Municipality Of Argao, Cebu Tender
Municipality Of Argao, Cebu Tender
Costs
Summary
Supply Of Labor, Materials & Equipment For The Proposed Construction Of Make Shift Market Stalls Of Mun. Of Argao, Cebu , Construction Projects ,municipality Of Argao, Cebu
Description
Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 8.00 1.00 A. Low Bed Trailer Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 1.00 Lot Minor Tools (10% Of Labor Cost) C. Equipment And Water: Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set D. First Aid Kit B. Manpower: Number Of Days 15.00 1.00 A. Safety Practitioner/officer (part Time) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 900(1)c2 " Structural Concrete (footing, Slab On Fill)" Quantity 27.01 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 27.01 M3 "structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 902(1) " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 833.82 Kg Dpwh Standard Output Per Hour (oph)= 143.438 Kg 833.82 Kg "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 903 (2) Formworks And Falseworks Quantity 82.18 M2 Dpwh Standard Output Per Hour (oph)= 3.24 M2 82.18 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Installation 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1047 (2)b Structural Steel (roof Truss, Gi Pipe Column & Rectangular Tube (for Walling)) Quantity 5,072.85 Kg Dpwh Standard Output Per Hour (oph)= 85 Kg 5072.85 Kg Structural Steel (roof Truss, Gi Pipe Column & Rectangular Tube (for Walling)) Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (angular Bar) 1.00 Kg B.gi Pipe Sched 40(6") 1.00 Kg C.rectangular Tube 2"x3" 0.01 Kg D. Acetylene 0.02 Kg E. Oxygen 0.02 Kg F. Welding Rod G. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1047 (2)c Structural Steel Purlins Quantity 1,835.49 Kg Dpwh Standard Output Per Hour (oph)= 90.45 Kg Kg 1835.49 Kg Structural Steel Purlins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1047 (5) Metal Structure Accessories (steel Plates) Quantity 155.43 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg Kg 155.43 Kg Metal Structure Accessories (steel Plates) Direct Cost: A. Materials: 1.05 Kg A. Steel Plates B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1047 (3)a Metal Structure Accessories (anchor Bolts) Quantity 176.00 Pc Dpwh Standard Output Per Hour (oph)= 1 Pc 176.00 Pc Metal Structure Accessories (anchor Bolts) Direct Cost: A. Materials: 1.00 Pc A. Anchor Bolt B. Manpower: Number Of Hours 0.10 1.00 A. Construction Foreman 0.10 1.00 B. Skilled Laborer 0.10 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 607.07 M2 Dpwh Standard Output Per Hour (oph)= 2.769 M2 M2 607.07 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1013(1) Fabricated Metal Roofing Accessory (flashings) Quantity 92.38 M Dpwh Standard Output Per Hour (oph)= 10.6 M 92.38 M Fabricated Metal Roofing Accessory (flashings) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1003(1) 4.5mm Fiber Cement Board On Metal Frame Ceiling Quantity 380.39 M2 Dpwh Standard Output Per Hour (oph)= 1.243 M2 M2 380.39 M2 4.5mm Fiber Cement Board On Metal Frame Ceiling Direct Cost: A. Materials: 0.37 Pc "a. 4.5mm Fiber Cement Board Plywood" 1.13 Pc "b. Metal Furring 3m Length" 0.36 Pc C. Carrying Channels 1.00 Pc D. Hanger Bars/rod 6.00 Pc E. Channel Clip 0.24 Pc F. Wall Angle 14.00 Pc G. Rivets 4.00 Pc H. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1008.00 Aluminum Glass Window (sliding/ Casement! Awning/ Fixed Type) Quantity 46.20 M2 Dpwh Standard Output Per Hour (oph)= 0.36 M2 46.20 M2 Aluminum Glass Window (sliding/ Casement! Awning/ Fixed Type) Direct Cost: A. Materials: 1.00 M2 A.aluminum Glass Window (sliding) B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1 I.s. 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 2.00 Length A. Pvc Pipe Poly 3/4 70.00 Length B. Pvc Pipe Poly 1/2 5.00 Pcs C. Pvc Square Box Poly 5x5 125.00 Pcs D. Flexible Connector 1/2 44.00 Pcs E. Utility Box 2x4 100.00 Pcs F. Junction Box 4x4 10.00 Pcs H. Electrical Tape - I. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 60.00 M A. Thhn Wire Stranded # 8 3.00 Box B.thhn Wire Stranded # 12 2.00 M C. Thhn Wire Stranded # 10 19.00 Set D. Flush Type Single-gang Switch 2.00 Set E. Flush Type Two-gang Switch 1.00 Set F. Flush Type Three-gang Switch 18.00 Set G. Flush Type Outlet 3 Gang Universal 4.00 Set G. Flush Type Outlet 1 Gang H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1 Set 1.00 I.s. Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Pcs A. Panel Board Bolt On Type 10 Holes 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs C. 30 Amp. Plug-in Breaker 3.00 Pcs D. 20 Amp. Plug-in Breaker 4.00 Pcs E. 15 Amp. Plug-in Breaker F. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1103(1) Lighting Fixtures Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1 Set 1.00 I.s. Lighting Fixtures Direct Cost: A. Materials: 40.00 Set A. Led Bulb Dayligt 13 W 4.00 Units B. Emergency Light (twin Head) 40.00 Units C. Receptacle Socket 4x4 B. Manpower: Number Of Hours 29.00 1.00 A. Construction Foreman 29.00 1.00 B. Skilled Laborer 29.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1032(1)a Painting Works (masonry Painting) Quantity 380.39 M2 Dpwh Standard Output Per Hour (oph)= 2.10 M2 M2 380.39 M2 Painting Works (masonry Painting) Direct Cost: A. Materials: 0.02 Gal A. Concrete Neutralizer 0.04 Gal B. Concrete Sealer/prime 0.05 Gal C. Patching Compound 0.08 Gal D. Semi Gloss Latex (two Coat Only) E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5% 1032(1)c Painting Works (metal Painting) Quantity 178.65 M2 Dpwh Standard Output Per Hour (oph)= 2 M2 178.65 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit 10% Overhead, Contingencies And Miscellaneous (ocm) Expenses 15% Tax (vat/withholding Tax) 5%
Contact
Tender Id
f9622ef5-e9bd-376d-b91e-398c7b28fdc5Tender No
11349229Tender Authority
Municipality Of Argao, Cebu ViewPurchaser Address
-Website
notices.philgeps.gov.ph