Ministry Of Road Transport And Highways Tender
View complete overview of Uttarakhand MORTH Tender
Ministry Of Road Transport And Highways - MORTH Tender
Works
Civil And Construction
Road Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date9 Jan 2025
Closing Date24 Feb 2025
Tender AmountINR 2,97,10,81,000 (USD 3,42,88,398)
AI Insights
AI Insights
Technical
Financial
Technical Capacity
The important information given under the technical capacity header which is specifically related to prior work experience includes:
- For Categories 1 and 2, only projects with an estimated capital cost exceeding a specified amount are included.
- For Categories 3 and 4, only projects where payments received exceed a specified amount are included.
- The experience for each category would be computed as per the weight of the following factors to arrive at its aggregated Eligible Experience:
- Category 1: Project in highways sector, factor: 1
- Category 2: Project in core sector, factor: 0.75
- Category 3: Construction in highways sector, factor: 1
- Category 4: Construction in core sector, factor: 0.75
- The Bidder shall have received payments for construction of Eligible Project(s), or has undertaken construction works by itself in a PPP project, such that the sum total thereof is more than Rs. 297.11 Crore.
- For normal Highway projects, at least one similar work of 20% of Estimated Project Cost Rs. 59.42 crore shall have been completed from the Eligible Projects in Category 1 and/or Category 3.
- A project shall be considered to be completed, if more than 90% of the value of work has been completed and such completed value of work is equal to or more than 20% of the estimated project cost.
- The total estimated capital cost of the project is Rs. …… cr. (Rupees …………………crore).
- The applicant has itself undertaken the construction of the project of Rs. ………(Rupees ………. Crores) excluding any part of the project for which any contractor, sub-contractor or other agent was appointed.
- The receipts indicated above are restricted to the share of the Applicant who undertook these works as a partner or a member of joint venture.
- The applicant has a share of _____% in the Joint Venture/Consortium.
- For a project to qualify as an Eligible Project under Categories 1 and 2, it should have been undertaken as a PPP project on BOT, BOLT, BOO, BOOT or other similar basis, with the entity claiming experience holding a minimum of 26% equity during the entire year for which Eligible Experience is being claimed.
- The capital cost of the project should be more than 5% of the amount specified as the Estimated Project Cost.
- The entity claiming experience shall, during the last 5 financial years preceding the Bid Due Date, have itself undertaken the construction of the project for an amount equal to at least one half of the Project Cost of eligible projects.
- A table containing the value of Civil Engineering Works in respect of EPC Projects undertaken by the Bidder during the last 5 years, which includes:
- Year
- Value of Civil Engg. Works undertaken w.r.t. EPC Projects including bonus, if any (Rs. in Crores)
- Amount of bonus (Rs. in Crores)
- Net Value excluding bonus (Rs. in Crores)
- Maximum value of projects that have been undertaken during the F.Y. ________ out of the last 5 years and value excluding amount of bonus thereof is Rs._____Crores.
- Amount of bonus received, if any, in EPC Projects during the last 5 years (updated to the price level of the year indicated in Appendix), which includes:
- F.Y. / Calendar Year
- Amount of Bonus (Rs. in Crores)
- Updation Factor
- Updated Amount of Bonus (Rs. in Crores)
- A table to calculate the value of "B" which contains the value of all existing commitments and on-going works to be completed during the next ** years, including:
- Name of Project/Work
- Percentage of participation of Bidder in the project
- Date of start / appointed date of project
- Construction period as per Agreement/LOA
- Value of contract as per Agreement/LOA
- Value of work completed
- Balance value of work to be completed
- Anticipated date of completion
- Balance value of work at 2023-24/2023 price level
Values like amount and percentage mentioned under the same header include:
- 26% (twenty six per cent) equity
- 5% of the amount specified as the Estimated Project Cost
- one half of the Project Cost of eligible projects
- Rs. 297.11 Crore
- Rs. 59.42 crore
- 20% of the estimated project cost
- 90% of the value of work
- _____% in the Joint Venture/Consortium.Similar work or eligible projects mentioned in the technical capacity experience include:
* Project in highways sector with a factor of 1
* Project in core sector with a factor of 0.75
* Construction in highways sector with a factor of 1
* Construction in core sector with a factor of 0.75
* Normal Highway projects (including Major Bridges/ROB/Flyovers/Tunnels)
* Widening / reconstruction / upgradation works on NH/SH/Expressway or on any category of road
* Widening / reconstruction / upgradation works on MDRs with loan assistance from multilateral agencies or on BOT Basis
* Widening / reconstruction / upgradation works in Municipal Corporation limits, construction of bypasses
* Construction of Stand-alone bridge, ROBs, Tunnels
* Construction / reconstruction of linear projects like Airport runways, Railways, metro rail, and ports (including construction of Jetties)
* EPC Projects (Turnkey projects / Item rate contract/ Construction works)
* Rehabilitation and Up-gradation from single lane to two lane with paved shoulder on NH 134 in the state of Uttarakhand under EPC mode
Values mentioned:
- Rs. 59.42 crore (Estimated Project Cost)
- Rs. 297.11 Crore (Threshold Technical Capacity)
- Rs. 14.85 crore (minimum receipts or work executed amount)
- Rs. 44.57 crore (Average Annual Turnover required)
- 20% (percentage of Estimated Project Cost that should have been completed from Eligible Projects)
- 90% (percentage of value of work that should have been completed for a project to be considered completed)
- 60% (requirement of Bid Capacity, Technical and Financial Capacity for the Lead Member)
- 20% (requirement of Bid Capacity, Technical and Financial Capacity for other JV members)
- 15% (percentage of Estimated Project Cost that Average Annual Turnover required should be)
Costs
EMD
INR 5,94,22,000 (USD 6,85,772)
Summary
Rehabilitation And Up-gradation From Single Lane To Two Lane With Paved Shoulder From Existing Km 195.175 To Km 220.00 (design Chainage From Km
Description
Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MoRTH_843532_1Tender No
66/13 yata-NH-10/2024 dt. 08/01/2025Tender Authority
Ministry Of Road Transport And Highways ViewPurchaser Address
-
Unlock the Tender details for free
Documents
Report Missing Document