Hvac Tenders
Hvac Tenders
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
United States
Closing Date27 Aug 2024
Tender AmountRefer Documents
Details: Combined Synopsis-solicitation For Commercial Products And Commercial Services revision 01
effective: 05/30/2023
description
this Is A Combined Synopsis/solicitation For Commercial Products And Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. this Solicitation Is Issued As Rfq 36c24124q0631. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2024-03. the Associated North American Industrial Classification System (naics) Code For This Procurement Is Naics 238210 (electrical Contractors And Other Wiring Installations) Sba Size Standard $19 Million. this Is Being Bid As A Sdvosb Set-aside. va Connecticut Healthcare System West Haven And Newington Campuses Require Complete Tri-annual Electrical Testing Of The Electrical Power Distribution System. Vachs Is Currently Seeking Services For All Labor, Transportation, Parts, And Expertise Necessary To Provide Tri-annual Testing Of Numerous Electrical Items Throughout The Campuses. These Include, But Are Not Limited To: Electrical Panels, Transformers, Fused/non-fused Switches, Generators And Automatic Transfer Switches. The Contractor Is Responsible To Verify Total Quantities And Completeness. T Field Service Work Shall Be Performed Directly By Field Service Engineers Who Have Successfully Demonstrated Their Knowledge And Experience In The Field Of Electrical Power Distribution Systems Testing. The Field Service Engineer Shall Be Capable Of: 1) Testing Assessing, Evaluation, Servicing, And Reconditioning Components, 2) Assuring That The Equipment On Which Work Has Been Performed Is Safe, Reliable And Acceptable For Its Intended Purpose, And 3) Identifying Defective Equipment, And Potential Safety Problems, Environmental Hazards, Or Code Violations. Because Of The Function Of The Hospital, Clinics, And Many Of The Buildings Operations, Much Of The Work Will Need To Be Executed Outside Of Regular Business Hours To Include Nights, And/or On Weekends. Coordination Of Power Outages Associated With This Testing Will Require A Minimum Four (4) Week Notice To The Va Cor Responsible For Managing And Coordinating This Required Utilities Management Service. The Full Sow Is Attached Below For Reference. all Interested Companies Shall Provide Quotations For The Following: statement Of Work
maintenance, Inspection, And Testing of The Electrical Power Distribution System background
va Connecticut Healthcare System West Haven And Newington Campuses Require Complete Tri-annual Electrical Testing Of The Electrical Power Distribution System. Vachs Is Currently Seeking Services For All Labor, Transportation, Parts, And Expertise Necessary To Provide Tri-annual Testing Of Numerous Electrical Items Throughout The Campuses. These Include, But Are Not Limited To: Electrical Panels, Transformers, Fused/non-fused Switches, Generators And Automatic Transfer Switches. The Contractor Is Responsible To Verify Total Quantities And Completeness. Field Service Work Shall Be Performed Directly By Field Service Engineers Who Have Successfully Demonstrated Their Knowledge And Experience In The Field Of Electrical Power Distribution Systems Testing. The Field Service Engineer Shall Be Capable Of: 1) Testing Assessing, Evaluation, Servicing, And Reconditioning Components, 2) Assuring That The Equipment On Which Work Has Been Performed Is Safe, Reliable And Acceptable For Its Intended Purpose, And 3) Identifying Defective Equipment, And Potential Safety Problems, Environmental Hazards, Or Code Violations. Adherence To All Applicable Codes, Such As The Latest Version Of The Nec, Is Expected. Because Of The Function Of The Hospital, Clinics, And Many Of The Buildings Operations, Much Of The Work Will Need To Be Executed Outside Of Regular Business Hours To Include Nights, And/or On Weekends. Coordination Of Power Outages Associated With This Testing Will Require A Minimum Four (4) Week Notice To The Va Cor Responsible For Managing And Coordinating This Required Utilities Management Service. justification
veterans Health Administration (vha) Seeks To Continue To Improve The Operational Capabilities By Establishing Services That Result In Fewer Operational Problems, Improved Communications, Increased Efficiency Within The Facility And To Improve The Quality Of Services To Veterans. Basis For This Work Is Given In Vha Directive 1028, Electrical Power Distribution System, Dated February 24, 2020. location Of Services
va Medical Center West Haven
950 Campbell Avenue
west Haven, Ct 06516 va Medical Center Newington
555 Willard Avenue
newington, Ct 06111 period Of Performance
base Contract Period Shall Be 120 Days. qualifications
to Be Considered Eligible For Consideration, Potential Bidders Shall Have A Field Service Representative Located Within 200 Miles Of The Newington And West Haven Campus Of The Va Connecticut Healthcare System And Have Been Trained By The Original Equipment Manufacturer (oem) On The Specific Model Of Equipment Or Service That He/she Is Being Asked To Provide Services For. the Contracting Officer And/or Contracting Officer S Representative (cor) Specifically Reserve The Right To Reject Any Of The Contractor S Personnel And Refuse Them Permission To Work On The Equipment Outlined Herein. contractors Shall Be Experienced Electrical Contractors, Having Properly Trained And Licensed Permanent Staff Required To Perform The Proposed Work. Electrical Contracting (i.e. The Construction, Repair, Testing And Maintenance Of Industrial And Commercial Electrical Distribution Systems) Shall Be The Primary Interest/specialty Of The Contractor S Business. field Service Work Shall Be Performed Directly By Field Service Engineers Who Have Successfully Demonstrated Their Knowledge And Experience In The Field Of Electrical Power Distribution Systems Testing. The Field Service Engineer Shall Be Capable Of: 1) Testing Assessing, Evaluation, Servicing, And Reconditioning Components, 2) Assuring That The Equipment On Which Work Has Been Performed Is Safe, Reliable And Acceptable For Its Intended Purpose, And 3) Identifying Defective Equipment, And Potential Safety Problems, Environmental Hazards, Or Code Violations.
contractors Shall Have Technical Training And Demonstratable Track Records Of Working Experience In Maintenance, Inspection, And Testing Of The Electrical Power Distribution Systems And Related Components In Healthcare, Industrial, Education, And Commercial Facilities For A Minimum Of Five (5) Continuous Years. Electrical Components On Which The Contractors Have Experience Shall Include, But Not Be Limited To, Switchboards & Switchgear (low And Medium Voltage); Low Voltage Controls; Emergency And Standby Generators; Automatic Transfer Switches, Wiring, Transformers, Meters, And Other Electrical Appurtenances. the Lead Field Service Engineer/technician Must Have Minimum Qualifications As Follows:
1. Current Certification By The National Institute For Certification In Engineering Technologies (nicet) Or The National Electrical Testing Association (neta), Plus At Least Five (5) Years Experience In Electrical Switchgear And Power Distribution Systems Testing; Or
2. Persons Who, By Their Education, Training, And Specialized Experience Can Qualify For Certification But Who Have Not Yet Applied Or Taken The Certification Exams. These People Must Submit Three (3) References On Projects Of Similar Size And Complexity And Demonstrate That They Have The Required Specialized Knowledge And Five (5) Years Experienced In Electrical Switchgear And Power Distribution Systems Testing; Or
3. Persons With Higher Qualifications, Such As A Bs Degree In Engineering, If They Submit Three (3) References On Projects Of Similar Size And Complexity And Demonstrate That They Have The Acquired Specialized Knowledge And Five (5) Years Experience In Electrical Switchgear And Power Distribution Systems Testing. contractors Shall Have Safety Trainings; Either On The Job Or Classroom Type In Electrical Safety Outlined In The Osha Standard 29 Code Of Federal Regulations (cfr) 1910 Subpart S Electrical, And The Nfpa 70e Standard For Electrical Safety In The Workplace. Training Certification Shall Be Provided Indicating Each Technician Is A Qualified Person As Defined By Nfpa 70e. Training Certifications Shall Be Submitted To The Va Contracting Officer Prior To Work. If No Training Certifications Are Available, The Contractor S Employer Shall Certify That He/she Has Met This Requirement In Writing And Submit To The Va Contracting Officer Prior To Work. contractors Shall Have Ready Access To The Latest Versions Of The Following References:
nfpa 70, National Electric Code.
nfpa 70b, Recommended Practice For Electrical Equipment Maintenance. nfpa 70e, Standard For Electrical Safety For The Workplace. nfpa 110, Standard For Emergency And Standby Power System. osha Standard 29 Cfr 1910, Subparts I & S.
international Electrical Testing Specifications.
operating/maintenance Manuals, And Specifications Of The Electrical Equipment To Be Maintained And Tested. These Documents May Be Obtained From The Vha Medical Center, Or The Equipment Manufacturers.
vha Directive 1028 Facility Electrical Power Systems. contractors Shall Have And Provide All Necessary Tools, Equipment, And Personal Protective Equipment (ppe) To Perform The Work Safely, Effectively, And Timely. Tools, Equipment, And Ppe Shall Comply With The Requirements Of Osha Standard 29 Cfr 1910, Subpart I, And Nfpa 70e. Prior To Initiating Work, The Contractor Shall Provide Documentation That All Instruments, Test Equipment, Tools, And Ppe Have Current Calibration. Dated Calibration Labels Shall Be Visible On All Instruments, Test Equipment, Tools, And Ppe As Appropriate. the Contractor Shall Provide Sample Test Sheets Used To Document Testing Of Each Component Type With Their Proposal. The Term Type Is Defined As Equipment Identified In Ansi-neta Mts-2023, Standards For Maintenance Testing Specifications, Chapter 7, Inspections And Test Procedures. all On-site Field Technicians And Supervisors Shall Submit Certification Documentation To The Va Contracting Officer With Their Proposal, Indicating Compliance With All Qualifications Described Herein. Additional Staff Hired After Award Of Contract Shall Submit Certification Documentation 14 Calendar Days Prior To Being Permitted On Site. proposals Submitted Shall Include The Following:
name And Contact Information; Address, Phone Number, And Email Address Of Contract Manager. name And Contact Information; Local Address, Phone Number, And Email Address Of On-site Supervising Field Service Engineer. name And Certifications Of The Site Safety And Health Officer And Competent Person.
qualifications, Certifications, And Past Experience Of On-site Supervising Field Service Engineer. (evaluation Criteria).
certifications Of On-site Technicians And Their Current Level Of Skill, I.e., Master Electrician, Journeyman, Apprentice, Etc. (evaluation Criteria). quality Control Plan To Including Safety Procedures (evaluation Criteria). proposed Schedule (evaluation Criteria). The Schedule Shall Be In The Form Of A Progress Chart Of Suitable Scale To Indicate The Work Schedule For Completion By Any Given Date During The Work Period. The Proposed Schedule Shall Be Reviewed By The Vamc Facilities Management; Any Requirements For Adjusting The Schedule (e.g. To Minimize Disruption To The Vamc) Shall Be Incorporated By The Contractor. three Examples Of Work Completed In The Past 5 Years Showing Contractor S Experience In Completing Similar Work As Requested In This Scope Of Work (evaluation Criteria). proposal Cost (evaluation Criteria). It Is The Responsibility Of The Contractor To Schedule With The Contracting Officer And The Respective Medical Center Cor And Conduct A Site Visit To Ensure Labor, Equipment, Materials, And Overhead Is Included For All Electrical Components Required To Be Tested And Maintained. Contractors Not Conducting A Site Visit To Validate And Verify The Level Of Work Shall Not Be Permitted To Increase The Cost Due To Unforeseen Site Conditions Or Unconfirmed Level Of Effort To Complete This Contract. sample Test Sheets For Specific Pieces Of Equipment And Cable To Be Used For Documenting Completed Tests For Each Type Of Component To Be Tested. subcontracting Of Ay Ensuing Award Of This Solicitation Shall Not Be Allowed Without Written Permission Of The Contracting Officer. Service Response On Calls From Unauthorized Personnel Could Result In Non-payment. scope Of Work
the Contractor Shall Furnish All Labor, Materials, Equipment, Tools, Supervision, And All Incidentals To Complete The Work For The Services Described In This Document. scheduled Maintenance Shall Be Completed Monday Through Friday And During Regular Business Hours Of 8:00 A.m. And 4:30 P.m. With A Minimum Notice Of Four (4) Weeks. no Work Shall Be Performed On Government Holidays Unless An Emergency Status Has Been Indicated By The Va Contracting Officer. description Of Services: tri-annual Electrical Testing Of The Electrical Power Distribution System
perform Infra-red Scanning/thermographic Survey On Electrical Equipment.
use An Infra-red Scanning Camera To Detect Hot Spots In The Electrical Power Distribution System. Objective Of This Work Is To Detect Any Loose, Broken, Or Corroded Connections In The System. Problem Connections Shall Be Replaced With New Connectors, And/or Tightened With Torque Wrench To Meet The Equipment Manufacturers Specifications. an Infra-red Photograph Along With A Written Report Of Each Piece Of Equipment Shall Be Provided Upon Completion Of This Task. For Equipment Showing No Problems A Written Report Required. note That Since This Work Item Must Be Done While The Electrical Power Distribution System Is Energized, Appropriate Safety Precautions Must Be Taken Before, During, And After Scanning The System. system Function Tests. Provide Function Test For All Equipment Listed In This Scope Of Work. test Conditions.
tests Will Be Conducted On A Scheduled Basis With The Cor/facilities Management Staff On Site. testing Will Require Off-hours And Weekend Work In Some Locations Due To The Clinical Nature Of The Areas And Requirement To Always Maintain Functionality. a Schedule Shall Be Developed And Proposed Testing Shall Be Coordinated And Planned With The Involvement Of On-site Faculties Management Staff. Approval Must Be Received On The Plan Prior To The Contractor Performing Work. All Work To Be Planned And Coordinated Prior To Commencing. No Work Shall Be Executed Prior To The Medical Center Communication To Include All Procedures And Notifications Have Been Briefed To Medical Center Stakeholders. off Hour Contract Work Shall Be Scheduled And Coordinated. Approximately 75% Of The Required Contract Work Shall Occur After Regular Business Hours Of 8:00 A.m. 4:30 P.m. Night And/or Weekend Work Shall Be Required And Coordinated After 5:30 P.m. 5:00 A.m. Weekend Work Shall Occur Between The Hours Of 7:00 A.m. 11 P.m. quality Control Of Contractor And Sub-contractor Employees. The Contractor Shall Provide A Quality Control Plan For The Work Completed Under This Contract. At A Minimum, The Contractor Shall: randomly Test 5% Of Components That Were Removed For Testing To Ensure Correct Phasing Upon Re-insertion.
randomly Test 10% Of The Components That Were Removed For Testing To Ensure Proper Reconnection Of Conductors/cables. provide Digital Files Showing The Results Of Any Quality Control Testing/documentation. 4-hour Power Outage Test
the Contractor Shall Be Present For And Participate In The Vamc 4-hour Test Of The Essential Electrical System (ees). This Test Shall Fulfill The Requirements Of Vha Directive, Electrical Power Distribution System, Nfpa 110 (e.g. Para. 8.4.9.) And The Joint Commission. this Test Will Include Opening Of All Utility Service Connections Serving The Vamc For A Minimum Of 4-hours. During The Test Period, Verify Operation Of All Ees Components Including The Transfer To Emergency Power And Return To Normal Service. the Contractor Shall Assist The Vamc Staff With Troubleshooting And Correcting Malfunctioning Electrical Equipment Discovered During The Test. Contractor Shall Make Any Required Adjustments And/or Recalibrations To All Equipment Which Has Been Otherwise Maintained, Inspected, And Tested Under This Scope Of Work. no Work Shall Be Permitted On Energized Circuits Without The Expressed Written Permission Of The Medical Center Director. contractor Shall Not Perform Any Service That Will Result In Additional Charges Without Prior Approval From The Va Contracting Officer. unscheduled/emergency Repairs & Service Calls Requirements: unscheduled Repairs Shall Be Performed At The Direction Of The Va Contracting Officer. The Vendor And The Va Contracting Officer Will Agree On The Scope Of Work And Labor Hours Prior To The Commencement Of Work. emergency Service And Repairs Are Available On A 24 Hour Per Day Basis And Will Be Invoiced At The Prevailing Straight Time Or Overtime Contract Customer Rate. vendor Shall Submit The Following Associated With Unscheduled Repairs. labor Hours: Minimum 6 Hours submittals/deliverables
a Complete Digital Test And Maintenance Report Of The Work Performed Shall Be Provided To The Va Within Seven (7) Calendar Days Of Completion Of The Testing And Maintenance Of Each Campus. Information Shown In The Reports Shall Be As Follows:
equipment Report Sheets Shall Be Specific To The Piece Of Equipment And Indicate Inspection And Test Procedures Used And The Results Of The Visual, Mechanical, And Electrical Inspections And Test In Accordance With Neta-mts 2023. Optional Tests Performed Shall Be Documented. Test Values Shall Be Presented On The Sheet. The Sheet Shall Include A Rating Of Good, Fair, Or Poor Based On Neta-mts 2023 Criteria And Tables. company S Name, Addresses, Telephone, Fax, And Email Address(es). name And Signature Of Contractors Who Perform The Maintenance And Testing.
va Work Contact Number, Name, And Number Of Va Contracting Officer. date And Time Of Work. Provide, For The Contractor Personnel Each Subcontractor S Personnel, Certified Payrolls Showing Specific Time Worked, Normal Hours Worked, Overtime Hours Worked, Job Classification And Wages And Benefits.
for Each Individual Conducting Testing And Maintenance Of Equipment, Provide Copies Of Contractor S Valid Licenses, Professional And Training Certificates. descriptions And Model Number Of Specialized Tools And Equipment Used, Such As Torque Wrench Or Infra-red Scanning Camera. location, Type, Name, And Nameplate Information Of Electrical Equipment To Be Maintained And Tested. Location Shall Include:
descriptions Of Work Items
station Name
building
room Number Or Corridor Designation
equipment Name If Electrical Component Has More Than One Item Tested. test Data And Results. Provided In A Format Approved By The Joint Commission. Each Electrical Component Tested Shall Have A Digital Photograph Taken Prior To Removal For Testing And A Digital Photo Upon Completion Of Testing. The Photo Taken After Testing Shall Clearly Show A Label Indicating Successful Completion Of Testing And Maintenance. reference Materials Such As Equipment Manufacturer S Specifications, Coordination Study, Etc. Used In The Testing And Maintenance. remarks On Conditions Of Electrical Equipment. List All Deficiencies, If Any.
recommended Corrective Actions Along With Projected Costs. If Any. a Complete Digital Infra-red Report Of Each Piece Of Equipment Shall Be Provided To The Va Within 14 Calendar Days Of Completion Of The Infra-red Testing At Each Campus. Information Shown In The Reports Shall Be As Follows: company S Name, Addresses, Telephone, Fax, And Email Address(es)
name And Signature Of Contractors Who Perform The Maintenance And Testing.
va Work Contract Number, Name, And Number Of Va Contracting Officer.
date And Time Of Work. Provide, For The Contractor Personnel Each Subcontractor S Personnel, Certified Payrolls Showing Specific Time Worked, Normal Hours Worked, Overtime Hours Worked, Job Classification And Wages And Benefits.
for Each Individual Conducting Testing And Maintenance Of Equipment, Provide Copies Of Contractor S Valid Licenses, Professional And Training Certificates. descriptions And Model Number Of Specialized Tools And Equipment Used, Such As Torque Wrench Or Infra-red Scanning Camera. location, Type, Name, And Nameplate Information Of Electrical Equipment To Be Maintained And Tested. descriptions Of Work Items. test Data And Results. Provided In A Format Approved By The Joint Commission. Each Electrical Component Tested Shall Include A Digital Infra-red Photograph. Electrical Components Showing Deficiencies Shall Have A Second Digital Infra-red Photograph Taken Showing Corrected Deficiency. upon Acceptance Of The Digital Reports, Submit Three (3) Hard Copies Of The Complete Reports To Va Cor Within Fourteen (14) Calendar Days Of Digital Report Acceptance. hard Copies And Worksheets Or Raw Data Collected During The Testing And Maintenance Shall Be Provided After Each Workday And Prior To The Start Of The Next Workday. Information Shall At A Minimum Include The Following:
required Testing Form.
company S Name, Addresses, Telephone, Fax, And Email Address(es). name And Signature Of Contractors Who Perform The Maintenance And Testing.
va Work Contract Number, Name, And Number Of Va Contracting Officer. location, Type, Name, And Nameplate Information Of Electrical Equipment To Be Maintained And Tested. Location Shall Include: station Name
building
room Number Or Corridor Designation And equipment Name If Electrical Component Has More Than One Item Tested.
any Deficiencies Identified. scheduling And Power Outages
this Contract Is For The Testing And Maintenance Of A Critical Electrical Distribution System And Will Require 30+ Days For Completion.
the Contractor Shall, Within Fourteen (14) Calendar Days After Award, Prepare And Submit To The Va Cor For Acceptance A Basic Schedule Showing The Order In Which The Contractor Proposes To Perform Work. All Work Shall Be Coordinated With The Cor And The Medical Center: kick-off Meeting (with Basic Schedule) Ntp + 14 Calendar Days. verification And Validation Of Electrical Components To Be Tested, Inspected And Maintained. Ntp + 60 Calendar Days. infra-red Survey Includes With Item 4. testing, Inspection, And Maintenance Of Electrical Components. 30+ Working Days, 45 Calendar Days Ntp + 75 Calendar Days. draft Report Submissions. Ntp + 89 Calendar Days. final Report Submissions. Ntp + 113 Calendar Days. upon Verification And Validation Of The Electrical Components, The Contractor Shall Provide A Proposed Detailed Outage Schedule. Allow For 3 Calendar Days For Scheduling Of Each Outage After Approval Of Detailed Outage Schedule. Due To The Critical Nature Of The Electrical Distribution System, The Va May Restrict The Size And Length Of Each Outage. Coordinate With The Cor And Va Fms Safety And Outage Coordinator. the Detailed Outage Schedule Shall Include The Following:
location For Locking Out Electrical Components For Each Outage.
electrical Components To Be Tested, Inspected, And Maintained For Each Outage.
length Of Time Of Each Outage.
proposed Date Of Each Outage. number Of Contractor Employees On-site For Each Outage. limitations Of Each Outage:
outages Shall Be Completed During Other Than Normal Working Hours And Shall Be Approved By The Va Contracting Officer And The Cor. outages May Be Limited To Night And Weekend Hours. outages Shall Not Last Longer Than 4 Hours In A 24-hour Period Without The Specific Approval Of The Va Contracting Officer And The Cor. miscellaneous Requirements the Cor Shall Be Contacted As To Providing A Working Space For Testing Electrical Components And An Area For Storage Of Materials. Storge Space Within The Medical Center Is Not Available. Therefore, Material Storage Space Shall Be The Responsibility Of The Contractor And Shall Be Mobile In Nature (conex, Trailer, Etc.). Final Location Of Mobile Storage To Be As Directed By The Cor. contractor Parking Shall Be Coordinated With The Cor. va Shall Provide Space For Testing Equipment And Electrical Power To Run The Contractor Testing Equipment. The Location For The Equipment Shall Be Designated By The Cor And The Location Will Not Be Oved Without Approval Of The Cor. Submit The Power Requirements For Contractor Testing Equipment In The Contractor Proposal. Connection To The Power Source For Contractor Equipment Is The Responsibility Of The Contractor To Include Protective Devices, Cables, Etc. The Va Electrical Staff Will De-energize Any Lines For Contractor To Connect To. the Contractor Shall Supply All Labor, Materials, Supplies, Equipment, Vehicles, Portable Generators, Lights, Etc. Necessary To Accomplish Work During Power Shutdowns. The Va Will Not Furnish Materials Or Equipment For The Contractor S Use. Contractor Shall Be Responsible For The Labor, Materials, Equipment, Tools, Etc., To Remove Covers, Lids, Bars, Plates, Or Other Removable Impediments To Electrical Components For Access To The Equipment To Be Tested, Inspected And/or Maintained. The Va Will Not Provide Labor For Any Work Except For De-energizing And Energizing Electrical Components And Providing Access To Secure Areas. review Of Electrical Distribution System Prior To Bidding Is The Responsibility Of The Contractor. Documents/information Provided In This Solicitation Is Not Sufficient To Complete An Accurate Cost Estimate/proposal. Failure To Conduct A Site Visit Will Not Be A Reason For A Request For Equitable Adjustment After Award Of The Contract. va Owned Transformers And Oil Filled Switches
the Contractor Shall Provide Onsite; Labor, Materials, Tools, Test Equipment And Supervision Necessary To Accomplish Testing On Va-owned Transformers And Oil Filled Switches. all Services For This Contract Must Meet Manufacturer S Performance And Technical Specifications, Federal Regulations, And Other Specifications That May Apply Such As National Electrical Code (nec), Life Safety Code (lsc), Joint Commission On Accreditation Of Healthcare Organizations (jcaho), And Va Regulations. testing Shall Include But Not Is Not Limited To:
visual Inspection & Field Service History To Include All Fluid Levels, Temperature Readings, Pressure/vacuum, Paint Condition, Leaks And History Of Maintenance Services. liquid Screen Test Data To Include Neutralization Number, Ift, Dielectric Breakdown Strength, Color, Specific Gravity, And Visual Examination Data. These Tests Are To Evaluate The Progress Of Oxidation, Indicate Needs For Maintenance And Identify Contamination. inhibitor Content: The Most Cost-effective Point At Which To Perform Oil Maintenance Is When Oxidation Inhibitor Has Become Depleted, But Other Oil Quality Results Are Still Acceptable. liquid Power Factor: Contamination From Outside Materials, Moisture, And Oil Oxidation All Raise The Liquid Power Factor. The Type Of Problem Will Be Determined And Evaluated Using The Liquid Power Factor Analysis Run At Both 25 Degrees Celsius And 100 Degrees Celsius. karl Fischer Moisture Determination: Moisture Corrodes Metal Components, Weakens The Solid Insulation, And Promotes Oxidation And Increases The Rate Of Aging For The Equipment. At High Levels, It Lowers The Insulating Capabilities Of The Oil And Solid Insulation And Can Lead To Flashover. Moisture Analysis Is Required To Monitor The Progress Of This Damaging Contaminant. furan Analysis: This Is A Method For Determining The Condition Of The Solid Insulation By Drawing And Analyzing A Sample Of The Insulating Liquid. The Profile Of Furans Indicates Whether An Active Fault Condition Is Breaking Down The Paper And Gives A Reliable Estimate Concerning The Extent To Which The Solid Insulation Has Aged. dissolved Gas Analysis: Concentrations Of Nine Gases Dissolved In The Insulating Liquid Are Determined. The Profile Of Gases Is Interpreted. An Abnormal Gas Profile Indicates An Incipient Transformer Fault Oil Or Paper Overheating, Hot Spot Overheating, Or An Electrical Discharge. pcb Content: The Pcb Content Will Be Determined Using Packed Column Gas Chromatography Documentation. deliverables
the Service Provider Shall Submit Two (2) Hard Copies And Electronic Copy Of All Maintenance, Testing, And Inspection Data/reports To The Cor Within Seven (7) Calendar Days Of Completion Of Work. the Contractor Shall Submit Any Waste Manifest Documents As Applicable. special Instructions
contractor Check-in: All Employees Of The Service Provider Shall Comply With Va Security Management Program And Obtain Permission Of The Va Police And Restricted From Unauthorized Access. Upon Arrival, The Contractor Shall Sign-in At Building 15 And Receive A Temporary Identification Badge Prior To Performing Services At Va Connecticut Healthcare System. The Contractor Shall Wear Visible Identification Always Displaying The Name And Company Id While On Site. All Site Visits Shall Be Coordinated With The Va Cor. documentation: At The Conclusion Of Each Repair And Scheduled Maintenance Visit, The Contractor Shall Provide A Written Service Report Indicating The Date Of Service, The Model, Serial Number, And Location Of Equipment Serviced, The Name Of The Representative, And The Services Performed, And Parts Replaced And Labor Hours. The Reports Shall Be Delivered Within Five Business Days. per Va Directive 1805, Smoking Vaping, And Smokeless Tobacco Are Prohibited On The Grounds Of Va Facilities, Including In Vehicles. This Directive Applies To All Service Providers And Their Employees. no Photography Of Va Premises Is Allowed Without Written Permission Of The Contracting Officer. Patients And Staff Are Not To Be Photographed At Any Time. va Reserves The Right To Close Or Shut Down The Facilities And Order Service Provider Employees Off The Premises In The Event Of A National Emergency. The Service Provider May Return To The Site Only With The Written Approval Of The Va Contracting Officer. prior To Commencing Work Onsite, All Service Providers And Provider Personnel Shall Furnish Proof Of Receipt Of Required Covid Vaccinations And Boosters In Compliance With Current Vha Directives.
prior To Commencing Work Onsite, All Service Providers And Provider Personnel Shall Furnish Proof Of Receipt Of Required Tuberculosis Testing In Compliance With Vha Directive 1131(5), Dated June 04, 2021. parking For Service Provider And Its Employees Shall Be In Designated Areas Only. Service Provider To Coordinate With Cor. the Service Provider Shall Confine All Operations (including Storage Of Materials) On Government Premises To Areas Authorized Or Approved By The Va Contracting Officer. The Service Provider Shall Hold And Save The Government, Its Officers, And Agents, Free And Harmless From Liability Of Any Nature Occasioned By The Service Provider S Performance. Working Space And Space Available For Storing Materials Shall Be As Determined By The Cor. Workers Are Subject To The Rules Of The Medical Center Applicable To Their Conduct. Execute Work In Such A Manner As To Reduce Impacts With Work Being Done By Others. billing: Provide Cor With A Report Or Statement Of Work Completed And Include Statements With Request For Payment. Statement Should Include Service Completed And The Date Each Service Item Was Completed. Labor Charges Shall Be Billed Hourly, And Any Unused Labor Totals Will Be Credited Back To The Va Medical Center On The Next Billing Cycle, Upon Receipt Of The Service Report. terms And Conditions
user Responsibility: The Contractor Shall Not Be Held Responsible Under The Terms Of This Contract For Repairs To Equipment Necessitated By User Abuse And/or Misuse Of Equipment. all Work Is Subject To Inspection, Review And Approval By The Hvac Supervisor, Utility System Supervisor, Chief M&o, Chief Engineer, And/or Their Designees. evaluation Process award Will Be Made To The Best Price, As Determined To Be The Most Beneficial To The Government. Please Read Each Section Below Carefully For The Submittals And Information Required As Part Of The Evaluation. Failure To Provide The Requested Information Below Shall Be Considered Non-compliant And Your Quote Could Be Removed From The Evaluation Process. Vendors Quotes Shall Be Evaluated Under Far Part 13.106-2(b) -- Evaluation Of Quotations Or Offers. The Government Will Award A Contract Resulting From This Solicitation To The Responsible Vendor Whose Quote Conforming To The Solicitation Will Be Most Advantageous To The Government, Price, Past Performance, And Capabilities. The Following Factors Shall Be Used To Evaluate Offers: 1. Price (follow These Instructions):
a. Vendor Shall Provide A Quote For The Scheduled Drop Off Dates Above. Vendors Must Also Provide All Applicable Labor Rates For The Solicited Services So They Can Be Compared To The Applicable Wage Determination For Compliance With The Service Contract Labor Standards (scls) If Applicable. b. Ensure Your Validation Is Current In The System For Award Management (sam)( Https://www.sam.gov). Federal Acquisition Regulations Require That Federal Contractors Register In The Sam Database At Http://www.sam.gov And Enter All Mandatory Information Into The System. Award Cannot Be Made Until The Contractor Has Registered. Offerors Are Encouraged To Ensure That They Are Registered In Sam Prior To Submitting Their Quotation.
2. Capable: The Vendors Quote Shall Be Evaluated To Determine If The Organization Has The Experience And Capabilities To Provide The Requested Services In Accordance With The Statement Of Work In A Timely Efficient Manner. a. Contractor Shall Demonstrate Their Corporate Experience And Approach To Meet All Requirements.
b. Contractor Shall Provide A List Of All Services Included In The Price.
c. Contractor Shall Provide All Current And Relevant Licenses And/or Certifications For The State Of Connecticut If Applicable.
d. If You Are Planning To Sub-contract Some Or All Of This Work, Please Provide The Name And Address(s) Of All Subcontractor(s) (if Applicable) And A Description Of Their Planned Subcontracting Effort.
e. Contractor Shall State And/or Demonstrate Their Ability To Meet All Requirements And Deliverables Stated In This Solicitation And Statement Of Work. Any Additional Information To Further Identify How The Company Is Experienced And Capable Of Performing The Requested Work Is Welcome. 3. Veterans Preference Factor (per 852.215-70): The Government Will Assign Evaluation Credit For An Offeror (prime Contractor) Which Is A Service-disabled Veteran-owned (sdvosb) Or A Veteran-owned Small Business (vosb). Non-sdvosb/vosb Offerors Proposing To Use Sdvosbs Or Vosbs As Subcontractors Will Receive Some Consideration Under This Evaluation Factor. a. For Sdvosbs/vosbs: In Order To Receive Credit Under This Factor, An Offeror Shall Submit A Statement Of Compliance That It Qualifies As A Sdvosb Or Vosb In Accordance With Vaar 852.215-70, Service-disabled Veteran-owned And Veteran-owned Small Business Evaluation Factors . Offerors Are Cautioned That They Must Be Registered And Verified In Vendor Information Pages (vip) Database (http://www.vetbiz.gov). i. Verified Sdvosbs Will Receive A 5% Price Credit (e.g. If A Sdvosb Submits An Offer Of $100.00, It Will Be Evaluated As If It Submitted An Offer Of $95.00).
ii. Verified Vosbs Will Received A 2.5% Price Credit (e.g. If A Vosb Submits An Offer Of $100.00, It Will Be Evaluated As If It Submitted An Offer Of $97.50). the Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html. (x) Please Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications -- Commercial Items, With Your Offer Via The Sam.gov Website Or A Written Copy. (xi) Clause 52.212-4, Contract Terms And Conditions -- Commercial Items, Applies To This Acquisition In Addition To The Following Addenda S To The Clause: 52.252-2 Clauses Incorporated By Reference (feb 1998), 52.203-17 Contractor Employee Whistleblower Rights And Requirement To Inform Employees Of Whistleblower Rights (jun 2020), 52.204-4 Printed Or Copied Double-sided On Postconsumer Fiber Content Paper (may 2011), 52.204-13 System For Award Management Maintenance (oct 2018), 52.204-18 Commercial Government Entity Code Maintenance (aug 2020), 52.217-9 Option To Extend The Term Of The Contract (mar 2000), 52.228-5 Insurance-work On A Government Installation (jan 1997), 52.232-40 Providing Accelerated Payments To Small Business Subcontracting (dec 2013), 852.212-70 Provisions And Clauses Applicable To Va Acquisitions Of Commercial Items (apr 2020) 852.203-70 Commercial Advertising 852.219-74, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside 852.232-72 Electronic Submissions Of Payment Requests 852.233-70 Protest Content/alternative Dispute Resolution 852.233-71 Alternate Protest Procedure 852.270-1 Representatives Of Contracting Officers 852.219-74 Limitations On Subcontracting Monitoring And Compliance (jul 2018) as Prescribed In 819.7203(a) Insert The Following Clause: (a) This Solicitation Includes 852.219-74, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside, (b) Accordingly, Any Contract Resulting From This Solicitation Is Subject To The Limitation On Subcontracting Requirements In 13 Cfr 125.6. The Contractor Is Advised That In Performing Contract Administration Functions, The Contracting Officer May Use The Services Of A Support Contractor(s) Retained By Va To Assist In Assessing The Contractor S Compliance With The Limitations On Subcontracting Or Percentage Of Work Performance Requirements Specified In The Clause. To That End, The Support Contractor(s) May Require Access To Contractor S Offices Where The Contractor S Business Records Or Other Proprietary Data Are Retained And To Review Such Business Records Regarding The Contractor S Compliance With This Requirement. (c) All Support Contractors Conducting This Review On Behalf Of Va Will Be Required To Sign An Information Protection And Non-disclosure And Disclosure Of Conflicts Of Interest Agreement To Ensure The Contractor S Business Records Or Other Proprietary Data Reviewed Or Obtained In The Course Of Assisting The Contracting Officer In Assessing The Contractor For Compliance Are Protected To Ensure Information Or Data Is Not Improperly Disclosed Or Other Impropriety Occurs. (d) Furthermore, If Va Determines Any Services The Support Contractor(s) Will Perform In Assessing Compliance Are Advisory And Assistance Services As Defined In Far 2.101, Definitions, The Support Contractor(s) Must Also Enter Into An Agreement With The Contractor To Protect Proprietary Information As Required By Far 9.505-4, Obtaining Access To Proprietary Information, Paragraph (b). The Contractor Is Required To Cooperate Fully And Make Available Any Records As May Be Required To Enable The Contracting Officer To Assess The Contractor S Compliance With The Limitations On Subcontracting Or Percentage Of Work Performance Requirement. (end Of Clause) 852.219-77 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction. as Prescribed In 819.7009(c) Insert The Following Clause:
va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (sep 2021) (deviation) (a) Pursuant To 38 U.s.c. 8127(k)(2), The Offeror Certifies That (1) If Awarded A Contract (see Far 2.101 Definition), It Will Comply With The Limitations On Subcontracting Requirement As Provided In The Solicitation And The Resultant Contract, As Follows: [contracting Officer Check The Appropriate Box Below Based On The Predominant Naics Code Assigned To The Instant Acquisition As Set Forth In Far 19.102.] (i) [x] Services. In The Case Of A Contract For Services (except Construction), The Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Not Vip-listed Sdvosbs As Set Forth In 852.219-74 Or Vosbs As Set Forth In 852.219-11. Any Work That A Similarly Situated Vip-listed Subcontractor Further Subcontracts Will Count Towards The 50% Subcontract Amount That Cannot Be Exceeded. Other Direct Costs May Be Excluded To The Extent They Are Not The Principal Purpose Of The Acquisition And Small Business Concerns Do Not Provide The Service As Set Forth In 13 Cfr 125.6. (ii) [ ] General Construction. In The Case Of A Contract For General Construction, The Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To It To Firms That Are Not Vip-listed Sdvosbs As Set Forth In 852.219-74 Or Vosbs As Set Forth In 852.219-11. Any Work That A Similarly Situated Vip-listed Subcontractor Further Subcontracts Will Count Towards The 85% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted. (iii) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, The Contractor Will Not Pay More Than 75% Of The Amount Paid By The Government To It To Firms That Are Not Vip-listed Sdvosbs As Set Forth In 852.219-74 Or Vosbs As Set Forth In 852.219-11. Any Work That A Similarly Situated Subcontractor Further Subcontracts Will Count Towards The 75% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted. (2) The Offeror Acknowledges That This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States. The Offeror Further Acknowledges That This Certification Is Subject To Title 18, United States Code, Section 1001, And, As Such, A False, Fictitious, Or Fraudulent Certification May Render The Offeror Subject To Criminal, Civil, Or Administrative Penalties, Including Prosecution. (3) If Va Determines That An Sdvosb/vosb Awarded A Contract Pursuant To 38 U.s.c. 8127 Did Not Act In Good Faith, Such Sdvosb/vosb Shall Be Subject To Any Or All Of The Following: (i) Referral To The Va Suspension And Debarment Committee; (ii) A Fine Under Section 16(g)(1) Of The Small Business Act (15 U.s.c. 645(g)(1)); And (iii) Prosecution For Violating Section 1001 Of Title 18. (b) The Offeror Represents And Understands That By Submission Of Its Offer And Award Of A Contract It May Be Required To Provide Copies Of Documents Or Records To Va That Va May Review To Determine Whether The Offeror Complied With The Limitations On Subcontracting Requirement Specified In The Contract. The Contracting Officer May, At Their Discretion, Require The Contractor To Demonstrate Its Compliance With The Limitations On Subcontracting At Any Time During Performance And Upon Completion Of A Contract If The Information Regarding Such Compliance Is Not Already Available To The Contracting Officer. Evidence Of Compliance Includes, But Is Not Limited To, Invoices, Copies Of Subcontracts, Or A List Of The Value Of Tasks Performed. (c) The Offeror Further Agrees To Cooperate Fully And Make Available Any Documents Or Records As May Be Required To Enable Va To Determine Compliance With The Limitations On Subcontracting Requirement. The Offeror Understands That Failure To Provide Documents As Requested By Va May Result In Remedial Action As The Government Deems Appropriate. (d) Offeror Completed Certification/fill-in Required. The Formal Certification Must Be Completed, Signed, And Returned With The Offeror S Bid, Quotation, Or Proposal. The Government Will Not Consider Offers For Award From Offerors That Do Not Provide The Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award. i Hereby Certify That If Awarded The Contract, [insert Name Of Offeror] Will Comply With The Limitations On Subcontracting Specified In This Clause And In The Resultant Contract. I Further Certify That I Am Authorized To Execute This Certification On Behalf Of [insert Name Of Offeror].
printed Name Of Signee: _________________________________
printed Title Of Signee: ________________________________
signature: ______________________________________________
date: ___________________________________________________
company Name And Address: _____________________________________________________________________________________
(end Of Clause) 852.242-71 Administrative Contracting Officer. as Prescribed In 842.271, Insert The Following Clause: administrative Contracting Officer (oct 2020)
the Contracting Officer Reserves The Right To Designate An Administrative Contracting Officer (aco) For The Purpose Of Performing Certain Tasks/duties In The Administration Of The Contract. Such Designation Will Be In Writing Through An Aco Letter Of Delegation And Will Identify The Responsibilities And Limitations Of The Aco. A Copy Of The Aco Letter Of Delegation Shall Be Furnished To The Contractor. (end Of Clause)
(xii) Clause At 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, Applies To This Acquisition And In Addition To The Following Far Clauses Cited, Which Are Also Applicable To The Acquisition: 52.203-6, 52.204-10, 52.209-6, 52.219-4, 52.219-8, 52.219-6, 52.219-28, 52.222-3, 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.222-40, 52.222-50, 52.223-18, 52.225-3, 52.225-13, 52.232-33, 52.222-41 (wage Determination West Haven And Newington Vamc Wd 2015-4127 And 2015-4119 (rev-28), 52.222-42, 52.222-43, 52.222-55, 52.222-6
(xiii) All Contract Requirement(s) And/or Terms And Conditions Are Stated Above.
(xiv) The Defense Priorities And Allocations System (dpas) And Assigned Rating Are Not Applicable To This Requirement.
(xv) Rfq Questions Are Due Nlt 08/23/2024 At 17:00 Pm Est. Rfq Responses Are Due Nlt 08/27/2024 At 17:00 Pm Est. Rfq Responses Must Be Submitted Via Email With Rfq #36c24124q0631 In The Subject Line To: Nathan.langone@va.gov Hand Deliveries Shall Not Be Accepted.
(xvi) The Poc Of This Solicitation Is Nathan Langone (nathan.langone@va.gov)
City Government Of Navotas Tender
Others
Philippines
Closing Date8 Apr 2024
Tender AmountPHP 300 K (USD 5.2 K)
Details: Description Request For Quotations: Please Quote Your Best Offer For The Item/s Described Below, Subject To The Terms And Conditions Provided At The Dorsal Portion Of This Request For Quotation. Submit Your Quotation Duly Signed By You Or Your Duly Representative And Copies Of Eligibility Requirements (business Permit, Local/national Tax Clearance And Philgeps Certificate Of Registration) Not Later Than The Deadline For Submission. Items: Procurement Of Electrical Supplies, Plumbing Supplies, Carpentry Supplies, Acu Tools And Materials Under Other Supplies & Materials Expenses Used For Repairs From Various Offices Requested By General Services Office Lot 1- Other Supplies And Materials Expenses Purchase Of Electrical Supplies, Plumbing Supplies, Carpentry Supplies, Acu Tools And Materials Other Supplies And Materials Expense (by Ordering Agreement) 1 50 Pc/s Access Valve 120.00 2 20 Tank/s Acetelyne Gas Refill (standard Size) 3,300.00 3 50 Gallon/s Acry Color Paint 700.00 4 50 Pc/s Acrylone Roller #7 140.00 5 100 Pc/s Adaptor, Male/female #1/2 40.00 6 60 Pc/s Adaptor, Universal 85.00 7 20 Roll/s Aerotape, Size: 1/8" Thick X2" X 30feet Roll 770.00 8 20 Pc/s Aircon Washbag For 1hp To 3hp With Drain Hole 870.00 9 20 Pc/s Analog Multimeter, Pointer Type, Zero Center Instrument 200mohm 1,500.00 10 100 Pc/s Angle Bar, 1.5 X 1.5 X 2.0mm X 10ft, Slotted 700.00 11 100 Pc/s Angle Bar, 1/4 X 1 X 20ft 820.00 12 100 Pc/s Angle Bar, 1/4 X 2 X 20 Ft 2,400.00 13 100 Pc/s Angle Bar, 3/16 X 1 X 20 Ft 770.00 14 100 Pc/s Angle Valve, .5 X .5 Stainless -2 Way 460.00 15 100 Pc/s Angle Valve, .5 X .5 Stainless -3 Way 480.00 16 100 Pc/s Angular Bar, 1" 770.00 17 50 Pc/s Anti Corrosion Spray Primer Paint, Density : 0, 95-1, 20 G / Ml 1,000.00 18 100 Pc/s Baby Roller #4 120.00 19 100 Pc/s Ballast, 40 Watts 240.00 20 20 Kilo/s Barb Wire, Gauge 12 Thickness 3,400.00 21 100 Pc/s Bareta De Cabra 24" 270.00 22 100 Pc/s Bareta De Cabra 30" 600.00 23 100 Pc/s Barrel Bolt #4 120.00 24 100 Pc/s Bearing #6205 320.00 25 100 Set/s Bidet 630.00 26 100 Sack/s Binistay (buhangin) 300.00 27 100 Pc/s Bisagra 2 X 4 350.00 28 100 Pc/s Bisagra 4 X 4 250.00 29 50 Box/es Black Screw # 3/16 X 1, 500s 1,300.00 30 500 Pc/s Black Screw #1 2.00 31 500 Pc/s Black Screw #2 10.00 32 500 Pc/s Black Screw Metal #1.5 12.00 33 500 Pc/s Black Screw Metal #2 14.00 34 100 Box/es Blind Rivet 1/8 X 1 610.00 35 100 Box/es Blind Rivet 1/8 X 1/2 500.00 36 100 Box/es Blind Rivet 3/16 X 1 550.00 37 100 Box/es Blind Rivet 3/16 X 1/2 300.00 38 20 Pc/s Bolt Cutter 36" 3,200.00 39 500 Pc/s Bolts And Nuts With Washer 15.00 40 500 Pc/s Brass Ball Valve 1 Inch 360.00 41 500 Pc/s Brass Ball Valve 1/2 Inch 310.00 42 500 Pc/s Brass Ball Valve 3/4 Inch 400.00 43 500 Pc/s Brass Gate Valve 880.00 44 500 Pc/s Bronze Welding Rod 1/8 200.00 45 500 Pc/s Cable Clamp 1/2 20.00 46 1000 Pc/s Cable Tie, 5 Inches 4.00 47 100 Pc/s Capacitor 60 Microfarad (single) 950.00 48 100 Pc/s Capacitor 65 Microfarad (single) 1,000.00 49 1000 Bag/s Cement, 40kg 500.00 50 20 Pc/s Chainblock 1 Tonner 7,000.00 51 20 Pc/s Chainblock 3 Tonner 12,700.00 52 100 Set/s Check Valve 1/2 525.00 53 100 Set/s Check Valve 3/4 750.00 54 100 Pc/s Checkered Plate 3/16 X 4 X 8 12,000.00 55 100 Pc/s Circuit Breaker 20 Amp With Aircon Outlet 1,200.00 56 20 Set/s Circuit Breaker 250amp With Enclosure 13,000.00 57 100 Pc/s Circuit Breaker 30 Amp 650.00 58 100 Pc/s Circuit Breaker 60 Amp Bolt-on 2 Pole 1,500.00 59 100 Pc/s Circuit Halogen Bulb #3 24v / 70 W 120.00 60 100 Pc/s Clamp (ring Type) 3/4 Double 10.00 61 100 Pc/s Clamp Meter With Lflex 1500v (micro) 49,000.00 62 100 Pc/s Clog Drain Remover, 10 Meters (hand Crank Duct Dredge) 770.00 63 100 Pc/s Cold Chisel 235.00 64 200 Kilo/s Common Nail #1 180.00 65 200 Kilo/s Common Nail #1.5 150.00 66 200 Kilo/s Common Nail #2 200.00 67 200 Kilo/s Common Nail #3 220.00 68 200 Kilo/s Common Nail #4 230.00 69 500 Pc/s Compact Pin Light 18 Watts G24d1 Socket 500.00 70 200 Kilo/s Concrete Nail #1 170.00 71 200 Kilo/s Concrete Nail #1.5" 180.00 72 200 Kilo/s Concrete Nail #2 170.00 73 200 Kilo/s Concrete Nail #3 230.00 74 200 Kilo/s Concrete Nail #4 170.00 75 100 Pc/s Corrugated Sheet G24 8 Ft 1,400.00 76 100 Dozen/s Cotton Gloves 310.00 77 100 Pc/s Coupling 2" Orange 40.00 78 50 Pc/s Cut-off Disc (12 Inch) 690.00 79 10 Set/s Cut-off Machine (12 Inch) 18,000.00 80 100 Pc/s Cutting Disc #4 200.00 81 100 Box/es Cutting Disc 100mm X 1mm X 16mm 150.00 82 100 Pc/s Cylindrical #1.5 400.00 83 100 Pc/s Cylindrical #3/4 150.00 84 100 Pc/s Cylindrical Hinges #1 135.00 85 100 Pc/s Cylindrical Hinges #3/4 80.00 86 100 Pc/s Deformed Bar 10mm 280.00 87 100 Pc/s Deformed Bar 12mm 395.00 88 100 Pc/s Deformed Steel Bar 12mm 520.00 89 100 Pc/s Diamond Disc Cutter #4 525.00 90 100 Pc/s Diamond Trowel Big 150.00 91 100 Pc/s Diamond Trowel Medium 135.00 92 100 Pc/s Diamond Trowel Small 130.00 93 100 Pc/s Digging Bar, 25mm X 5ft 1,200.00 94 100 Pc/s Door Knob 700.00 95 100 Pc/s Door Knob Hole Saw Kit 300.00 96 100 Pc/s Drill Bit #1/4 (concrete) 80.00 97 100 Pc/s Drill Bit #1/4 (steel) 210.00 98 100 Pc/s Drill Bit #1/8 (concrete) 70.00 99 100 Pc/s Drill Bit #1/8 (steel) 110.00 100 100 Pc/s Drill Bit #3/16 (concrete / Masonry) 75.00 101 100 Pc/s Drill Bit #3/16 (steel) 140.00 102 100 Pc/s Drill Bit #3/8 (concrete) 150.00 103 100 Pc/s Drill Bit #3/8 (masonry) 130.00 104 100 Pc/s Drill Bit #3/8 (steel) 425.00 105 100 Pc/s Drill Bit #5/16 (concrete) 90.00 106 100 Pc/s Drill Bit #5/16 (steel) 310.00 107 100 Pc/s Drill Bit Set, Heavy Duty 6,750.00 108 100 Pc/s Dual Flush Toilet Push Button 770.00 109 100 Pc/s Duct Tape 820.00 110 100 Pc/s Electric Tape, Large 80.00 111 100 Gallon/s Emulsion 1,000.00 112 100 Pc/s Entrance Cap 3/4 60.00 113 100 Liter/s Epoxy All Purpose 1,200.00 114 100 Pair/s Epoxy Gloss 1,700.00 115 100 Gallon/s Epoxy Primer 1,900.00 116 100 Gallon/s Epoxy Primer Gray W/ Catalyst 1,400.00 117 100 Gallon/s Epoxy Reducer 800.00 118 100 Gallon/s Epoxy Topcoat 1,850.00 119 100 Pc/s Exhaust Fan, 12" 2,750.00 120 50 Pc/s Exhaust Fan, Industrial, 12" 3,900.00 121 50 Pc/s Exhaust Fan, Industrial, 16" 6,950.00 122 100 Pc/s Expansion Shield 3/8 X 2 With Washers 70.00 123 50 Pc/s Fan, Wall Fan, 16" 1,800.00 124 100 Pc/s Faucet , Wall Mounted, For Cr 1,300.00 125 100 Pc/s Faucet, Lavatory 1,200.00 126 100 Pc/s Faucet, Pvc, Tb 500.00 127 100 Set/s Faucet, With Telephone Shower 1,310.00 128 100 Pc/s Fiber Cement 4 X 8 700.00 129 100 Pc/s Fiber Cement Board 1/4 X 4 X 8 1,100.00 130 500 Kilo/s Finishing Nail #1 160.00 131 500 Kilo/s Finishing Nail #1.5 150.00 132 500 Kilo/s Finishing Nail #2 155.00 133 10 Set/s Fire Exit Door Lock 16,000.00 134 100 Pc/s Flat Bar 1" 500.00 135 100 Pc/s Flat Bar 3/16 X 1 X 20ft 480.00 136 100 Roll/s Flat Cord #16 5,100.00 137 100 Pc/s Flat Sheet 24 X 3 X 8 2,000.00 138 100 Pc/s Flat Sheet 24 X 4 X 8 (liso) 1,700.00 139 100 Pc/s Flat Washer 1 1/4 M32 60.00 140 100 Pc/s Flat Washer 1 1/8 M28 40.00 141 100 Pc/s Flexible Hose .5 X .5 X 16 Inches 270.00 142 100 Roll/s Flexible Hose 1/2 Orange 1,400.00 143 100 Roll/s Flexible Hose 3/4 Orange 1,800.00 144 100 Set/s Flood Light 200w Led With Metal Halide 6,300.00 145 100 Quart/s Floor Coating Chlorinated Rubber Base Marking 700.00 146 100 Quart/s Floor Coating Chlorinated Rubber Base Reducer 400.00 147 100 Gallon/s Floor Coating Rubber Base 2,500.00 148 100 Pc/s Floor Drain Cover 4 X 4 150.00 149 100 Pc/s Fluorescent Holder Snap Fit 25.00 150 100 Pc/s Fluorescent Lamp 40 Watts 216.00 151 100 Pc/s Fluorescent Lamp T8 Holder 55.00 152 100 Set/s Fluorescent Light With Housing 577.00 153 100 Set/s Folding Allen Wrench 7pcs/set 69-262 2.5- 10mm 700.00 154 50 Tank/s Freon R134a, 13.6kg 7,000.00 155 50 Kilo/s Freon R22 (refill) 925.00 156 50 Tank/s Freon R22, 13.6kg 9,000.00 157 50 Kilo/s Freon R410 (refill) 925.00 158 50 Tank/s Freon R410a, 11.3kg 9,500.00 159 500 Pc/s G.i. Coupling 140.00 160 500 Pc/s G.i. Coupling 3/4 130.00 161 500 Pc/s G.i. Nipple 3 X 1/2φ 54.00 162 500 Pc/s G.i. Pipe #1 1,500.00 163 500 Pc/s G.i. Pipe #1/2 965.00 164 500 Pc/s G.i. Pipe #3/4 1,200.00 165 500 Pc/s G.i. Pipe 1.5 X 20 Ft 2,600.00 166 500 Pc/s G.i. Pipe 1/2 S40 X 20 Ft 965.00 167 500 Pc/s G.i. Pipe S40 #1 1,600.00 168 500 Pc/s G.i. Pipe S40 #1 1/2 Diameter 2,600.00 169 500 Pc/s G.i. Pipe S40 #3/4 Diameter 1,200.00 170 500 Pc/s G.i. Pipe S40 #3diameter X 20 Ft 5,800.00 171 500 Kilo/s G.i. Wire #16 190.00 172 50 Pc/s Garden Hose 25 Meters 1/2 1,540.00 173 500 Pc/s Gauge Manifold Hose Only For R22 550.00 174 500 Pc/s Gauge Manifold Hose Only For R410 550.00 175 500 Pc/s Glass Window 48 1/2 Cm X 75cm 700.00 176 500 Pc/s Good Lumber 1 X 1 X 10 155.00 177 500 Pc/s Good Lumber 1.5 X 1 X 10 170.00 178 500 Pc/s Good Lumber 1.5 X 2 X 10 235.00 179 500 Pc/s Good Lumber 1/2 X 1 X 10 100.00 180 500 Pc/s Good Lumber 1/4 X 1 X 10 135.00 181 500 Pc/s Good Lumber 2 X 2 X 10 310.00 182 500 Pc/s Good Lumber 2 X 2 X 12 370.00 183 500 Pc/s Good Lumber 2 X 3 X 12 560.00 184 500 Pc/s Good Lumber 2 X 3 X 8 700.00 185 500 Pc/s Good Lumber 2 X 4 X 12 725.00 186 10 Elf Gravel 3,900.00 187 500 Sack/s Gravel, 50kilos Per Sack 435.00 188 20 Set/s Grinder (portable), Heavy Duty 5,400.00 189 500 Pc/s Grinding Stone #4 170.00 190 500 Kilo/s Grout 140.00 191 500 Pc/s Grub Hoe (asarol) 700.00 192 500 Pc/s Gypsum Board 1/2 X 4 X 8 1,100.00 193 50 Box/es Gypsum Screw 1, 500s 600.00 194 200 Pc/s Hacksaw Blade 135.00 195 200 Pc/s Hacksaw With Blade 440.00 196 10 Pc/s Hammer (martilyo), 25mm To 27mm 510.00 197 10 Pc/s Hand Riveter 10.5" 865.00 198 10 Set/s Hand Tools (combination Pliers, Long Nose Pliers, Adjustable Wrench, Mini Claw Hammer, Philips Screwdriver, Slotted Screwdriver, Sanp-off Blade Knife, Measuring Tape, Voltage Tester, Canvas Bag) 2,400.00 199 10 Set/s Handle Drill Rechargeable Cordless Drill Screw Drive, Heavy Duty 15,000.00 200 50 Pc/s Handle For Welding Machine 540.00 201 100 Set/s High Tensile Allen Caps Screw 7/16x2 With Nut Flat Washer 24.00 202 1000 Pc/s Hollow Blocks 40.00 203 5 Pc/s Jackhammer Portable, Heavy Duty 49,000.00 204 500 Pc/s Jalousie 1/4 X 10 X 80 125.00 205 500 Pair/s Jalousie Frame 14 Blades 1,100.00 206 500 Pc/s Junction Box With Cover 60.00 207 5 Pc/s K-400 Drum Machine / Drain Auger Cleaning Machine 22,500.00 208 100 Pc/s Kindry 1 1/2 X 2 X 10 550.00 209 100 Pc/s Kindry 2 X 4 X 10 1,260.60 210 100 Gallon/s Lacquer Thinner 800.00 211 100 Bottle/s Lacquer Thinner 350ml 80.00 212 100 Pc/s Lavatory Bottle (p Trap) 1 1/2" 300.00 213 100 Pc/s Lavatory Faucet, Stainless Steel 1,170.00 214 100 Pc/s Led Bulb 15 Watts 500.00 215 100 Pc/s Led Bulb 7 Watts 190.00 216 100 Pc/s Led Panel 6 Watts Daylight 350.00 217 100 Pc/s Led Panel 9 Watts Daylight 440.00 218 100 Pc/s Led Panel Light 12 Watts 6500k Round Type 605.00 219 100 Pc/s Led Panel Light 15 Watts 700.00 220 100 Pc/s Led Panel Light 15 Watts (round Type) 770.00 221 100 Pc/s Led Panel Light 165x165 12 Watts 650.00 222 100 Pc/s Led Panel Light 18 Watts Round Type 800.00 223 100 Pc/s Led Panel Light 18 Watts Round Type (ceiling Mounted) 695.00 224 100 Pc/s Led Panel, 18w 6000k 195.00 225 100 Pc/s Led Tube Light T8 Short 9 Watts Daylight 280.00 226 100 Pc/s Led, Fluorescent, 18 Watts T8 600.00 227 100 Pc/s Liston, 1/2 X 1 X 10 99.00 228 50 Pc/s Long Elbow 3/4 50.00 229 50 Pc/s Long Nose Pliers 500.00 230 20 Pc/s Long Nose, 8", Heavy Duty 600.00 231 10 Pc/s Magnetic Contactor 60 Amp 8,000.00 232 500 Pc/s Male Adaptor With Pvc Locknut Metal 70.00 233 500 Pc/s Male Plug Ordinary 74.00 234 100 Pc/s Mapp Gas Self Ignition Turbo Torch 1,390.00 235 100 Pc/s Mapp Gas, 400g 600.00 236 100 Kilo/s Masilya Powder 50.00 237 100 Pc/s Masonry Drill Bit 1/4 80.00 238 100 Pc/s Metal Furring "angle" 85.00 239 100 Pc/s Metal Furring "c" 260.00 240 100 Pc/s Metal Screw Diameter 10mm X 2inch 12.00 241 100 Pc/s Metal Screw Diameter 3/16 X 2inch 15.00 242 100 Pc/s Metal Screw Flat Head 10.00 243 50 Pc/s Mirror Glass 78 Cm X 195 Cm 3,700.00 244 100 Can/s Multi Use Penetrating Oil, 382ml 515.00 245 100 Kilo/s Nail, Umbrella Nail #2 1/2 185.00 246 100 Set/s Nema 3r Enclosure With 30at Breaker Bolt On 1,700.00 247 20 Tank/s Nitrogen Tank, 20kgs With Valve 12,000.00 248 20 Tank/s Nitrogen Tank, Refill 800.00 249 10 Roll/s Nylon Rope #12 6mm 1,500.00 250 10 Roll/s Nylon Rope #16 8mm 1,700.00 251 10 Pc/s Orbit Fan, 16", Heavy Duty 3,100.00 252 500 Pc/s Outlet Universal Extension Surface Type, 2-gang 100.00 253 500 Pc/s Outlet Universal Extension Surface Type, 3-gang 135.00 254 500 Pc/s Outlet Universal Extension Surface Type, 4-gang 170.00 255 100 Pc/s Padlock 30mm Heavy Duty 270.00 256 100 Pc/s Padlock 40mm Heavy Duty 350.00 257 100 Pc/s Paint Brush # 1 35.00 258 100 Pc/s Paint Brush # 1 1/2 40.00 259 100 Pc/s Paint Brush # 2 65.00 260 100 Pc/s Paint Brush # 3 110.00 261 100 Pc/s Paint Brush # 4 120.00 262 100 Gallon/s Paint Thinner 600.00 263 100 Bottle/s Paint Thinner 350ml 90.00 264 100 Liter/s Paint, Acry Color 350.00 265 100 Gallon/s Paint, Flat Wall Enamel 1,300.00 266 100 Gallon/s Paint, Gloss Enamel 1,100.00 267 100 Pail/s Paint, Latex Enamel 1,845.00 268 100 Gallon/s Paint, Latex Flat 954.00 269 100 Pail/s Paint, Latex Flat 3,690.00 270 100 Pail/s Paint, Latex Gloss 4,300.00 271 100 Gallon/s Paint, Latex Gloss 1,200.00 272 100 Pail/s Paint, Latex Semi Gloss 3,910.00 273 100 Gallon/s Paint, Roof Paint 995.00 274 100 Pc/s Paint, Spray Paint, 300g 190.00 275 100 Quart/s Paint, Tinting 135.00 276 100 Gallon/s Paint, Waterproofing 1,200.00 277 100 Pair/s Paleta 100.00 278 100 Pc/s Panel Box 2 Branch Plug-in 1,100.00 279 100 Roll/s Pdx Wire #10 7,600.00 280 100 Meter/s Pdx Wire #12 110.00 281 100 Roll/s Pdx Wire #12 5,500.00 282 100 Pc/s Piano Hinges 8ft 300.00 283 100 Pc/s Pipe Tube 2" 3,425.00 284 100 Pc/s Pipe Wrench (12") 1,055.00 285 100 Pc/s Pipe Wrench (14") 1,225.00 286 100 Pc/s Plain Sheet Gauge 18 X 4 X 8 2,200.00 287 100 Pc/s Plastic Clamp Orange 3/4 10.00 288 100 Pc/s Plastic Moulding 3/4 110.00 289 100 Pc/s Plate, 2 Gang 85.00 290 100 Pc/s Plies, 8", Heavy Duty 750.00 291 100 Pc/s Plyboard 3/4 X 4 X 8 1,910.00 292 100 Pc/s Plywood 1/2 X 4 X 8 (ordinary) 1,520.00 293 100 Pc/s Plywood 1/4 X 4 X 8 850.00 294 100 Pc/s Plywood 3/4 X 4 X 8 (marine) 2,400.00 295 100 Pc/s Plywood 3/4 X 4 X 8 (ordinary) 2,310.00 296 100 Pc/s Polycarbonate 1/4 X 4 X 8 2,200.00 297 100 Liter/s Polyester Body Filler With Hardener 370.00 298 100 Roll/s Polythelene Tape, 4" X 45m 200.00 299 100 Pc/s "portable Auto Air Compressor Pump, Dc 12v, Heavy Dut 2,500.00 300 5 Set/s Portable Welding Machine, Heavy Duty 15,000.00 301 100 Pc/s Ppr Cutter, 42mm, Heavy Duty 700.00 302 100 Pc/s Ppr Heater - Fusion Machine With Mould Size 20, 25, And 32 3,500.00 303 100 Pc/s Ppr White 32mm 4m Long 970.00 304 100 Pc/s Pressure Washer 1200w, Heavy Duty 5,500.00 305 100 Pc/s Primer Multi-seal, 600g 1,200.00 306 100 Pc/s P-trap (lavatory) 650.00 307 100 Pc/s Push Cart 300kg - Heavy Duty 16,000.00 308 10 Set/s Pushcart Wheel Wood 3 Pcs (12" Diameter X 3" Double Bearing) 7,000.00 309 100 Pair/s Putty Knife (paleta) # 1 60.00 310 100 Pair/s Putty Knife (paleta) # 1 1/2 70.00 311 100 Pair/s Putty Knife (paleta) # 2 75.00 312 100 Pair/s Putty Knife (paleta) # 5 60.00 313 100 Pc/s Pvc 45 Deg Sanitary 2" 65.00 314 100 Pc/s Pvc Adapter #3/4 28.00 315 100 Pc/s Pvc Ball Valve 1/2 80.00 316 100 Pc/s Pvc Ball Valve 3/4 110.00 317 100 Pc/s Pvc Bracket #1/2 10.00 318 100 Pc/s Pvc Cement, 100cc 170.00 319 100 Pc/s Pvc Cement, 200cc 260.00 320 100 Pc/s Pvc Clamp #1/2 10.00 321 100 Pc/s Pvc Connector #1/2 With Thread 24.00 322 100 Pc/s Pvc Coupling #1/2 20.00 323 100 Pc/s Pvc Coupling #3/4 25.00 324 100 Pc/s Pvc Elbow #1 Orange 100.00 325 100 Pc/s Pvc Elbow #1/2 50.00 326 100 Pc/s Pvc Elbow #1/2 Threaded 20.00 327 100 Pc/s Pvc Elbow #2 Orange 80.00 328 100 Pc/s Pvc Elbow #3/4 Blue 45.00 329 100 Pc/s Pvc Elbow #3/4 Orange 70.00 330 100 Pc/s Pvc Elbow 1/2 Moldex Plain 50.00 331 100 Pc/s Pvc Elbow 1/2 Moldex W/ Thread 80.00 332 100 Pc/s Pvc Elbow Sanitary 2" 125.00 333 100 Meter/s Pvc Flexible Hose 35.00 334 100 Pc/s Pvc Long Elbow #1/2 40.00 335 100 Pc/s Pvc Long Elbow #3/4 65.00 336 100 Pc/s Pvc Pipe #1 Orange 395.00 337 100 Pc/s Pvc Pipe #1/2 Blue 150.00 338 100 Pc/s Pvc Pipe #1/2 Diameter Threaded, Blue 170.00 339 100 Pc/s Pvc Pipe #1/2 Orange 200.00 340 100 Pc/s Pvc Pipe #2 Orange 615.00 341 100 Pc/s Pvc Pipe #3/4 Blue 235.00 342 100 Pc/s Pvc Pipe #3/4 Orange 310.00 343 100 Pc/s Pvc Pipe Sanitary 2" 400.00 344 100 Pc/s Pvc Plug 3/4 30.00 345 100 Pc/s Pvc Short Elbow #1/2 29.00 346 100 Pc/s Pvc Short Elbow #3/4 24.00 347 100 Pc/s Pvc Tee 1/2 25.00 348 100 Pc/s Pvc Tee 3/4 30.00 349 50 Gallon/s Quick Dry Enamel 1,200.00 350 50 Set/s R410/r22 Single Manifold Gauge (high Side) With Adaptor And 2 Pcs Hose2,310.00 351 100 Kilo/s Rags 140.00 352 100 Pc/s Rake 8 X 35 X 125 539.00 353 100 Pc/s Receptacle (bokilya) 70.00 354 100 Pc/s Rectangular Trowel Pvc Rubber 270.00 355 50 Gallon/s Red Oxide 738.00 356 50 Gallon/s Reducer 945.45 357 50 Lbs Refill Of Fire Extinguisher - Dry Chemical 120.00 358 100 Pc/s Roller Brush #4 75.00 359 100 Pc/s Roller Brush #7 85.00 360 500 Pc/s Roller Pan / Roller Tray 110.00 361 500 Pc/s Roller Tray 70.00 362 500 Quart/s Roof Sealant 1,100.00 363 1000 Pc/s Round Bar 1" 2,230.00 364 500 Pc/s Rubber Plug 95.00 365 500 Pc/s Rubber Socket 165.00 366 500 Gallon/s Rubberized With Catalyst 1,850.00 367 500 Bottle/s Rust Converter, 4l 1,590.00 368 1000 Pc/s Sacks, Net Weight 50kg 20.00 369 500 Sack/s Sand Bistay, Approx. 10kg To 13kg 62.00 370 100 Pc/s Sanding Disc #4 29.00 371 100 Pc/s Sandpaper #100, #140, #180, #240, #500 70.00 372 100 Pc/s Sanitary Pvc Fittings Emerald Clean Out W/ Plug 4" 400.00 373 20 Pc/s Screw Driver (flat Screw),slotted 205.00 374 20 Set/s Screw Driver Bit, ( 10pcs ) 150.00 375 20 Set/s Screw Driver Set, Heavy Duty 1,100.00 376 100 Pc/s Screw Driver, Phillips, 2 X 4 395.00 377 100 Liter/s Sealant 900.00 378 100 Pc/s Sealant Clear 480.00 379 100 Pc/s Sealant Gun 9" 500.00 380 100 Pack/s Sealant, 75ml 110.00 381 50 Pc/s Shovel, Square/pointed 570.00 382 50 Pc/s Side Cutter 8" 890.00 383 100 Pc/s Silicon Gun 9" 500.00 384 100 Pc/s Silicon Sealant, 300ml 480.00 385 500 Pc/s Silver Rod 40.00 386 100 Sack/s Skim Coat, 20kg 895.00 387 50 Pc/s Sledge Hammer 6 Lb (maso) 1,500.00 388 50 Pc/s Soldering Iron, 100w 615.00 389 100 Roll/s Soldering Lead, 1.2mm 800.00 390 100 Pair/s Spatula 85.00 391 100 Pc/s Spatula #5 120.00 392 100 Pc/s Square Bar #12 X 20 540.00 393 100 Pc/s Starter 40 Watts 50.00 394 100 Pc/s Steel Bar 10mm 270.00 395 100 Lot Steel Bending Service 2,310.00 396 100 Pc/s Steel Matting 3/16 X 4 X 8 1,200.00 397 100 Pc/s Strainer, 4 Inches 465.00 398 100 Pc/s Switch 120.00 399 100 Pc/s Switch Light, Two-way 110.00 400 100 Pc/s Switch, Single, Wide Series 170.00 401 100 Pc/s Switch, Two-gang, Universal Wide Series, 240.00 402 100 Pc/s Teflon Tape 1/2 25.00 403 100 Pc/s Teflon Tape 3/4 28.00 404 100 Pc/s Tek Screw Holder 135.00 405 100 Pc/s Tek Screw, 1.5 5.00 406 100 Pc/s Tek Screw, 2 1/2 10.00 407 500 Pc/s Thermostat 660.00 408 10 Box/es Thhn Wire #8 16,000.00 409 10 Roll/s Thhn Wire Solid #12 7,380.00 410 10 Roll/s Thhn Wire Stranded #10/7 10,500.00 411 10 Roll/s Thhn Wire Stranded #12/7 6,810.00 412 10 Box/es Thhn/thwn 3.5mm^2 6,400.00 413 10 Box/es Thhn/thwn 5.5mm^2 9,700.00 414 20 Roll/s Thhn/thwn 8.0 Mm^2 Wire Stranded 24,000.00 415 100 Bag/s Tile Adhesive 25kg 510.00 416 100 Bag/s Tile Grout 2kg 120.00 417 100 Pc/s Tile Levelling Wedges 190.00 418 100 Pc/s Tiles 20 X 90 565.00 419 100 Pc/s Tiles 30 X 30 100.00 420 100 Box/es Tiles 30 X 30 (ceramic) 200.00 421 100 Pc/s Tiles 60 X 60 850.00 422 100 Bag/s Tiles Grout Sponge 140.00 423 100 Pc/s Tinting Color 690.00 424 100 Set/s Toilet Bowl 5,920.00 425 100 Set/s Toilet Flush Set Fittings Dual Button Flush Valve 360.00 426 100 Pc/s Toilet Tank Flush Lever Single 60.00 427 100 Pack/s Tox #5, 100s 60.00 428 100 Pack/s Tox #6, 100s 100.00 429 50 Pc/s Tubular 1.5 1x1x20 700.00 430 50 Pc/s Tubular 1.5 2x3x20 1,850.00 431 50 Pc/s Tubular 1.5 X 2 X 3 X 20 1,845.00 432 50 Pc/s Tubular S40 # 2x1x20ft - 1.5mm 1,300.00 433 50 Pc/s Tubular S40 # 2x2x20ft - 1.5mm 875.00 434 30 Pc/s Universal Single Type Push Toilet Flush Button - 38mm 284.00 435 50 Set/s Urinal Bowl 4,400.00 436 50 Pc/s Urinal Push Button 1,230.00 437 50 Bottle/s Varnish, 350ml 100.00 438 100 Pc/s Wall Hook Screw 1/2" 10.00 439 100 Pc/s Wall Hook Screw 3/4" 15.00 440 100 Kilo/s Welding Rod 3/32 330.00 441 100 Kilo/s Welding Rod 5/64 Stainless 620.00 442 100 Box/es Welding Rod 6013 2,460.00 443 100 Liter/s Wood Do Putty 450.00 444 100 Pack/s Wood Glue 500grams 380.00 445 100 Pc/s Wood Screw 3/16 X 2 7.00 446 100 Pc/s Wood, 1 1/2 X 2 X 10, Lumber 410.00 447 100 Pc/s Wood, 1 X 2 X 8 S4s 220.00 448 100 Pc/s Wood, 1 X 4 X 8 420.00 449 100 Pc/s Wood, 1.5 X 2 X 8 190.00 450 100 Pc/s Wood, 1/2 X 1 X 10 100.00 451 100 Pc/s Wood, 1/2 X 1 X 8 80.00 452 100 Pc/s Wood, 1/2 X 2 X 8 130.00 453 100 Pc/s Wood, 1/4 X 4 X 8 Plywood (marine) 870.00 454 100 Pc/s Wood, 2 X 10 X 10 1,700.00 455 100 Pc/s Wood, 2 X 2 X 12 370.00 456 100 Pc/s Wood, 2 X 3 X 8 610.00 457 100 Pc/s Wood, 2 X 3 X 8 S4s 370.00 458 100 Pc/s Wood, 2 X 4 X 10 Kindry 1,270.00 459 100 Pc/s Wooden Drill Bit #3/8 500.00 460 100 Pc/s Wooden Plank 2" X 10" X 10' 2,500.00 461 5 Set/s Socket Wrench Set 25 Pcs X 1/2 Dr. (10-32mm) 12pts 5,000.00 462 50 Pc R134a Quick Connector Adapter Coupler With Low High Hvac All Copper Quick Connect Air Conditioner Refrigerant Adapter Universal Ac Manifold Gauge Auto Set Adjustable 1/4" 1,300.00 463 10 Pc Heat Gun/hot Air Gun 2000w 2,500.00 464 100 Pc Duplex Universal Outlet W/ Ground And Shutter Set 300.00 465 20 Sack/s Patching Compound 20kgs/sack 1,200.00 466 20 Pair Hinges 2-ball Bearing Stainless 200.00 467 50 Pair Stainless Steel Bracket Corner Code With Screws 50.00 468 50 Liter/s Latex Color Lamp 240.00 469 5 Pc/s Analog Clamp Meter/tester 8,500.00 Abc:php300,000.00 By Ordering Agreement: Within 15 Calendar Days Delivery Upon Receipt Of Delivery Ordering Contract (terms Of Reference Attached In Pr) (please Secure Complete List And/or Rfq Form From Ms. Maricar E. Pablo, Pauline Anne S. Sioco At 09338100230, And Roxette May P. Poblete At 0936-493-5632 Or Email Address: Procurement@navotas.gov.ph) Terms And Conditions: 1. Bidders Shall Provide Correct And Accurate Information Required. 2. Bidders May Quote For All The Items. 3. Price Quotation/s Must Be Valid For A Period Of Thirty (30) Days Calendar Days From The Date Of Submission. 4. Price Quotation/s, To Be Denominated In Philippine Peso Shall Include All Taxes, Duties And/or Levies Payable. 5. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 6. Delivery Period Expressed Merely In Days Or Working Days Shall Be Rejected. 7. Award Of Contract Shall Be Made To The Lowest Quotation (for Goods And Infrastructure) Or, The Highest Rated Offer (for Consulting Services) Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. 8. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initiated By You Or Any Of Your Duly Authorized Representative/s. 9. The Item/s Shall Be Delivered As Indicated In The Approved Bac Resolution/purchase Order. 10. The Procuring Entity Concerned Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Technical Specifications. 11. Liquidated Damages Equivalent To One Tenth Of One Percent (0.001%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The City Government Of Navotas Shall Rescind The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. For The Committee Original Signed Atty. Joel Joselito D. Parong Bac Chairperson
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Real Estate Service
United States
Closing Date12 Apr 2024
Tender AmountRefer Documents
Details: Gsa Template R103 (10/23) gsa Template R103 (10/23) va Request For Lease Proposals No. 36c26324r0065
sioux Falls/sd offers Due By 05/12/2024
in Order To Be Considered For Award, Offers Conforming To The Requirements Of The Rlp Shall Be Received No Later Than 1600 Cst On The Date Above. See Receipt Of Lease Proposals Herein For Additional Information. this Request For Lease Proposals ("rlp") Sets Forth Instructions And Requirements For Proposals For A Lease Described In The Rlp Documents. Proposals Conforming To The Rlp Requirements Will Be Evaluated In Accordance With The Basis Of Award Set Forth Herein To Select An Offeror For Award. The Government Will Award The Lease To The Selected Offeror, Subject To The Conditions Herein. the Information Collection Requirements Contained In This Solicitation/contract, That Are Not Required By Regulation, Have Been Approved By The Office Of Management And Budget Pursuant To The Paperwork Reduction Act And Assigned The Omb Control No. 3090-0086. small Rlp
gsa Template R103 (10/23)
table Of Contents
section 1 - Statement Of Requirements 1
general Information (small) (oct 2023) 1
amount And Type Of Space And Lease Term (slat) (oct 2020) 1
north American Industry Classification System (naics) Code And Small Business Size Standard (oct 2023) 1
section 2 - Solicitation Provisions 2
parties To Execute Lease (apr 2015) 2
flood Plains (oct 2022) 2
the Following Clauses Are Incorporated By Reference 2
section 3 - Eligibility And Preferences For Award 3
basis Of Award (oct 2023) 3
seismic Safety Moderate Seismicity (oct 2023) - Intentionally Removed 3
seismic Safety High Seismicity (oct 2023) - Intentionally Removed 3
historic Preference (small) (sep 2015) - Intentionally Removed 3
energy Independence And Security Act (small) (oct 2023) 3
national Historic Preservation Act Requirements Rlp (small) (oct 2023) 3
hubzone Small Business Concern Price Preference Waiver (small) (oct 2023) 3
section 4 - How To Offer 4
receipt Of Lease Proposals (small) (oct 2023) 4
proposal Contents For Small Leases (oct 2023) 4
fire Protection And Life Safety Submittals (small) (oct 2020) 4
eisa Submittals (small) (sep 2015) - Intentionally Removed 5
swing Space - Rlp (oct 2022) - Intentionally Removed 5 rlp No. 36c26324r0065, Page gsa Template R103 (10/23) rlp No 36c26324r0065, Page 2
gsa Template R103 (10/23) section 1 - Statement Of Requirements general Information (small) (oct 2023)
this Request For Lease Proposals (rlp) Sets Forth Instructions And Requirements For Proposals For A Lease Described In The Rlp Documents. The Government Will Evaluate Proposals Conforming To The Rlp Requirements In Accordance With The Basis Of Award Set Forth Below To Select An Offeror For Award. The Government Will Award The Lease To The Selected Offeror, Subject To The Conditions Below. included In The Rlp Documents Are The Gsa Form 3626 (u.s. Government Lease For Real Property (short Form)) Which Serves As An Offer Form And Lease Contract Award Document Supplemental Lease Requirements Document, And Gsa 3517a, General Clauses. the Offeror's Executed Gsa Form 3626 Shall Constitute A Firm Offer. No Lease Shall Be Formed Until The Lease Contracting Officer (lco) Executes The Gsa Form 3626 And Delivers A Signed Copy To The Offeror. offeror May Not Use Federal Agency Name(s) And/or Acronym(s), E.g., Veterans Administration, Va, In The Entity Name That Owns And/or Leases The Space He Va. amount And Type Of Space And Lease Term (slat) (oct 2020)
the Space Shall Be Located In A Modern Quality Building Of Sound And Substantial Construction With A Facade Of Stone, Marble, Brick, Stainless Steel, Aluminum Or Other Permanent Materials In Good Condition And Acceptable To The Lco. If Not A New Building, The Space Offered Shall Be In A Building That Has Undergone, Or Will Complete By Occupancy, Modernization, Or Adaptive Reuse For The Space With Modern Conveniences. city, State
sioux Fall, Sd
delineated Area
main Campus Of Augustana University, Sioux Fall, Sd
space Type(s)
medical/lab
minimum Sq. Ft. Rsf
752
maximum Sq. Ft. Rsf
752
reserved Parking Spaces (total)
0
reserved Parking Spaces (surface)
0
reserved Parking Spaces (structure)
0
initial Full Term
7 Months
termination Rights
30 Days
initial Firm Term
4 Months
soft Term
3
additional Requirements
none north American Industry Classification System (naics) Code And Small Business Size Standard (oct 2023)
the North American Industry Classification System (naics) Code For This Acquisition Is 531120 (exception). the Small Business Size Standard For The Applicable Naics Code Is Found At Standards. section 2 - Solicitation Provisions parties To Execute Lease (apr 2015) if The Lessor Is An Individual, That Individual Shall Sign The Lease. A Lease With An Individual Doing Business As A Firm Shall Be Signed By That Individual, And The Signature Shall Be Followed By The Individual's Typed, Stamped, Or Printed Name And The Words, An Individual Doing Business As . if The Lessor Is A Partnership, The Lease Must Be Signed In The Partnership Name, Followed By The Name Of The Legally Authorized Partner Signing The Same, And A Copy Of Either The Partnership Agreement Or Current Certificate Of Limited Partnership Shall Accompany The Lease. if The Lessor Is A Corporation, The Lease Must Be Signed In The Corporate Name, Followed By The Signature And Title Of The Officer Or Other Person Signing The Lease On Its Behalf, Duly Attested, And, If Requested By The Government, Evidence Of This Authority To So Act Shall Be Furnished. if The Lessor Is A Joint Venture, The Lease Must Be Signed By Each Participant In The Joint Venture In The Manner Prescribed In Paragraphs (a) Through (c) Of This Provision For Each Type Of Participant. When A Corporation Is Participating In The Joint Venture, The Corporation Shall Provide Evidence That The Corporation Is Authorized To Participate In The Joint Venture.
if The Lease Is Executed By An Attorney, Agent, Or Trustee On Behalf Of The Lessor, An Authenticated Copy Of The Power Of Attorney, Or Other Evidence To Act On Behalf Of The Lessor, Must Accompany The Lease. flood Plains (oct 2022) a Lease Will Not Be Awarded For Any Offered Property Located Within A 1-percent-annual-chance Floodplain (formerly Referred To As 100-year Floodplain) Unless The Government Has Determined That There Is No Practicable Alternative. An Offeror May Offer Less Than Its Entire Site In Order To Exclude A Portion Of The Site That Falls Within A Floodplain, So Long As The Portion Offered Meets All The Requirements Of This Rlp And Does Not Impact The Government S Full Use And Enjoyment Of The Premises. If An Offeror Intends That The Offered Property That Will Become The Premises For Purposes Of This Lease Will Be Something Other Than The Entire Site As Recorded In Tax Or Other Property Records The Offeror Shall Clearly Demarcate The Offered Property On Its Site Plan/map Submissions And Shall Propose An Adjustment To Property Taxes On An Appropriate Pro Rata Basis. For Such An Offer, The Government May Determine That The Offered Property Does Not Adequately Avoid Development In A 1-percent- Annual-chance Floodplain. in Addition, A Lease Will Not Be Awarded For Any Offered Property Adjacent To 1-percent-annual-chance Floodplain, Where Such An Adjacency Would, As Determined By The Government, Restrict Ingress Or Egress To The Premises In The Event Of A Flood, Unless There Is No Practicable Alternative.
the Following Clauses Are Incorporated By Reference: 552.270-1 - Instructions To Offerors Acquisition Of Leasehold Interests In Real Property (jun 2011) Alternate Ii (mar 1998) 52.215-5 - Facsimile Proposals (oct 1997) section 3 - Eligibility And Preferences For Award basis Of Award (oct 2023) lowest Price Technically Acceptable Approach. The Lease Will Be Awarded To The Responsible Offeror Whose Offer Conforms To The Requirements Of This Rlp And Lease Documents And Is The Lowest Priced Technically Acceptable Offer Submitted, Based On The Lowest Price Per Square Foot, According To The Ansi/boma Z65.1-2017 Definition For Occupant Area, Which Means The Total Aggregated Area Used By An Occupant Before Load Factors Are Applied, Consisting Of Tenant Area And Tenant Ancillary Area. The Method A Multiple Load Factor Method Shall Apply. if An Offer Contains Terms Taking Exception To Or Modifying Any Lease Provision, The Government Will Not Be Under Any Obligation To Award A Lease In Response To That Offer. seismic Safety Moderate Seismicity (oct 2023) - Intentionally Removed
seismic Safety High Seismicity (oct 2023) - Intentionally Removed historic Preference (small) (sep 2015) - Intentionally Removed
energy Independence And Security Act (small) (oct 2023) the Energy Independence And Security Act (eisa) Establishes Requirements For Government Leases Relating To Energy Efficiency Standards And Potential Cost-effective Energy Efficiency And Conservation Improvements. if The Offered Space Is Not In A Building That Has Earned The Energy Starâ® Label Within One Year Prior To The Due Date For Final Proposal Revisions, Offerors Are Required To Include In Their Lease Proposal An Agreement To Renovate The Building For All Energy Efficiency And Conservation Improvements That It Has Determined Would Be Cost Effective Over The Firm Term Of The Lease, If Any, Prior To Acceptance Of The Space note. Additional Information Can Be Found On Https://www.gsa.gov/real-estate/real-estate- Services/leasing/sustainability-policies Under Sustainability Policies. the Term "cost Effective" Means An Improvement That Will Result In Substantial Operational Cost Savings To The Landlord By Reducing Electricity Or Fossil Fuel Consumption, Water, Or Other Utility Costs. The Term "operational Cost Savings" Means A Reduction In Operational Costs To The Landlord Through The Application Of Building Improvements That Achieve Cost Savings Over The Firm Term Of The Lease Sufficient To Pay The Incremental Additional Costs Of Making The Building Improvements. instructions For Obtaining An Energy Starâ® Label Are Provided At Https://www.energystar.gov/buildings/building_recognition (use Portfolio Manager To Apply). Energy Starâ® Tools And Resources Can Be Found At Https://www.energystar.gov/buildings/tools-and-resources. The Energy Starâ® Building
upgrade Manual And Building Upgrade Value Calculator Are Tools Which Can Be Useful In Considering Energy Efficiency And Conservation Improvements To Buildings. if The Offered Space Is Not In A Building That Has Earned The Energy Starâ® Label Within One Year Prior To The Due Date For Final Proposal Revisions, The Successful Offeror Will Be Excused From Performing Any Agreed-to Energy Efficiency And Conservation Renovations If It Obtains The Energy Star Label Prior To The Government S Acceptance Of The Space
if No Improvements Are Proposed, The Offeror Must Demonstrate To The Government Using The Energy Star⮠Online Tools Why No Energy Efficiency And Conservation Improvements Are Cost Effective. If Such Explanation Is Unreasonable, The Offer May Be Rejected. national Historic Preservation Act Requirements Rlp (small) (oct 2023) the Government Is Responsible For Complying With Section 106 Of The National Historic Preservation Act Of 1966, As Amended, 54 U.s.c. § 306108 (section 106). An Offeror Must Allow The Government Access To The Offered Property To Conduct Studies In Furtherance Of The Section 106 Compliance.
if The Government Determines That The Leasing Action Could Affect Historic Property, The Offeror Of Any Property That The Government Determines Could Affect Historic Property Will Be Required To Retain, At Its Sole Cost And Expense, The Services Of A Preservation Architect Who Meets Or Exceeds The Secretary Of The Interior S Professional Qualifications Standards For Historic Architecture, As Amended And Annotated And Previously Published In The Code Of Federal Regulations, 36 C.f.r. Part 61, And The Gsa S Qualification Requirements For Preservation Architects. These Standards Are Available At: Https://www.gsa.gov/real-estate/historic-preservation/. hubzone Small Business Concern Price Preference Waiver (small) (oct 2023) a Hubzone Small Business Concern (sbc) Offeror May Elect To Waive The Price Evaluation Preference Provided In The Basis Of Award Paragraph. In Such A Case, No Price Evaluation Preference Shall Apply To The Evaluation Of The Hubzone Sbc. section 4 - How To Offer receipt Of Lease Proposals (small) (oct 2023) offeror Is Authorized To Transmit Its Lease Proposal As An Attachment To An Email. Offeror's Email Shall Include The Name, Address And Telephone Number Of The Offeror, And Identify The Name And Title Of The Individual Signing On Behalf Of The Offeror. Offeror's Signed Lease Proposal Must Be Saved In A Generally Accessible Format (such As Portable Document Format (pdf)), Which Displays A Visible Image Of All Original Document Signatures And Must Be Transmitted As An Attachment To The Email. Only Emails Transmitted To, And Received At, The Va Email Address Identified In The Rlp Will Be Accepted. Offeror Submitting A Lease Proposal By Email Shall Retain In Its Possession, And Make Available Upon Va's Request, Its Original Signed Proposal. Offeror Choosing Not To Submit Its Proposal Via Email May Still Submit Its Lease Proposal, By United States Mail, Or Other Express Delivery Service Of Offeror's Choosing.
in Order To Be Considered For Award, Offers Conforming To The Requirements Of The Rlp Shall Be Received No Later Than 1700 Cst On The Date Specified Below At The Following Designated Office And Address, Or Email Address: date: April 12, 2024, At 1600cdt
email Address: Scott.jennings@va.gov offers Sent By United States Mail Or Hand Delivered (including Delivery By Commercial Carrier) Shall Be Deemed Late If Delivered To The Address Of The Office Designated For Receipt Of Offers After The Date And Time Established For Receipt Of Offers. offers Transmitted Through Email Shall Be Deemed Late If Received At The Designated Email Address After The Date And Time Established For Receipt Of Offers Unless It Was Received At The Initial Point Of Entry To The Government Infrastructure Not Later Than 5:00 P.m. One Working Day Prior To The Date Specified For Receipt Of Proposals. offers May Be Also Deemed Timely If There Is Acceptable Evidence To Establish That It Was Received At The Government Installation Designated For Receipt Of Proposals And Was Under The Government S Control Prior To The Time Set For Receipt Of Proposals; Or If It Was The Only Proposal Received.
b. There Will Be No Public Opening Of Offers, And All Offers Will Be Confidential Until The Lease Has Been Awarded. However, The Government May Release Proposals Outside The Government Such As To Support Contractors To Assist In The Evaluation Of Offers. Such Government Contractors Shall Be Required To Protect The Data From Unauthorized Disclosure. proposal Contents For Small Leases (oct 2023) the Proposal Shall Consist Of The Following Documents: document Name Or Description
u.s. Government Lease For Real Property (short Form) (gsa Form 3626), Completed And Signed By Offeror
agency Specific Requirements, Dated 06/01/2022, Initialed By Offeror (found In The Memorandum Of Understanding (mou), Attached, Initial)
security Requirements, Initialed By Offeror (see Mou)
fire Protection And Life Safety Information And Documents (see Applicable Fire Protection And Life Safety Paragraphs)
registration In The System For Award Management (sam) Prior To The Lease Award Date, Including Completion Of All Required Representations And Certifications. This Registration Service Is Free Of Charge.
evidence Of Ownership Or Control Of Building Or Site, Including A Copy Of The Property Deed
proof Of Signing Authority (see Gsa 3516a, Solicitation Provisions)
offeror S Rate For Routine Cleaning And Disinfection Requirements fire Protection And Life Safety Submittals (small) (oct 2020)
the Offeror Must Submit The Fire Protection And Life Safety (fpls) Submittal Information In A.1 Through A.5, Unless The Building Meets Either Exemption In Sub-paragraph B Or C Below. completed Gsa Form 12000, Prelease Fire Protection And Life Safety Evaluation For An Office Building (part A Or Part B, As Applicable). a Copy Of The Previous Year S Fire Alarm System Maintenance Record Showing Compliance With The Requirements In Nfpa 72 (if A System Is Installed In The Building). a Copy Of The Previous Year S Automatic Fire Sprinkler System Maintenance Record Showing Compliance With The Requirements In Nfpa 25 (if A System Is Installed In The Building). computer Generated Plans Set To 1/8" = 1'-0" (preferred). Plans Submitted For Consideration Shall Include Floor Plan(s) For Which Space Is Being Offered And Floor Plan(s) Of The Floor(s) Of Exit Discharge (e.g., Street Level(s)). Each Plan Submitted Shall Include The Locations Of All Exit Stairs, Elevators, And The Space(s) Being Offered To The Government. In Addition, Where Building Exit Stairs Are Interrupted Or rlp No. 36c26324r0065, Page 4 Gsa Template R103 (10/23) rlp No. 36c26324r0065, Page gsa Template R103 (10/23) rlp No. 36c26324r0065, Page gsa Template R103 (10/23) discontinued Before The Level Of Exit Discharge, Additional Floor Plans For The Level(s) Where Exit Stairs Are Interrupted Or Discontinued Must Also Be Provided.
a Valid Building Certificate Of Occupancy (c Of O) Issued By The Local Jurisdiction. If The Building C Of O Is Not Available Or The Local Jurisdiction Does Not Issue A Building C Of O, Provide A Report Prepared By A Licensed Fire Protection Engineer With Their Assessment Of The Building Regarding Compliance With All Applicable Local Fire Protection And Life Safety-related Codes And Ordinances.
if The Space Offered Is 10,000 Rsf Or Less In Area And Is Located On The 1st Floor Of The Building, Offeror Is Not Required To Submit To The Va The Fire Protection And Life Safety (fpls) Submittal Information Listed In A.1 Through A.5 Above. if The Offeror Provides A Building C Of O Obtained Under Any Edition Of The International Building Code (ibc), And The Offered Space Meets Or Will Meet All The Requirements Of The Lease With Regard To Means Of Egress, Automatic Fire Sprinkler System, And Fire Alarm System Prior To Occupancy, Then Offeror Is Not Required To Submit The Va The Fpls Submittal Information In A.1 Through A.5 Above. eisa Submittals (small) (sep 2015) - Intentionally Removed swing Space - Rlp (oct 2022) - Intentionally Removed p. p. memorandum Of Understanding (mou)
regarding Temporary Hosting Of Animal Research From The Sioux Falls Va Health Care System
at The Augustana University effective Date: June 1, 2022 parties To This Mou Are: sioux Falls Veterans Affairs Health Care System Located At 2501 West 22nd Street, Sioux Falls, South Dakota 57105, Hereafter Known As "sfva". augustana University Located At 2001 South Summit Avenue, Sioux Falls, South Dakota 57197, Hereafter Known As "au". purpose. Collaborative Endeavors Depend Fundamentally On The Good Faith Efforts Of All Parties Involved, To Maintain A Healthy, Cooperative, And Mutually Beneficial Relationship. The Purpose Of This Mou Is To Facilitate Those Good-faith Efforts By Defining The Expectations Of The Parties With Regard To Their Collaboration On The Maintenance Of The Sfva Mouse Breeding Colonies At The Au During Renovation Of The Animal Facility At Sfva. For The Purposes Of This Mou, The Terms "collaboration" Or "collaborative" Refer To The Joint Efforts Of The Parties To Manage And Oversee The Breeding Colonies While They Are At The Au. The Housing Facilities And Research Laboratories At The Au That Will Be Used By Sfva Will Be Rented By Sfva Per A Separate Agreement. This Mou Is To Define The Specifics Of How Responsibilities For And In Those Spaces Will Be Shared. references. The Most Recent Versions Of Following Documents Are The Foundation For The Terms Of This Mou. This Is Not An Exhaustive List But Highlights The Regulatory References Of Particular Relevance To Collaborative Efforts Involving Animal Research. c.l. The Animal Welfare Act (7 Usc⧠54:2131-2159) As Implemented In The United States Department Of Agriculture (usda) Animal Welfare Act Regulations (9 Cfr Parts 1, 2, And 3; Usda Animal Welfare Act), With Special Emphasis On Sections 2.31 (institutional Animal Care And Use Committee (iacuc)), 2.32 (personnel Qualifications), And 2.33 (attending Veterinarian And Adequate Veterinary Care). the Health Research Extension Act Of 1985 (pl 99-158: 495) As Implemented In The Public Health Service (phs) Policy On Humane Care And Use Of Laboratory Animals. office Of Laboratory Animal Welfare (olaw) Frequently Asked Question D.8, "when Institutions Collaborate, Or When The Performance Site Is Not The Awardee Institution, Which Iacuc Is Responsible For Review Of The Research Activity?", And National Institutes Of Health (nlh) Notice Not-od-01-017, ''no Requirement For Duplicate Review." "guide For The Care And Use Of Laboratory Animals" (guide), 8th Edition, With Special Emphasis On Meeting The Requirements For Collaborative Research Found On Page 15 In The "collaborations" Section. aaalac International (formerly "association For Assessment And Accreditation Of Laboratory Animal Care International") Rules Of Accreditation. vha Handbook 1058.01, "research Reporting Requirements." vha Directive 1200.01, "research And Development Committee." vha Directive 1200.02, "business Operations." vha Handbook 1200.07, "use Of Animals In Research." general Stipulations d.l. Parties Agree That All Of The Collaborative Activities Covered By This Mou Must Comply With The References Cited Under Section C. d.2 For The Purposes Of This Document, Parties Agree That The Terms "sfva Iacuc Of Record" And "sfva Iacuc" Refer Generally To The Institutional Animal Care And Use Committee (iacuc) That Is Held Responsible For Oversight Of Sfva Research With Animals, According To The Terms Of The Applicable Public Health Service Animal Welfare Assurance (phs Assurance) Approved By The National Institutes Of Health Office Of Laboratory Animal Welfare (olaw) That Covers The Sfva Program, And This Mou. The Sfva Iacuc Of Record Is The University Of South Dakota (usd) Iacuc, As Described In A Separate Mou Between Sfva And Usd. parties Agree That All Work Covered By This Mou Is Considered "va Research", And Must Comply With Va Policy, As Set Forth In Vha Handbooks 1200.07 (ref. C.9, Above), 1200.02 (ref. C.8, Above), And Vha Directive 1200.01 (ref. C.7, Above). parties Agree That Collaborative Research With Animals Will Generally Not Be Considered Au Research, But If Au, At Its Sole Discretion, Determines That Any Of It Is Au Research, That Work Will Be Subject To The Oversight Of Both The Sfva Iacuc Ofrecord And The Au Iacuc. In That Case, Each Party Agrees That Such Research Will Be Conducted Only If It Meets Both The Requirements Of The Sfva And The Requirements Of The Au. parties Agree That The Ultimate Authority To Interpret Any Regulatory Requirement Rests With The Agency Or Entity That Published And Administers It. parties Agree That All Animals Covered By This Mou Will Be Owned By Sfva. parties Agree To Make Good Faith Efforts To Facilitate Reciprocal Physical Access To Personnel, Records, And Facilities, As Well As To Provide Information And Data, As Needed For both Parties To Meet Their Respective Regulatory Obligations Related To Their Collaboration, And To Respect The Security And Access Requirements Of Each Party. d.6. In Case Of Any Open Records Request (e.g., Any Request Submitted Under The Terms Of The Federal Freedom Of Information Act (foia), 5 U.s.c. § 552, Or State Open Records Laws) That Addresses Any Aspect Of Their Collaboration, Parties Commit To Making Good Faith Efforts To Coordinate Their Responses And Permit Reasonable Opportunity For Each To Review Materials Before Release, To The Extent Allowed By Law And By Each Party's Policies. d.7. Parties Agree To Make Good Faith Efforts To Grant Representatives Of Recognized Regulatory Or Accrediting Entities (e.g., Usda, Olaw, Aaalac, And Va) Access To Facilities And Records As Needed For Both Parties To Meet Their Regulatory Obligations. Parties Agree To Keep Each Other Apprised Of Visits By Such Regulatory Or Accrediting Entities And To Share With Each Other Any Reports Or Findings Relevant To The Collaborative Activities. stipulations Related To The Facilities To Be Used For The Work With Mice That Is Covered By This Mou the Facilities That Are To Be Used For The Collaborative Activities Covered By This Mou Must Be Included In A Phs Assurance Approved By Olaw (vha Handbook 1200.07, Ref. C.l 0, Above). e.2(a) Each Party Will Independently Ensure That The Facilities Used For The Work Covered By This Mou Are Included In A Phs Assurance, Approved By Olaw. Because The Facilities Relevant To This Mou Will Be Rented By Sfva, They Will Be Included As Part Of The Sfva Program Covered By The Usd Phs Assurance. full Aaalac International Accreditation Must Be Maintained For The Facilities Used For The Collaborative Activities Covered By This Mou (vha Handbook 1200.07, Ref. C.10, Above). e.3(a) The Facilities At Au That Will Be Rented By Sfva For The Work With Animals Covered By This Mou Will Be Included With The Sfva Facilities In The Usd Program Accredited By Aaalac International. appropriate Veterinary Care And Routine Husbandry Will Be Provided As Follows To All Animals Involved In Research Under The Terms Of This Mou: e.4(a) By Sfva Personnel According To Sfva Sops. as Required By Phs Policy, All Personnel Involved In Collaborative Activities Covered By This Mou Must Have The Opportunity To Participate In An Occupational Health And Safety Program (ohsp) That Includes A Periodic Individual Risk Assessment Related To Exposure To Animals Or Their Unfixed Tissues Or Fluids (vha Handbook 1200.07, Ref. C.10, Above). e.5(b) Parties Agree That Personnel Involved In Activities Covered By This Mou May Waive Participation In The Sfva Ohsp Only If They Participate Instead In A Phs-compliant Ohsp That Is Offered By The Au Or Another Institution Acceptable To The Va. stipulations Related To Iacuc Oversight. All Collaborative Activities With Animals Covered By This Mou Are Subject To The Oversight Of The Sfva Iacuc Ofrecord, Which Is The Iacuc Identified In The Olaw-approved Phs Assurance That Covers The Sfva Program Of Research With Animals. The Iacuc Of Record For Sfva Is The University Of South Dakota Iacuc. each Iacuc Will Keep The Other Iacuc Informed Of Any Matters That Arise Relevant To The Collaborative Activities Covered By This Mou And Will Provide In A Timely Fashion Any Information Or Documentation Required For The Other Iacuc To Meet Its Regulatory Obligations. The Sfva Iacuc Of Record Will Generally Be Solely Responsible For Oversight Of All Collaborative Activities Covered By This Mou (including But Not Limited To Protocol Reviews, Program And Facility Reviews, Investigations, And Determinations About Reporting), But The Au Iacuc Retains The Right To Act Independently, If Circumstances Dictate, And Solely At Its Own Discretion. Au Agrees To Exercise That Discretion Only As Necessary To Meet Its Oversight Responsibilities, And To Allow Access Of The Sfva Iacuc Of Record To The Au Facilities And Records As Needed For The The Sfva Iacuc Of Record To Meet Its Oversight Responsibilities. Each Party Agrees To Inform The Other Party Promptly Of Its Findings And Determinations, And To Consider The Other Party's Findings And Determinations In Its Own Deliberations. each Iacuc Must Evaluate Semiannually The Animal Use Programs And Facilities That Are Covered By Its Own Phs Assurance And Will Inform The Other Iacuc Promptly Of Any Important Concerns Noted, And Corrective Actions Planned And Taken, That Are Relevant To The Collaborative Activities. Both Parties Agree To Review Such Information That Is Received, And To Honor Reasonable Requests Submitted By The Other Iacuc For Additional Details And Updates (see "sharing Of Information", Section G, Below). Each Iacuc Is Independently Responsible For Reporting The Results Of Its Own Semiannual Evaluations To Its Own Institutional Official (10). In Cases Of Potential Regulatory Noncompliance Related To The Animals Involved In Collaborative Activities Covered By This Mou, The Sfv Iacuc Of Record Will Take Primary Responsibility For Investigating, Determining Whether Regulatory Noncompliance Is Involved (and, If So, What Corrective Actions Are Appropriate), And Reporting To The Applicable Regulatory Entities. Neither Iacuc Has Any Authority To Investigate Or Address Any Aspect Of The Animal Care And Use Program Of The Other Party That Is Not Related To The Collaborative Activities, But Each Iacuc Is Obligated To Bring Concerns About Any Aspect Of The Other Program To The Attention Of The Iacuc That Oversees It. f.4(a) To Facilitate Coordination Of Oversight, Each Party Agrees To Notify The Other Promptly (within Two (2) Business Days) If Its Iacuc Acts To Change The Approval status Of Any Protocol That It Has Previously Approved For Collaborative Activity (e.g., Suspension Ofiacuc Approval, Lifting The Suspension Ofiacuc Approval). Any Collaborative Activity Covered By This Mou Must Stop If Any Approval That Was Granted Is Suspended And May Not Resume Until The Suspension Is Lifted. f.4(b) The Sfva Iacuc Will Submit Any Reports About Collaborative Activities That Are Required By The Vha Office Of Research And Development (ord) Or The Vha Oro. Because Vha Handbook 1058.01 (ref. C.7, Above) Includes Specific Requirements With Regard To The Timing Of Correspondence With Oro About Non-compliance, The Au Agrees To Provide Information Promptly To The Va Iacuc, As Follows: f.4(b)(1) Any Information Suggesting Potential Regulatory Noncompliance Related To The Collaborative Activity Covered By This Mou Will Be Provided To The Sfva Iacuc Within Five (5) Business Days Of Au Becoming Aware Of It, As Required By Vha Handbook 1058.01. f.4(b)(2) Information About Any Corrective Action Plan Prepared, Corrective Actions Completed, Or Sanctions Imposed Or Lifted On Collaborative Activities, , Will Be Communicated Promptly To The Other Iacuc (within Five (5) Business Days Of Such Actions Being Taken). stipulations Regarding The Sharing Of Information Between The Sfva And The Au each Party Agrees To Make Good Faith Efforts To Provide All Information, Copies Of Documents, And Access Necessary For The Other Party To Meet Its Regulatory Obligations Related To The Collaboration. g.l(a) Each Party Has Its Own Independent Iacuc, And Each Iacuc Agrees To Provide The Information And Documents To The Other Iacuc. redaction Of Information From Copies Of Documents To Be Provided (vha Handbook 1200.07, Ref. C.10, Above). g.2(a) Parties Agree That Documents That Are Otherwise Publicly Available Will Not Be Redacted. g.2(b) The Sfva Agrees That Any Au Document To Be Shared With Va May Be Redacted Of Information Not Relevant To Matters Covered By This Mou, Provided The Unredacted Version Is Available For Va Representatives To Review At The Au During Normal Business Hours, Within Three (3) Business Days Of Request. g.2(c) The Au Agrees That Any Sfva Document To Be Shared With The Au May Be Redacted Of Information Not Relevant To Matters Covered By This Mou, Provided The Unredacted Version Is Available For Au Representatives To Review At The Sfva During Normal Business Hours, Within Three (3) Business Days Of Request. documents To Be Shared- Each Party Agrees To Provide Promptly On Request All Documents Needed By The Other Party To Meet Its Regulatory Obligations, And To Limit Its Own Requests To Those Documents That Are Reasonably Needed. Each Party Agrees To Provide To The Other Party, Routinely And In A Timely Fashion, Without Waiting For Request, A Copy (which May Be Redacted As Described In G.2, Above) Of Correspondence With Any Oversight Entity, That Is Relevant To The Collaborative Activities With Animals - E.g., Reports Of Noncompliance, Reports From An Oversight Entity About Routine Or "for Cause" Site Visits, Institutional Responses To Site Visit Reports. (vha Handbook 1200.07, Ref. C.10, Above): other Information To Be Shared Routinely - Each Party Agrees To Notify The Other Party Promptly About All Other Matters Relevant To The Collaborative Activities Covered By This Mou (vha Handbook 1200.07, Ref. C.10, Above), Including The Following: g.4(a) Receipt Of Any Complaint, Allegation, Or Other Information Suggesting Concerns About Animal Welfare Or Potential Regulatory Noncompliance Relevant To The Collaboration; The Other Party Will Be Notified Within Two (2) Business Days Of Receipt Of The Information, Even Ifiacuc Investigation Of The Matter Is Still Pending, So That Both Parties Can Be Prepared To Address Any Inquiries Received. g.4(b) The Outcome Of Any Investigation By The Iacuc Regarding Any Matter That Is Potentially Reportable And Relevant To The Collaboration; The Sfva Will Receive Notification Of Such Outcomes Immediately, So That Va Requirements For Reporting To The Sfva Director And Then To The Vha Oro Can Be Met. g.4(c) Receipt Of Any Foia Request Or Other Open Records Request Regarding Collaborative Activities; The Other Party Will Be Notified Within Two (2) Business Days Ofreceipt Of The Request. g.4(d) Any Public Disclosure (including Press Releases) Regarding Collaborative Activities; Each Party Will Notify The Other Party At Least Five (5) Business Days Before Release, To Provide An Opportunity For The Other Party To Comment And Request Revision. Parties Agree To Give Reasonable Consideration To All Requested Edits Received. g.4(e) Identification Of Key Individuals -each Party Will Identify And Ensure That The Other Party Has The Current Contact Information For Its Personnel Who Are Responsible For The Following Functions In Support Of The Collaboration g.4(e)(l) Animal Care (including Emergency Contact Information) for Sfva: Dr. Karen Munger, Chief Of Research & Development For The Sioux Falls, Va Health Care System. for Au: Dr. Alexander Kloth, Assistant Professor Of Biology g.4(e)(2) Iacuc Operations And Communications With The Other Party for Sfva: Dr. Karen Munger, Chief Of Research & Development For The Sioux Falls, Va Health Care System. for Collaborating Institution: Dr. Cyndey Johnson-edler, Assistant Professor Of Chemistry And Biochemistry And Chair Of The Au Iacuc; Dr. Jay Kahl, Assistant Vice Provost For Assessment & Academic Excellence additional Terms And Conditions 1this Mou Neither Authorizes Nor Memorializes Any Exchange Or Commitment Of Funds Between The Parties. The Agreement For Sfva To Rent Facilities At Au Will Be Documented And Executed By The Parties' Authorized Representatives. Each Party Is Responsible For Its Own Costs And Expenses, And The Sfva's Participation Is Subject To The Availability Of Appropriated Funds. parties Agree To Work In Good Faith To Amend This Document As Needed To Reflect Changes In The Circumstances Or Policies Of Either Party. Amendments Must Be Bilaterally Executed In Writing And Signed By Authorized Representatives Of Both Parties. No Oral Or Unilateral Amendments Will Be Effective. this Mou Will Remain In Effect Through The Renovation Of The Sfva Facility, Which Is Estimated To Take Less Than 3 Months. if Either Party Fails To Satisfactorily Fulfill Its Obligations, Promises, Terms, Or Conditions Of This Mou, And Having Been Given Reasonable Notice Of And Opportunity To Take Corrective Actions And Not Having Taken Satisfactory Corrective Action Within The Time Specified By The Other Party, The Other Party Will Have The Right To Terminate This Mou By Giving Written Notice Of Such Termination At Least Fourteen (14) Calendar Days Before The Effective Date Of Such Termination. After A Termination Notice Is Received, The Parties Will Make Good Faith Efforts To Transfer All Remaining Animals, Equipment, And Data In A Timely, Orderly, And Mutually Agreeable Manner; And The Collaborative Activities Will Terminate No Later Than When The Mou Terminates. disputes - Disputes Will Be Documented In Writing That Clearly States The Disputed Issue And The Reason For The Dispute. Any Dispute Will Be Submitted Jointly To Sfva And Au In Accordance With G.4.f(2). Both Parties Agree To Make All Reasonably Good Faith Efforts To Resolve The Dispute By Mutual Agreement. Both Parties Agree That The Vha Cvmo And Senior Administrators Of The Au May Be Consulted For Guidance In Resolving The Dispute. If Agreement Cannot Be Reached At This Level, The Disagreement Will Be Raised To The Next Highest Level. Pending The Resolution Of Any Dispute Pursuant To This Paragraph, The Parties Agree To Diligently Pursue Performance Of All Obligations To The Extent Possible. liability - Neither Party Indemnifies The Other Party For Any Action. Au Will Be Responsible For Any Loss Or Damage Caused By Its And Its Employees, Officers, And directors' Acts Or Omissions In The Performance Of This Mou. Va Is A Federal Entity Of The United States. The Liability, If Any, Of The United States For Damage To Or Loss Of Property, Or Personal Injury Or Death Will Be Governed Exclusively By The Provisions Of The Federal Tort Claims Act.
each Of The Undersigned Certifies Thats/he Is Authorized To Enter Into This Mou On Behalf Of The Party S/he Represents And Has Read And Agrees To All Terms Stated Herein. for Augustana University signature Date
jay Kahl, Phd
assistant Vice Provost For Assessment & Academic Excellence For The Sioux Falls Va Health Care System signature
timothy L. Pendergrass, Md
acting Director
sioux Falls Va Health Care System Date general Services Administration
page Of 3
gsa Form 3626 (rev 10/21) general Services Administration
page Of 3
gsa Form 3626 (rev 10/21) u.s. Government Lease For Real Property
(short Form)
1a. Lease Number Dsd12406-001
1b. Building Number
23
part I - Offer (offeror Completes Section A, C And D; Government Shall Complete Section B) note: All Offers Are Subject To The Terms And Conditions Outlined In Request For Lease Proposals No. , Supplemental Lease Requirements Document, General Clauses (gsa Form 3517a), And Any Other Attachments Included Herein. location And Description Of Premises Offered For Lease By Government
1. Name And Address Of
building (include Nine-digit Zip Code)
2. Location(s) In Building 2a. Floor(s)
2b. Room Number(s)
2e Number Of Parking Spaces Offered
2001 South Summit Avenue
1 & 2 structured 4
sioux Falls, Sd 57197-0001 surface 4
2c.sq. Ft.
2d. Type rentable 752
aboa 557.04
general Office Warehouse
annual Parking Rates (if Not Included In Rates Under Part C Below) common Area Factor Other (specify)
structured $0/space 0.35
medical Lab
surface $0/space
term
3a. To Have And To Hold The Said Premises With Its Appurtenances For The Term Beginning Upon Acceptance Of The Premises As Required By This Lease And Continuing For A Period Of 7 Months, 4 Months Firm, Subject To Termination And Renewal Rights As May Be Hereinafter Set Forth. The Commencement Date Of This Lease, Along With Any Applicable Termination And Renewal Rights, Shall Be More Specifically Set Forth In A Lease Amendment Upon Substantial Completion And Acceptance Of The Space By The Government. 3b. The Government May Terminate This Lease, In Whole Or In Parts, At Any Time Effective After The Firm Term Of This Lease, By Providing Not Less Than 30 Days Prior Written Notice To The Lessor. The Effective Date Of The Termination Shall Be The Day Following The Expiration Of The Required Notice Period Or The Termination Date Set Forth In The Notice, Whichever Is Later. No Rental Shall Accrue After The Effective Date Of Termination.
3c. This Lease May Be Renewed At The Option Of The Government For A Term Of 0 Years At The Rental Rate(s) Set Forth Below, Provided Notice Is Given To The Lessor At Least 0 Days Before The End Of The Original Lease Term; All Other Terms And Conditions Of This Lease, As Same May Have Been Amended, Shall Remain In Full Force And Effect During Any Renewal Term. rental
4. Rent Shall Be Payable In Arrears And Will Be Due On The First Workday Of Each Month. When The Date For Commencement Of The Lease Falls After The 15th Day Of The Month, The Initial Rental Payment Shall Be Due On The First Workday Of The Second Month Following The Commencement Date. Rent For A Period Of Less Than A Month Shall Be Prorated. Rent Shall Not Be Adjusted For Changes In Real Estate Taxes Or Operating Costs. 5a. Amount Of Annual Rent
$11,922
5b. Rate Per Month
$2,193 rental Rate Breakdown
firm Term ($/rsf/year)
non-firm Term ($/rsf/year)
renewal Term ($/rsf/year)
6. Building Shell Rent (incl. Real Estate Taxes)
6a. $30.00
6b. $30.00
6c. $0.00
7. Operating Rent
7a. $5.00
7b. $5.00
7b. $0.00
8. Turnkey Tenant Improvement Rent
(see Blocks 12 And 13 Below For Additional Breakdown Of Cost And Amortization Rate )
8a. $0.00
8b. $0.00
8c. $0.00
9. Building Specific
amortized Capital (if Applicable)
9a. $0.00
9b. $0.00
9c. $0.00
10. Total Rent
10a. $35.00
10b. $35.00
10c. $0
11. Tenant Improvement Costs
0
12. Interest Rate To Amortize Tenant Improvements
0 13. Hvac Overtime Rate Per Hour 0
14. Adjustment For Vacant Premises Rate ($/aboa Sf/year) N/a
owner Identification And Certification 15. Recorded Owner 15a. Name
the Augustana University
15b. Unique Entity Identifier (uei) W6yzcptmfsd5
15c. Address
2001 South Summit Avenue
15d. City Sioux Falls
15e. State Sd
15f. Zip + 4
57197-0001 By Submitting This Offer, The Offeror Agrees Upon Acceptance Of This Proposal By Herein Specified Date, To Lease To The United States Of America, The Premises Described, Upon The Terms And Conditions As Specified Herein, In Full Compliance With And Acceptance Of The Aforementioned Rlp, With Attachments. I Have Read The Rlp With Attachments In Its Entirety And Am Requesting No Deviations offeror S Interest In Property
owner Authorized Agent Other (specify) Department Chair
18. Offeror Check If S
ame As Recorded Owner 18a. Name
18b. Address
18c. City
18d. State
18e. Zip + 4
18f. Title
18g. E-mail Address
18h. Telephone Number
18i. Offeror S Signature
18j. Date Signed part Ii - Award (to Be Completed By Government)
your Offer Is Hereby Accepted. This Award Consummates The Lease, Which Consists Of The Following Attached Documents: (a) This Gsa Form 3626,
(b) Supplemental Lease Requirements, (c) Security Requirements, (d) Agency Specific Requirements, (e) Floor Plan Delineating The Premises, (f) Gsa Form 3517a, General Clauses (acquisition Of Leasehold Interests In Real Property For Small Leases), And (g) The Following Building Improvements, Changes Or Additions Made Or Agreed To By You (for Example, Energy Efficiency And Conservation Improvements, Abaas Upgrades, Seismic Form C - Building Retrofit Or New Construction Pre-award Commitment (if Applicable)):
the Period Of Performance For The Lease Is Expected To Be From December 2023 Through June 2024. This Will Be A Seven-month Lease. The First Four Months Are Firm And The Final Three Months Are Soft. We Request That The Government Be Able To Terminate The Lease, In Whole Or In Part, After The Firm Term Of This Lease, By Providing Not Less Than 30 Days Prior Written Notice To The Lessor. The Total Cost Of The Seven-month Lease Is Expected To Be $11,922.00, Fully Serviced.
breakdown Of Firm Term And Soft Term
firm Term 4 Months December 2023 March 2024 room Type space Sf shell Cost
operating Cost
monthly Cost
wet Lab, Bench Research
360
$30
$5
$1,050
animal Holding
151
$30
$5
$440
common Animal Space
151
$30
$5
$411
animal Supply Storage
100
$30
$5
$292
total
752 $2,193
room Type
space Sf
shell Cost
operating Cost
monthly Cost
wet Lab, Bench Research
360
$30
$5
$1,050
total
360 $1,050 firm Term Is 752 Rentable Sf At $2,193 Per Month For 4 Months Totaling $8,772. Soft Term 3 Months April 2024 June 2024 soft Term Is 360 Rentable Sf At $1,050 Per Month For 3 Months Totaling $3,150. general Services Administration Gsa Form 3626 (rev 10/21)
page 2 Of 3 general Services Administration
page Of 3
gsa Form 3626 (rev 10/21) general Services Administration
page Of 3
gsa Form 3626 (rev 10/21) this Document Is Not Binding On The Government Of The United States Of America Unless Signed Below By Authorized Lease Contracting Officer.
3a. Name Of Lease Contracting Officer (type Or Print)
scott J. Jennings
3b. Signature Of Lease Contracting Officer
3c. Date
DEPT OF THE NAVY USA Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Closing Date26 Jun 2024
Tender AmountRefer Documents
Details: Amendment 0003: the Purpose Of This Amendment It To Extend The Closing Date To 06/26/2024 12pm And Provide Government Responses To Industry Questions. amendment 0002: the Purpose Of This Amendment Is To Issueindustry Questions And Government Responses. All Other Terms And Conditions Remain The Same. amendment 0001: this Amendment Is To Provide Answers To Questions. original Posting: n0016424r1025 Indefinite Delivery/indefinite Quantity (idiq) Contract For Multi‐ Discipline Architect‐engineer (a‐e) Services In Support Of Naval Surface Warfare Center Crane Division (nswc Crane) Facilities Projects At Naval Support Activitys Crane (nsa Crane), Crane, Indiana And Lake Glendora Test Facility (lgtf), Sullivan In. description: All Information Needed For Interested Parties To Submit A Standard Form Sf 330, Architect Engineer Qualifications Is Contained Herein. There Is No Separate Request For Proposals (rfp) Package To Download. related Notices: N0016422snb83, N0016424snb55 background: the Naval Surface Warfare Center Crane Division (nswc Crane) Requires A-e Services In Support Of Various Projects At Nsa Crane And Lgtf. This Procurement Will Result In One Single-award Idiq Contract For Multi‐discipline A‐e Services For Planning, Design, Construction, Evaluation Of New Construction, And Renovation Projects. These Services Will Be Procured In Accordance With 40 United States Code (usc) Chapter 11, Selection Of Architects And Engineers, As Implemented By Federal Acquisition Regulation (far) Subpart 36.6. The Idiq Contract Will Be For A Five-year Ordering Period. This Is A Five-year Contract, With No Option Years. The Maximum Value For The Contract Term, Including All Awards, Shall Not Exceed $12,000,000. There Will Be No Minimum Dollar Limit Per Order And The Maximum Dollar Limit Per Order Will Be $5m In Compliance With The $9m Fy24 Ndaa Prescription. The Guaranteed Minimum For The Contract Ordering Period Is $5,000 And Will Be Satisfied By Simultaneous Award Of The Initial Task Order With The Basic Contract. Firm‐fixed Price Task Orders Will Be Negotiated At The Task Order Level. In Accordance With Far 15.404-4(c)(4)(i)(b), The Contract Price Or The Estimated Cost And Fee For Production And Delivery Of Designs, Plans, Drawings, And Specifications Shall Not Exceed Six (6) Percent Of The Estimated Construction Cost Of The Public Work Or Construction, Excluding Fees. there Will Be No Minimum Dollar Limits Per Task Order. The Estimated Award Date Is May 2025. this Proposed Contract Is Anticipated To Be A Small Business Set-aside. The North American Industry Classification System (naics) Code Is 541330, Engineering Services, And The Small Business Size Standard Is $25,500,000. The Product And Services Code (psc) Is C219 Architect And Engineering- General: Structural Engineering. The Government Seeks The Most Highly Qualified Firm To Perform The Required Services, Based On The Demonstrated Competence And Qualifications, In Accordance With The Selection Criteria Included Herein. comprehensive A‐e Services Are Required For The New Construction, Repair, Replacement, Demolition, Alteration, And/or Improvement Of Facility Projects. Projects May Include Single Or Multiple Disciplines, Such As: Structural, Civil, Mechanical, Electrical, Architectural, Planning, Environmental, Fire Protection, Cost Estimating, And/or Geotechnical. The Types Of Projects May Include: Building Renovations; Building Additions; Site Work Required To Support New Work; New Construction; Parking Areas; Foundations; Retaining Walls; Failure Investigation Including Destructive And Non‐destructive Testing; Seismic Evaluation And Design; Progressive Collapse Analysis; Blast Resistant Design; Structural Engineering Investigations; Utility Systems Including Sanitary And Storm; Water Systems; Electrical Power Systems, Storm Water Management; Surveying; Pavement Design; And Civil Engineering Studies. the Selected Offeror Will Be Solely Responsible For The Designs Produced On The Resulting Task Order Contracts And Will Be Recorded As The Designer Of Record. The Successful Offeror Shall Also Be Accountable And Responsible For Contributions To Design-build Rfp Preparation And All Other Requirement Submittals To The Government. in Accordance With Far 36.604 And The Supplements Thereto, And Upon Final Acceptance Or Termination, All Task Orders Above $35,000 Will Receive A Performance Evaluation. A Performance Evaluation May Be Prepared For Lesser Task Orders And Interim Performance Evaluations May Be Prepared At Any Time. Performance Evaluations Will Be Maintained For Use In Future Source Selections For Architect-engineer Services. performance Location(s): crane, Indiana sullivan, Indiana requirements: for Complete Details On This Requirement See Attachment 1, “statement Of Work (sow).” Specific Types Of A‐e Services That May Be Required Under This Contract Include: facility Planning And Project Development: Services May Include Work Such As The Following: Prepare Master Plans, Project/site Plans For Proposed Facility/infrastructure Projects. Facility Planning May Be Requested For Renovation, Addition, Repair And New Construction Projects. development Of Design‐bid‐build (dbb) Packages: Services May Include Preparation Of Drawings And Specifications For Renovation, Addition, Repair Or New Construction Projects. Design Meetings With The Government May Be Required In Order To Agree On Design Solution(s) That Meet The Government’s Project Requirements. Electronic Document Delivery Details Will Be Specified At The Order Level. Electronic Delivery Shall Include Both .pdf And .dwg Formats. development Of Design‐build (db) Request For Proposal (rfp) Packages: Services May Include Working With A Construction Manager As Part Of A Design-build Team To Prepare Drawings And Specifications For Renovation, Additions, Repair Or New Construction Projects. Design Meetings With The Government May Be Required In Order To Agree On Design-build Solution(s) That Meet The Government’s Project Requirements. Electronic Document Delivery Details Will Be Specified At The Order Level. Electronic Delivery Shall Be Include Both .pdf And .dwg Formats. preparation Of Cost Estimates Using Unit Guidance, Parametric Methodologies, And Detailed Cost Estimating: Services May Include Preparing Cost Estimates To Include Rough Order Of Magnitude Through Construction Working Estimates For Renovation, Addition, Repair And/or New Construction Projects Based On Prepared Design Documents, As Called Out In The Task Order. development Of Alternatives And Economic Analysis: Service May Include Providing Alternate Design Solutions And Associated Economic Impacts For Renovation, Addition, Repair Or New Construction Projects. condition Assessment: Services May Include Performing Studies Of Existing Buildings And/or Components Of Buildings To Validate Existing Conditions That May Then Be Used To Inform Future Proposed Design Solutions. Site Visits May Be Required To Document Existing Facility/infrastructure Conditions. field Investigations (including Utility And Geotechnical): Services May Include Conducting Field Surveys/investigations Of Existing Sites, Buildings Or Specific Components Of A Building (i.e., Hvac Or Electrical Systems) In Order To Document Current Status Of A Facility’s Infrastructure. The Results Of Any Field Investigations May Then Be Used To Assist With The Preparation Of Design Documents For A Particular Project. surveying And Mapping: Services May Include Surveying And/or Mapping Of Existing Or Proposed Sites For A New Construction Project Or Building Addition. Survey Work May Be Required In Order To Document Existing Site Conditions To Support Site/civil Design Solutions. preparation Of Engineering Evaluations: Services May Include Performing Engineering Calculations To Support Civil, Mechanical, Electrical, Plumbing Or Fire Protection Design Solutions. incorporation Of Sustainable Engineering Design Practices: Services May Include Incorporation Of Design Principles For Renovation, Addition, Repair And/or New Construction Projects To Support Sustainable Design Solutions And/or Leadership In Energy And Environmental Design (leed) Certification. consultations: Services May Include Collaborating With Other Specialty Design Professionals To Offer And Propose Design Solutions Required To Respond To Unique Project Requirements. energy Computations: Services May Include Preparation Of Energy Calculations To Verify Proposed Design Solutions Comply With Required Building Codes, Federal, State And/or Local Energy Requirements. geotechnical Investigations: Services May Include Conducting Soil Boring Testing In Order To Identify Minimum Design Requirements For New Construction Projects Or Building Additions. obtaining Permits And Regulatory Approvals: Services May Include Submitting Design Documents To Local, State And/or Federal Jurisdictions For Review And Approval Prior To Proceeding With Renovation/construction Work. environmental Investigation And Consultation: Services May Include Providing Design Services Required To Meet Environmental/epa Regulations On Facility/infrastructure Projects And Providing Consultation(s)/collaboration With The Government To Discuss Acceptable Environmental Design Alternatives And Solutions. review Of Construction Contractor Submittals: Services May Include Review Of Project Submittals (such As Product Data Or Product Samples) In Order To Validate Proposed Materials/products Comply With Design Drawings And/or Specifications. field Consultation And Inspection During Construction: Services May Include Responding To Contractor Requests For Information (rfis) During Construction In Order To Address Design Questions That May Arise During Construction/renovation Projects. commissioning: Services May Include Supporting The Commissioning Process By Attending Commissioning Meetings In Order To Validate Engineered Design Solutions Are Incorporated Into The Project In Accordance With Design Specifications. operation And Maintenance Support Information (omsi): Services May Include Providing The Government With O&m Documentation And Training, Where Applicable, Based On The Final Design Solution And Construction. Electronic Document Delivery Details Shall Be Included With Each Order. Electronic Delivery Shall Include Both .pdf And .dwg Formats. as‐built Drawing Preparation: Services May Include Updating Design Documents Including Drawings And Specifications To Accurately Reflect Construction Field Changes And Document Final As-built Construction/renovation Projects. Electronic Document Delivery Details Shall Be Included With Each Order. Electronic Delivery Shall Include Both .pdf And .dwg Formats functional Analysis Concept Development (facd)/design Charrette/other Design And Construction Related Workshops And Meetings: Contractor Shall Attend Design Meetings To Collaborate With Government Representatives To Consider Design Options And Build Consensus Regarding Preferred Design Solution(s). Contractor Shall Provide Meeting Minutes (cdrl A005). document Deliverable Requirements: cdrl - Did Number - Did Title - Did Description/scope - Deliverable Schedule a001 di-misc-80508b technical Report study/services studies And Specifications at Milestone/ Asreq a002 di-fncl-81116 Not 2 manhour Estimate, Technical Cost Proposals manpower And Cost Estimate To Implement The Statement Of Work (sow) at Milestone a003 di-mgmt-80061a Not 2 engineering And Technical Services Accomplishment Report production Report weekly a004 di-misc-81274 Not 2 environmental Permits outlines Submittal Procedures To Be Applied To All Permits asreq a005 di-admn-81250c meeting Minutes meeting Minutes 2 Days After Meeting a006 di-mgmt-81597 personnel Resumes contractor’s Personnel Roster With Relevant Qualifications And Certifications post Award Kickoff a007 di-mgmt-80507 project Planning Chart schedule post Award Kick Off a008 di-admn-81249c meeting Agenda meeting Agenda 1 Day Before Meeting a009 di-facr-82278 installation Design Package designs And Drawings asreq other Special Considerations: as Defined By Paragraph 1‐5 Of United Facilities Criteria (ufc) 3‐ 600‐01, Fire Protection Engineering For Facilities, This Contract Requires The Services Of A Licensed Fire Protection Engineer Or Consultant. asbestos And/or Lead‐based Paint Assessments May Be Required On This Contract To Determine The Presence Of Hazardous Material During Removals/demolition Or At Utility Points Of Connections. Work On And Around Waterfront Structures, Including Under Deck And Underwater, And Work In Confined Spaces May Be Required On This Contract. A‐e Firms Must Be Able To Accept Work That Involves Asbestos, Lead Paint, Poly‐chlorinated Biphenyls (pcbs), And Other Hazardous Materials, Work On And Under Waterfront Structures, And In Confined Spaces. all Engineering And Design Services Shall Comply With The Most Current Edition Of Facilities Criteria (fc) 1‐300‐09n Design Procedures, And Other Requirements As Indicated On The Whole Building Design Guide (wbdg) Web Site (www.wbdg.org). The Selected A-e Contractor Shall Have Online Access To Web‐based Support Programs Capable Of Creating Auto-cad Documents For Government Review, And Email Via The Internet For Routine Exchange Of Correspondence. The Selected A-e Contractor Shall Submit And Maintain An A‐e Accident Prevention Plan (app) In Accordance With U.s. Army Corp Of Engineers (usace) Em 385‐1‐1 For Each Project On This Contract And Activity Hazard Analysis (aha) For Each In‐field Action. Key Personnel, Including Consultants, Must Be U.s. Citizens. a‐e Firms Are Advised That The Selected Firm, Its Subsidiaries Or Affiliates, And Its Consultants Which Design, Prepare, Or Provide Engineering Services In Support Of Construction Contract Documents Cannot Provide Construction Services For The Same Contract. This Includes Concept Design, Preparation Of Project Programming Documents (dd Form 1391), Facility Siting Studies, Environmental Assessments, Geotechnical Services, Engineering Studies And Services, Design‐build Request For Proposals (rfps), Or Other Activities That Result In Identification Of Project Scope And Cost. The Awarded Contract Will Be Subject To Specific Provisions Addressing The Avoidance Of Organizational Conflicts Of Interest, Including H-209-h003, Required Disclosure Of Organizational Conflict Of Interest (navsea) (nov 2022). The Prime Firm For This Contract Will Be Required To Perform Throughout The Contract Term. in Accordance With Far 19.505, The Concern Will Not Pay More Than 50 Percent Of The Amount Paid By The Government For Contract Performance To Subcontractors That Are Not Similarly Situated Entities. Any Work That A Similarly Situated Entity Further Subcontracts Will Count Towards The Concern's 50 Percent Subcontract Amount That Cannot Be Exceeded. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Service Portion Of The Contract. submission Requirements: submission Requirements - Sf 330 Part I typed, 12 Point Times New Roman, Shall Not Exceed 100 Single‐sided 8.5 By 11 Inch Pages criterion criterion Title criterion Requirements criterion 1 specialized Experience sf 330, Part I, Section F - Minimum Of Three (3) And Maximum Of Five (5) Projects Completed (project Completion To Be Defined As Receiving Final Design Acceptance From Client) Within The Past Seven (7) Years criterion 2 professional Qualifications And Technical Competence sf 330, Part I, Section E – Resumes For All Proposed Key Personnel That Illustrate Experience In The Type Of Work Proposed Under This Contract. Resumes Are Limited To Three Pages And Should Indicate: Professional Registration, Certification, Licensure And/or Accreditation In Appropriate Disciplines; Cite Recent (within The Past 10 Years) Project‐specific Experience In Work Relevant To The Services Required Under This Contract; And Indicate Proposed Role In This Contract. Indicate Participation Of Key Personnel In Example Projects In The Sf 330, Part I, Section G. criterion 3 past Performance submit A Completed Cpars/acass/ppq Evaluation For Each Project Under Criterion 1 criterion 4 quality Control describe The Quality Control Program That Will Be Utilized For All Deliverables Of This Contract And The Management Approach For Quality Control Processes And Procedures. criterion 5 program Management And Capacity 1. Provide An Organizational Chart For The Team And Discuss The Management Plan For This Contract And Personnel Roles In The Organization. 2. Describe The Firm’s Present Workload And The Availability Of The Project Team (including Consultants) For The Specified Contract Performance Period. 3. Describe The Firm’s Ability To Sustain The Loss Of Key Personnel While Accomplishing Work Within Required Time Limits, To Ensure Continuity Of Services And Ability To Meet Surges In Unexpected Project Demands And Ability To Adhere To Schedules And Budgets. criterion 6 knowledge Of General Geographic Area 1. Indicate Location Of The Office(s) That Will Be Performing The Work, Including Main Offices, Branch Offices, And Offices Of Team Members. 2. Provide A Narrative Describing The Team’s Knowledge And Previous Experience Of The Primary Geographic Areas To Be Covered By This Contract. 3. Provide A Narrative To Describe The Team’s Ability To Provide Timely Response To Requests For On‐site Support. criterion 7 volume Of Work firms Shall Not Submit Data For This Factor. a‐e Firms Desiring To Be Considered For This Contract Shall Submit A Completed Sf 330 Package By Dod Safe To The Contracting Officer And The Contract Specialist. The Sf 330 Shall Be Typed, 12 Point Times New Roman. Part I Shall Not Exceed 100 Single‐sided 8.5 By 11 Inch Pages (the 100 Page Limit Does Not Include The First Eight (8) Instructional Pages Of The Sf 330, Individual Subcontracting Reports (isrs) Or Certificates/licenses, Nor Does The Page Limit Include Cover Sheets Or Dividers, Provided That These Do Not Contain Any Substantive Information Submitted In Response To The Synopsis Or Intended To Demonstrate The Qualifications Of The Firm). Part I Pages Shall Be Numbered Sequentially. Introductions Shall Be Included In Sections E And F. A-e Firm Submissions Shall Include Its Unique Entity Identifier (uei), Commercial And Government Entity (cage), And Taxpayer Identification Number (tin) Numbers In Block 30 Of The Sf 330. submissions To This Proposal Announcement Must Be Submitted Electronically Through Dod Safe. No Paper Copies, Email, Cd-roms Or Facsimile Submissions Will Be Accepted. Electronic Proposal Submission Is Required Through The Army’s Electronic File Sharing Service, Dod Safe (https://safe.apps.mil). The Dod Safe Application Is Used To Send Large Files To Individuals That Would Normally Be Too Large To Send Via Email. There Are No User Accounts For Dod Safe. Authentication Is Handled Via Email. anyone Has Access To Dod Safe And The Application Is Available For Use By Anyone. The Dod Safe “getting Started Guide” Has Information On How To Utilize The System (https://safe.apps.mil/about.php). Instructions For Uploading Are As Follows: send An Email To The Contracting Officer And Contract Specialist To Receive The Link To Drop Off Your Proposal. This Will Need To Be Completed Five (5) Business Days Prior To The Proposal Due Date. contract Specialist, Aaron Hohl, Aaron.m.hohl.civ@us.navy.mil contracting Officer, John Latta, John.c.latta3.civ@us.navy.mil. you Will Receive An Email With The Link To Submit Your Drop Off. The Link Will Be Provided No Later Than Two (2) Business Days Prior To The Proposal Due Date. short Note To The Recipients: Click The Add Files Or Drag And Drop Your Files. For File Description, Enter N0016424r1025-firmname. click Upload Button To Send Documents. guest Users Will Need To Check Their Email To Verify Their Email Address Before The Recipients Will Be Notified. (government-issued Common Access Cards (cacs) Are Not Required). file Size Limitations: Offerors Are Advised To Follow The Dod Safe Instruction For Uploading Files. Dod Safe Supports Delivery Up To 8gb. If Needed, Offerors Are Advised To Break The Files Down To Smaller Sections In Order To Upload It To The System. In Such Cases, Please Divide The Sections As Logically As Possible And Be Sure To Clearly Name The Files As Specified Below. file Naming Convention: To Ensure Your Submission Is Received And Processed Appropriately, It Is Important That Interested Parties Carefully Ensure Their Electronic Files Adhere To The Following Naming Convention: xxx- Firmname- Volume I xxx- Firmname- Volume Ii each File Name Shall Begin With The Solicitation Number Followed By The Firm’s Name And A Brief File Description. Please See Examples Above. file Organization: Although Hard Copies Are Not Accepted, Each File Shall Be Clearly Indexed, And Logically Assembled. Font Size Shall Be 12 Or Larger. Pages Shall Be Letter Sized (larger Page Sizes (such As 11x17 Foldouts, Etc.) Will Be Counted As One Page. Proposals Shall Be In Narrative Format, Organized, And Titled So That Each Section Of The Proposal Follows The Order And Format Of The Criterion. Information Presented Should Be Organized So As To Pertain To Only The Evaluation Factor In The Section That The Information Is Presented. Information Pertaining To More Than One Evaluation Factor Should Be Repeated In Each Section For Each Factor. upload Completion And Deadline: Interested Offerors Shall Submit Proposals No Later Than The Date And Time Specified In This Synopsis. The Time And Date Of The Proposal Receipt Will Be Upload Completion/delivery Time And Date Recorded Within Dod Safe Site. Do Not Assume That Electronic Submission Will Occur Instantaneously. Large Files (e.g. 10mb Or More) Will Take Some Time To Upload. Offerors Should Time Their Upload Effort With Prudence By Not Waiting Until The Last Few Minutes- This Will Allow For Unexpected Delays In The Transmittal Process. Offerors Are Encouraged To Keep A Copy Of The Upload Confirmation For Their Record. Submissions After The Deadline Will Be Considered Late And Will Be Processed In Accordance With Far 15.208. electronic Files: Files Shall Be In Their Native Format (i.e .,.docx, .xlsx, .ppt, Etc.), Or If In .pdf Format, Shall Be In Searchable Text. Text And Graphics Portfolios Of The Electronic Copies Shall Be In A Format Readable By Microsoft Office Or Adobe Applications. Data Submitted In A Spreadsheet Format Shall Be Readable By Ms Excel (all Cells And Formulars Shall Be Unlocked). all Contractors Are Advised That Registration In System For Award Management (sam) Database Is Required Prior To Award Of A Contract. Failure To Register In The Sam Database May Render Your Firm Ineligible For Award. For More Information, Check The Sam Web Site: Https://www.sam.gov. The Technical Data Package May Contain Information That Is Export Controlled. Only Those Companies That Have Completed Dd Form 2345 And Are Certified Under The Joint Certification Program (jcp) In An Active Status Are Authorized To Receive Export Controlled Information. Additional Information About Jcp Is Available At Https://www.dla.mil/hq/logisticsoperations/services/jcp/. offerors Shall Restrict The Disclosure Or Use Of Its Proposal, (and) A Proper Legend Must Be Included On Materials Provided. Individual Subcontractor/vendor Proprietary Information May Be Submitted Separately. In Addition, If Proposal Volumes Include Technical Requirements That Have Been Identified As Cui, The Markings Shall Apply To The Technical Information Included In The Technical Volume. offeror Shall Mark Proposal Documents As Cui In Accordance With Nist Sp 800-171. Possible Categories For Use Include But Are Not Limited To The Following: cui Category: General Proprietary Business Information https://www.archives.gov/cui/registry/category-detail/proprietary-business-info.html#authority-list banner Marking For Specified Authorities: Cui//sp-propin banner Marking For Basic Authorities: Cui category Description: material And Information Relating To, Or Associated With, A Company's Products, Business, Or Activities, Including But Not Limited To Financial Information; Data Or Statements; Trade Secrets; Product Research And Development; Existing And Future Product Designs And Performance Specifications. *at A Minimum Technical Proposals Shall Safeguard In Accordance With Markings And Distributions Statements On All Technical Documents Within The Solicitation (sow, Specification, Drawings, Etc.). cui Category: Controlled Technical Information* https://www.archives.gov/cui/registry/category-detail/controlled-technical-info.html#authority-list banner Marking: Cui//sp-cti category Description: controlled Technical Information Means Technical Information With Military Or Space Application That Is Subject To Controls On The Access, Use, Reproduction, Modification, Performance, Display, Release, Disclosure, Or Dissemination. Controlled Technical Information Is To Be Marked With One Of The Distribution Statements B Through F, In Accordance With Department Of Defense Instruction 5230.24, "distribution Statements Of Technical Documents." The Term Does Not Include Information That Is Lawfully Publicly Available Without Restrictions. "technical Information" Means Technical Data Or Computer Software, As Those Terms Are Defined In Defense Federal Acquisition Regulation Supplement Clause 252.227-7013, "rights In Technical Data - Noncommercial Items" (48 Cfr 252.227-7013). Examples Of Technical Information Include Research And Engineering Data, Engineering Drawings, And Associated Lists, Specifications, Standards, Process Sheets, Manuals, Technical Reports, Technical Orders, Catalog-item Identifications, Data Sets, Studies And Analyses And Related Information, And Computer Software Executable Code And Source Code. category Marking: cti *at A Minimum Technical Proposals Shall Safeguard In Accordance With Markings And Distributions Statements On All Technical Documents Within The Solicitation (sow, Specification, Drawings, Etc.). cui Category: General Procurement And Acquisition https://www.archives.gov/cui/registry/category-detail/procurement-acquisition.html#authority-list banner Marking: Cui//sp-procure category Description: material And Information Relating To, Or Associated With, The Acquisition And Procurement Of Goods And Services, Including But Not Limited To, Cost Or Pricing Data, Contract Information, Indirect Costs And Direct Labor Rates. category Marking: procure cui Category: Source Selection https://www.archives.gov/cui/registry/category-detail/source-selection banner Marking For Specified Authorities: Cui//sp-ssel banner Marking For Basic Authorities: Cui category Description: per Far 2.101: Any Of The Following Information That Is Prepared For Use By An Agency For The Purpose Of Evaluating A Bid Or Proposal To Enter Into An Agency Procurement Contract, If That Information Has Not Been Previously Made Available To The Public Or Disclosed Publicly: (items 1-10). category Marking: ssel each Volume Submitted Shall Be Properly Marked With At A Minimum Ssel As Follows: a Cover Page Including The “cui” Marking In The Header And Footer As Required, As Well As The Requiredcui Designator Block If The Volume Contains Cui. This Designator Block Shall Be Included At The Bottom Right Portion Of The Cover Page And Read As Follows: controlled By: Department Of The Navy controlled By: Nswc Crane Code 02 cui Category: Propin/cti/procure/ssel distribution/dissemination Control: Fedcon poc: Nswccr 0253 Branch Head all Subsequent Pages Of The Document Shall Include The “cui” Marking In The Header And Footer. If Other Information Is Included In The Header Or Footer, The "cui" Marking Shall Be Centered On Its Own Line Within The Header And Footer. in Accordance With The Federal Acquisition Regulations (far) 36.601‐4(b), The A‐e Firm Must Be A Professional A-e Firm Permitted By Law To Practice The Professions Of Architecture Or Engineering In The State Of Indiana. Furthermore, The Firm Must Hold A Current And Active License In The State Of Indiana As Well As Currently Employ At Least Two (2) State Of Indiana Registered A-e Professionals. A-e Firms Shall Provide Proof That The Firm Is Permitted By Law To Practice The Professions Of Architecture And Engineering, (e.g., State Registration Number, Or A Brief Explanation Of The Firm’s Licensing In Jurisdictions That Do Not Register Firms, Etc.). Failure To Submit The Required Proof Will Result In A Firm’s Elimination From Consideration. firms Who Are Offering As A Joint Venture (jv) Should Include With Their Submission A Copy Of The Joint Venture Agreement. Failure To Include The Joint Venture Agreement Will Result In The Firm’s Elimination From Further Evaluation. Additionally, Jv Firms Should Include The Following Jv Specific Information And Documentation: Cage, Uei, Location, Immediate Owners With Percentages Of Ownership, Responsible Manager Name And Company Affiliation, Small Business Administration (sba) Approval Of Mentor-protégé Agreement (if Applicable), Jv Compliance Certificate From The Protégé (if Applicable), And An Organization Chart Which Depicts Relationships Within The Jv. if An Sf 254/sf 255 Is Submitted For This Request, It Will Not Be Reviewed Or Considered. As Required Above, Provide Verifiable Evidence That Your Firm Is Permitted By Law To Practice The Professions Of Architecture Or Engineering (e.g., State Registration Number). interested Firms Shall Submit Proposals To Both The Contract Specialist And The Contracting Officer Via Dod Safe. sf 330 Submissions Are Due No Later Than 21 June 2024 At 12:00 Pm (est). Late Responses Will Be Handled In Accordance With Federal Acquisition Regulations (far) 52.215‐1. The Points Of Contact For This Acquisition Are Contract Specialist, Aaron Hohl, At Aaron.m.hohl.civ@us.navy.mil And John Latta, Contracting Officer, At John.c.latta3.civ@us.navy.mil. inquiries Concerning This Procurement Should Reference The Solicitation Number (n0016424r1025) And Title And Be Forwarded Via Email To The Points Of Contact Identified Above. Questions Pertaining To This Requirement Are Due No Later Than Fourteen (14) Days After Posting Of This Requirement In Sam.gov. list Of Attachments: statement Of Work (sow) cdrls past Performance Questionnaire (ppq) key Personnel Criteria dd 254 selection Criteria: firms Responding To This Special Notice Will Be Evaluated To Determine The Most Highly Qualified Firms To Perform The Required Services In Accordance With The Published Selection Criteria. failure To Comply With Instructions, Or Provide Complete Information May Affect The Firm’s Evaluation Or Disqualify The Firm From Further Consideration. Evaluation Criteria (1) Through (4) Are Considered Most Important And Are Equal Among Themselves; Criteria (5) Through (6) Are Less Important And Are Equal Among Themselves; Criteria (7) Will Only Be Used As A Tie‐breaker Among Technically Equal Firms. Specific Selection Criteria Include: specialized Experience professional Qualifications And Technical Competence past Performance quality Control program Management And Capacity knowledge Of General Geographic Area volume Of Work (no Data Submission Required) criterion 1 —specialized Experience (sf 330, Part I, Section F): firms Will Be Evaluated On Specialized Experience In Performance Of Services Similar To Those Anticipated Under This Contract Through Evaluation Of Experience In: infrastructure/facility Design Utilizing The Following Criteria, Including, But Not Limited To, Unified Facilities Criteria (ufcs) And Military Standard (milstd); conducting On‐site Design Development Workshops, Charrettes, Functional Analysis, Schematic Design, Or Space Programming, Including Supporting Budgetary Or Parametric Cost Estimating; demonstrated Ability To Design To Project Budget And Schedule; experience Preparing Design‐bid‐build; experience Preparing Design‐build Rfp Packages; And designing Projects In Accordance With Dod, Navy, Or Other Government Agencies’ Criteria. use Of Specsintact For Package Generation And Submittal To The Government specialized Design Experience To Include Antiterrorism Force Protection (atfp), Seismic Design And Analysis, And Design Of Secure Spaces firms May Be Considered More Favorably Under Criterion 1 By Demonstrating The Following: demonstrated Experience On Military Bases Within The Primary Geographic Area Of The Contract. experience In The Delivery Of Multiple Types Of A‐e Services Identified In The Requirements Above. experience On Multiple Facility Types, Such As Business, Educational, Industrial, Assembly, Health Care, Residential, Storage, Laboratory, And Mixed-use Occupancies, Identified In The Requirements Above. demonstrated Experience Using Rsmeans-based (or Equal) Electronic Cost Estimating Software. demonstrated Experience Designing Modifications To Existing Structures And Developing Construction Phasing While Associated Facilities Are Required To Remain In Service. demonstrated Experience Specific To Navy Facility Projects, Illustrating The Capability Of The A‐e Firm And Individual Design Team Members (a‐e Staff, Key Personnel, Consultants) To Work Within The Navy Project Planning Process Including: dd Form 1391 Development In The Navy’s Electronic Procurement Generator (epg), dd Form 1391 Validation Procedures Including Cost Validation. demonstrated Understanding Of Procedures And Timely Submission Of Base Access Documents In Adherence With Security, Safety, Environmental, And Accident Prevention Regulations In Order To Support A‐e Activities And Maintain Project Schedules. experience Of A‐e Firm And Individual Design Team Members (a‐e Staff, Key Personnel, Sub‐ Consultants) With Facilities Located In Historic Areas That Will Require Consultation With State Historic Preservation Officer (shpo) Throughout The Design Process. criterion 1 Submission Requirements: provide Up To A Minimum Of Three (3) And Maximum Of Five (5) Projects Completed (project Completion To Be Defined As Receiving Final Design Acceptance From Client) Within The Past Seven (7) Years Immediately Preceding The Date Of Issuance Of This Notice That Best Demonstrate Specialized Experience Of The Proposed Team In The Areas Outlined Above. Sufficient Information To Determine The Date Of Completion Of The Project Must Be Included In The Project Description Or The Project Will Not Be Considered. If More Than The Maximum Number Of Projects Is Submitted, The Government Will Only Evaluate Projects Up To The Maximum Number Authorized In The Order Submitted. all Projects Provided In The Sf 330 Must Be Completed By The Actual Office/branch/regional Office/ Individual Team Member Proposed To Manage And Perform Work Under This Contract. Projects Not Meeting This Requirement Will Be Excluded From Consideration In The Evaluation. To Enable Verification, Firms Should Include The Uei And Cage Along With Each Firm Name In The Sf 330 Part I, Section F, Block 25, “firm Name.” Include A Contract Number Or Project Identification Number In Block 21. Include An E‐mail Address And Phone Number For The Point Of Contact In Block 23(c). In Block 24, Include In The Project Description The Contract Period Of Performance, Award Contract Value, Current Contract Value, And A Summary Of The Work Performed That Demonstrates Relevance To Specialized Experience As Outlined Above. For Projects Performed As A Sub-contractor Or A Joint Venture Involving Different Partners, Specifically Indicate The Value Of The Work Performed As A Subcontractor Or By Those Firms Proposed For This Contract, And Identify The Specific Roles And Responsibilities Performed As A Sub-contractor Or By Those Firms On The Project Rather Than The Work Performed On The Project As A Whole. If The Project Description Does Not Clearly Delineate The Work Performed By The Entity/entities Offering/teaming On This Contract, The Firm Will Be Eliminated From Award Consideration. note: If The Firm Is A Joint Venture, Projects Performed By The Joint Venture Should Be Submitted; However, If There Are No Projects Performed By The Joint Venture, Projects Must Be Submitted For Each Joint Venture Partner, Not To Exceed A Total Of Five (5) Projects For Both Partners Combined. Each Partner Within A Jv May Not Be Responsible For More Than Three (3) Projects Within The Past Performance Submission. Firms Failing To Provide Projects From All Joint Venture Partners Will Be Considered To Have Not Met The Requirements Of The Criterion. projects Shall Be Submitted On The Sf 330 At Part I, Section F And Shall Be Completed Projects. Projects Not Completed Will Be Excluded From Evaluation Consideration. For Submittal Purposes, A Task Order On An Idiq Contract Is Considered A Project, As Is A Stand‐alone Contract Award. Do Not Submit An Idiq Base Contract As An Example Project. Instead, List Relevant Task Orders Or Stand‐ Alone Contract Awards That Fit Within The Definition Above. The Government Will Not Evaluate Information Provided For An Idiq Contract. Examples Of Project Work Submitted That Do Not Conform To This Requirement Will Not Be Evaluated. all Information For Criterion 1 Shall Be Submitted In The Sf 330, Part I, Section F. The Government Will Not Consider Information Submitted In Addition To Part I, Section F In The Evaluation Of Criterion 1. criterion 2—professional Qualifications And Technical Competence (sf 330, Part I, Sections E & G): firms Will Be Evaluated On Professional Qualifications, Competence, And Experience Of The Proposed Key Personnel In Providing Services To Accomplish The Tasks Required Under This Contract, Including Participation In Example Projects In The Sf 330, Part I, Section G. Key Personnel Are Individuals Who Will Have Major Contract Or Project Management Responsibilities And/or Will Provide Unusual Or Unique Expertise. Specific Disciplines That Must Be Included In Key Personnel Are: project Manager, Registered Architect Or Professional Engineer, 10 Years quality Control Specialist, Architect Or Professional Engineer, 15 Years architect, Senior, Registered Architect, 15 Years architect, Junior, Registered Architect, 10 Years civil Engineer, Senior, Registered Professional Engineer, 15 Years civil Engineer, Junior, Registered Professional Engineer, 10 Years structural Engineer, Senior, Registered Professional Engineer, 15 Years structural Engineer, Junior, Registered Professional Engineer, 10 Years mechanical Engineer, Senior, Registered Professional Engineer, 15 Years mechanical Engineer, Junior, Registered Professional Engineer, 10 Years electrical Engineer, Senior, Registered Professional Engineer, 15 Years electrical Engineer, Junior, Registered Professional Engineer, 10 Years registered Communication Distribution Design (rcdd), 15 Years fire Protection Engineer, Registered Professional Engineer, 15 Years cost Estimator, Certified Cost Professional Or Equivalent, 15 Years key Personnel, Including Consultants, Shall Be U.s. Citizens. submissions Must Demonstrate Key Personnel Relevant Experience, Formal Education (e.g. Bachelor’s Or Master’s Degrees), And Relevant Professional Development Or Professional Certifications. See Key Personnel Attachment For Specific Qualification Criteria. If An Offeror Is Unable To Meet Key Personnel Requirement List In Its Entirety, The Government Still Urges A Response For Consideration Which Illustrates The Firm’s Maximum Personnel Capabilities. If Certain Key Personnel Roles Cannot Be Fulfilled, Please Indicate Those Role Vacancies Individually With A Course Of Action For Fulfillment. criteria 2 Submission Requirements: sf 330, Part I, Section E – Provide Resumes For All Proposed Key Personnel That Illustrate Experience In The Type Of Work Proposed Under This Contract. Resumes Are Limited To Three (3) Single-sided Pages And Should Indicate: Professional Registration, Certification, Licensure And/or Accreditation In Appropriate Disciplines To Include Document/licensure Numbers; Cite Recent (within The Past 10 Years) Project‐specific Experience In Work Relevant To The Services Required Under This Contract; And Indicate Proposed Role In This Contract. Indicate Participation Of Key Personnel In Example Projects In The Sf 330, Part I, Section G. The Firm Must Hold A Current And Active License In The State Of Indiana As Well As Currently Employ At Least Two (2) State Of Indiana Registered A-e Professionals. offeror Will Not Be Permitted To Simultaneously Fulfill Multiple Roles With An Individual On The Same Project. The Individuals Identified As Key Personnel On The Sf330 May Not Have Multiple Duties Or Be “dual-hatted.” Offerors Shall Provide Individual Resumes In Sf330 Section E For Each Of The Individuals Listed Above. criterion 3—past Performance (sf 330, Part I, Section H): firms Will Be Evaluated On Past Performance With Government Agencies And Private Industry In Terms Of Work Quality, Compliance With Schedules, Cost Control, And Stakeholder/customer Satisfaction. evaluating Past Performance And Experience Will Include Information Provided In The Contract performance Assessment Reporting System (cpars) / Architect-engineer Contract Administration Support System (acass) Or A Completed Past Performance Questionnaire (ppq) For Criterion 1 Projects And May Include Customer Inquiries, Government Databases, And Other Information Available To The Government Including Contacts With Points Of Contact In Other Criteria. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. criteria 3 Submission Requirements: submit A Completed Cpars/acass/ppq Evaluation For Each Project Under Criterion 1. firms May Provide Any Information On Problems Encountered And The Corrective Actions Taken On Projects Submitted Under Criterion 1—specialized Experience. Firms May Also Address Any Adverse Past Performance Issues. Information For Each Past Performance Submission Shall Not Exceed Five Single‐sided Pages In Total. offeror Shall Submit One (1) Past Performance Questionnaire Provided As An Attachment To This Synopsis To Each Of Its Customer Pocs Identified In Criterion 1 For Referenced Projects With No Cpars/acass Available. In Order To Expedite The Assessment Process, The Offeror May Complete The “contract Information” Portion Of The Past Performance Questionnaire For The Convenience Of The Customer Poc. A Ppq Submission Is Not Required For Criterion 1 Projects Accompanied By A Cpars/acass. However, A Ppq Submission For Every Criterion 1 Project, Including Those With A Cpars/acass Evaluation On Record, Would Assist The Government In Evaluation Accuracy And Is Encouraged. the Offeror Shall Not, However, Complete Any Other Section Of The Past Performance Questionnaire. The Questionnaire Shall Be Provided To The Customer Poc With Instructions To Complete And Submit It Directly To The Contracting Officer And/or The Point Of Contact Identified In This Announcement On Or Before The Proposal Due Date. Electronic Submission Via Encrypted E-mail By The Customer Is Required. under No Circumstances Shall The Questionnaires Be Returned To The Offerors After Completion. Any Information Provided By The Offeror’s References Is Subject To Verification/validation By The Government During The Evaluation Process. The Government May Make Contact And Follow Up With The Listed References Identified On The Contractor Past Performance Data Documents/data. The Offeror May Provide Information On Problems Encountered On The Identified Contracts As Well As The Offeror’s Corrective Actions. The Government Reserves The Right To Solicit Feedback Beyond What Is Identified In The Questionnaire. awards, Letters Of Commendation, Certificates Of Appreciation, Etc., Shall Not Be Submitted And Will Not Be Considered In The Evaluation. criterion 4—quality Control Program (sf 330, Part I, Section H): firms Will Be Evaluated On The Strength Of The Quality Control Program Proposed By The Firm To Ensure Quality Products And Services Under This Contract And Means Of Ensuring Quality Services From Their Consultants/subcontractors. criteria 4 Submission Requirements: describe The Quality Control Program That Will Be Utilized For All Deliverables Of This Contract And The Management Approach For Quality Control Processes And Procedures. The Description Shall: describe Specific Quality Control Processes And Procedures Proposed For This Contract To Achieve Technical Accuracy Of And Assurance Of Overall Coordination Of Plans And Specifications, And Engineering And Design Services. provide A Quality Control Process Chart Showing The Inter‐relationship Of The Management And Team Components. identify The Key Personnel (submitted Under Criterion 2—professional Qualifications And Technical Competence) Responsible For The Quality Control Program And A Description Of Their Roles And Responsibilities. describe How The Firm’s Quality Control Program Extends To Management Of Sub-contractors. explain The Quality Control Program Including An Example Of How The Plan Has Worked For One Of The Projects Submitted As Part Of Sf 330, Section F Or How The Plan Will Work If It Has Not Been Used Previously. criterion 5—program Management And Capacity (sf 330, Part I, Section H): firms Will Be Evaluated On The Firm’s Ability To Plan For And Manage Work Under The Contract And The Capacity To Accomplish The Work In The Required Time. criteria 5 Submission Requirements: provide An Organizational Chart For The Team And Discuss The Management Plan For This Contract And Personnel Roles In The Organization. Describe The Ability Of The Firm To Manage, Coordinate And Work Effectively With Team Members, Both Internal Staff, Sub- Contractors And Consultants. Discuss The History Of Working Relationships With Team Members, Including Joint Venture Partners Where Applicable. describe The Firm’s Present Workload And The Availability Of The Project Team (including Consultants) For The Specified Contract Performance Period. Describe The Workload/availability Of The Key Personnel During The Anticipated Contract Performance Period And The Ability Of The Firm To Provide Qualified Backup Staffing For Key Personnel To Ensure Continuity Of Services. General Statements Of Availability/capacity May Be Considered Less Favorably. describe The Firm’s Ability To Sustain The Loss Of Key Personnel While Accomplishing Work Within Required Time Limits, To Ensure Continuity Of Services And Ability To Meet Surges In Unexpected Project Demands And Ability To Adhere To Schedules And Budgets. criterion 6— Knowledge Of General Geographic Area (sf 330, Part I, Section H) firms Will Be Evaluated On The Locations Of Their Office Or Offices That Will Be Performing The Work Under This Contract And Demonstrated Knowledge Of The General Geographic Areas In Which Projects Could Be Located. Evaluation Of Firms Will Include Consideration Of Their Location Within The General Geographic Area Of The Anticipated Projects (primarily At Naval Surface Warfare Center Crane Division, Crane, In). criteria 6 Submission Requirements: indicate Location Of The Office(s) That Will Be Performing The Work, Including Main Offices, Branch Offices, And Offices Of Team Members. provide A Narrative Describing The Team’s Knowledge And Previous Experience Of The Primary Geographic Areas To Be Covered By This Contract. provide A Narrative To Describe The Team’s Ability To Provide Timely Response To Requests For On‐site Support. Provide Timelines And Examples Of The Team’s Success In Providing This Response. Include Both Primary And Sub‐contractor Support As Required. Teams With A Demonstrated History Of Providing Timely Support May Be Considered More Favorably. criterion 7—volume Of Work (sf 330, Part 1, Section H) (tie-breaker) in The Event Of A Tie Among Equally Rated Firms, Those Firms Will Be Evaluated In Accordance With Dod Federal Acquisition Regulation Supplement (dfars) Procedures, Guidance And Information (pgi) 236.602‐1, From Data Extracted From The Federal Procurement Data System (fpds). Firms Will Be Evaluated In Terms Of Work Previously Awarded To The Firm By Dod Within The Past Twelve (12) Months With The Objective Of Effecting An Equitable Distribution Of Contracts Among Qualified A‐e Firms Including Small, Disadvantaged Business Firms, And Firms That Have Not Had Prior Dod A‐e Contracts. criterion 7 Submission Requirements: firms Shall Not Submit Data For This Factor.
City Government Of Navotas Tender
Others
Philippines
Closing Date17 Jun 2024
Tender AmountPHP 1 Million (USD 17 K)
Details: Description Request For Quotations: Please Quote Your Best Offer For The Item/s Described Below, Subject To The Terms And Conditions Provided At The Dorsal Portion Of This Request For Quotation. Submit Your Quotation Duly Signed By You Or Your Duly Representative And Copies Of Eligibility Requirements (business Permit, Local/national Tax Clearance And Philgeps Certificate Of Registration) Not Later Than The Deadline For Submission. Items: Procurement Of Other Supplies And Materials Expenses (electrical Supplies, Plumbing Supplies, Carpentry Supplies, Acu Tools And Materials Requested By The Gso Lot 1- Other Supplies And Materials Expenses Item Estimated Quantity Unit Of Issue Item Description Unit Cost -purchase Of Electrical Supplies, Plumbing Supplies, Carpentry Supplies, Acu Tools And Materials 1,000,000.00 Other Supplies And Materials Expense (by Ordering Agreement) 1 50 Pc/s Access Valve 122.00 2 20 Tank/s Acetelyne Gas Refill (standard Size) 3,333.00 3 50 Gallon/s Acry Color Paint 707.00 4 50 Pc/s Acrylone Roller #7 142.00 5 300 Pc/s Adaptor, Male/female #1/2 41.00 6 60 Pc/s Adaptor, Universal 86.00 7 20 Roll/s Aerotape, Size: 1/8" Thick X2" X 30feet Roll 778.00 8 20 Pc/s Aircon Washbag For 1hp To 3hp With Drain Hole 879.00 9 5 Pc/s Analog Clamp Meter/tester 8,585.00 10 20 Pc/s Analog Multimeter, Pointer Type, Zero Center Instrument 200mohm 1,515.00 11 300 Pc/s Angle Bar, 1.5 X 1.5 X 2.0mm X 10ft, Slotted 707.00 12 300 Pc/s Angle Bar, 1/4 X 1 X 20ft 829.00 13 300 Pc/s Angle Bar, 1/4 X 2 X 20 Ft 2,424.00 14 300 Pc/s Angle Bar, 3/16 X 1 X 20 Ft 778.00 15 300 Pc/s Angle Valve, .5 X .5 Stainless -2 Way 465.00 16 300 Pc/s Angle Valve, .5 X .5 Stainless -3 Way 485.00 17 300 Pc/s Angular Bar, 1" 778.00 18 50 Pc/s Anti Corrosion Spray Primer Paint, Density: 0, 95-1, 20 G / Ml 1,010.00 19 300 Pc/s Baby Roller #4 122.00 20 300 Pc/s Ballast, 40 Watts 243.00 21 20 Kilo/s Barb Wire, Gauge 12 Thickness 3,434.00 22 300 Pc/s Bareta De Cabra 24" 273.00 23 300 Pc/s Bareta De Cabra 30" 606.00 24 300 Pc/s Barrel Bolt #4 122.00 25 300 Pc/s Bearing #6205 324.00 26 300 Set/s Bidet 637.00 27 300 Sack/s Binistay (buhangin) 303.00 28 300 Pc/s Bisagra 2 X 4 354.00 29 300 Pc/s Bisagra 4 X 4 253.00 30 50 Box/es Black Screw # 3/16 X 1, 500s 1,313.00 31 500 Pc/s Black Screw #1 3.00 32 500 Pc/s Black Screw #2 11.00 33 500 Pc/s Black Screw Metal #1.5 13.00 34 500 Pc/s Black Screw Metal #2 15.00 35 300 Box/es Blind Rivet 1/8 X 1 617.00 36 300 Box/es Blind Rivet 1/8 X 1/2 505.00 37 300 Box/es Blind Rivet 3/16 X 1 556.00 38 300 Box/es Blind Rivet 3/16 X 1/2 303.00 39 20 Pc/s Bolt Cutter 36" 3,232.00 40 500 Pc/s Bolts And Nuts With Washer 16.00 41 500 Pc/s Brass Ball Valve 1 Inch 364.00 42 500 Pc/s Brass Ball Valve 1/2 Inch 314.00 43 500 Pc/s Brass Ball Valve 3/4 Inch 404.00 44 500 Pc/s Brass Gate Valve 889.00 45 500 Pc/s Bronze Welding Rod 1/8 202.00 46 500 Pc/s Cable Clamp 1/2 21.00 47 1000 Pc/s Cable Tie, 5 Inches 5.00 48 300 Pc/s Capacitor 60 Microfarad (single) 960.00 49 300 Pc/s Capacitor 65 Microfarad (single) 1,010.00 50 1000 Bag/s Cement, 40kg 505.00 51 20 Pc/s Chainblock 1 Tonner 7,070.00 52 20 Pc/s Chainblock 3 Tonner 12,827.00 53 300 Set/s Check Valve 1/2 531.00 54 300 Set/s Check Valve 3/4 758.00 55 300 Pc/s Checkered Plate 3/16 X 4 X 8 12,120.00 56 300 Pc/s Circuit Breaker 20 Amp With Aircon Outlet 1,212.00 57 20 Set/s Circuit Breaker 250amp With Enclosure 13,130.00 58 300 Pc/s Circuit Breaker 30 Amp 657.00 59 300 Pc/s Circuit Breaker 60 Amp Bolt-on 2 Pole 1,515.00 60 300 Pc/s Circuit Halogen Bulb #3 24v / 70 W 122.00 61 300 Pc/s Clamp (ring Type) 3/4 Double 11.00 62 300 Pc/s Clamp Meter With Lflex 1500v (micro) 49,490.00 63 300 Pc/s Clog Drain Remover, 10 Meters (hand Crank Duct Dredge) 778.00 64 300 Pc/s Cold Chisel 238.00 65 200 Kilo/s Common Nail #1 182.00 66 200 Kilo/s Common Nail #1.5 152.00 67 200 Kilo/s Common Nail #2 202.00 68 200 Kilo/s Common Nail #3 223.00 69 200 Kilo/s Common Nail #4 233.00 70 500 Pc/s Compact Pin Light 18 Watts G24d1 Socket 505.00 71 200 Kilo/s Concrete Nail #1 172.00 72 200 Kilo/s Concrete Nail #1.5 182.00 73 200 Kilo/s Concrete Nail #2 172.00 74 200 Kilo/s Concrete Nail #3 233.00 75 200 Kilo/s Concrete Nail #4 172.00 76 300 Pc/s Corrugated Sheet G24 8 Ft 1,414.00 77 300 Dozen/s Cotton Gloves 314.00 78 300 Pc/s Coupling 2" Orange 41.00 79 50 Pc/s Cut-off Disc (12 Inch) 697.00 80 10 Set/s Cut-off Machine (12 Inch) 18,180.00 81 300 Pc/s Cutting Disc #4 202.00 82 300 Box/es Cutting Disc 100mm X 1mm X 16mm 152.00 83 300 Pc/s Cylindrical #1.5 404.00 84 300 Pc/s Cylindrical #3/4 152.00 85 300 Pc/s Cylindrical Hinges #1 137.00 86 300 Pc/s Cylindrical Hinges #3/4 81.00 87 300 Pc/s Deformed Bar 10mm 283.00 88 300 Pc/s Deformed Bar 12mm 399.00 89 300 Pc/s Deformed Steel Bar 12mm 526.00 90 300 Pc/s Diamond Disc Cutter #4 531.00 91 300 Pc/s Diamond Trowel Big 152.00 92 300 Pc/s Diamond Trowel Medium 137.00 93 300 Pc/s Diamond Trowel Small 132.00 94 300 Pc/s Digging Bar, 25mm X 5ft 1,212.00 95 300 Pc/s Door Knob 707.00 96 300 Pc/s Door Knob Hole Saw Kit 303.00 97 300 Pc/s Drill Bit #1/4 (concrete) 81.00 98 300 Pc/s Drill Bit #1/4 (steel) 213.00 99 300 Pc/s Drill Bit #1/8 (concrete) 71.00 100 300 Pc/s Drill Bit #1/8 (steel) 112.00 101 300 Pc/s Drill Bit #3/16 (concrete / Masonry) 76.00 102 300 Pc/s Drill Bit #3/16 (steel) 142.00 103 300 Pc/s Drill Bit #3/8 (concrete) 152.00 104 300 Pc/s Drill Bit #3/8 (masonry) 132.00 105 300 Pc/s Drill Bit #3/8 (steel) 430.00 106 300 Pc/s Drill Bit #5/16 (concrete) 91.00 107 300 Pc/s Drill Bit #5/16 (steel) 314.00 108 300 Pc/s Drill Bit Set, Heavy Duty 6,818.00 109 300 Pc/s Dual Flush Toilet Push Button 778.00 110 300 Pc/s Duct Tape 829.00 111 300 Set/s Duplex Universal Outlet W/ Ground And Shutter Set 303.00 112 300 Pc/s Electric Tape, Large 81.00 113 300 Gallon/s Emulsion 1,010.00 114 300 Pc/s Entrance Cap 3/4 61.00 115 300 Liter/s Epoxy All Purpose 1,212.00 116 300 Pair/s Epoxy Gloss 1,717.00 117 300 Gallon/s Epoxy Primer 1,919.00 118 300 Gallon/s Epoxy Primer Gray W/ Catalyst 1,414.00 119 300 Gallon/s Epoxy Reducer 808.00 120 300 Gallon/s Epoxy Topcoat 1,869.00 121 300 Pc/s Exhaust Fan, 12" 2,778.00 122 50 Pc/s Exhaust Fan, Industrial, 12" 3,939.00 123 50 Pc/s Exhaust Fan, Industrial, 16" 7,020.00 124 300 Pc/s Expansion Shield 3/8 X 2 With Washers 71.00 125 50 Pc/s Fan, Wall Fan, 16" 1,818.00 126 300 Pc/s Faucet , Wall Mounted, For Cr 1,313.00 127 300 Pc/s Faucet, Lavatory 1,212.00 128 300 Pc/s Faucet, Pvc, Tb 505.00 129 300 Set/s Faucet, With Telephone Shower 1,324.00 130 300 Pc/s Fiber Cement 4 X 8 707.00 131 300 Pc/s Fiber Cement Board 1/4 X 4 X 8 1,111.00 132 500 Kilo/s Finishing Nail #1 162.00 133 500 Kilo/s Finishing Nail #1.5 152.00 134 500 Kilo/s Finishing Nail #2 157.00 135 10 Set/s Fire Exit Door Lock 16,160.00 136 300 Pc/s Flat Bar 1" 505.00 137 300 Pc/s Flat Bar 3/16 X 1 X 20ft 485.00 138 300 Roll/s Flat Cord #16 5,151.00 139 300 Pc/s Flat Sheet 24 X 3 X 8 2,020.00 140 300 Pc/s Flat Sheet 24 X 4 X 8 (liso) 1,717.00 141 300 Pc/s Flat Washer 1 1/4 M32 61.00 142 300 Pc/s Flat Washer 1 1/8 M28 41.00 143 300 Pc/s Flexible Hose .5 X .5 X 16 Inches 273.00 144 300 Roll/s Flexible Hose 1/2 Orange 1,414.00 145 300 Roll/s Flexible Hose 3/4 Orange 1,818.00 146 300 Set/s Flood Light 200w Led With Metal Halide 6,363.00 147 300 Quart/s Floor Coating Chlorinated Rubber Base Marking 707.00 148 300 Quart/s Floor Coating Chlorinated Rubber Base Reducer 404.00 149 300 Gallon/s Floor Coating Rubber Base 2,525.00 150 300 Pc/s Floor Drain Cover 4 X 4 152.00 151 300 Pc/s Fluorescent Holder Snap Fit 26.00 152 300 Pc/s Fluorescent Lamp 40 Watts 219.00 153 300 Pc/s Fluorescent Lamp T8 Holder 56.00 154 300 Set/s Fluorescent Light With Housing 583.00 155 300 Set/s Folding Allen Wrench 7pcs/set 69-262 2.5- 10mm 707.00 156 50 Tank/s Freon R134a, 13.6kg 7,070.00 157 50 Kilo/s Freon R22 (refill) 935.00 158 50 Tank/s Freon R22, 13.6kg 9,090.00 159 50 Kilo/s Freon R410 (refill) 935.00 160 50 Tank/s Freon R410a, 11.3kg 9,595.00 161 50 Kilo/s Freon R32 (refill) 935.00 162 50 Tank/s Freon R32, 9.5kg 9,595.00 163 500 Pc/s G.i. Coupling 142.00 164 500 Pc/s G.i. Coupling 3/4 132.00 165 500 Pc/s G.i. Nipple 3 X 1/2φ 55.00 166 500 Pc/s G.i. Pipe #1 1,515.00 167 500 Pc/s G.i. Pipe #1/2 975.00 168 500 Pc/s G.i. Pipe #3/4 1,212.00 169 500 Pc/s G.i. Pipe 1.5 X 20 Ft 2,626.00 170 500 Pc/s G.i. Pipe 1/2 S40 X 20 Ft 975.00 171 500 Pc/s G.i. Pipe S40 #1 1,616.00 172 500 Pc/s G.i. Pipe S40 #1 1/2 Diameter 2,626.00 173 500 Pc/s G.i. Pipe S40 #3/4 Diameter 1,212.00 174 500 Pc/s G.i. Pipe S40 #3diameter X 20 Ft 5,858.00 175 500 Kilo/s G.i. Wire #16 192.00 176 50 Pc/s Garden Hose 25 Meters 1/2 1,556.00 177 500 Pc/s Gauge Manifold Hose Only For R22 556.00 178 500 Pc/s Gauge Manifold Hose Only For R410 556.00 179 500 Pc/s Glass Window 48 1/2 Cm X 75cm 707.00 180 500 Pc/s Good Lumber 1 X 1 X 10 157.00 181 500 Pc/s Good Lumber 1.5 X 1 X 10 172.00 182 500 Pc/s Good Lumber 1.5 X 2 X 10 238.00 183 500 Pc/s Good Lumber 1/2 X 1 X 10 101.00 184 500 Pc/s Good Lumber 1/4 X 1 X 10 137.00 185 500 Pc/s Good Lumber 2 X 2 X 10 314.00 186 500 Pc/s Good Lumber 2 X 2 X 12 374.00 187 500 Pc/s Good Lumber 2 X 3 X 12 566.00 188 500 Pc/s Good Lumber 2 X 3 X 8 707.00 189 500 Pc/s Good Lumber 2 X 4 X 12 733.00 190 10 Elf Gravel 3,939.00 191 500 Sack/s Gravel, 50kilos Per Sack 440.00 192 20 Set/s Grinder (portable), Heavy Duty 5,454.00 193 500 Pc/s Grinding Stone #4 172.00 194 500 Kilo/s Grout 142.00 195 500 Pc/s Grub Hoe (asarol) 707.00 196 500 Pc/s Gypsum Board 1/2 X 4 X 8 1,111.00 197 50 Box/es Gypsum Screw 1, 500s 606.00 198 200 Pc/s Hacksaw Blade 137.00 199 200 Pc/s Hacksaw With Blade 445.00 200 10 Pc/s Hammer (martilyo), 25mm To 27mm 516.00 201 10 Pc/s Hand Riveter 10.5" 874.00 202 10 Set/s Hand Tools (combination Pliers, Long Nose Pliers, Adjustable Wrench, Mini Claw Hammer, Philips Screwdriver, Slotted Screwdriver, Sanp-off Blade Knife, Measuring Tape, Voltage Tester, Canvas Bag) 2,424.00 203 10 Set/s Handle Drill Rechargeable Cordless Drill Screw Drive, Heavy Duty 15,150.00 204 50 Pc/s Handle For Welding Machine 546.00 205 10 Pc/s Heat Gun/hot Air Gun 2000w 2,525.00 206 300 Set/s High Tensile Allen Caps Screw 7/16x2 With Nut Flat Washer 25.00 207 20 Pair/s Hinges 2-ball Bearing Stainless 202.00 208 1000 Pc/s Hollow Blocks 41.00 209 5 Pc/s Jackhammer Portable, Heavy Duty 49,490.00 210 500 Pc/s Jalousie 1/4 X 10 X 80 127.00 211 500 Pair/s Jalousie Frame 14 Blades 1,111.00 212 500 Pc/s Junction Box With Cover 61.00 213 5 Pc/s K-400 Drum Machine / Drain Auger Cleaning Machine 22,725.00 214 300 Pc/s Kindry 1 1/2 X 2 X 10 556.00 215 300 Pc/s Kindry 2 X 4 X 10 1,274.00 216 300 Gallon/s Lacquer Thinner 808.00 217 300 Bottle/s Lacquer Thinner 350ml 81.00 218 50 Liter/s Latex Color Lamp 243.00 219 300 Pc/s Lavatory Bottle (p Trap) 1 1/2" 303.00 220 300 Pc/s Lavatory Faucet, Stainless Steel 1,182.00 221 300 Pc/s Led Bulb 15 Watts 505.00 222 300 Pc/s Led Bulb 7 Watts 192.00 223 300 Pc/s Led Panel 6 Watts Daylight 354.00 224 300 Pc/s Led Panel 9 Watts Daylight 445.00 225 300 Pc/s Led Panel Light 12 Watts 6500k Round Type 612.00 226 300 Pc/s Led Panel Light 15 Watts 707.00 227 300 Pc/s Led Panel Light 15 Watts (round Type) 778.00 228 300 Pc/s Led Panel Light 165x165 12 Watts 657.00 229 300 Pc/s Led Panel Light 18 Watts Round Type 808.00 230 300 Pc/s Led Panel Light 18 Watts Round Type (ceiling Mounted) 702.00 231 300 Pc/s Led Panel, 18w 6000k 197.00 232 300 Pc/s Led Tube Light T8 Short 9 Watts Daylight 283.00 233 300 Pc/s Led, Fluorescent, 18 Watts T8 606.00 234 300 Pc/s Liston, 1/2 X 1 X 10 100.00 235 50 Pc/s Long Elbow 3/4 51.00 236 50 Pc/s Long Nose Pliers 505.00 237 20 Pc/s Long Nose, 8", Heavy Duty 606.00 238 10 Pc/s Magnetic Contactor 60 Amp 8,080.00 239 500 Pc/s Male Adaptor With Pvc Locknut Metal 71.00 240 500 Pc/s Male Plug Ordinary 75.00 241 300 Pc/s Mapp Gas Self Ignition Turbo Torch 1,404.00 242 300 Pc/s Mapp Gas, 400g 606.00 243 300 Kilo/s Masilya Powder 51.00 244 300 Pc/s Masonry Drill Bit 1/4 81.00 245 300 Pc/s Metal Furring "angle" 86.00 246 300 Pc/s Metal Furring "c" 263.00 247 300 Pc/s Metal Screw Diameter 10mm X 2inch 13.00 248 300 Pc/s Metal Screw Diameter 3/16 X 2inch 16.00 249 300 Pc/s Metal Screw Flat Head 11.00 250 50 Pc/s Mirror Glass 78 Cm X 195 Cm 3,737.00 251 300 Can/s Multi Use Penetrating Oil, 382ml 521.00 252 300 Kilo/s Nail, Umbrella Nail #2 1/2 187.00 253 300 Set/s Nema 3r Enclosure With 30at Breaker Bolt On 1,717.00 254 20 Tank/s Nitrogen Tank, 20kgs With Valve 12,120.00 255 20 Tank/s Nitrogen Tank, Refill 808.00 256 10 Roll/s Nylon Rope #12 6mm 1,515.00 257 10 Roll/s Nylon Rope #16 8mm 1,717.00 258 10 Pc/s Orbit Fan, 16", Heavy Duty 3,131.00 259 500 Pc/s Outlet Universal Extension Surface Type, 2-gang 101.00 260 500 Pc/s Outlet Universal Extension Surface Type, 3-gang 137.00 261 500 Pc/s Outlet Universal Extension Surface Type, 4-gang 172.00 262 300 Pc/s Padlock 30mm Heavy Duty 273.00 263 300 Pc/s Padlock 40mm Heavy Duty 354.00 264 300 Pc/s Paint Brush # 1 36.00 265 300 Pc/s Paint Brush # 1 1/2 41.00 266 300 Pc/s Paint Brush # 2 66.00 267 300 Pc/s Paint Brush # 3 112.00 268 300 Pc/s Paint Brush # 4 122.00 269 300 Gallon/s Paint Thinner 606.00 270 300 Bottle/s Paint Thinner 350ml 91.00 271 300 Liter/s Paint, Acry Color 354.00 272 300 Gallon/s Paint, Flat Wall Enamel 1,313.00 273 300 Gallon/s Paint, Gloss Enamel 1,111.00 274 300 Pail/s Paint, Latex Enamel 1,864.00 275 300 Gallon/s Paint, Latex Flat 964.00 276 300 Pail/s Paint, Latex Flat 3,727.00 277 300 Pail/s Paint, Latex Gloss 4,343.00 278 300 Gallon/s Paint, Latex Gloss 1,212.00 279 300 Pail/s Paint, Latex Semi Gloss 3,950.00 280 300 Gallon/s Paint, Roof Paint 1,005.00 281 300 Pc/s Paint, Spray Paint, 300g 192.00 282 300 Quart/s Paint, Tinting 137.00 283 300 Gallon/s Paint, Waterproofing 1,212.00 284 300 Pair/s Paleta 101.00 285 300 Pc/s Panel Box 2 Branch Plug-in 1,111.00 286 20 Sack/s Patching Compound 20kgs/sack 1,212.00 287 300 Roll/s Pdx Wire #10 7,676.00 288 300 Meter/s Pdx Wire #12 112.00 289 300 Roll/s Pdx Wire #12 5,555.00 290 300 Pc/s Piano Hinges 8ft 303.00 291 300 Pc/s Pipe Tube 2" 3,460.00 292 300 Pc/s Pipe Wrench (12") 1,066.00 293 300 Pc/s Pipe Wrench (14") 1,238.00 294 300 Pc/s Plain Sheet Gauge 18 X 4 X 8 2,222.00 295 300 Pc/s Plastic Clamp Orange 3/4 11.00 296 300 Pc/s Plastic Moulding 3/4 112.00 297 300 Pc/s Plate, 2 Gang 86.00 298 300 Pc/s Plies, 8", Heavy Duty 758.00 299 300 Pc/s Plyboard 3/4 X 4 X 8 1,930.00 300 300 Pc/s Plywood 1/2 X 4 X 8 (ordinary) 1,536.00 301 300 Pc/s Plywood 1/4 X 4 X 8 859.00 302 300 Pc/s Plywood 3/4 X 4 X 8 (marine) 2,424.00 303 300 Pc/s Plywood 3/4 X 4 X 8 (ordinary) 2,334.00 304 300 Pc/s Polycarbonate 1/4 X 4 X 8 2,222.00 305 300 Liter/s Polyester Body Filler With Hardener 374.00 306 300 Roll/s Polythelene Tape, 4" X 45m 202.00 307 300 Pc/s Portable Auto Air Compressor Pump, Dc 12v, Heavy Duty 2,525.00 308 5 Set/s Portable Welding Machine, Heavy Duty 15,150.00 309 300 Pc/s Ppr Cutter, 42mm, Heavy Duty 707.00 310 300 Pc/s Ppr Heater - Fusion Machine With Mould Size 20, 25, And 32 3,535.00 311 300 Pc/s Ppr White 32mm 4m Long 980.00 312 300 Pc/s Pressure Washer 1200w, Heavy Duty 5,555.00 313 300 Pc/s Primer Multi-seal, 600g 1,212.00 314 300 Pc/s P-trap (lavatory) 657.00 315 300 Pc/s Push Cart 300kg - Heavy Duty 16,160.00 316 10 Set/s Pushcart Wheel Wood 3 Pcs (12" Diameter X 3" Double Bearing) 7,070.00 317 300 Pair/s Putty Knife (paleta) # 1 61.00 318 300 Pair/s Putty Knife (paleta) # 1 1/2 71.00 319 300 Pair/s Putty Knife (paleta) # 2 76.00 320 300 Pair/s Putty Knife (paleta) # 5 61.00 321 300 Pc/s Pvc 45 Deg Sanitary 2" 66.00 322 300 Pc/s Pvc Adapter #3/4 29.00 323 300 Pc/s Pvc Ball Valve 1/2 81.00 324 300 Pc/s Pvc Ball Valve 3/4 112.00 325 300 Pc/s Pvc Bracket #1/2 11.00 326 300 Pc/s Pvc Cement, 100cc 172.00 327 300 Pc/s Pvc Cement, 200cc 263.00 328 300 Pc/s Pvc Clamp #1/2 11.00 329 300 Pc/s Pvc Connector #1/2 With Thread 25.00 330 300 Pc/s Pvc Coupling #1/2 21.00 331 300 Pc/s Pvc Coupling #3/4 26.00 332 300 Pc/s Pvc Elbow #1 Orange 101.00 333 300 Pc/s Pvc Elbow #1/2 51.00 334 300 Pc/s Pvc Elbow #1/2 Threaded 21.00 335 300 Pc/s Pvc Elbow #2 Orange 81.00 336 300 Pc/s Pvc Elbow #3/4 Blue 46.00 337 300 Pc/s Pvc Elbow #3/4 Orange 71.00 338 300 Pc/s Pvc Elbow 1/2 Moldex Plain 51.00 339 300 Pc/s Pvc Elbow 1/2 Moldex W/ Thread 81.00 340 300 Pc/s Pvc Elbow Sanitary 2" 127.00 341 300 Meter/s Pvc Flexible Hose 36.00 342 300 Pc/s Pvc Long Elbow #1/2 41.00 343 300 Pc/s Pvc Long Elbow #3/4 66.00 344 300 Pc/s Pvc Pipe #1 Orange 399.00 345 300 Pc/s Pvc Pipe #1/2 Blue 152.00 346 300 Pc/s Pvc Pipe #1/2 Diameter Threaded, Blue 172.00 347 300 Pc/s Pvc Pipe #1/2 Orange 202.00 348 300 Pc/s Pvc Pipe #2 Orange 622.00 349 300 Pc/s Pvc Pipe #3/4 Blue 238.00 350 300 Pc/s Pvc Pipe #3/4 Orange 314.00 351 300 Pc/s Pvc Pipe Sanitary 2" 404.00 352 300 Pc/s Pvc Plug 3/4 31.00 353 300 Pc/s Pvc Short Elbow #1/2 30.00 354 300 Pc/s Pvc Short Elbow #3/4 25.00 355 300 Pc/s Pvc Tee 1/2 26.00 356 300 Pc/s Pvc Tee 3/4 31.00 357 50 Gallon/s Quick Dry Enamel 1,212.00 358 50 Pc/s R134a Quick Connector Adapter Coupler With Low High Hvac All Copper Quick Connect Air Conditioner Refrigerant Adapter Universal Ac Manifold Gauge Auto Set Adjustable 1/4" 1,313.00 359 50 Set/s R410/r22 Single Manifold Gauge (high Side) With Adaptor And 2 Pcs Hose 2,334.00 360 300 Kilo/s Rags 142.00 361 300 Pc/s Rake 8 X 35 X 125 545.00 362 300 Pc/s Receptacle (bokilya) 71.00 363 300 Pc/s Rectangular Trowel Pvc Rubber 273.00 364 50 Gallon/s Red Oxide 746.00 365 50 Gallon/s Reducer 955.00 366 50 Lb/s Refill Of Fire Extinguisher - Dry Chemical 122.00 367 300 Pc/s Roller Brush #4 76.00 368 300 Pc/s Roller Brush #7 86.00 369 500 Pc/s Roller Pan / Roller Tray 112.00 370 500 Pc/s Roller Tray 71.00 371 500 Quart/s Roof Sealant 1,111.00 372 1000 Pc/s Round Bar 1" 2,253.00 373 500 Pc/s Rubber Plug 96.00 374 500 Pc/s Rubber Socket 167.00 375 500 Gallon/s Rubberized With Catalyst 1,869.00 376 500 Bottle/s Rust Converter, 4l 1,606.00 377 1000 Pc/s Sacks, Net Weight 50kg 21.00 378 500 Sack/s Sand Bistay, Approx. 10kg To 13kg 63.00 379 300 Pc/s Sanding Disc #4 30.00 380 300 Pc/s Sandpaper #100, #140, #180, #240, #500 71.00 381 300 Pc/s Sanitary Pvc Fittings Emerald Clean Out W/ Plug 4" 404.00 382 20 Pc/s Screw Driver (flat Screw),slotted 208.00 383 20 Set/s Screw Driver Bit, ( 10pcs ) 152.00 384 20 Set/s Screw Driver Set, Heavy Duty 1,111.00 385 300 Pc/s Screw Driver, Phillips, 2 X 4 399.00 386 300 Liter/s Sealant 909.00 387 300 Pc/s Sealant Clear 485.00 388 300 Pc/s Sealant Gun 9" 505.00 389 300 Pack/s Sealant, 75ml 112.00 390 50 Pc/s Shovel, Square/pointed 576.00 391 50 Pc/s Side Cutter 8" 899.00 392 300 Pc/s Silicon Gun 9" 505.00 393 300 Pc/s Silicon Sealant, 300ml 485.00 394 500 Pc/s Silver Rod 41.00 395 300 Sack/s Skim Coat, 20kg 904.00 396 50 Pc/s Sledge Hammer 6 Lb (maso) 1,515.00 397 5 Set/s Socket Wrench Set 25 Pcs X 1/2 Dr. (10-32mm) 12pts 5,050.00 398 50 Pc/s Soldering Iron, 100w 622.00 399 300 Roll/s Soldering Lead, 1.2mm 808.00 400 300 Pair/s Spatula 86.00 401 300 Pc/s Spatula #5 122.00 402 300 Pc/s Square Bar #12 X 20 546.00 403 50 Pair/s Stainless Steel Bracket Corner Code With Screws 51.00 404 300 Pc/s Starter 40 Watts 51.00 405 300 Pc/s Steel Bar 10mm 273.00 406 300 Lot Steel Bending Service 2,334.00 407 300 Pc/s Steel Matting 3/16 X 4 X 8 1,212.00 408 300 Pc/s Strainer, 4 Inches 470.00 409 300 Pc/s Switch 122.00 410 300 Pc/s Switch Light, Two-way 112.00 411 300 Pc/s Switch, Single, Wide Series 172.00 412 300 Pc/s Switch, Two-gang, Universal Wide Series, 243.00 413 300 Pc/s Tape, Teflon 1/2 26.00 414 300 Pc/s Tape, Teflon 3/4 29.00 415 300 Pc/s Tek Screw Holder 137.00 416 300 Pc/s Tek Screw, 1.5 6.00 417 300 Pc/s Tek Screw, 2 1/2 11.00 418 500 Pc/s Thermostat 667.00 419 10 Box/es Thhn Wire #8 16,160.00 420 10 Roll/s Thhn Wire Solid #12 7,454.00 421 10 Roll/s Thhn Wire Stranded #10/7 10,605.00 422 10 Roll/s Thhn Wire Stranded #12/7 6,879.00 423 10 Box/es Thhn/thwn 3.5mm^2 6,464.00 424 10 Box/es Thhn/thwn 5.5mm^2 9,797.00 425 20 Roll/s Thhn/thwn 8.0 Mm^2 Wire Stranded 24,240.00 426 300 Bag/s Tile Adhesive 25kg 516.00 427 300 Bag/s Tile Grout 2kg 122.00 428 300 Pc/s Tile Levelling Wedges 192.00 429 300 Pc/s Tiles 20 X 90 571.00 430 300 Pc/s Tiles 30 X 30 101.00 431 300 Box/es Tiles 30 X 30 (ceramic) 202.00 432 300 Pc/s Tiles 60 X 60 859.00 433 300 Bag/s Tiles Grout Sponge 142.00 434 300 Pc/s Tinting Color 697.00 435 300 Set/s Toilet Bowl 5,980.00 436 300 Set/s Toilet Flush Set Fittings Dual Button Flush Valve 364.00 437 300 Pc/s Toilet Tank Flush Lever Single 61.00 438 300 Pack/s Tox #5, 100s 61.00 439 300 Pack/s Tox #6, 100s 101.00 440 50 Pc/s Tubular 1.5 1x1x20 707.00 441 50 Pc/s Tubular 1.5 2x3x20 1,869.00 442 50 Pc/s Tubular 1.5 X 2 X 3 X 20 1,864.00 443 50 Pc/s Tubular S40 # 2x1x20ft - 1.5mm 1,313.00 444 50 Pc/s Tubular S40 # 2x2x20ft - 1.5mm 884.00 445 30 Pc/s Universal Single Type Push Toilet Flush Button - 38mm 287.00 446 50 Set/s Urinal Bowl 4,444.00 447 50 Pc/s Urinal Push Button 1,243.00 448 50 Bottle/s Varnish, 350ml 101.00 449 300 Pc/s Wall Hook Screw 1/2" 11.00 450 300 Pc/s Wall Hook Screw 3/4" 16.00 451 300 Kilo/s Welding Rod 3/32 334.00 452 300 Kilo/s Welding Rod 5/64 Stainless 627.00 453 300 Box/es Welding Rod 6013 2,485.00 454 300 Liter/s Wood Do Putty 455.00 455 300 Pack/s Wood Glue 500grams 384.00 456 300 Pc/s Wood Screw 3/16 X 2 8.00 457 300 Pc/s Wood, 1 1/2 X 2 X 10, Lumber 415.00 458 300 Pc/s Wood, 1 X 2 X 8 S4s 223.00 459 300 Pc/s Wood, 1 X 4 X 8 425.00 460 300 Pc/s Wood, 1.5 X 2 X 8 192.00 461 300 Pc/s Wood, 1/2 X 1 X 10 101.00 462 300 Pc/s Wood, 1/2 X 1 X 8 81.00 463 300 Pc/s Wood, 1/2 X 2 X 8 132.00 464 300 Pc/s Wood, 1/4 X 4 X 8 Plywood (marine) 879.00 465 300 Pc/s Wood, 2 X 10 X 10 1,717.00 466 300 Pc/s Wood, 2 X 2 X 12 374.00 467 300 Pc/s Wood, 2 X 3 X 8 617.00 468 300 Pc/s Wood, 2 X 3 X 8 S4s 374.00 469 300 Pc/s Wood, 2 X 4 X 10 Kindry 1,283.00 470 300 Pc/s Wooden Drill Bit #3/8 505.00 471 300 Pc/s Wooden Plank 2" X 10" X 10' 2,525.00 Abc:php1,000,000.00 Delivery Date: Within 30 Calendar Days Delivery Upon Receipt Of Delivery Ordering Contract (please Secure Complete List And/or Rfq Form From Ms. Maricar E. Pablo, At 09676781263 Pauline Anne S. Sioco At 09338100230, And Roxette May P. Poblete At 0936-493-5632 Or Email Address: Procurement@navotas.gov.ph) Terms And Conditions: 1. Bidders Shall Provide Correct And Accurate Information Required. 2. Bidders May Quote For All The Items. 3. Price Quotation/s Must Be Valid For A Period Of Thirty (30) Days Calendar Days From The Date Of Submission. 4. Price Quotation/s, To Be Denominated In Philippine Peso Shall Include All Taxes, Duties And/or Levies Payable. 5. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 6. Delivery Period Expressed Merely In Days Or Working Days Shall Be Rejected. 7. Award Of Contract Shall Be Made To The Lowest Quotation (for Goods And Infrastructure) Or, The Highest Rated Offer (for Consulting Services) Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. 8. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initiated By You Or Any Of Your Duly Authorized Representative/s. 9. The Item/s Shall Be Delivered As Indicated In The Approved Bac Resolution/purchase Order. 10. The Procuring Entity Concerned Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Technical Specifications. 11. Liquidated Damages Equivalent To One Tenth Of One Percent (0.001%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The City Government Of Navotas Shall Rescind The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. For The Committee Original Signed Atty. Joel Joselito D. Parong Bac Chairperson
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
United States
Closing Date18 Jan 2024
Tender AmountUSD 430.4 K This is an estimated amount, exact amount may vary.
Details: This Is A Special Notice For The Establishment Of An Architect-engineering (a-e) Contract With Services To Be Performed At The Central Virginia Va Health Care System (cvvhs)-richmond Vamc, 1201 Broad Rock Blvd, Richmond, Va 23249. This Requirement Is Being Executed Under A 100% Set-aside To Service-disabled Veteran Owned Small Business (sdvosb) Firms. This Announcement Is Not A Request For Proposal; No Solicitation Package Will Be Issued Until After An Evaluation Has Been Made On The Provided Sf-330s. The Sf-330 Can Be Downloaded Through The Gsa Forms Library At: Http://www.gsa.gov/portal/forms/type/top, Scroll Down To Locate And Click On The Sf-330 Hyperlink Entitled, Architect-engineer Qualifications. Nevertheless, Sf-330 Is Attached As Attachment C. Interested Firms Should Submit Their Current Sf-330, Parts I And Ii, To The Contract Specialist, Moses Deng At Moses.deng2@va.gov. The Sf-330s Are Due No Later Than 2:00 Pm, Eastern Standard Time (est) On January 18, 2024. scope Of Work: This Project Requires The Services Of An Architectural Engineering Firm (a/e) Having Special Knowledge Of Design To Replace The Existing Outdated Campus Security Camera System With A New Up-to-date And Future Proof Security Camera And Storage Solution That Effectively Monitors All Areas. The A/e Must Have Experience With Architectural, Mechanical, Electrical, Electronic/security, Telecommunications, And Structural Engineering With Regards To Campus Wide Camera System Replacement. intent
the A/e Shall Provide Design Services For Nrm Construction Project 652-23-105-campus Wide Camera System Replacement. The Project Shall Replace Campus Wide Security Camera Systems. The Design Shall Include An Investigation To Determine The Existing Architectural Space, Electrical, Electronics/ Security, Telecommunications And Modernization Needed For The Replacement Of Security Cameras In The Entire Areas Contained Within The Campus Boundaries. The Extent And Type Of Security Cameras And Modernization Necessary Will Be Determined By The Findings Of The Investigation. The A/e Shall Retain The Services Of A Registered Fire Protection Engineer To Design And Review The Entire Project For Code Compliance. requirements (see Attached Statement Of Work For Full Details)
the A/e Selected Is Expected To Provide:
part I Investigative Services/schematic Design/other Related Services: Preparation Of Existing Conditions Plan And Conceptual Design Which Includes Site Investigation For Architectural, Mechanical, Electrical, Electronic/security, Telecommunications, And Structural Engineering, Environmental Hazards, Such As Suspect Acm, Other Hazardous Materials. To Complete An Accurate And Complete Site Investigation And Hazardous Material Assessment The A/e Should Anticipate Having To Stoop, Bend, Kneel And Crawl For Short To Modest Lengths Of Time. They Also May Be Required To Temporarily Remove Or Alter Partitions Or Climate Control Devices To Gain Needed Access To All Equipment And Areas To Complete A Full And Complete Assessment. The Va Cannot Provide Any Ladders, Flashlights, Tape Measures Or Other Devices That May Be Needed To Complete The Assessment. Perform Project Site Investigation In Accordance With The Site Investigations Section Of The Scope Of Work. physically Survey As Well As Review Record Drawings Of The Existing Building. Inform Co/cor Of Supplemental Information Gathering That May Be Required.
perform Photographic Documentation During Investigative Services; Files Are To Be Maintained For Future Reference Of Existing Conditions For Construction Documents And Unforeseen Unit Costing Basis.
the Contractor Shall Prepare Digital Photo Documentation Of Construction Work, Including Sites, Buildings, And Field Activities. Digital Photos Shall Be Consolidated Into A Project Report Detailing The Results Of Their Site Investigation Submitted In Pdf Format To The Contracting Officer And Cor, And To A Resolution Sufficient And Appropriate For The Type Of Work Photographed. The Contractor Shall Provide An Index For Each Set Of Photographs Submitted Identifying The Contractor, Base, Facility, Project Number, Date, And A Brief Description. The Contractor Shall Coordinate Photography Of Any Kind Through The Cor. part Ii Design Development And Part Iii Construction Documents: Submit Complete Review Package In Accordance With The Following Requirements And Guidelines Outlined In Http://www.cfm.va.gov/contract/aedessubreq.asp. Please Pay Specific Attention To The Schematic, Design And Construction Submission Requirements. As Appropriate Depending Upon The Complexity Of The Design, The A/e May Request Approval From Cor To Delete Individual Submissions Where Not Required (i.e. Do Not Address A. Site Development, Landscaping For Interior Renovation Projects) deliver One (1) Disc And Two (2) Hard Copies Per Submission; Drawings Shall Be Half Size: design Development (dd) 25%: identify All Design Calculations.
identify All Existing Condition, Utilities And Utility Requirements.
complete Applicable Dd Checklist Requirements
preliminary Estimate design Development (dd2) 50%: address All Comments From The Dd1 Submission Review.
complete Applicable Dd Checklist Requirements
updated Estimate design Development (cd1) 95%: address All Comments From The Dd2 Submission Review.
design All Finishes If Applicable
finalize Required Submittals.
complete Cd1 Checklist
updated Estimate contract Documents (bid Documents) 100%:
submit A Complete Document Of All Contract Requirements Including Final Estimate. The Cover Page Shall Be Submitted For Approval Signatures. If Necessary, Update And Submit Until Approved By The Va. consolidate All Necessary Submittals By Specification Section On An Excel Spreadsheet. Checklist To Be Utilized To Track/monitor Submittal Process.
provide Copies Of The Autocad Files. part Iv - Construction Period Services: Review And Provide Concise Recommendations On All Submittals, Shop Drawings, Product Data, Samples, Rfi S (questions & Clarification Requests), Change Order Proposals, Etc. In Accordance With Construction Period Services Section Of This Statement Of Work. Services Shall Include Third Party Asbestos Monitoring, If Needed, That Will Be Performed During Construction By A Va Certified Asbestos Air Sampler. Services Shall Include Providing Record Drawings Based On Finalized Contractor Red-line As-builts. assist The Va To Determine Whether The Contractor Or Subcontractor Meets Qualification Requirements, Supported By Written Recommendations Of Any Problems Or Litigation Encountered In Past Based On Firsthand Knowledge.
review All Submittals And Provide Recommendations To The Va Within Ten (10) Calendar Days.
review And Provide Replies To Contractor Generated Rfis When Required By The Project Manager/cor Within Seven (7) Calendar Days.
review Contractor's Cost Estimates And Provide Recommendations To The Va.
attend Preconstruction Conference (teleconference I.e. Ms Teams)
make Site Visits On Requests Of The Va And Prepare Written Reports To Include Agreed Upon Changes In Design As Determined Necessary During The Construction. Visits Made Based On Errors And Omissions In Design Will Be At No Cost To The Va.
participate In Partial/final Acceptance Inspections As Scheduled And Generate Punch List Items For Completion. The Punch List Shall Reference The Contract Documents For Specific Deficiencies (i.e. Specification Section, Drawing Detail, Etc.)
prepare As-built Drawings On Original Set With A/e S Stamp, Based On Record Drawings That The Contractor Kept During Construction. Transpose Contractor S As-builts To Autocad (.dwg) And Provide A Set Of Updated As-builts On Cd Within 30 Days To The Project Engineer. Final Drawing Submittal Will Include Hard Copies As Described For Other Submissions As Well As A Cd Clearly Labeled With The Project Name, Number And Submittal Date Containing: Folder Labeled Bid Documents all Specifications Bound In One (1) Word Document (make Sure Spec Sections Are Separated By Page Breaks And That New Sections Start On Right Hand Page)
all Drawing Sheets In One .pdf File.
folder Labeled Dwgs With Subfolders Containing Engineering Disciplines (architectural, Mep, Structural, Civil, Etc.) Which Includes The .arj File (for Every Discipline) To Launch And Organize The Drawing File System And Make All Drawings The Current Project Inside Of Autocad.
folder Labeled Pdf Sheets Containing Separate .pdf Documents For Each Discipline.
folder Labeled Cost Estimate Containing A Copy Of The Final Construction Cost Estimate Documents.
folder Labeled Calculations Containing Final Calculation Documents.
folder Labeled Specifications With A Word Document For Each Spec Section.
folder Labeled Misc For Ih Reports, Materials Testing, Vpdes Permit, Soils Tests, Sustainability Checklist, Etc.
upon Construction Completion, Red Line Drawings Will Be Furnished To The A/e To Prepare As Built Drawings. Final As Built Drawings Will Be Furnished As Master Building Drawings In A Project Manager Format Prescribed By The Va. the A/e Shall Review And Approve All Specified Equipment And Installation Submittals And Shop Drawings. During Construction, The A/e Shall Allow For A Minimum Of Six (6) Site Visits As Directed And Scheduled By The Cor. The A/e Shall Also Attend The Final Inspection And Provide The Cor With An Itemized Punch List. part V Construction Period Site Visits: Visit The Site At The Request Of The Va In Accordance With Section Site Visits In The Scope Of Work. The Total Number Of Site Visits During The Construction Period Is Estimated To Be A Minimum Of 6 For This Project, Which May Be Finalized After Selection Of The A/e And During Negotiation Of The Proposal. Each Site Visit Shall Be Documented Through A Field Report Denoting The Purpose And Results Of The Site Visit. attend Preconstruction Conference (teleconference I.e. Ms Teams)
make Site Visits On Requests Of The Va And Prepare Written Reports To Include Agreed Upon Changes In Design As Determined Necessary During The Construction. Visits Made Based On Errors And Omissions In Design Will Be At No Cost To The Va.
participate In Partial/final Acceptance Inspections As Scheduled And Generate Punch List Items For Completion. The Punch List Shall Reference The Contract Documents For Specific Deficiencies (i.e. Specification Section, Drawing Detail, Etc.) architect-engineer Design Scope Of Work
central Va Health Care System (cvvhs), Richmond, Virginia, 23667.
project No: 652-23-105
project Name: Campus Wide Camera System Replacement
estimated Construction Magnitude: Between $250,000 And $500,000.
1. Summary Of Services
provide Professional Architect/engineer (ae) Necessary To Create An Acceptable And Within Budget Design To Replace The Existing Outdated Campus Security Camera System With A New Up-to-date And Future Proof Security Camera And Storage Solution That Effectively Monitors All Areas Of The Richmond Vamc Campus Services Required Of This A/e Contract Shall Include, But Are Not Limited To:
part I Preparation Of Existing Conditions And Conceptual Design Investigative Services: Preparation Of Existing Conditions Plan And Schematic Design Sd (15%) Which Includes Site Investigation For Existing Architectural Space, Electrical, Electronics/ Security, And Telecommunications. The Site Investigation Includes The Entire Campus Contained Within The Campus Boundaries. Perform Project Site Investigation In Accordance With The Site Investigations Section Of This Scope Of Work. part Ii Preparation Drawings And Specifications Design Development: Preparation And Submission For Va Review Interim Design Development Document Packages Dd1, And Dd2. Design Development Packages Shall Be Submitted In Accordance With The Terms Of The Design Package Submission Schedule Section Of The Scope Of Work. Packages Shall Contain A Complete Set Of Documents As Specified In The Design Requirements/submissions Section Of This Scope Of Work. The A/e Shall Develop A Design Necessary To Meet The Requirements Listed In The Project Scope Section. Design Services Shall Include The Following Disciplines: Architectural, Electrical, Electronic/security, And Telecommunications.
part Iii Preparation Of Drawings And Specifications - Construction Documents
preparation Of Construction Bid Documents, Cd1(95%), Cd2(100%) And Bd (final Bid Documents) At The Completion Of The Design Development Process In Accordance With The Design Package Submission Schedule Section. Final Construction Document Packages Shall Contain A Complete Set Of Documents As Specified In The Design Requirements/submissions Section Of This Scope Of Work. The Ae Shall Finalize The Design That Meets The Requirements In The Project Scope Section Of This Scope Of Work And The Construction Budget. Design Shall Include The Following Engineering Services: Architectural, Electrical, Electronic/security, And Telecommunications.
part Iv - Construction Period Services: Review And Provide Concise Direction On All Submittals, Shop Drawings, Product Data, Samples, Rfi S, Change Order Proposals, Etc. In Accordance With Construction Period Services Section Of This Statement Of Work. Services Shall Also Include:
commissioning For Security Camera System In Lieu Of A Va Hired 3rd Party Agent. providing Record Drawings Based On Finalized Contractor Red-line As-builts. part V - Site Visits: Visit The Site At The Request Of The Va In Accordance With Section Site Visits In This Scope Of Work. The Ae Shall Respond On Site Within A Two-hour Period When Requested. A Total Of Thirteen (13) Site Visits During Construction Shall Be Included. Each Site Visit Shall Be Documented Through A Field Report Denoting The Purpose And Results Of The Site Visit.
2. Project Scope 2.1 General Requirements ae Is Responsible For Providing All Services Necessary For Design Of This Project I.e. Demolition, Architectural, Electrical, Electronics/ Security, And Telecommunications. ae Will Review Needs Identified By The Integrated Project Team For The Area Under Consideration For Design And Provide Recommendations. A Minimum Of Three Approaches That Address The Identified Needs Will Be Presented To The Va For Review. This Project Shall Be Phased To Minimize The Impact To The Medical Center And Patient Care. Prior To Submission Of Schematic Design Material, The Ae Shall Meet With The Vamc S Cor To Discuss Any Proposed Phasing Requirements For The Project. These Phasing Requirements Shall Describe The General Sequence Of The Project Work, Estimated Project Duration, And What Government Constraints Will Exist That Will Influence The Contractor's Approach To The Construction Project. The Ae Shall Be Responsible For Documenting The Phasing Requirements.
the Ae Shall Provide An Evaluation, Cost Estimate, And Conceptual Approaches To Determine The Feasibility Of Completing The Project Within Project Budget For Each Of The Three Options Submitted. Disadvantages And Advantages Will Be Provided Including Impacts To Patient Care/medical Center Operations And Order Of Magnitude Cost Estimates (with Cost Of Patient Care Factored Into The Economy/feasibility).
at The Cd1 (95%) Design Submission, The Ae Shall Finalize A Construction Plan Showing Temporary Conditions For Construction, Per Phase, To Ensure General Conditions, Life Safety And Infection Control Requirements Are Designed, Identified And Specified Including: infection Control Risk Assessment (icra) Classification Sheet On Construction Plan, Denoting:
requirements For How Negative The Space Must Be Maintained (in Inches Of Water) requirements For Negative Air Monitoring And Alarming
negative Air Achievement During Construction By Capping All Hvac Ducts In The Area
denote All Existing Rated Barriers (vertical And Horizontal) And Identify Requirements For Demolition Of Existing Systems And Installation Of New Systems In Or Through These Barriers (patch And Fill Requirements And Timeframes After Demo) denote Any Temporary Construction Barrier Wall And Construction Entry Door/frame Types And Ratings For Separation Of Construction Areas To Other Areas (all Barriers Between Construction Areas And Other Areas Shall Be Maintained With A Minimum Of A One-hour Fire Barrier Until Final Installation Of Ceiling And Sprinkler System). All Temporary Construction Barriers Shall Be Finished Immediately Upon Installation And The Finishes Shall Mirror And Be Cohesive With Surrounding Areas. identify Contractor Laydown Area, Trash, Delivery, And Pedestrian/construction Routes.
identify Temporary Utilities For Contractors Use As Necessary
identify And Note On Drawings Existing Exhaust Or Other Exterior Connections That Can Be Used To Maintain Negative Pressure Within The Space.
identify Any Utilities/systems That May Be Impacted By Construction Or That May Require Bypass During Construction To Be Maintained/bypassed To Ensure Continuity Of Services In Adjacent Areas
always Minimize Impacts To Continuity Of Care. Phase Construction As Required To Minimize Impacts To Continuity Of Care As The Work Is Being Completed. ae Shall Retain The Services Of A Registered Fire Protection Engineer To Design And Review The Entire Project For Code Compliance. Guidance On Fire Protection Engineer Consultant Services Can Be Found At The Following Links:
http://www.cfm.va.gov/til/ae/fp_engr.doc
http://www.cfm.va.gov/til/aedessubreq.asp
at The Cd-1 (95%) Design Submission Phase, The Va Will Retain The Services Of A 3rd Party Registered Fire Protection Engineer To Review The Design For Fire And Life Safety Code Compliance In Accordance With The Latest Edition Of Vha Directive 7712 Fire Protection Code Reviews Of Delegated Construction Projects. The Ae Shall Incorporate All Comments Into The Design Prior To Finalizing The Design. 2.2 Specific Requirements
provide Professional Engineering Services For The Design And Construction Administration Replace The Outdated Existing Security Camera System With A New Up-to-date And Future Proof Security Camera Network And Video Storage Solution. Work Shall Include The Establishment Of The Design Documents That Will Include, But Is Not Limited To, The Following Project Tasks/items:
establishment Of Project Requirements Based Up Local Va Personnel Input And In Accordance With Va Design Guidance (see Section 5.0). The Area Of Consideration Is Included As Attachment G Project Location Plan. work Shall Be Phased In Order To Maintain Existing Camera Coverage. extensive Site Survey To Document The Existing Camera System And All Support Equipment.
working With The Ipt To Determine The Extent Of Coverage For Each Building On The Campus And The Extent Of Exterior Coverage.
all Existing Camera Systems And Ancillary Equipment, Cables, Conduit, Etc. Not Reused For The New System Shall Be Indicated For Demolition As Part Of The Design.
installation Of The New Security Camera System Network And All Necessary Ancillary Items Necessary To Have A Complete And Usable Solution That Meets Va Requirements. the Estimated Cost Of Construction For This Project Must Always Be Within The Programmed Construction Estimated Construction Magnitude Of Between $250,000 And $500,000.
if During The Design Process The Estimated Cost Of Construction Exceeds The Budget, The A/e Is To Immediately Notify The Va And Work With The Ipt To Reduce The Scope Of The Design To Bring The Project Within The Construction Budget. Once Measures To Reduce The Estimated Cost Are Finalized The A/e Shall Provide A Summary Of The Changes To The Design Scope For Vamc And Visn 6 Approval. 3.0 Site Investigations
3.1 As-built Investigations
the Ae Will Make Site Visits As Necessary To Survey And Document All Existing Conditions. The Ae Shall Make Site Visits, As Required, To Determine The Existing As-built Conditions Of Areas Contained In This Project. Information, Including Drawings And Other Documentation, Provided To The Ae Shall Be Used As Reference Only. Original As-built And Historical Drawings Are Available Upon Request. The Ae Shall Verify All As-built Condition Related To This Project Despite The Presence Of As-built Drawings. The Ae Shall Coordinate Visits With The Cor As Assigned At The Ntp. The Ae Shall Arrange For And Oversee The Performance Of Such Investigations Necessary For The Proper Design Of The Project. Autocad Background Drawings May Be Provided By The Va Upon Request And Shall Be Used As Reference Only. the Ae Shall Field Verify Every Physical Aspect That Relates To The Project Using Onsite Investigation Methods. 4.0 Design Package Submission Schedule
the Ae Shall Submit Review Packages, So They Are Received On The Day Noted In The Schedule Below.
attachment
tasks/submissions Schedule
duration calendar Days
completion Date -
calendar Days After Ntp initial Investigation - Integrated Project Team (ipt) Meeting
1 Day
14 Days
a
generate/submit Schematic Design Sd (15%) (3 Options)
35 Days
49 Days ipt Review
28 Days
77 Days
b
design Development Dd1 (35%) Design Submission
28 Days
105 Days ipt Review
21 Days
126 Days
c
design Development Dd2 (65%) Design Submission
28 Days
154 Days ipt Review
21 Days
175 Days
d
construction Documents Cd1 (95%) Design Submission
28 Days
203 Days ipt Review
21 Days
224 Days
e
construction Documents Cd2 (100%) Design Submission
28 Days
252 Days ipt Review
14 Days
266 Days
f
final Construction Bid Documents Bd Submission
14 Days
280 Days the Issuance Of The Ntp May Be Performed Virtually And Will Be An Introduction Of The Ae Team To The Ipt. The Ipt Will Consist Of At A Minimum, The Following Members:
impacted Administrative Services engineering (safety, Biomed And M&o) oit
va Police
other Members Of The Medical Center Who Have Vested Interests In The Design, Compliance And Accreditation For The Medical Center. the Period Between The Ntp And The Initial Ipt Meeting Shall Be Used For The Ae To Gather Data/information To Be Well Prepared To Discuss Their Design Intent And To Ensure Project Requirement/restraints Are Understood To Make A Highly Productive Meeting At The Initial Ipt Meeting. This Time Shall Also Be Used To Gather As-builts And Begin Investigative Services. Ae Will Be Required To Attend And Take Minutes At Each Ipt Meeting. Minutes Will Be Submitted Electronically To The Cor And Contracting Officer Within Five (5) Calendar Days Of Each Meeting. Ae Is Responsible For Documenting Through Meeting Minutes All Comments Received At The Ipt On-site Reviews Including But Not Limited To Written, Typed, Drawing Mark-ups, Verbal Etc. the First Five Working Days Of The Ipt Review Time Will Be For The Va To Determine Minimum Acceptability Of The Design Submission.â If The Va Finds The Design Submission To Be Unacceptable, The Ae Will Be Required To Resubmit The Submission. The Va Review Time Will Not Be Impacted And Shall Remain The Same Number Of Allotted Days With The First Five Working Days For The Va To Determine Acceptability Of The Design Submission. The Ae Will Be Responsible For Maintaining The Overall Design Completion Date And Is Responsible For Making Up Lost Time Due To Unacceptable Design Submissions. An Incomplete Submission Is Defined As A Submission Lacking Any Piece Of Information Outlined In Attachments A F Of This Sow, Or Failure Of Submission To Include A Required Item As Outlined By Pg-18-15, Volume C. all Documents Submitted Shall Comply With The Cad Standards Contained In The Va Building Information Model Standards.
5.0 Design Requirements/submissions
5.1 General Requirements
the Ae Shall Submit Complete Review Package In Accordance With The Following Requirements And Guidelines Outlined In Pg 18-15 A/e Submission Requirements, Vol. C And In Accordance With This Scope Of Work. Please Pay Specific Attention To The Schematic, Design And Construction Submission Requirements. As Appropriate Depending Upon The Complexity Of The Design, The Ae May Elect To Delete Individual Submissions Where Not Required (i.e. Do Not Address A. Site Development, Landscaping For Interior Renovation Projects)
deliver All Design Packages In Person Directly To The Cor On The Established Dates To Allow The Va Ipt To Meet As Scheduled. A Transmittal Letter Is Required To Go To The Contracting Officer On The Same Day As Delivery. include All Information Required For Each Submittal As Outlined In Program Guide Pg-18-15, Volume C And As Modified In The Attachments A F, With The Attachments Taking Precedence. Ae Shall Provide A Checklist Of All Submittals, Certifications, Tests, And Inspections Required Per Drawing And Specification Section.
all Designs Shall Be Accomplished In Accordance With Va Guidelines And Specifications, Which Are Available On The Internet At The Office Of Construction And Facilities Management, Technical Information Library. As A Minimum, Design Shall Comply With The Applicable Sections From The Following Va Standards And Guidelines Found At The Web Site Above:
pg-18-1 Master Construction Specifications
pg-18-3 Design & Construction Procedures
pg-18-4 Standard Details And Cad Standards
h-18-8 Seismic Design Handbook (seismicity = Low, Risk Category = Iv, Site Class = D, Seismic Design Category = C, Component Importance Factor, Ip = 1.5)
pg-18-10 Design Manuals
pg 18-12 Design Guides
pg-18-15 Minimum Requirements For Ae Submissions infrastructure Standards For Telecommunication Spaces, V3.1
physical Security And Resiliency Design Manual
telecommunications And Special Telecom Systems Design Manual
cost Estimating Requirements
ae Quality Alerts
ae Design Alerts 5.2 Cost Estimating
the Ae Shall Manage The Execution Of The Project Within The Va Programmed Construction Budget. The Entire Ae Design Team Will Take Ownership Of The Project Construction Budget And Be An Advocate For Successful Execution Of The Project Within The Available Funding. The Cost Estimator S Role Must Be Viewed As A Critical Element Of Project Cost Management. Rather Than Limiting Responsibilities To Simply Reporting Costs, The Estimator Must Be An Integral Part Of The Design Team, Continually Interacting And Providing Input To Design Decisions At Every Stage Of Development.
5.2.1 Cost Estimate Objective
cost Estimates For The Base Bid Shall Be Within The Va Programed Construction Budget. If The Cost Estimate Is Outside Of The Construction Budget, The Ae Is Responsible For Notifying The Va Of Potential Budget Issues, Providing Non-scope Impacting Recommendations To Get Estimate Within The Budgeted Construction Cost And Providing Design Documents That Correspond Accordingly. Design Submissions With Cost Estimates Outside Of The Construction Budget Are Grounds For Rejecting A Design Submission. The Final Construction Document Submission Estimate Shall Not Be Greater Than The Va Programed Construction Budget And Not Less The 90% Of The Va Programed Construction Budget. All Cost Estimates Costs Shall Be Escalated To The Midpoint Of The Expected Construction Period.
5.2.2 Recapitulation
the Ae Shall Provide A Recapitulation Sheet Of The Total Project (phase By Phase As Appropriate) Listing Site Work, Each New Building, Each New Building Addition And Each Renovated Building Separately. This Document Shall Precede The Summary Sheets. A Recapitulation Sheet Will Be Required For Each Bid Packages (deductive Alternates). 5.2.3 Level Of Detail
the Level Of Detail Of The Estimate Shall Be Consistent With The Degree Of Completeness Of The Drawings Being Submitted. If A Construction Element Is Shown, It Must Be Priced; If It Is Shown In Detail, It Must Be Priced In Detail. For Detailed Elements, "lump Sum" Or "allowance" Figures Will Not Be Acceptable. Project Estimates Will Include All Elements Within The Contractor S Bid Such As Insurance, Bonds, Hazardous Abatement And Any Other Such Items.
5.2.4 Timing Of Submission responsible Decisions Cannot Be Made Without Knowing The Associated Cost. Cost Documentation Must Be Delivered At The Same Time As Other Design Submissions. The Ae Is Responsible For Managing Workflow And Communications To Ensure That This Can Be Accomplished. It Is Understood That Some Details May Change In The Final Days Preceding A Submission. Cost Data Shall Be Submitted On The Most Up To Date Design Information Possible, With A Narrative Of Any Late Developments That Will Affect Cost.
5.3 Deductive Alternates the Ae Shall Provide A Design Identifying A Minimum Of 10% Of The Construction Budget As Deductive Alternates. The Project Must Remain Within The Construction Budget With All Deduct Alternatives In Place. Each Alternate Shall Be Progressively Deductive In Nature And Shall Be Non-scope Impacting. The Va And Ae Shall Work Collaboratively To Ensure Project Remains Viable For Medical Center Operations Within The Allotted Budget. The Va Will Have The Final Determination On The Ae Recommended Bid Deducts. Items Removed As Bid Deducts Shall Be Evaluated To Determine Impacts To The Remainder Of The Design. Certain Bid Deducts Could Require A Separate Design To Keep The Design Intent Viable. Items Identified As Yes In Question 1 Of The Below Decision Tree Shall Not Be Removed As Bid Deductive Alternates. Items Identified As Yes In Question 2, 3, Or 4 Of The Below Decision Tree Shall Not Be Removed As Bid Deductive Alternates Without Explicit Consent From The Contracting Officer Through The Facility Chief Engineer. Items Identified As No In Question 4 Shall Not Be Included As Part Of The Construction Project, However, Utilities And Site Prep For Such Equipment (or Future Equipment) Is Permissible. 5.3.1 Decision Tree
is The Item Necessary To Meet Requirements For An Occupied Building? This Includes All Governing Code Required Items, Such As Fire Alarm. If Yes, The Item Is To Be Funded Within The Construction Project. If No, Proceed To Question 2.
is The Item Covered By Ocfm's Master Construction Specifications Pg-18-1, Divisions 1 Through 10, 13 Through 26, Or 28 Through 48? If Yes, The Item Is To Be Funded Within The Construction Project. If No, Proceed To Question 3.
is The Item Covered In Ocfm's Master Construction Specifications Pg-18-1, Division 27 And Not It Equipment*? If Yes, The Item Is To Be Funded Within The Construction Project. If No, Proceed To Question 4.
is The Item Covered In Ocfm's Master Construction Specifications Pg-18-1, Number 12 31 00, 12 32 00, 12 34 00, Or 12 36 00? If Yes, The Item Is To Be Funded Within The Construction Project. If No, Then The Equipment Must Be Funded By The Facility S Respective Equipment Fund From Medical Care Appropriations. *it Equipment Includes: Computers, Monitors, Keyboards, Docking Stations, Phones, Printers, Scanners, Etc. Cabling And Raceways For It Equipment Is Not Included As Part Of It Equipment.
other Non-it Equipment Includes: Physical Access Control Systems, Data Closet Racks, Wi-fi (both Patient And Medical), Temp Track, Testing And Punch Down Of The Information Systems Etc.
5.4 Va Information Security Requirements
5.4.1 General
contractors, Contractor Personnel, Subcontractors, And Subcontractor Personnel Shall Be
subject To The Same Federal Laws, Regulations, Standards, And Va Directives And Handbooks
as Va And Va Personnel Regarding Information And Information System Security.
5.4.2 Access To Va Information And Va Information Systems
a. A Contractor/subcontrator Shall Request Logical (technical) Or Physical Access To Va Information And Va Information Systems For Their Employees, Subcontractors, And Affiliates Only To The Extent Necessary To Perform The Services Specified In The Contract, Agreement, Or Taskorder.
b. All Contractors, Subcontractors, And Third-party Servicers And Associates Working With Va Information Are Subject To The Same Investigative Requirements As Those Of Va Appointees Or Employees Who Have Access To The Same Types Of Information. The Level And Process Of Background Security Investigations For Contractors Must Be In Accordance With Va Directive And Handbook 0710, Personnel Suitability And Security Program. The Office For Operations, Security, And Preparedness Is Responsible For These Policies And Procedures. c. Contract Personnel Who Require Access To National Security Programs Must Have A Valid Security Clearance. National Industrial Security Program (nisp) Was Established By Executive Order 12829 To Ensure That Cleared U.s. Defense Industry Contract Personnel Safeguard The Classified Information In Their Possession While Performing Work On Contracts, Programs, Bids, Or Research And Development Efforts. The Department Of Veterans Affairs Does Not Have A Memorandum Of Agreement With Defense Security Service (dss). Verification Of A Security Clearance Must Be Processed Through The Special Security Officer Located In The Planning And National Security Service Within The Office Of Operations, Security, And Preparedness.
d. Custom Software Development And Outsourced Operations Must Be Located In The U.s. To The Maximum Extent Practical. If Such Services Are Proposed To Be Performed Abroad And Are Not Disallowed By Other Va Policy Or Mandates, The Contractor/subcontractor Must State Where All Non-u.s. Services Are Provided And Detail A Security Plan, Deemed To Be Acceptable By Va, Specifically To Address Mitigation Of The Resulting Problems Of Communication, Control, Data Protection, And So Forth. Location Within The U.s. May Be An Evaluation Factor. e. The Contractor Or Subcontractor Must Notify The Contracting Officer Immediately When
an Employee Working On A Va System Or With Access To Va Information Is Reassigned Or Leaves
the Contractor Or Subcontractor S Employ. The Contracting Officer Must Also Be Notified
immediately By The Contractor Or Subcontractor Prior To An Unfriendly Termination.
5.4.3 Va Information Custodial Language
a. Information Made Available To The Contractor Or Subcontractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor/subcontractor In Performance Or Administration Of The Contract Shall Be Used Only For Those Purposes And Shall Not Be Used In Any Other Way Without The Prior Written Agreement Of The Va. This Clause Expressly Limits The Contractor/subcontractor's Rights To Use Data As Described In Rights In Data - General, Far 52.227-14(d) (1).
b. Va Information Should Not Be Co-mingled, If Possible, With Any Other Data On The Contractors/subcontractor S Information Systems Or Media Storage Systems In Order To Ensure Va Requirements Related To Data Protection And Media Sanitization Can Be Met. If Co-mingling Must Be Allowed To Meet The Requirements Of The Business Need, The Contractor Must Ensure That Va S Information Is Returned To The Va Or Destroyed In Accordance With Va S Sanitization Requirements. Va Reserves The Right To Conduct On Site Inspections Of Contractor And Subcontractor It Resources To Ensure Data Security Controls, Separation Of Data And Job Duties, And Destruction/media Sanitization Procedures Are In Compliance With Va Directive Requirements.
c. Prior To Termination Or Completion Of This Contract, Contractor/subcontractor Must Not Destroy Information Received From Va, Or Gathered/created By The Contractor In The Course Of Performing This Contract Without Prior Written Approval By The Va. Any Data Destruction Done On Behalf Of Va By A Contractor/subcontractor Must Be Done In Accordance With National Archives And Records Administration (nara) Requirements As Outlined In Va Directive 6300, Records And Information Management And Its Handbook 6300.1 Records Management Procedures, Applicable Va Records Control Schedules, And Va Handbook 6500.1, Electronic Media Sanitization. Self-certification By The Contractor That The Data Destruction Requirements Above Have Been Met Must Be Sent To The Va Contracting Officer Within 30 Days Of Termination Of The Contract.
d. The Contractor/subcontractor Must Receive, Gather, Store, Back Up, Maintain, Use, Disclose And Dispose Of Va Information Only In Compliance With The Terms Of The Contract And Applicable Federal And Va Information Confidentiality And Security Laws, Regulations And Policies. If Federal Or Va Information Confidentiality And Security Laws, Regulations And Policies Become Applicable To The Va Information Or Information Systems After Execution Of The Contract, Or If Nist Issues Or Updates Applicable Fips Or Special Publications (sp) After Execution Of This Contract, The Parties Agree To Negotiate In Good Faith To Implement The Information Confidentiality And Security Laws, Regulations And Policies In This Contract.
e. The Contractor/subcontractor Shall Not Make Copies Of Va Information Except As Authorized And Necessary To Perform The Terms Of The Agreement Or To Preserve Electronic Information Stored On Contractor/subcontractor Electronic Storage Media For Restoration In Case Any Electronic Equipment Or Data Used By The Contractor/subcontractor Needs To Be Restored To An Operating State. If Copies Are Made For Restoration Purposes, After The Restoration Is Complete, The Copies Must Be Appropriately Destroyed.
f. If Va Determines That The Contractor Has Violated Any Of The Information Confidentiality, Privacy, And Security Provisions Of The Contract, It Shall Be Sufficient Grounds For Va To Withhold Payment To The Contractor Or Third Party Or Terminate The Contract For Default Or Terminate For Cause Under Federal Acquisition Regulation (far) Part 12.
g. If A Vha Contract Is Terminated For Cause, The Associated Baa Must Also Be Terminated And Appropriate Actions Taken In Accordance With Vha Handbook 1600.01, Business Associate Agreements. Absent An Agreement To Use Or Disclose Protected Health Information, There Is No Business Associate Relationship. h. The Contractor/subcontractor Must Store, Transport, Or Transmit Va Sensitive Information In An Encrypted Form, Using Va-approved Encryption Tools That Are, At A Minimum, Fips 140-2 Validated.
i. The Contractor/subcontractor S Firewall And Web Services Security Controls, If Applicable, Shall Meet Or Exceed Va S Minimum Requirements. Va Configuration Guidelines Are Available Upon Request. j. Except For Uses And Disclosures Of Va Information Authorized By This Contract For Performance Of The Contract, The Contractor/subcontractor May Use And Disclose Va Information Only In Two Other Situations: (i) In Response To A Qualifying Order Of A Court Of Competent Jurisdiction, Or (ii) With Va S Prior Written Approval. The Contractor/subcontractor Must Refer All Requests For, Demands For Production Of, Or Inquiries About, Va Information And Information Systems To The Va Contracting Officer For Response.
k. Notwithstanding The Provision Above, The Contractor/subcontractor Shall Not Release Va Records Protected By Title 38 U.s.c. 5705, Confidentiality Of Medical Quality Assurance Records And/or Title 38 U.s.c. 7332, Confidentiality Of Certain Health Records Pertaining To Drug Addiction, Sickle Cell Anemia, Alcoholism Or Alcohol Abuse, Or Infection With Human Immunodeficiency Virus. If The Contractor/subcontractor Is In Receipt Of A Court Order Or Other Requests For The Above-mentioned Information, That Contractor/subcontractor Shall Immediately Refer Such Court Orders Or Other Requests To The Va Contracting Officer For Response.
l. For Service That Involves The Storage, Generating, Transmitting, Or Exchanging Of Va Sensitive Information But Does Not Require C&a Or An Mou-isa For System Interconnection, The Contractor/subcontractor Must Complete A Contractor Security Control Assessment (csca) On A Yearly Basis And Provide It To The Cotr.
5.4.4 5.4.5 Not Used
5.4.6 Security Incident Investigation a. The Term Security Incident Means An Event That Has, Or Could Have, Resulted In Unauthorized Access To, Loss Or Damage To Va Assets, Or Sensitive Information, Or An Action That Breaches Va Security Procedures. The Contractor/subcontractor Shall Immediately Notify The Cotr And Simultaneously, The Designated Iso And Privacy Officer For The Contract Of Any Known Or Suspected Security/privacy Incidents, Or Any Unauthorized Disclosure Of Sensitive Information, Including That Contained In System(s) To Which The Contractor/subcontractor Has Access.
b. To The Extent Known By The Contractor/subcontractor, The Contractor/subcontractor S Notice To Va Shall Identify The Information Involved, The Circumstances Surrounding The Incident (including To Whom, How, When, And Where The Va Information Or Assets Were Placed At Risk Or Compromised), And Any Other Information That The Contractor/subcontractor Considers Relevant.
c. With Respect To Unsecured Protected Health Information, The Business Associate Is Deemed To Have Discovered A Data Breach When The Business Associate Knew Or Should Have Known Of A Breach Of Such Information. Upon Discovery, The Business Associate Must Notify The Covered Entity Of The Breach. Notifications Need To Be Made In Accordance With The Executed Business Associate Agreement.
d. In Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig And Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va Information, Obtain Monetary Or Other Compensation From A Third Party For Damages Arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From, Or Related To, The Incident.
5.4.7 Liquidated Damages For Data Breach
a. Consistent With The Requirements Of 38 U.s.c. §5725, A Contract May Require Access To Sensitive Personal Information. If So, The Contractor Is Liable To Va For Liquidated Damages In The Event Of A Data Breach Or Privacy Incident Involving Any Spi The Contractor/subcontractor Processes Or Maintains Under This Contract.
b. The Contractor/subcontractor Shall Provide Notice To Va Of A Security Incident As Set Forth In The Security Incident Investigation Section Above. Upon Such Notification, Va Must Secure From A Non-department Entity Or The Va Office Of Inspector General An Independent Risk Analysis Of The Data Breach To Determine The Level Of Risk Associated With The Data Breach For The Potential Misuse Of Any Sensitive Personal Information Involved In The Data Breach. The Term 'data Breach' Means The Loss, Theft, Or Other Unauthorized Access, Or Any Access Other Than That Incidental To The Scope Of Employment, To Data Containing Sensitive Personal Information, In Electronic Or Printed Form, That Results In The Potential Compromise Of The Confidentiality Or Integrity Of The Data. Contractor Shall Fully Cooperate With The Entity Performing The Risk Analysis. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination.
c. Each Risk Analysis Shall Address All Relevant Information Concerning The Data Breach, Including The Following:
(1) Nature Of The Event (loss, Theft, Unauthorized Access);
(2) Description Of The Event, Including:
(a) Date Of Occurrence;
(b) Data Elements Involved, Including Any Pii, Such As Full Name, Social Security Number, Date Of Birth, Home Address, Account Number, Disability Code;
(3) Number Of Individuals Affected Or Potentially Affected;
(4) Names Of Individuals Or Groups Affected Or Potentially Affected;
(5) Ease Of Logical Data Access To The Lost, Stolen Or Improperly Accessed Data In Light Of The Degree Of Protection For The Data, E.g., Unencrypted, Plain Text;
(6) Amount Of Time The Data Has Been Out Of Va Control;
fmagnitude(made Accessible To And Usable By Unauthorized Persons);
(8) Known Misuses Of Data Containing Sensitive Personal Information, If Any;
(9) Assessment Of The Potential Harm To The Affected Individuals;
(10) Data Breach Analysis As Outlined In 6500.2 Handbook, Management Of Security And Privacy Incidents, As Appropriate: And
(11) Whether Credit Protection Services May Assist Record Subjects In Avoiding Or Mitigating The Results Of Identity Theft Based On The Sensitive Personal Information That May Have Been Compromised.
d. Based On The Determinations Of The Independent Risk Analysis, The Contractor Shall Be Responsible For Paying To The Va Liquidated Damages In The Amount Of $ Per Affected Individual To Cover The Cost Of Providing Credit Protection Services To Affected Individuals Consisting Of The Following:
(1) Notification;
(2) One Year Of Credit Monitoring Services Consisting Of Automatic Daily Monitoring Of At Least 3 Relevant Credit Bureau Reports;
(3) Data Breach Analysis;
(4) Fraud Resolution Services, Including Writing Dispute Letters, Initiating Fraud Alerts And Credit Freezes, To Assist Affected Individuals To Bring Matters To Resolution;
(5) One Year Of Identity Theft Insurance With $20,000.00 Coverage At $0 Deductible; And
(6) Necessary Legal Expenses The Subjects May Incur To Repair Falsified Or Damaged Credit Records, Histories, Or Financial Affairs.
5.4.8 Security Controls Compliance Testing
on A Periodic Basis, Va, Including The Office Of Inspector General, Reserves The Right To Evaluate Any Or All Of The Security Controls And Privacy Practices Implemented By The Contractor Under The Clauses Contained Within The Contract. With 10 Working-days Notice, At The Request Of The Government, The Contractor Must Fully Cooperate And Assist In A Government-sponsored Security Controls Assessment At Each Location Wherein Va Information Is Processed Or Stored, Or Information Systems Are Developed, Operated, Maintained, Or Used On Behalf Of Va, Including Those Initiated By The Office Of Inspector General. The Government May Conduct A Security Control Assessment On Shorter Notice (to Include Unannounced Assessments) As Determined By Va In The Event Of A Security Incident Or At Any Other Time.
5.4.9 Training
a. All Contractor Employees And Subcontractor Employees Requiring Access To Va Information And Va Information Systems Shall Complete The Following Before Being Granted Access To Va Information And Its Systems:
(1) Sign And Acknowledge (either Manually Or Electronically) Understanding Of And Responsibilities For Compliance With The Contractor Rules Of Behavior, Appendix E Relating To Access To Va Information And Information Systems;
(2) Successfully Complete The Va Cyber Security Awareness And Rules Of Behavior Training And Annually Complete Required Security Training; (3) Successfully Complete The Appropriate Va Privacy Training And Annually Complete Required Privacy Training; And
(4) Successfully Complete Any Additional Cyber Security Or Privacy Training, As Required For Va Personnel With Equivalent Information System Access [to Be Defined By The Va Program Official And Provided To The Contracting Officer For Inclusion In The Solicitation Document E.g., Any Role-based Information Security Training Required In Accordance With Nist Special Publication 800-16, Information Technology Security Training Requirements.]
b. The Contractor Shall Provide To The Contracting Officer And/or The Cotr A Copy Of The Training Certificates And Certification Of Signing The Contractor Rules Of Behavior For Each Applicable Employee Within 1 Week Of The Initiation Of The Contract And Annually Thereafter, As Required.
c. Failure To Complete The Mandatory Annual Training And Sign The Rules Of Behavior Annually, Within The Timeframe Required, Is Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Training And Documents Are Complete
5.5 Fraud, Waste, And Abuse
the Vendor Has Responsibility For Duty To Report Any Fraud, Waste And Abuse Witnessed While On Va Premises To The Integrity And Compliance Officer.
6.0 Construction Period Services
the Ae Shall Provide The Following Services During The Period Of Project Construction:
assist In Answering Bid Questions During Solicitation Process By Issuing Any Addendums, Drawings, Etc. Necessary To Address Questions.
assist The Va To Determine Whether The Construction Contractor Or Subcontractor Meets Technical Qualification Requirements.
assist The Va In The Review Of Contractor Proposals For Technical Acceptability And Provide Written Recommendations Of Any Problems Or Litigations Encountered With The Proposing Contractor In The Past Based On First-hand Knowledge.
review All Submissions And Provide Concise Direction To The Va. provide Direction Within 7 Calendar Days Upon Request For Review Of Submittals (shop Drawings, Product Data, Installation Instructions, Samples, Etc). provide Direction Within 7 Calendar Days For Rfi S And Change Order Proposals. Changes To Contract Documents Based On Errors And Omissions In Design Will Be Executed At No Cost To The Va, Including Cost Estimates For The Change. Contracting Officer Shall Make Final Determination On What Is Or Is Not An Error Or Omission.
provide A Commissioning Agent For The Security Camera System In Lieu Of A Va Hired 3rd Party Agent. prepare Record Drawings Based On Contractor Red-line As-built Drawings With Correspondence Performed During Construction. The Ae Shall Provide A Set Of Updated Drawings And Specifications On Cd Within 30 Calendar Days Of Construction Contract Completion To The Cor.
the Ae Fee Shall Include All Costs For Printing And Miscellaneous Reimbursable Costs. invoice Payments For Construction Period Services Shall Be Correlated To The Construction Project Progress In The Following Manner. The Contractor Shall Bill Monthly For Work Accomplished Up To And Including 50% Of The Cps Line Item Value. The Remaining 50% Will Be Billed In Direct Correlation To The Completion Of Construction And Will Be Coordinated With The Cor (i.e. If The Construction Is 20% Complete, 20% Of The Remaining Construction Period Services Shall Be Billed). 7.0 Site Visits the Ae Shall Make Site Visits At The Request Of The Va And Prepare Documented Field Reports Denoting The Purpose And Results Of The Site Visit To Include Agreed Upon Changes In Design As Determined Necessary During The Construction. Visits Resulting From Errors And Omissions In Design Will Be At No Cost To The Va. Attend The Pre-bid And Pre-construction Conference To Review And Confirm Project Scope.
participate In Partial/final Acceptance Inspections (in-wall, Above Ceiling And Final) As Scheduled And Generate Punch List Items For Completion. Inspections Shall Cover Quality Of Installations And Locations/placement Of Items In Accordance With The Contract Documents. The Punch List Shall Reference The Contract Documents For Specific Deficiencies (i.e., Specification Section, Drawing Detail, Etc.).
during Construction, Allow For A Maximum Of 13 Site Visits As Directed And Scheduled By The Cor. Site Visits Related To Commissioning And Construction Laboratory Testing Services Do Not Count Towards The 13 Site Visits.
8.0 Period Of Performance contract Period Of Performance Shall Be As Follows:
design Completion: 280 Calendar Days From Design Notice To Proceed; Includes Va Design Reviews In Accordance With Section 4.0.
procurement Timeframe: 180 Calendar Days From The Completion Of The Design. Designer Shall Answer Pre-bid Rfis And Provide Updated Construction Documents To Capture Any Changes Made Through The Procurement Process During This Period. construction Period Services: 365 Calendar Days From Construction Notice To Proceed. total Contract Period Of Performance: 825 Calendar Days
Alberta Public Sector Tender
Software and IT Solutions
Canada
Closing Date26 Mar 2024
Tender AmountRefer Documents
Details: Date: March 4, 2024 Competitive Bid Issued By: Agriculture Financial Services Corporation Competitive Bids For: It Security Consultant To Provide Penetration Tests And Vulnerability Assessment For Afsc Competitive Bid #: Rfp 0696 Contracted Service: Penetration Test And Vulnerability Assessment Provider Closing: March 26, 2024 Afsc Buyer: Kathy Walker Title: Buyer, Business Services Address: Afsc Purchasing Department 5718 56th Avenue Lacombe, Alberta T4l 1b1 E-mail: Rfp@afsc.ca Table Of Contents: Terms And Conditions - 1 - 1.0 Introduction - 1 - 1.1 Definitions - 1 - 1.2 Mandatory Requirements And Desirable Provisions - 1 - 1.3 Confidentiality And Security Of Information - 2 - 1.4 Material Ownership - 2 - 1.5 Conflict Of Interest - 2 - 1.6 Inaccuracies Or Misrepresentations - 3 - 1.7 Inquiries - 3 - 1.8 Blackout Period - 4 - 1.9 Liability For Errors - 4 - 1.10 Notification Of Changes - 4 - 1.11 Vendor’s Expenses - 5 - 1.12 Short Listing - 5 - 1.13 Resource Replacement - 5 - 1.14 Freedom Of Information And Protection Of Privacy - 5 - 1.15 Reservation Of Rights - 6 - 1.16 Competitive Bid Administration - 6 - 1.17 Afsc’s Policies And Procedures For Security And Training On Site - 7 - 1.18 Vendor Debriefing - 7 - 2.0 Statement Of Work - 8 - 2.1 Introduction - 8 - 2.2 Background - 8 - 2.3 Objectives - 9 - 2.3.1 Penetration Testing Services - 9 - 2.3.1.1 Network Penetration Testing Services - 10 - 2.3.1.2 Application Penetration Testing Services - 10 - 2.3.1.3 Social Engineering Testing Services - 10 - 2.3.2 Vulnerability Assessment Services - 10 - 2.3.3 Web Application Penetration Testing Services - 11 - 2.3.4 Red Teaming Exercise - 11 - 2.3.5 Additional Services - 11 - 2.3.6 Security Policy Review. Continuous Threat Exposure Management (ctem) - 12 - 2.4 Duration - 12 - 2.5 Requirements - 12 - 2.5.1 Preferred Requirements - 12 - 2.5.2 Optional Requirements - 16 - 2.5.3 Training - 18 - 2.6 Corporate Capabilities And Executive Summary - 18 - 2.7 Resources - 18 - 2.8 Value Add - 19 - 2.9 Approach - 19 - 2.10 Security - 20 - 2.10.1 Data Classification - 20 - 2.11 Technology Information - 20 - 2.12 Documentation - 20 - 2.13 Additional Information - 21 - 2.14 Disclosure - 22 - 2.15 Pricing - 22 - 3.0 Evaluation - 23 - 4.0 Contract Review - 26 - 4.1 Negotiations - 27 - 5.0 Master Schedule - 27 - 6.0 Proposal Submission Guidelines - 29 - 6.1 Proposal Format - 29 - 6.2 Proposal Submissions - 31 - Terms And Conditions 1.0 Introduction Agriculture Financial Services Corporation (afsc) Is An Alberta Provincial Crown Corporation Under The Ministry Of Agriculture And Irrigation. Afsc’s Core Programs Include Business Risk Management Programs And Services To The Agriculture Industry As Well As Lending Products And Services To Farmers’ Agribusinesses, Value Added Enterprises And Commercial Operations. More Detailed Information About Afsc Is Available On The Website Www.afsc.ca. The Objective Of This Competitive Bid Is For Afsc To Solicit Proposals From Those Qualified In Providing The Specified Services Described Under Section 2.0 Of This Competitive Bid. 1.1 Definitions The Following Abbreviations And Terminology Are Used Throughout This Competitive Bid: Term Description Personnel Employees, Contractors, Subcontractors And Agents Of The Vendor. Vendor Any Business That Is Registered In Canada And Is Authorized To Operate In Alberta, Proposing To Submit A Proposal To The Competitive Bid. Competitive Bid Competitive Bid (rfp), Request For Quote (rfq), Value Based Request (vbr), Notice Of Proposed Procurement (npp), Request For Information (rfi), Request For Comment (rfc) Statement Of Work The Services Required By This Competitive Bid As Described In Section 2.0 Of This Competitive Bid. Contract Monitor Afsc Representative That Will Be Responsible For The Management Of The Contract That May Result From This Competitive Bid. 1.2 Mandatory Requirements And Desirable Provisions Proposals That Do Not Comply With The Competitive Bid Requirements Will Be Rejected. “must”, “shall”, “mandatory” And “will” Mean A Requirement That Must Be Met In Order For The Proposal To Receive Consideration. For Mandatory Requirements, The Vendor Must Provide Sufficient Information In The Proposals To Sustain Compliance To The Competitive Bid’s Mandatory Requirements. “should” And “desirable” Mean A Provision Having A Significant Degree Of Importance To The Objectives Of The Competitive Bid. For Desirable/optional Provisions, The Vendor’s Proposal Should Provide Details Of How The Desirable/optional Provisions Are Addressed. 1.3 Confidentiality And Security Of Information The Vendor And The Vendor’s Personnel Shall: A) Keep Strictly Confidential All Information Concerning Afsc Or Third Parties, Or Any Of The Business Or Activities Of Afsc Or Third Parties Acquired As Result Of Participation In The Competitive Bid; B) Only Use, Copy Or Disclose Such Information As Necessary For The Purpose Of Submitting A Proposal Or Upon Written Authorization Of Afsc. The Vendor Shall Maintain Security Standards, Including Control Of Access To Data And Other Information, Consistent With The Highest Standards Of Business Practice In The Vendor’s Industry. 1.4 Material Ownership Ownership In All Materials Including Copyright, Patent, Trade Secret, Industrial Design Or Trademark That Are Made, Prepared, Developed, Generated, Produced Or Acquired Under Or In Relation To The Competitive Bid And Any Subsequent Contract By The Vendor, The Vendor’s Employees, Subcontractors Or Agents Belongs To Afsc As They Are Made, Prepared, Developed, Generated, Produced Or Acquired. Any Such Materials Shall Be Delivered To Afsc Upon Completion Or Termination Of The Competitive Bid. The Vendor: A) Irrevocably Waives In Whole All Moral Rights. B) Shall Ensure That Its Employees, Subcontractors, And Agents Irrevocably Waive In Whole All Moral Rights To The Materials Made, Prepaid, Developed, Generated Produced, Or Acquired Under The Competitive Bid And Any Subsequent Contract And Declares That These Waivers Shall Operate In Favour Of Afsc And Afsc’s Assignees And Licenses. 1.5 Conflict Of Interest Vendor(s) Must Fully Disclose, In Writing To Afsc On Or Before The Closing Date Of The Competitive Bid, The Circumstances Of Any Possible Conflict Of Interest Or What Could Be Perceived As A Possible Conflict Of Interest If The Vendor Were To Become A Contracting Party Pursuant To The Competitive Bid. Afsc Will Review Any Submissions By Vendor(s) Under This Provision And May Reject Any Proposals Where, In The Sole Opinion Of Afsc, The Vendor Could Be In A Conflict Of Interest Or Could Be Perceived To Be In A Possible Conflict Of Interest Position If The Vendor Were To Become A Contracting Party Pursuant To The Competitive Bid. 1.6 Inaccuracies Or Misrepresentations If, During The Competitive Bidding Process, Afsc Determines That The Vendor Has Made A Material Misstatement Or Misrepresentation Or That Materially Inaccurate Information Has Been Provided To Afsc, The Vendor Will Be Disqualified From The Competitive Bidding Process. 1.7 Inquiries All Inquiries Related To This Competitive Bid Must Be Addressed To The Afsc Buyer On Or Before The Date Specified In The Master Schedule And As Per The Following: A) Inquiries Must Be Sent By E-mail To The Afsc Buyer At Rfp@afsc.ca, Utilizing The Q&a Template Provided. B) No Telephone Inquiries Will Be Accepted. C) No Additional Information Or Clarifications Will Be Provided To Inquiries Received After The Applicable Deadline. D) To Be Considered, All Inquiries Must Provide The Following Vendor Information: • Name Of Primary Contact • Address • Telephone Number • E-mail Address • Competitive Bid Reference Number. E) All Inquiries Received Will Be Reviewed By Afsc. F) All Inquiries Will Be Compiled And Answered In The Form Of Written Addendum(s) Issued By Afsc Via Alberta Purchasing Connection (apc) To All Prospective Vendor(s). G) Vendor(s) Are Advised That All Inquiries Answered By Afsc Will Be Provided Verbatim In Writing To All Prospective Vendor(s). H) Inquiries That May Contain Proprietary Or Confidential Information Of A Vendor May Be Answered Exclusively To The Submitting Vendor (afsc Will Direct The Correspondence Regarding This Inquiry Only To The Vendor’s Primary Contact) Provided The Addendum Does Not: • Require A Modification To This Competitive Bid; Or • Potentially Provide An Undue Advantage In The Competitive Process. I) If Either Of The Above Situations (h) Arises, Afsc Reserves The Right To: • Request The Vendor Reword And Resubmit The Inquiry; Or • Decline To Provide A Response. J) Afsc Reserves The Right To Not Disclose Information In Conjunction With This Competitive Bid On Any Inquiry That Requires Releasing Information That Afsc, In Its Sole Discretion, Regards As Confidential To Afsc. K) Afsc Reserves The Right In Any Event To Decline To Provide A Proposal For Any Reason In Its Sole Discretion. L) It Is The Vendor’s Responsibility To Notify Afsc, In Writing, And In Advance, Of Any Change In The Vendor(s) Primary Contact Information. M) Afsc Assumes No Responsibility Or Liability Arising From Information Obtained In A Manner Other Than As Described In This Competitive Bid. 1.8 Blackout Period With Respect To The Competitive Bid, Afsc Prohibits Communications Initiated By A Vendor To Any Afsc Employee, Other Than The Purchasing Department, For The Period Of Time From The Submission Date Of The Competitive Bid Up To And Including The Date Of Contract Award Resulting From This Competitive Bid. Any Communication Between A Vendor And Afsc During The Blackout Period Will Be Initiated By Afsc, In Writing, For The Purpose Of Obtaining Information Or Clarification Necessary To Ensure A Proper And Accurate Evaluation Of The Proposal. Any Communication Initiated By A Vendor During The Blackout Period May Be Grounds For Disqualifying The Offending Vendor From Further Consideration For The Acquisition And/or Any Future Afsc Solicitations. Afsc Will Notify All Vendors Upon Award Of A Contract From This Requisition. Accordingly, Vendors Are Asked To Refrain From Requesting Status Updates During The Proposal Evaluation Process. Vendors Who Are Currently Engaged In An Active Contract With Afsc May Continue To Communicate Directly With The Afsc Contract Monitor As It Relates To Activities Covered Under The Active Contract. 1.9 Liability For Errors While Every Effort Is Taken To Ensure An Accurate Representation Of Information In This Competitive Bid, Afsc Shall Not Be Liable Or Accountable For Any Error Or Omission In Any Part Of This Competitive Bid. 1.10 Notification Of Changes Any Changes To This Competitive Bid, As Well As The Response(s) To Inquiries, Will Be Posted As An Addendum On The Alberta Purchasing Connection (apc). Vendors Should Routinely Check Apc For Amendments And Adhere To Any Amendment Requirements. In The Event Of A Directed Competitive Bid, Vendors Should Routinely Check The Email Address The Bid Was Delivered To For Amendments. 1.11 Vendor’s Expenses Vendors Are Solely Responsible For Their Own Expenses In Preparing The Proposal, As Well As Any Subsequent Proposals, Including Any Costs Associated With Attendance To Information Sessions, Site Tours Or A Potential Short-listed Vendor’s Interview With Afsc. 1.12 Short Listing A Shortlist Of Vendors May Be Established. Short Listed Vendors May Be Requested To Make Formal Presentations, Regarding Their Proposal To Afsc. Key Vendor Management And Technical Personnel Will Be Expected To Participate In The Presentations. This Process Is Used To Validate Claims Made In The Proposal And Confirm The Vendor’s Ability To Meet The Requirements In The Competitive Bid. These Presentations Must Be Made At No Cost To Afsc. Based On Information Obtained At The Presentation, Vendors’ Scores May Be Adjusted. 1.13 Resource Replacement Resource Replacement Is Not Encouraged, However, There Could Be Circumstances Following The Competitive Bids Closing Date And Prior To Contract Execution That A Vendor May Request That A Proposed Resource Be Replaced. Any Proposed Resource Replacement Must Have, In The Opinion Of Afsc, Equivalent Or Better Qualifications Than The Originally Proposed Resource. Vendors Will Not Receive Additional Credit In The Evaluation Process If The Qualifications Of The Replacement Resource Exceed Those Of The Original Resource. Afsc Reserves The Right To Deny Any Request For Replacement And Reject Any Proposed Replacement. 1.14 Freedom Of Information And Protection Of Privacy The Vendor Acknowledges That: A) The Freedom Of Information And Protection Of Privacy Act Of Alberta (foip) Applies To All Information And Records Relating To, Or Obtained, Generated, Created, Collected Or Provided Under The Competitive Bid And Any Subsequent Contract And Which Are In The Custody Or Control Of Afsc. Foip Allows Any Person A Right Of Access To Records In Afsc’s Custody Or Control, Subject To Limited And Specific Exceptions As Set Out In Foip. B) Foip Imposes An Obligation On Afsc, And Through The Competitive Bid And Any Subsequent Contract On The Vendor(s), To Protect The Privacy Of Individuals To Whom Information Relates. The Vendor(s) Will Protect The Confidentiality And Privacy Of Any Individual’s Personal Information Accessible To The Vendor(s) Or Collected By The Vendor(s) Pursuant To The Competitive Bid And Any Subsequent Contract. C) The Vendor(s), If It Considers Portions Of Its Proposal To Be Confidential, Will Identify Those Parts Of Its Proposal To Afsc Considered To Be Confidential And What Harm Could Reasonably Be Expected From Disclosure. Afsc Does Not Warrant That This Identification Will Preclude Disclosure Under Foip. D) Materials Produced By The Vendor(s), In Connection With Or Pursuant To The Competitive Bid And Any Subsequent Contract, Which Are The Property Afsc Pursuant To The Competitive Bid And Any Subsequent Contract, Could Be Considered Records Under The Control Of A Public Body And Could Therefore Also Be Subject To The Foip Before Delivery To Afsc. As Such, The Vendor Must Conduct Itself To A Standard Consistent With Foip In Relation To Such Materials. E) For The Records And Information Obtained Or Possessed By The Vendor(s) In Connection With Or Pursuant To The Competitive Bid And Any Subsequent Contract, And Which Are In The Custody Or Control Of Afsc, The Vendor(s) Must Conduct Itself To A Standard Consistent With Foip When Providing The Services Or Carrying Out The Duties Or Other Obligations Of The Vendor Under The Competitive Bid And Any Subsequent Contract. The Purpose For Collecting Personal Information For The Competitive Bid Is To Enable Afsc To Ensure The Accuracy And Reliability Of The Information, To Evaluate The Proposal, And For Other Related Program Purposes Of Afsc. Authority For This Collection Is The Government Organization Act, As Amended From Time To Time. The Vendor(s) May Contact The Buyer Identified In The Competitive Bid Regarding Any Questions About Collection Of Information Pursuant To The Competitive Bid. 1.15 Reservation Of Rights Afsc Reserves The Right In Its Sole Discretion To: A) Accept Or Reject Any Or All Proposals. B) Disqualify A Vendor In The Event That, In Afsc’s Opinion, The Proposal Does Not Contain Sufficient Information To Permit A Thorough Evaluation. C) Verify The Validity Of The Information Supplied And To Reject Any Proposal Where The Contents Appear To Be Incorrect Or Inaccurate In Afsc’s Estimation. D) Seek Proposal Clarification At Any Time With Vendor(s) To Assist In Making Evaluations. E) Accept Proposals In Whole Or In Part. F) Accept A Proposal With Only Minor Non-compliance. G) Retain One Copy And Destroy And Dispose Of All Other Copies Of Any And All Proposals Received By Afsc. H) Cancel This Competitive Bid Process At Any Stage, Without Award Or Compensation To Vendors, Their Officers, Directors, Employees Or Agents, Without Assigning Any Reasons. 1.16 Competitive Bid Administration The Proposal Must Indicate That The Vendor Accepts The Procedures Set Down In This Competitive Bid. In Accordance With This Competitive Bid, The Vendor, If It Considers Portions Of Its Proposal To Be Confidential, Shall Identify Those Parts Of Its Proposal To Afsc Considered To Be Confidential And What Harm Could Reasonably Be Expected From Disclosure. Afsc Does Not Warrant That This Identification Will Preclude Disclosure Under Foip. 1.17 Afsc’s Policies And Procedures For Security And Training On Site The Vendor, Its Employees, Subcontractors, And Agents When Using Any Of Afsc’s Buildings, Premises, Equipment, Hardware Or Software Shall Comply With All Safety And Security Policies, Regulations Or Directives Relating To Those Buildings, Premises, Equipment, Hardware Or Software That Are Promulgated By Afsc From Time To Time. The Vendor’s Employees, Subcontractors And Agents Shall Comply, As Applicable, With All Provisions Of The Alberta Occupational Health And Safety Act, Occupational Health And Safety Regulation And Occupational Health And Safety Code With Respect To The Provision Of Services And Materials. When The Workers’ Compensation Act (alberta), As Amended, Applies, And Upon Request From Afsc, Deliver To Afsc A Certificate From The Workers’ Compensation Board Showing That The Vendor Is Registered And In Good Standing With The Board. 1.18 Vendor Debriefing The Corporate Purchasing Section Will, At The Request Of An Unsuccessful Vendor Who Responded To This Competitive Bid, Conduct A Debriefing After Contract Award For The Purpose Of Informing The Vendor On The Reasons Their Proposal Was Not Selected. 2.0 Statement Of Work 2.1 Introduction Agriculture Financial Services Corporation (afsc), As Part Of Its Vulnerability Management Program Is Seeking The Services Of An Information Technology Security Vendor To Carry Out Third-party Assessment Of Afsc It Systems And Infrastructure Using Various Techniques And Services As Specified In 2.3 Of The Scope Of Work To Evaluate The Effectiveness Of The Existing Security Controls And To Provide Input Into The Development Of Security And Risk Management Program At Afsc. A Major High-level Objective Of This Engagement Is To Request The Respondents Independently Validate Identified Risks Discovered Utilizing Vendor’s Standard Penetration Testing Methodologies, Vulnerability Assessments Techniques, And Red Teaming Methodologies. Another Goal Is To Assist Afsc To Identify Critical Security Controls Gaps That Could Significantly Affect The Confidentiality, Integrity, Availability, Privacy, And Safety Of Afsc, Its Clients And/or Its Staff. 2.2 Background As An Alberta Provincial Crown Corporation, Afsc Provides Farmers, Agribusinesses And Other Small Businesses Loans, Crop Insurance And Farm Income Disaster Assistance. With This Service Portfolio, Afsc Holds In Trust, Vast Amounts Of Small And Medium Scale Enterprise Sme Records And Information That Must Be Protected; Afsc Must Also Comply With Alberta's Freedom Of Information And Protection Of Privacy (foip) Act Which Provides A Framework For How Alberta Public Bodies Must Handle Citizen’s Information. With The Sensitivity And Volume Of Data Involved, A Data Breach Will Have Severe Risk Consequences For Afsc. It Is Thus Paramount That This Supporting Risk Management Activity (continuous Threat Exposure Management, Vulnerability Assessment, Penetration Testing And Red Teaming Exercise) Complements Afsc’s Assurance Functions. The Purpose Of The Engagement Is To: • Find Vulnerabilities In The Publicly Exposed (internet Accessible) Elements Of The Afsc Infrastructure From A Potential Intruder’s Point Of View. • Determine Whether Technical Vulnerabilities May Be Exploited And The Degree Of Exploitation And Its Impact To Afsc. • Assess The Overall Effectiveness Of Security Controls On The Perimeter Network And External Hosts In A Safe And Controlled Manner With No Unplanned Interruptions To Afsc’s Business Functions. • Explore The Ability For A Company To Help Afsc Build And Mature A Ctem Program The Successful Respondent May Be Required To Provide The Following As Part Of Its Deliverables To Afsc: • Evaluate And Assess Current Afsc Information Security Controls For Mission Critical Applications Within The Organization. • Perform Cloud Assessment And Penetration Testing Services (e.g. Infrastructure, Applications). • Determine The Extent To Which Internal Users May Represent An Exploitable Vulnerability To The Afsc’s Security Through Social Engineering Techniques. • Analyze The Results, Rule Out False Positives, Prioritize The Confirmed Vulnerabilities And Provide Steps For Immediate Remediation. • Provide A Detailed Account Of Findings And A Prioritized List Of Remediation Actions To Be Taken. • Provide Or Assist In Building A Complete Ctem Actionable Security Posture Remediation And Improvement Plan • Perform A Detailed Analysis Of Afsc Network Architecture Evaluating Data Flow, Physical And Logical Connections, Communication Protocols (intranet, Extranet, Remote Vpn), And Identify All Vulnerabilities Not Covered By Current Security Controls. • Conduct An Enterprise Network Discovery And Data Leakage Test To Identify Hosts, Routers, And Subnets That May Be Transmitting Data On Non-approved Or Unauthorized Devices Such As Unauthorized Third-party Connections, Unauthorized Internet Circuits, Or Unauthorized Virtual Private Networks (vpn’s); • Live Fire Type Tuning Of Current Security Tools In Utilization At Afsc 2.3 Objectives The Respondent Shall Provide A Broad Range Of Quality Services To Meet The Requirements Of Afsc In The Following Categories: • Penetration Testing Services – Preferred • Vulnerability Assessment Services – Preferred • Web App Penetration Testing - Preferred • Red Teaming Exercise – Optional; • Additional / Value Add Services – Optional; And • Continuous Threat Exposure Management (ctem) – Optional The Respondent Is Expected To Submit A Proposal For All Preferred Categories And Can Choose To Submit For The Optional Categories As Well. 2.3.1 Penetration Testing Services Penetration Tests Are Important Part Of A Security Team’s Threat And Vulnerability Management Capability. Penetration Tests Are Used As An Independent Verification Mechanism To Assess Organizations’ It Environment Controls. This Type Of Test Will Be Utilized To Determine The Organization’s Overall Security Posture. The Respondent Shall Provide The Following Quality Penetration Testing Services As Further Described Below: • Network Penetration Testing Services; • Web Application Penetration Testing Services; • Web Application Testing Services; And • Social Engineering Testing Services. 2.3.1.1 Network Penetration Testing Services A Network Penetration Testing Of The Computing Infrastructure Of Afsc. This Test Will Be Designed To Determine What Vulnerabilities Exist From Within/outside Afsc Network. The Objective Is To Perform A Controlled Attack Against Findings To Verify Results, And Provide An Overall Risk Assessment To Assist Afsc In Securing Network Infrastructure. The Respondent Shall Provide Network Penetration Testing Services Including But Not Limited To The Details Provided In Section 2.5. 2.3.1.2 Application Penetration Testing Services Application Penetration Testing Provides An Independent Verification Of The Security Status Of Afsc’s Applications. This Test Determines Whether Applications Present And Exploitable Risk To The Organization. The Respondent Shall Provide Application Penetration Testing Services Including But Not Limited To The Details Provided In Section 2.5. 2.3.1.3 Social Engineering Testing Services Social Engineering Testing Is The Use Of Deception And Manipulation To Obtain Confidential Information. It Is A Non-technical Kind Of Intrusion That Relies Heavily On Human Interaction And Often Involves Tricking People Into Breaking Normal Security Procedure. The Respondent Shall Provide Human Centric Social Engineering Testing Services Including But Not Limited To The Following: • Pretexting; • Phishing Campaigns (e.g., Email, Phone); • Brute Force (on Designated Systems); • Password Cracking. 2.3.2 Vulnerability Assessment Services A Vulnerability Assessment Exercise Will Identify What Vulnerabilities Exist Within The Afsc Network And Will Also Provide Recommendation On Prioritization And Remediation Based On The Resultant Risks To Afsc. This Will Also Complement The Findings Of The Afsc Vulnerability Management Program. The Respondent Shall Provide Vulnerability Assessment Services Which Will Include; • Identification Of Vulnerabilities On The Afsc Network; • Analysis Of Such Identified Vulnerabilities And Removing False Positives; • Prioritization Of The Identified Vulnerabilities; • Contextualization Of Risks That Might Arise Due To A Successful Exploit Of The Vulnerability; • Recommendations For Remediation Of The Vulnerability. 2.3.3 Web Application Penetration Testing Services Web Application Penetration Testing Provides An Independent Verification Of The Security Status Of Afsc’s Web Applications. This Test Determines Whether Web Applications Present And Exploitable Risk To The Organization. The Respondent Shall Provide Web Application Penetration Testing Services Including But Not Limited To The Details Provided In Section 2.5. 2.3.4 Red Teaming Exercise Red Teaming Exercise Is Used To Validate The Efficacy Of Security Controls And Capabilities, Or As Part Of Ongoing Incident Response And Threat & Vulnerability Management. The Respondent Will Conduct A Red Teaming Exercise To Obtain A Realistic Level Of Risk And Vulnerabilities Against: • Technology – Systems, Networks And Applications Devices And Appliances; • People – Staff, Outsourced Vendor Personnel, Departments And Business Partners; • Processes; • Incident Response Handling(or Testing); And • Physical Facilities – Offices And Data Centre. 2.3.5 Additional Services The Respondent Should Provide Any Additional / Out Of The Band Services To Afsc. Additional Services May Include, But Not Limited To The Following: • Remediation Assessments Following To The Initial Penetration Tests: • Physical Security Controls Review: • Internet And Email Security Controls Review: • Security Architecture Review: • Security Awareness Exercise Review: 2.3.6 Security Policy Review. Continuous Threat Exposure Management (ctem) A Ctem Program Uses Tools To Inventory And Categorize Assets And Vulnerabilities, Simulate Or Test Attack Scenarios And Other Forms Of Posture Assessment Processes And Technologies. It Is Important That A Ctem Program Has An Effective And Actionable Path. A Continuous Threat Exposure Management (ctem) Program Is A Set Of Processes And Capabilities That Allow Enterprises To Evaluate The Accessibility, Exposure, And Exploitability Of An Enterprise’s Digital And Physical Assets Continually And Consistently. The Respondent Shall Provide Ctem Cycle That Must Include: • Scoping • Discovery • Prioritization • Validation • Mobilization 2.4 Duration May 2024 Would Be The Anticipated Start Date Of Contract, Activities To Follow After That. The Resulting Initial Contract Shall Be For A Period Of One (1) Year With An Option For Extension Subject To Negotiations Satisfactory To Both Parties The Successful Vendor(s) Will Be Afsc’s Preferred Vendor(s) On A Need-to-need Basis During The Term Of The Contract Or Until Such Time As Afsc’s Business Needs Change. If Cloud Services Are Involved, Then Durations May Change. Expansion Capabilities – In The Future, Afsc May Wish To Expand Services Into Other Areas Of Its Business. In This Regard, Afsc Reserves The Right To Engage The Successful Vendor In The Future For Integrated Expansion Capabilities/modules For Other Asfc Business Areas. 2.5 Requirements Afsc Requests Respondents To Execute A Comprehensive Vulnerability Assessment, Penetration Testing Services, And Red Teaming Exercise For Afsc’s Systems And Applications. Respondents Are Required To Provide Supporting Information To Show How Vendor Will Execute Based On The Above Exercises And/or Services. 2.5.1 Preferred Requirements Network Penetration Testing Please Indicate Which Of The Following Network-related Environments You Can Perform Penetration Testing On. Please Provide Short Descriptions Of Your Approach Or Methodology For Each. Network Penetration Testing Requirements Response (yes / No) Approach/methodology Internal And External Penetration Testing Perimeter And Publicly Facing Infrastructure Telephony Systems/voip Cloud Assessment And Penetration Testing Printers, Hvac, Cctv Systems Network Penetration Testing Supporting Information Please Indicate If And How You Can Perform And Meet The Following Network-related Testing Requirements. Please Provide Short Descriptions Of Your Approach Or Methodology For Each. Requirements Response (yes / No) Approach Or Methodology Denial Of Service Testing Out Of Band Attacks War Dialing Wireless, Wep/wpa Cracking Spoofing Malware Attacks Service Discovery/port Scanning Web & Non-web Application Penetration Testing Please Indicate Which Of The Following Application (web And Non-web)-related Environments And (or) Vectors You Can Perform Penetration Testing On. Please Provide Short Descriptions Of Your Approach Or Methodology For Each. Requirements Response (yes / No) Approach Or Methodology Web Applications (i.e. Apis, Java, Xml, Asp.net, Php) Custom Apps (i.e. Crm Systems, Sap, Hr Systems ) Databases (i.e. Sql, Mysql, Oracle) 3rd Party Hosted Applications Mobile Applications Web & Non-web Application Penetration Testing Supporting Information Please Indicate If And How You Can Perform And Meet The Following Application (web And Non-web) -related Testing Requirements. Please Provide Short Descriptions Of Your Approach Or Methodology For Each. Requirements Response (yes / No) Approach Or Methodology Code Review: Analyzing Application Source Code For Sensitive Information Of Vulnerabilities In The Code. Authorization Testing: Testing Systems Responsible For User Session Management To See If Unauthorized Access Can Be Permitted. This Includes: • Input Validation Of Login Fields: Inputting Of Bad Or Overlong Characters And Inputs With The Aim Of Generating Irregular Results. • Cookie Security: Theft Of Cookies By Unauthorized Person. • Lockout Testing: Validating Lockout Processes Such As Timeout And Intrusion Controls To Ensure Legitimate Sessions Cannot Be Compromised Functionality Testing: Performing Testing Of The Application Functionality Itself. This Includes: • Input Validation: Inputting Of Bad Or Overlong Characters, Urls, Or Other Inputs With The Aim Of Generating Irregular Results. • Transaction Testing: Ensuring Desired Application Performance And Run With No Ability To Be Abused By End Users. Website Penetration Testing: Active Analysis Of Web Application Weaknesses Or Vulnerabilities. Encryption Usage Testing: Testing Applications’ Use Of Encryption To Ensure Secure Standards And Management Are Being Used. Authentication Process Testing: Ensuring Strong Authentication Processes Are In Place For End Users. User Session Integrity Testing: Ensuring User Sessions’ Ability To Remain Uncompromised Social Engineering Testing Please Indicate Which Of The Following Vectors You Can Perform Some Level Of Penetration Testing On. Please Provide Short Descriptions Of Your Approach Or Methodology For Each Vector. Requirements Response (yes / No) Approach Or Methodology Email / Phishing Phone / Vishing Physical Building Access Social Engineering Testing Supporting Information Please Indicate Which Of The Following Methods Of Social Engineering Or Tendencies You Can Support. Please Provide Short Descriptions Of Your Approach Or Methodology For Each. Requirements Response (yes / No) Approach Or Methodology Phishing Attacks Social Networking Scams – Facebook, Linkedin Pretexting Watering Hole Attacks Tailgating Bypassing Other Physical Security Measures Impersonation – Employee Or External Authority Password Cracking Others – Please Indicate Vulnerability Analysis And Exploitation Please Indicate If And How You Can Perform And Meet The Following Vulnerability Analysis And Exploitation Requirements: Requirements Comments: Please State Your Justification For How Requirements Are Met Please Indicate Any Exploitation Techniques That Will Be Used To Validate Identified Vulnerabilities. Please Indicate What Tools Are Used To Exploit Vulnerabilities And Whether They Are Open Source, Commercial, Or Proprietary Please Indicate How You Will Perform Traversal Of Systems And Hosts Please Indicate Which Of The Following Methods Are Used: • Credential Compromise • Cross Site Scripting • Any Other Method Used 2.5.2 Optional Requirements Red Teaming Exercise Please Indicate If And How You Can Perform And Meet The Following Red Team Exercise Requirements. Please Provide Short Descriptions Of Your Approach Or Methodology For Each. Requirements Response (yes / No) Approach Or Methodology Please Provide Information About The Methodology That Will Be Used In Conducting Red Team Exercise Of The Afsc Environment. Which Of The Following Areas Are Included In The Assessment. • Digital Assets • Physical Assets • Technical And Operational Processes What Exploitation Tactics Are Used For This Exercise? Does These Include • The Network Services • Physical Layer • Application Layer Are There Particular Cyberattack Emulations Or Threat Actor Roles (such As Organized Crime, Cyberterrorist, Hacktivist, Cyberspy) That Will Be Used During This Exercise? If Yes, Please Provide Additional Information On The Emulations Used. How Does The Team Ensure Foothold And Maintain Presence During The Exercise To Achieve The Set Objectives Continuous Threat Exposure Management Please Indicate Which Of The Following Network-related Environments You Can Perform Ctem Plan On. Please Provide Short Descriptions Of Your Approach Or Methodology For Each. Ctem Requirements Response (yes / No) Approach/methodology Scoping Discovery Prioritization Validation Mobilization 2.5.3 Training If There Is A Need For A Device Install Or Configuration Changes Needed, Documentation And Training To Be Provide To Afsc Staff In Order To Assist With Timely Install And Configuration For What Is Needed. Vendor To Provide Any Needed Training For Documentation To Afsc In Order To Facilitate Any Vulnerability Assessment Activities. 2.6 Corporate Capabilities And Executive Summary Proposals Must Include An Executive Summary Of The Key Features Of The Proposal. This Summary Should Include: A) A Brief Introduction Of The Vendor; B) A Brief Company History And Overview Of The Vendor As It Applies To The Content Of The Competitive Bid; C) Demonstrate A Sound Understanding Of The Scope, Objectives And Requirements Presented In This Competitive Bid; D) The Number And Nature Of Engagements In Similar Scope And Size As Outlined In Section 2.0 Of Competitive Bid During The Past Two (2) Years; And E) Industry Awards, Certifications And Other Market Place Distinctions; F) Social Responsibilities And Environmental Consideration; G) Indicate Why The Vendor Considers Itself To Be A “right” Service Provider And What Key Strengths It Will Bring To Afsc In The Immediate And Long Term. 2.7 Resources Please Provide A List Of The Staff Members That Will Be Assigned To The Engagement At Afsc. Please Note, The Successful Respondent Will Be Required To Sign Off On All Of Afsc’s Security Forms Prior To Any Work Being Completed. The Response Should Include But Not Limited To The Following: Requirements Comments: Please State Your Justification For How Requirements Are Met Provide Information Pertaining To Previous Projects/engagements Of Similar Nature That The Resource Or Team Lead Has Had And Provide References For The Project Provide Resumes For Staff That Will Be Assigned To The Engagement At Afsc. The Resume Should Include Skills, Experience, Qualification, Certifications And Accreditation. If Any Of The Assigned Staff Possess Or Requires Government Security Clearances. Respondent Should Also Identify The Tasks And The Task Dependencies Involved In The Completion Of The Requested Services. Provide Evidence Of License To Conduct Pentest In Location. 2.8 Value Add The Vendor May Describe Two (2) Significant Value Added Services Provided Relative To The Scope Of Work Provided To Other Clients Including The Vendor’s Commitment For Future Support. The Proposal Should Contain A Description Of Value Added Services Provided By The Vendor And The Strategy That The Vendor Would Employ In Proposing A Similar Type Of Service To Afsc. The Proposal Must Clearly Outline If There Are Any Additional Cost For The Value Added Services. 2.9 Approach Proposal Should Include The Following: A) A Description Of Corporate Philosophies, Values, Culture And Approaches Especially As They Relate To The Requirements Of Afsc; B) A Description Of The Vendor’s Decision Making Approach And Philosophy; And; C) The Proposal Must Provide Two Project Examples To Demonstrate The Vendor’s Ability To Take Ownership, Accept Accountability And Deliver On Commitments Made And To “stand Behind Their Work”. D) How The Vendor Plans To Proactively Address Issues That May Come Up In Regards To A Relationship With Afsc. E) Provide The Vendor’s Approach To Quality Assurance, Continuous Improvement, And Performance Management Processes, Techniques, Change Control And Tools. Vendor(s) Proposing An Alternative To A Competitive Bid Requirement Must Clearly Denote Each As An Alternative And Substantiate The Merit Of That Alternative. Proposed Alternatives Must Substantially Meet The Fundamental Intent Of The Requirement. 2.10 Security Please Complete Appendix D Information Security Privacy Cloud Assessment Form And Include It With Your Proposal. This Form Must Be Completed And Submitted Prior To The Closing Date In Order To Proceed To The Next Review Phase. 2.10.1 Data Classification For Awareness, The Type Of Data Involved In This Project Are ( Not Limited To Restricted/protected C. This Can Be Reviewed On The Goa Site. Do You Provide The Ability To Apply Different Data Or Information Classification Levels To Your Data Sets, And Are Different Levels Of Controls Available For Them Based On The Classification? If So Please Provide Detail For Different Processes Such As Security, Privacy Or Retention. 2.11 Technology Information Afsc’s Central Office Is Situated In Lacombe, Alberta Canada. With 2 Geographically Separated Data Centers Located In Edmonton Ab And Lacombe Ab, Afsc’s Enterprise Network Also Consists Of Branch Office Lans Dispersed Across Alberta, Canada. The Afsc Branch Office Lans Are Connected Via Vpn Tunnels Implemented In A Hub-and-spoke Architecture. These Vpns Run In Private Leased Mpls Clouds And Terminate On Head-ends Situated At Each Of The Data Centers Earlier Described. At A Very Simplified Level, Afsc Has About 38 Offices Across Alberta, With Social Media And Cloud Presence; It Also Has Just Under 700 Staff Providing Client, Administration And Technical Support. 2.12 Documentation Please Describe Your Final Penetration Results Report Structure; Requirements Response (yes/ No) Comments: Please State Your Justification For How Requirements Are Met Are These Components Included In The Final Report? • Introduction • Executive Summary • Technical Review • Detailed Findings • Testing Methodology • Screen Shots • Validation Of Compromise Will The Report Contain The Methodology Used Please Describe How You Prioritize Any Identified Vulnerabilities Or Security Weaknesses Do You Provide Recommendations For Remediation? Please Describe Please Provide A Sample Report For Each Of The Test Services Conducted (i.e. Penetration Testing, Etc.) 2.13 Additional Information Additional Requirements Comments: Please State Your Justification For How Requirements Are Met Description Of At Least Three (3) Engagements For Vulnerability Assessment, Penetration Testing / Red Teaming Exercise The Respondent Company Has Conducted Including A Statement Regarding The Type Of It Infrastructure And The Results For Each. A Detailed Recommended Approach Associated With An Assessment Of This Nature For The Scope Of Work Outlined Above. Project Plan That Contains The Elements Relative To The Vulnerability Assessment, Penetration Test And Red Teaming Exercise Conducted From A Location External To Afsc. What Activities Would Be Performed And How Those Activities Would Be Controlled So That Afsc Operations Are Not Interrupted. A Detailed Timeline Required To Complete Scope And Provide Deliverables As Outlined. Preferably In Electronic/paper Form That Contains A Project Plan With The Entire High Level Work Breakdown List. A Brief Description Of Each Project (vulnerability Assessment, Penetration Testing & Red Teaming Exercise) Plan Phase And Milestones And Also The Estimated Timelines For Each Phase And Milestone. The Methodology That Will Be Followed For Implementation Of Your Plan From Within Afsc And Outside Of Afsc (remote Location) Processing Environment. Include Any Unique Requirements Or Conditions. Description Of How The Respondent Company Stays Abreast With The Changing Governmental Regulations And Industry Guidelines For Cyber Security. In Protection Of The Afsc Confidential Information, The Respondent Company Is Expected To Describe How It; • Protects The Information Gathered During The Engagement From Both Internal And External Sources. • Stores Data Collected During Engagement. • Disposes Of Data Collected During Engagement. Please List And Describe All The Tools You Use For An Engagement Like This And Include If They Are Commercially Or In-house Developed. 2.14 Disclosure In The Interest Of Full Disclosure To All Vendors Wishing To Submit A Proposal, Please Note That Afsc Has Had A Previous Working Relationship With A Vendor Who May Submit A Proposal To This Competitive Bid. In This Regard, Through The Normal Course Of Providing Prior Services To Afsc, It Is Likely That This Vendor Will Have Acquired Knowledge About Afsc, In Addition To Having Had Access To Information, Beyond What Has Been Included Within This Competitive Bid. The Nature Of The Services Provided By The Vendor To Afsc Includes Services That Are Similar, Or Identical, To The Services Described In The Statement Of Work. 2.15 Pricing Please Indicate That The Price Quoted Will Be Guaranteed Until Implementation. Afsc Is Requesting A Fixed Price Response For The Scope Of Work As Outlined In The Section Above In Canadian Dollars. Identify Any Other Administrative Fees Or Services Charges, And Indicate How You Will Be Invoicing In Detail. Please Provide Pricing For One Year Period. Vendors Must Also Identify Any Other Administrative Fees Or Service Charges, And Provide Details On Invoicing (which May Subject To Change Based On Afsc’s Requirements). Services / Solution Pricing Penetration Test (internal Pentest And External Pentest) 3rd Party Hosted Web Application. Price Should Be Provided For Four (4) Of Such Applications Annually Red Teaming Exercise Vulnerability Assessment G. S. T. Certification Clause This Is To Certify That The Services Ordered Or Purchased Are For The Use Of, And Are Being Purchased By Afsc With Crown Funds, And Are Therefore Not Subject To The Goods And Services And Harmonized Sales Tax. 3.0 Evaluation Evaluation Criteria The Competitive Bid Evaluation Criteria Will Be Distributed Within The Following Rating Categories. Evaluation Criteria Evaluation Category Weighting % Requirements • Network Penetration Testing • Web & Non-web Application Penetration Testing • Social Engineering Testing • Vulnerability Analysis And Exploitation • Red Teaming Exercise • Continuous Threat Exposure Management For This Criteria The Evaluation Committee Will Give Particular Reference To The Vendor’s Response To Section 2.5 25% Corporate Capability & Executive Summary • Demonstrate A Sound Understanding Of The Scope • Indicate Why The Vendor Considers Itself To Be A “right” Service Provider And What Key Strengths It Will Bring To Afsc In The Immediate And Long Term. For This Criteria The Evaluation Committee Will Give Particular Reference To The Vendor’s Response To Section 2.6 5% Resource Qualifications • Previous Projects/engagements Of Similar Nature That The Resource Or Team Lead Has Had • Skills, Experience, Qualification, Certifications And Accreditation. • Identify The Tasks And The Task Dependencies Involved In The Completion Of The Requested Services. • Evidence Of License To Conduct Pentest In Location. For This Criteria The Evaluation Committee Will Give Particular Reference To The Vendor’s Response To Section 2.7 20% Value Add • The Vendor May Describe Two (2) Significant Value Added Services Provided Relative To The Scope Of Work Provided To Other Clients Including The Vendor’s Commitment For Future Support. • The Proposal Should Contain A Description Of Value Added Services Provided By The Vendor And The Strategy That The Vendor Would Employ In Proposing A Similar Type Of Service To Afsc. The Proposal Must Clearly Outline If There Are Any Additional Cost For The Value Added Services. For This Criteria The Evaluation Committee Will Give Particular Reference To The Vendor’s Response To Section 2.8 10% Approach For This Criterion The Evaluation Committee Will Give Particular Reference To The Vendor’s Response To Section 2.9 5% Documentation For This Criterion The Evaluation Committee Will Give Particular Reference To The Vendor’s Response To Section 2.12 10% Additional Requirements For This Criterion The Evaluation Committee Will Give Particular Reference To The Vendor’s Response To Section 2.13 5% Pricing (can Be Removed And Scored Independently) 20% Each Evaluation Category And/or Sub-category Is Given A Weight As A Percentage To Reflect Its Relative Importance In The Evaluation. The Members Of The Evaluation Committee Consist Of Afsc Staff From The Product Lines Or A Part Of The Specified Project/area/department Requesting The Services. Proposals Will Be Evaluated And Scored Based On Quality Of Response To The Requirements Of This Rfp. Those Proposals That Score The Highest May Be Shortlisted To Participate In A Subsequent Interview/presentation/demo Process. The Written Portion Will Be Weighted At _60_% And The Interview/demo At _40_%. The Scores From The Proposals May Be Adjusted As Per The Clarifications Presented In The Interview. Selection Of The Preferred Vendor Will Be Based On The Highest Score. (if Applicable) Contract Negotiations May Be Completed Prior To Award And May Be Used As Part Of The Award Decision. Pre-screening Proposals May Be Subject To Pre-screening Based On Select Mandatory Criteria. (if Applicable) 4.0 Contract Review All Agreements Must Be Drafted (or Reviewed And Agreed To) By Afsc’s Legal Department. Previously Entered Into Agreements Between Afsc And The Successful Vendor Will Not Be Used As The Form Of Definitive Agreement For This Engagement. The Definitive Agreement That Is Entered Into Between The Vendor And Afsc Will Incorporate Afsc’s Terms Of Business Set Out At Appendix (b), As Well As Key Afsc Standards For Contracts, Which Are As Follows: • Termination For Convenience Upon Written Notice. • No Limitations Of Liability Or Monetary Caps Granted. • No Disclaimers Of Liability Granted. • No Indemnities Against Third Party Claims Granted (limited Exceptions). • Governing Law - Province Of Alberta, Country Of Canada. • Finite Term Of Contract - No Auto-renewals. If The Vendor Wishes To Propose Alternative Wording To The Terms Of Business Set Out At Appendix (b) Or Disagrees With The Above-listed Key Afsc Standards For Contracts, The Vendor Must Complete And Submit Appendix (c) (alternate Wording – Additional Clause Template) Clearly Citing The Suggested Variations. ***note That Afsc Has The Sole Discretion To Consider Whether Wording Changes Or Alternate Clauses Will Be Considered For Negotiation Purposes And/or Incorporated Into The Definitive Agreement. The Extent And Materiality Of Any Requested Changes/deviations From The Terms Of Business Or Key Afsc Standards For Contracts By The Vendor May Impact The Vendor’s Overall Rating When The Proposal Is Evaluated. By Submitting A Proposal Without A Completed Appendix (c) Attached Thereto, Vendors Are Deemed To Accept The Terms Of Business As Set Out At Appendix (b), As Well As The Above-listed Key Afsc Standards For Contracts As A Condition Of Submitting A Proposal. A Vendor’s Acceptance Of The Terms Of Business And Key Afsc Standards For Contracts May Have A Positive Bearing On The Vendor’s Overall Score. As Part Of The Vendor’s Proposal, Afsc Requires The Vendor To Submit The Vendor’s Typical Form Of Agreement Generally Used With Customers. ***afsc May Or May Not Choose To Use The Vendor’s Typical Form Of Agreement As The Basis Of The Definitive Agreement Between Afsc And The Vendor. Even If Afsc Opts To Use The Vendor’s Typical Form Of Agreement As A Foundation For The Definitive Agreement, As Stated Above, The Final Version Of The Definitive Agreement Will Incorporate Afsc’s Terms Of Business Set Out At Appendix (b), As Well As Key Afsc Standards For Contracts. ***note That Afsc Has The Discretion To Amend The Wording Of The Terms Of Business As Set Out At Appendix (b) When Incorporating Into The Definitive Agreement And, To The Extent That There Is Any Inconsistency Between The Terms Of Business And The Definitive Agreement, The Definitive Agreement Shall Take Precedence. No Work Will Commence In Relation To This Competitive Bid Until A Fully Executed Definitive Agreement Is In Place Between Afsc And The Vendor. Failure To Comply With This Requirement Will Result In Non-payment Of Any Activities Performed Prior To The Execution Of The Definitive Agreement. 4.1 Negotiations Afsc May Require Selected Vendor(s) To Participate In Negotiations And To Submit Revisions To Pricing, Technical Information, Agreements And Any Other Items In Any Proposal That May Result From Negotiations. If Negotiations Do Not Result In Modification Of The Agreement(s) That Is Acceptable To Afsc, The Proposal May Be Rejected. 5.0 Master Schedule The Master Schedule Of Competitive Bid Related Events Is Set Out In The Table Below And Is Governed By The Following Principles: A) In The Event That Any Dates Elsewhere In This Competitive Bid Conflict With A Date Set Out In This Table, The Date Set Out In This Table Shall Prevail; B) All Times Listed Are Based On Mountain Standard Time (mst); C) Afsc Reserves The Right To Adjust The Dates Of The Schedule If Required Through An Addendum Process. # Event Scheduled Date/time 1 Afsc To Accept E-mail Inquiries Relevant To This Competitive Bid. Vendor(s) Must Use The Q & A Template Provided As Appendix (a) And Submit Through Rfp@afsc.ca. March 12, 2024 2 Final Receipt Of Proposals. (closing Date) March 26, 2024 @ 1:00 Pm 3 Evaluation Of Competitive Bid Written Proposals. Afsc In Its Discretion May Extend This Time. March 27, 2024 To April 4, 2024 4 Interviews Or Presentations For Short-listed Vendors. Afsc In Its Discretion May Change This Date. Week Of April 15, 2024 5 Afsc To Perform Reference Checks On Shortlisted Vendors. Afsc In Its Discretion May Change This Date. Week Of April 15, 2024 6 Final Evaluation And Notification Of Award Of Contract. Afsc In Its Discretion May Change This Date. Week Of April 22, 2024 7 Target Commencement Date Afsc In Its Discretion May Change This Date. May 15, 2024 6.0 Proposal Submission Guidelines 6.1 Proposal Format To Facilitate Ease Of Evaluation By The Evaluation Team, And To Ensure Each Proposal Receives Full Consideration, Proposals Should Be Organized In The Following Format Using The Section Titles And Sequence Listed Below: Table Of Contents; A) Pre-screening Requirements (optional) B) Proposal To Statement Of Work (2.0); Including Legal And Contact Information: • The Full Legal Name Of The Vendor. • The Location Of The Vendor’s Head Office And Service Centers. • A Vendor Contact For All Questions And Clarifications Arising From The Proposal. • Vendor Contact Authorized To Participate In Contract Finalizations. References • The Proposal Should Include Three (3) References Including, But Not Limited To Organization, Address, Contact Name, Telephone Number And Email Address. • References Should Include Organizations That Can Verify The Satisfactory Provision, Performance And Or/servicing Of Goods And Associated Services The Name As, Or Similar To The Requirements Of This Competitive Bids, The Corporate Purchasing Section May Contact References In Addition To Those Provided In The Proposal. • References May Be Conducted To Validate Information Provided In The Vendor’s Proposal • It Is Expected That The Vendor(s) Will Be Able To Arrange For Afsc To Contact The Reference During The Evaluation Period. • Government And Agencies, References Would Be Preferred If Available. (optional) Additional Information • Additional Information May Be Included At The Vendor’s Discretion, But This Must Not Detract From The Ability Of Afsc To Easily Reference Information For Evaluation Purposes. Assumptions • Vendor Is Expected To Identify In Detail Any Assumptions That Have Been Made During The Creation Of Their Written Proposal To The Scope Identified. C) Alternate Wording Template (appendix C) D) Vendor’s Agreement Template E) Proof Of Wcb And Insurance F) Proof Of Corporate Registry G) Financial Requirements (optional) H) Vendor’s Ethics Policy (optional) The Vendor Should Have An Ethics Policy That Guides Their Organization In All Its Business Activities And Should Provide A Copy Of This Ethical Policy As An Attachment To Their Proposal. This Policy Will Not Form Part Of The Evaluation. Appendices The Following Appendices Are Included And Applicable To This Competitive Bid: Appendix A: Question And Answer Template Appendix B: Terms Of Business Appendix C: Alternate Wording-additional Clause Template Appendix D: Information Security Privacy Cloud Assessment Form Appendix E: Letter Of Submission Revised 2023 Responsive Proposals Should Provide Straightforward, Concise Information That Satisfies The Requirements Noted In The Proposal Guidelines Section Of This Rfp. Emphasis Should Be Placed On Conformity To Afsc’s Instructions, Requirements Of This Rfp, And Completeness And Clarity Of Content. Ambiguous, Repetitive, Unclear Or Unreadable Proposals May Be Cause For Rejection. 6.2 Proposal Submissions Vendors Must Provide An Electronic Version Of Their Proposal By E-mail To Rfp@afsc.ca Prior To The Closing Date And Time Of This Competitive Bid. (optional) Buyer May Request That A Hard Copy Is Submitted. Electronic Versions (emails) Must Be Less Than 18 Mb In Order For Afsc To Receive The Vendor’s Submission. If The Proposal Is Larger Than 18 Mb, It Must Be Divided Into A Sufficient Number Of Files Such That Each Email, Including Attachments, Is Less Than 18 Mb. Afsc Cannot Accept Files On Media Storage Devices. (optional) All Hard Copy Proposal Materials Are To Be Sealed In A Single Package And Clearly Labelled With The Competitive Bid # To: Attention: Buyer, Business Services Afsc 5718 – 56th Avenue Lacombe, Ab T4l 1b1 In Responding To This Competitive Bid, Your Attention Is Drawn To The Following: • Proposals Received After This Competitive Bid’s Closing Date And Time Will Be Rejected. • Proposals Received Not In The Order Outlined Above In Section 6.1 May Not Be Evaluated Further. Vendors By Submitting A Proposal Are Deemed To Have Accepted The Competitive Bid Terms And Conditions.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Healthcare and Medicine
United States
Closing Date19 Jan 2024
Tender AmountRefer Documents
Details: This Solicitation Is Cancelled. The Requirement Will Be Revised And Re-solicited. description This Is A Combined Synopsis/solicitation For Commercial Products And Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. This Solicitation Is Issued As An Rfq. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2023-05. This Solicitation Is Set-aside For Service Disabled Veteran Owned Small Businesses (sdvosb). Vendors Must Be Registered In Sam And Vetcert Before They Submit Their Quote Or They Will Not Be Considered. The Associated North American Industrial Classification System (naics) Code For This Procurement Is 624230, With A Small Business Size Standard Of $41.5 Million. The Fsc/psc Is X1gz. Schedule Of Services Base Period: December 1, 2023 November 30, 2024 Item # Clin Medical Cache Services Qty Monthly Price Extended Amount 1 Clin 0001 Storage Of Government Property Medical Cache 12 â â 2 Clin 0002 Training 12 â â 3 Clin 0003 Mobilization Of Cache 12 â â 4 Clin 0004 Consumables And Equipment Replenishment 12 â â Total For Base Year $ - Option Year 1: December 1, 2024 - November 30, 2025 Item # Clin Medical Cache Services Qty Monthly Price Extended Amount 1 Clin 1001 Storage Of Government Property Medical Cache 12 â â 2 Clin 1002 Training 12 â â 3 Clin 1003 Mobilization Of Cache 12 â â 4 Clin 1004 Consumables And Equipment Replenishment 12 â â Total For Option Year 1 $ - Option Year 2: December 1, 2025 - November 30, 2026 Item # Clin Medical Cache Services Qty Monthly Price Extended Amount 1 Clin 2001 Storage Of Government Property Medical Cache 12 â â 2 Clin 2002 Training 12 â â 3 Clin 2003 Mobilization Of Cache 12 â â 4 Clin 2004 Consumables And Equipment Replenishment 12 â â Total For Option Year 2 $ - Option Year 3: December 1, 2025 - November 30, 2026 Item # Clin Medical Cache Services Qty Monthly Price Extended Amount 1 Clin 3001 Storage Of Government Property Medical Cache 12 â â 2 Clin 3002 Training 12 â â 3 Clin 3003 Mobilization Of Cache 12 â â 4 Clin 3004 Consumables And Equipment Replenishment 12 â â Total For Option Year 3 $ - Option Year 4: December 1, 2025 - November 30, 2026 Item # Clin Medical Cache Services Qty Monthly Price Extended Amount 1 Clin 4001 Storage Of Government Property Medical Cache 12 â â 2 Clin 4002 Training 12 â â 3 Clin 4003 Mobilization Of Cache 12 â â 4 Clin 4004 Consumables And Equipment Replenishment 12 â â Total For Option Year 4 $ - Va Federal Coordinating Center Patient Reception Team Cache General Information Title Of Project: Va Fcc Medical Cache Maintenance & Storage/echcs Emergency Cache Storage Only Scope Of Work: Contractor Shall Store And Maintain All Items In The Federal Coordinating Center (fcc) Medical Cache That Is Needed For Emergency Response To Medical Disasters. This Includes But Not Limited To; Replacing Iv Solutions That Have Expired, Replenish Items And Equipment As Necessary From Use. All Items In The Fcc Medical Caches Are Owned By The Department Of Veterans Affairs, Eastern Colorado Health Care System (echcs). The Fcc Medical Cache Shall Be Available At All Times For Emergency Response. Storage Only, No Maintenance Of The Echcs Emergency Cache. Background: The Department Of Veterans Affairs, Echcs Is The Host Federal Agency For The National Disaster Medical System. The National Disaster Medical System (ndms) Is Managed By The Department Of Homeland Security And May Be Activated In Times Of Federally Declared National And International Emergencies To Coordinate Medical Care Of Evacuees From The Emergency Area To An Assigned Area. The Echcs Is Dedicated As The Federal Coordinating Center (fcc) And Coordinates The Federal Disaster Response Emergencies And Exercises For The Region With The Local Medical Facilities. This A Mass Casualty Emergency Or Exercise That Will Simulate The Receiving, Triage, And Transport Of More Than 150 Patients To 11 Metro-area Hospitals Via Eight Ground Ambulances And Ten Helicopters Over The Course Of Six Hours. General Requirements: The Contractor Shall Identify And Purchase (upon Approval Of Cache List) Fcc Medical Equipment And Supplies To Provide The Va Patient Reception Team A Separate And Independent Cache To Work From During Ndms Patient Movement Evolutions. Fcc Cache Will Be In-service Within 1 Months Of Contract Approval. The Contractor Shall Provide Space For Storage Of Va Patient Reception Team (prt) Fcc Cache That Meets The Following Requirements: Local To The Denver Metropolitan Area Climate Controlled Monitored Security Rapid Access Within A 10-mile Radius Of Denver International Airport The Contractor Shall Maintain The Va-prt Fcc Cache In A Ready To Respond State. This Maintenance Will Include: Battery Rotation And Conditioning Inventory Management Rotation Of Expired Stock The Contractor Shall Ensure Delivery Of Fcc Cache To A Specified Location Within Fema Region Viii. In The Event Of Fcc Prt Activation, Pick-up Of Cache Will Happen Within 4 Hours Of Notice By Va-prt. For Exercises Or Training Events Delivery Of The Cache Will Be Done In Accordance With The Objectives Of The Exercise Or Training. The Contractor Shall Participate In A Functional Exercise That Will Have The Following Objectives As A Minimum: Activation Of The Va-prt Delivery Of The Va-prt Fcc Cache To A Specified Location Assess The Va-prt S Ability To Identify, Organize, And Manage The Personnel And Resources Needed To Effectively Carry Out A Patient Reception Event. Setup Of A Staging, Triage, Treatment, Transportation, And Patient Tracking Groups. These Groups Will Be Comprised Of Various Local Resources Engage Local Responders And Hospitals, Patients Will Be Transported To Local Hospitals By Air And Ground Resources As Necessary. The Contractor Shall Provide A Secure Website For Access To The Cache Inventory The Contractor Shall Assist With Training The Va Patient Reception Team Two (2) Times A Year. This Training Will Include: Accessing The Va-prt Fcc Cache Medical Equipment Overview And Familiarization Policy And Procedure Questions The Contractor Shall Have Minimum Of Five Years Of Experience For Storage And Maintenance Of Medical Cache. The Contractor Staff Shall Have Medical Training To Ensure That The Va Patient Reception Team (va-prt) Fcc Cache Is Maintained In A Ready To Respond State At All Times. The Contractor Shall Be Responsible For Government Furnished Equipment That Is Provided For Storage And Maintenance In The Medical Cache. Hours Of Coverage: Normal Hours Of Coverage Are Monday Through Friday From 8:00 A.m. To 5:00 P.m., Excluding The Federal Holidays Listed As Follows: Federal Holidays: New Year S Day Dr. Martin Luther King Jr S Birthday Presidents Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veteran S Day Thanksgiving Day Christmas Day Any Other Day Specifically Declared A National Holiday By The President Of The United States. When One Of The Above Designated Legal Holidays Falls On A Sunday, The Following Monday Will Be Observed As A Legal Holiday. When A Legal Holiday Falls On A Saturday, The Preceding Friday Is Observed As A Holiday By Us Government Agencies. Fcc Emergency Hours Of Coverage: The Government Will Have The Authority To Activate The Fcc Medical Cache In A National Emergency Within 2 Hours Of The Governments Notification To Contractor To Deploy. Fcc Government Furnished Property Inventory List Trifold -7 Cart Item Description Qty U/m Tri-fold-7 60-0001 Litters 20 Ea Tri-fold-7 60-0008 Iv Poles 20 Ea Tri-fold-7 Delineator Post Delineator Post 12 Ea Tri-fold-7 12# Base Base For Post 12 Ea Tri-fold-7 Lanyards Lanyards 400 Ea Rubbermaid-9 Cart Item Description Qty U/m Rubbermaid-9 Is-8303sa Small Sharps 10 Ea Rubbermaid-9 Al-881a Sani-cloth Wipes 6 Bx Rubbermaid-9 Is-shut Sharps Shuttle 24 Ea Rubbermaid-9 3m 1860 N-95 Mask 4 Bx/20 Rubbermaid-9 Mds195184 Glove-sm 4 Bx Rubbermaid-9 Mds195185 Glove-med 4 Bx Rubbermaid-9 Mds195186 Glove-lrg 4 Bx Rubbermaid-9 Mds195187 Glove-xlrg 4 Bx Rubbermaid-9 Og-888-02 Regulator 2 Ea Rubbermaid-9 Is-5488 Sharps-krg. 4 Ea Rubbermaid-9 Ic-1507 Infectious Control Kit 16 Ea Treatment-green Cart Item Description Qty U/m Rubbermaid-9 Is-8303sa Small Sharps 10 Ea Rubbermaid-9 Al-881a Sani-cloth Wipes 6 Bx Rubbermaid-9 Is-shut Sharps Shuttle 24 Ea Rubbermaid-9 3m 1860 N-95 Mask 4 Bx/20 Rubbermaid-9 Mds195184 Glove-sm 4 Bx Rubbermaid-9 Mds195185 Glove-med 4 Bx Rubbermaid-9 Mds195186 Glove-lrg 4 Bx Rubbermaid-9 Mds195187 Glove-xlrg 4 Bx Rubbermaid-9 Og-888-02 Regulator 2 Ea Rubbermaid-9 Is-5488 Sharps-krg. 4 Ea Rubbermaid-9 Ic-1507 Infectious Control Kit 16 Ea Treatment-red-yellow Cart Item Description Qty U/m Treatment Red-yellow Sg-2020s-blu Blood Presure Kit 2 Ea Treatment Red-yellow St-2290 Stethoscope 2 Ea Treatment Red-yellow In001-blk Utility Scissors 1 Ea Treatment Red-yellow Pl-1008 Penlight 2 Ea Treatment Red-yellow Po8500a Pulse Ox 1 Ea Treatment Red-yellow Gu10019 Accu-chek Glucomrter 1 Ea Treatment Red-yellow Th-4000 Thermoscan 1 Ea Treatment Red-yellow Th5075 Probe Covers 1 Bx Treatment Red-yellow Tx-wheel Pedi-wheel 1 Ea Treatment Red-yellow Tx-critical Pocket Guide 1 Ea Treatment Red-yellow Ba6715 Kerlix 2 Ea Treatment Red-yellow Bj848 4x4 Pads 20 Ea Treatment Red-yellow Di-444 Heet-pak 1 Ea Treatment Red-yellow Di-688 Cold-pak 1 Ea Treatment Red-yellow Be-2 Coban 2" 1 Rl Treatment Red-yellow Ba-415 Xeroform 2 Ea Treatment Red-yellow Om-20039 Saline Bullets 7 Ea Treatment Red-yellow Sl-7122 Sodium Chloride,250ml 2 Bt Treatment Red-yellow Ta-7827-1 Transpore 1" 2 Rl Treatment Red-yellow Ta-7827-2 Transpore 2" 2 Rl Treatment Red-yellow Ta-5104 Zonas Tape 1" 2 Rl Treatment Red-yellow Ta-5106 Zonas Tape 2" 2 Rl Treatment Red-yellow Bs7303a Emergency Blanket 1 Ea Treatment Red-yellow Mds195184 Glove-sm 1 Bx Treatment Red-yellow Mds195185 Glove-med 1 Bx Treatment Red-yellow Mds195186 Glove-lrg 1 Bx Treatment Red-yellow Mds195187 Glove-xlrg 1 Bx Treatment Red-yellow Iv4173-15 Primary Iv Set 2 Ea Treatment Red-yellow Iv-001 Inject Site 2 Ea Treatment Red-yellow Iv-8042 Ext Set 2 Ea Treatment Red-yellow It-6150 Iv Start Pak 6 Ea Treatment Red-yellow It-18ga 18 Ga. Needle 5 Ea Treatment Red-yellow It21ga 21 Ga. Needle 5 Ea Treatment Red-yellow It23ga 23 Ga. Needle 5 Ea Treatment Red-yellow It3ccll 3cc Syringe 2 Ea Treatment Red-yellow It5ccll 5cc Syringe 2 Ea Treatment Red-yellow It10ccll 10cc Syringe 2 Ea Treatment Red-yellow It-1709 Iv Cath 14ga 5 Ea Treatment Red-yellow It-1707 Iv Cath 16ga 5 Ea Treatment Red Yellow It-1705 Iv Cath 18ga 5 Ea Treatment Red-yellow It-1703 Iv Cath 20ga 5 Ea Treatment Red-yellow It-1701 Iv Cath 22ga 5 Ea Treatment Red-yellow Is-5488 Sharps Colector 3.3 Qt 1 Ea Chairs From Roger Rewerts At Denver Va Va Denver â 18 Tables From Roger Rewerts At Denver Va Va Denver â 6 Wheelchairs From Roger Rewerts At Denver Va Va Denver â 20 Iv Poles For Wheelchairs From Roger Denver Va Va Denver â 10 Cart Item Description Qty U/m Office Supplies 181594 Pens-black 4 Dz Office Supplies 729036 Pens-red 4 Dz Office Supplies 181578 Pens-blue 4 Dz Office Supplies 203349 Sharpie-black 4 Dz Office Supplies 128844 Highlighter Yellow 2 Dz Office Supplies 107580 Pencil 48 Ea Office Supplies 588290 Pencil Sharpener 2 Ea Office Supplies 275714 Stapler 3 Ea Office Supplies 221051 Staples 1 Pk Office Supplies 255722 3-hole Punch 1 Ea Office Supplies 375667 Scissors 4 Ea Office Supplies 221784 Paper Clips 1 Pk Office Supplies 615303 Binder Slips 4 Pk Office Supplies 173336 Tape Dispenser 4 Ea Office Supplies 575341 Invisible Tape 1 Pk Office Supplies 965232 White Out Tape 10 Ea Office Supplies 432479 Post-it Pads 12 Ea Office Supplies 553800 Dry Erase Set 1 Ea Office Supplies 305466 Writing Pad 12 Ea Office Supplies 810838 Manila File Folder 50 Ea Office Supplies 526076 Clipboard W/stor 10 Ea Office Supplies 348037 Copy Paper 4 Rm Office Supplies 848808 13 Gl. Trash Bags 100 Ea Office Supplies 348037 Copy Paper 6 Rm Cart Item Description Qty U/m Crash 1,2 Is-5488 Sharps Colector 3.3 Qt 1 Ea Crash 1,2 Ok-2100 Suction Unit 1 Ea Crash 1,2 Lp1212 Life-pak Unit 1 Ea Crash 1,2 Th-5075 Probe Covers 1 Bx Crash 1,2 In-001-blk Utility Scissors 1 Ea Crash 1,2 In-920 Ring Cutter 1 Ea Crash 1,2 Pl-1008 Pen Light 2 Ea Crash 1,2 St-2290 Stethoscope 1 Ea Crash 1,2 Sg2020s-blu Blood Presure Kit 1 Ea Crash 1,2 Gu-40019 Accu-chek Glucomrter 1 Ea Crash 1,2 Tx-critical Pocket Guide 1 Ea Crash 1,2 Tx-wheel Pedi-wheel 1 Ea Crash 1,2 Th-4000 Thermoscan 1 Ea Crash 1,2 11996-000081 Filterline Set 2 Ea Crash 1,2 0488-1952 Adult Co2 Sample Set 2 Ea Crash 1,2 Mds195184 Glove-sm 1 Bx Crash 1,2 Mds195185 Glove-med 1 Bx Crash 1,2 Mds195186 Glove-lrg 1 Bx Crash 1,2 Mds195187 Glove-xlrg 1 Bx Crash 1,2 It-6150 Iv Start Pak 6 Ea Crash 1,2 Iv-001 Inject Site 2 Ea Crash 1,2 Iv-8042 Ext Set 2 Ea Crash 1,2 Iv-4173-15 Primary Iv Set 2 Ea Crash 1,2 It-1709 Iv Cath 14ga 5 Ea Crash 1,2 It-1707 Iv Cath 16ga 5 Ea Crash 1,2 It-1705 Iv Cath 18ga 5 Ea Crash 1,2 It-1703 Iv Cath 20ga 5 Ea Crash 1,2 It-1701 Iv Cath 22ga 5 Ea Crash 1,2 It3ccll 3cc Syringe 4 Ea Crash 1,2 It5ccll 5cc Syringe 4 Ea Crash 1,2 It10ccll 10cc Syringe 4 Ea Crash 1,2 It18ga 18 Ga. Needle 5 Ea Crash 1,2 It21ga 21 Ga. Needle 5 Ea Crash 1,2 It23ga 23 Ga. Needle 5 Ea Crash 1,2 Ic-90 Procedure Mask 1 Bx Crash 1,2 In-374 Magil Forcep Child 1 Ea Crash 1,2 In-675 Magil Forcep Adult 1 Ea Crash 1,2 Ab-300k Nasopharyngeal Airway Kit 1 Ea Crash 1,2 Aa-25 Guedel Airway Kit 1 Ea Crash 1,2 Om-7100 Bag Mask Adult 1 Ea Crash 1,2 Om-7200 Bag Mask Pedi 1 Ea Crash 1,2 Om-7300 Bag Mask Infant 1 Ea Crash 1,2 Oh-5013 Suction Handle W/tubing 1 Ea Crash 1,2 Ac-125 Et Tube Holder 2 Ea Crash 1,2 Ok-0101 Menconium Aspirator 1 Ea Crash 1,2 Ly1f Laryngo Handle Med. 1 Ea Crash 1,2 Ly2f Laryngo Handle Sm. 1 Ea Crash 1,2 Ly71f Blade Mac 1 1 Ea Crash 1,2 Ly72f Blade Mac 2 1 Ea Crash 1,2 Ly73f Blade Mac 3 1 Ea Crash 1,2 Ly74f Blade Mac 4 1 Ea Crash 1,2 Ly80f Blade Miller 0 1 Ea Crash 1,2 Ly81f Blade Miller 1 1 Ea Crash 1,2 Ly82f Blade Miller 2 1 Ea Crash 1,2 Ly83f Blade Miller 3 1 Ea Crash 1,2 Ly84f Blade Miller 4 1 Ea Crash 1,2 1920 Cannula 1 Ea Crash 1,2 Om-2438 Nebulizer 1 Ea Crash 1,2 Om-1058 Pedi-o2 Mask 1 Ea Crash 1,2 Ba-5 Triangular Bandage 2 Ea Crash 1,2 Be-2 Coban 2" 1 Ea Crash 1,2 Sl-7122 Sodium Chloride,250ml 2 Ea Crash 1,2 Bj-848 4x4 Pads 1 Bx Crash 1,2 Ba-6715 Kerlix 5 Ea Crash 1,2 Non246074p Limb Holder 6 Ea Crash 1,2 Ba-7020 Bandages 1 Bx Crash 1,2 Bs-7303a Emergency Blanket 1 Ea Crash 1,2 Md-63 Glucose 1 Ea Crash 1,2 Di-444 Heat-pak 2 Ea Crash 1,2 Di-688 Cold-pak 3 Ea Crash 1,2 Ta-5104 Zonas Tape 1" 2 Rl Crash 1,2 Ta-5106 Zonas Tape 2" 2 Rl Crash 1,2 Ta-7827-1 Transpore 1" 2 Rl Crash 1,2 Ta-7827-2 Transpore 2" 2 Rl Crash 1,2 Ba-415 Xeroform 2 Ea Crash 1,2 Os-01jt Oxygen Cylinder 1 Ea Crash 1,2 Og-888-02 O2 Regulator 1 Ea Crash 1,2 3m 1860 N-95 Mask 1 Bx Crash 1,2 Is-5488 Sharps Colector 3.3 Qt 1 Ea Crash 1,2 El-533 Electrode,meditrace 1 Bx Crash 1,2 Ic-1507 Infect Control Kit 2 Ea Cart Item Description Qty U/m Rubbermaid-8 Om-2438 Nebulizer 37 Ea Rubbermaid-8 Huds 1920 Nasal Cannula 96 Ea Rubbermaid-8 Om-1058 Pedi-mask W/resv 78 Ea Cart Item Description Qty U/m Rubbermaid-7 Iv-4173-15 Primary Iv Set 57 Ea Rubbermaid-7 Al-1 Alcohol Preps 2 Bx Rubbermaid-7 Cx-900p Stif-neck-pedi 2 Ea Rubbermaid-7 0814-9357 Stif-neck-adult 4 Ea Rubbermaid-7 Ta-2104 Zonas Tape 1" 12 Rl Rubbermaid-7 Ta-7827-1 Transpore 1" 12 Rl Rubbermaid-7 Id-1060 Pull-lock 1 Pk/250 Rubbermaid-7 El1310-p Meditrace 1310 6 Pk Rubbermaid-7 16293 Life-pak Paper 5 Rl Rubbermaid-7 El-533 Meditrace 533 1 Bx Rubbermaid-7 Om-20039 Addi-pak 1 Bx Rubbermaid-7 0488-1952 Co2 Cunnula 6 Ea Rubbermaid-7 Sl-7122 Sodium Chloride,250ml 8 Bt Rubbermaid-7 Ivv-16d Thoracentesis Kit 2 Ea Cart Item Description Qty U/m Rubbermaid-6 It-6150 Iv Start Pak 7 Bx/25 Rubbermaid-6 It-100 Atomization Device 1 Ea Rubbermaid-6 Iv-001 Injection Site 42 Ea Rubbermaid-6 It18ga 18 Ga. Needle 80 Ea Rubbermaid-6 It21ga 21 Ga. Needle 80 Ea Rubbermaid-6 It23ga 23 Ga. Needle 80 Ea Rubbermaid-6 It3ccll 3cc Syringe 92 Ea Rubbermaid-6 It5ccll 5cc Syringe 92 Ea Rubbermaid-6 It10ccll 10cc Syringe 92 Ea Rubbermaid-6 It-1709 Iv Cath 14ga 30 Ea Rubbermaid-6 It-1707 Iv Cath 16ga 30 Ea Rubbermaid-6 It-1705 Iv Cath 18ga 30 Ea Rubbermaid-6 It-1703 Iv Cath 20ga 30 Ea Rubbermaid-6 It-1701 Iv Cath 22ga 30 Ea Rubbermaid-6 Iv-8042 Ext Set 32 Ea Cart Item Description Qty Rubbermaid-5 Ab300k Naso Airway Kit 8 Rubbermaid-5 Aa25 Guedel Airway Kit 8 Rubbermaid-5 Om-7300 Infant Resuscitator 2 Rubbermaid-5 Om-7200 Pedi Resuscitator 4 Rubbermaid-5 Om-7100 Adult Resuscitator 9 Rubbermaid-5 Ac-125 Et Tube Holder 6 Rubbermaid-5 Ae-525 Flexiset,uncuffed 2.5 Mm 6 Rubbermaid-5 Ae-530 Flexiset,uncuffed 3.0 Mm 6 Rubbermaid-5 Ae-535 Flexiset,uncuffed 3.5 Mm 6 Rubbermaid-5 Ae-540 Flexiset,uncuffed 4.0 Mm 6 Rubbermaid-5 Ae-545 Flexiset,uncuffed 4.5 Mm 6 Rubbermaid-5 Ae-550 Flexiset,uncuffed 5.0 Mm 6 Rubbermaid-5 Ae-755 Flexiset-cuffed 5.5 Mm 6 Rubbermaid-5 Ae-760 Flexiset-cuffed 6.0 Mm 6 Rubbermaid-5 Ae-765 Flexiset-cuffed 6.5 Mm 6 Rubbermaid-5 Ae-770 Flexiset-cuffed 7.0 Mm 6 Rubbermaid-5 Ae-775 Flexiset-cuffed 7.5 Mm 6 Rubbermaid-5 Ae-780 Flexiset-cuffed 8.0 Mm 6 Rubbermaid-5 Ae-785 Flexiset-cuffed 8.5 Mm 6 Rubbermaid-5 Ae-790 Flexiset-cuffed 9.0 Mm 6 Rubbermaid-5 Oh-5013 Yankauer Suct. Set 2 Rubbermaid-5 33593 Poise Pads, Lrg 1 Rubbermaid-5 31738 Training Pants, 3t-4t 1 Rubbermaid-5 26242 Pampers 1, 8-14 Lbs 1 Rubbermaid-5 26247 Pampers 3, 16-28 Lbs 1 Rubbermaid-5 26251 Pampers 5, 27+ Lbs 1 Cart Item Description Qty U/m Rubbermaid 4 Pa-60 Bed Pan 20 Ea Rubbermaid 4 Pa-59 Urinal 20 Ea Rubbermaid 4 Pa-57 Emesis Basin 50 Ea Cart Item Description Qty U/m Rubbermaid-3 Ba6715 Kerlix 34 Ea Rubbermaid-3 Di-444 Heet-pak 13 Ea Rubbermaid-3 Di-688 Cold-pak 21 Ea Rubbermaid-3 Bj848 4x4 Pads 8 Bx Rubbermaid-3 Bs7303a Emergency Blanket 15 Ea Rubbermaid-3 Be-2 Coban 2" 4 Rl Rubbermaid-3 In001-blk Utility Scissors 1 Ea Rubbermaid-3 Ba-5 Triangular Bndg. 12 Ea Rubbermaid-3 Ba-415 Xeroform 2 Ea Rubbermaid-3 Is-shut Sharps Shuttle 16 Ea Cart Item Description Qty U/m Rubbermaid-2 Lp1212bipsbca Life-pak 12 2 Ea Rubbermaid-2 Ok-2100 Suction Unit 2 Ea Cart Item Description Qty U/m Rubbermaid-1 59826 Power Strip 4 Ea Rubbermaid-1 293556 Gorilla Tape 4 Rl Rubbermaid-1 1ec16 Tape Holder 3 Ea Rubbermaid-1 59226 Power Cord-15ft. 4 Ea Rubbermaid-1 67864 Power Cord-25ft. 4 Ea Rubbermaid-1 67439 Power Cord-50ft. 2 Ea Rubbermaid-1 82455 Power Cord-100ft. 3 Ea Rubbermaid-1 9bn-125501 Mega-phone 1 Ea Cart Item Description Qty U/m Trifold-8 Sh11c Folding Cot 30 Ea Trifold-8 Earplugs Earplugs 400 Ea Trifold-8 Reflective Belts Neon Green Belts 50 Ea Trifold-8 Wristbands Blue,green,yellow,orange 500 Ea Trifold-8 Non24777a Safety Glasses,lrg 60 Ea Trifold-8 Dms-05834 Vest,blue 8 Ea Trifold-8 Dms-05835 Vest,green 13 Ea Trifold-8 Dms-05838 Vest,black 11 Ea Trifold-8 Dms-05831 Vest,red 6 Ea Trifold-8 Dms-05832 Vest,white 8 Ea Trifold-8 Dms-05833 Vest,yellow 8 Ea Trifold-8 Dms-05836 Vest,orange 10 Ea Trifold-8 â Ndms Fcc Vest 14 Ea Trifold-8 5023-72 Blue Suede Leather Gloves,lrg 42 Pr Cart Item Description Qty U/m Trifold-10 Triage Area Stand Triage Area Tape Stand 75 Ea Trifold-10 119287 1st. Priority Tape Red 1 Rl Trifold-10 119288 2nd. Priority Tape Yellow 1 Rl Trifold-10 119289 3rd. Priority Tape Green 1 Rl Trifold-10 Bt-2m-3-500-pin Pink Barracade Tape 2 Rl Trifold-10 1n956 Do Not Enter Tape 3 Rl Trifold-10 Sand Bag Sand Bag 65 Ea Trifold-10 Pink Triage Flag Pink Triage Flag 1 Ea Trifold-10 Yellow Triage Flag Yellow Triage Flag 1 Ea Trifold-10 Red Triage Lfag Red Triage Lfag 1 Ea Trifold-10 Green Triage Flag Green Triage Flag 1 Ea Trifold-10 100ft Measuring Tape 100ft Measuring Tape 1 Ea Cart Item Description Qty U/m Storm 4 Aah73wcf9na5an Dtr650,1watt,10ch,900mhz,two Way Radio 10 Ea Storm 4 Bdn6773a Headset,sngl Spkr For Two Way Radios 10 Ea Storm 4 Rpm4035a Battery Charger For Two Way Radios 10 Ea Storm 4 Snn5708b Battery 3.6 Lithium 10 Ea Cart Item Description Qty U/m Storm-3 â Life-pak 1212 Charger 1 Ea Storm-3 â Printer 1 Ea Storm-3 â Power Cord For Charger 1 Ea Storm-3 â Power Cord For Printer 1 Ea Storm-3 â Data Cord For Printer 1 Ea Cart Item Description Qty U/m Storm-2 224-8070 Lap Top Computer 3 Ea Storm-2 3800g14 Handheld Barcode Scanner 1 Ea Storm-2 A2866576 Router 1 Ea Storm-2 330-9456 Mice For Lap -top 3 Ea Storm-2 â Power Cord For Lap-top 3 Ea Cart Item Description Qty U/m Storm-1 â Motorola Barcode Scanner 10 Ea Storm-1 â Battery Charger 3 Ea Storm-1 â Docking Station For Scanners 1 Ea Storm-1 â Batteries For Scanners 22 Ea Cart Item Description Qty U/m Triage Rolling Tx-5420 Triage Tags 10 Pk Triage Rolling Mds195184 Glove-sm 1 Bx Triage Rolling Mds195185 Glove-med 1 Bx Triage Rolling Mds195186 Glove-lrg 1 Bx Triage Rolling Mds195187 Glove-xlrg 1 Bx Triage Rolling Po8500a Pulse Ox 2 Ea Triage Rolling In001-blk Utility Scissors 2 Ea Triage Rolling Pl-1008 Penlight 2 Ea Triage Rolling St-2290 Stethoscope 1 Ea Triage Rolling Ta-7827-1 Transpore 1" 2 Rl Triage Rolling Ta-7827-2 Transpore 2" 2 Rl Triage Rolling Ta-5104 Zonas Tape 1" 2 Rl Triage Rolling Ta-5106 Zonas Tape 2" 2 Rl Triage Rolling Tx-wheel Pedi-wheel 1 Ea Triage Rolling Tx-critical Pocket Guide 1 Ea Triage Rolling Sg-2020s-blu Blood Presure Kit 1 Ea Triage Rolling Hp-202 Ear Plugs 2 Bx Triage Rolling 0s-01jt Oxygen Cylinder 3 Ea Triage Rolling 0s-01jt Oxygen Cylinder 3 Ea Cart Item Description Qty U/m Tri-fold-4 961760 Folding Chairs 20 Ea Tri-fold-4 624759 Easel 1 Ea Tri-fold-4 â Easel Stand 1 Ea Tri-fold-4 287073 Shredder 1 Ea Tri-fold-4 313098 Trash Can 41 Qt. 2 Ea Tri-fold-4 221507 Trash Can 7 Gl. 10 Ea Tri-fold-4 Non123143 Red Liners 31 X 43 1 Cs/200 Tri-fold-4 Pa-59 Urinal 10 Ea Tri-fold-4 Pa-60 Bed Pan 11 Ea Tri-fold-4 â Clipboards 20 Ea Cart Item Description Qty U/m Stretcher Psc-he Wheeled Stretcher Cart W/20 Wheels 10 Ea Cart Item Description Qty U/m Tri-fold-5 60-0014 Stretcher Stand 10 Ea Tri-fold-5 60-0027 Back Rest 5 Ea Tri-fold-5 Mass-casualty O2 Kit Mass-casualty O2 Kit 1 Ea Tri-fold-5 Kit-2222 Personal Protection Kit Lrg 1 Ea Cart Item Description Qty U/m Tri-fold-6 60-0014 Stretcher Stand 10 Ea Tri-fold-6 60-0027 Back Rest 5 Ea Tri-fold-6 Mass-casualty O2 Kit Mass-casualty O2 Kit 1 Ea Tri-fold-6 Kit-2222 Personal Protection Kit Lrg 1 Ea Cart Item Description Qty U/m Tri-fold-7 60-0001 Litters 20 Ea Tri-fold-7 60-0008 Iv Poles 20 Ea Tri-fold-7 Delineator Post Delineator Post 12 Ea Tri-fold-7 12# Base Base For Post 12 Ea Tri-fold-7 Lanyards Lanyards 400 Ea Cart Item Description Qty U/m Rubbermaid-9 Is-8303sa Small Sharps 10 Ea Rubbermaid-9 Al-881a Sani-cloth Wipes 6 Bx Rubbermaid-9 Is-shut Sharps Shuttle 24 Ea Rubbermaid-9 3m 1860 N-95 Mask 4 Bx/20 Rubbermaid-9 Mds195184 Glove-sm 4 Bx Rubbermaid-9 Mds195185 Glove-med 4 Bx Rubbermaid-9 Mds195186 Glove-lrg 4 Bx Rubbermaid-9 Mds195187 Glove-xlrg 4 Bx Rubbermaid-9 Og-888-02 Regulator 2 Ea Rubbermaid-9 Is-5488 Sharps-krg. 4 Ea Rubbermaid-9 Ic-1507 Infectious Control Kit 16 Ea Cart Item Description Qty U/m Treatment- Green Sg-2020s-blu Blood Presure Kit 2 Ea Treatment- Green St-2290 Stethoscope 2 Ea Treatment- Green Po8500a Pulse Ox 1 Ea Treatment- Green In001-blk Utility Scissors 1 Ea Treatment- Green Pl-1008 Penlight 2 Ea Treatment- Green Tx-wheel Pedi-wheel 1 Ea Treatment- Green Tx-critical Pocket Guide 1 Ea Treatment- Green Ba6715 Kerlix 2 Ea Treatment- Green Bj848 4x4 Pads 20 Ea Treatment- Green Di-444 Heet-pak 1 Ea Treatment- Green Di-688 Cold-pak 1 Ea Treatment- Green Om-20039 Saline Bullets 5 Ea Treatment- Green Sl-7122 Sodium Chloride,250ml 2 Bt Treatment- Green Ta-7827-1 Transpore 1" 2 Rl Treatment- Green Ta-7827-2 Transpore 2" 2 Rl Treatment- Green Ta-5104 Zonas Tape 1" 2 Rl Treatment- Green Ta-5106 Zonas Tape 2" 2 Rl Treatment- Green Bs7303a Emergency Blanket 1 Ea Treatment- Green Mds195184 Glove-sm 1 Bx Treatment- Green Mds195185 Glove-med 1 Bx Treatment- Green Mds195186 Glove-lrg 1 Bx Treatment- Green Mds195187 Glove-xlrg 1 Bx Treatment- Green Sl-7122 Sodium Chloride,250ml 2 Bt Treatment- Green Is-5488 Sharps Colector 3.3 Qt 1 Ea Cart Item Description Qty U/m Treatment Red-yellow Sg-2020s-blu Blood Presure Kit 2 Ea Treatment Red-yellow St-2290 Stethoscope 2 Ea Treatment Red-yellow In001-blk Utility Scissors 1 Ea Treatment Red-yellow Pl-1008 Penlight 2 Ea Treatment Red-yellow Po8500a Pulse Ox 1 Ea Treatment Red-yellow Gu10019 Accu-chek Glucomrter 1 Ea Treatment Red-yellow Th-4000 Thermoscan 1 Ea Treatment Red-yellow Th5075 Probe Covers 1 Bx Treatment Red-yellow Tx-wheel Pedi-wheel 1 Ea Treatment Red-yellow Tx-critical Pocket Guide 1 Ea Treatment Red-yellow Ba6715 Kerlix 2 Ea Treatment Red-yellow Bj848 4x4 Pads 20 Ea Treatment Red-yellow Di-444 Heet-pak 1 Ea Treatment Red-yellow Di-688 Cold-pak 1 Ea Treatment Red-yellow Be-2 Coban 2" 1 Rl Treatment Red-yellow Ba-415 Xeroform 2 Ea Treatment Red-yellow Om-20039 Saline Bullets 7 Ea Treatment Red-yellow Sl-7122 Sodium Chloride,250ml 2 Bt Treatment Red-yellow Ta-7827-1 Transpore 1" 2 Rl Treatment Red-yellow Ta-7827-2 Transpore 2" 2 Rl Treatment Red-yellow Ta-5104 Zonas Tape 1" 2 Rl Treatment Red-yellow Ta-5106 Zonas Tape 2" 2 Rl Treatment Red-yellow Bs7303a Emergency Blanket 1 Ea Treatment Red-yellow Mds195184 Glove-sm 1 Bx Treatment Red-yellow Mds195185 Glove-med 1 Bx Treatment Red-yellow Mds195186 Glove-lrg 1 Bx Treatment Red-yellow Mds195187 Glove-xlrg 1 Bx Treatment Red-yellow Iv4173-15 Primary Iv Set 2 Ea Treatment Red-yellow Iv-001 Inject Site 2 Ea Treatment Red-yellow Iv-8042 Ext Set 2 Ea Treatment Red-yellow It-6150 Iv Start Pak 6 Ea Treatment Red-yellow It-18ga 18 Ga. Needle 5 Ea Treatment Red-yellow It21ga 21 Ga. Needle 5 Ea Treatment Red-yellow It23ga 23 Ga. Needle 5 Ea Treatment Red-yellow It3ccll 3cc Syringe 2 Ea Treatment Red-yellow It5ccll 5cc Syringe 2 Ea Treatment Red-yellow It10ccll 10cc Syringe 2 Ea Treatment Red-yellow It-1709 Iv Cath 14ga 5 Ea Treatment Red-yellow It-1707 Iv Cath 16ga 5 Ea Treatment Red-yellow It-1705 Iv Cath 18ga 5 Ea Treatment Red-yellow It-1703 Iv Cath 20ga 5 Ea Treatment Red-yellow It-1701 Iv Cath 22ga 5 Ea Treatment Red-yellow Is-5488 Sharps Colector 3.3 Qt 1 Ea Echcs Government Furnished Property Inventory List (storage Only) Item Description Quantity Invacare/hill Rom Hospital Beds/stretchers 30 Blue Isolation Tents 10 Bed Negative Isolation Tent W/hvac Unit 3 Hand Wash Station Portable Hand Wash Station/w Hand Sanitizer 6 Canopy Tents 10x10 Pop Up Canopy Tents 14 Lighting Units Milwaukee Cordless Lighting Units 6 Medical Surge Kits Vericore Portable Medical Surge Units 13 Shelter In Place Kits Propac 25 Bed Shelter In Place Kit 2ft X 4 Ft 10 Medical Surge Beds Vericore Put Together Beds For Med Surge 50 Emergency Transport Trailer Red Tow Trailer For Transport Of Cache To Hospital 1 The Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html. The Following Solicitation Provisions Apply To This Acquisition: Far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services Offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. The Following Contract Clauses Apply To This Acquisition: Far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services [dec 2022] Far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products And Commercial Services [sept 2023] The Following Subparagraphs Of Far 52.212-5 Are Applicable: 52.204-10 Reporting Executive Compensation & First-tier Subcontract Awards (jun 2020) 52.209-9 Protecting The Government S Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (nov 2021) 52.219-4 Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (oct 2022) 52.219-28 Post Award Small Business Program Representation (sept 2023) 52.222-3, Convict Labor (jun 2003) (e.o.11755) 52.222-19, Child Labor-cooperation With Authorities And Remedies (dec 2022) (e.o.13126) 52.222-21, Prohibition Of Segregated Facilities (apr 2015) 52.222-26, Equal Opportunity (sep 2016) (e.o.11246) 52.222-36 Equal Opportunity For Workers With Disabilities (jun 2020) 52.222-50 Combating Trafficking In Persons (nov 2021) 52.223-18, Encouraging Contractor Policies To Ban Text Messaging While Driving (jun 2020) (e.o. 13513) 52.224-3 Privacy Training (jan 2017) 52.232-34 Payment By Electronic Funds Transfer Other Than System For Award Management (jul 2013) 52.222-41 Service Contract Labor Standards (aug 2018) 52.222-42 Statement Of Equivalent Rates For Federal Hires (may 2014) Far 52.204-9, Personal Identity Verification Of Contractor Personnel (jan 2011); Far 52.204-13, System For Award Management Maintenance (oct 2018); Far 52.204-18, Commercial And Government Entity Code Maintenance (aug 2020); Far 52.217-8 Option To Extend Services (nov 1999) The Government May Require Continued Performance Of Any Services Within The Limits And At The Rates Specified In The Contract. These Rates May Be Adjusted Only Because Of Revisions To Prevailing Labor Rates Provided By The Secretary Of Labor. The Option Provision May Be Exercised More Than Once, But The Total Extension Of Performance Hereunder Shall Not Exceed 6 Months. The Contracting Officer May Exercise The Option By Written Notice To The Contractor Within Fifteen (15) Days Of The Expiration Date Of The Current Contract Period. The `specified' Rates Under This Clause Will Be Those Rates In Effect Under The Contract Each Time An Option Is Exercised Under This Clause. (end Of Clause) Far 52.217-9 Option To Extend The Term Of The Contract (mar 2000) (a) The Government May Extend The Term Of This Contract By Written Notice To The Contractor Within 1 Days; Provided That The Government Gives The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least 30 Days Before The Contract Expires. The Preliminary Notice Does Not Commit The Government To An Extension. (b) If The Government Exercises This Option, The Extended Contract Shall Be Considered To Include This Option Clause.(c) The Total Duration Of This Contract, Including The Exercise Of Any Options Under This Clause, Shall Not Exceed 5 Years. (end Of Clause) Far 52.222-14 Disputes Concerning Labor Standards (feb 1988) Cl 120 - Supplemental Insurance Requirements: In Accordance With Far 28.307-2 And Far 52.228-5, The Following Minimum Coverage Shall Apply To This Contract: (a) Workers' Compensation And Employers Liability: Contractors Are Required To Comply With Applicable Federal And State Workers' Compensation And Occupational Disease Statutes. If Occupational Diseases Are Not Compensable Under Those Statutes, They Shall Be Covered Under The Employer's Liability Section Of The Insurance Policy, Except When Contract Operations Are So Commingled With A Contractor's Commercial Operations That It Would Not Be Practical To Require This Coverage. Employer's Liability Coverage Of At Least $100,000 Is Required, Except In States With Exclusive Or Monopolistic Funds That Do Not Permit Workers' Compensation To Be Written By Private Carriers. (b) General Liability: $500,000.00 Per Occurrences. (c) Automobile Liability: $200,000.00 Per Person; $500,000.00 Per Occurrence And $20,000.00 Property Damage. (d) The Successful Bidder Must Present To The Contracting Officer, Prior To Award, Evidence Of General Liability Insurance Without Any Exclusionary Clauses For Asbestos That Would Void The General Liability Coverage. (end Of Clause) Far 52.232-40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023); Far 52.237-3, Continuity Of Services (jan 1991); Vaar 852.203-70, Commercial Advertising (may 2008); Vaar 852.204-70, Personal Identity Verification Of Contractor Personnel (may 2020); Vaar 852.215-71, Evaluation Factor Commitments (oct 2019) Vaar 852.232-72 Electronic Submission Of Payment Requests (nov 2018) The Provision At Far 52.212-2, Evaluation -- Commercial Items (nov 2021), Applies To This Acquisition. (a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers: Factor 1: Past Performance Offeror Shall Provide No More Than Three References Of Relatively The Same Size And Complexity. Include The Following Information For Each Contract: Name And Address Of Contracting Activity (company Name), Contract Number, Type Of Contract, Total Contract Amount, And Status, Date Of Award And Completion, Description And Location Of Contract Work, List Of Major Subcontractors If Any, Contracting Officer Or Individual Responsible For Signing The Contract, And Their Email Address. Offerors May Provide Information On Problems Encountered On Identified Contracts And The Offeror S Corrective Action. Searches In Cpars (contractor Performance Assessment Reporting System), Ppirs (past Performance Information Retrieval System), As Well As Past Performance Questionnaires May Be Utilized. Factor 2: Price Offerors Shall Provide One Copy Of The Fully Completed Price Schedule In The Format Listed Above. Proposed Prices Will Be Evaluated For Reasonableness. Contract Award Will Be Made Based On The Solicitation Response That Represents The Best Value To The Government Using A Contracting Officer S Comparative Analysis. Since The Contracting Officer Is Considering Price And Other Factors, The Co May Award To Other Than The Lowest-priced Offer. The Information Below Explains The Evaluation Approach. Award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13. Comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Most Favorable To The Government. The Contracting Officer Will Make A Comparative Analysis Of All Offers Against The Solicitation, Using The Following Factors To Decide Which Offer(s) Represent The Best Value To The Government: (b) Options. The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s). (c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer S Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (end Of Provision) All Quoters Shall Submit The Following: Completed Pricing Schedule And One Of The Below Statements Must Be Included In The Offer: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." Or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" Quoters Shall List Exception(s) And Rationale For The Exception(s), If Any. Submission Of Your Response Shall Be Received Not Later Than 1pm Mtn On Monday, November 13, 2023. Responses Shall Be Sent To The Point Of Contact Listed. The Full Text Of A Solicitation Provision Or Contract Clause May Be Accessed Electronically At The Address(es) Below: Http://www.acquisition.gov/far/index.html Http://www.va.gov/oamm/oa/ars/policyreg/vaar/index.cfm All Information Has Been Posted And There Are No Other Documents Available. Offers Are To Be Received Via Email To The Points Of Contact Below No Later Than 1:00 Pm Mountain Time On Monday, November 13, 2023. Offers Submitted By Fascimile (fax Machine) Will Not Be Accepted. Any Questions Or Concerns Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The Point Of Contact Listed Below. Point Of Contact Jennifer Balsiger; Jennifer.balsiger@va.gov
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Consultancy Services
United States
Closing Date20 Feb 2024
Tender AmountRefer Documents
Details: Combined Synopsis-solicitation For Commercial Products And Commercial Services revision 01
effective: 05/30/2023
description
this Is A Combined Synopsis/solicitation For Commercial Products And Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. this Solicitation Is Issued As Rfq 36c24124q0249. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2023-03. the Associated North American Industrial Classification System (naics) Code For This Procurement Is Naics 238290 (other Building Equipment Contractors) Size Standard $22 Million. this Is Being Bid As A Sdvosb Set-aside. the Vamc West Haven 950 Campbell Ave West Haven, Ct 06516 Is Seeking To Identify Any Vendor Capable Of Providing Vamc West Haven With Mechanical Systems Repairs In Building 1 Servicing Critical Infrastructure. They Have Been Diagnosed And In Need Of The Following Repairs: replacement Of The Head Pressure Control On Compressor 1 Of Crac #1 Located In Building 1 Room Sg105.
replacement Of The Compressor In The Liebert Unit Located In Building 1 Room Sg105.
replacement Of The Relief Valve On Compressor 2 Of Crac #3 In Building 1 Room Sg105. all Interested Companies Shall Provide Quotations For The Following: statement Of Work
background
mechanical Systems In Building 1 Servicing Critical Infrastructure Have Been Diagnosed And In Need Of Repairs As Follows: replacement Of The Head Pressure Control On Compressor 1 Of Crac #1 Located In Building 1 Room Sg105.
replacement Of The Compressor In The Liebert Unit Located In Building 1 Room Sg105. replacement Of The Relief Valve On Compressor 2 Of Crac #3 In Building 1 Room Sg105. justification
replacement Of Mechanical Equipment Is Needed To Maintain Daily Operations And Protect Critical Infrastructure Needed To Continue To Provide Patient Care. place Of Performance
the Place Of Performance For This Contract Is Va Connecticut Healthcare System, West Haven Va Medical Center Located At 950 Campbell Avenue, West Haven, Ct 06516. period Of Performance
the Contract Time Period Of Performance Will Be 60 Calendar Days From Notice To Proceed (ntp) And Includes Contractor Closeout. qualifications
to Be Considered Eligible For Consideration, Potential Bidders Shall Have A Field Service Representative Located Within 200 Miles Of The West Haven And Newington Campuses Of The Va Connecticut Healthcare System And Have Been Trained By The Original Equipment Manufacturer (oem) On The Specific Model Of Equipment That He/she Is Being Asked To Provide Services For. bidders Shall Provide Upon Request, Documentation Of Factory Certified Service/maintenance Training On The Specific Equipment Under The Terms Of This Contract. The Contracting Officer And/or Contracting Officer S Representative (cor) Specifically Reserve The Right To Reject Any Of The Contractor S Personnel And Refuse Them Permission To Work On The Equipment Outlined Herein, Based Upon Credentials Provided. scope Of Work
the Scope Of This Work Includes The Replacement Of Mechanical System Parts Including Compressor Head Pressure Control, Compressor, And Compressor Relief Valve. the Awarded Contractor Shall Furnish Al Materials, Equipment, Supervision, And Personnel Necessary To Accomplish The Project As Indicated. work Shall Occur During Regular Business Hours Between 7:00 A.m. 4:30 P.m. Or As Coordinated. objectives:
the Project Will Include But Not Be Limited To The Following:
contractor Shall Furnish Appropriate Tools, Equipment, And Labor To Replace The Head Pressure Control On Compressor 1 Of Crac #1 Located In Building 1 Room Sg105. contractor Shall Furnish Appropriate Tools And Equipment To Replace The Compressor In The Liebert Unit Located In Building 1 Room Sg105. contractor Shall Furnish Appropriate Tools And Equipment To Replace The Relief Valve On Compressor 2 Of Crac #3 Located In Building 1 Room Sg105. protect All Equipment In Place During Replacement Activities. all Contractor Personnel, Sub-contractors And Representatives Visiting Va Sites Will Be Required To Sign In Upon Arrival At Building 15 And/or Retain A Temporary Va Badge. Each Visiting Individual Be Required To Enter Their Name, Their Company S Name, Va Project Title, Reason For Visit, And The Times Of Arrival And Departure. Arrangements For After Normal Hour Working Site Visits Must Be Made In Advance And During Normal Working Hours. general: The Contracting Officer Reserves The Right To Terminate Any Construction Period Services, Without Payment For Services Completed, If Such Services Are Not Needed Or Are Not Being Adequately Completed. approved Plans And Permits: Prior To The Start Of Construction, Submit To Va Copies Of All Required Permits. site Visits: Day To Day Construction Administration Will Be Performed By The Cor. Periodic Reviews, Tests, And Other Field Observation By The Government Are Not To Be Interpreted As Superintendence Nor As Resulting In Any Approval Of The Contractor S Apparent Progress Toward Meeting The Government S Objectives; But Are Intended To Discover Any Information That The Contracting Officer May Be Able To Call To The Contractor S Attention To Prevent Costly Misdirection Of Effort.
the Contractor Shall Remain Responsible For Constructing, Operating, And Maintaining The Site In Full Accordance If The Requirements Of This Solicitation. the Contractor Shall Provide Va With A Copy Of All Inspection Reports For Inspections Conducted By Local, Regional, And State Code Authorities From The Start Of Construction Through Issuance Of The Certificate Of Occupancy Or Completion. the Contractor Shall Develop And Provide To The Va The Following:
safety Plan: The Contractor Shall Produce Work In Accordance With The Latest Editions Of All Applicable Dva Guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria To Meet Hospital Joint Commission (jcaho) Requirements), Nfpa, Federal And State Codes Pertinent To The Project Scope. all Construction Personnel On Site Are Required To Obtain An Occupational Safety And Health
administration (osha) 10 Hour Construction Certification, And The Site Competent Person For The
contractor Must Obtain An Osha 30 Hour Construction Certification. prior To The Start Of Construction, The Specifications Shall Require The Contractor To Develop And
submit Such Plans As Required By The Va Relating To Safety And Environmental Issues. These May Include But Are Not Limited To:
job Hazard Analysis And Loto quality Control Plan: A Quality Control Plan Shall Be Implemented For Identifying And Specifying The Appropriate Standard Forms For Quality Control Inspections That Will Become Part Of The Overall Plan. per Va Directive 1805, Smoking Vaping, And Smokeless Tobacco Are Prohibited On The Grounds Of Va Facilities, Including In Vehicles. This Directive Applies To All Service Providers And Their Employees. no Photography Of Va Premises Is Allowed Without Written Permission Of The Contracting Officer. Patients And Staff Are Not To Be Photographed At Any Time. prior To Commencing Work Onsite, All Service Providers And Provider Personnel Shall Furnish Proof Of Receipt Of Required Covid Vaccinations And Boosters In Compliance With Current Vha Directives. prior To Commencing Work Onsite, All Service Providers And Provider Personnel Shall Furnish Proof Of Receipt Of Required Tuberculosis Testing In Compliance With Vha Directive 1131(5), Dated June 04, 2021. parking For Service Provider And Its Employees Shall Be In Designated Areas Only. Service Provider To Coordinate With Cor. the Service Provider Shall Confine All Operations (including Storage Of Materials) On Government Premises To Areas Authorized Or Approved By The Va Contracting Officer. The Service Provider Shall Hold And Save The Government, Its Officers, And Agents, Free And Harmless From Liability Of Any Nature Occasioned By The Service Provider S Performance. Working Space And Space Available For Storing Materials Shall Be As Determined By The Cor. Workers Are Subject To The Rules Of The Medical Center Applicable To Their Conduct. Execute Work In Such A Manner As To Reduce Impacts With Work Being Done By Others. billing: Provide Cor With A Report Or Statement Of Work Completed And Include Statements With Request For Payment. Statement Should Include Service Completed And The Date Each Service Item Was Completed. Labor Charges Shall Be Billed Hourly, And Any Unused Labor Totals Will Be Credited Back To The Va Medical Center On The Next Billing Cycle, Upon Receipt Of The Service Report. safety Codes / Certification / Licensing: environmental Abatement Work, If Necessary, Is To Be Performed By Contractor Under Supervision And
monitoring For The Va By A Certified Industrial Hygienist.
the Contractor Shall Comply With All Codes As Described Above, As Well As Codes Customarily Applied In
va Construction Jobs Such As Nfpa Fire Code, Osha, Va Design Guides, Etc. Labs Used By The Contractor
shall Be Licensed As Required By Any Applicable Governing Agencies, And Their Certifications And Licenses
shall Be Included In The Reports. travel:
contractor And/or Subcontractors Will Travel From Their Place Of Business To The West Haven Vamc Of The Va Connecticut Healthcare System. appendix A
infection Prevention Measures a. Implement The Requirements Of Va Medical Center S Infection Control Risk Assessment
(icra) Team. Icra Group May Monitor Dust, In The Vicinity Of The Construction Work, And
require The Contractor To Take Corrective Action Immediately If The Safe Levels Are Exceeded.
b. Establish And Maintain A Dust Control Program As Part Of The Contractor S Infection
preventive Measures In Accordance With The Guidelines Provided By Icra Group As Specified
here. Prior To Start Of Work, Prepare A Plan Detailing Project-specific Dust Protection Measures,
including Periodic Status Reports, And Submit To Project Manager And Facility Icra Team For
review For Compliance With Contract Requirements In Accordance With Section 01340, Samples
and Shop Drawings.
1. All Personnel Involved In The Construction Or Renovation Activity Shall Be Educated
and Trained In Infection Prevention Measures Established By The Medical Center.
c. Medical Center Infection Control Personnel Shall Monitor For Airborne Disease (e.g.
aspergillosis) As Appropriate During Construction. A Baseline Of Conditions May Be Established
by The Medical Center Prior To The Start Of Work And Periodically During The Construction Stage
to Determine Impact Of Construction Activities On Indoor Air Quality. In Addition:
1. The Project Manager And Vamc Infection Control Personnel Shall Review Pressure
differential Monitoring Documentation To Verify That Pressure Differentials In The Construction
zone And In The Patient-care Rooms Are Appropriate For Their Settings. The Requirement For
negative Air Pressure In The Construction Zone Shall Depend On The Location And Type Of Activity.
upon Notification, The Contractor Shall Implement Corrective Measures To Restore Proper
pressure Differentials As Needed.
2. In Case Of Any Problem, The Medical Center, Along With Assistance From The
contractor, Shall Conduct An Environmental Assessment To Find And Eliminate The Source.
d. In General, Following Preventive Measures Shall Be Adopted During Construction To Keep
down Dust And Prevent Mold.
1. Dampen Debris To Keep Down Dust And Provide Temporary Construction Partitions In
existing Structures Where Directed By Resident Engineer. Blank Off Ducts And Diffusers To
prevent Circulation Of Dust Into Occupied Areas During Construction.
2. Analyze Each Site During Design To Determine The Effects Of Blocking Hvac Ducts And
their Impact On Existing Air Handling Systems That Must Remain Operational Before Initiating A
dust Control Program. The Method Of Capping Ducts Shall Be Dust Tight And Withstand Airflow.
3. Construct Anteroom To Maintain Negative Airflow From Clean Area Through Anteroom
and Into Work Area Where Required.
4. High Risk Patient Care Areas May Require Additional Measures Like Air Locks, Special
signage, Smoke And Negative Pressure Alarms.
5. Identify These Areas Clearly On The Drawings And Work With Medical Center Personnel
to Achieve Desired Level Of Isolation Suited To The Scope Of Risk Involved.
6. Do Not Perform Dust- Producing Tasks Within Occupied Areas Without The Approval Of
the Project Manager. For Construction In Any Areas That Will Remain Jointly Occupied By The
medical Center And Contractor S Workers, The Contractor Shall:
a. Provide Dust Proof Fire-rated Temporary Drywall Construction Barriers To
completely Separate Construction From The Operational Areas Of The Hospital In Order
to Contain Dirt Debris And Dust. Barriers Shall Be Sealed And Made Presentable On
hospital Occupied Side. Install A Self-closing Rated Door In A Metal Frame,
commensurate With The Partition, To Allow Worker Access. Maintain Negative Air At All
times. A Fire Retardant Polystyrene, 6-mil Thick Or Greater Plastic Barrier Meeting Local
fire Codes May Be Used Where Dust Control Is The Only Hazard, And An Agreement Is
reached With The Resident Engineer And Medical Center.
b. Hepa Filtration Is Required Where The Exhaust Dust May Reenter The Breathing
zone. Contractor Shall Verify That Construction Exhaust To Exterior Is Not Reintroduced
to The Medical Center Through Intake Vents, Or Building Openings. Install Hepa (high
efficiency Particulate Accumulator) Filter Vacuum System Rated At 95% Capture Of 0.3
microns Including Pollen, Mold Spores And Dust Particles. Insure Continuous Negative
air Pressures Occurring Within The Work Area. Hepa Filters Should Have Ashrae 85 Or
other Pre-filter To Extend The Useful Life Of The Hepa. Provide Both Primary And
secondary Filtrations Units. Exhaust Hoses Shall Be Heavy Duty, Flexible Steel
reinforced And Exhausted So That Dust Is Not Reintroduced To The Medical Center.
c. Adhesive Walk-off/carpet Walk-off Mats, Minimum 24 X 36 , Shall Be Used At All
interior Transitions From The Construction Area To Occupied Medical Center Area.
these Mats Shall Be Changed As Often As Required To Maintain Clean Work Areas
directly Outside Construction Area At All Times.
d. Vacuum And Wet Mop All Transition Areas From Construction To The Occupied
medical Center At The End Of Each Workday. Vacuum Shall Utilize Hepa Filtration.
maintain Surrounding Area Frequently. Remove Debris As They Are Created. Transport
these Outside The Construction Area In Containers With Tightly Fitting Lids.
e. The Contractor Shall Not Haul Debris Through Patient-care Areas Without Prior
approval Of The Resident Engineer And The Medical Center. When, Approved, Debris
shall Be Hauled In Enclosed Dust Proof Containers Or Wrapped In Plastic And Sealed
with Duct Tape. No Sharp Objects Should Be Allowed To Cut Through The Plastic. Wipe
down The Exterior Of The Containers With A Damp Rag To Remove Dust. All Equipment,
tools, Material, Etc. Transported Through Occupied Areas Shall Be Made Free From Dust
and Moisture By Vacuuming And Wipe Down.
f. Using A Hepa Vacuum, Clean Inside The Barrier And Vacuum Ceiling Tile Prior To
replacement. Any Ceiling Access Panels Opened For Investigation Beyond Sealed Areas
shall Be Sealed Immediately When Unattended.
g. There Shall Be No Standing Water During Construction. This Includes Water In
equipment Drip Pans And Open Containers Within The Construction Areas. All
accidental Spills Must Be Cleaned Up And Dried Within 12 Hours. Remove And Dispose
of Porous Materials That Remain Damp For More Than 72 Hours.
h. At Completion, Remove Construction Barriers And Ceiling Protection Carefully,
outside Of Normal Work Hours. Vacuum And Clean All Surfaces Free Of Dust After The
removal.
e. Final Cleanup:
1. Upon Completion Of Project, Or As Work Progresses, Remove All Construction Debris
from Above Ceiling, Vertical Shafts And Utility Chases That Have Been Part Of The Construction.
2. Perform Hepa Vacuum Cleaning Of All Surfaces In The Construction Area. This Includes
walls, Ceilings, Cabinets, Furniture (built-in Or Free Standing), Partitions, Flooring, Etc.
1. All New Air Ducts Shall Be Cleaned Prior To Final Inspection. Spec Writer Note:
on Small Projects Developed At Medical Center, Engineering Officer May Tag
items To Be Removed And Stored, Instead Of Noting Such Items On Drawings Or In
specifications. appendix B
va Information And Information System Security/privacy Language For
inclusion Into Contracts, As Appropriate
1. General
contractors, Contractor Personnel, Subcontractors, And Subcontractor Personnel Shall Be
subject To The Same Federal Laws, Regulations, Standards, And Va Directives And Handbooks
as Va And Va Personnel Regarding Information And Information System Security.
2. Access To Va Information And Va Information Systems
a. A Contractor/subcontractor Shall Request Logical (technical) Or Physical Access To Va
information And Va Information Systems For Their Employees, Subcontractors, And
affiliates Only To The Extent Necessary To Perform The Services Specified In The Contract,
agreement, Or Task Order.
b. All Contractors, Subcontractors, And Third-party Servicers And Associates Working With Va
information Are Subject To The Same Investigative Requirements As Those Of Va
appointees Or Employees Who Have Access To The Same Types Of Information. The Level
and Process Of Background Security Investigations For Contractors Must Be In Accordance
with Va Directive And Handbook 0710, Personnel Suitability And Security Program. The
office For Operations, Security, And Preparedness Is Responsible For These Policies And
procedures.
c. Contract Personnel Who Require Access To National Security Programs Must Have A Valid
security Clearance. National Industrial Security Program (nisp) Was Established By
executive Order 12829 To Ensure That Cleared U.s> Defense Industry Contractor
personnel Safeguard The Classified Information In Their Possession While Performing
work On Contracts, Programs, Bid, Or Research And Development Efforts. The
department Of Veterans Affairs Does Not Have A Memorandum Of Agreement With
defense Secretary Service (dss). Verification Of A Security Clearance Must Be Processed
through The Special Security Officer Located In The Planning And National Security
service Within The Office Of Operations, Security, And Preparedness.
d. Custom Software Development And Outsourced Operations Must Be Located In The U.s.
to The Maximum Extent Practical. If Such Services Are Proposed To Be Performed Abroad
and Are Not Disallowed By Other Va Policy Or Mandates, The Contractor/subcontractor
must State Where All Non-u.s. Services Are Provided And Detail A Security Plan, Deemed
to Be Acceptable By Va, Specifically To Address Mitigation Of The Resulting Problems Of
communication, Control, Data Protection, And So Forth. Location Within The U.s. May Be
an Evaluation Factor.
e. The Contractor Or Subcontractor Must Notify The Contracting Officer Immediately When
an Employee Working On A Va System Or With Access To Va Information Is Reassigned Or
leaves The Contractor Or Subcontractor S Employ. The Contracting Officer Must Also Be
notified Immediately By The Contractor Or Subcontractor Prior To An Unfriendly
termination. 3. Va Information Custodial Language
a. Information Made Available To The Contractor Or Subcontractor By Va For The
performance Or Administration Of This Contract Or Information Developed By The
contractor/subcontractor In Performance Or Administration Of The Contract Shall Be Used
only For Those Purposes And Shall Not Be Used In Any Other Way Without The Prior Written
agreement Of The Va. This Clause Expressly Limits The Contractor/subcontractor S Rights
to Use Data As Described In Rights In Data General, Far 52.227-14(d) (1).
b. Va Information Should Not Be Co-mingled, If Possible, With Any Other Data On The
contractors/subcontractor S Information Systems Or Media Storage Systems In Order To
ensure Va Requirements Related To Data Protection And Media Sanitization Can Be Met.
if Co-mingling Must Be Allowed To Meet The Requirements Of The Business Need, The
contractor Must Ensure That Va S Information Is Returned To The Va Or Destroyed In
accordance With Va S Sanitization Requirements. Va Reserves The Right To Conduct Onsite
inspections Of Contractor And Subcontractor It Resources To Ensure Data Security
controls, Separation Of Data And Job Duties, And Destruction/media Sanitization
procedures Are In Compliance With Va Directive Requirements.
c. Prior To Terminator Or Completion Of This Contract, Contractor/subcontractor Must Not
destroy Information Received From Va, Or Gathered/created By The Contractor In The
course Of Performing This Contract Without Prior Written Approval By The Va. Any Data
destruction Done On Behalf Of Va By A Contractor/subcontractor Must Be Done In
accordance With National Archives And Records Administration (nara) Requirements As
outlined In Va Directive 6300, Records And Information Management And Its Handbook
6300.1 Records Management Procedures, Applicable Va Records Control Schedules, And
va Handbook 6500.1 Electronic Media Sanitization. Self-certification By The Contractor
that The Data Destruction Requirements Above Have Been Met Must Be Sent To The Va
contracting Officer Within 30 Days Of Termination Of The Contract.
d. The Contractor/subcontractor Must Receive, Gather, Store, Back Up, Maintain, Use,
dispose Of Va Information Only In Compliance With The Terms Of The Contract And
applicable Federal And Va Information Confidentiality And Security Laws, Regulations And
policies. If Federal Or Va Information Confidentiality And Security Laws, Regulations And
policies Become Applicable To The Va Information Or Information Systems After
execution Of The Contract, Or If Nist Issues Or Updates Applicable Fips Or Special
publications (sp) After Execution Of This Contract, The Parties Agree To Negotiate In Good
faith To Implement The Information Confidentiality And Security Laws, Regulations And
policies In This Contract.
e. The Contractor/subcontractor Shall Not Make Copies Of Va Information Except As
authorized And Necessary To Perform The Terms Of The Agreement Or To Preserve
electronic Information Stored On Contractor/subcontractor Electronic Storage Media For
restoration In Case Any Electronic Equipment Or Data Used By The
contractor/subcontractor Needs To Be Restored To An Operating State. If Copies Are Made
for Restoration Purposes, After The Restoration Is Complete, The Copies Must Be
appropriately Destroyed.
f. If Va Determines That The Contractor Has Violated Any Of The Information Confidentiality,
privacy, And Security Provisions Of The Contract, It Shall Be Sufficient Grounds For Va To
withhold Payment To The Contractor Or Third Party Or Terminate The Contract For Default
or Terminate For Cause Under Federal Acquisition Regulation (far) Part 12.
g. If A Vha Contract Is Terminated For Cause, The Associated Baa Must Also Be Terminated
and Appropriate Actions Taken In Accordance With Vha Handbook 1600.01, Business
associate Agreements. Absent An Agreement To Use Or Disclose Protected Health
information, There Is No Business Associate Relationship.
h. The Contractor/subcontractor Must Store, Transport, Or Transmit Va Sensitive
information In An Encrypted Form, Using Va-approved Encryption Tools That Are, At A
minimum, Fips 140-2 Validated.
i. The Contractor/subcontractor S Firewall And Web Services Security Controls, If Applicable,
shall Meet Or Exceed Va S Minimum Requirements. Va Configuration Guidelines Are
available Upon Request.
j. Except For Uses And Disclosures Of Va Information Authorized By This Contract For
performance Of The Contract, The Contractor/subcontractor May Use And Disclose Va
information Only In Two Other Situations: (i) In Response To A Qualifying Order Of A Court
of Competent Jurisdiction, Or (ii) With Va S Prior Written Approval. The
contractor/subcontractor Must Refer All Requests For, Demands For Production Of, Or
inquiries About, Va Information And Information Systems To The Va Contracting Officer
for Response.
k. Notwithstanding The Provision Above, The Contractor/subcontractor Shall Not Release Va
records Protected By Title 38 U.s.c. 5705, Confidentiality Of Medical Quality Assurance
records And/or Title 38 U.s.c. 7332, Confidentiality Of Certain Health Records Pertaining
to Drug Addiction, Sickle Cell Anemia, Alcoholism Or Alcohol Abuse, Or Infection With
human Immunodeficiency Virus. If The Contractor/subcontractor Is In Receipt Of A Court
order Or Other Requests For The Above Mentioned Information, That
contractor/subcontractor Shall Immediately Refer Such Court Orders Or Other Requests To
the Va Contracting Officer For Response.
l. For Service That Involves The Storage, Generating, Transmitting, Or Exchanging Of Va
sensitive Information But Does Not Require C&a Or An Mou-isa For System
interconnection, The Contractor/subcontractor Must Complete A Contractor Security
control Assessment (csca) On A Yearly Basis And Provide It To The Cor.
4. Information System Design And Development
a. Information Systems That Are Designed Or Developed For On Behalf Of Va At Non-va
facilities Shall Comply With All Va Directives Developed In Accordance With Fisma, Hipaa,
nist, And Related Va Security And Privacy Control Requirements For Federal Information
systems. This Includes Standards For The Protection Of Electronic Phi, Outlined In 45
c.f.r. Part 164, Subpart C, Information And System Security Categorization Level
designation In Accordance With Fips 199 And Fips 200 With Implementation Of All
baseline Security Controls Commensurate With The Fips 199 System Security
categorization (reference Appendix D Of Va Handbook 6500, Va Information Security
program). During The Development Cycle A Privacy Impact Assessment (pia) Must Be
completed, Provided To The Cor, And Approved By The Va Privacy Service In Accordance
with Directive 6507, Va Privacy Impact Assessment.
b. The Contractor/subcontractor Shall Certify To The Cor That Applications Are Fully
functional And Operate Correctly As Intended On Systems Using The Va Federal Desktop
core Configuration (fdcc), And The Common Security Configuration Guidelines Provided
by Nist Or The Va. This Includes Internet Explorer 7 Configured To Operate On Windows
xp And Vista (in Protected Mode On Vista) And Future Versions, As Required.
c. The Standard Installation, Operation, Maintenance, Updating, And Patching Of Software
shall Not Alter The Configuration Settings From The Va Approved And Fdcc Configuration.
information Technology Staff Must Also Use The Windows Installer Service For Installation
to The Default Program Files Directory And Silently Install And Uninstall.
d. Applications Designed For Normal End Users Shall Run In The Standard User Context
without Elevated System Administration Privileges.
e. The Security Controls Must Be Designed, Developed, Approved By Va, And Implemented
in Accordance With The Provisions Of Va Security System Development Life Cycle As
outlined In Nist Special Publication 800-37, Guide For Applying The Risk Management
framework To Federal Information Systems, Va Handbook 6500, Information Security
program And Va Handbook 6500.5, Incorporating Security And Privacy In System
development Lifecycle.
f. The Contractor/subcontractor Is Required To Design, Develop, Or Operate A System Of
records Notice (sor) On Individuals To Accomplish An Agency Function Subject To The
privacy Act Of 1974, (as Amended), Public Law 93-579, December 31, 1974 (5 U.s.c.
552a) And Applicable Agency Regulations. Violation Of The Privacy Act May Involve The
imposition Of Criminal And Civil Penalties.
g. The Contractor/subcontractor Agrees To:
(1) Comply With The Privacy Act Of 1974 (the Act) And The Agency Rules And Regulations
issued Under The Act In The Design, Development, Or Operation Of Any System Of
records On Individuals To Accomplish An Agency Function When The Contract
specifically Identifies:
a. The Systems Of Records (sor); And
b. The Design, Development, Or Operation Work That The Contractor/subcontractor
is To Perform;
i. Include The Privacy Act Notification Contained In This Contract In Every
solicitation And Resulting Subcontract And In Every Subcontract Awarded
without A Solicitation, When The Work Statement In The Proposed Subcontract
requires The Redesign, Development, Or Operation Of A Sor On Individuals
that Is Subject To The Privacy Act; And
ii. Include This Privacy Act Clause, Including This Subparagraph (3), In All
subcontracts Awarded Under This Contract Which Requires The Design,
development, Or Operation Of Such A Sor.
h. In The Event Of Violations Of The Act, A Civil Action May Be Brought Against The Agency
involved When The Violation Concerns The Design, Development, Or Operation Of A
sor On Individuals To Accomplish An Agency Function, And Criminal Penalties May Be
imposed Upon The Officers Or Employees Of The Agency When The Violation Concerns
the Operation Of Sor On Individuals To Accomplish An Agency Function. For Purposes
of The Act, When The Contract Is For The Operation Of A Sor On Individuals To
accomplish An Agency Function, The Contractor/subcontractor Is Considered To Be An
employee Of The Agency.
(1) Operation Of A System Of Records Means Performance Of Any Of The Activities
associated With Maintaining The Sor, Including The Collection, Use,
maintenance, And Dissemination Of Records.
(2) Record Means Any Item, Collection, Or Grouping Of Information About An
individual That Is Maintained By An Agency, Including, But Not Limited To,
education, Financial Transactions, Medical History, And Criminal Or Employment
history And Contains The Person S Name, Or Identifying Number, Symbol, Or Any
other Identifying Particular Assigned To The Individual, Such As A Fingerprint Or
voiceprint, Or A Photograph.
(3) System Of Records Means A Group Of Any Records Under The Control Of Any
agency From Which Information Is Retrieved By The Name Of The Individual Or By
some Identifying Number, Symbol, Or Other Identifying Particular Assigned To The
individual.
i. The A/e Shall Ensure The Security Of All Procured Or Developed Systems And
technologies, Including Their Subcomponents (hereinafter Referred To As Systems ),
throughout The Life Of This Contract And Any Extension, Warranty, Or Maintenance
periods. This Includes, But Is Not Limited To Workarounds, Patches, Hotfixes,
upgrades, And Any Physical Components (hereafter Referred To As Security Fixes)
which May Be Necessary To Fix All Security Vulnerabilities Published Or Known To The
a/e Anywhere In The Systems Including Operating Systems And Firmware. The A/e
shall Ensure That Security Fixes Shall Not Negatively Impact The Systems.
j. The A/e Shall Notify Va Within 24 Hours Of The Discovery Or Disclosure Of Successful
exploits Of The Vulnerability Which Can Compromise The Security Of The Systems
(including The Confidentiality Or Integrity Of Its Data And Operations, Or The
availability Of The System). Such Issues Shall Be Remediated As Quickly As Is Practical,
but In No Event Longer Than 7 Days.
k. When The Security Fixes Involve Installing Third Party Patches (such As Microsoft Os
patches Or Adobe Acrobat), The A/e Will Provide Written Notice To The Va That The
patch Has Been Validated As Not Affecting The System Within 10 Working Days. When
the A/e Is Responsible For Operations Or Maintenance Of The Systems, They Shall Apply
the Security Fixes Within 7 Days.
l. All Other Vulnerabilities Shall Be Remediated As Specified In This Paragraph In A Timely
manner Based On Risk, But Within 60 Days Of Discovery Or Disclosure. Exceptions To
this Paragraph (e.g. For The Convenience Of Va) Shall Only Be Granted With Approval
of The Contracting Officer And The Va Assistant Secretary For Office Of Information
and Technology.
5. Information System Hosting, Operation, Maintenance, Or Use
a. For Information Systems That Are Hosted, Operated, Maintained, Or Used On Behalf Of Va
at Non-va Facilities, Contractors/subcontractors Are Fully Responsible And Accountable
for Ensuring Compliance With All Hipaa, Privacy Act, Fisma, Nist, Fips, And Va Security
and Privacy Directives And Handbooks. This Includes Conducting Compliant Risk
assessments, Routine Vulnerability Scanning, System Patching And Change Management
procedures, And The Completion Of An Acceptable Contingency Plan For Each System. The
contractor S Security Control Procedures Must Be Equivalent, To Those Procedures Used
to Secure Va Systems. A Privacy Impact Assessment (pia) Must Also Be Provided Ot The
cor And Approved By Va Privacy Service Prior To Operational Approval. All External
internet Connections To Va S Network Involving Va Information Must Be Reviewed And
approved By Va Prior To Implementation.
b. Adequate Security Controls For Collecting, Processing, Transmitting, And Storing Of
personally Identifiable Information (pii), As Determined By The Va Privacy Service, Must
be In Place, Tested, And Approved By Va Prior To Hosting, Operation, Maintenance, Or Use
of The Information System, Or Systems By Or On Behalf Of Va. These Security Controls Are
to Be Assessed And Stated Within The Pia And If These Controls Are Determined Not To Be
in Place, Or Inadequate, A Plan Of Action And Milestones (poa&m) Must Be Submitted
and Approved Prior To The Collection Of Pii.
c. Outsourcing (contractor Facility, Contractor Equipment Or Contractor Staff) Of Systems Or
network Operations, Telecommunications Services, Or Other Managed Services Requires
certification And Accreditation (authorization) (c&a) Of The Contractor S Systems In
accordance With Va Handbook 6500.3, Certification And Accreditation And/or The Va
ocs Certification Program Office. Government-owned (government Facility Or
government Equipment) Contractor-operated Systems, Third Party Or Business Partner
networks Require Memorandums Of Understanding And Interconnection Agreements
(mou-isa) Which Detail What Data Types Are Shared, Who Has Access, And The
appropriate Level Of Security Controls For All Systems Connected To Va Networks.
d. The Contractor/subcontractor S System Must Adhere To All Fisma, Fips, And Nist
standards Related To The Annual Fisma Security Controls Assessment And Review And
update The Pia. Any Deficiencies Noted During This Assessment Must Be Provided To The
va Contracting Officer And The Iso For Entry Into Va S Poa&m Management Process.
the Contractor/subcontractor Must Use Va S Poa&m Process To Document Planned
remedial Actions To Address Any Deficiencies In Information Security Policies, Procedures,
and Practices, And The Completion Of Those Activities. Security Deficiencies Must Be
corrected Within The Timeframes Approved By The Government.
contractor/subcontractor Procedures Are Subject To Periodic, Unannounced
assessments By Va Officials, Including The Va Office Of Inspector General. The Physical
security Aspects Associated With Contractor/subcontractor Activities Must Also Be Subject
to Such Assessments. If Major Changes To The System Occur That May Affect The Privacy
or Security Of The Data Or The System, The C&a Of The System May Need To Be Reviewed,
retested And Re-authorized Per Va Handbook 6500.3. This May Require Reviewing And
updating All Of The Documentation (pia, System Security Plan, Contingency Plan). The
certification Program Office Can Provide Guidance On Whether A New C&a Would Be
necessary.
e. The Contractor/subcontractor Must Conduct An Annual Self-assessment On All Systems
and Outsourced Services As Required. Both Hard Copy And Electronic Copies Of The
assessment Must Be Provided To The Cor. The Government Reserves The Right To
conduct Such An Assessment Using Government Personnel Or Another
contractor/subcontractor. The Contractor/subcontractor Must Take Appropriate And
timely Action (this Can Be Specified In The Contract) To Correct Or Mitigate Any
weaknesses Discovered During Such Testing, Generally At No Additional Cost.
f. Va Prohibits The Installation And Use Of Personally-owned Or Contractor/subcontractor Owned
equipment Or Software On Va S Network. If Non-va Owned Equipment Must Be
used To Fulfill The Requirements Of A Contract, It Must Be Stated In The Service Agreement,
sow, Or Contract. All Of The Security Controls Required For Government Furnished
equipment (gfe) Must Be Utilized In Approved Or Other Equipment (oe) And Must Be
funded By The Owner Of The Equipment. All Remote Systems Must Be Equipped With, And
use, A Va-approved Antivirus (av) Software And A Personal (host-based Or Enclaved
based) Firewall That Is Configured With A Va-approved Configuration. Software Must Be
kept Current, Including All Critical Updates And Patches. Owners Of Approved Oe Are
responsible For Providing And Maintaining The Anti-viral Software And The Firewall On The
non-va Owned Oe.
g. All Electronic Storage Media Used On Non-va Leased Or Non-va Owned It Equipment That
is Used To Store, Process, Or Access Va Information Must Be Handled In Adherence With
va Handbook 6500.1, Electronic Media Sanitization Upon: (i) Completion Or Termination
of The Contract Or (ii) Disposal Or Return Of The It Equipment By The
contractor/subcontractor, Whichever Is Earlier. Media (hard Drives, Optical Disks, Cds,
back-up Tapes, Etc.) Used By The Contractors/subcontractors That Contain Va Information
must Be Returned To The Va For Sanitization Or Destruction Or The
contractor/subcontractor Must Self-certify That The Media Has Been Disposed Of Per
6500.1 Requirements. This Must Be Completed Within 30 Days Of Termination Of The
contract.
h. Bio-medical Devices And Other Equipment Or Systems Containing Media (hard Drives,
optical Disks, Etc.) With Va Sensitive Information Must Not Be Returned To The A/e At The
end Of Lease, For Trade-in, Or Other Purposes. The Options Are:
(1) A/e Must Accept The System Without The Drive;
(2) Va S Initial Medical Device Purchase Includes A Spare Drive Which Must Be Installed
in Place Of The Original Drive At Time Of Turn-in; Or
(3) Va Must Reimburse The Company For Media At A Reasonable Open Market
replacement Cost At Time Of Purchase
(4) Due To The Highly Specialized And Sometimes Proprietary Hardware And Software
associated With Medical Equipment/systems, If It Is Not Possible For The Va To Retain
the Hard Drive, Then;
(a) The Equipment A/e Must Have An Existing Baa If The Device Being Traded In Has
sensitive Information Stored On It And Hard Drive(s) From The System Are Being
returned Physically Intact; And
(b) Any Fixed Hard Drive On The Device Must Be Non-destructively Sanitized To The
greatest Extent Possible Without Negatively Impacting System Operation.
selective Clearing Down To Patient Data Folder Level Is Recommended Using Va
approved And Validated Overwriting Technologies/methods/tools. Applicable
media Sanitization Specifications Need To Be Pre-approved And Described In The
purchase Order Or Contract.
620-21-205 Montrose River Front Storm Damage Repairs
va Medical Center Fdr Montrose, New York
page 19 Of 21
(c) A Statement Needs To Be Signed By The Director (system Owner) That States That
the Drive Could Not Be Removed And That (a) And (b) Controls Above Are In Place
and Completed. The Iso Needs To Maintain The Documentation.
6. Security Incident Investigation
a. The Term Security Incident Means An Event That Has, Or Could Have, Resulted In
unauthorized Access To, Loss Or Damage To Va Assets, Or Sensitive Information, Or An
action That Breaches Va Security Procedures. The Contractor/subcontractor Shall
immediately Notify The Cor And Simultaneously, The Designated Iso And Privacy Officer
for The Contract Of Any Known Or Suspected Security/privacy Incidents, Or Any
unauthorized Disclosures Of Sensitive Information, Including That Contained In System(s)
to Which The Contractor/subcontractor Has Access.
b. To The Extent Known By The Contractor/subcontractor, The Contractor/subcontractor S
notice To Va Shall Identify The Information Involved, The Circumstances Surrounding The
incident (including To Whom, How, When, And Where The Va Information Or Assets Were
placed At Risk Or Compromised), And Any Other Information That The
contractor/subcontractor Considers Relevant.
c. With Respect To Unsecured Protected Health Information, The Business Associate Is
deemed To Have Discovered A Data Breach When The Business Associate Knew Or Should
have Known Of A Breach Of Such Information. Upon Discovery, The Business Associate
must Notify The Covered Entity Of The Breach. Notifications Need To Be Made In
accordance With The Executed Business Associate Agreement.
d. In Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor
must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or
entities) Of Jurisdiction, Including The Va Oig And Security And Law Enforcement. The
contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate
with Va And Any Law Enforcement Authority Responsible For The Investigation And
prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The
contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va
information, Obtain Monetary Or Other Compensation From A Third Party For Damages
arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From,
or Related To, The Incident.
7. Liquidated Damages For Data Breach
a. Consistent With The Requirements Of 38 U.s.c. §5725, A Contract May Require Access To
sensitive Personal Information. If So, The Contractor Is Liable To Va For Liquidated Damages
in The Event Of A Data Breach Or Privacy Incident Involving Any Spi The
contractor/subcontractor Processes Or Maintains Under This Contract.
b. The Contractor/subcontractor Shall Provide Notice To Va Of A Security Incident As Set
forth In The Security Incident Investigation Section Above. Upon Such Notification, Va
must Secure From A Non-department Entity Or The Va Office Of Inspector General An
independent Risk Analysis Of The Data Breach To Determine The Level Of Risk Associated With
the Data Breach For The Potential Misuse Of Any Sensitive Personal Information Involved In
the Data Breach. The Term Data Breach Means The Loss, Theft, Or Other Unauthorized
access, Or Any Access Other Than That Incidental To The Scope Of Employment, To Data
containing Sensitive Personal Information, In Electronic Or Printed For, That Results In The
potential Compromise Of The Confidentiality Or Integrity Of The Data. Contractor Shall Fully
cooperate With The Entity Performing The Risk Analysis. Failure To Cooperate May Be
deemed A Material Breach And Grounds For Contract Termination.
c. Each Risk Analysis Shall Address All Relevant Information Concerning The Data Breach,
including The Following:
(1) Nature Of The Event (loss, Theft, Unauthorized Access);
(2) Description Of The Event, Including
(a) Date Of Occurrence
(b) Data Elements Involved, Including Any Pii, Such As Full Name, Social Security
number, Date Of Birth, Home Address, Account Number, Disability Code;
(3) Number Of Individuals Affected Or Potentially Affected;
(4) Names Of Individuals Or Groups Affected Or Potentially Affected;
(5) Ease Of Logical Data Access To The Lost, Stolen Or Improperly Accessed Data In Light Of
the Degree Of Protection For The Data, E.g., Unencrypted, Plain Text;
(6) Amount Of Time The Data Has Been Out Of Va Control;
(7) The Likelihood That The Sensitive Personal Information Will Or Has Been Compromised
(made Accessible To And Usable By Unauthorized Persons);
(8) Known Misuses Of Data Containing Personal Information, If Any;
(9) Assessment Of The Potential Harm To The Affected Individuals;
(10) Data Breach Analysis As Outlined In 6500.2 Handbook, Management Of Security
and Privacy Incidents, As Appropriate; And
(11) Whether Credit Protection Services May Assist Record Subjects In Avoiding Or
mitigating The Results Of Identity Theft Based On The Sensitive Personal Information
that May Have Been Compromised.
d. Based On The Determinations Of The Independent Risk Analysis, The Contractor Shall Be
responsible For Paying To The Va Liquidated Damages In The Amount Of $37.50 Per Affected
individual To Cover The Cost Of Providing Credit Protection Services To Affected Individuals
consisting Of The Following:
(1) Notification;
(2) One Year Of Credit Monitoring Services Consisting Of Automatic Daily Monitoring Of At
least 3 Relevant Credit Bureau Reports;
(3) Data Breach Analysis;
(4) Fraud Resolution Services, Including Writing Dispute Letters, Initiating Fraud Alerts And
credit Freezes, To Assist Affected Individuals To Bring Matters To Resolution;
(5) One Year Of Identity Theft Insurance With $20,000.00 Coverage At $0 Deductible; And
(6) Necessary Legal Expenses The Subjects May Incur To Repair Falsified Or Damaged Credit
records, Histories, Or Financial Affairs.
8. Security Controls Compliance Testing
on A Periodic Basis, Va, Including The Office Of Inspector General, Reserves The Right To
evaluate Any Or All Of The Security Controls And Privacy Practices Implemented By The
contractor Under The Clauses Contained Within The Contract. With 10 Working-day S Notice,
at The Request Of The Government, The Contractor Must Fully Cooperate And Assist In A
government-sponsored Security Controls Assessment At Each Location Wherein Va
information Is Processed Or Stored, Or Information Systems Are Developed, Operated,
maintained, Or Used On Behalf Of Va, Including Those Initiated By The Office Of Inspector
general. The Government May Conduct A Security Control Assessment On Shorter Notice (to
include Unannounced Assessments) As Determined By Va In The Event Of A Security Incident
or At Any Other Time.
9. Training
a. All Contractor Employees And Subcontractor Employees Requiring Access To Va
information And Va Information Systems Shall Complete The Following Before Being
granted Access To Va Information And Its Systems:
(1) Sign And Acknowledge (either Manually Or Electronically) Understanding Of And
responsibilities For Compliance With The Contractor Rules Of Behavior, Appendix E
relating To Access To Va Information And Information Systems;
(2) Successfully Complete The Va Cyber Security Awareness And Rules Of Behavior
training And Annually Complete Required Security Training;
(3) Successfully Complete The Appropriate Va Privacy Training And Annually Complete
required Privacy Training; And
(4) Successfully Complete Any Additional Cyber Security Or Privacy Training, As Required
for Va Personnel With Equivalent Information System Access [to Be Defined By The Va
program Official And Provided To The Contracting Officer For Inclusion In The
solicitation Document E.g., Any Role-based Information Security Training Required In
accordance With Nist Special Publication 800-1 6, Information Technology Security
training Requirements.]
b. The Contractor Shall Provide To The Contracting Officer And/or The Cor A Copy Of The
training Certificates And Certification Of Signing The Contractor Rules Of Behavior For Each
applicable Employee Within 1 Week Of The Initiation Of The Contract And Annually
thereafter, As Required.
c. Failure To Complete The Mandatory Annual Training And Sign The Rules Of Behavior
annually, Within The Timeframe Required, Is Grounds For Suspension Or Termination Of All
physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such
time As The Training And Documents Are Complete. evaluation Process award Will Be Made To The Best Price, As Determined To Be The Most Beneficial To The Government. Please Read Each Section Below Carefully For The Submittals And Information Required As Part Of The Evaluation. Failure To Provide The Requested Information Below Shall Be Considered Non-compliant And Your Quote Could Be Removed From The Evaluation Process.
vendors Quotes Shall Be Evaluated Under Far Part 13.106-2(b) -- Evaluation Of Quotations Or Offers. The Government Will Award A Contract Resulting From This Solicitation To The Responsible Vendor Whose Quote Conforming To The Solicitation Will Be Most Advantageous To The Government, Price, Past Performance, And Capabilities. The Following Factors Shall Be Used To Evaluate Offers: 1. Price (follow These Instructions):
a. Vendor Shall Provide A Quote For The Scheduled Drop Off Dates Above. Vendors Must Also Provide All Applicable Labor Rates For The Solicited Services So They Can Be Compared To The Applicable Wage Determination For Compliance With The Service Contract Labor Standards (scls) If Applicable. b. Ensure Your Validation Is Current In The System For Award Management (sam)( Https://www.sam.gov). Federal Acquisition Regulations Require That Federal Contractors Register In The Sam Database At Http://www.sam.gov And Enter All Mandatory Information Into The System. Award Cannot Be Made Until The Contractor Has Registered. Offerors Are Encouraged To Ensure That They Are Registered In Sam Prior To Submitting Their Quotation. 2. Capable: The Vendors Quote Shall Be Evaluated To Determine If The Organization Has The Experience And Capabilities To Provide The Requested Services In Accordance With The Statement Of Work In A Timely Efficient Manner. a. Contractor Shall Demonstrate Their Corporate Experience And Approach To Meet All Requirements. b. Contractor Shall Provide A List Of All Services Included In The Price. c. Contractor Shall Provide All Current And Relevant Licenses And/or Certifications For The State Of Massachusetts If Applicable. d. If You Are Planning To Sub-contract Some Or All Of This Work, Please Provide The Name And Address(s) Of All Subcontractor(s) (if Applicable) And A Description Of Their Planned Subcontracting Effort. e. Contractor Shall State And/or Demonstrate Their Ability To Meet All Requirements And Deliverables Stated In This Solicitation And Statement Of Work. Any Additional Information To Further Identify How The Company Is Experienced And Capable Of Performing The Requested Work Is Welcome. 3. Veterans Preference Factor (per 852.215-70): The Government Will Assign Evaluation Credit For An Offeror (prime Contractor) Which Is A Service-disabled Veteran-owned (sdvosb) Or A Veteran-owned Small Business (vosb). Non-sdvosb/vosb Offerors Proposing To Use Sdvosbs Or Vosbs As Subcontractors Will Receive Some Consideration Under This Evaluation Factor. a. For Sdvosbs/vosbs: In Order To Receive Credit Under This Factor, An Offeror Shall Submit A Statement Of Compliance That It Qualifies As A Sdvosb Or Vosb In Accordance With Vaar 852.215-70, Service-disabled Veteran-owned And Veteran-owned Small Business Evaluation Factors . Offerors Are Cautioned That They Must Be Registered And Verified In Vendor Information Pages (vip) Database (http://www.vetbiz.gov). i. Verified Sdvosbs Will Receive A 5% Price Credit (e.g. If A Sdvosb Submits An Offer Of $100.00, It Will Be Evaluated As If It Submitted An Offer Of $95.00). ii. Verified Vosbs Will Received A 2.5% Price Credit (e.g. If A Vosb Submits An Offer Of $100.00, It Will Be Evaluated As If It Submitted An Offer Of $97.50). the Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html. (x) Please Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications -- Commercial Items, With Your Offer Via The Sam.gov Website Or A Written Copy. (xi) Clause 52.212-4, Contract Terms And Conditions -- Commercial Items, Applies To This Acquisition In Addition To The Following Addenda S To The Clause: 52.252-2 Clauses Incorporated By Reference (feb 1998), 52.203-17 Contractor Employee Whistleblower Rights And Requirement To Inform Employees Of Whistleblower Rights (jun 2020), 52.204-4 Printed Or Copied Double-sided On Postconsumer Fiber Content Paper (may 2011), 52.204-13 System For Award Management Maintenance (oct 2018), 52.204-18 Commercial Government Entity Code Maintenance (aug 2020), 52.217-9 Option To Extend The Term Of The Contract (mar 2000), 52.228-5 Insurance-work On A Government Installation (jan 1997), 52.232-40 Providing Accelerated Payments To Small Business Subcontracting (dec 2013), 852.212-70 Provisions And Clauses Applicable To Va Acquisitions Of Commercial Items (apr 2020) 852.203-70 Commercial Advertising 852.219-74, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside 852.232-72 Electronic Submissions Of Payment Requests 852.233-70 Protest Content/alternative Dispute Resolution 852.233-71 Alternate Protest Procedure 852.270-1 Representatives Of Contracting Officers 852.219-74 Limitations On Subcontracting Monitoring And Compliance (jul 2018) as Prescribed In 819.7203(a) Insert The Following Clause: (a) This Solicitation Includes 852.219-74, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside, (b) Accordingly, Any Contract Resulting From This Solicitation Is Subject To The Limitation On Subcontracting Requirements In 13 Cfr 125.6. The Contractor Is Advised That In Performing Contract Administration Functions, The Contracting Officer May Use The Services Of A Support Contractor(s) Retained By Va To Assist In Assessing The Contractor S Compliance With The Limitations On Subcontracting Or Percentage Of Work Performance Requirements Specified In The Clause. To That End, The Support Contractor(s) May Require Access To Contractor S Offices Where The Contractor S Business Records Or Other Proprietary Data Are Retained And To Review Such Business Records Regarding The Contractor S Compliance With This Requirement. (c) All Support Contractors Conducting This Review On Behalf Of Va Will Be Required To Sign An Information Protection And Non-disclosure And Disclosure Of Conflicts Of Interest Agreement To Ensure The Contractor S Business Records Or Other Proprietary Data Reviewed Or Obtained In The Course Of Assisting The Contracting Officer In Assessing The Contractor For Compliance Are Protected To Ensure Information Or Data Is Not Improperly Disclosed Or Other Impropriety Occurs. (d) Furthermore, If Va Determines Any Services The Support Contractor(s) Will Perform In Assessing Compliance Are Advisory And Assistance Services As Defined In Far 2.101, Definitions, The Support Contractor(s) Must Also Enter Into An Agreement With The Contractor To Protect Proprietary Information As Required By Far 9.505-4, Obtaining Access To Proprietary Information, Paragraph (b). The Contractor Is Required To Cooperate Fully And Make Available Any Records As May Be Required To Enable The Contracting Officer To Assess The Contractor S Compliance With The Limitations On Subcontracting Or Percentage Of Work Performance Requirement. (end Of Clause) 852.219-77 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction. as Prescribed In 819.7009(c) Insert The Following Clause:
va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (sep 2021) (deviation) (a) Pursuant To 38 U.s.c. 8127(k)(2), The Offeror Certifies That (1) If Awarded A Contract (see Far 2.101 Definition), It Will Comply With The Limitations On Subcontracting Requirement As Provided In The Solicitation And The Resultant Contract, As Follows: [contracting Officer Check The Appropriate Box Below Based On The Predominant Naics Code Assigned To The Instant Acquisition As Set Forth In Far 19.102.] (i) [x] Services. In The Case Of A Contract For Services (except Construction), The Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Not Vip-listed Sdvosbs As Set Forth In 852.219-74 Or Vosbs As Set Forth In 852.219-11. Any Work That A Similarly Situated Vip-listed Subcontractor Further Subcontracts Will Count Towards The 50% Subcontract Amount That Cannot Be Exceeded. Other Direct Costs May Be Excluded To The Extent They Are Not The Principal Purpose Of The Acquisition And Small Business Concerns Do Not Provide The Service As Set Forth In 13 Cfr 125.6. (ii) [ ] General Construction. In The Case Of A Contract For General Construction, The Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To It To Firms That Are Not Vip-listed Sdvosbs As Set Forth In 852.219-74 Or Vosbs As Set Forth In 852.219-11. Any Work That A Similarly Situated Vip-listed Subcontractor Further Subcontracts Will Count Towards The 85% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted. (iii) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, The Contractor Will Not Pay More Than 75% Of The Amount Paid By The Government To It To Firms That Are Not Vip-listed Sdvosbs As Set Forth In 852.219-74 Or Vosbs As Set Forth In 852.219-11. Any Work That A Similarly Situated Subcontractor Further Subcontracts Will Count Towards The 75% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted. (2) The Offeror Acknowledges That This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States. The Offeror Further Acknowledges That This Certification Is Subject To Title 18, United States Code, Section 1001, And, As Such, A False, Fictitious, Or Fraudulent Certification May Render The Offeror Subject To Criminal, Civil, Or Administrative Penalties, Including Prosecution. (3) If Va Determines That An Sdvosb/vosb Awarded A Contract Pursuant To 38 U.s.c. 8127 Did Not Act In Good Faith, Such Sdvosb/vosb Shall Be Subject To Any Or All Of The Following: (i) Referral To The Va Suspension And Debarment Committee; (ii) A Fine Under Section 16(g)(1) Of The Small Business Act (15 U.s.c. 645(g)(1)); And (iii) Prosecution For Violating Section 1001 Of Title 18. (b) The Offeror Represents And Understands That By Submission Of Its Offer And Award Of A Contract It May Be Required To Provide Copies Of Documents Or Records To Va That Va May Review To Determine Whether The Offeror Complied With The Limitations On Subcontracting Requirement Specified In The Contract. The Contracting Officer May, At Their Discretion, Require The Contractor To Demonstrate Its Compliance With The Limitations On Subcontracting At Any Time During Performance And Upon Completion Of A Contract If The Information Regarding Such Compliance Is Not Already Available To The Contracting Officer. Evidence Of Compliance Includes, But Is Not Limited To, Invoices, Copies Of Subcontracts, Or A List Of The Value Of Tasks Performed. (c) The Offeror Further Agrees To Cooperate Fully And Make Available Any Documents Or Records As May Be Required To Enable Va To Determine Compliance With The Limitations On Subcontracting Requirement. The Offeror Understands That Failure To Provide Documents As Requested By Va May Result In Remedial Action As The Government Deems Appropriate. (d) Offeror Completed Certification/fill-in Required. The Formal Certification Must Be Completed, Signed, And Returned With The Offeror S Bid, Quotation, Or Proposal. The Government Will Not Consider Offers For Award From Offerors That Do Not Provide The Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award. i Hereby Certify That If Awarded The Contract, [insert Name Of Offeror] Will Comply With The Limitations On Subcontracting Specified In This Clause And In The Resultant Contract. I Further Certify That I Am Authorized To Execute This Certification On Behalf Of [insert Name Of Offeror].
printed Name Of Signee: _________________________________
printed Title Of Signee: ________________________________
signature: ______________________________________________
date: ___________________________________________________
company Name And Address: _____________________________________________________________________________________
(end Of Clause) 852.242-71 Administrative Contracting Officer. as Prescribed In 842.271, Insert The Following Clause: administrative Contracting Officer (oct 2020) the Contracting Officer Reserves The Right To Designate An Administrative Contracting Officer (aco) For The Purpose Of Performing Certain Tasks/duties In The Administration Of The Contract. Such Designation Will Be In Writing Through An Aco Letter Of Delegation And Will Identify The Responsibilities And Limitations Of The Aco. A Copy Of The Aco Letter Of Delegation Shall Be Furnished To The Contractor. (end Of Clause) (xii) Clause At 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, Applies To This Acquisition And In Addition To The Following Far Clauses Cited, Which Are Also Applicable To The Acquisition: 52.203-6, 52.204-10, 52.209-6, 52.219-4, 52.219-8, 52.219-6, 52.219-28, 52.222-3, 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.222-40, 52.222-50, 52.223-18, 52.225-3, 52.225-13, 52.232-33, 52.222-41 (wage Determination Central Western Massachusetts Vamc Hampshire County Wd 2015-4095 (rev-21), 52.222-42, 52.222-43, 52.222-55, 52.222-62 (xiii) All Contract Requirement(s) And/or Terms And Conditions Are Stated Above. (xiv) The Defense Priorities And Allocations System (dpas) And Assigned Rating Are Not Applicable To This Requirement. (xv) Rfq Questions Are Due Nlt 01/16/2024 At 17:00 Pm Est. Rfq Responses Are Due Nlt 01/20/2024 At 17:00 Pm Est. Rfq Responses Must Be Submitted Via Email With Rfq #36c24124q0249 In The Subject Line To: Nathan.langone@va.gov Hand Deliveries Shall Not Be Accepted. (xvi) The Poc Of This Solicitation Is Nathan Langone (nathan.langone@va.gov)
UNDP - UNDP Tender
Honduras
Closing Date18 Jan 2024
Tender AmountRefer Documents
Details: Undp-hnd-00105 Supply, installation and commissioning of HVAC equipment & The United Nations Development Program (UNDP) appreciates your quote for supply, installation and commissioning under the turn-key modality. of Precision Air Conditioning Equipment as Detailed in Annex 1 of this Sdc. This Quote Request is Managed Exclusively Through Our Quantum Supplier Portal. Suppliers can use the online portal to view documents related to the quote request and bid submission process, communicate with the procurement office via the messaging feature, and submit their bid. It is important to mention that the term "negotiation" is used to refer to an acquisition process in Quantum. If you are interested in submitting an offer and have never entered the Supplier Portal, you must register on the Quantum Portal using the exclusive registration link to enter your supplier profile with UNDP in Honduras: http://bit.ly/40hgahy Please Follow The steps indicated in the Video Tutorial and in the Registration Instructions for Quantum Suppliers that are available in the "acquisitions" section of the UNDP website in Honduras: Https://www.undp.org/es/honduras/ Procurement If You Already Have a Supplier Profile in Quantum, Please Login to the Supplier Portal Using the Following Link http://supplier.quantum.partneragencies.org Then Search for the Deal With Reference undp-hnd-00105 and Upload Your Offer Following the Offer Submission Guide, Also Available in the "Procurement" Section of the UNDP Honduras Website. Note: if you recently participated in a purchasing process, tender, had a contract or purchase order or any type of commercial link with the UNDP in Honduras in the last few months, prior to registering your profile in Quantum, please write to us at our Email Account acquisitionspnudhn@undp.org since it is possible that your profile/username currently exists in quantum, in these cases we can help you restore and/or activate your account. Deadline for Submission of the Offer in Quantum: December 18, 2023 Until 5:30 Pm (Official Time of the Republic of Honduras GMT-6). Offers Sent Through Postal Service, Courier, Email Or Other Means Will Not Be Accepted. Previous Meeting: An Information Meeting will be held prior to the presentation of offers, attendance is not mandatory, however, it is highly recommended. Date: Wednesday, December 6, 2023 Time: 10:00 Am (Official Time of the Republic of Honduras) Place: Zoom Platform Suppliers interested in participating must register using the registration link indicated below: Https://undp .zoom.us/webinar/register/wn_nxbl08ozscafwm0fpcmchg Additionally, a technical visit will be carried out: A technical visit will be carried out to the premises where the air conditioning equipment will be installed so that interested companies can verify the existing conditions (expanded in Annex 1 supply and Installation of Air Conditioning Equipment/considerations prior to installation), in accordance with the following detail: time: Starting at 10:00 am Date: Thursday, December 7, 2023 Address: Ip Room, Second Level of the Technical Building, Hondutel Miraflores Campus To confirm your attendance you must send written notification to the following email account: Adquisicionespnudhn@undp.org; No later than December 6, 2023 to confirm your participation, indicating the name, role in the company and identification card number of each participant. A maximum of two (2) representatives of each interested company will be admitted. This Visit is Not Mandatory. However, if the Bidder does not attend, he/she will not be able to claim, during the execution of the contract or purchase order, lack of knowledge of the physical conditions or other existing situations for the preparation of his/her offer, so he/she will not be able to present claims for this fact. Requests for Clarifications: Queries and Requests must be submitted in writing through the Quantum Messaging Function No later than Friday, December 8, 2023. Responses will be communicated to Registered Suppliers from the same Portal. In the event of making queries to people or email addresses, even if they are from the UNDP, the UNDP will not be obliged to respond to them or confirm having officially received them. Technical Assistance If you experience any inconvenience in the process of registering and submitting an offer in Quantum, please write to us at: comprapnudhn@undp.org To ensure that your case is resolved as quickly as possible, you are requested to share the following details: • The Id Or Reference Code Of The Negotiation, In This Case: Undp-hnd-00086 • Email Under Which You Registered On The Platform And Name Of The Company. • A brief description of the steps you took before finding the problem. • Screenshots of any errors or warning messages. Avoid Registering and Posting Your Proposal Too Close to the Submission Deadline Date and Time. If you face problems with the last minute system, there will be no possibility to provide you with technical support. At the end of this Notice, there is a link called "negotiation Document(s)", where the documents of this negotiation process are incorporated (list of requirements and technical specifications, offer submission forms, etc.), which you can Download Easily From Any Device. Before Accessing The Negotiation Documents, Please Click On The Link Provided. Best regards, UNDP Procurement Unit in Honduras
7301-7310 of 7313 archived Tenders