Municipality Of Tiaong, Quezon Tender
Municipality Of Tiaong, Quezon Tender
Costs
Summary
Construction Of Multi-purpose Building, Municipal Compound, Poblacion 3, Tiaong, Quezon , Construction Projects ,municipality Of Tiaong, Quezon
Description
Description B Other General Requirement Mobilization 1 Lot Demobilization 1 Lot Design Services 1 Lot Hauling 1 Lot Health And Safety 10 Mos Scaffolding And Formworks 1 Lot 605 Project Signboard Materials Tarpaulin 1.00 Pcs. Ordinary Plywood 4' X 8' X 1/2" 2.00 Pcs. Cocolumber 2" X 3" X 12' 5.00 Pcs. Assorted Common Nail 1.00 Kgs. Labor 1 Carpenter 0.50 Day 1 Laborer 0.50 Day A1 Masonry Work Qty 1400 + 250 Sq.m. Materials 150mm Concrete Hollow Blocks 23,000 Pcs 10mm Dia. Deformed Bars 1,300 Pcs Cement 1,600 Bags Sand 150 Cu.m. Tie Wire 12 Box Labor 1 Forman 27 Days 15 Skilled Worker 27 Days 15 Labor 27 Days Equipment Minor Tools (5% Of Labor Cost) A2 Plastering And Painting Works Qty 2760 + 500 +610 Sq.m. Materials Flat Latex 120 Tin Semi Gloss 140 Tin Skim Coat 850 Bags Cement 170 Bags Sand 60 Cu.m. Pioneer A& B 30 Liter Reducer 30 Pcs Liquid Tile 12 Gallon Mesh Tape 50 Pcs Liha 40 Meters Baby Roller 200 Pcs Brush #2 200 Pcs Paint Tray 20 Pcs Masking Tape 20 Pcs Diyaryo 50 Kilos Basahan 100 Kilos Consumables 1 Lot Labor 1 Forman 23 Days 15 Skilled Worker 23 Days 15 Labor 23 Days Equipment Minor Tools (5% Of Labor Cost) A3 Roofing Works Materials Ga #24 Pre-painted Rib-type Roofing Sheets 4ft X 62ft 50 Pcs Ga #24 Pre-painted Rib-type Roofing Sheets 4ft X 65ft 33 Pcs Ga #24 Pre-painted Gutter X 8ft 36 Pcs Ga #24 Pre-painted Ridge Roll X8 Ft 25 Pcs 10mm Thk. Double Sided Insulation Foam 35 Pcs 8mm Rivet X 2inch Length 7,000 Pcs Roof Sealant 20 Liters 3mm X 15mm Flat Bar 50 Pcs Consumables 1 Lot Labor 1 Forman 22 Days 12 Skilled Worker 22 Days 10 Labor 22 Days Equipment Minor Tools (5% Of Labor Cost) A4 Ceiling Works Materials 8mm Thk. Gypsum Ceiling Board 300 Pcs 600 X 600 X 15 Mm Thk. Acoustic Ceiling 900 Pcs 0.6mm X 40mm Metal Wall Runner X 5meters 150 Pcs 0.6mm X 50mm Metal Furring Channel 1,100 Pcs Furring Clip 1 Lot 6mm Rivet 1 Lot 0.6mm Thk Metal T-beam Ceiling Frame 250 Pcs 0.6mm Thk Metal Cross-beam Ceiling Frame 180 Pcs 10mm Suspension Rod With Carrying Hanger 1 Lot Consumables 1 Lot Labor 1 Forman 20 Days 10 Skilled Worker 20 Days 10 Labor 20 Days Equipment Minor Tools (5% Of Labor Cost) A5 Tile Works Materials 600mm X 600mm Granite Tiles; Color: White 3,400 Pcs 300mm X 600mm Floor Tiles Rustic Gray Finish 400 Pcs 300mm X 600mm Wall Tiles Rustic Gray Finish 1,200 Pcs 450x450 Vinyl Tiles 1,450 Pcs Rugby 100 Qrts Tile Adhesive 600 Bag Sand 16 Cu.m. Tile Grout 240 Kg Consumables 1 Lot Labor 1 Forman 30 Days 15 Skilled Worker 30 Days 15 Labor 30 Days Equipment Minor Tools (5% Of Labor Cost) A6 Doors Materials D1 - 12mm Thk. Tempered Glass 1000mm X 2500mm 4 Set D2 - Ga#24 Steel Door 1000mm X 2500mm 2 Set D3 - Solid Swing Door 1000mm X 2100mm 7 Set D4 - Ga#24 Steel Door 1000mm X 2100mm 4 Set D5 - Solid Door 1000mm X 2100mm 1 Set D6 - Solid Swing Door 1000mm X 2100mm 2 Set Rd1 3300mm X 4594mm 1 Set Rd2 3300mm X 3830mm 1 Set 12mm Thk Frameless Tempered Glass Panel 1000mm X 2500mm 9 Pcs 20mm Thk Phenolic Board 1 Lot 4" Door Hinges 100 Pcs Door Knob For Wood Door 12 Pcs Door Knob For Steel Door 4 Pcs Metal Epoxy Paint 12 Li Quick Drying Enamel 20 Li Consumables 1 Lot Labor 1 Forman 20 Days 9 Skilled Worker 20 Days 9 Labor 20 Days Equipment Minor Tools (5% Of Labor Cost) A7 Windows Materials W1 - 12mm Thk. Glass Fixed Window 1417mm X 1567mm 1 Pcs W2 - 12mm Thk. Glass Fixed Window 4200mm X 1971mm 1 Pcs W3 - 12mm Thk. Glass Fixed Window 1920mm X 2092mm 1 Pcs W4 - 12mm Thk. Glass Fixed Window 4200mm X 1971mm 1 Pcs W5 - 12mm Thk. Glass Fixed Window 1417mm X 1567mm 1 Pcs W1a - 12mm Thk. Glass Fixed Window 1417mm X 1850mm Pcs W2a - 12mm Thk. Glass Fixed Window 4200mm X 1850mm 2 Pcs W3a - 12mm Thk. Glass Fixed Window 1920mm X 1850mm 1 Pcs W6 - 12mm Thk. Glass Awning Window 4000mm X 1600mm 6 Pcs W7 - 12mm Thk. Glass Awning Window 2000mm X 1600mm 19 Pcs W8 - 12mm Thk. Glass Awning Window 1500mm X 1600mm 1 Pcs W9 - 12mm Thk. Glass Awning Window 1100mm X 1600mm 1 Pcs W10 - 12mm Thk. Glass Awning Window 4000mm X 1100mm 1 Pcs W11 - 12mm Thk. Glass Awning Window 600mm X 400mm 21 Pcs W12 - 12mm Thk. Glass Fixed Window 900mm X 1850mm 12 Pcs Consumables 1 Lot Labor 1 Forman 20 Days 13 Skilled Worker 20 Days 13 Labor 20 Days Equipment Minor Tools (5% Of Labor Cost) A8 Drywall Works Qty 305sqm Materials 15mm Thk. Fiber Cement Board 240 Pcs 32mm X 102mm X 0.8mm Thk Metal Stud 1,220 Pcs 6mm Rivet 1 Lot Gasa Tape 30 Pcs Polituff With Hardener 20 Li 8mm Anchor Bolt 720 Pcs Consumables 1 Lot Labor 1 Forman 15 Days 13 Skilled Worker 15 Days 12 Labor 15 Days Equipment Minor Tools (5% Of Labor Cost) A9 Acrylic Glass Design Materials Acrylic Sheet 3.0mm X 4'x8' 6 Pcs Acrylic Customized Letter 3.0mm Thk 25 Pcs 38x38x3.0mm Angle Bar 15 Pcs 38mmx3.0 Flat Bar 10 Bags Blind Rivet 1 Lot 10mm Dyna Bolt 1 Lot Epoxy Primer 20 Liters Consumables 1 Lot Labor 1 Forman 9 Days 2 Skilled Worker 9 Days 2 Labor 9 Days Equipment Minor Tools (5% Of Labor Cost) A10 Aluminum Cladding And Ceiling Materials 3mm Aluminum Composite Cladding Panel 190 Pcs 38x38x3.0mm Angle Bar Support 380 Pcs Blind Rivet 1 Lot 10mm Dyna Bolt 1 Lot Sealant 1 Lot 10mm Rod Hanger 1 Lot Epoxy Primer 50 Liters Consumables 1 Lot Labor 1 Forman 15 Days 11 Skilled Worker 15 Days 11 Labor 15 Days Equipment Minor Tools (5% Of Labor Cost) A11 Carpentry Works Materials 20mm Thk Marine Plywood 40 Pcs 8mm Thk. Gypsum Board 20 Pcs 0.6mm X 40mm Metal Wall Runner X 5meters 40 Pcs 0.6mm X 50mm Metal Furring Channel 40 Pcs 1" Hinges X5m Long 17 Pcs Quick Drying Enamel For Wood 25 Liters 1 Liter Polytuff 30 Liters Finishing Nail 1 Lot Liha 20 Box Baby Roller 35 Pcs 2 Inches Brush 60 Pcs Countertop With Cabinet At Kitchen 1 Lot Countertop At Cr (female/male) 2 Lot Countertop At Pwd/common Cr 2 Lot Countertop With Cabinet At Pantry 1 Lot Consumables 1 Lot Labor 1 Forman 15 Days 7 Skilled Worker 15 Days 7 Labor 15 Days Equipment Minor Tools (5% Of Labor Cost) C1 Rehabilitation Works Materials Dismantling, Demolition And Removal Of Existing Roof Trusses, Purlins And Roofing Sheets 1.00 Lot Cutting Of Affected Trees 1 Lot Rehabilitation Of Existing Drainage Junction Box 1 Lot Demolition And Removal Of Existing Chb Fence 1 Lot C2 Structural And Metal Works Materials 150x50x6.0 Tubular Steel 220 Lm W 12x65 (column) 85 Lm W 14x90 (column) 105 Lm W 24x76 (beam) 65 Lm W 16x57 (beam) 85 Lm W 14x22 (lateral Beam) 230 Lm W 12x136 35 Lm W 12x26 (stairs) 19 Lm W 24x68 (rafters) 620 Lm C 4x4.5 3200 Lm Ga#20 Steel Deck X 3.2ft 175 Lm 12mm Checkered Plate 4x8ft 5 Pcs 50x50x6.0 Angle Bar 15 Pcs 38 Dia Gi Pipe 10 Pcs 10mm Square Bar 40 Pcs 10mm Dia. Sag Rod 250 Pcs 16mm Anchor Bolts 550 Pcs 300x300x16 Base Plate 75 Pcs Epoxy Metal Paint 200 Liter Paint Thinner 80 Liter Basahan 80 Kilos Diyaryo 40 Kilos Welding Rod 150 Box 12mm And 16mm Plate Stiffener 1 Lot Consumables 1 Lot Labor 1 Forman 60 Days 42 Skilled Worker 60 Days 42 Labor 60 Days Equipment Minor Tools (5% Of Labor Cost) C3 Concrete And Rebar Works Materials Cement 2,600 Bags Sand 160 Cu.m. Gravel 370 Cu.m. 20mm Dia Reinforcement Bar X 6m 70 Pcs 16mm Dia Reinforcement Bar X 6m 1,200 Pcs 10mm Dia Reinforcement Bar X 6m 2,500 Pcs Ga # 24 Tie Wires 50 Box Consumables 1 Lot Labor 1 Forman 45 Days 15 Skilled Worker 45 Days 15 Labor 45 Days Minor Tools (5% Of Labor Cost) P1 Plumbing Fixtures Materials Water Closet 12 Pcs Urinal 2 Pcs Lavatory 9 Pcs Floor Drain 10 Pcs Faucet 13 Pcs Bidet 14 Pcs Kitchen Sink 1 Pcs Consumables 1 Lot Labor 1 Forman 18 Days 6 Skilled Worker 18 Days 6 Labor 18 Days Equipment Minor Tools (5% Of Labor Cost) P2 Water System Materials 32mm Gi Water Pipe X 6m 30 Pcs 25mm Gi Water Pipe X 6m 2 Pcs 20mm Gi Water Pipe X 6m 10 Pcs 32x32 Gi Tee 1 Pcs 32x25 Gi Reducer Tee 1 Pcs 32x20 Gi Reducer Tee 6 Pcs 25x20 Gi Reducer Tee 3 Pcs 20x20 Gi Tee 13 Pcs 32mm Gi Elbow 2 Pcs 25mm Gi Elbow 2 Pcs 20mm Gi Elbow 5 Pcs 20mm Gi Elbow One-side Female Thread 21 Pcs 32mm Gi Coupling 30 Pcs 25mm Gi Gi Coupling 2 Pcs 20mm Gi Gi Coupling 10 Pcs 32mm Gate Valve 2 Pcs 20mm Gate Valve 2 Pcs 32x20 Gi Reducer 2 Pcs 13mm Gi Pipe Tiplon 1 Box Consumables 1 Lot Labor 1 Forman 10 Days 4 Skilled Worker 10 Days 3 Labor 10 Days Equipment Minor Tools (5% Of Labor Cost) P3 Waste Water System Materials 100mm Dia Pvc Waste Pipe X 3m 34 Pcs 75mm Dia Pvc Waste Pipe X 3m 9 Pcs 50mm Dia Pvc X 3m 12 Pcs Cement 60 Bag Sand 4 Cu.m. Gravel 8 Cu.m. 10mm Dia Reinforcement Bar 40 Pcs 100 X 100 Sanitary Tee 3 Pcs 100 X 75 Sanitary Tee 14 Pcs 100 X 50 Sanitary Tee 18 Pcs 75 X 75 Sanitary Tee 1 Pcs 75 X 50 Sanitary Tee 2 Pcs 100 X 100 Tee 6 Pcs 100 X 50 Tee 5 Pcs 75 X 50 Tee 6 Pcs 50 X 50 Tee 6 Pcs 50 X 50 Elbow 6 Pcs 50mm Dia P-trap 20 Pcs Pvc Cement 50 100cc 10mm Dia Hanger Rod 1 Lot 100mm Dia Cleanout 4 Pcs 75mm Dia Cleanout 3 Pcs Septic Tank 2 Lot Consumables 1 Lot Labor 1 Forman 15 Days 3 Skilled Worker 15 Days 3 Labor 15 Days Equipment Minor Tools (5% Of Labor Cost) P4 Drainage System Materials 200mm Dia Pvc Pipe 2 Pcs 150mm Dia Pvc Pipe 30 Pcs 100mm Dia Pvc Downspout Pipe 32 Pcs 100mm Concrete Hollow Blocks 700 Pcs Cement 40 Pcs Sand 4 Lot Gravel 6 Lot 100mm Dia Reinforcement Bar 40 Pcs Ga#24 Tie Wire 1 Box Pvc Cement 5 Li Consumables 1 Lot Labor 1 Forman 10 Days 4 Skilled Worker 10 Days 4 Labor 10 Days Equipment Minor Tools (5% Of Labor Cost) E Electrical Materials 3.5 Mm² Thhn Cu. Wire 24 Roll/box 5.5 Mm² Thhn Cu. Wire 3 Roll/box 22 Mm² Thhn Cu. Wire 1 Roll/box 70 Mm² Thhn Cu. Wire 10 Roll/box 100 Mm² Thhn Cu. Wire 5 Roll/box 3.5 Mm² Tw Cu. Wire 8 Roll/box 22 Mm² Tw Cu. Wire 3 Roll/box 80 Mm² Tw Cu. Wire 2 Roll/box Led Pin Light 12 W (offices) 23 Pcs Led Pin Light 15 W (warehouse) 24 Pcs Led Center Light 40 W 122 Pcs Led Wall Light 20 W 15 Pcs 1-gang Light Switch (1 -way) 10 Pcs 2-gang Light Switch (1-way) 50 Pcs Led Emergency Lighting Fixture, Twin Head Automatic Rechargeable Heavy Duty Type (2 X 5 Watts) Including Supply And Installation Of Simplex Outlet. 10 Pcs Duplex Convenience Outlet (standard) 143 Pcs Duplex Convenience Outlet (gfci) 4 Pcs Pull Boxes, Junction Boxes, Joints, Connector, Bolts, Conduit Clamps, Conduit And Cable Tray Support 1 Ls Flexible Conduit - 20mm 5 Roll Grounding Rod 3 Pcs Grounding Rod Clamp 3 Pcs Pvc Pipe - 25 Mm 2000 Lm Rsc Pipe - 50 Mm (mdp-main) 120 Lm Service Entrance Cap - 50 Mm 1 Pcs Panelboard (refer To The Single Line Diagram) 0 0.00 "main Distribution Panel (mdp) - (main (3 Pole), Branch (3 Pole)) Nema 1 / 18 Kaic, 1- 250 At, 2- 200 At, 2-100 At, 2- 60 At, 2- 30 At" 1 Assy "power Panel (pp1) - (main (3 Pole - 400v), Branch (1 Pole - 230 V)) Nema 1 / 18 Kaic, 1- 60 At,1 - 40 At, 5- 30 At, 6- 20 At" 1 Assy "lighting Panel (lp) - (main (3 Pole - 400 V), Branch (1 Pole - 230v)) Nema 1 / 18 Kaic, 1- 20 At, 20-15at" 1 Assy "fccu Panel - (main (3 Pole), Branch (1- 3 Pole, 17-1 Pole)) Nema 1 / 18 Kaic, 1- 20 At, 30-15at" 1 Assy Enclosed Circuit Breaker (fccu) 10 Amp 230 V 1 P 28 Set Enclosed Circuit Breaker (accu) - Nema 3r 200 Amp 400 V 3p 2 Set Enclosed Circuit Breaker (accu) - Nema 3r 30 Amp 400 V 3p 1 Set Consumables And Small Items 1 Lot Labor 1 Forman 40 Days 15 Skilled Worker 40 Days 10 Labor 40 Days Equipment Minor Tools (5% Of Labor Cost)
Contact
Tender Id
2135c227-0741-3d3d-9dc5-e251ae17844eTender No
10996019Tender Authority
Municipality Of Tiaong, Quezon ViewPurchaser Address
-Website
notices.philgeps.gov.ph