Interior Tenders
Interior Tenders
The village of Miskovice Tender
Civil And Construction...+2Others, Building Construction
Corrigendum : Closing Date Modified
Czech Republic
Details: The subject of the Public Contract is Construction Works and Related Supplies and Services Consisting in the Implementation of Construction Modifications and Extensions of Sokolovna, No. 87 In the Municipality of Miskovice in the Central Bohemian Region, Including the Necessary Preparation of Land, Paved Areas, Land Improvements, Implementation of Construction Works and Technological Objects and Other Construction Components, Using the Design & Build Method. Part of the construction is the implementation of clean floor surfaces, tiling and paving, but not the delivery of the interior equipment and catering equipment itself. The supply of interior equipment and catering equipment will be part of a separate procurement procedure. The building is divided into the following buildings: A) Sat 01 – Sokolovna, B) Sat 02 – Courtyard, C) Sat 03 – Playground. Part of the Subject of Fulfillment of the Public Contract Is, in particular: A) Processing of Project Documentation, which will include the following parts: A. Documentation for Construction Implementation (dps). Dps Will Be Prepared On The Basis Of Dúr+dsp From 2020 In The Wording Of The Updated Version Of The Addendum From 2023 Including A Detailed Item Budget With A Statement Of Areas, B. Documentation Of The Actual Execution Of The Construction Incl. Geometrical Plan and Focus of the Actual Construction, C. Operational Documentation, D. Documentation for the Needs of the Cadastral Office. B) Implementation of Construction Activities in the Form of Realization of Construction Modifications and Extensions of Sokolovna, No. 87 In the Municipality of Miskovice, i.e. Execution of construction works and technological objects in accordance with the contract and project documentation. C) Ensuring Approval. More detailed information is provided in other parts of the Public Procurement Terms and Conditions, which are an integral part of the Tender Documentation of this Public Procurement, i.e. In the Project Documentation for the Issuance of a Joint Permit (major+dsp) Entitled "Reconstruction of the Sokolovna" From 2020 As Amended from 2023 (hereinafter referred to as "Project Documentation Entitled "Reconstruction of the Sokolovna") and the Binding Model Contract.
Closing Date9 Jan 2025
Tender AmountRefer Documents
U S COAST GUARD USA Tender
Machinery and Tools
Corrigendum : Closing Date Modified
United States
Details: General Requirements
1. Scope
1.1 Intent. This Standard Specification Invokes General Requirements For Conducting Vessel Repairs Performed By Commercial Contractors At A Coast Guard Facility For Coast Guard Vessels.
2. References
coast Guard Drawings
none.
coast Guard Publications
surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements
other References
none.
3. Requirements
3.1 General. The Contractor Must Conform To All Requirements Specified In Sflc Std Spec 0000 And In This Item, As Applicable, During The Performance Of This Availability. The Requirements Of This Wi Apply To All Work Under The Scope Of This Contract, Whether Explicitly Stated In All Following Work Items Or Not, And To All Other Work Subsequently Authorized By Changes, Modifications, Or Extensions To The Contract.
3.2 Period Of Performance. The Period Of Performance For This Work Is 24mar2025-05may2025
3.3 Location. The Contractor Must Perform The Work While The Uscgc Waesche Is Alongside The Pier At U.s. Coast Guard Base Alameda, Coast Guard Island, Alameda Ca 94501.
58310_mla_1124_418
item 1: Folding Boom Cranes, Biennial Maintenance, Perform
1. Scope
1.1 Intent. This Work Item Describes The Requirements For The Contractor To Inspect, Perform Maintenance, And Test Folding Boom Cranes Listed In Table 1.
table 1 – List Of Folding Boom Cranes
crane
location
manufacturer / Model Number
coast Guard Tech Pub
crane No. 2
main Deck, Port Side, Aft Of Frame 95
appleton Marine Inc. / Fb90-28
7903
crane No. 4
main Deck, Port Side, Aft Of Frame 90
appleton Marine Inc. / Fb90-28
7903
crane No. 3
main Deck, Stbd Side
appleton Marine Inc. / Fb90-28
7903
1.2 Government-furnished Property.
mti
item Description
nsn/pn
qty
estimated Cost ($/unit)
y
*cb-oth Mark Iv
(coast Guard Drawing 26b-cb-iv-801-001)
n/a
1 Ea.
n/a
y
*long Range Interceptor Ii
(lri-ii) Cutter Boat
(coast Guard Drawing 35-lri-ii-801-001)
n/a
1 Ea.
n/a
2. References
coast Guard Drawings
coast Guard Drawing 26b-cb-iv-801-001, Rev -, Booklet Of General Plans
coast Guard Drawing 35-lri-ii-801-001, Rev -, General Arrangement
coast Guard Drawing 418a-wmsl 801-001, Rev A, Booklet Of General Plans
coast Guard Drawing 750-wmsl-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes
coast Guard Drawing 750-wmsl-583-508, Rev -, Installations Iwo Aft Folding Cranes
coast Guard Fleet Drawing Fl-1702-11, Rev -, Inspection Of Sheaves
coast Guard Publications
coast Guard Technical Publication (tp) 7903, Swbs 583, Oct 2021, Aft Boat Handling System –model Fb90-28
surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements
surface Forces Logistics Center Standard Specification 5000 (sflc Std Spec 5000), 2022, Auxiliary Machine Systems
surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures
other References
the Society For Protective Coatings (sspc) Surface Preparation Specification No.11 (sspc-sp 11), 2020, Power Tool Cleaning To Bare Metal
3. Requirements
3.1 General.
3.1.1 Cir. The Contractor Must Submit A Cir For The Inspections Listed In The Following Paragraph(s):
3.3 Inspect And Repair Task Particulars (task #1, #2, #3 And #7)
3.1.2 Tech Rep. The Contractor Must Provide The Services Of A Qualified Technical Representative Who Is Familiar With The Folding Boom Cranes, Appleton Marine Inc. Model Fb90-28, To Accomplish The Following On Site:
advise On Manufacturer's Proprietary Information Pertinent To The System.
ensure Compliance With Manufacturer's Procedures And Standards During Inspections, Repairs, Calibration And Testing.
3.1.2.1 Ensure The Tech Rep Has Experience With The System/equipment Stated Above And Demonstrated On Their Résumé.
3.1.2.2 Submit The Name And Résumé Of The Tech Rep With The Contractors Bid.
3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection).
3.1.3.1 Protection Of Fine Surfaces. The Contractor Must Protect All Fine Surfaces In Accordance With Sflc Std. Spec 5000.
3.1.3.2 Hydraulic System Contamination Protection. The Contractor Must Maintain Existing Hydraulic Cleanliness In Accordance With Sflc Std. Spec 5000.
3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following:
piping
electrical Cables
note
coast Guard Personnel Will Operate All Shipboard Machinery And Equipment.
3.2 Operational Test, Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of All Items Or Shipboard Devices To Be Disturbed, Used, Repaired, Or Altered, To Demonstrate Existing Operational Condition. Submit A Cfr.
3.3 Inspect And Repair Task Particulars. The Contractor With Tech Rep Support Must Perform Tasks Listed In Table 2 In Accordance With Sflc Std Spec 5000 And Tp 7903. See Applicable Drawings And Tech Pub In Section 2 For Technical Information And Installation Details.
table 2 – Task List
additional Requirements
#
task Type
qty
component Or Assembly
appendix And Para. From Sflc Std Spec 5000
other
tech Pub 7903
1
operate And Inspect
3
folding Boom Crane
3.2.1
submit A Cir. Document The Existing Software Program/version.
note: There Is An Issue While Running Cranes #2 And #4 In Tandem (with A Load In Remote). While Hoisting, The Operator Receives Indication Crane #4 Is Overloading. Users Must Override To Operate The Cranes In Tandem. The Contractor Will Need To Conduct This “operate And Inspect” Task Under Load To Troubleshoot This Issue.
2
operate And Inspect
1
chest Pack (chest Pack Controls And Junction Boxes)
3.2.1
submit A Cir.
note: There Is One Chest Pack. It Should Be Rotated Between All Three Cranes.
3
operate And Inspect
1
control Console
3.2.1
submit A Cir.
4
service & Inspect
&
groom & Lubricate
3
crane Assembly
3.2.2
perform All Preventive Maintenance Actions As Indicated On Table 4-1 Of Cg Tp 7903, Regardless Of Specified Interval. Inspect Hydraulic Hoses For Leaks, Abrasions, Swelling And Defects. Inspect Entire Folding Crane Assembly For Signs Of Leakage, Cracks, Structural Damage And Deformations. Submit A Cfr.
note 1: Only Check The Torque Of 25% Of The Turntable Bearing Mounting Bolts (4-3.18.1) – Include A Diagram Of The Bolts That Were Checked In The Cfr For This Section.
note 2: Take Off Removable Hose Sleeves And Hose Fitting Tape For Inspection, If Applicable. Reinstall Hose Sleeves And Fitting Tape Upon Completion Of Inspection
5
service And Inspect
3
cranes (mechanical/hydraulic)
3.2.2
inspect Swing Drives, Swing Motor, Swing Manifold, Hydraulic Swivel, Slew Bearing, Slew Bearing Gear, Slew Bearing Bolts, Slew Bearing Wear Inspection, Main Control Manifold, Wire Rope, Elr Manifold, Heel Pins, Jib Pins, Telescope Cylinders, Slide Pads, Jib And Luffing Cylinders, Sheaves, Crane Block Assembly, 10 Ton Hook, Snatch Block, Winch, Constant Tension System, Overhaul Ball. Fasteners, Submit A Cfr.
6
partially Preserve
3
folding Boom Crane Assembly
3.2.4, 3.2.4.3.2, 3.2.4.4, And 3.2.4.5.1
7
hydraulic Lube Oil Analysis
3
hydraulic System
c2.1.3.1
submit A Cir.
8
service And Inspect
1
hydraulic Power Unit (hpu)
3.2.2
inspect Prime Mover/link Motor, Hpu Pumps, Hpu Reservoir, Hpu Tank Heaters, Oil Cooler, Hpu Manifold And Hoses. Hpu Temperature Transmitter, Hpu Display, Hpu Controls, Joysticks And Control Cabinet In Accordance With Tp 7903.
9
system Relief Valves, Switches And Indicators
1
hydraulic System
in Accordance With Tp 7903, Verify Set Points, Adjustment And Calibration On:
pump Compensator Relief Valve
system Relief Valve.
winch Limit Adjustment.
load Monitor Indicators
crane Position Indicators
submit A Cfr.
10
disassemble And Inspect
1
hydraulic Oil Heat Exchanger
3.2.3
disassemble To The Minimum Extent Necessary To Clean The Heat Exchanger.
11
service And Inspect
2
hydraulic System
crane Motor A And B
3.2.2
perform Insulation Resistance Test In Accordance With Ansi/easa Ar 100-2020.and Section 3 Of Tp 7903 Submit A Cfr.
12
service And Inspect
3
cranes
(electrical)
3.2.2
inspect Load Pin, Boom Angle Transducer, Jib Angle Transducer, Swing Angle Encoder, Length Transducer, Turret Enclosure, Flood Lights And Electrical Cables
13
operational And Weight Test
3
folding Boom Crane Assembly
perform In Accordance With Paragraph 3.5 Of This Work Item.
14
fabricate And Install
3
label Plate
b2.9
name Plate Must Also Include Additional Information Of Dynamic Load Test, Brake Test And Wll Weights.
3.3.1 Materials. The Contractor Must Provide All Parts (i.e. All Greases, Lubricating Oils, Hydraulic Fluid, Hydraulic Oil Filters, Tank Breather Elements And Other Miscellaneous Materials) And Materials Including, But Not Limited To, The Items Listed In Table 3 Below, To Conduct The Required Maintenance Actions Listed Above.
table 3 – List Of Parts
quantity
part Number
description
source Of Supply
1
ymd-8861-r
hpu Hydraulic Return Filter
appleton Marine Inc.
1
ymd-10416
hpu Hydraulic Return Filter
2
ymd-12209-r
pressure Filters (for Crane No.2 & 4)
1
ymd-12234-r
(0280d005bh4hc)
pressure Filters (for Crane No.3)
1
ymd-12234-r
(0060d005bh4hc)
pressure Filters (for Crane No.3)
3.3.2 Hose Inspection. The Contractor Must Visually Inspect The Condition Of All Flexible Hoses; Tp7903 Has A Comprehensive List Of Hoses And Their Locations. Submit A Cfr With The Following:
hose Number
hose Physical Condition
service Life Dates (date For Required Hose Renewal; If Not Specified, Add Twelve Years To Installation Date)
3.3.2.1 If Not Present, The Contractor Must Provide New Hose Tags, In Accordance With Sflc Std Spec 5000, Paragraph C2.2.1.4. Ensure Tag Color Coding Of Black On Natural Or Black On White. Ensure That Tags Must Be Attached Using Materials That Will Not Damage Hose Assembly In Any Way Or Interfere With The Normal Flexing Motion Of The Hose.
3.3.2.2 The Contractor Must Stamp, Engrave, Or Etch The Following Information On Each Tag. Handwritten Information On Each Tag Is Not Acceptable. Utilize The Cutter’s Hose Log For Information As Necessary.
hose Log Item Number (serial Number)
hydrostatic Test Pressure (psi)
hydrostatic Test Date (dd/mm/yy)
service Life (replacement Date) Date (qtr "q"/fy)
3.4 Preservation Requirements. The Contractor Must Perform The Following Work To Accomplish The First Bulleted Requirement Of Sflc Std Spec 5000 (para 3.2.4.3.2).
3.4.1 All Other Requirements As Specified From Sflc Std Spec 5000 Regarding “partially Preserve” Remain Applicable.
3.4.2 In Addition To Partial Preservation, Abrade Entire Crane Surface And Provide Aesthetic Topcoat.
note
coast Guard Personnel Will Operate All Shipboard Machinery And Equipment.
note
certain Water Weight Bags May Be Too Large To Fit Within The Notch. Ensure Test Weights Are Able To Fit Within The Notch To Accomplish All Testing.
caution
do Not Exceed The Working Load Limit (wll) Of The Cranes For Any Of The Tests Listed In Appendix A, Cg Tp 7903. Exceeding The Wll Could Result In Equipment Damage And/or Personnel Injury.
3.5 Operational And Weight Testing. The Contractor Must Perform The Appleton Marine Inc. “start-up And Overhaul Test Procedure”, Appendix A Of Cg Tp 7903 Items 1-10. Static Load Test (item 2.1) Is Not Required. Perform All Testing With Cutter At Or Near 0-degree Trim And 0-degrees List. Record And Provide All Testing Data Of Appendix A, Cg Tp 7903 Via A Cfr. Utilize Test Weights That Will Ensure The Boom Can Be Extended Horizontal In The Notch.
3.5.1 The Contractor Must Supply Weights And A Certified Dynamometer To Conduct Load Testing, Submit Cfr With Certification Details. Perform All Testing In The Presence Of The Coast Guard Inspector And The Tech Rep.
3.5.2 Upon Successful Completion Of The Load Testing, Operational Testing Must Be Performed Using The Various Gfp Small Boats In Accordance With The Test Procedure Detailed In Appendix A, Cg Tp 7903.
3.6 Bearing Wear Inspection. The Contractor Must Conduct A Bearing Wear Inspection Of The Turntable Bearing, For All Cranes In Table 1, In Accordance With Cg Tp 7903 Appendix B. Submit A Cfr With Test Results As Compared With The Baseline Measurements In Table 4.
table 4 – Cgc Waesche Turntable Bearing Baseline (15july2018)
3.7 Operational Test, Post Repairs. After Completion Of Work, The Contractor Must Thoroughly Test, In The Presence Of The Coast Guard Inspector And Demonstrate All Items Or Shipboard Devices That Have Been Disturbed, Used, Repaired, Altered, Or Installed To Be In Satisfactory Operating Condition. Submit A Cfr.
3.8 Touch-up Preservation. The Contractor Must Prepare And Coat All New And Disturbed Exterior And Interior Surfaces To Match Existing Adjacent Surfaces, In Accordance With Sflc Std Spec 6310. Abide By All Touch-up Requirements Outlined In Sflc Std Spec 6310.
4. Notes
this Section Is Not Applicable To This Work Item.
Closing Date11 Feb 2025
Tender AmountRefer Documents
General Secretariat for Administration of the Ministry of the Interior South Directorate of General Administration and Finance Tender
Services
Security and Emergency Services
France
Purchaser Name: General Secretariat for Administration of the Ministry of the Interior South Directorate of General Administration | France – Installation Services Of Checking Equipment – Prestations De Maintenance Pour Les Installations De Vidéo Surveillance Contribuant À La Protection Du Centre De Rétention Administrative De Nîmes
Closing Date27 Feb 2025
Tender AmountRefer Documents
General Secretariat for Administration of the Ministry of the Interior South Directorate of General Administration and Finance Tender
Security and Emergency Services
France
Purchaser Name: General Secretariat for Administration of the Ministry of the Interior South Directorate of General Administration | Maintenance Services for Video Surveillance Installations Contributing to the Protection of the Nîmes Administrative Detention Center
Closing Date27 Feb 2025
Tender AmountRefer Documents
Wohn und Pflegezentrum Havelland GmbH Tender
Others
Germany
Details: Construction work is being put out to tender for the conversion of a nursing home into a psychiatric-psychosomatic specialist clinic of Havelland Kliniken GmbH. A four-storey, partially basemented solid building with a flat roof is being converted for clinical use by three nursing wards, a day clinic and a psychiatric outpatient clinic Pia. The construction work affects the interior of the building; the outer shell remains unchanged. The subject of this tender is the execution of tiling work including the delivery of required tiles. The following are to be carried out - 50 sq. m. floor tiles 10/10 cm - 120 sq. m. wall tiles 10/10 cm - 62 linear metres of tile frieze made of 5/5 cm tiles, in two rows - 9 shower areas with gradient made of 5/5 cm tiles, 100x100 to 150x150 cm in size as well as demolition and sealing work.
Closing Date28 Jan 2025
Tender AmountRefer Documents
Wohn und Pflegezentrum Havelland GmbH Tender
Others
Germany
Details: Construction work is being put out to tender for the conversion of a nursing home into a psychiatric-psychosomatic specialist clinic of Havelland Kliniken GmbH. A four-storey, partially basemented solid building with a flat roof is being converted for clinical use by three nursing stations, a day clinic and a psychiatric outpatient clinic Pia. The construction work affects the interior of the building, the outer shell remains unchanged. The subject of this tender is floor covering work on all floors, consisting of - 750 m² of subfloor preparation (cement screed) and filling - 65 m² of rubber floor covering - 500 m² of linoleum floor covering - 70 m² of vinyl chloride floor covering - 35 m² of carpet floor covering - 35 linear metres of PVC skirting board - 475 linear metres of wooden skirting board - 45 linear metres of stainless steel expansion joint profile
Closing Date28 Jan 2025
Tender AmountRefer Documents
Municipality of Lana Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Czech Republic
Details: The subject of the performance of the Public Contract is the Projection Work Follow-up to the Prepared Study of the Reconstruction of the Dubina V Láne Building, Including the Adjacent Public Space, Prepared by the Company Mackovič Architecture Sro, Ičo 24814334 (Annex No. 2 Zd). The subject of the work is the processing of project documentation in the scope of: • Project documentation for the construction permit, including the performance of related engineering activities and securing the construction permit • Project documentation for the implementation of construction, including the itemized budget and list of construction works, supplies and services • Project documentation for the interior of the building for the following parts Buildings – Entire 2np (common spaces, Hall + Accessories, Municipal Office, Rented Premises) And also Common Spaces In 1np (corridors, Social Facilities). • Cooperation and technical assistance in the procurement procedure for the selection of the contractor • Performance of the author's supervision during the implementation of the building until its approval
Closing Date30 Jan 2025
Tender AmountRefer Documents
Apartment S.R.O. Tender
Others...+1Electrical and Electronics
Czech Republic
Details: The subject of the public contract is the reconstruction of the electrical installation in common areas in order to bring the building into line with the current fire regulations and current electrical regulations and requirements. This involves changing the network from Tn-c to Tn-s. The entire existing electrical distribution will be replaced with new cables running under the plaster of the interior spaces, new switchboards will be installed, and in each switchboard, the neutral conductor Pen will be divided into a separate protective conductor Pe and a separate working conductor N. All apartment switchboards are designed to have a three-phase connection. Furthermore, autonomous fire detectors will be installed behind all entrance doors to the apartment units, and a home phone system will be added. The connection of the individual networks of the building will remain intact. The lights in the common areas (staircases and corridors) will be equipped with LED sources with motion sensors and the option of switching to permanent lighting. The work also includes checking and revising the existing lightning conductor.
Closing Date20 Feb 2025
Tender AmountRefer Documents
Apartment S.R.O. Tender
Others...+1Electrical and Electronics
Czech Republic
Details: The subject of the public contract is the reconstruction of the electrical installation in common areas in order to bring the building into line with the current fire regulations and current electrical regulations and requirements. This involves changing the network from Tn-c to Tn-s. The entire existing electrical distribution will be replaced with new cables running under the plaster of the interior spaces, new switchboards will be installed, and in each switchboard, the neutral conductor Pen will be divided into a separate protective conductor Pe and a separate working conductor N. All apartment switchboards are designed to have a three-phase connection. Furthermore, autonomous fire detectors will be installed behind all entrance doors to the apartment units, and a home phone system will be added. The connection of the individual networks of the building will remain intact. The lights in the common areas (staircases and corridors) will be equipped with LED sources with motion sensors and the option of switching to permanent lighting. The work also includes checking and revising the existing lightning conductor.
Closing Date20 Feb 2025
Tender AmountRefer Documents
Amt Friesack Tender
Civil And Construction...+1Others
Germany
Details: Focus positions: Approx. 830 m² reinforced concrete ceilings (as filigree ceilings) Approx. 320 m² reinforced concrete floor slab Approx. 215 m² waterproof concrete floor slab Approx. 675 m² Ks masonry D= 24 cm Approx. 150 m² Ks masonry D= 17.5 cm Approx. 57 tonnes of reinforcing steel Approx. 110 m frost protection Approx. 85 m reinforced concrete underlays/overlays, ring beams Approx. 360 m³ soil removal and disposal Approx. 190 m³ foundation cushion sand/gravel Approx. 290 m² perimeter insulation Approx. 1150 m² lime cement interior plaster walls Construction site equipment: 1 office container 2 sanitary containers Approx. 360 m² construction road Approx. 310 m construction fence + underground pipes and house inlets
Closing Date3 Mar 2025
Tender AmountRefer Documents
4091-4100 of 4202 archived Tenders