining room are also housed in a container built specifically for this purpose. The school's classrooms are available for homework support. The care center also uses the outdoor area and the gymnasium and, depending on staff capacity, parts of the former caretaker's house, which is also on the school premises but urgently needs to be renovated and equipped with furniture and play materials. The gymnasium is shared with the speech therapy school in the mornings and used by the care center and the Geislitz gymnastics club in the afternoons. For swimming lessons in the third year, all children go to the indoor pool in Gelnhausen with their swimming teachers. Due to the high birth rate and the looming three-stream system at the Geisberg School, as well as the steadily growing speech therapy department at the Brentano School, the spatial situation at the Geisberg School is becoming increasingly problematic. The school is in contact with the school authority in this regard. With regard to the rooms, the following measures have already been planned or will be continued: The homework groups are distributed across different classrooms. AGs can take place in the classrooms and specialist rooms in the afternoon, but in the morning lessons the options for moving to other rooms outside of classrooms are limited. Fixed plans for the specialist rooms are not possible due to the fact that two schools are under one roof and share the specialist rooms. With regard to the gym, the Brentano School has been allocated a fixed day of the week for physical education and another fixed period for the weeks in which the indoor pool is closed and no swimming lessons can take place. The situation is similar with the kitchen and other specialist rooms. There will probably still be four lunch groups and these will be mixed together, also changing daily, depending on when lessons end for the respective classes. Every change in the timetable makes a change in the composition of the meal groups unavoidable. The options in the container have proven to be extremely limited. There is still no solution for this. It still needs to be clarified with the school authority how the lunch situation can be alleviated. As part of the digital pact, the network room was re-equipped. There are now a total of 56 iPads available, 20 of which always remain in the network room, while the others can be borrowed for the classrooms (e.g. when doing homework, for research). The room and the iPads can also be used in support lessons and extracurricular activities. - Further information can be found in the Geisbergschule Linsengericht Eidengesäß concept for implementing the pact for all-day schooling (appendix II.2.g of the service description). Lot 8: Erich-Simdorn-Schule Neuberg - Address: Rüdigheimer Straße, 63543 Neuberg - Start of service: August 1st, 2025 - Number of students: 192 - Students to be supervised: 105 + 80 of them in module 1 + 25 of them in module 2 - Rooms: The student care service is currently using an extension consisting of 2 maxi containers, two former classrooms in the pavilion, and in the afternoons the rooms on the ground floor in the main building (2 classrooms and the craft/music room for homework and homework supervision). As part of the all-day school, the library in the main building can be integrated into the room concept. Support offers take place in the existing rooms in the main building. The sports hall is used by the school in the mornings and by local clubs from 2:45 p.m. The sports hall is used for sports groups in alternating mode from 12.15 p.m. to 1.45 p.m. In the summer, the Erich Simdorn School uses the neighboring sports grounds of the municipality of Neuberg. There is currently space for 36 pupils to eat lunch in the cafeteria kitchen. Lunch is currently served to 90 children in five shifts. The kitchen has a food counter with heating devices, a cold food counter, a plate warmer, a crockery cupboard, a refrigerator, an industrial dishwasher, a washing machine, a tumble dryer and a sink with a hand basin. There is also a kitchenette with a sink, two stoves and two ovens. The school has two exercise rooms, the gym and the schoolyard. There are also a number of project rooms, such as a library and a music and craft room. The school also has options for teacher workstations and a teacher's room. - Further information is available in the concept The Erich-Simdorn-Schule Neuberg for the implementation of the pact for all-day schooling (appendix II.2.h of the service description). Lot 9: Adolf-Reichwein-Schule Rodenbach - Address: Alzenauer Str. 25, 63517 Rodenbach - Start of service: August 1st, 2025 - Number of students: 770 in total, of which 398 in the elementary school - Students to be supervised: 150 + of which 100 in module 1 + of which 50 in module 2 - Rooms: The rooms currently available are in the elementary school wing, in the so-called "b-wing". In the two-story building, there is a classroom, the media library, the secondary school workshop and the toilets on the ground floor. On the first floor there are three rooms of the supervised elementary school, a school kitchen and the cafeteria. Opposite there are two more classrooms and toilets on the first floor of the so-called "a-wing", on the ground floor there is the preparatory class, a storage room and the art room, which is currently used by the secondary school. In an extension, in the "e-wing", on the edge of the schoolyard there is the auditorium, which is used for teaching purposes in the morning. The auditorium is also used for a variety of events such as conferences, information events, parents' evenings, parents' cafe on the first day of school, as an exercise room, as a practice room for clubs and much more. From the 2025/26 school year, the new room concept envisages the classrooms being used for lessons in the morning and at lunchtime/afternoons for homework supervision, study time or for the support of individual children or small groups. Appropriate furniture should enable multifunctional use of the rooms (lockable, with wheels). Discussions with the school authority are already taking place. There are currently two sports halls available, which are very busy in the mornings due to physical education classes for primary and secondary school students. In the afternoons, the gyms are mainly used by clubs. Since the halls are to be used all day, discussions with the clubs are planned with a view to cooperation. It must already be taken into account that, given the increasing number of pupils, there are not enough classrooms and that more containers will have to be provided. The auditorium will continue to be available primarily for lessons in the mornings. It will also still be possible to use it for school events and parties. The auditorium can be used as part of the all-day offerings, e.g. for a theater group, for arts activities or quiet exercise activities (relaxation, yoga). - Further information can be found in the Adolf Reichwein School Rodenbach's concept for implementing the all-day pact (Appendix II.2.i of the service description). Lot 10: Sterntalerschule Schöneck - Address: Wiesenau 3, 61137 Schöneck - Start of service: August 1st, 2025 - Number of students: 173 - Students to be supervised: 130 + 85 of them in module 1 + 45 of them in module 2 - Rooms: After completion of the new building, the Sterntalerschule will have 8 classrooms, three multifunctional specialist/ag/care rooms, an open differentiation area, a multifunctional room, a cafeteria and a parents' meeting room (approx. 3m³). There are different rooms in which different activities take place for the children: four classrooms are available as permanent rooms for homework supervision after the end of lessons. There is a games room with a table football table, air hockey, board games, puzzles, a Barbie house and role-playing games. In the creative room you will find everything to do with handicrafts, painting, gluing, cutting, ironing beads etc. The construction room is used for building, playing with Lego, includes a marble run, construction toys and much more. The room is equipped with floor mats, tables and chairs. There is also a so-called mat room, which is used for romping. This is equipped with mats, cushions, foam building blocks, swimming noodles and more. Here 10 children can romp around at the same time for half an hour under the supervision of a carer. There is also a relaxation room and a music room for musical activities. Like the aforementioned rooms, the classrooms are also available for multifunctional use. There is a gym and a fairly spacious outdoor area on the school premises. - Further information can be found in the Sterntalerschule Schöneck concept for implementing the pact for the whole day (appendix II.2.h of the service description). Lot 11: Friedrich-ebert-schule Schöneck - Address: Bleichstraße 9, 61137 Schöneck - Start of service: August 1st, 2025 - Number of students: 240 - Students to be supervised: 135 + of which 90 in module 1 + of which 45 in module 2 - Rooms: Classrooms are available for homework or individual learning time. It is possible to set up different learning groups that are spatially separated. Further supervision takes place in three rooms in the cafeteria wing. There are classrooms and a supervision room with sufficient workstations available, in which both the preparatory courses and support offers take place. There is a gymnasium. The hall plan is adapted annually to the needs of the all-day concept. In the outdoor area, the existing facilities (green classroom, play bushes, school garden, etc.) have been supplemented by a balance bar, among other things. In bad weather, the Erich-Simdorn-Halle right next to the school can be used - in consultation with AGS and clubs. The school also has a room for breaks and lunch. The cafeteria set up for this purpose serves the school and is also used for teaching purposes. - Further information can be found in the Friedrich-Ebert-Schule Schöneck concept for implementing the pact for all-day schooling (appendix II.2.k of the service description). Lot 12: Aufenau Primary School Wächtersbach/aufenau - Address: Frankfurter Str. 26, 63607 Wächtersbach - Start of service: August 1st, 2025 - Number of students: 110 - Students to be supervised: 80 + 60 of them in module 1 + 20 of them in module 2 - Rooms: The primary school's rooms consist of two building complexes: an old building from 1910 and an extension from 1997. In total, the following are available for school purposes: seven classrooms, a cafeteria with kitchen, a multi-purpose room, a teachers' room with materials room, a multifunctional room (craft and music room, room for preparatory course, etc.), a library and two office rooms. The school grounds have a fenced-in playground with climbing equipment, a swing, a play tower with a slide and a sandpit, a large lawn, a green classroom, a playhouse with balls, ropes, pedalos etc., an asphalted schoolyard and a football pitch, a paved area between the two parts of the building with a table tennis table and a car park with 9 spaces. As the school does not have a gymnasium, physical education classes take place in the rooms of the cultural centre in Aufenau. The all-day offer takes place mainly in the old building and in the multi-purpose room of the new building. Classrooms are occasionally used. After meals, the children can play outside or keep themselves busy inside when it rains. - Further information can be found in the concept of the Aufenau Wächtersbach/Aufenau primary school for the implementation of the all-day pact (appendix II.2.l of the service description). Lot 13: Hasela School Linsengericht-Altenhaßlau - Address: Bergstrasse 18, 63589 Linsengericht - Start of service: August 1st, 2025 - Number of students: 137 - Students to be supervised: 70 + 50 of them in module 1 + 20 of them in module 2 - Rooms: The Hasela School has 8 classrooms, a teachers' room, three administration rooms, a tea kitchen and an auditorium/atrium. There are no additional specialist rooms such as music, art or craft rooms, kitchen, parent-teacher room or differentiation or rest rooms. One administration room (the secretariat) was divided: In the rear area, a workstation for the secretary was created; in the front area there is a small student library. A container for supervision is used by the preparatory course in the mornings. The gym is a three-field hall and is used by both the Hasela School and the Brentano School. Occupancy is coordinated with the Brentano School every six months. As the Brentano School is an all-day school, capacity is limited. Swimming lessons, which are given in the third year, take place in the indoor and outdoor pools of the town of Gelnhausen. The following rooms are available for the implementation of the so-called exercise activities: schoolyard, adventure playground behind the school and sports field (artificial turf) directly opposite the school (also used as a play area during recess). - Further information can be found in the Hasela School Linsengericht-Altenhaßlau concept for implementing the pact for all-day schooling (appendix II.2.m of the service description).

Offizielle Bezeichnung Tender

Civil And Construction...+1Civil Works Others
Germany
Closing Date4 Feb 2025
Tender AmountRefer Documents 
Contract notice - General guideline, standard rule open procedure (construction work) 008-2025, sports hall renovations Eks/gag/igs, interior construction, brickwork, interior plastering, TB, painter, floor covering, tiling, floor covering work in a total usable area of approx. 3,200 m² in the changing rooms, showers and functional areas of school sports halls. Work on 3 double sports halls at various. Locations in the Hochtaunus district 008-2025, sports hall renovations Eks/gag/igs, interior construction work - brickwork, interior plastering, Tb, painting, floor covering, tiling, floor covering work in a total usable area of approx. 3,200 m² in the changing rooms, showers and functional areas of school sports halls - work on 3 double sports halls at various locations in the Hochtaunus district
361-370 of 388 active Tenders