Hvac Tenders

Hvac Tenders

FEDERAL BUREAU OF INVESTIGATION USA Tender

Security and Emergency Services
United States
Details: The Federal Bureau Of Investigation (fbi) Is Seeking Capability Statements From Interested Sources For The Establishment Of An Enterprise-wide Facility Operations & Maintenance (efom) Idiq Contract Vehicle. Enterprise-wide Is Defined As Any Fbi Facility/site Within The Continental United States (u.s.) And U.s. Territories. the Purpose Of This Request For Information (rfi) Will Be To Identify Sources Interested In Performing Full Facility Operations & Maintenance (o&m). Some Fbi Sites Are A Mission Critical Facility With Tier 3 Data Center. Large And Small Businesses Are Invited To Respond. Teaming Arrangements Or Joint Ventures Are Encouraged. to Be Considered As A Potential Qualified Source, An Active Defense Counterintelligence Security Agency (dcsa) Facility Clearance Level (fcl) At The Top-secret Level With Sci Eligibility Is Required At The Time Of Proposal Submission. Failure To Provide Evidence Of An Active Dd-254 Will Be Cause For Elimination From Consideration. As Per 13 Cfr 121-03(h)(4): “facility Security Clearances. A Joint Venture May Be Awarded A Contract Requiring A Facility Security Clearance Where Either The Joint Venture Itself Or The Individual Partner(s) To The Joint Venture That Will Perform The Necessary Security Work Has (have) A Facility Security Clearance.” this Rfi Is Not A Request For Proposal (rfp) Or A Promise To Issue An Rfp In The Future. this Rfi Does Not Commit The Government To Contract For Any Supply Or Service. the Fbi Is Not Seeking Proposals And Will Not Accept Unsolicited Proposals. the Fbi Will Not Pay For Any Information Or Administrative Costs Incurred In Response To This Rfi. not Responding To This Rfi Does Not Preclude Participation In Any Future Solicitation. if A Solicitation Is Released, It Will Be Synopsized On Www.sam.gov - The U.s. Government System For Award Management (sam) Website. It Is The Responsibility Of The Potential Responder To Monitor This Site For Information Pertaining To This Requirement. anticipated Period Of Performace: the Solicitation Is Anticipated To Be Released During The Summer Of 2024, With A Target Award Date Of Fall 2024. The Government Anticipates A One-month Transition Period. The Contract Duration Is Estimated To Be A Base One-year Period With Four One-year Option Periods And A 6-month Extension If Needed For A Total Of 66 Months. anticipated Contract Type: the Contract Type Being Considered Is A Firm Fixed Price Structure With The Possibility Of Incentives. anticipated Contract Vehicle: firm Fixed Price Possibly With Incentives. objective: it Is The Intent Of The Fbi To Establish A Multiple Award Indefinite Delivery, Indefinite Quantity (idiq) Contract With Companies That Specialize In Providing Facilities O&m Services For Fbi Locations That May Include A Requirement For A Mission Critical, Tier 3 Data Center Capability. This Contract Shall Be Available For Use Across Conus And U.s. Territories. The Following Are Known Locations That May Require Facility O&m In The Future: 1) Washington, Dc 2) In Virginia -quantico,vienna, Andwinchester 3) Clarksburg, West Virginia 4) Huntsville, Alabama 5) Pocatello, Idaho the Fbi Intends To Compete Subsequent Facility O&m Requirements As Task Orders Under This Idiq To Companies Selected For An Award Of The Idiq. scope: the Scope Of The Work Shall Cover All Facility O&m Services That Exist Within Various Locations Within Conus And U.s. Territories. the Contractor Shall Perform Preventive Maintenance, Corrective Maintenance And Associated Facility Operation And Maintenance Tasks To Include Building And Equipment Repairs. Contractor Shall Provide All Personnel, Equipment, Supplies, Transportation, Tools, Materials, Supervision, And Other Items And Non-personal Services Necessary To Perform Facilities Operation And Maintenance. The Work Will Be Performed On A Host Of Systems To Include Heating, Ventilation, And Air Conditioning (hvac) Systems, Cooling Towers, Condensers, Chillers, Boilers, Hydronic Piping Systems, Electric Utility Distribution Systems, Fire Alarm And Suppression Systems, Elevators And Plumbing Systems. the Fbi’s Intent Is For The Contractor To Provide Skilled Professional Facility Operations And Maintenance Services At Various Fbi Operated Leased And/or Owned Sites Around The Conus And U.s. Territories. This Contract Will Require Licensed Personnel In The Mechanical, Electrical, Plumbing, Building Controls, Carpentry, Logistics, And Critical Support Equipment Trades. Personnel Will Provide Operations, Monitoring, Repair, And Alteration Of Facilities, And Facility Systems. Some Locations Include Secure Mission Critical Tier Iii Enterprise Data Centers, Mission Critical Operations Centers, Or Central Utility Plants That Require 24/7/365 Staff On Site And May Have Elevated Experience Requirements. Individual Sites Will Define The Requirements For The Services And Positions For Each Task Order. submittal Information: responses Should Indicate This Submission Is In Response To Rfi#15f06724r0000416. submit Your Interest No Later Than 10:00am Est On 4/30/2024 To The Fbi Contracting Officer, Ms. Melissa Golicz At Mgolicz@fbi.gov And Contract Specialist Ms. Linda Patterson At Lspatterson2@fbi.gov. please Include The Following Information About Your Company For Consideration. company Name, Address, Business Size And Unique Identification Number As Registered On Www.sam.gov capabilities Statement With Two Examples Of Similar Size And Scope Of This Requirement That Supports The Contractor’s Ability To Provide Services. acknowledgement Of The Requirement For An Active Facility Clearance At Time Of Proposal Submission. address Any Concerns Or Areas That May Require Further Elaboration To Better Support The Development Of Your Proposal.
Closing Date30 Apr 2024
Tender AmountRefer Documents 

INDIAN HEALTH SERVICE USA Tender

Electrical and Electronics...+1Electrical Works
United States
Details: This Sources Sought Notice Is For The Navajo Area Indian Health Service, Tsaile Health Center Issued In Accordance With Far 5.101. The Purpose Of This Notice Is To Identify Potential Sources For Providing Chiller Unit Preventative Maintenance Services At The Tsaile Health Center. This Notice Does Not Commit The Government To Issue A Solicitation Or Make An Award Or To Prelude A Solicitation Expected To Be Issued From Closure Of Notice. tsaile Health Center Is Located In Northeast Arizona As A Part Of The Chinle Service Unit. This Ambulatory Care Center Is Situated At The Base Of The Lukachukai Mountain Rage With Local Elevations Of 7,000 To 8,000 Feet. Two Lakes Are Within 10-15 Minute Drive Which Offer Camping, Fishing, And Non-motorized Boating. description Of Services: The Contractor Shall Provide Preventative Maintenance (pm) To The Chiller Units, Access The Metasys Control, Make The Necessary Adjustment Settings, And Set Points For The (hvac) System. The Metasys System Is An Integrated Control System Designed By Johnson Controls And Is The Backbone Of The Facility. It Is A (web-ctrl) Building Of An Automation System Of A Network That Controls Heating, And Air Conditioning, Configures, Views Trends, Manages Events (alarms), And Manipulates Temperature Set Points. The System Identifies System Hardware And The Environmental Comfort Of The Facility. duration Of Requirement: 12-months Duration From Date Of Award place Of Performance: Tsaile Health Center, Navajo Route 64 & 12, Po Box C21, Tsaile, Az 86556 instructions To Industry: All Capable Parties Are Encouraged To Respond. Responses Must Directly Demonstrate The Company’s Capability, Experience, And Ability To Marshal Resources To Effectively And Efficiently Perform The Objectives Described Above. Generic Capability Statements Are Not Sufficient And Will Not Be Considered Compliant With The Requirements Of This Notice. the Government Requests Interested Parties Submit A Written Response To This Notice Which Includes: company Name. company Sam Unique Entity Identifier (uei) Number. system For Award Management (sam) Registration Status. All Respondents Must Register On The Sam Located At Http://www.sam.gov . name, Telephone Number, And E-mail Address Of A Company Point Of Contact Who Has The Authority And Knowledge To Clarify Responses With Government Representatives. date Submitted. applicable Company Gsa Schedule Number Or Other Available Procurement Vehicle. business Size Standard Of Company (i.e., Small Business, 8(a), Woman Owned, Veteran Owned, Etc.). geographic Coverage: Please Identify The Areas Of The United States Where Your Organization Provides These Services. capability Statement: Detailed Capability Statement Addressing The Company’s Qualifications And Ability To Provide The Requirements Listed Herein, With Appropriate And Specific Documentation Supporting Claims Of Recent Organizational And Staff Capability To Support This Requirement. If Significant Subcontracting Or Teaming Is Anticipated In Order To Deliver Technical Capability, Organizations Should Address The Administrative And Management Structure Of Such Arrangements. experience: Provide A List Of 3-5 Private Industry Or Government Contracts For The Same Services That You Have Performed Within The Last 3 Years. For Each Contract, Include The Company’s Point Of Contact’s Name, Email Address, Telephone Number, Dollar Value Of Contract, And Description Of The Services Provided On The Contract. The Government May Contact These Entities To Conduct Past Performance Checks. demonstrate Capacity: The Metasys System Is An Integrated Control System Designed By Johnson Controls. Tsaile Health Center System Is A (web-ctrl) Building Of An Automation System Of A Network That Controls Heating, & Air Conditioning, Configures, Views Trends, Manages Events (alarms), And Manipulates Temperature Set Points. Company Must Exhibit Ability To Adjust Settings, Set Points And Navigate Johnson Controls Metasys Intenerated Control Systems. if American Indian/native American Owned Small Business, Then Complete Attached Iee Representation Form. the Government Will Evaluate Market Information To Ascertain Potential Market Capacity To: 1) Provide Services Consistent In Scope And Scale With Those Described In This Notice And Otherwise Anticipated; 2) Secure And Apply The Full Range Of Corporate Financial, Human Capital, And Technical Resources Required To Successfully Perform Similar Requirements; And 3) Implement A Successful Project Management Plan That Includes: Compliant With Tight Program Schedules; Cost Containment: Meeting And Tracking Performance; Hiring And Retention Of Key Personnel And Risk Mitigation. disclaimer And Important Notes: This Notice Does Not Obligate The Government To Award Contract. Any Information Provided By Industry To The Government As A Result Of This Sources Sought Synopsis Is Strictly Voluntary. Responses Will Not Be Returned. No Entitlements To Payment Of Direct Or Indirect Costs Or Charges To The Government Will Arise As A Result Of Contractor Submission Of Responses, Or The Government's Use Of Such Information Or Otherwise Pay For The Information Provided In Response. The Government Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate. Any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization’s Qualifications To Perform The Work. Respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provide Feedback To Respondents With Respect To Any Information Submitted. After A Review Of The Responses Received, A Pre-solicitation Synopsis And Solicitation May Be Published On A Government Gpe. However, Responses To This Notice Will Not Be Considered Adequate Responses To A Solicitation. confidentiality: No Proprietary, Classified, Confidential, Or Sensitive Information Should Be Included In Your Response. The Government Reserves The Right To Use Any Non-proprietary Technical Information In Any Resultant Solicitation(s). Responses Must Be Submitted Via Email To The Primary Poc No Later Than Specified Closing Date. ***no Questions Will Be Accepted.*** attachments: -statement Of Work -iee Representation Form
Closing Date8 May 2024
Tender AmountRefer Documents 

AGRICULTURAL RESEARCH SERVICE USA Tender

Others
Corrigendum : Closing Date Modified
United States
Details: Amendment 0004 schedule B Has Been Updated To Schedule B - Rev. 3 - 21mar2024. the Header And Footer For Each Tab Of Schedule B May Be Changed Under Page Setup To Show Company Name, Proprietary Statement, Or Submission Date. However, The Cells May Not Be Changed. Values Should Be Input In The Highlighted Cells. the Following Question Was Received After The Rfi Due Date. However, The Government Considered It In The Best Interest Of The Government To Provide An Answer: question: Pursuant To The Pws Requirement For Journeyman Licensed Individuals, Does The Trade Staff Need To Hold A Journeyman’s Card From Their Respective Trade Halls? For Example, Would A State Epa Hvac, Or Boiler Operator Certification, Or A General Trades Journeyman License From The Current Cba Union Cover This Requirement? Alternatively, Is A Specific Trade Union (ibew, Pipefitters, Carpenters, Boilermaker) Journeyman Card Required Showing The Completion Of A Union Apprenticeship In The Trade? Does The Government Recognize Eits Cards? answer: Licensing And Qualifications Are Two Different Topics. Licensing For Boiler Operators And Refrigerant Handling Are State Level Certificates. Journeyman Qualifications Are Determined By Trade Unions Which Issue Cards To Their Members. We Are Not Requiring The Cards, But Do Expect The Tradesmen To Have Qualifications And Experience In Line With The Journeymen For The Specific Trades They Are Working In. The Current Cba Union, Teamsters 115, Does Not Provide Journeymen Cards For Mechanical And Electrical Trades, So, The Successful Contractor Will Have To Determine That The Employees Possess Adequate Qualifications And Experience To Be Described As Journeymen. (end Of Change) amendment 0003 the Due Date For Proposals Is Extended To Monday, April 8, 2024, 10:00 Am Et. schedule B Has Been Updated To Schedule B - Rev. 2 - 19mar2024. exhibit E.7 – Past Performance Questionnaire Is Hereby Implemented. If A Ppq Request Has Already Been Sent To The End-user/client, Please Resend With This Form. agar Provision 452.215-71 Has Been Updated. the Preventative Maintenance (pm) Plan Paragraph Under The Management Approach Section Of L.3.1.1 Factor 1 – Management Approach Has Been Updated. l.3.1.4 Factor 4 – Past Performance Has Been Updated. the Preventative Maintenance (pm) Plan Paragraph Under M.4.1 Factor 1, Management Approach Has Been Updated. questions And Answers 1 Through 78 Have Been Implemented Into The Solicitation. (end Of Change) pre-proposal Conference pre-proposal Conference Minutes, Slides, And Recording Have Been Added To Attachments. (end Of Change) amendment 0002 questions And Answers 1 Through 11 Have Been Implemented Into The Solicitation. (end Of Change) amendment 0001 the Date Of The Pre-proposal Conference Specified In Agar Provision 452.237-71 Is Hereby Changed To Thursday, March 7, 2024. Time And Location Are Unchanged. (end Of Change) this Is A Request For Proposal Prepared In Accordance With The Format Pursuant To Far Part 15, Supplemented With Additional Information Included In This Notice. The Solicitation Number Is 12305b24r0014 And Incorporates Those Provisions And Clauses In Effect Through Federal Acquisition Circular 2024-02. requirement Information scope: Operation And Maintenance Support Services location: Wyndmoor, Pa a Pre-proposal Conference Will Be Conducted As Follows: date: Thursday, March 7, 2024 time: 9:00 Am Eastern Time location: Microsoft Team Meeting -https://teams.microsoft.com/l/meetup-join/19%3ameeting_ywexmdyzmzmtmdu5zi00m2m2lthhmwmtntk0yza4zjcynzm3%40thread.v2/0?context=%7b%22tid%22%3a%22ed5b36e7-01ee-4ebc-867e-e03cfa0d4697%22%2c%22oid%22%3a%2235ace42a-71ed-40ef-a0ce-6139175d7f1a%22%7d a Site Visit Will Be Conducted As Follows: date: Monday, March 11, 2024 time: 9:00 Am Eastern Time location: Eastern Regional Research Center 600 East Mermaid Lane wyndmoor, Pa 19038 if You Wish To Attend The Site Visit, Please Send An Email To Roger.ammons@usda.gov, Neil.goldberg@usda.gov, And Timothy.toal@usda.gov With The Title “12305b24r0014 Site Visit Registration” With The Attendee Name(s), Along With Company Information. Contractors Must Be Registered To Attend The Site Visit. If Contractors Are Not Registered, They Will Not Be Permitted On The Site Visit. The Site Visit Registration Deadline Is March 8, 2024, At 9:00 Am Et, Any Registration Request Received After The Deadline Will Not Be Accepted. north American Industry Classification System Code: (naics): 561210 small Business Size Standard: $47m any Amendment And Documents Related To This Procurement Will Be Available Electronically Via The Government Point Of Entry (www.sam.gov). Failure To Provide The Required Information In The Requested Format May Result In Proposals Not Being Considered For Award. Reference Attachments For Additional Information.
Closing Date8 Apr 2024
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Others
Corrigendum : Closing Date Modified
United States
Details: **amendment 0008 Issued To Update Sol. Provisions, And Upload Revised Price Breakout File.** **amendment 0007 Issued To Extend The Due Date, Update Pla Language And Update Sow. Projnet Is Opened Back Up. ** **amendment 0006 Issued To Extend The Due Date For Proposal Submission.** **amendment 0005 Issued To Clarify Items Based On Inquiries Received, Update The Price Breakout And Extend Proposal Due Date.** *amendment 0004 Issued To Clarify Items Based On Inquiries Received And To Add A Price Breakout For Clin 0002.* *amendment 0003 Issued To Clarify Solicitation Provisions Based On Inquiries Received.* *amendment 0002 Issued To Post The Site Visit Attendance Sheet* *amendment 0001 Issued To Post The Justification And Approval Document For Hvac Chillers.* See Attached Documents. The U.s. Army Corps Of Engineers, Wilmington District, Is Soliciting For Construction Of Carbon Net Zero Barracks Located At Smoke Bomb Hill, Fort Liberty, North Carolina. The Project Will Consist Of A Standard Design, Permanent Party (pp) Unaccompanied Housing (uh), Junior Enlisted And Junior Noncommissioned Officer (nco) Facility. The Army Standard Design, Updated November Of 2021, Will Be The Basis Of The Design For Interior Features, To Include Floor Plans For Living Areas (e.g. Bedroom, Bath And Kitchen), Dayrooms, Fitness Rooms, Expanded Vending Areas As Well As Outdoor Areas For Sport, Fitness And Socialization. The Facility Will Provide Spaces For 146 Personnel (pn). Each Dwelling Unit Will Consist Of Sleeping Rooms With Walk-in Closets, A Bathroom With Adjacent Vanity Rooms, A Common Kitchen And Common Living Area. Common Areas Include A Dayroom, Entry Lobby With Visitors Waiting Area, Charge Of Quarters (cq) Station, Fitness Room, Vending Area, Laundry Rooms, Mechanical, Electrical And Communications Spaces, An Elevator, Corridors, Stairwells, Janitor Closet, Storage, And A Boot Wash And Ta-50 Equipment Cleaning Area. Access For Individuals With Disabilities Will Be Provided. Fire Life Safety (fls) Systems And Utility Control Systems (umcs) Will Also Be Included. Supporting Facilities Include Utilities, Storm Drainage, Paving, Walks, Curbs And Gutters, Parking, Landscaping And Site Improvements. This Building Is Being Designed As A Carbon Net Zero Facility. The Net Zero Goals For This Project Include Passive Energy Conservation (reduction Of Heating And Cooling Demands), Active Energy Conservation (optimized Performance), Full Electrification Of Standard Building Operations, Sustainable Materials (using Materials And Products With Low Global Warming Potential). The Project Will Be Designed To Net Zero Greenhouse Gas Emissions. A Department Of Defense (dod) Net Zero Emissions Building Is An Efficient, All Electric Building That Is Designed And Operated So Scope 1 (direct Emissions From Owned Or Controlled Sources) And Scope 2 (indirect Emissions From The Generation Of Purchased Energy) Green House Gas (ghg) Emissions From All Facility Energy Use Equal Zero On An Annual Basis, Assuming It Is Able To Be Connected To On-site Renewable Energy Or A Regional Grid That Provides 100 Percent Carbon-free Electricity (cfe) On A Net Annual Basis. The Contract Issued Will Be Both A Firm Fixed Price (ffp) And Fixed-price Incentive (fpi(s)) Type Using A One-time Deviation For Integrated Design And Construction (idac) Of The Fixed Priced Incentive (successive Targets) Clause. The Base Requirement To Perform Pre-construction Services Will Be Ffp. The Option To Construction Will Be Fpi(s) Until Exercised ? It Will Convert To Ffp At That Time. The North American Industry Classification System (naics) Code Is 236220 ? Commercial And Institutional Building Construction And The Size Standard Is $45,000,000.00. The Magnitude Of Construction Of This Project Is Between $50,000,000 And $100,000,000. Offerors Shall Submit An Offer Subject To Project Labor Agreement (pla) Requirements In Accordance With Far 22.504, General Requirements For Project Labor Agreements. Any Pla Reached Pursuant To The Pla Requirements In The Solicitation Does Not Change The Terms Of The Contract Or Provide For Any Price Adjustment By The Government. This Solicitation Is Unrestricted. It Is The Governments Intent To Award A Single Contract Using The Idac Delivery Method. Any Award Made From The Upcoming Solicitation Will Be In Accordance With The Best Value Tradeoff (bvto) Source Selection Process. Offerors Must Be Registered In The System For Award Management (sam) To Be Eligible For An Award From Any Government Solicitation. Call 1-866-606-8220 For More Information Or Visit The Sam Website Athttp://www.sam.gov. After Completing Sam, To Download Documents Contractors And Their Subcontractors Must Register At Https://sam.gov/. To Locate Solicitation, Contractors Can Go To The Https://sam.gov/ Website And Search For The Solicitation Number Under Contract Opportunities. Contractors Can Register To Be Put On An Interested Vendors List That Others Can Access Through The Https://sam.gov/ Site. It Is The Offerors Responsibility To Check The Internet Address Provided As Necessary For Any Posted Changes To This Solicitation And All Amendments. For Additional Information Or Assistance, Please Contact Mrs. Karri L. Mares, Contract Specialist At Email Karri.l.mares@usace.army.mil, Or Contracting Officer, Mr. John T.c. Hill, Email John.t.hill@usace.army.mil. Contracting Office Address: U.s. Army Corps Of Engineers Wilmington District, Cesaw-ct-m,69 Darlington Ave Wilmington, North Carolina 28403-1343 United States
Closing Date24 Oct 2024
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: Page 4 Of 15 page 1 Of 12 subject* critical Air Monitoring general Information contracting Office S Zip Code* 33637 solicitation Number* 36c24825q0046 response Date/time/zone 10-25-2024 1600 Eastern Time, New York, Usa archive 90 Days After The Response Date recovery Act Funds n set-aside product Service Code* h941 naics Code* 541990 contracting Office Address department Of Veterans Affairs network Contracting Office 8 (nco 8) 8875 Hidden River Pkwy Suite 525 tampa Fl 33637 point Of Contact* contracting Officer j'vonne Wilson jvonne.wilson@va.gov 813-816-4620 place Of Performance address department Of Veteran's Affairs james A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd. tampa Fl postal Code 33612 additional Information agency S Url https://www.va.gov url Description department Of Veteran's Affairs agency Contact S Email Address jvonne.wilson@va.gov the Network Contracting Office 8 (nco 8) Is Seeking Service-disabled Veteran-owned Small Businesses (sdvosbs), Veteran-owned Small Businesses (vosbs) And All Other Small Businesses (sbs) Vendors, With Resources And Capabilities To Provide Support Maintenance For Critical Air Monitoring, To Our Mission Critical Facilities. Contractor Shall Provide All Labor, Material, And Equipment Required To Test Environmental Conditions Of Critical And Non-critical Spaces At The James A. Haley Va Medical Center, 13000 Bruce B. Downs Blvd., Tampa, Florida 33612, And The Primary Care Annex, 13515 Lake Terrace Lane, Tampa, Florida 33637. Environmental Conditions Of Critical Spaces Include Temperature (f), Humidity (%rh), Supply Air (cfm), Return/exhaust (cfm), And Air Changes Per Hour (ach) Shall Be Recorded And Certified. Contractor Shall Provide All Labor And Materials To Change Bag-in-bag-out Hepa Filters At The James A Haley Va Medical Center Main Campus, And To Test, Calibrate And Certify, Eight Iso 5 Biological Hoods At Buildings 1, 2, 38, And 100, Per The Performance Work Statement (pws). the Anticipated Period Of Performance Is A Base Year And 4 One-year Option Years. the Applicable Naics For This Service Is: 541990, All Other Professional, Scientific And Technical Services; Product Service Code: H941, Other Quality Control, Testing, And Inspection, Refrigeration, Air Conditioning, And Air Circulating Equipment; And Size Standard: $19.5 Million. vendors Must Be Registered In The System For Award Management Sam.gov | Home Prior To Award. disclaimer This Sources Sought Announcement Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Announcement That Is Marked As Proprietary Will Be Handled Accordingly. In Accordance With Far 15.201(e), Responses To This Announcement Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. responders Are Solely Responsible For All Expenses Associated With Responding To This Announcement. All Information Submitted In Response To This Announcement Is Voluntary; The Government Will Not Pay For Information Requested Nor Will It Compensate Any Respondent For Any Cost Incurred In Developing Information Provided To The Government. draft page 11 Of 11 performance Work Statement air Monitoring Of Critical And Non-critical Rooms, bag In Bag Out Hepa Filter Change title Of Project: Service And Maintenance Of All Critical And Non-critical Spaces Located At Two Facilities, 1) A. Haley Veterans Administration Medical Center (jahvamc) Bldgs.1,38 On Main Hospital Campus, 13000 Bruce B. Downs Blvd Tampa Fl, 2) Primary Care Annex (pca Bldg. # 814) 13515 Lake Terrace Lane Tampa, Fl 8 Dental Rooms. scope Of Work: the Contractor Shall Provide All Labor, Material, And Equipment Required To Test Environmental Conditions Of Critical And Non-critical Spaces At The James A. Hailey Va Main Hospital And The Primary Care Annex. Environmental Conditions Of Critical Spaces Include Temperature (f), Humidity (%rh), Supply Air (cfm), Return/exhaust (cfm), And Air Changes Per Hour (ach) Shall Be Recorded And Certified. Contractor Will Provide All Labor And Materials To Change Bag In Bag Out Hepa Filters At The James A Haley Va Main Campus Including Bldg. 1, Bldg.38, Bldg.2, Bldg.100.contractor Shall Test, Calibrate And Certify 8 Iso 5 Biological Hoods Located The James A Haley Va Main Campus Including Bldg. 1, Bldg.38, Bldg.2, Bldg.100. General Requirements: Air Monitoring there Are Currently 106 Rooms On Attachment A (critical Rooms) And 139 Rooms On Attachment B (non-critical) Soiled, Clean And Pyxis Rooms. critical Rooms Will Be Checked Bi-annually And Annually For Non-critical Rooms. All Rooms Will Be Checked According To Requirements Below. contractor Shall Determine All Critical And Non-critical Space Dimensions. space Volume Calculated, And Calculated Space Volumes Shall Be Used In Calculating Air Changes Per Hour (ach) For Each Critical Space. based On Actual Data The Contractor Shall Validate That Room Pressure Relationships, Room Air Changes, Actual Space Temperatures, And Humidity Meet The Requirements Of The Hvac Design Manual New, Replacement, Addition, And Renovation Of Existing Va Facilities, 2017 Edition. Testing Will Be Done Semi-annual On Critical And Annually On Non-critical. Rooms contractor Shall Submit A Written Report No Later Than 15 Days After Testing And Shall Submit Copies Of Daily Reports And At That Time Also Report Any Existence Or The Development Of Any Defects In Equipment. The Report Shall Include All Environmental Data, Calculated Air Changes, And Notification Of Any Deficiencies Where Testing Data Or Calculated Results Did Not Meet The Requirements Of The Hvac Va Design Manual 2017. contractor Shall Submit Template Report. The Cor Has Final Approval Of This Report. contractor Shall Place Hvac Design Manual 2017 Information At The Bottom Of Each Report. contractor Shall Provide Sticker With Date Inspected With Inspector S Initials To Be Placed In Each Room Inspected. contractor Shall Use The Va Hvac Design Guide For Patient Negative Isolation Rooms, Operating Rooms, And Procedure Rooms. Contractor Shall Use Usp 800 For The Iv Pharmacy Rooms. contractor And Technicians Shall Be Certified With Associated Air Balance Council (aabc) And Or The National Environmental Balancing Board (nebb) general Requirements: Biological Iso 5 Lab Hoods all Iso 5 Biological Hoods Will Be Tested Semi-annually. Based On Actual Data, The Contractor Shall, According To Requirements Of Nsf/ansi 49-annex F And Manufactures, Validate Air Velocity, Filters, Site Assessment, Worker Comfort And Calibrate All Alarms. contractor Shall Submit A Written Report On Iso 5 Biological Hoods No Later Than 5 Days After Testing And Shall Submit Copies Of Daily Reports, Also Report Any Existence Or The Development Of Any Defects In Equipment. The Report Shall Include All Items Listed In Sections Above And Notification Of Any Deficiencies Where Testing Data Or Calculated Results Did Not Meet The Requirements Of Nsf/ansi 49-annex F And Manufactures. all Iso 5 Biological Hoods Will Be Tested Semi-annually With Coordination Of contractor Shall Submit Template Copy Of Report To Cor For Approval. This Report Is Subject To Approval By The Cor. contractor Shall Place Nsf/ansi 49-annex F And Manufactures Information At The Bottom Of Each Report. contractor Shall Provide Certified Sticker With Date Inspected With Inspector S Initials To Be Placed On Each Hood As Inspected. contractor And Technicians Shall Be Certified With United States Pharmacopeia (usp), National Environmental Balancing Bureau (nebb), National Sanitation Foundation (nsf), Controlled Environmental Testing Association (ceta), Institute Of Environmental Sciences And Testing (iest) general Requirements: Hepa Filter Change contractor Shall Sanitize Filter Boxes And Change Filters According To Manufactures Recommendations On 44 Currently Installed Bag In Bag Out Hepa Filter Boxes. Each Filter Shall Be Changed Annually. Boxes Are Located On Several Roofs. Scheduled Maintenance: the Contractor Must Perform Annual Air Monitoring On Non-critical Rooms And Semi-annual Air Monitoring On Critical Rooms To Ensure The Rooms Listed In The Contract Are Completely Operational And Tested. Contractor Shall Test, Calibrate, And Certify All Iso 5 Biohoods Semi-annually. the Contractor Must Make A Thorough Air Study Of The Rooms Covered In The Contract. Within Forty-five (45) Days After Award Of Contract, the Contractor Must Submit A Schedule And Checklist For How The Air Study Will Be Conducted Describing In Detail The Procedures For Testing Each Room. contractor Shall Submit Copies Of All Rooms Completed Each Day To The Cor. Indicating The Room Worked Is Performed And Actual Values Obtained. Contractor Shall Report Any Rooms That Failed Testing. testing Services Must Be Performed In Accordance With And During The Hours Defined In This Pws. all Exceptions To The Schedule Must Be Arranged And Approved In Advance With The Cor. all Parts, Manuals, Tools, Or Software Required To Successfully Complete Scheduled Tests Are To Be Provided By The Contractor. the Contract Will Include _106__ Critical And _139__non-critical Rooms. A Mutually Agreeable Time For The Testing Will Be Scheduled Through The Cor. the Following Summarizes 245 Critical Spaces And Non- Critical And The Required Frequency Of Testing Included In This Service Contract. See Attachments A And B For Detail List. critical Rooms frequency Of Testing quantity Of Rooms negative Pressure Rooms semi-annual 56 or Surgical Proceedure Rooms semi-annual 20 special Procedure Rooms semi-annual 20 supply Processing And Distribution (sps) semi-annual 10 non-critical Rooms frequency Of Testing quantity Of Rooms soiled Storage, Clean Storage, Pyxis Rooms annual 139 total Spaces 245 biological Hoods bldg. room # tb room Type service usage mfg. model unit # semi Annual Lab Hood Certifications total Number Of Rooms 8 â  â  â  â  1 1d-195h â  dna laboratory biological nuaire nu-425-400-30 116027070307 1 1d-195h â  dna laboratory biological nuaire nu-425-400-30 116083070907 1 1d-195h â  dna laboratory biological nuaire nu-425-400-30 116020070307 1 1d-196 micro laboratory biological nuaire nu-425-600-30 115703061407 1 1d-196h â  afb laboratory biological nuaire nu-425-600-30 116015070207 1 1d-196h afb laboratory biological nuaire nu-425-600-30 115991062907 1 1d-185 cytology laboratory biological nuaire nu-425-600-30 116075070507 1 2d-270 â  dna or biological nuaire Reporting Requirements: the Contractor Must Report To The Engineering/ac Shop Building 1, 13000 Bruce B Downs Tampa, Florida 33612. During Normal Working Hours And Contact The Cor At 813-972-2000 Ext. 5271, And After Hours Contact The Central Energy Plant Operator At Ext. 7080. Contractor Is Responsible For Providing Reports To The Cor With Fifteen (15) Working Days After Completion Of Service. coordination: the Contracting Officer Representative (cor) Will Assist The Contractor In Scheduling The Testing With The Various Service Lines To Minimize The Disruption To Patient Care. The Ac Shop Will Provide An Ac Mechanic To Escort The Contractor Into The Critical Spaces When Needed. working Hours: contractor Shall Provide A Certified Technician(s) During Normal, After-hours And On Weekends To Minimize Disruption Of Patient Care. Normal Business Hours Are Defined As 8a.m. To 4:30p.m. After Hours Are Defined As 4:30p.m. To 12:00a.m. And 12:00a.m. To 8:00a.m. Weekends Can Be Scheduled As Either Normal Or After Hours . Some Room May Be Occupied By Patients And Need To Be Rescheduled; Contractor Will Need To Coordinate With The Cor. federal Holidays Observed By The Veterans Administration Are Listed Below And Revised To Include Any Other Day Specifically Declared By The President Of The United States To Be A National Holiday: national Holidays, Observed By The Federal Government Are: new Year S Day January 1 martin Luther King S Birthday .3rd Monday In January president S Day .3rd Monday In February memorial Day Last Monday In May juneteenth National Independence Day June 19th independence Day ...july 4th labor Day 1st Monday In September columbus Day 2nd Monday In October veteran S Day November 11 thanksgiving Day ...last Thursday In November christmas Day ........december 25 reporting Requirements: the Contractor Must Report To The Engineering/ac Shop Building 1, 13000 Bruce B Downs Tampa, Florida 33612. During Normal Working Hours Contact The Cor At 813-972-2000 Ext. 5271, And After Hours Contact The Central Energy Plant Operator At Ext. 7080. Contractor Is Responsible For Providing Reports To The Cor With Fifteen (15) Working Days After Completion Of Service. appropriate Dress: contractors Shall Comply With The Dress Requirements Of The Area In Which The Work Is To Be Performed. In Certain Areas This Requirement Includes Coveralls, Shoe Covers, Hair Covering For Example. Area Representatives Can Provide Specific Information For The Areas If The Requirements Are Not Posted. clean Up: the Work Area And Area Surrounding Equipment Shall Be Free Of Wires, Tools, Debris, Parts, And Chemicals At The Conclusion Of Each Area Visited. All Work Areas Shall Remain Free Of Hazards And Obstructions During Testing To Provide A Safe Environment For Staff And Patients And Technician Workers. compliance: contractor Is 100% Responsible For Compliance With All Veterans Administration (va), Local, State, And Federal Environmental/occupational Safety Laws, Rules, And Regulations. The Contractor Must Follow Life Safety Codes And Take Necessary Actions To Avoid Conditions That May Be Hazardous To Health And Safety Of Hospital Personnel And Patients. The Contractor Is Responsible For Meeting All Applicable Osha And Va Guidelines For Safe Working Processes To Include All Upgrades/updates. Qualifications: All Contractor Employees Under This Contract Are Required To Complete: contractors Must Provide Signed Certifications Of Completion To The Cor During Each year Of The Contract. This Requirement Is In Addition To Any Other Training That May Be Required Of The Contractor. contractor Must Have An Established Business With An Office And Full-time Staff. contractor Staff Includes A Fully Qualified Field Technician And A Fully Qualified Technician Who Will Serve As Backup. 1. Fully Qualified Is Based Upon Training And On Experience In The Field. for Training, The Technician(s) Has Successfully Completed A Formalized Training Program, For The Equipment For Field Experience. 2. The Technician(s) Has A Minimum Of Two Years Experience, With Respect To Scheduled Air Studies And Air Surveys. 3. The Technician(s) Must Be Authorized By The Contractor To Perform Testing As Required. e. The Contractor May Be Required To Provide Written Assurance Of The Competency Of Their Personnel And List Of Credentials Of Approved Technician(s) For Services Under This Pws. the Cor May Authenticate The Training Requirements, Request Training Certificates Or Credentials From The Contractor At Any Time For Any Personnel Who Are Testing Any Va Rooms. the Cor Specifically Reserves The Right To Stop Work To Any Of The Contractor S Personnel In Case Of Safety. contractor And Technicians Shall Be Certified With The Associated Air Balance (aabc) And/or The National Environmental Balancing Board (nebb) contractor Must Exhibit At Least Two Years (2) Successful Experience And/or Operation In The Industry, For Conducting Test And Balance Of Air And Hvac Systems. contractor Must Provide The Osha Certificates For The Technician (10 Hour) And For The Supervisor/superintendent (30 Hour) Certificate To The Cor. Contractor Employee Identification: Contractor Employees Must Be Clearly Identified As Contractors (not Va Employees) When Performing Services Under This Contract. This Includes Visual (appearance), Verbal (phone), And Electronic (email). The Contractor Must Provide All Employees With A Contractor Identification (id) Badge At The Contractor S Expense Prior To Performing Work Under This Contract. Contractor Employees Are Required To Always Display This Badge When Performing Services Under This Contract. Employees Released From Service By The Contractor Must Have Their Badge Collected By The Contractor. All Badges Must Contain An Expiration Date And Photograph Of The Employee. Contractor Employees Must Also Be Required To Wear Va Issued Badges And Must Always Display These Badges While In The Performance Of This Contract And/or As Instructed By The Cor. contractor Employee Conduct: the Contractor Is Completely Responsible For All Actions And Conduct Of Their Employees. Contractor Employees Must Be Well-groomed And Neat In Appearance. Contract Employees Must Be Professional In Attire And Must Not Wear Any Offensive Clothing. Contractor Employees Must Conduct Themselves In A Socially Acceptable Manner Appropriate For An Office Work Environment. Loudness, Vulgarity, Rudeness, Or Other Similar Offensive Conduct By A Contractor Employee May Be Grounds For Denying The Employee Further Access To Va Premises. Contractor Employees Must Not Consume Alcohol Or Illegal Drugs During Working Hours Or At Any Other Time The Employees Are Performing Work Under This Contract. h. Performance Requirements Summary: the Equipment Shall Be Operable And Available For Use 95% Of The Normal Operating Hours Of The Equipment. Downtime Will Be Computed From Notification Of Problem During Normal Work Hours. Scheduled Maintenance Will Be Excluded From Downtime. (normal Work Hours Are 7:30 Am- 4:30 Pm, Monday Thru Friday, Excluding National Holidays). Operational Uptime Will Be Computed During A Month- Long Time- Period. Repeated Failure To Meet This Requirement Can Subject The Contractor To Default Action. task performance Standards acceptable Quality Levels methods Of Surveillance incentive the Contractor Shall perform Air Monitoring For Positive And Negative Pressure Rooms only Qualified And certified For The specific Test The technicians Shall perform 100% (no Deviation) government To receive A Copy Of The technicians certifications payment Only For Properly Performed Services. per 52-212-4 (a): Reperformance Of Service And No Increase In Contract Price, And A Potential Reduction In Contract Price. the Contractor Shall ensure That Only Oem (new) Parts For The equipment Is Used To make The Any/all necessary And Scheduled work To Equipment. contractor Is In Compliance With 100 Percent Of The Time. only Equipment oem Parts Used To service And Repair apparatus. 100% (no Deviation) government To obtain Warranty and/or Inspect Parts before Being replaced. payment Only For Properly Performed Services. per 52-212-4 (a): Reperformance Of Service And No Increase In Contract Price, And A Potential Reduction In Contract Price call Back And Emergency Response Services on-call Repairs Are emergency Repairs beyond The Scheduled maintenance. contractor Is In Compliance With Qcp 100 Percent Of The Time the Contractor Shall respond To A Call Within One (1) Hour And be At The Job Site within Four (4) Hours during Regular working Hours, And be On-site For emergency Repair within 24-hour notice 100% (no Deviation) Within 1 Hour Of Va Notification To Contractor service Technician monitors And Reports to Cor. payment Only For Properly Performed Services. per 52-212-4 (a): Reperformance Of Service And No Increase In Contract Price, And A Potential Reduction In Contract Price the Contractor Shall perform Preventive maintenance (pm), in Accordance With The manufacturer specifications. provides Services with All records/reports Of services Performed within A Timely manner Forty-eight (48) Hours. 99% Provide service record/report For every Item serviced. government Receipt of Reports In A Timely manner. failure Affects Performance Evaluations And Increases Potential Regulatory Violations And Legal Liabilities. per 52-212-4 (a): Reperformance Of Service And No Increase In Contract Price. Potential Reduction In Contract Price. with No Sensitive Data But Requires Training va Information And Information System Security/privacy Language va Information Custodial Language: a. Contractors, Contractor Personnel, Subcontractors, And Subcontractor Personnel Shall Be Subject To The Same Federal Laws, Regulations, Standards, And Va Directives And Handbooks As Va And Va Personnel Regarding Information And Information System Security. b. If Va Determines That The Contractor Has Violated Any Of The Information Confidentiality, Privacy, And Security Provisions Of The Contract, It Shall Be Sufficient Grounds For Va To Withhold Payment To The Contractor Or Third Party Or Terminate The Contract For Default Or Terminate For Cause Under Federal Acquisition Regulation (far) Part 12. c. A Contractor/subcontractor Shall Request Logical (technical) Or Physical Access To Va Information And Va Information Systems For Their Employees, Subcontractors, And Affiliates Only To The Extent Necessary To Perform The Services Specified In The Contract, Agreement, Or Task Order. d. All Contractors, Subcontractors, And Third-party Servicers And Associates Working With Va Information Are Subject To The Same Investigative Requirements As Those Of Va Appointees Or Employees Who Have Access To The Same Types Of Information. The Level And Process Of Background Security Investigations For Contractors Must Be In Accordance With Va Directive And Handbook 0710, Personnel Suitability And Security Program. The Office For Operations, Security, And Preparedness Is Responsible For These Policies And Procedures. security Incident Investigation: a. The Term Security Incident Means An Event That Has, Or Could Have, Resulted In Unauthorized Access To, Loss Or Damage To Va Assets, Or Sensitive Information, Or An Action That Breaches Va Security Procedures. The Contractor/subcontractor Shall Immediately Notify The Cor And Simultaneously, The Designated Iso And Privacy Officer For The Contract Of Any Known Or Suspected Security/privacy Incidents, Or Any Unauthorized Disclosure Of Sensitive Information, Including That Contained In System(s) To Which The Contractor/subcontractor Has Access. b. To The Extent Known By The Contractor/subcontractor, The Contractor/subcontractor S Notice To Va Shall Identify The Information Involved, The Circumstances Surrounding The Incident (including To Whom, How, When, And Where The Va Information Or Assets Were Placed At Risk Or Compromised), And Any Other Information That The Contractor/subcontractor Considers Relevant. c. With Respect To Unsecured Protected Health Information, The Business Associate Is Deemed To Have Discovered A Data Breach When The Business Associate Knew Or Should Have Known Of A Breach Of Such Information. Upon Discovery, The Business Associate Must Notify The Covered Entity Of The Breach. Notifications Need To Be Made In Accordance With The Executed Business Associate Agreement. d. In Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig And Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va Information, Obtain Monetary Or Other Compensation From A Third Party For Damages Arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From, Or Related To, The Incident. liquidated Damages For Data Breach: a. Consistent With The Requirements Of 38 U.s.c. §5725, A Contract May Require Access To Sensitive Personal Information. If So, The Contractor Is Liable To Va For Liquidated Damages In The Event Of A Data Breach Or Privacy Incident Involving Any Spi The Contractor/subcontractor Processes Or Maintains Under This Contract. b. The Contractor/subcontractor Shall Provide Notice To Va Of A Security Incident As Set Forth In The Security Incident Investigation Section Above. Upon Such Notification, Va Must Secure From A Non-department Entity Or The Va Office Of Inspector General An Independent Risk Analysis Of The Data Breach To Determine The Level Of Risk Associated With The Data Breach For The Potential Misuse Of Any Sensitive Personal Information Involved In The Data Breach. The Term 'data Breach' Means The Loss, Theft, Or Other Unauthorized Access, Or Any Access Other Than That Incidental To The Scope Of Employment, To Data Containing Sensitive Personal Information, In Electronic Or Printed Form, That Results In The Potential Compromise Of The Confidentiality Or Integrity Of The Data. Contractor Shall Fully Cooperate With The Entity Performing The Risk Analysis. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination. security Controls Compliance Testing : on A Periodic Basis, Va, Including The Office Of Inspector General, Reserves The Right To Evaluate Any Or All The Security Controls And Privacy Practices Implemented By The Contractor Under The Clauses Contained Within The Contract. With 10 Working-day S Notice, At The Request Of The Government, The Contractor Must Fully Cooperate And Assist In A Government-sponsored Security Controls Assessment At Each Location Wherein Va Information Is Processed Or Stored, Or Information Systems Are Developed, Operated, Maintained, Or Used On Behalf Of Va, Including Those Initiated By The Office Of Inspector General. The Government May Conduct A Security Control Assessment On Shorter Notice (to Include Unannounced Assessments) As Determined By Va In The Event Of A Security Incident Or At Any Other Time. training: a. All Contractor Employees And Subcontractor Employees Requiring Access To Va Information And Va Information Systems Shall Complete Va Privacy And Information Security Awareness And Rules Of Behavior Training Before Being Granted Access To Va Information And Its Systems. (1) Sign And Acknowledge (either Manually Or Electronically) Understanding Of And Responsibilities For Compliance With The Rules Of Behavior Before Being Granted Access To Va Information And Its Systems. b. The Contractor Shall Provide To The Contracting Officer And/or The Cor A Copy Of The Training Certificates And Certification Of Signing The Rules Of Behavior For Each Applicable Employee Within 1 Week Of The Initiation Of The Contract And Annually Thereafter, As Required. c. Failure To Complete The Mandatory Annual Training And Sign The Rules Of Behavior Annually, Within The Timeframe Required, Is Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Training And Documents Are Complete. the Certification And Accreditation (c&a) Requirements Do Not Apply And A Security Accreditation Package Is Not Required For This Pws. important Information: The Government Is Not Obligated To Nor Will It Pay For Or Reimburse Any Costs Associated With Responding To This Sources Sought Synopsis Request. This Notice Shall Not Be Construed As A Commitment By The Government To Issue A Solicitation Or Ultimately Award A Contract, Nor Does It Restrict The Government To A Particular Acquisition Approach. The Government Will In No Way Be Bound To This Information If Any Solicitation Is Issued. Any Offeror Capable Of Providing This Service Shall Notify The Contracting Officer By Email Within Seven (7) Calendar Days From The Date Of The Publication Of This Special Notice. *responses Shall Be Sent Via Email To Jvonne.wilson@va.gov, No Later Than 4:00 Pm Est On 10/25/2024. Sent All Questions About This Notice To Jvonne.wilson@va.gov, The Title Of The Email Shall Read Critical Air Monitoring . see Attached Document: Attachment A - Respondent Requirements.
Closing Date25 Oct 2024
Tender AmountRefer Documents 

Ministry Of The Interior SGAMI SUD WEST Bordeaux DAGF BCP 33041 Bordeaux Tender

Civil And Construction...+2Others, Security and Emergency Services
France
Details: Sgami33-2024-14-tx: Works contract relating to the partitioning and improvement of the security of the premises of the Limoges police headquarters (87). - Lot 1: Plastering, Painting, Flooring, Suspended Ceiling - Interior Carpentry. - Lot 2: Electricity - HVAC. - Lot 3: Global Security Solution.
Closing Date30 Apr 2024
Tender AmountRefer Documents 

National Veterinary School Of Alfort Tender

France
Details: Maintenance of Heating, Ventilation, Air Conditioning and Sanitary Plumbing Installations of Enva - Maisons-Alfort Site The purpose of this contract is the operation, operation and maintenance of HVAC and sanitary plumbing installations, as well as the services Associés.ce Operation and Maintenance Contract for Air Conditioning Installations Includes an Energy Performance Clause.
Closing Date31 Jan 2024
Tender AmountRefer Documents 

Factory of AGGL TOULOUSAINE Tender

Civil And Construction...+1Civil Works Others
France
Details: This contract is awarded as part of the operation for the construction of the Atelier Daturas garage on line C of the Toulouse metro. It concerns the execution of building work services. More specifically, it concerns services relating to: - To carry out lifting devices - To carry out Cfo Cfa works - To carry out HVAC Plumbing works This contract is awarded as part of the operation for the construction of the Daturas Workshop Garage of Line C of the Metro From Toulouse.it Concerns The Execution Of Building Work Services.More Particularly It Concerns Services Relating To:- The Carrying Out Of Elevating Devices- The Carrying Out Of Cfo Cfa Works- The Carrying Out Of HVAC Plumbing Work
Closing Date6 Feb 2024
Tender AmountRefer Documents 

Social ministries (health, work, youth and sports) - FRANCE TRAVAIL DSI (93100 - MONTREUIL) Tender

Electrical and Electronics...+1Electrical Works
France
Details: The purpose of this contract is to entrust the Holder(s) with the work necessary to replace the 2x2 inverters as well as HVAC adaptation work (air conditioning, ventilation, heating) on the Data Center of the Systems Department site France Travail Information Located in Orléans, at La Chapelle-Saint-Mesmin (45).
Closing Date21 May 2024
Tender AmountRefer Documents 

Elering AS - ESTONIA Tender

Estonia
Details: Elering As Acquires Estlink 1 Control And Cooling System Room Hvac System Refrigeration Equipment (two pieces). The scope of the project envisages the dismantling and disposal of existing refrigeration equipment (2 units), supply, installation, configuration, testing and connection of new refrigeration equipment (2 units) to the existing system.
Closing Date22 Jan 2024
Tender AmountRefer Documents 
7051-7060 of 7379 archived Tenders