Hvac Tenders

Hvac Tenders

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

United States
Details: Synopsis: introduction: in Accordance With Federal Acquisition Regulation (far) 10.002(b)(2), This Sources Sought Notice Is For Market Research And Information Purposes Only At This Time And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs (va). the Department Of Veterans Affairs, Veterans Health Administration (vha), Program Contracting Activity Central (pcac) Is Conducting A Market Survey And Is Seeking Potential Sources For The Ehrm Infrastructure Upgrades Construction Project At The Lt. Col. Luke Weathers, Jr. Va Medical Center Memphis. project Description: the Contractor Shall Provide All Necessary Tools, Labor, Materials, Equipment, Permits, License, Supervision, And Quality Control For Ehrm Infrastructure Upgrades Memphis, Tn At The Lt. Col. Luke Weathers, Jr. Va Medical Center Memphis, In Accordance With The Drawings And Specifications. Work Includes Infrastructure Upgrades And Reconfiguring And Renovating Existing Space Impacted By Said Improvements. Infrastructure Upgrades Include Electrical, Bonding, Ups, Building Management Systems Interfaces, Hvac, Communication, Physical Security Upgrades, And Fiber Infrastructure Backbone Campus Wide Within And Between Buildings, Including Modification To Impacted Roads, Walks, Grading And Drainage, And Other Existing Utilities, Data Center, Wan Updates, And Hazardous Material Abatement. Project Buildings Include 1, 1a, 5, 6, 7, 9, And 10. procurement Information: the Proposed Project Will Be A Competitive Firm-fixed-price Contract Utilizing The Design-bid-build Approach (final Specifications And Drawings Will Be Provided). The Anticipated Solicitation Will Be Issued As Either A Request For Proposal (rfp) In Accordance With Far Part 15, Considering Technical And Price Factors Or As An Invitation For Bid (ifb) In Accordance With Far Part 14. The Results And Analysis Of The Market Research Will Finalize The Determination Of The Procurement Method. The Type Of Socio-economic Set-aside, If Any, Will Depend Upon The Responses To This Notice And Any Other Information Gathered During The Market Research Process. this Project Is Planned For Advertising In Early March 2024. In Accordance With Vaar 836.204, The Magnitude Of Construction Is Between $20,000,000.00 And $50,000,000.00. It Has Been Determined That The Value Of This Project Is Closer To The Higher Range Of The Magnitude Cited Above. The Applicable North American Industry Classification System (naics) Code Is 236220 With A Size Standard Of $45 Million. The Duration Of The Project Is Currently Estimated At 670 Calendar Days From The Issuance Of A Notice To Proceed. The Services For This Project Will Include Providing All Construction Related Services Such As: Providing Labor, Materials And Equipment Required To Complete The Project As Per Contract Documents Prepared By An Independent Architect-engineer Firm. the Government Is Concerned That Small Disadvantaged Veteran Owned Small Business (sdvosb) May Have Difficulty Obtaining The Necessary Bonding Capabilities To Perform A Project Of This Magnitude. Accordingly, All Business Types (e.g., Sdvosb, Vosb, 8(a), Hubzone, Etc) Are Highly Encouraged To Provide Responses Demonstrating Their Interest As Outlined Below. capability Statement: respondents Shall Provide A General Capabilities Statement To Include The Following Information: section 1: Provide Company Name, Unique Entity Identifier Number Associate With Sam.gov, Company Address, Point-of-contact Name, Phone Number And Email. section 2: Provide Company Business Size Based On Naics Code 236220. Also, Provide Business Type (i.e., Large Business, Small Business, Service-disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-owned Small Business, Hub Zone Small Business, Etc.). section 3: Provide A Statement Of Interest In The Project. section 4: Provide The Prime Contractor S Available Bonding Capacity In The Form Of A Letter Of Intent From Your Bonding Company With This Submission. *please Ensure That The Individual Bonding Capacity Is In Line With The Vaar Magnitude Of Construction Listed Above. section 5: Provide The Type Of Work Your Company Has Performed In The Past In Support Of The Same Or Similar Requirement. This Section Is Important As It Will Help To Determine The Type Of Socio-economic Set-aside, If Any. Please Provide The Following In Your Response: no More Than Three (3) Contracts That Your Company Has Performed Within The Last Seven (7) Years That Are Of Comparable Size, Complexity, And Scope To This Requirement. Include The Project Name, Project Owner And Contact Information As This Person May Be Contacted For Further Information, Project Scope, Project Size (example: Square Footage), Building Use (example: Medical Facility, Office Building, Etc.), Project Dollar Value, Start And Completion Dates. provide Specific Examples That Relate Aspects Of Previous Projects To The Proposed Project. Describe Specific Technical Skills And Key Personnel Your Company Possess To Perform The Requirements Described Under Description Of Work. describe Your Self-performed** Effort (as Either A Prime Or Subcontractor). Describe Self-performed Work In Terms Of Dollar Value And Description. **self-performed Means Work Performed By The Offeror Themselves, Not Work Performed By Another Company For Them For Any Of The Project Examples Provided. section 6: Project Labor Agreement (pla) - A Pla Is Defined As A Pre-hire Collective Bargaining Agreement With One Or More Labor Organizations That Establishes The Terms And Conditions Of Employment For A Specific Construction Project And Is An Agreement Described In 29 U.s.c. 158(f). The Pla Questionnaire Must Be Filled Out And Returned With The Sources Sought Response. The Questionnaire Can Be Found At The End Of This Document. federal Acquisition Regulation (far) 22.503 Policy: (a) Project Labor Agreement (pla) Is A Tool That Agencies May Use To Promote Economy And Efficiency In Federal Procurement. Pursuant To Executive Order 13502, Agencies Are Encouraged To Consider Requiring The Use Of Project Labor Agreements In Connection With Large-scale Construction Projects. (b) An Agency May, If Appropriate, Require That Every Contractor And Subcontractor Engaged In Construction On The Project Agree, For That Project, To Negotiate Or Become A Party To A Project Labor Agreement With One Or More Labor Organizations If The Agency Decides That The Use Of Project Labor Agreements Will- (1) Advance The Federal Government's Interest In Achieving Economy And Efficiency In Federal Procurement, Producing Labor-management Stability, And Ensuring Compliance With Laws And Regulations Governing Safety And Health, Equal Employment Opportunity, Labor And Employment Standards, And Other Matters; And (2) Be Consistent With Law. (c) Agencies May Also Consider The Following Factors In Deciding Whether The Use Of A Project Labor Agreement Is Appropriate For The Construction Project: (1) The Project Will Require Multiple Construction Contractors And/or Subcontractors Employing Workers In Multiple Crafts Or Trades. (2) There Is A Shortage Of Skilled Labor In The Region In Which The Construction Project Will Be Sited. (3) Completion Of The Project Will Require An Extended Period Of Time. (4) Project Labor Agreements Have Been Used On Comparable Projects Undertaken By Federal, State, Municipal, Or Private Entities In The Geographic Area Of The Project. (5) A Project Labor Agreement Will Promote The Agency S Long Term Program Interests, Such As Facilitating The Training Of A Skilled Workforce To Meet The Agency S Future Construction Needs. (6) Any Other Factors That The Agency Decides Are Appropriate. see Far Provision: 52.222-33 Notice Of Requirement For Project Labor Agreement And Far it Is Requested That Interested Contractors Submit A Response (electronic Submission) Of No More Than Nine (9) Single Sided Pages, Single-spaced, 12-point Font Minimum That Addresses The Above Information (this Is Inclusive Of The Pla Questionnaire). This Response Must Be Submitted As A Single Application-generated (not Scanned) Pdf Document That Is Less Than Or Equal To 4mb In Size. Please Note That Hard Copies Will Not Be Accepted. Please Also Include A Cover Page, Which Includes, At A Minimum: The Company S Name, Address, Dun & Bradstreet Number, Unique Entity Identifier (if Available), Socio-economic Status, Point-of-contact Name, Phone Number, And E-mail Address. Responses Must Include The Sources Sought Number And Project Title In The Subject Line Of Their E-mail Response Responses Must Include The Sources Sought Number And Project Title In The Subject Line Of Their E-mail Response. Submissions (responses) Shall Be Submitted Via Email To The Primary Point Of Contact Listed Below By January 11, 2024 At 1:00 Pm Et. No Phone Calls Will Be Accepted. the Capabilities Statement Submitted In Response To This Sources Sought Shall Not Be Considered To Be A Bid Or Proposal. This Notice Is For Information And Planning Purposes Only And Is Neither To Be Construed As A Commitment By The Government Nor Will The Government Pay For Information Solicited. No Evaluation Letters And/or Results Will Be Issued To The Respondents. After Completing Its Analyses, The Government Will Determine Whether To Limit Competition Among The Small Business Categories Listed Above Or Proceed With Full And Open Competition As Other Than Small Business. at This Time No Solicitation Exists; Therefore, Please Do Not Request A Copy Of The Solicitation. If A Solicitation Is Released It Will Be Synopsized In Contract Opportunities At Https://sam.gov. It Is The Potential Offeror's Responsibility To Monitor This Site For The Release Of Any Solicitation Or Synopsis. contracting Office Address: vha Program Contracting Activity Central (vha-pcac) 6100 Oak Tree Blvd., Suite 490 independence, Oh 44131 primary Point Of Contact: sharese Mckinney contract Specialist sharese.mckinney@va.gov project Labor Agreement (pla) Questionnaire (please Respond To The Questions Below) 1. Is Your Company Familiar With Project Labor Agreement (pla) And Its Use On Construction Projects? yes/no comments: 2. Would Your Company Likely Submit A Proposal For The Va Construction Solicitation That Requires The Use Of A Pla? yes/no comments: 3. If Va Requires A Pla, Would Your Proposed Construction Cost Likely To Increase Or Decrease And What Is The Likely Percentage Of Cost Increase Or Decrease? comments: 4. Does The Va Requirement To Use Of A Pla On A Construction Project Restrict Competition? yes/no comments: 5. Do You Expect Subcontractor Resistance Should Va Requires The Use Of A Pla On This Construction Solicitation? yes/no comments: 6. Do You Have Additional Comments Regarding The Use Of A Pla For This Project? comments: --- End Of Pla Questionnaire ---
Closing Date11 Jan 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

United States
Details: Amendment 0001: amendment 0001 Is Issued To Present Questions And Answers Received To Date. questions And Rfi Response Submissions (executive Summary Responses) Should Be Submitted Only To Aaron Hohl, Aaron.m.hohl.civ@us.navy.mil By Email Only. questions Received With Answers: q1. We Are In Receipt Of The Subject Rfi/ss And Would Like Clarification On The Following Statement Within: “the Contractor Will Be Responsible To Provide All Management, Labor, Material,equipment, Transportation, Supervision, And Environmental And Quality Controlsrelated To Performing A Maximum Of Four (4) Simultaneous Projects.” since This Appears To Be Drafted For A/e Services, We Needed More Information Regarding The Inclusion Of This Requirement. a1. Nswc Crane Anticipates Multiple Concurrent Task Orders To Be Issued Under This Single Award Idiq Contract. The Above Referenced Statement Is Clarifying That The Successful Firm Will Be Expected To Provide All Management, Labor, Material, Equipment, Transportation, Supervision, And Environmental And Quality Controls Required To Perform Architecture And Engineering Services For Up To Four (4) Simultaneous Projects. for Example, Site Surveying And Analysis Of Proposed Sites For Foundations, Utilities, And/or Access Will Require An Onsite Presence To Complete The Tasking. Illustrating The Capability To Fulfill Resource Demands For Four (4) Simultaneous Architect And Engineering Services Projects Will Be Required During The Sf 330 Response Phase. original Posting: n0016424snc12 - Request For Information (rfi)/sources Sought (ss) – Architect And Engineering (a-e) Services– Fsc/psc C219 – Naics 5413 issue Date: 17 Jul 2024 Closing Date: 14 Aug 2024 (1200pm Et) related Notices: N0016422snb83, N0016424snb55, N0016424r1025 note: This Is Not A Solicitation For Proposals. This Is An Rfi/ss Only. This Rfi/ss Is For Planning And Informational Purposes Only And Shall Not Be Considered As A Request For Proposal (rfp) Or As An Obligation On The Part Of The Government To Acquire Any Products Or Services. The Government Will Not Be Responsible For Any Costs Incurred In Responding To This Rfi/ss Or Furnishing The Requested Information. No Entitlement To Payment Of Direct Or Indirect Costs Or Charges By The Government Will Arise As A Result Of A Contractor’s Submission Of Responses To This Rfi/ss Or The Government’s Use Of Such Information. The Government Reserves The Right To Reject, In Whole Or In Part, Any Contractor’s Input Resulting From This Rfi/ss. No Contract Will Be Awarded From This Announcement. Pursuant To Federal Acquisition Regulations (far) 15.201(e), Responses To This Rfi/ss Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. The Information Provided In This Rfi/ss Is Subject To Change And Is Not Binding On The Government. Fsc/psc Codes Anticipated Include: architect And Engineering Pscs c1aa c1ab c1az c1bf c1ea c1eb c1ec c1ga c1gd c1gz c1ha c1hb c1hc c1hz c1jb c1lb c1nz c1pc c212 c219 c220 c221 c222 c223 purpose: this Rfi/ss Constitutes Market Research In Accordance With Far Part 10 And Is Not An Rfp. Nswc Crane Is Issuing This Rfi/ss To Gain Information Of Current Market Conditions And Size Standards As Well As To Identify Potential Vendors With Proven Capabilities To Provide Planning, And/or Design For New Construction, Renovation, Repair, Replacement, Demolition, Alteration, And/or Improvement Of Facilities And Infrastructure For Simultaneous Architect And Engineering Projects To Be Performed At The Following Locations: Nswc Crane; Lake Glendora Test Facility. The Government Is Seeking Information To Determine An Acceptable And Appropriate Acquisition Strategy To Meet Both Regulations And Timely Facility Requirements. requirements: nswc Crane Requirements Are In Support Of Providing Planning, And/or Design For New Construction, Renovation, Repair, Replacement, Demolition, Alteration, And/or Improvement Of Facilities And Infrastructure. Additionally, Types Of Tasking Requiring A-e Services May Include, But Not Be Limited To: -building Renovations And/or Additions -site Work Required To Support New Work -new Construction -roads, Parking Areas, Or Bridges -foundations -retaining Walls -failure Investigation Including Destructive And Non‐destructive Testing -seismic Evaluation And Design -progressive Collapse Analysis -blast Resistant Design -structural Engineering Investigations -utility Systems Including Sanitary And Storm -water Systems -storm Water Management -sediment And Erosion Control -earthwork -surveying -pavement Design -civil Engineering Studies -electrical And Heating, Ventilation And Air Conditioning (hvac) Design For Renovations Or New Facilities -concept Design -preparation Of Project Programming Documents -facility Siting Studies -environmental Assessments -geotechnical Services -engineering Studies And Services -design-build Request For Proposals (rfps) -planning Studies -project Programming Documents -developing Of Requirements -preparing Engineering Evaluations -project Scope -unit Guidance Or Parametric Cost Estimating -cost Valuation Surveying -development Of Alternatives And Economic Analysis -analysis Of Proposed Sites For Foundations, Utilities, And/or Access -constraints And Identification Of Environmental Issues -concept And Site Sketches -recommendations On Potential Utilities Impacts, Sustainable Features, And May Require Enhancement Of Previously Prepared Basic Documentation. all Such Work Shall Be Accomplished In Strict Accordance With All Applicable Navy And Local Instructions, Processes, And Procedures. Architectural And Engineering Requirements Will Be Identified In Individual Orders. The Architectural And Engineering Requirements May Be Executed At Nswc Crane; Crane, Indiana Or Lake Glendora Test Facility; Sullivan, Indiana. the Contractor Will Be Responsible To Provide All Management, Labor, Material, Equipment, Transportation, Supervision, And Environmental And Quality Controls Related To Performing A Maximum Of Four (4) Simultaneous Projects. requested Information: both Large And Small Businesses Currently Possessing, Or In Process Of Acquiring, Joint Certification Program (jcp) Certification Are Encouraged To Respond. respondents Who Are Interested Shall Provide A Capability Statement That Identifies The Successful Performance Of Architectural And Engineering Projects That Have Been Completed Within A Five (5) Year Timeframe Of The Posting Date Of This Rfi. The Capability Statement Shall Specify Whether Performance Was Completed As A Prime Contractor Or Via A Subcontractor Arrangement. Previous Projects Identified Shall Notate Whether The Effort Was For Commercial Entities Or For Work Completed On Government Installations. Furthermore, The Prior Performance Should Include The State In Which The Tasking Was Performed. contractors Must Be Properly Registered In The System For Award Management (sam.gov). Offerors May Obtain Information On Sam.gov Registration And Annual Confirmation Requirements By Calling 1-866-606-8220 Or Via The Internet At Https://sam.gov. the Technical Data Package May Contain Information That Is Export Controlled. Only Those Companies That Have Completed Dd Form 2345 And Are Certified Under The Jcp In An Active Status Are Authorized To Receive Export Controlled Information. Only Jcp Certified Firms Will Be Eligible For Any Future Award Made Related To This Effort. Additional Information About Jcp Is Available At Https://www.dla.mil/hq/logisticsoperations/services/jcp/. responses: vendors Possessing The Requisite Skills, Resources, And Capabilities Necessary To Perform The Stated Requirements Are Invited To Respond To This Rfi Via A Submission Of An Executive Summary On 8 ½ X 11 In Paper, No More Than Fifteen (15) Pages In Length, Using 12-point Times New Roman Font. All Responses Must Include The Following Information: name And Address Of Company name, Telephone, Fax Number, And E-mail Address Of Point Of Contact For Contracts cage Code And Sam Uei business Size (under Naics 541310) announcement Number: N0016424snc12 name, Telephone, And Email Address Of Point Of Contact For Facility Security Officer. Please See Nispom 32 Cfr 117 For Information Regarding Fso Requirements. jcp Certification Number, Jcp Status, Jcp Expiration Date – If Currently Working To Acquire Jcp Certification, Please Provide A Brief Explanation Of Your Firm’s Progress Towards Certification. please Be Advised That Proprietary Information Must Be Marked As Such On A Page-by-page And Paragraph-by-paragraph Basis. The Government Will Not Assume That The Information Provided By A Respondent Is Proprietary Unless It Is Conspicuously Marked On This Basis. Moreover, The Government Does Not Assume Duty To Contact A Respondent And Inquire Whether Unmarked Information Submitted In Response To This Rfi/ss Is Proprietary. All Information Marked Proprietary Will Be Safeguarded. the Government Is Only Seeking Sources/information For Market Research To Determine Market Interest And To Identify Sources And Capabilities Of Sources For Future Solicitations To Best Meet The Government’s Requirements. Acknowledgement Of Receipt Will Not Be Made, Nor Will Respondents Be Notified Of Nswc Crane’s View Of The Information Received. Do Not Send Any Material That Requires A Non-disclosure Agreement Or Identify Information This Is Business Sensitive. Submittals Will Not Be Returned To The Sender. Availability Of A Formal Solicitation/synopsis Will Be Announced Separately. It Is The Contractor’s Responsibility To Check Sam.gov To Receive Additional Data, Such As Any Changes That Occur Before The Closing Date. Your Interest In This Response Is Appreciated. respondents Will Not Be Notified Of The Results Of This Sources Sought Notice. The Information Obtained From Submitted Responses May Be Used In Development Of An Acquisition Strategy And Future Solicitation/synopsis. The Government May Contact Rfi Respondents Requesting Additional Information And Modeling Information To Substantiate Modeling Capabilities. When/if The Government Issues An Rfp, Interested Parties Will Be Expected To Thoroughly Address The Requirements Thereof Regardless Of The Circumstances Surrounding This Sources Sought. do Not Submit Classified Information To The Below Email Address. If A Potential Respondent Believes Submission Of Classified Material Is Necessary Or Will Provide A Higher Quality Response, Please Contact The Below Poc To Request Instructions For Submission. please Submit Executive Summary Responses To Aaron Hohl, Aaron.m.hohl.civ@us.navy.mil By Email Only. questions: questions Or Comments Regarding This Notice May Be Addressed To Aaron Hohl, Aaron.m.hohl.civ@us.navy.mil By Email Only. Telephone Calls/questions Or Inquiries Will Not Be Accepted. No Questions Will Be Accepted After 9 August 2024 At 1200 Eastern Time. Please Reference N0016424snc12 In The Subject Line Of All E-mails. The Government Intends To Respond To As Many Questions As Practicable And Will Respond To Questions Via An Amendment To This Rfi Posted To Sam.gov So That All Interested Parties Will Benefit From The Same Information. reference Announcement Number N0016424snc12 In The Subject Line Of E-mails And In All Correspondence And Communications Related To This Effort.
Closing Date14 Aug 2024
Tender AmountRefer Documents 

PUBLIC BUILDINGS SERVICE USA Tender

Real Estate Service
Corrigendum : Closing Date Modified
United States
Details: Amendment 0007 Issued On 05/29/2024 (see Attachment) solicitation No. 47pm0423r0032 Fy24 Idiq Satoc St Elizabeth West Campus Seed Project Located At 2701 Martin Luther King Jr., Ave., Se., Washington, Dc Is Hereby Amended (0007) To Include The Following: 1) The Bid Due Date And Time For Proposals To The Solicitation Has Been Revised And Extended From May 30, 2024 To August 2, 2024, No Later Than 5:00pm (est); 2) Notification That A New Seed Project For Bidding Will Be Issued For The Project In An Upcoming Amendment. A New Solicitation Package With Details Will Be Inclusive Of That Information; And 3) A Site Visit Date Of The New Project Area Will Be Made Available For All Interested Parties To Attend And Review The Area Of The Requirement Once The New Package With The Seed Project For Bidding Has Been Issued. Details For Attending The Site Visit Will Be Included In The New Solicitation Package. a Forthcoming Amendment Will Be Published To Update The Base Satoc Package Documentation With All Pertinent Information Required For Bidding. The Date Of This Solicitation Bid Date May Be Extended If Necessary During The Procurement Process To Allow Proper Time For Responsive Submissions To Be Received. all Other Terms And Conditions Remain The Same. all Queries To This Solicitation Shall Be Submitted In Writing Via Email To Contract Specialist, Georgia Robinson At Georgia.robinson@gsa.gov And The Contracting Officer Marquida Gaskins At Marquida.gaskins@gsa.gov. amendment 0006 Issued On 03/12/2024 (see Attachment) solicitation No. 47pm0423r0032 Fy24 Idiq Satoc St Elizabeth West Campus Seed Project Located At 2701 Martin Luther King Jr., Ave., Se., Washington, Dc Is Hereby Amended (0006) To Include The Following: 1) The Bid Due Date And Time For Proposals To The Solicitation Has Been Revised And Extended From March 13, 2024 To May 30, 2024, No Later Than 2:00pm (est) And 2) Notification That A New Seed Project Will Be Issued For The Project. A New Solicitation Package With Details Will Be Inclusive Of That Information. a Forthcoming Amendment Will Be Published To Update The Base Satoc Package Documentation With All Pertinent Information Required For Bidding. A Site Visit Of The Project Area Will Be Made Available For All Interested Parties To Attend And Review The Area Of The Requirement. Details Forthcoming. all Other Terms And Conditions Remain The Same. all Queries To This Solicitation Shall Be Submitted In Writing Via Email To Contract Specialist, Georgia Robinson At Georgia.robinson@gsa.gov And The Contracting Officer Marquida Gaskins At Marquida.gaskins@gsa.gov. amendment 0005 Issued On 01/25/24 ( See Attachments) solicitation No. 47pm0423r0032 For The St. Elizabeth West Campus Satoc Located At 2701 Martin Luther King Jr., Ave., S.e., Washington, Dc Is Hereby Amended (0005) To Include The Following: 1) The Bid Due Date And Time For Proposals To The Solicitation Has Been Revised And Extended From January 31, 2024 To March 13, 2024, No Later Than 2:00pm (est). a Forthcoming Amendment Will Be Published To Update The Base Satoc Package Documentation With All Pertinent Information Required For Bidding. all Other Terms And Conditions Remain The Same. all Queries To This Solicitation Shall Be Submitted In Writing Via Email To Contract Specialist, Georgia Robinson At Georgia.robinson@gsa.gov And The Contracting Officer Marquida Gaskins At Marquida.gaskins@gsa.gov. your Technical Proposal And Price Quote Shall Be Sent Electronically To Contract Specialist Georgia Robinson At Georgia.robinson@gsa.gov And Cc Contracting Officer Marquida Gaskins At Marquida.gaskins@gsa.gov. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ amendment 0004 Issued On 12/20/23 ( See Attachments) solicitation No. 47pm0423r0032 For The St E's West Campus Satoc Located At 2701 Martin Luther King Jr., Ave., S.e. Is Hereby Amended As Follows: 1) To Extend The Proposal Due Date From 01/04/24 To 1/31/24, No Later Than 12:00pm Est. 2) To Change The Contracting Officer From Nicole Dent To Marquida Gaskins, Effective Immediately. the Government Is In The Process Of Revising The Sow For The Seed Project. This Information Along With An Revised Solicitation And Agreement Will Be Forthcoming In An Upcoming Amendment. all Other Terms And Conditions Remain Unchanged. if You Have Any Questions About This Amendment, Please Contact The Contract Specialist Georgia Robinson At Georgia.robinson@gsa.gov And The Contracting Officer Marquida Gaskins At Marquida.gaskins@gsa.gov ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ amendment 0003 Issued On 11/22/23 ( See Attachments) solicitation No. 47pm0423r0032 For The St E's West Campus Satoc Located At 2701 Martin Luther King Jr., Ave., S.e. Is Hereby Amended To Solicitation To Include The Following Updated Documents And To Extend The Proposal Due Date. 1) Form 527 23 11 21 2) Wage Determination Rates 23 11 07 3) Site Visit Attendance Sheet Final 23 10 11 4) Rfi Responses 23 11 07 5) Extend The Proposal Due Date From 11/30/2023 To 01/04/24 No Later Than 12:00pm Est. the Government Is In The Process Of Revising The Sow For The Seed Project. This Information Along With An Revised Solicitation And Agreement Will Be Forthcoming In An Upcoming Amendment. All Other Terms And Conditions Remain Unchanged. If You Have Any Questions About This Amendment, Please Contact The Contract Specialist Georgia Robinson At Georgia.robinson@gsa.gov And The Contracting Officer Nicole Dent At Nicole.dent@gsa.gov ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------- amendment 0002 Issued On 11/02/23 ( See Attachments) solicitation No. 47pm0423r0032 For The St Es West Campus Satoc Located At 2701 Martin Luther King Jr., Ave., S.e. Is Hereby Amended To: 1. Extend The Proposal Due Date Due To The High Volume Of Rfis Received.rfis Responses Will Be Issued Via An Amendment Upon Completion. The Rfp Due Date Is Extended To Thrusday, November 30, 2023 No Later Than 12:00pm Est. Please Submit Your Proposal To Georgia.robinson@gsa.gov And Cc Nicole.dent@gsa.gov. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- amendment 0001 Issued On 9/28/23 ( See Attachments) solicitation No. 47pm0423r0032 For The St Es West Campus Satoc Located At 2701 Martin Luther King Jr., Ave., S.e. Is Hereby Amended To: 1. Provide Vendors With The Scope Of Work Dated July 13, 2023. 2. Reschedule Site Visit To Wednesday, October 11, 2023. Rfis Will Be Due On October 18, 2023 By 11:00am Est. The Rfp Due Date Is Extended To Monday, November 13, 2023 No Later Than 12:00pm Est ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ the Government Contemplates The Award Of A Firm Fixed Price Contract Single Award Task Order Contract For The St. Elizabeths Campus Located In Washington, Dc. The Estimated Values Of All Projects/task Orders Will Range From $3.500 Up To The Simplified Acquisition Threshold (currently $250,000.00). Award Of This Contract Shall Be Subject To The Availability Of Appropriated Funds, And The Government Shall Incur No Obligation Under The Solicitation In Advance Of Such Time As Funds Are Made Available To The Contracting Officer. this Solicitation Will Be Awarded Using The Lowest Price Technically Acceptable (lpta). This Acquisition Will Be Total Small Business Set-aside the Term Of The Idiq Contract Will Be A One (1) Year Base With Four (4) One-year Options. The Contract Will Not Include Pre-negotiated Line-item Pricing. Each Project/task Order Will Not Be Competed Using Criteria Established By The Ordering Office. This Contract Vehicle Will Be Utilized By The Regional 11 Only. the Scope Of This Proposed Procurement Includes The Provision Of The Following Services: 1) Construction Services, Including, But Not Limited To General Office Renovation; Interior Construction; Exterior Construction Repair; General Repair And Alteration Work; Installation Of New And The Alteration Of Existing Power Panels; Carpet And Carpet Tile Replacement; Painting; Hvac Duct Work Modification; Modification Of Existing Building Fire Sprinkler Systems; Plastering And Plaster Repair Work; Sidewalk Repairs/replacement; Asphalt/concrete Paving; 2) Alteration Services, Including, But Not Limited To: Electrical, Carpentry, Masonry, Plumbing, Mechanical, Architectural, Landscaping, Storm Drainage, Exterior Restoration, Waterproofing, Re-pointing, Cleaning, Sealing, Design-build Services; Roofing Involving Installation, Repair And Alteration, And Removal; And Paving Relevant To Property And Roads Owned, Leased Or Otherwise Under The Control Of Gsa, Or Other Authorized Federal Agencies; And Other Related Work. Additionally, Design Work Incidental To Construction As Well As Design/build Work Are Included. this Proposed Procurement Is Anticipated To Be Set Aside For Small Businesses Under Far 19.502-2. Idiq Contracts Will Be Awarded To Responsible Offerors Whose Proposals Offer The Best Overall Value To The Government. Individual Projects/task Orders Will Range In Value From $3,500.00 To The Simplified Acquisition Threshold (currently $250,000.00.) The Naics Code Applicable To This Proposed Procurement Is 236220 And The Size Standard Is $39.5 Million. Prospective Contractors Should Have Bonding Capacity Of A Minimum Of $500,000.00. to Encourage Participation In This Rfq, A Pre-submission Meeting Will Be Scheduled At Later Date. An Amendment To This Notice Will Be For Issued With The Date, Time, And Location. Attendance Is Completely Voluntary And Will Not Positively Or Negatively Impact A Team's Evaluation. Those Wishing To Attend Should Rsvp To Nicole Dent, Contracting Officer, Atnicole.dent@gsa.govand Georgia Robinson, Contract Specialistgeorgia.robinson@gsa.ogv In The E-mail, Please Provide The Names Of Those Attending. all Responsive Offers Will Be Considered. The Prime Contractor Must Be Registered In The System For Award Management (www.sam.gov).
Closing Date2 Aug 2024
Tender AmountRefer Documents 

DAVAO ORIENTAL STATE UNIVERSITY Tender

Corrigendum : Tender Amount Updated
Philippines
Details: Description 1 Lot To Acquire New Book Collection And Expand Library Holdings. 1 Copy Book 9710328765 The New Philippine Almanac Millennial Edition, Hb,2024 1 Copy Book 9781032779300 Object Relations Theories And Psychopathology/summers, 2024 1 Copy Book 9781071857182 Personality Theories And Applications/shiraev,2024 1 Copy Book 9781071847473 Process Of Research Psychology/mcbride,2024 1 Copy Book 9781916784468 Psychological Disorders And Therapies: Dsm5 Perspective/johnson, 2024 1 Copy Book 9781774698785 Psychopathology At School: Theorizing Mental Disorders/ Wagan, 2024 1 Copy Book 9781529793666 Research Methods And Statistics In Psychology, Haslam, 2024 1 Copy Book 9781032607634 Social Psychology: Theories And Applications/deb, 2024 1 Copy Book 9798891612280 Soil And Plant Diagnostics Techniques/mcmahon, 2024 1 Copy Book 9781394170098 Trauma Impacts: The Repercussions Of Individual & Collective Trauma/stone, 2024 1 Copy Book 9798891610293 Fishing Technology/nielsen,2024 1 Copy Book 9781266874741 M:management/bateman,2024 1 Copy Book 9788196458850 Navigating Agricultural Extension: A Comprehensive Guide/mallick,2024 1 Copy Book Strategic Human Resources Management/jones,2024 1 Copy Book Introduction To Learning And Behavior/powell,2023 1 Copy Book Cognitive Psychology 3rd Ed/goldstein,2024 1 Copy Book Biological Psychology 14th Ed/kalat,2024 1 Copy Book Portraits Of Everyday Practice In Music Therapy/potvin,2023 1 Copy Book Live Digital Theatre/dundjerovic,2023 1 Copy Book Art And Entertainment/hamilton,2024 1 Copy Book Culture And Arts/mishra,2023 1 Copy Book A Brief History Of Modern Psychology 4th Ed/benjamin,2024 1 Copy Book Local Journalism/matthews,2024 1 Copy Book Culture And Psychology 7th Ed/matsumoto,2023 1 Copy Book Garment Construction With Dvd/3g,2023 1 Copy Book Adult Development And Aging 9th Ed/cavanaugh,2024 1 Copy Book 9781975217129 Nursing 2025-2026 Drug Handbook 45e/lww,2025 1 Copy Book 9780323831734 Clinical Reasoning Cases In Nursing 8e/harding,2024 1 Copy Book 9781975174477 Critical Care Nursing 12ed/morton,2024 1 Copy Book 9780323809825 Concepts For Nursing Practice 4e (with E-book Access On Vital Source)/giddens,2025 1 Copy Book 9781266853388 Hole's Human Anatomy & Physiology 17e/welsh,2025 1 Copy Book 9781284293432 Nursing Informatics And The Foundation Of Knowledge, 6th Ed/dee Mcgonigle,2025 1 Copy Book 9780323882828 Public Health Nursing: Population-centered Health Care In The Community 11ed/stanhope,2025 1 Copy Book 9780443107108 Lehne's Pharmacology For Nursing Care: 12ed/burchum,2024 1 Copy Book 9781913484378 Guiness World's Record 2024/guiness,2024 1 Copy Book 9781529916607 Reply's Believe It Or Not/ripley,2023 1 Copy Book 9780357860151 Comparative Politics/kesselman,2024 1 Copy Book 9781266084089 University Physics W/ Modern Physics/bauer,2024 1 Copy Book 9780323936507 Rodak's Hematology: Clinical Principles And Applications 7e/keohane,2025 1 Copy Book 9781284254907 Statistics For Nursing: A Practical Approach 4e/heavey,2024 1 Copy Book 9780323874250 Clinical Judgement And Test-taking Strategies/silvestre,2024 1 Copy Book 9780323846684 Teaching In Nursing: A Guide For Faculty/billings,2024 1 Copy Book 9781009370479 Power And Inequality: A Reformist Perspective/roncaglia,2024 1 Copy Book 9781032282459 The Power Of Opposition/wegmann,2023 1 Copy Book 9781032271293 Contemporary Contribution To Critiques Of Political Economy/giri,2024 1 Copy Book 9781032469560 Methodologies In Critical Terrorism Studies: Gaps And Interdisciplinary Perspectives/finden,2024 1 Copy Book 9781984685674 Basics Of Electrostatistics,2024 1 Copy Book 9781984679963 Electronics Technology,2023 1 Copy Book 9781984685513 Hvac Basics,2024 1 Copy Book 9781984685575 Basic Knowledge Of Automotive Servicing,2024 1 Copy Book 9781984688866 Agriscience Applications With Access Code/corpas,2024 1 Copy Book 9781647253646 Internal Combustion Engine: Engineering Fundamentals/vaughn,2023 1 Copy Book 9780357618738 The Complete Hvacr Lab Manual/silberstein,2023 1 Copy Book 9780357766248 Automotive Engines Diagnosis, Repair, Rebuilding/gilles,2024 1 Copy Book 9780357766620 Automotive Maintenance & Light Repair/thompson,2024 2 Copy Book 9786214183210 Criminological Research- A Self Study Guide/depayso,2024 2 Copy Book 9786214182572 Law Enforcement Operations And Planning With Crime Mapping/tancangco,2024 2 Copy Book 9786214183494 Comparative Models Of Policing And Philippine National Police Policing/depayso,2024 2 Copy Book 9786214183135 Moral Philosophy And Ethics /bacuyag,2024 2 Copy Book 9786214183456 Learning General Psychology-the Easy Way/uriarte,2024 2 Copy Book 9786214182718 Purposive Communication In Diverse Contexts/josue,2023 2 Copy Book 9786214183364 A Modular Approach In Advanced Writing/pagalilauan,2023 2 Copy Book 9786214182749 Drills And Exercises For Intensive English/josue,2023 2 Copy Book 9786214183449 Learn And Enjoy Intermediate Statistics-the Easy Way/uriarte,2024 2 Copy Book 9786214183432 Learn And Enjoy Statistics-the Easy Way (basic) Vol.1/uriarte,2024 2 Copy Book 9786214183425 Learning Research-the Easy Way Revised Edition/uriarte,2024 2 Copy Book 9786214183500 Criminal Procedure- A Handbook For Criminology Students/gabao,2024 2 Copy Book 9786214182787 Fundamentals Of Criminal Law -revised Penal Code Book 1/abastillas,2023 2 Copy Book 9786214183708 Human Rights Education- Building A Universal Culture Of Human Rights/tulalian,2024 2 Copy Book 9786214183487 Human Development - Understanding Criminal Behavior And Victimology/togana,2024 2 Copy Book 9786214183647 Deceptive Minds - Unmasking The Art Of Lie Detection/moyao,2024 2 Copy Book 9786214183715 Traffic Management Ad Accident Investigation With Defensive Driving/dausan,2024 2 Copy Book 9786214183654 Vice And Drug Education And Control/tad-awan,2024 2 Copy Book 9786214183272 Dispute Resolutions And Crises/incident Management - Alternative Dispute Resolution/caṅo,2024 2 Copy Book 9786214183784 Instructional Modules In Human Behavior And Victimology/rago,2025 2 Copy Book 9786214183517 Fundamentals Of Criminal Investigation And Intelligence/lopez,2024 2 Copy Book 9786214183401 Theories Of Crime Causation - An Institutional And Learning Guide/caballero,2024 2 Copy Book 9786214103371 Forensic Photography/tad-awan,2024 2 Copy Book 9786214183753 Juvenile Delinquency & Juvenile Justice/mariano,2024 2 Copy Book 9786214183531 Handbook In Juvenile Delinquency And Violence Against Women And Their Children,barican,2024 2 Copy Book 9786214183340 Special Crime Investigation With Interview And Interrogation Protocols/domingo,2024 2 Copy Book 9786214183395 Introduction To Criminology : A Guide Book For Criminology Instructors And Students/caballero,2024 2 Copy Book 9786214183357 Introduction To Criminology/magtaan,2024 2 Copy Book 9786214183319 Introduction To Criminology/rectin,2023 2 Copy Book 9786214183470 Fundamentals Of Criminal Investigation And Intelligence/tad-awan,2024 2 Copy Book 9786214183609 Introduction To Cybercrime And Environmental Laws And Protection/tad-awan,2024 2 Copy Book 9786214183463 Introduction To The Forensic Sciences/taduran,2024 1 Copy Book 9798887153407 Agribusiness Management/gilbert,2024 1 Copy Book 9780357875575 Agriscience: Fundamentals And Applications/burton,2024 1 Copy Book 9780357543733 Modern Livestock And Poultry Production/flanders,2025 1 Copy Book 9798887153032 Crop Production: Theory, Techniques And Technology/martin,2024 1 Copy Book 9798887153360 Abstract Algebra/thompson,2024 1 Copy Book 9781774697528 Introduction To Statistics/ngetich,2024 1 Copy Book 9780357753637 Precalculus: Mathematics For Calculus/stewart,2024 1 Copy Book 9788119365746 Introduction To Psychology/lobo,2024 1 Copy Book 9780357658116 Learning And Behavior/chance,2023 1 Copy Book 9781119856740 Applied Psychology/davey,2023 1 Copy Book 9780357946442 Theories Of Personality/schultz,2025 1 Copy Book 9798891612143 Technical Writing/franco,2024 1 Copy Book 9788119205899 Ground Water And Soil Pollution Remediation/borde,2024 1 Copy Book 9781774693827 Encyclopedia Of Veterinary Science/anand,2023 1 Copy Book 9789395337489 Animal Science And Range Management/saba,2023 3 Copy Book Multidisiplinaryong Pananaliksik Sa Araling Pilipino/tuazon,2024 3 Copy Book Advanced Marketing Management/arante,2024 3 Copy Book The Teacher And The Community School Culture And Organizational Leadership/boholand,2024 3 Copy Book A Course Module For Teaching English In The Elementary Grades 9language Arts)/reyes,2021 1 Copy Book Technology For Teaching And Learning 1 1 Copy Book Teaching Science In The Elementary Grades/bilbao,2024 3 Copy Book Advanced Theory & Practice In Public Administration/abante,2024 3 Copy Book Cad Basics 1 Introduction To 2d Drawing/mangubat,2023 3 Copy Book Advanced Public Fiscal Management Finance And Accountability/abante,2024 3 Copy Book The Essential Of Practicing Values Education With Work Ethics: Modular Approach/cadiz,2023 3 Copy Book Assessment Of Learning 1/manas,2024 3 Copy Book Survey Of Afro-asian Literature/cordova,2024 3 Copy Book Field Study 2/baltazar,2024 2 Copy Book Risk Management With Haccp As Applied To Safety, Security And Sanitation/yeung,2020 3 Copy Book Field Study 1/boholand,2021 2 Copy Book Assessment In Learning 2/sawchel,2023 2 Copy Book The Teaching Profession/fernando,2024 3 Copy Book The Teacher And The School Curriculum/ Gallardo,2024
Closing Date30 Sep 2024
Tender AmountPHP 681.8 K (USD 12.1 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Software and IT Solutions
United States
Details: This Announcement Constitutes A Sources Sought Synopsis (market Survey). This Is Not A Request For Quote (rfq) Or A Request For Proposal (rfp). This Announcement Is For Information And Planning Purposes Only And Is Not To Be Construed As A Commitment By The Government, Implied Or Otherwise, To Issue A Solicitation Or Award A Contract. The Government Will Not Pay For Any Cost Incurred In Responding To This Announcement. Any Information Submitted By Respondents To This Sources Sought Synopsis Shall Be Voluntary. this Sources Sought Notice Is For Market Research Purposes Only. The Information Submitted In Response To The Sources Sought Notice Will Not Be Utilized To Determine Vendor Standing In Any Future/potential Request For Quote/request For Proposal, Nor Will It Be Utilized To Determine If A Vendor Is Qualified To Submit A Request For Quote/request For Proposal For Any Future/potential Requirement. The Notice And The Information Received Shall Not Be Used To Determine How Well Respondents Can Perform A Requirement, Which Can Only Be Evaluated In Response To A Solicitation. note: We Are Primarily Looking For Sdvosb And Vosb Capabilities For Potential Consideration Under The Veterans First Contracting Program. the Veterans Integrated Service Network (visn) 8 Encompassing Florida And Puerto Rico Is Seeking Business Concerns Capable Of Providing Pharmacy Personnel And Environmental Monitoring Certification Services As Described Below. the Government Requires Personnel Certification Testing Of Gloved Fingertip And Thumb Testing, Media Fill Testing, Facility Compounding Area Surface Monitoring, And Air Viable And Non-viable Testing In Accordance With Usp , Usp , Ceta And Fda Guidelines In Support Of The Visn 8 Sunshine Healthcare Network Pharmacies That Compound Sterile Preparations (csp). Further Details Of The Requirement Are As Follows: the Vendor Shall Refer To The Most Current Versions Of Standards Including But Not Limited To Usp, Fda And Ceta When Conducting The Requested Monitoring And Reporting. The Frequencies Of Testing And Specific Procedure Should Be Determined By The Most Updated Version Of Ceta, Usp And , And Per Specific Facility Requirements And/or Requests. The Vendor Shall Be Responsible For Complying With The Most Updated Versions Of This Guidance And Will Conduct All Sampling Per The Procedures Outlined Within The Official Chapters. gowning And Garbing Evaluation: The Vendor Shall Perform A Gowning And Garbing Evaluation For Each Employee In Conjunction With The Gloved Fingertip And Thumb Sampling And Media-fill Test. The Vendor Shall Use The Facility S Standard Operating Procedure As Guidance For Their Evaluation. gloved Fingertip And Thumb Sampling: The Vendor Shall Perform The Gloved Fingertip And Thumb Sampling For The Expected Number Of Employees From Each Facility As Listed In Appendix A. This Should Be Done In Conjunction With Media-fill Testing. The Results Should Be Reported By Number Of Colony-forming Units (cfu) Per Hand (left Hand, Right Hand). If Any Agar Plates Demonstrate Growth, The Preliminary Results Will Be Reported To The Chief, Pharmacy Service And Corresponding Pharmacy Service Point Of Contact (contracting Officer Representative {cor}, Etc.) As Soon As The Initial Result Is Known. Final Results Will Be Expeditiously Reported After Further Antimicrobial Testing Is Complete. media-fill Testing: The Vendor Shall Perform Media-fill Testing For The Expected Number Of Employees From Each Facility As Listed In Appendix A. This Should Be Done In Conjunction With Gloved Fingertip And Thumb Sampling. The Results Should Include The Name Of The Employee Evaluated, The Evaluation Date/time, Media And Components Used To Include The Expiration Date And Lot Number, The Results, And The Signatures Of The Person Evaluated And The Observer. Failure Of The Test In Indicated By Visible Turbidity Or Other Visual Manifestations Of Growth In The Medium In One Or More Container-closer Units On Or Before The End Of The Incubation Period. If Any Container-closer Units Demonstrate Growth, The Preliminary Results Will Be Reported To The Chief, Pharmacy Service And Corresponding Pharmacy Service Point Of Contact (cor, Etc.) As Soon As The Initial Result Is Known And Final Results Will Be Expeditiously Reported After Further Antimicrobial Testing Is Complete. compounding Area Certification: The Vendor Shall Provide Certification Of Classified Areas Using Procedures In The Current Controlled Environment Testing Association (ceta) Application Guides. Certification Must Be Performed At Least Every 6 Months And As Needed Depending On Facility Requirements Or Requests. Certification Must Include The Following: airflow Testing: The Air Changes Per Hour (acph) From The Hvac, Acph Contributed From The Pec, And The Total Acph Must Be Documented On The Certification Report. hepa Filter Integrity Testing: Hepa Filters Must Be Leak Tested At The Factory And Then Leak Tested Again After Installation And As Part Of Recertification. total Particle Count Testing: Must Be Performed Under Dynamic Operating Conditions Using Current, State-of-the-art Electronic Equipment. Air Sampling Sites Must Be Selected In All Classified Areas. Measurements Must Be Taken In Each Pec At Locations Where There Is Greatest Risk To The Exposed Csps, Containers, And Closures. Measurements Of Nonviable Airborne Particles In Other Classified Areas Including The Buffer Room(s) And Ante-room(s), Should Be Taken At Representative Locations That Reflect The Quality Of Air In The Room(s). smoke Visualization Studies: Must Be Performed For Each Pec During Dynamic Operating Conditions To Demonstrate Unidirectional Airflow And Sweeping Action Over And Away From The Preparation (s). A Video Of The Smoke Test Must Accompany The Report. Any Media Files Must Be Provided In Dvd Format To Comply With Vha Guidance For Media. No .zip Files, Usb Storage, Flash Drives, Or Downloadable Files From Vendor Web Sites. primary Engineering Control (pec) Certification (laminar Flow Hoods, Biological Safety Cabinets, Compounding Aseptic Isolators, Compounding Aseptic Containment Isolators, Passthrough Chambers Etc.). The Pec Must Be Certified To Meet Iso Class 5 At 0.5 M And Larger Particles During Dynamic Operating Conditions. Pec Certification Must Include All Specifications As Outlined Per Ceta Application Guides And Pertinent Usp Chapters. differential Pressure Certification: Must Be Performed For Ante Rooms And Buffer Rooms. Cleanrooms Used For Non-hazardous Compounding Must Be Positive Pressure Relative To The Adjacent Spaces. Usp Chapter Requires A Minimum Pressure Differential Of 0.020 W.c. Relative To Adjacent Spaces. Cleanrooms Used For Hazardous Applications Should Be A Minimum 0.010 W.c. Negative Relative To Adjacent Spaces. viable Air Sampling: Each Classified Area Shall Have Volumetric Active Air Sampling Using An Impaction Device During Dynamic Operating Conditions At Least Every 6 Months And As Needed Depending On Facility Requirements. At Least 1 Cubic Meter Or 1000 Liters Of Air Should Be Sampled At Each Designated Location. The Media Should Be Examined And The Report Should Detail The Total Number Of Discrete Colonies Of Microorganisms On Each Plate As Cfu Per Cubic Meter Of Air Based On The Sample Type, Sample Location And Sample Date. The Genus Of Any Microorganism Recovered Must Be Identified With The Assistance Of A Microbiologist If The Cfu Count Exceeds The Following: Greater Than 1 For Iso Class 5, Greater Than 10 For Iso Class 7, And Greater Than 100 For Iso Class 8. If Any Container Demonstrates The Presence Of Cfu That Exceed The Actionable Levels, The Preliminary Results Will Be Reported To The Chief, Pharmacy Service And Corresponding Pharmacy Service Point Of Contact As Soon As The Initial Result Is Known And Final Results Will Be Expeditiously Reported After Further Antimicrobial Testing Is Complete. viable Surface Monitoring: Each Classified Area Including The Interior Of The Pec (including Equipment Contained In It), Staging Or Work Areas Near The Pec, Frequently Touched Surfaces And Pass Through Chambers Must Be Sampled At Least Monthly. Sampling Should Be Performed At The End Of The Compounding Activities, But Before The Area Has Been Cleaned And Disinfected. The Media Should Be Examined And The Report Should Detail The Total Number Of Discrete Colonies Of Microorganisms On Each Device As Cfu Per Sample Based On The Sample Type, Sample Location And Sample Date. The Genus Of Any Microorganism Recovered Must Be Identified With The Assistance Of A Microbiologist If The Cfu Count Exceeds The Following: Greater Than 3 For Iso Class 5, Greater Than 5 For Iso Class 7, And Greater Than 50 For Iso Class 8. If Any Device Demonstrates The Presence Of Cfu That Exceed The Actionable Levels, The Preliminary Results Will Be Reported To The Chief, Pharmacy Service And Corresponding Pharmacy Service Point Of Contact (cor, Etc.) As Soon As The Initial Result Is Known And Final Results Will Be Expeditiously Reported After Further Antimicrobial Testing Is Complete. environmental Wipe Sampling For Hazardous Drug (hd) Surface Residue Should Be Performed Routinely As Outlined By Usp For Those Facilities Listed In Appendix A. Results Will Be Reported To The Chief, Pharmacy Service And Corresponding Pharmacy Service Point Of Contact (cor, Etc.) As Soon As Results Are Available. the Contracting Officer Representative Will Schedule Testing With The Vendor. The Vendor Shall Provide The Corresponding Pharmacy Service With All Service Reports And Certification Of The Job Performed. After Completion Of Work, The Vendor Shall Notify The Contracting Officer Representative For Signature And Verification Of Work Performed. all Equipment Shall Be Maintained In Proper Operating Condition As Specified By The Manufacturer, Usp, Ceta And Fda Standards. The Vendor Is To Have Required Supplies, Manuals, And Schematics, Which Must Be Available On Site To Perform The Services. All Work Is To Be Performed In Accordance With The Guidelines Established By State And Local Ordinances With Manufacturer S Manual And Quality Control Manual, And With All Terms, Conditions, Provisions, Schedules And Specifications Provided Herein. in The Event That The Facility Or Personnel Require Recertification Or Testing Due To Actionable Results, The Vendor Must Be Able To Provide Retesting Within 7 Calendar Days Of The Request. If Vendor Is Not Able To Provide Services Within The Required Timeframe, The Vendor Shall Propose A Reasonable Alternative Response Time. vendors Will Not Receive Formal Notification Or Feedback On Any Information Submitted In This Sources Sought Request. All Future/proposed Submissions/solicitations Requirements Solicited On A Government Point Of Entry (gpe) Will Be Evaluated Independent Of Any Information Submitted In Response To This Sources Sought Notice. No Vendor Will Be Provided Information On Solicitations Issued On A Government Point Of Entry Based On This Sources Sought Request. potential Sources Shall Include A Capability Statement And At A Minimum The Following: identification Of Company S Name, Address, Telephone Number, And Point Of Contact; organization Size/ownership Of Business, I.e. Large, Small, Small Disadvantaged, 8(a), Disabled-veteran, Veteran, Women-owned Business, And Hub-zone; duns# identification Of Organization's Gsa Schedules/federal Supply Schedules. questions Regarding This Sources Sought Posting Should Be Directed To Paul Jarrett At Paul.jarrett@va.gov the Government Requests Responses To This Sources Sought Submitted No Later Than 3pm On 9 May 2024.
Closing Date9 May 2024
Tender AmountRefer Documents 

PUBLIC BUILDINGS SERVICE USA Tender

Civil And Construction...+1Civil Works Others
United States
Details: This Is A Pre-solicitation Notice For A Job Order Construction Contract (jocc) Awarded As An Indefinite-delivery Indefinite-quantity (idiq) For Small Repair And Alteration Projects Under The Simplified Acquisition Threshold (sat) For Federal Buildings Across The State Of Utah. The General Services Administration, Public Buildings Service, Region 8 (hereinafter Also Referred To As "region 8") Anticipates Release Of A Request For Proposal (rfp) On April 11, 2024, And Receipt Of Proposals On May 13, 2024, At 1 Pm, Mdt. Region 8 Anticipates Award Of One Contract As A Result Of The Solicitation. The Awarded Contract Will Include A One-year Base Period With Four One-year Option Periods. Total Contract Length With Base And All Options Exercised Is Five Years. the Solicitation Is A Total Woman-owned Small Business Set Aside For Firms With A Bona Fideplace Of Business In The State Of Utah Where A Participant Regularly Maintains An Office Which Employees At Least One (1) Full Time Individual Within The Appropriate Geographic Boundary. It Cannot Be A Construction Trailer Or Temporary Site. A Business Entity Regularly Maintains An Office If A Participant Conducts Business Activities As An Ongoing Business Concern From A Fixed Location On A Daily Basis. naics:the North American Industry Classification System (naics) Code For This Project Is 236220, Commercial And Institutional Building Construction, And The Size Standard Is $45 Million. set-aside: The Government Intends To Set Aside The Requirement For Woman-owned Small Business Concerns. tentative Schedule: All Dates Are Subject To Change And Are Only Given As Approximations For The Purposes Of Planning. issuance Of Solicitation: 04/11/2024 proposals Due: 05/13/2024 contract Award Date: 07/01/2024 start Of Jocc Idiq: 07/01/2024 funds Availability: Issuance Of This Pre-solicitation Notice Does Not Warrant That Funds Are Presently Available For Award Of A Contract. Award Of A Contract Shall Be Subject To The Availability Of Appropriated Funds, And The Government Shall Incur No Obligation Under The Solicitation And Notice In Advance Of Such Time As Funds Are Made Available For The Contracting Officer For The Purpose Of Contract Award. document Availability: The Solicitation Will Be Available For Electronic Download From Https://www.sam.gov Under The Contract Opportunities. The Download Will Be Available At No Charge. The Solicitation Will Be Listed Under A Different Identifying Number Than The One Assigned To This Pre-solicitation Notice. geographic Areas:the Idiq Jocc Covers Seven Offices. These Offices Regularly Acquire Construction Services For Projects That Usually Do Not Exceed The Sat, Which Currently Is $250,000. The Geographic Areas Are As Follows: geographic Area 1 (weber County) Includes The Following: james V. Hansen Federal Building 324 25th Street ogden, Ut 84401-2310,building Number: Ut0035zz forest Service Building 507 25th Street ogden, Ut84601-4452,building Number: Ut0010zz geographical Area 2 (salt Lake County) Includes The Following: wallace F. Bennett Federal Building 125 South State Street salt Lake City, Ut 84318-1102,building Number: Ut00032zz frank E. Moss U.s. Courthouse 350 South Main Street salt Lake City, Ut 84101-2106,building Number: Ut0017zz u.s. District Courthouse For The District Court Of Utah 351 South West Temple salt Lake City, Ut 84101-2106,building Number: Ut0018zz geographical Area 3 (utah County) Includes The Following: robinson Federal Building 88 West 100 North provo, Ut 84601-4452,building Number: Ut0014zz geographical Area 4 (washington County) Includes The Following: st. George Federal Office Building 196 East Tabernacle Street st. George, Ut 84770-3467,building Number: Ut0042zz information On Proposal Submission:the Government Plans To Conduct A Competitive Negotiated Acquisition. The Government Will Use Source Selection Procedures To Evaluate Proposal Packages. Specifically, The Government Will Use The Best Value Continuum Concept. The Best Value Continuum Concept Evaluates Technical Factors And Price Through A Tradeoff Process And Other Procedures Described In The Solicitation. the Government Reserves The Right To Make Awards Without Discussions. Therefore, Offerors Should Submit Proposals That Are Acceptable Without Additional Explanation Or Information As The Government May Evaluate And Make A Final Decision For Award Solely On The Basis Of The Initial Proposal Submitted By Offerors. Furthermore, The Government May Determine The Acceptability Of A Proposal Based On The Initial Proposal Submitted By Offerors. Offerors Are Required To Submit A Technical Proposal Package And A Price Proposal Package. technical Package: The Evaluation Factors That Comprise Of The Technical Package Are As Follows, In No Order Of Particular Importance: (1) Project Experience; (2) Past Performance; And (3) Staffing Plan. The Technical Factors Are Significantly More Important Than Price. As Proposals Become More Equal In The Technical Merits, Price Becomes More Important. price Package: The Government Will Incorporate The Rs Means Pricing Book Into The Contract For The Cost Of Task Orders. When Evaluating Price, The Government Will Require The Offeror To Submit The Following Coefficients For Evaluations For The Base And Four, One-year Option Periods: bid Factor (geographic Area 1 - Weber County, Ogden, Ut): normal Working Hours bid Factor (geographic Area 1 - Weber County, Ogden, Ut): after Normal Working Hours bid Factor (geographic Area 2 - Salt Lake County, Salt Lake City, Ut): normal Working Hours bid Factor (geographic Area 2 - Salt Lake County, Salt Lake City, Ut): after Normal Working Hours bid Factor (geographic Area 3 - Utah County, Provo, Ut): normal Working Hours bid Factor (geographic Area 3 - Utah County, Provo, Ut): after Normal Working Hours bid Factor (geographic Area 4 - Washington County, St. George, Ut): normal Working Hours bid Factor (geographic Area 4 - Washington County, St. George, Ut): after Normal Working Hours bond Rate: bonding: Provide A Percentage To Be Applied To Contracts In Which Bonding Is Required. coefficient Pricing Shall Include The Following:labor; Materials; Equipment; Subcontractor Costs; Subcontractor Markups; Prime/contractor Overhead And Profit; Prime/contractor Profit And Risk; Social Security Contributions; General Insurance; Workman Compensation Insurance; State Unemployment Insurance; Federal Unemployment Insurance; Mobilization And Demobilization Costs; Site Cleanup; Labor Adjustments Between The Rs Means Labor Rates And The Davis/bacon Labor Rates; Supervision; Quality Control; Lodging And Per Diem; Shipping; Transportation Of Contractor's Personnel To, From, And Within The Job Site; All Division 1 Requirements; Submittals; And Job Order Preparation Costs. please Note The Following About Coefficient Pricing: Division 1 - General Requirements Section From The Rs Means Book Will Not Be Allowed When Pricing Task Orders. Any Consideration For Division 1 - General Requirements Shall Be In The Offeror's Bid Factor the City Cost Index From The Rs Means Book Will Not Be Applied When Pricing Task Orders. Any Adjustment For Location Has Already Been Included In The Offeror's Bid Factor the Unit Prices Listed In The 2024 Rs Means Building Construction Cost Data Are Bare Costs. Bare Cost Equals A Factor Of 1.000, The Same As "net", All Other Bid Factors "minus" Or "plus" Will Be Added Or Subtracted From The Bare Cost Factor. A "minus" 4% Shall Be Written 0.96, A "plus" 4% Shall Be Written 1.040 And "net" Shall Be Written 1.000.) The Offered Bid Factors For The Base And Each Option Period Will Be Applied To All Work Items For Which A Unit Price Is Stated In The Price Schedule That Are Ordered Via Task Orders In The Respective Base/option Period. resulting Idiq Contracts Awarded:the Maximum Order Limitation For The Five-year Duration Is $10,000,000. The Awarded Contract Will Contain A Guaranteed Minimum Amount Of $2,000. Terms Which Support The Payment Of The Guaranteed Minimum Amount Will Be Specified In The Solicitation. potential Task Order Requirements: A Typical Task Order Issued As A Result Of This Contract Will Be Valued At Or Less Than The Simplified Acquisition Threshold. The Successful Offeror Will Be Required To Complete A Wide Range Of Construction Projects Over The Life Of The Contract. Task Orders Will Consist Of Repair/alteration And Tenant Finish Projects For The Gsa And Other Government Agencies In Occupied Federally Owned Or Leased Buildings. Task Orders May Contain Some Or All Of The Following: Modifications To Architectural Components And Related Electrical Systems Associated With, But Not Limited To Ceilings, Walls, Floors (including Access Floor Systems), Roofing Systems, Millwork And Wall Covering. Work May Also Include Modifications And Replacement Of Mechanical Systems To Include, But Not Be Limited To: Air Handling Units, Chillers, Boilers, Ductwork Systems And Accessories, Piping Systems (including Pumps), Hvac System Controls, Fire Protection Sprinkler Systems And Accessories, And Plumbing Equipment/accessories. In Addition, Scope May Also Include Work On Electrical Systems Including, But Not Limited To Lighting Systems, Primary And Secondary Power Distribution Systems And Transformers. Special Competencies Will Be Required For Any Work Involving Membrane Roofing, Asbestos Abatement, Pcb Removal And/or Elevator Work. pre-construction Task Orders May Require Pre-construction Phase Services And Shall Include, But Are Not Limited To, Review And Evaluation Of The Concept, Design Development And Construction Document Submission For Constructability, Value Engineering Or Alternate Means And Methods Recommendations, Identification Of Any Problems Or Errors In The Design Documentation, Consultation During Construction Document Production, Preliminary Project Schedule Development, Primary Cost Estimates During Design Development And Construction Documents, And Development Of Subcontractor And Supplier Interest. contract Type: The Expected Base Contract Shall Be A Single-award Indefinite-delivery, Indefinite Quantity Job Order Construction Contract (idiq Jocc). All Task Orders Placed Against The Idiq Jocc Shall Be Firm-fixed Price Based On The Rs Means Pricing Structure And Contractor Bid Factors. The Ordering Activity Shall Specify Whether Bonds Are Applicable To The Construction Activity For Each Task Order. estimated Scope Of Task Orders: The Following Is Provided For Informational Purposes Only. Contractors Should Be Aware That Annual Budgets Are Highly Variable And The Actual Quantities And Value Of Work Changes Annually. Data Shows That Gsa, Region 8 Executes About 50 - 60 Contract Actions Annually To Perform Minor Alterations And Repairs That Fall Within The Scope Of Construction Services Under The Idiq Jocc. Gsa Also Executes Reimbursable Work Authorizations On Behalf Of Other Agencies For Tenant Improvement Projects. Although Construction Activities Take Place Throughout The Year, A Large Quantity Of These Projects Typically Falls Between The Months Of April And September. The Expected Average Dollar Value Of Projects Executed Under The Scope Is About $25,000 With A Median Dollar Value Of About $12,500. The Majority Of Task Orders Are Expected To Be Between $2,000 And $25,000.
Closing Date11 Apr 2024
Tender AmountRefer Documents 

FOOD AND DRUG ADMINISTRATION USA Tender

United States
Details: This Is A Sources Sought Announcement, A Market Survey For Written Information Only. This Is Not A Solicitation Announcement For Proposals And No Contract Will Be Awarded From This Announcement. No Reimbursement Will Be Made For Any Costs Associated With Providing Information In Response To This Announcement Or Any Follow-up Information Requests. No Telephone Calls Will Be Accepted Requesting An Rfq Package Or Solicitation. There Is No Rfq Package Or Solicitation. In Order To Protect The Procurement Integrity Of Any Future Procurement, If Any, That May Arise From This Announcement, Information Regarding The Technical Point Of Contact Will Not Be Given And No Appointments For Presentations Will Be Made. the U.s. Food And Drug Administration (fda), Office Of Acquisitions And Grants Services (oags) Is Issuing This Source Sought Announcement On Behalf Of The National Center For Toxicological Research (nctr) In Order To Determine If There Are Existing Small Business Sources And Other Than Small Business Sources Capable Of Providing A Complete Guinea Pig Rack, Accommodating Cages, And Components. if Your Firm Is Considered A Small Business Source Under North American Industry Classification System (naics) Code 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing; Small Business Size Standard Is 750 Employees And Believe That Your Firm Would Be Able To Provide The Fda With The Supplies/services Described Below, Please Submit An Email To Warren.dutter@fda.hhs.gov. The Vendor Should Include Information About The Company And Demonstrate That It Can Meet All Of The Minimum Technical Requirements. background: The Nctr, Division Of Neurotoxicology Has An Approved Scientific Study Requiring The Use Of Guinea Pigs. Researchers Within The Division Anticipate Using Guinea Pigs In A Series Of Future Studies. Owing To The Nature Of The Work Guinea Pigs Must Be Used. However, Guinea Pigs Have Different Housing Requirements Then Species Currently In Used At The Nctr (rats, Mice, Nonhuman Primates). We Cannot Currently House Guinea Pigs In A Way That Would Be Compliant With Federal Regulations On The Care And Use Of Animals In Research. New Housing Must Be Purchased To Complete Approved Scientific Studies. The Purchased Housing Must Be Compliant With Federal Regulations For The Use Of Guinea Pigs In Federally Funded Research. We Require Two (2) Additional New Guinea Pig Housing Racks. Each Rack Must Hold A Minimum Of Eight (8) Cages. Four (4) Racks Are Necessary To Allow For Appropriate Housing During The Rack And Cage Cleaning Process (one In Use While One Is Being Cleaned). A Rack Must Hold At Least Eight (8) Cages To Ensure We Have Enough Space To House The Total Number Of Animals Necessary For The Planned Work. minimum Technical Requirements: rack Systems Must Not Require Facility Renovations, Including Alterations To The Building Hvac System, To Accommodate Their Use. the Equipment Shall Provide An Environment That Shall Meet Or Exceed The Housing Specifications Listed In The Guide For The Care And Use Of Laboratory Animals, 8th Edition (http://qrants.nih.gov/qrants/olaw/guide-for-the-care-and-use-of-laboratorv-animals.pdf). guinea Pig Racks And Caging Components Shall Be Constructed Of High Quality And Corrosion Resistant 304 Stainless Steel And Durable Plastic/rubber/silicone Materials That Can Withstand Being Repeatedly Washed With Detergents At 180-190° F And Autoclaved Up To 275° F stainless Steel Materials Must Be 304 Stainless Steel With All Exposed Surfaces Smoothed To Prevent Injuries. all Welds Must Be Continuous And Smooth For Durability And To Protect The Animals From Sharp Edges. the Cage Unit Shall Be Supported On Stainless Steel 5” Casters. casters Shall Have Locking Brakes; casters Shall Have Sealed Bearings; wheels Shall Be Made Of Durable Materials That Can Withstand High Temperatures (180°f) And Chemicals (detergent, Acid). rack System Shall Be Available As Single Or Double Sided shall Include A Drawer Style Cage Design; a Solid Bottom Configuration shall Provide A Minimum Of 8 Cages Per Rack. rack Dimension Requirements To Ensures Animals Shall Be Visualized Without The Use Of Anything More Than A Two-step Ladder, To Ensure Ergonomic Safety As Well As Maximizes Housing Capacity Within Available Animal Room Floor Space height From The Floor To The Highest Placed Cage On The Rack Shall Not Exceed 65 Inches; total Height Of Rack Shall Not Exceed 80 Inches; total Width Of Rack Shall Not Exceed 65 Inches. guinea Pig Cage Dimension Requirements depth Shall Be At Least 25 Inches And Shall Not Exceed 30 Inches; height Shall Be At Least 9 Inches; width Shall Be At Least 25 Inches And Shall Not Exceed 33 Inches. guinea Pig Cage Material Shall Be Composed Of High Temperature Thermal Plastic That Can Withstand High Temperatures (180°f) And Chemicals (detergent, Acid).  guinea Pig Cage Material Shall Be Opaque. the Cage Card Holders Provided Shall Be Designed To Not Block The View Of The Animals. all Guinea Pig Cages Shall Be Equipped With Removable Stainless Steel Grated Front Panels That Allow Full Visualization Of The Animals. The Panel Will Need To Secure To The Side Cage Portions And Any Door Mechanisms In A Mechanism That Is Secure And Precludes The Animals From Escaping. the Technician Must Have A Method For Visualization, Husbandry And Removal Of The Guinea Pigs From The Front Access Of The Cage. This Cage Units Must Have At Minimum: Either An Engineered Mechanism For The Caging To Be Pulled By A Drawer Mechanism For Access Or A Stainless-steel Hinged Door Included In The Stainless-steel Cage Front. all Guinea Pig Cages Must Have A J Type Feeder To Provide Feed. each Cage Compartment To Be Equipped With One Bottle Water System Which Includes A Stainless-steel Water Bottle Holder, 32 Oz Bottle, Sipper Tube And Stopper. ear Cage Compartment Should Be Equipped With Edstrom Or Commercially Compatible Stainless Steel “reverse S” Style Automatic Water System With Rodent Drinking Valves, Stainless Steel Drip Troughs And All Mounting Hardware. matching Stainless Steel Or High Temperature Plastic Excreta Plans For Each Of The Cages Shall Be Included For Placement Underneath The Cages. the System Should Provide A Quiet Environment. system Shall Feature Ease Of Storage And Sanitation Handling. cage Components Shall Be Stackable. warranty: systems Shall Be Warranted For Not Less Than One (1) Year From Fda Acceptance Of The System(s).  Phone And Email Technical Support Shall Be Included For A Minimum Of 1-year. period Of Performance: delivery Shall Occur Within 120 Calendar Days From Date Of Award. delivery Location: fda/nctr 3900 Nctr Rd jefferson, Ar 72079 though The Target Audience Is Small Business Vendors Or Small Businesses Capable Of Supplying A U.s. Service Of A Small Business Vendor Or Producer All Interested Parties May Respond. At A Minimum, Responses Shall Include The Following: business Name And Bio, Unique Entity Identification (uei) Number, Business Address, Business Website, Business Size Status (i.e., Sb, Vosb, Sdvosb, Hubzone Sb, Sdb, Wosb, Lb), Point Of Contact Name, Mailing Address (if Different From Business Address), Phone Number And Email Address. Provide This Same Information Again If Responding To Provide A Service Offered By Another Firm. past Performance Information For The Manufacturer And/or Sale Of Same Or Substantially Similar Product And Service Or Similar Brand Instruments To Include Date Of Sale, Description, Dollar Value, Client Name, Client Address, Client Contact Name, Client Point Of Contact Mailing Address (if Different From That Provided For Client), Client Point Of Contact Phone Number, Client Point Of Contact Email Address, And Name Of The Manufacturer (to Include Uei Number And Size Status) If Not The Respondent. descriptive Literature, Brochures, Marketing Material, Etc. Detailing The Nature Of The Product And Service The Responding Firm Is Regularly Engaged In Manufacturing And/or Selling. the Offeror Shall Furnish Sufficient Technical Information Necessary For The Government To Conclusively Determine That The Offered Services Meet The Technical Requirements Identified Above. the Offeror Shall Advise If The Product And/or Service Is On A Best In Class Contract. if Applicable, The Offeror Shall Clearly Identify Where The Offered Product Is Made. if Applicable, Identification Of The Firm's Gsa Schedule Contract(s) By Schedule Number And Sins That Are Applicable To This Potential Requirement Are Also Requested. if A Large Business, Provide If Subcontracting Opportunities Exist For Small Business Concerns. standard Commercial Warranty And Payment Terms. provide Place Of Product Manufacture Or Service Performance And Any Other Applicable Information To Enable Review And Analysis Pertaining To The Buy American Statute And Requirements Relating To Made In America In The Event A Nonavailability Waiver Request Through The Miao Digital Waiver Portal Is Needed. informational Pricing Is Desired. the Government Is Not Responsible For Locating Or Securing Any Information, Not Identified In The Response. interested Contractors Must Respond With Capability Statements Which Are Due By Email To The Point Of Contact Listed Below On Or Before January 15, 2024 By 1:00 Pm Central Time At The Food And Drug Administration, Field Operations Branch, Fda|oo|ofba|oags|dap, Attn: Warren Dutter, Email Warren.dutter@fda.hhs.gov. Reference: Fda-ssn-121615. disclaimer And Important Notes this Notice Does Not Obligate The Government To Award A Contract Or Otherwise Pay For The Information Provided In Response. The Government Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate. Any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization’s Qualifications To Perform The Work. Respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provide Feedback To Respondents With Respect To Any Information Submitted. After A Review Of The Responses Received, A Pre‐solicitation Synopsis And Solicitation May Be Published In Sam.gov. However, Responses To This Notice Will Not Be Considered Adequate Responses To A Solicitation. confidentiality no Proprietary, Classified, Confidential, Or Sensitive Information Should Be Included In Your Response. The Government Reserves The Right To Use Any Non‐proprietary Technical Information In Any Resultant Solicitation(s). additional Notes: if The Stated Requirements Appear Restrictive, Please Submit Comments Detailing The Concern. Though This Is Not A Request For Quote, Informational Pricing For The Service Would Be Helpful.
Closing Date15 Jan 2024
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

United States
Details: Sources Sought Notice sources Sought Notice page 8 Of 8 sources Sought Notice *= Required Field sources Sought Notice page 1 Of 8 sources Sought: The Central Alabama Veterans Health Care System (cavhcs) Located At 215 Perry Hill Road, Montgomery, Al 36109 Has A Requirement For A Firm Fixed Price Contract That Includes General Construction, Demolition, Modification, And Renovation Of The Existing Central Boiler Plant- (building 14). project Description: See The Attached Statement Of Work For What This Project Includes, But It Not Limited To This Description Of The Project. this Is Not A Request For Proposal (rfp): The Purpose Of This Notice Is To Determine If There Are Qualified Sdvosb, Vosb And Small Businesses That Have The Experience For This Highly Specialized Type Of Work And If Such Firms Are Interested In This Procurement. the Sources Sought Notice Is For A Design-bid-build Project. The Naics Code Is 236220 And The Small Business Size Standard Is $45 Million. The Psc Is Z1dz. The Magnitude Of Construction Is Between $10,000,000 And $20,000,000. interested Firms Should Indicate Their Interest No Later Than 4:00 Pm Est On 01/31/2024 Via Email To Contract Officer Margaret.yeaton@va.gov (visn 7 Network Contracting Office) the Following Information Is Required In Response To This Notice. Please Number Your Responses (1) Through (5). Your Specific Response To The Following Items Is Requested. There Is No Page Limit, However Pages Should Be Sufficient To Describe Your Firm. a Positive Statement Of Your Intention To Submit A Proposal In Response To A Solicitation For This Project And Include Your Firm S Full Name, Address, Point(s) Of Contact, Telephone Numbers And Email Addresses, Url, And Uei. your Firm S Bonding Capability (construction Bonding Level Per Single Contract And Aggregate Construction Bonding Level, Both Expressed In Dollars Along With Your Current Available Bonding Capacity). evidence Of Your Experience In Replacing And Installing Comparable Boiler Projects That Are Highly Specialized And Completed Within The Past Five (5) Years. Your Projects Must Be Similar In Size And Scope With A Construction Magnitude Between $10,000,000 To 50,000,000. Provide Contract Descriptions, Location, Contract Dollar Value And The Name Of The Company, Agency Or Government Entity For Which The Work Was Performed. State Your Firm S Role In The Successful Project (prime, Subcontractor, Jv Member Etc.) Include The Name, Title, Email And Phone Number Of Your Customer Point Of Contact (i.e., Cor, Contracting Officer, Program/project Manager). if Applicable, Your Firm Should Provide Proof Of A Valid Joint Venture Or Mentor-protege Agreement, By Supplying The Duns Number/uei And Names Of Respective Jv Or Mp Principals. (see Vaar 819.7003(c) For Joint Venture Agreements And Vaar 819.71 For Mentor-protege Agreements At Https://www.va.gov/oal/library/vaar/vaar819.asp other Information That Is Useful To Show The Knowledge And Depth Of Experience Of Your Firm In Comparable Projects, Such As For Example, Your Experience With Environmental Compliance, Permitting Processes, Certifications, Any Awards, And Recognition, Your Ability To Implement Logical And Physical Security Measures And Safeguards, Accident-free Record, Etc. all Information Must Be Submitted In Sufficient Detail For A Decision To Be Made On The Availability Of Interested Sdvosb, Vosb Or Sb Concerns. Failure To Submit All Information Requested Will Result In A Contractor Not Being Considered As An Interested Sdvosb, Vosb Or Sb Concern. If Adequate Interest Is Not Received This Action Will Not Be A Set-aside. Interested Firms Should Reply Via E-mail To Margaret.yeaton@va.gov . Firms Must Be Registered In The System For Award Management (sam). Visit Sam.gov To Register In Sam. sdvosb Or Vosb Firms Must Be Verified In Vet Cert. Https://veterans.certify.sba.gov/ the Contracting Office Welcomes The Interest Of New Entrants To Construction Projects For Visn 7 And Especially Looks Forward To Responses Of Well-qualified Small Businesses And In Particular To The Responses Of Certified Sd/vosb Contractors. A Project Description Is Set Out Below That Will Guide You In Furnishing The Information Requested In (1) Through (5) Above. disclaimer this Source Sought Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Notice. project Information: The Proposed Statement Of Work For This Project Is Within This Document. a. Project Description: title Of Project: 619-20-103 - Correct Fca Deficiencies In Boiler Plant, Building 14. project Overview: This Project Will Replace The Boiler System And Completely Renovate Building14. It Will Correct Several Fca Deficiencies Identified In The 2012, 2016, And 2021 Facility Conditions Assessment (fca). scope Of Work: The Contractor Shall Provide All Labor, Supervision, Transportation, Materials, Cranes, And All Other Incidentals To Facilitate A Successful Construction Project. a. This Project Replaces The Boilers And Connected Piping And Equipment As Identified In The 2016 Visn 7 Facilities Condition Assessments (fca) For Central Alabama Veterans Health Care Systems-east (cavhcs-west). This Will Include The Design Of Replacement Of Boiler Plant, Which Include The Alternate Fueling System, Emergency Electrical System, Pumping System, Electrical Control System, Structural System, Replacing Windows And Refinishing Interior Painted Surfaces, And Temporary Boilers. b. This Project Shall Repair Or Replace Exterior Concrete And Brick Wall Repair, Metal Casework Replacement In Boiler Room, Roof Replacement, Deaeration Tank Replacement, Oil Water Separator Installation. Replace All Domestic Water Lines Inside Building, Restricted Access Design, Replace Sump Pump In Basement To Provide Duplex Unit, Increased Steam Tunnel Remediation Of Piping Supports And Associated Abatement, Testing, And Design. The Length Of Tunnel Remediation Included Is 240 Ft, Increased Steam Tunnel Lighting Replacement. A N+ 1 Temporary Boiler Configuration With Platforms For Boiler Personnel Use Along With A Boiler Personnel Operation Trailer. c. This Project Shall Installation, And Commissioning Of Fire Protection Sprinkler System For The Entire Building, The Electrical System, And The Boilers. These Modifications Will Not Change To The Exterior Of The Building. d. The Construction Work Does Not Require Coordination With Shpo. applicable Codes And Standards: international Plumbing Code 2018 Edition va Boiler Design Guides 2017 Edition international Mechanical Code 2015 Edition ashrae Fundamentals Handbook 2015 Edition nfpa 99 2021 Edition va Plumbing Design Manual 2018 Edition va Hvac Design Manual 2017 Edition va Plumbing Design Manual 2018 Edition existing Conditions: the Boiler Plant Is In Desperate Need Of Renovation To Include The Replacement All Major Components. The Two 400 Hp And One 150 Hp Boilers Are Beyond Their Useful Life And Require Replacement. The Building Infrastructure Needs Renovation To Comply With Present Occupancy, Workplace Use, And Safety Codes. building 14 the Last Major Boiler Replacement Was Approximately 45 Years Ago. All Major Systems And Component Require Replacement. the Building Infrastructure Both Internally And Externally Is Crumbling And Require Significant Repair. The Physical Improvements Will Include A New Roof, Blast Resistant Storefront Windows, Energy Efficient Lights, Fresh Paint, New Flooring, Two Unisex Restrooms With Lockers And Dressing Spaces. location Of Work: Central Alabama Veteran Health Care System, 215 Perry Hill Road Montgomery, Al 3610983 period Of Performance: The Required Period Of Performance Will Be 915 Calendar Days From The Date Of Contract Award Or Notice To Proceed. work Hours: The Contractor Shall Be Available During Normal Business Hours Of 8:00 Am 4:30 Pm, Monday Friday Excluding Federal Holidays. Contract Will Require Contractor To Work After Hours And On Weekends And Shall Be Coordinated With The Cor At Least 14 Business Days In Advance. type Of Contract: This Shall Be A Firm Fixed Price Contract. general Requirements the Contractor Shall Provide The Cor With A List Of Contractor Employees Expected To Enter Facilities. While On Va Premises, All Contractor Personnel Shall Comply With The Rules, Regulations, And Procedures Governing The Conduct Of Personnel And The Operation Of The Facility. an Access Badge Will Be Given To The Contractor S Employee Upon Entrance Into Va Buildings. The Contractor Employee Must Safeguard The Access Badge And Immediately Report Any Lost, Stolen, Or Destroyed Badges To The Cor. All Contract Personnel Must Properly Display Their Access Badges. Access Badges Must Be Worn At Or Above The Waist (facing Forward.). The Contractor S Employees Must Return The Access Badge(s) To The Cor Or Designee When The Work Is Complete. it Is The Responsibility Of The Contractor S Personnel To Park In The Appropriate Designated Parking Areas. Parking Information Shall Be Coordinated With Each Facility Cor. cavhcs Does Not Validate Or Make Reimbursement For Parking Violations Of The Contractor S Personnel Under Any Circumstance. government Responsibilities the Government Shall Be Responsible For Making The Building Available To Contractor During Normal Business Hours 8:00 Am - 4:30 Pm. If There Is A Need For Work To Be Done After Hours, The Government Will Plan For Contractor To Have Access To The Building. contractor Personnel Security Requirements the Contractor Shall Be Required To Comply With All Security Policies/requirements. All Security Policies/requirements Must Be Met, And Employees Cleared Prior To The Contractor Performing Work Under This Contract. Employees That Cannot Meet The Security And Clearance Requirements Shall Not Be Allowed To Perform Work Under This Contract. temporary Badges For All Workers Will Be Required To Access The Facilities. Coordinate With The Cor For Receipt Of The Temporary Badge. interference To Normal Function contractor May Be Required To Interrupt Their Work At Any Time So As Not To Interfere With The Normal Functioning Of The Facility, Including Utility Services, Fire Protection Systems, And Passage Of Facility Patients, Personnel, Equipment, And Carts. in The Event Of An Emergency, Contractor Services May Be Stopped And Rescheduled At No Additional Cost To The Government. contractor Personnel Shall Inform The Cor Or The Designee Of The Need To Gain Access To Secured Areas. If Access Is Required To Secure Areas, Prearranged Scheduling Will Be Made With Cor Or Designee.
Closing Date31 Jan 2024
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Software and IT Solutions
United States
Details: Metasys Adx Server & User Interface Upgrade Scope Of Work baltimore Vamc And Loch Raven Vamc 512-24-3-849-0288 general: visn 5 The Va Maryland Health Care System Is Dedicated To Improving The Lives Of Veterans And Their Families Every Day. Our Health Care Teams Are Deeply Experienced And Guided By The Needs Of Veterans, Their Families, And Caregivers. The Building Automation System (bas) Is A Cornerstone Of General Everyday Operations On The Veterans Administration Services. Bas Monitor Systems Such As Hvac, Boiler Operation, Programs To Switch Circulating Pumps, Compressor Controls, And Lighting. It Was Notated By Information Security And It/irm Specialist That System Vulnerabilities Were Present In The Existing System. The Network Infrastructure Is Connected To The Internet. Several Hardware And Software Devices Must Be Replaced/upgraded To Meet Veterans Administration New Policies. about The Sites: baltimore Va Medical Center Provides Primary Care And Specialty Health Services, Including Mental Health Services, Women S Health Care, Multiple Sclerosis Treatment, Care For Veterans Who Are Blind Or Have Low Vision, Cancer Treatment, Physical Therapy, Chronic Pain Management, And More. theâ loch Raven Va Community Living & Rehabilitation Center Provides Rehabilitation And Recreation Therapy For Our Recovering Veterans. The Main Building Also Provides Hospice, Nursing Home Care And Care For Patients With Alzheimer S. The Surrounding Campus Provides Services Including Mental Health Care, Audiology, Care For Veterans Who Are Blind Or Have Low Vision, And More. period Of Performance: the Period Of Performance For This Contract To Begin On July 1, 2024 And Terminate On September 30, 2024 Provided Services And Materials. i. Scope Of Work the Contractor Shall Provide All Personnel, Management, Material, Parts, Equipment, Supplies, And Labor To Perform Software Upgrades And Server Install To Integrate System To Meet Metasys Version 13.0 At The Va Baltimore Medical Center And Va Loch Raven Medical Center In Maryland. Contractor Shall Meet These Requirements: provide System User Interface (ui) Graphics For All Equipment/systems In Metasys Not Modified Or Enhanced Under The Ameresco Visn5 Espc. Which Includes Liebert Units, Med Gas Systems, Energy Meters, Crac Units, Etc. All Other Mui Graphics Will Be Provided Under The Ameresco Visn5 Espc. Espc Documents Will Be Included During Kickoff Meeting. provide Summary List And Graphics Of Dcv 4.4 Occupied Sensors, In Addition To Vav Boxes That Don't Have Dcv Implemented. provide Home Page Navigation For Easy Access To Systems For Both Loch Raven And Va Baltimore. furnish And Install 3d Floor Plans For All New And Existing Spaces For Both Loch Raven And Va Baltimore furnish And Install Spaces And Equipment Relationship For All New And Existing Equipment. furnish And Install Mui Version 13 provide Labor And Licensed Software To Upgrade To Metasys Adx Server Version 13. va It Support Will Be Present During Software Installation. va Is Required To Furnish Any/additional Hardware, Server Sql, Os Systems, Software, Etc. To Ensure Compatibility With Metasys Version 13. contractor Shall Provide Schedule For Integration Of Ui In Each Section. contractor Shall Provide Schedule For Server Install And Integration. contractor Shall Be Paid Performance Based On Percentage Completed And Turned Over To The Veteran Administration As It Pertains To The New Ui. any Missed Or Incomplete Programing For New Ui System Conversion And Integration Shall Be The Sole Responsibility Of The Contractor. Verification Shall Be Conducted By Veterans Administration Staff Upon Completion Of A Section. This Shall Be Ongoing During The Project. warranty Period Shall Be One Year reporting For Duty: When Onsite Visits Are Mandated Contractor Staff Shall Report For Duty To 10 North Green Street Baltimore Maryland, 6th Floor Engineering Suite Or Loch Raven Facilities And Engineering Department Building Located At 3900 Loch Raven Boulevard, Building #4, Room 133 Prior To Performing Any Work Unless Otherwise Directed By The Cor. The Contractors Shall Review The Required Tasks And Scheduling With The Facilities And Engineering Supervisors Prior To The Start Of Each Workday. The Workday Hours Shall Be Coordinated With The Cor But Will Generally Be 8-hour Days Depending On The Nature Of The Work Required. reporting Requirements: Upon Completion Of Work The Contractor Shall Document Services Electronically Or Written In A Legible Format And Provide To The Cor. Documentation Requirements Are To Follow Building Automation System Annual Service Contract Scope. invoicing: Contractor To Submit Invoicing Upon Completion Of The Scope Of Work. Invoicing Will Be Reviewed By The Contracting Officer Representative (cor) For Authenticity. Items Not To Be Billed To This Contract Will Be Equipment Damage, Storage Fees, Fuel Fees, Rental Costs, Unverified Hours, Travel Cost, Additional Fees, Taxes, Etc. Invoices Will Be Rejected And Be Required To Be Resubmitted If Errors Are Detected. ordering Activities And Officers: The Contractor And/or Its Staff Shall Not Accept Any Instructions Issued By Any Other Person(s) Other Than The Contracting Officer, The Cor, Or His/her Delegated Representative Acting Within The Limits Of His/her Authority. Purchase Of Materials Will Be Documented And Coordinated Through The Cor. safety And Security Precautions: the Contractor Shall Comply With All Applicable Federal, State And Local Legal Requirements Regarding Workers Health And Safety. The Requirements Include But Are Not Limited To, Those Found In Federal And State Occupational Safety And Health Act (osha) Statutes And Regulations, Such As Applicable Provisions Of Title 29, Code Of Federal Regulations (cfr) Parts 1910 And 1926. Contractor Is Solely Responsible For Determining The Legal Requirements That Apply To Activities And Shall Ensure Safe And Healthful Working Conditions For Its Employees. contractor Shall Provide His/her Employees With The Necessary Safety Equipment Required For Performance Of The Contract. The Contractor Shall Take Precautions Regarding Fire And Safety Policies/procedures Within Vamc And Their Associated Clinics. contractor Shall Assume The Responsibility To Guard Against Causing Of Fires And/or Explosions And To Protect Government Property. no Flammable Liquids Shall Be Stored In Non-designated Areas Or Used In The Medical Center Without Communication And Written Approval From The Contracting Officer Representative (cor). the Contractor And/or Its Staff Shall Immediately Notify The Cor Of Any Existing Or Potentially Unsafe Conditions, I.e., Frayed Electrical Cord, Dripping, Or Seeping Of Fluids. the Contractor Shall Receive From The Cor A Permit For All Cutting, Welding, Soldering, Or Hot Work Of Any Kind. All Permits Shall Be Prominently Displayed During All Activities. all Necessary Precautions Shall Be Taken By The Contractor To Prevent Accidental Operation Of Any Existing Smoke Detectors Or Sprinkler Heads. hazardous Material Reporting: the Contractor Shall Maintain Hazardous Material Inventories And Material Safety Data Sheets (msds) For All Hazardous Materials (as Defined In Cfr 1910.120, 40 Cfr S 355, 370, & 372) To Be Stored And Used On This Medical Center. Hazardous Materials Must Be Inventoried When Received And At The Project S Completion. The Amounts Used Shall Be Maintained For The Project Duration. hazardous Materials Inventories, Material Safety Data Sheets And Material Quantities Used Shall Be Submitted To The Contracting Officer For Approval And Copies Furnished To The Contracting Officers Technical Representative. in The Event Of A Spill, Contractor Shall Immediately Notify The Contracting Officer S Technical Representative As Well As The Contracting Officer. The Contractor Shall Be Solely Responsible For The Expense Of Any Cleanup And / Or Damage Resulting Of Such Spill, And The Cleanup Shall Be In Accordance With The Applicable Provisions Of 40 Cfr Part 761. smoking Policy: Smoking Is Not Permitted Within The Vamc Facilities. Smoking Is Prohibited On The Campus Ground Or Military Base. Contractors Found Smoking In/on Campus, In Their Vehicles Will Be Removed From Campus And Contractors Supervision Notified. changes. Only Those Services Specified Herein Are Authorized. Services That Are Not Included In The Contract Shall Not Be Provided Unless Authorized Via A Modification Issued By The Contracting Officer. badges And Parking: Badging Will Be Issued For Temporary Access To Critical Areas During The Period Of Performance. Parking Information Is Available From The Vamc Security Office. The Government Shall Not Validate Or Reimburse For Parking Violations Under Any Circumstance. At The Baltimore 10 North Greene Street Locations Parking Will Be As Needed. Parking Passes Are Restricted During Business Hours To Patients Only In The Parking Garage. Contractors Will Find The Nearest Location To The Building. Contractors May Not Park In Non-designated Areas. Contractors May Temporarily Park Vehicles Closer To Buildings For Drop Off Purposes That Do Not Exceed 30 Minutes Per Day. At The Loch Raven Campus, Contractors Will Park Along The Designated Contractors Parking Area The Alameda. Contractors May Temporarily Park Vehicles Closer To Buildings For Drop Off Purposes That Do Not Exceed 30 Minutes Per Day Unless Otherwise Discussed With The Cor. national Holidays: Listed Below Are The Eleven National Holidays: new Year S Day january 1 martin Luther King S Birthday third Monday In January president S Day third Monday In February memorial Day last Monday In May juneteenth june 19 independence Day july 4 labor Day first Monday In September columbus Day second Monday In October veterans Day november 11 thanksgiving Day fourth Thursday In November christmas Day december 25 also Included Would Be Any Day Specifically Declared By The President Of The United States Of America As A National Holiday. contractor Must Immediately Notify Their Cor Or Contracting Officer If Contract Performance Is Jeopardized Due To Contractor Employees Being Denied Entry Into Va Facilities. For Indefinite Delivery Contracts: Contractor Agrees To Comply With Vha Supplemental Contract Requirements For Any Task Or Delivery Orders Issued Prior To This Modification When Performance Has Already Commenced. point Of Contact And Cor: all Questions, Clarifications, Or Ambiguities Must Be In Writing To: louis Hopson 3900 Loch Raven Blvd Baltimore, Md 21218 (410) 605-7000 X55889 mobile 443-986-2593 Louis.hopson@va.gov alfred Webb 10 North Greene Street Baltimore, Md 21201 (410) 605-7000 X57020 Alfred.webb@va.gov
Closing Date24 Jun 2024
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

United States
Details: Repair Building S-1832, Camp Casey, Korea (matoc Only) 2.1.1. Structural Work 2.1.1.1. Repair By Replacing Existing Column W/ Steel Column. 2.1.2. Architectural Work 2.1.2.1. Floor Work 2.1.2.1.1. Replace Deteriorated Existing Floor Tile With New Pvct Including Vcb Or wooden Base As Shown On New Floor Plan & Interior Finish Schedule. 2.1.2.1.2. Replace Deteriorated Existing Cmt With New Fct Including Cement Bond Coat, waterproof Membrane, Mortar Bed As Shown On Floor Plans, Section And Details Drawings. 2.1.2.2. Interior & Exterior Wall Work 2.1.2.2.1. Replace Deteriorated Existing Gypsum Wall Board Walls With New Gwb Wall (gwb, normal, Water Resistant Or 'x' Type) Including Metal Studs, Metal Clips And Metal Bar As Shown on Floor Plans, Sections And Detail Drawings. tp I-1 2.1.2.2.2. Paint All Interior Walls And Designated Exterior Surfaces As Shown On Floor Plan, detail Drawings And Interior Finish Schedule. 2.1.2.2.3. Replace Deteriorated Existing Gcwt With New Including Cement Bond Coats, waterproof Membrane, Plastering W/metal Lath And Waterproof Gwb As Shown On Floor Plans and Sections. 2.1.2.3. Interior & Exterior Ceiling/roof Work 2.1.2.3.1. Replace Deteriorated Existing Ceiling With New Acoustical Tile Ceiling And Gypsum wall Board (gwb, Normal, Water Resistant Or 'x' Type) Ceiling Including Ceiling Suspension system As Shown On Floor Plan, Sections And Finish Schedule. 2.1.2.3.2. Paint On All Interior Ceiling Surfaces As Shown On Interior Finish Schedule And section. 2.1.2.3.3. Replace Deteriorated Existing Insulations With New At Bottom Of The Roof Surfaces including Fluted Metal Linings As Shown On Floor Plan, Sections And Interior Finish Schedule. 2.1.2.3.4. Replace Existing Metal Roof With New Protected Metal Roof At Storage Facility Area including 2-ply Of 12thk Plywood Sheathings, Roof Insulations And Fluted Metal Linings At bottom Of The Roof As Shown On Elevation, Sections And Finish Schedule. 2.1.2.3.5. Repair By Installation Of Fluid Applied Waterproofing System On Existing Metal Roof at The Straight Metal Roof Area And New Protected Metal Roof At Storage Facility Area Including replacement Of Wooden Fascia Boards, Metal Rain Gutters And Downspouts As Shown On Floor plan, Elevations And Finish Schedule. 2.1.2.4. Misc. Work 2.1.2.4.1. Replace Deteriorated Existing Doors And Door Frames With New Including Hardware sets As Shown On New Floor Plan And Door Schedule. 2.1.2.4.2. Replace Deteriorated Existing Windows With New Including Horizontal Fireproof Type mini Blinds. 2.1.2.4.3. Replace Deteriorated Existing Columns With New As Shown On Floor Plan. *see Structure Drawings. 2.1.2.4.4. Replace Deteriorated Existing Fire Extinguishers Cabinets (fec) With New As Shown on Floor Plans And Detail Drawing. 2.1.2.4.5. Replace Deteriorated Existing All Toilet Accessories With New As Shown On Floor plans, Schedule And Detail Drawings. 2.1.2.4.6. Replace Interior & Exterior Signages With New As Shown On Floor Plan, Elevations and Signage Schedule. 2.1.2.4.7. Replace Deteriorated Existing Bulletin Board With New As Shown On Floor Plan, detail Drawing And Signage Schedule. 2.1.2.4.8. Clean The Existing Main Entrance Aluminum Double Doors. 2.1.2.4.9. Replace Deteriorated Existing Concrete Stoop And Metal Canopy With New Including wooden Step Inside The Door As Shown On New Floor Plan And Pictures. 2.1.3. Mechanical Work 2.1.3.1. Repair The Heating And Cooling System By Installing New Split Heat Pump System, split Air Conditioning Unit, Electric Wall Heater, Electric Unit Heater, Valves, Piping, Insulations, controls, Equipment Support (conc. Pad), And All Associated Accessories For Hvac System as Shown On Drawings. tp I-2 2.1.3.2. Repair The Ventilation System By Installing New Split Compact Dedicated Outdoor Air system, Exhaust Fans, Controls, Diffusers, Register, Ducts, Insulations, Outside Air Intake louver With Birdscreen, Motorized Damper And All Associated Accessories For Ventilation system As Shown On Drawings. 2.1.3.3. Repair The Plumbing System By Installing New Electric Domestic Hot Water Heater, domestic Hot Water Recirc. Pump, Electric Water Cooler, Domestic Cold And Hot Water Piping system, Insulation, Sewer And Vent Piping System, Water Hammer Arrests, Floor Drain, Floor cleanout Including Plumbing Fixtures, And All Associated Accessories As Shown On Drawings. 2.1.4. Electrical Work 2.1.4.1. Replace Deteriorated Existing Interior/ Exterior Lighting Fixtures, Exit Lights, Toggle switches, Wires And Conduits With New. 2.1.4.2. Replace Existing Watthour Meter, Current Transformers, Panelboards, Receptacles w/cover Plates, Associated Wiring & Conduits With New. 2.1.4.3. Replace Deteriorated Existing Safety Switches, Motor Controllers, Junction Boxes, control/power Wires And Conduits For Mechanical Systems With New. 2.1.4.4. Replace Deteriorated Fire Alarm Control System With New Addressable Fire Alarm control And Mass Notification System Panel, Manual Pull Station, Smoke Detector & Relay module, Antenna, Visual/signal Strobes (15 Or 75 Candela), Microphone, Speaker (wattage As req'd) Device, Fire Alarm Building Transmitter, Antenna, Surge Protector, And Associated Wiring and Conduit. 2.1.4.5. Replace Deteriorated Existing Telecommunication System Including Telephone terminal Board, Telephone/data Outlets W/cover Plates, Terminal Blocks, Equipment Rack and Associated Wire & Conduit With New. 2.1.4.6. Replace Existing Exterior Underground Telecommunication Line, Accessories With new. 2.1.4.7. Replace Existing Exterior Power Distribution System With New Including Pad Mounted transformer. army Contract Writing System (acws) Transition Information For Offerors the Army Contracting Enterprise (ace) Is In The Process Of Deploying New Solicitation And Contract Writing Software To Army Contracting Offices Worldwide. Known As The Army Contract Writing System (acws), This Modern Software Suite Will Soon Replace Most Existing Army Contract Writing Systems, Including The System Used To Create And Release This Solicitation. during This Transition Period, Offerors Are Hereby Advised: the Contracting Office May Use Any Combination Of Contract Writing Systems To Create And Release Documents Related To This Solicitation (e.g. Solicitation Amendments And Awards, If Any). Due To This: this Solicitation May Contain Different Offer Submission Instructions Than Other Solicitations Released By The Same Contracting Office (e.g. Requiring Offer Submission Via The Piee Solicitation Module Vs. E-mail). Offerors Should Review All Offer Submission Instructions Contained In The Solicitation Documents And Direct Any Questions Or Concerns To The Contract Specialist Or Contracting Officer. if The Contracting Office Switches Contract Writing Systems Prior To Award, Documents You Receive From The Contracting Officer Or View On Sam.gov Or Other Forums May Appear Noticeably Different Than The Initial Solicitation Or Previous Solicitations Or Awards From The Same Contracting Office. This Is Normal And Expected. a Change Between Contract Writing Systems May Cause Important Information Concerning Solicitation Response (amendments) Or Accepted Terms (awards) To Take On Different Formatting Or Appear In Different Parts Of Later Documents Issued. Offerors Shall Review All Documents Carefully To Locate This Important Information And Direct Any Questions Or Concerns To The Contract Specialist Or Contracting Officer. the Government Does Not Intend To Use The Transition Between Contract Writing Systems To Effect Any Changes To Solicitation Or Award Terms And Conditions Without Accompanying Document Narratives Explicitly Stating Such Changes Are Deliberate And Desired. While The Contract Specialist And Contracting Officer Will Take Care To Minimize Or Eliminate Any Inadvertent Changes When Adapting To The New Contract Writing Software, You, As The Offeror, May Still Be The First To Spot Such Errors. Therefore, Offerors Shall: notify The Contracting Officer Immediately If Any Observed Changes, Removals, Or Additions Affect Your Award Eligibility, Violate Or Alter Existing Quote/proposal Terms, Or Could Affect Contract Performance Post-award. take Special Care To Ensure All Fill-in Clauses Are Populated And Remain Populated Across Documents Received From The Contracting Office Throughout The Solicitation And Award Process. contact The Contracting Officer Listed On The First Page Of The Solicitation Or Solicitation Amendment For Guidance If You Notice Or Suspect Any Inadvertent Change Has Occurred Between Document Issuances. the Contracting Officer Will Correct Problems Affecting Award Documents (if Any) Via Bilateral Modification, At No Cost To The Contractor. Any Such Modification Will Reconcile The Award With The Latest Version Of This Solicitation Reflecting Deliberate Action By The Contracting Officer (e.g. The First Issuance If No Amendments, Or The Latest Amendment With Accompanying Narratives), Inclusive Of Any Documented Pre-award Negotiations Or Accepted Supplemental Offer Terms. in The Unlikely Event A Network Disruption, Contract Writing System Error, Or Financial System Error Threatens Timely Award Of The Requirement Set Forth In This Solicitation, The Contracting Officer: may Elect To Use Alternative Mechanisms To Obligate Funds And Allow Work Or Deliveries To Legally Begin To The Benefit Of, And With Legal Protection For, Both Parties. will Incorporate The Latest Version Of This Solicitation Into Such Mechanisms To Serve As A Framework For Contract Execution Until Any Such System Problems Are Resolved. will Ensure Any Action Taken Does Not Conflict With The Stated Offer Evaluation And Award Methodology Of This Requirement. will Issue A Complete, Properly-formatted Award Accurately Reflecting This Requirement And All Applicable Terms And Conditions Once Systems Return To Normal.
Closing Date14 Aug 2024
Tender AmountRefer Documents 
7211-7220 of 7337 archived Tenders