Embankment Const. & Compaction At Canalization, Supply, Delivery & Installation Of Hdpe Pipes, Const. Of Canalization & Canal Structures For Svis, Siay, Zamboanga Sibugay , Construction Projects ,national Irrigation Administration - Region Ix
Description
Description Section I. Invitation To Bid Invitation To Bid For Embankment Const. & Compaction At Canalization, Supply, Delivery & Installation Of Hdpe Pipes, Const. Of Canalization & Canal Structures For Svis The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2025 National Expenditure Program (nep) For General Appropriation Act (gaa) 2025 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-epa-restonis2025-009 (infra) Project Name : Sibuguey Valley Irrigation System Contract Location : Siay, Zamboanga Sibugay Scope Of Works : Embankment Const. & Compaction At Canalization, Supply, Delivery & Installation Of Hdpe Pipes, Const. Of Canalization & Canal Structures Approved Budget For The Contract (abc) : Php 83,027,440.58 Contract Duration : 300 Calendar Days Amount Of Bidding Documents : Php 50,000.00 The Nia – Ro9 Bac Is Conducting An Early Procurement Activity (epa) On Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : December 7 – 26, 2024 At 8:30 Am Pre-bid Conference : December 13, 2024 At 9:00 Am Submission Of Bids : December 26, 2024 At 8:30 Am Opening Of Bids : December 26, 2024 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting December 7 – 26, 2024. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 13 December 2024 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 26 December 2024 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below. The Nia – Ro9 Bac Additional Guidelines Is The Conduct Of Site Inspection To Be Scheduled During Pre-bid Conference. • The Certificate Of Site Inspection Shall Be Issued And Signed By The Nia R9 Authorized Representative After The Activity, Which Shall Be Required To Include In The Bid Tender (technical Component). Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/hev-uxfp-utg Opening Of Bids : Https://meet.google.com/bkn-midq-rvv Any Requests For Additional Information Concerning This Bidding Shall Be Directed To The Following: Marietta M. Cortes Bac Secretariat Head, Nia-regional Office Regional Center Ix, Balintawak, Pagadian City, Zambo. Sur Niaregion9bac@gmail.com 09630884373 – Office Number Date Posted: December 7, 2024 (sgd) Antonio B. Gujeling Bac Chairperson 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Completed For The Past Five (5) Years. • Irrigation & Flood Control To Be Eligible To Bid For The Contract, Bidders Must Have Done A Single Largest Completed Contract (slcc) Containing A Category Of Work Which Is The Same As Or Similar To The Major Category Of Works, And Who’s Total Slcc Cost Is At Least 50% Of The Approved Budget For The Contract (abc) To Be Bid. The Above Slcc Must Be Supported By A Copy Of The Contract, Certificate Of Completion, And Owner’s Certificate Of Final Acceptance (1-year After The Issuance Of The Certificate Of Completion) Issued By The Project Owner Other Than The Contractor Or A Final Rating Of At Least Satisfactory In The Constructors Performance Evaluation System (cpes). In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Interested Bidders Shall Have At Least Or Any Equivalent To Pcab Size Range “medium A” Category: “b” (per Pcab Board Resolution No. 201, Series Of 2017) 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel Relevant Experience General Experience Number Project Engineer 5 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 5 Years 1 Office Engineer 3 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 3 Years 1 Materials Engineer 1 3 Years Shall Be An Accredited Material Engineer Of Dpwh. Shall Render Service To The Project As Required. 3 Years 1 Foreman 5 Years Experienced In Irrigation Structures. Shall Render Fulltime Service To The Project Until Completion. 5 Years 1 Safety & Health Officer (so2) 3 Years Shall Have At Least 3 Years’ Experience In Construction Industry. Completed Cosh Training And Shall Render Fulltime Service To The Project Until Completion. 3 Years 1 Geodetic Engineer 3 Years Licensed Geodetic Engineer. Shall Render Service To The Project As Required. 3 Years 1 The Contractor May Assign Other Support Personnel From Those Listed For The Optimal Performance Of The Project Construction Team. The Support Personnel Shall Undertake The Required Day-to-day Site Or Office-related Activities Of The Contractor. Full Time Services Mean, The Personnel Involved Shall Render Minimum Of Eight (8) Hours A Day Or Forty (40) Hour A Week And Shall Be Available Upon Request Of The Procuring Entity. 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity No. Of Units Excavator Crawler Type 1 Cu.m 3 Excavator Crawler Type W/ Vibro Hammer 1 Cu.m 1 Roller Compactor 10 Tons 1 Dumptruck 10-wheeler 10 Cu.m 3 Concrete Mixer 1 – Bagger 5 Concrete Vibrator 5 Butt Fusion Machine 800mm Ø 1 Set Generator Set 10kva 1 Set Survey Instrument 1 Set Initial Equipment Requirement Upon Mobilization: Equipment Capacity No. Of Units Excavator Crawler Type 1 Cu.m 3 Dumptruck 10-wheeler 10 Cu.m 3 Survey Instrument 1 Set The Proof Of Ownership Of Equipment Requirements Are Copies Of Current Lto Official Receipt (or) And Certificate Of Registration (cr) Of The Equipment Which Should Be Attached Together With The Affidavit Of Ownership. In Case Of Leased Equipment, A Lease Contract And Affidavit Of Commitment Or Certificate Of Availability Of Equipment Should Be Submitted With The Lessor/owner As The Pledger Of The Equipment, Stating Therein That The Equipment Will Be Available For The Whole Duration Of The Project. For Purchase Agreement, The Description Of The Equipment To Be Purchased Such As Brand/model, Type Of Equipment, Motor No., Body No. And The Capacity Must Be Indicated In The Document, Otherwise, The Bac Will Not Honor The Purchase Agreement And The Bidder Will Be Declared As Non-complying. Likewise, List Of Contractor’s Major Equipment Units Pledged To Be Used For The Project Must Be Supported By Proof Of Ownership If It Is Owned, Lease Agreement If It Is Being Leased And Purchase Agreement If To Be Purchased. A Certification Of Availability Of Equipment For The Duration Of The Project Must Also Be Provided By The Equipment Owner And/or Lessor/vendor. The Bidder Should Also Specify In The Submitted Bid The Location Of The Equipment Where It Can Be Inspected. If Any Piece Of Equipment Is Not In The Specified Location, Then The Bidder Shall Be Post-disqualified. Item No. Description Qty Unit I. Temporary Works, Construction And Installation Of Billboards, Construction Plant, Mobilization Of Construction Equipment And Demobilization 1 Ls Ii. Construction Safety And Health 1 Ls Iii. Hdpe-pipeline Canalization Common Excavation (mechanized) 4,550.02 Cu.m Overhaul 4,550.02 Cu.m Gravel Bedding (boulder Bedding) 1,866.00 Cu.m Embankment Construction And Compaction Borrow Haul (with Timber Matting) 13,450.10 Cu.m Structure Excavation (mechanized) 3,075.00 Cu.m Structure Backfill (mechanized) 2,380.00 Cu.m Reinforced Concrete Pile (0.20m X 0.20m) 1,368.00 Ln.m Concrete Footing Class A Concrete, 20.76 Mpa 90.67 Cu.m Rsb (reinforcing Steel Bars) 13,520.67 Kg Concrete Flume Set Class A Concrete, 20.76 Mpa 13.60 Cu.m Rsb (reinforcing Steel Bars) 5,281.33 Kg Hdpe 800mm Ø With Accessories (1 – 45 Deg X 630mm Ø Elbow Fitting Hdpe Pipe) (1 – 30 Deg X 630mm Ø Elbow Fitting Hdpe Pipe) Supply And Delivery 143.00 Pc Installation Of Hdpe And Accessories 227.00 Pc Sand Bedding 223.60 Cu.m Canal Structures Manhole (every 60m) Class A Concrete, 20.76 Mpa 104.27 Cu.m Rsb (reinforcing Steel Bars) 5,328.93 Kg Iv. Canalization (bench Flume) Common Excavation (mechanized) 3,109.72 Cu.m Common Backfill (mechanized) 2,213.72 Cu.m Concrete Class A Concrete, 20.76 Mpa 139.30 Cu.m Rsb (reinforcing Steel Bars) 4,500.20 Kg Gravel Bedding 108.72 Cu.m Borrow Haul 3,767.07 Cu.m V. Canal Structures Structure Excavation (mechanized) 124.40 Cu.m Structure Backfill (mechanized) 60.10 Cu.m Concrete Class A Concrete (3,000 Psi) – Plain Concrete 64.30 Cu.m Rsb (reinforcing Steel Bars) 4,402.90 Kg Gravel Bedding 21.36 Cu.m
Contact
Tender Id
4ed52ce4-ea00-3a4c-9e36-a8fef6a6de04Tender No
11587605Tender Authority
National Irrigation Administration ViewPurchaser Address
-Website